# 17th Street Canal — floodwall failure and reevaluation

Case reference year: 2005 | Location: New Orleans, Louisiana, United States

Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Reconcile competing ground-model and wall-loading assumptions, then propose a monitored remediation concept.

### Inputs to assemble

- Extract a published cross section and the laboratory/field-test evidence for foundation strength.
- Identify canal water levels, wall embedment and alternative assumptions for a water-filled gap.

### Deliverables

- Compare effective-stress/undrained equilibrium cases and sensitivity to weak layers.
- Develop a remediation alternatives assessment and a verification investigation.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

USACE publishes reevaluation material and later remediation decisions. The record distinguishes the original I-wall problem from subsequent protection measures.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — partial

The reevaluation and remediation decisions are linked; complete as-built records for all later works are not included.

## Project image

Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina in August 2005. NOAA photograph.

Credit: NOAA
Image source: https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg
Image rights: Public domain — https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg#Licensing

## Sources

- 17th Street Canal reevaluation (USACE; date not stated): https://www.mvn.usace.army.mil/portals/56/docs/hsdrrs/MOWL-17th-St-Canal.pdf
- Decision record for outfall-canal remediation (USACE; 2010): https://www.mvn.usace.army.mil/Media/News-Releases/Article/474147/district-commander-signs-decision-record-for-remediation-work-at-outfall-canals/
- NOAA Katrina NOLA 17th Street breach Aug 31 2005.jpg — image and reuse license (Wikimedia Commons / NOAA; 2005): https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.