# Stockholm Arlanda — aquifer thermal energy storage

Case reference year: 2009 | Location: Stockholm Arlanda Airport, Sweden

The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Size a conceptual paired-well seasonal storage system for an airport, keeping hydraulic interference, heat migration and groundwater protection visible in the design.

### Inputs to assemble

- Establish an assumed stratigraphic section and transmissivity range, clearly separated from the owner’s published system description.
- Build seasonal heating/cooling loads and identify water-quality limits, abstraction permissions and nearby receptors.

### Deliverables

- Calculate pumping drawdown, reinjection mounding and a first thermal travel-time estimate, then test sensitivity to groundwater flow.
- Prepare a well spacing concept, mass/energy balance, monitoring network and recovery-efficiency evaluation.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- How could returning the same volume of groundwater still change temperatures or groundwater quality outside the intended storage zone?
- Which combination of pumping tests and thermal tracers would best distinguish inadequate transmissivity from early thermal breakthrough?

## Published project information

### Design — partial

Swedavia describes seasonal circulation through the Brunkebergsåsen aquifer, reinjection of the extracted volume and uses for recovered heat. Detailed well construction, transmissivity and monitoring time series must be obtained separately.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The owner reports that the aquifer system began operation in summer 2009.

### Completion and records — partial

The owner describes the operating principle and an annual energy-reduction estimate. Treat that estimate as an owner-reported system value, not an independently reproduced geotechnical result.

## Published reference values

Use each value only within its stated scope. Reported costs have not been escalated or adjusted for inflation. These are source facts, not student design assumptions.

| Quantity | Value | Unit | Scope | Source locator |
| --- | ---: | --- | --- | --- |
| Owner-reported annual energy reduction | 19 | GWh/year | Airport system estimate from the owner description; not a measured heat-pump COP. | [Annual energy reduction](https://www.swedavia.com/about-swedavia/the-aquifer/) |

## Project image

Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.

Credit: Nemracc / Wikimedia Commons
Image source: https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG
Image rights: CC BY-SA 3.0 — https://creativecommons.org/licenses/by-sa/3.0

## Sources

- The aquifer — owner explanation of airport seasonal storage (Swedavia; date not stated): https://www.swedavia.com/about-swedavia/the-aquifer/
- Stockholm-Arlanda Airport aerial view.JPG (Nemracc; 2008): https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.