# Auckland City Rail Link — ground models and settlement baselines

Case reference year: 2023 | Location: Central Auckland, New Zealand

The urban rail link traverses weak rock, younger sediments, volcanic material and reclamation. Project engineers describe how phased investigations and a shared three-dimensional ground model informed procurement and risk allocation.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Prepare a defensible ground baseline and investigation plan for an urban railway with several geological transitions.

### Inputs to assemble

- Extract the geological units and trace how investigation priorities changed through design.
- Choose one alignment section and identify factual data separately from interpretation.

### Deliverables

- Create a baseline table of expected conditions and measurable exceedance criteria.
- Develop a building settlement screening and instrumentation strategy linked to tunnel operations.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which uncertainties should remain explicit in a baseline rather than being hidden in an average profile?
- How can a shared geological model improve procurement while still requiring independent interpretation?

## Published project information

### Design — partial

The geotechnical paper explains the baseline-report process, while owner pages link settlement assessments and TBM information. Those records support a procurement study without inventing a final asset-acceptance status.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.

Credit: Schwede66
Image source: https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg
Image rights: CC BY-SA 4.0 — https://creativecommons.org/licenses/by-sa/4.0

## Sources

- Managing ground risk from concept to procurement (Project engineers / New Zealand Geotechnical Society; date not stated): https://www.nzgs.org/libraries/managing-ground-risk-for-aucklands-city-rail-link-project-concept-design-to-procurement/
- TBM technical facts (City Rail Link Limited; date not stated): https://www.cityraillink.co.nz/tunnel-boring-machine-key-facts
- Consents and settlement assessments (City Rail Link Limited; date not stated): https://www.cityraillink.co.nz/consents-in-your-area
- CRL Albert Street 2452.jpg — image and reuse license (Wikimedia Commons / Schwede66; 2018): https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.