The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a ground-source borefield feasibility study that integrates thermal properties, drilling constraints and protection of groundwater.

### Inputs to assemble

- Extract the owner’s borefield arrangement and distinguish heat demand from ground capacity.
- Define site-specific thermal-response and groundwater information needed before sizing.

### Deliverables

- Prepare a borehole/loop concept and thermal-interference sensitivity study.
- Develop drilling, grouting, testing and surface-restoration work packages.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The university white paper describes approximately 3,600 boreholes, depths of 400–500ft and restored surface uses; these are closed loops, not pumping wells.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The first phase began operating in spring 2012; the later university paper describes the completed base project.

### Completion and records — partial

Owner information and a system map are linked; detailed bore logs and final bills were not established.

## Project image

Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.

Credit: Travisleehardin
Image source: https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg
Image rights: CC BY-SA 3.0 — https://creativecommons.org/licenses/by-sa/3.0

## Sources

- Geothermal energy system (Ball State University; date not stated): https://bsu.edu/about/geothermal
- Geothermal white paper, January 2019 (Ball State University; 2019): https://www.bsu.edu/-/media/www/departmentalcontent/cap/cote/021419geothermalwhitepaperjanuary2019.pdf