# Beaver Dam Wash Bridge — scour-resistant replacement

Case reference year: 2005 | Location: Mohave County, Arizona, United States

Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a crossing concept that addresses both local foundation scour and movement of the channel approaching the bridge.

### Inputs to assemble

- Extract the replacement alternatives, channel-change observations and protection measures.
- Identify missing hydraulic and geotechnical inputs for a detailed design.

### Deliverables

- Compare foundation depth and protection footprints for the alternatives.
- Prepare a training-dike concept and a life-cycle maintenance/inspection plan.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The FHWA case documents the selected longer bridge and gabion training-dike approach, with alternatives and economic justification.

### Cost information — partial

The source reports $6.5 million for resilience improvements; use its stated scope when comparing alternatives.

### Schedule information — partial

The damaging event occurred in 2005; the case describes emergency access followed by replacement planning.

### Completion and records — partial

The case records the selected resilience solution and lessons learned.

## Published reference values

Use each value only within its stated scope. Reported costs have not been escalated or adjusted for inflation. These are source facts, not student design assumptions.

| Quantity | Value | Unit | Scope | Source locator |
| --- | ---: | --- | --- | --- |
| Resilience-improvement cost | 6,500,000 | USD | Bridge-replacement resilience measures in the case summary. | [Project Snapshot](https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf) |

## Project image

The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.

Credit: Mohave County, published by FHWA
Image source: https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf
Image rights: No open reuse license verified; original copyright retained — https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf

## Sources

- FHWA-HIF-23-023 — Beaver Dam Wash bridge (FHWA / Mohave County; 2023): https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.