{"id":"bluestone-dam","title":"Bluestone Dam — rock anchors and spillway-foundation protection","summary":"The safety programme combines anchoring, drainage and armor over the bedrock stilling basin. Construction must be staged while the spillway remains an active river-release route.","topics":["dams-levees","rock","scour-erosion","dewatering","delivery"],"country":"United States","region":"Hinton, West Virginia","owner":"US Army Corps of Engineers","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock anchors","Uplift drainage","Stilling-basin armor","Cofferdams"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE describes completed earlier phases and the ongoing stilling-basin work. The project is not labeled fully complete; the owner’s 2026 programme forecasts completion in 2030.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The 2020 notice identifies a $319.6 million Phase 5 contract. It is not a final cost for all phases.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The 2026 owner update reports one half complete and forecasts overall completion in 2030; this supersedes the older 2020 contract forecast.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Stage foundation anchoring and armor placement in half of an operating stilling basin.","inputs":["Extract the owner’s phase boundaries, diversion concept and uplift-control components.","Define a study flood window and rock discontinuity model for temporary and permanent checks."],"deliverables":["Check anchor demand and drain effectiveness for intact and blocked-drain scenarios.","Prepare a cofferdam sequence and flood-response plan with excavation hold points.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does temporary river diversion alter uplift beneath the work area?","Which inspection or proof-test result should delay concreting over an anchor zone?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Safety assurance project and 2026 progress","url":"https://www.lrd.usace.army.mil/Missions/Projects/Article/3631104/bluestone-dam-dam-safety-assurance-mega-project/","publisher":"USACE Great Lakes and Ohio River Division","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Phase 5 contract milestone","url":"https://www.usace.army.mil/Media/News/Article/2126116/bluestone-pdt-achieves-milestone/","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Bluestone Dam 2022a.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","publisher":"Wikimedia Commons / Antony-22","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bluestone-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bluestone-dam/download/schematic"},{"id":"project-image","title":"Bluestone Dam 2022a.jpg","kind":"project-image","fileName":"bluestone-dam.jpg","mimeType":"image/jpeg","bytes":346957,"sha256":"1956f06dd42d585fa5868ce36388d01e769be3f4e1558d874872a4fa7143082e","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Antony-22","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-04-02 13:13:58","evidenceFile":"image-provenance/bluestone-dam-commons.json","evidenceSha256":"55a381e13ba93c79b945faaf64fc9910ada6981407ff3b529abc3e1d4a12faa5","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/90/Bluestone_Dam_2022a.jpg","downloadUrl":"/cases/bluestone-dam/download/project-image","originalSha1":"7a54bc8e6d12bb134ada88de7744b4def9c86426","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bluestone-dam-capstone.md","mimeType":"text/markdown","bytes":3056,"sha256":"db4860c066a5468d0b6af254a88a791ef3657652ddccc228ec5e7352a5e98892","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bluestone-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bluestone Dam in 2022, showing work in the spillway area.","caption":"Bluestone Dam in 2022, showing work in the spillway area. The photograph corresponds to the ongoing dam-safety programme.","credit":"Antony-22","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2022-04-02 13:13:58","imageDownloadAllowed":true},"figureCaption":"Bluestone Dam in 2022, showing work in the spillway area. The photograph corresponds to the ongoing dam-safety programme.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":67,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bluestone-dam-commons.json","evidenceSha256":"55a381e13ba93c79b945faaf64fc9910ada6981407ff3b529abc3e1d4a12faa5","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350998,"sourceCount":3,"url":"/cases/bluestone-dam"}