{"id":"bolivar-dam","title":"Bolivar Dam — seepage barriers in outwash and fractured abutment rock","summary":"Rehabilitation combined a partial-depth barrier, blanket improvements, relief wells and an abutment grout curtain. The project authors explain construction problems in thin limestone units with open flow paths.","topics":["dams-levees","seepage","rock","monitoring"],"country":"United States","region":"Tuscarawas County, Ohio","owner":"US Army Corps of Engineers","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Partial-depth cutoff","Relief wells","Abutment grouting","Piping control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The USACE completion account identifies the combined risk-reduction measures. A technical paper details the abutment grouting and downstage treatment decisions.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports rehabilitation completion in October 2017.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The completion account describes post-implementation evaluation and the resulting dam-safety classification.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare seepage-control combinations for an embankment on permeable outwash beside fractured rock.","inputs":["Separate foundation flow, rock-contact erosion and gate-system issues in the owner record.","Extract the grout-curtain arrangement and treatment response to circulation losses."],"deliverables":["Draw a seepage model with wall, blanket and relief-well alternatives.","Specify drilling/grouting decisions and post-treatment piezometric performance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a partial-depth barrier still reduce internal-erosion risk?","Where could seepage concentrate if the wall-to-rock transition is poorly treated?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Completion and post-implementation review","url":"https://www.army.mil/article/200670/bolivar_receives_best_dam_safety_rating","publisher":"US Army / USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Grout-curtain construction at Bolivar Dam","url":"https://pubs.geoscienceworld.org/aeg/eeg/article-abstract/24/1/121/522957/Grout-Curtain-Construction-At-Bolivar-Dam-Ohio","publisher":"USACE project authors / Environmental & Engineering Geoscience","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Bolivar Dam (Ohio) upstream.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","publisher":"Wikimedia Commons / Roseohioresident","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bolivar-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bolivar-dam/download/schematic"},{"id":"project-image","title":"Bolivar Dam (Ohio) upstream.jpg","kind":"project-image","fileName":"bolivar-dam.jpg","mimeType":"image/jpeg","bytes":395437,"sha256":"d20de43c4b633adfc2bdb10b723118662052fad325fe034c3b54fee87c8cd5c5","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"Roseohioresident","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg#Licensing","imageDate":"Taken on 18 August 2010","evidenceFile":"image-provenance/bolivar-dam-commons.json","evidenceSha256":"06d3cfbcd6025097e520fe62ad8bbd6609f2d0557a1751445d3a1c76c9f28fc3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/6e/Bolivar_Dam_%28Ohio%29_upstream.jpg","downloadUrl":"/cases/bolivar-dam/download/project-image","originalSha1":"9be59df03889845bff4d1c545c9fce0bc1a6693e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bolivar-dam-capstone.md","mimeType":"text/markdown","bytes":3151,"sha256":"15bf2f4194d6edcc19efb7438c2a05798f6806f3933f4462c59513b14abee9db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bolivar-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Upstream view of Bolivar Dam in Ohio.","caption":"Upstream view of Bolivar Dam in Ohio. The actual embankment is shown; the later seepage barrier and grout curtain are largely below ground.","credit":"Roseohioresident","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg#Licensing","width":1280,"height":960,"imageDate":"Taken on 18 August 2010","imageDownloadAllowed":true},"figureCaption":"Upstream view of Bolivar Dam in Ohio. The actual embankment is shown; the later seepage barrier and grout curtain are largely below ground.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":71,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bolivar-dam-commons.json","evidenceSha256":"06d3cfbcd6025097e520fe62ad8bbd6609f2d0557a1751445d3a1c76c9f28fc3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":399573,"sourceCount":3,"url":"/cases/bolivar-dam"}