# Bowman Road Bridge — reinforced-soil abutments

Case reference year: 2005 | Location: Defiance County, Ohio, United States

The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a replacement rural bridge abutment using the Bowman Road example as the reference project; compare reinforced soil with a conventional abutment.

### Inputs to assemble

- Extract span, reactions, abutment dimensions and reinforcement assumptions from the worked example.
- Identify scour, drainage and foundation information that the example assumes.

### Deliverables

- Reproduce the reference checks and document any difference caused by a current design basis.
- Prepare an abutment section, reinforcement schedule, drainage detail and bridge-approach settlement check.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — available

The archived FHWA worked example supplies bridge geometry, bearing loads, abutment sizing and internal/external checks. Use current guidance for a new design.

### Cost information — partial

FHWA reports $266,000 for the Bowman Road abutment, beams and waterproofing, compared with a $338,000 independent estimate for the conventional alternative. This historical comparison is not a certified final account.

### Schedule information — partial

Production construction occurred in 2005; the reviewed sources discuss accelerated construction rather than a complete contractor programme.

### Completion and records — partial

FHWA reports settlement and approach performance after opening.

## Published reference values

Use each value only within its stated scope. Reported costs have not been escalated or adjusted for inflation. These are source facts, not student design assumptions.

| Quantity | Value | Unit | Scope | Source locator |
| --- | ---: | --- | --- | --- |
| GRS abutment cost | 95,000 | USD | Bowman Road GRS-IBS abutment; historical comparison. | [Table 1](https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm) |
| GRS beams and waterproofing | 171,000 | USD | Bowman Road beams and waterproofing; historical comparison. | [Table 1](https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm) |
| Reported GRS total | 266,000 | USD | Combined abutment, beams and waterproofing in Table 1; not a certified final account. | [Table 1](https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm) |
| Conventional alternative estimate | 338,000 | USD | Independent cost estimate for the alternative in Table 1; not an awarded contract. | [Table 1](https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm) |

## Project image

Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.

Credit: Federal Highway Administration (FHWA)
Image source: https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm
Image rights: Public domain — U.S. federal government work — https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm

## Sources

- GRS-IBS Interim Implementation Guide — Bowman Road design example (FHWA; 2011): https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/004.cfm
- GRS-IBS bid-price analysis and cost comparisons (FHWA; 2019): https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm
- GRS-IBS synthesis — field case histories (FHWA; 2011): https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm
- FHWA-HRT-11-026, archived worked design (2012 errata included) (FHWA; 2012): https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/11026.pdf
- FHWA-HRT-11-027, case histories (FHWA; 2011): https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/11027.pdf
- FHWA-HRT-19-024, bid price analysis (FHWA; 2019): https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/19024.pdf

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.