{"id":"bowman-road-grs","title":"Bowman Road Bridge — reinforced-soil abutments","summary":"The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.","topics":["reinforced-soil","shallow-foundations","settlement","delivery"],"country":"United States","region":"Defiance County, Ohio","owner":"Defiance County","year":2005,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["GRS-IBS","Bearing and settlement","Reinforcement demand"],"documentationLevel":"worked-design","design":{"availability":"available","summary":"The archived FHWA worked example supplies bridge geometry, bearing loads, abutment sizing and internal/external checks. Use current guidance for a new design.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"FHWA reports $266,000 for the Bowman Road abutment, beams and waterproofing, compared with a $338,000 independent estimate for the conventional alternative. This historical comparison is not a certified final account.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"Production construction occurred in 2005; the reviewed sources discuss accelerated construction rather than a complete contractor programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"FHWA reports settlement and approach performance after opening.","sourceIds":["s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a replacement rural bridge abutment using the Bowman Road example as the reference project; compare reinforced soil with a conventional abutment.","inputs":["Extract span, reactions, abutment dimensions and reinforcement assumptions from the worked example.","Identify scour, drainage and foundation information that the example assumes."],"deliverables":["Reproduce the reference checks and document any difference caused by a current design basis.","Prepare an abutment section, reinforcement schedule, drainage detail and bridge-approach settlement check.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"GRS-IBS Interim Implementation Guide — Bowman Road design example","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"GRS-IBS bid-price analysis and cost comparisons","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm","publisher":"FHWA","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GRS-IBS synthesis — field case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s4","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/11026.pdf","publisher":"FHWA","year":2012,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["bowman-grs-guide"]},{"id":"s5","title":"FHWA-HRT-11-027, case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/11027.pdf","publisher":"FHWA","year":2011,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-synthesis"]},{"id":"s6","title":"FHWA-HRT-19-024, bid price analysis","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/19024.pdf","publisher":"FHWA","year":2019,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-bid-comparison"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bowman-road-grs.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/schematic"},{"id":"bowman-grs-guide","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","kind":"report","fileName":"bowman-grs-guide.pdf","mimeType":"application/pdf","bytes":9102045,"sha256":"fcc4772db9661f4ced0e7bf1d8c7cc47edcfac470f89a9869df71844c39a0807","sourceId":"s4","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; publication attribution and errata retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/39209","pages":176,"downloadUrl":"/cases/bowman-road-grs/download/bowman-grs-guide"},{"id":"grs-synthesis","title":"FHWA-HRT-11-027, case histories","kind":"report","fileName":"grs-synthesis.pdf","mimeType":"application/pdf","bytes":1733657,"sha256":"f81f37d091959f40e56e560052d16fd6d1235a836af77c99bbb267d9010daf59","sourceId":"s5","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; original publication retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/34474","pages":68,"downloadUrl":"/cases/bowman-road-grs/download/grs-synthesis"},{"id":"grs-bid-comparison","title":"FHWA-HRT-19-024, bid price analysis","kind":"report","fileName":"grs-bid-comparison.pdf","mimeType":"application/pdf","bytes":2719769,"sha256":"aa9e358d09b308d2131d1175a307b0f7fe66797d606a89015bed7f33a3bba3cc","sourceId":"s6","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship recorded by the National Transportation Library.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/40086","pages":16,"downloadUrl":"/cases/bowman-road-grs/download/grs-bid-comparison"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"bowman-road-grs-reference-values.csv","mimeType":"text/csv","bytes":1138,"sha256":"ded6368d90b3ccf2ad594fbefa7f56f0df2128d370be3afed39fbacf6277a527","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/bowman-road-grs/download/reference-values"},{"id":"project-image","title":"Bowman Road Bridge — FHWA Figure 23","kind":"project-image","fileName":"bowman-road-grs.jpeg","mimeType":"image/jpeg","bytes":13695,"sha256":"4d6c07c0f10c365be283b508151090886d0d43d6043e22e1fa50d652c37eaebb","sourceId":"s3","license":"Public domain — U.S. federal government work","width":401,"height":301,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/bowman-road-grs/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bowman-road-grs-capstone.md","mimeType":"text/markdown","bytes":5028,"sha256":"9b84946c504990c8bdb70c4aecd0bccb2c4e927c1cc7195c2794593bfa798a94","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23).","caption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":401,"height":301,"imageDate":null},"figureCaption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":1,"referenceValues":[{"label":"GRS abutment cost","value":95000,"unit":"USD","scope":"Bowman Road GRS-IBS abutment; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"GRS beams and waterproofing","value":171000,"unit":"USD","scope":"Bowman Road beams and waterproofing; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reported GRS total","value":266000,"unit":"USD","scope":"Combined abutment, beams and waterproofing in Table 1; not a certified final account.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Conventional alternative estimate","value":338000,"unit":"USD","scope":"Independent cost estimate for the alternative in Table 1; not an awarded contract.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":3,"downloadBytes":13576453,"sourceCount":6,"url":"/cases/bowman-road-grs"}