{"schemaVersion":1,"updated":"2026-11-22","total":25,"records":[{"id":"pebble-beach-bluff","title":"Pebble Beach Drive — coastal bluff stabilization","summary":"An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.","topics":["slopes","retaining-walls","coastal-offshore","seepage"],"country":"United States","region":"Crescent City, California","owner":"Del Norte County","year":2009,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Launched soil nails","Coastal slope drainage","Restricted-access construction"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The case describes nail arrangement, drainage galleries and installation adjustments. Its specialty nail system needs method-specific verification.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The case records a five-week construction period spanning December 2008 and January 2009.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Construction observations and photographs are linked at the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare drainage and reinforcement alternatives for a coastal bluff supporting a road, including corrosion and erosion exposure.","inputs":["Extract the exploration description and installation constraints.","Identify shoreline loading and future erosion information needed beyond the case."],"deliverables":["Develop a stability/drainage concept and distinguish launched nails from drilled-and-grouted nails.","Specify a trial installation, acceptance testing and long-term inspection plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Pebble Beach Drive slope stabilization","url":"https://www.geoinstitute.org/node/8373","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"pebble-beach-bluff.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pebble-beach-bluff/download/schematic"},{"id":"project-image","title":"Pebble Beach Drive — coastal stabilization works","kind":"project-image","fileName":"pebble-beach-bluff-r13.jpg","mimeType":"image/jpeg","bytes":134722,"sha256":"1274fb57f1619d2782a1b20c4e3c8883fd91f6a26c999a11455bec7372e8dd67","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":600,"height":450,"credit":"Del Norte County, via Soil Nail Launcher, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8373","licenseUrl":"https://www.geoinstitute.org/node/8373","imageDate":null,"evidenceFile":"image-provenance/pebble-beach-bluff-r13-source.json","evidenceSha256":"edab8ab0264051c065195fa974b31a0d414f32dbc778a367a0a38469618d34a9","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/SI1.jpg","originalSha256":"1274fb57f1619d2782a1b20c4e3c8883fd91f6a26c999a11455bec7372e8dd67","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/pebble-beach-bluff/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"pebble-beach-bluff-capstone.md","mimeType":"text/markdown","bytes":2696,"sha256":"3028e28553e93107e7a38993c995c67905c02bd14803be5a31eab41763f1ab69","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pebble-beach-bluff/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","caption":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","credit":"Del Norte County, via Soil Nail Launcher, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8373","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8373","width":600,"height":450,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":10,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/pebble-beach-bluff-r13-source.json","evidenceSha256":"edab8ab0264051c065195fa974b31a0d414f32dbc778a367a0a38469618d34a9","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3725,"sourceCount":1,"url":"/cases/pebble-beach-bluff"},{"id":"charleston-hlt-drains","title":"Hugh K. Leatherman Terminal — vertical-drain installation control","summary":"Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.","topics":["settlement","ground-improvement","coastal-offshore","monitoring"],"country":"United States","region":"Charleston, South Carolina","owner":"South Carolina State Ports Authority","year":2018,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Vertical drains","Surcharge","As-installed monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The submitted case describes variable drain depths and as-installed data acquisition during surcharge-ground improvement.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The source reports delivery of the drain programme on schedule but does not supply the complete programme.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"As-installed depth/location data are described; the underlying installation register is not locally supplied.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan drain installation and acceptance for a reclaimed port platform with spatially variable compressible deposits.","inputs":["Extract drain-depth ranges and the documented installation-control workflow.","Map the missing ground profile and design settlement inputs before sizing drain spacing."],"deliverables":["Develop zone-specific consolidation calculations and installation tolerances.","Prepare a spatial acceptance register and a response to short or misplaced drains.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Port of Charleston HLT wall remediation — PVD case","url":"https://www.geoinstitute.org/node/15986","publisher":"ASCE Geo-Institute / named case-history author","year":2020,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Source budget refers to the described package; it must not be interpreted as the entire terminal cost.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"charleston-hlt-drains.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/charleston-hlt-drains/download/schematic"},{"id":"project-image","title":"Hugh K. Leatherman Terminal — vertical-drain installation","kind":"project-image","fileName":"charleston-hlt-drains-r13.png","mimeType":"image/png","bytes":345339,"sha256":"2b3c4d924e04dd99a7742029b8a6d757fd230f1a87104579ccf746338f164813","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":413,"height":306,"credit":"Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history","sourceUrl":"https://www.geoinstitute.org/node/15986","licenseUrl":"https://www.geoinstitute.org/node/15986","imageDate":null,"evidenceFile":"image-provenance/charleston-hlt-drains-r13-source.json","evidenceSha256":"25eb76e4ff6e80a492861b0bc96ebabe9040069368342729cd8273c879ace608","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/Port%20of%20Charleston%20Picture1.png","originalSha256":"2b3c4d924e04dd99a7742029b8a6d757fd230f1a87104579ccf746338f164813","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/charleston-hlt-drains/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"charleston-hlt-drains-capstone.md","mimeType":"text/markdown","bytes":2752,"sha256":"81f1f270e586fe4a0953132af5d87be94da0333d6cfd15b52bf8670292d27182","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/charleston-hlt-drains/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","caption":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","credit":"Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history","sourceUrl":"https://www.geoinstitute.org/node/15986","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/15986","width":413,"height":306,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":12,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/charleston-hlt-drains-r13-source.json","evidenceSha256":"25eb76e4ff6e80a492861b0bc96ebabe9040069368342729cd8273c879ace608","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3930,"sourceCount":1,"url":"/cases/charleston-hlt-drains"},{"id":"olmsted-locks","title":"Olmsted Locks and Dam — marine construction and project controls","summary":"The navigation replacement became operational in 2018 after a long construction programme. USACE publishes project-control updates and completion material.","topics":["dams-levees","deep-foundations","coastal-offshore","delivery"],"country":"United States","region":"Ohio River, Illinois–Kentucky","owner":"US Army Corps of Engineers","year":2018,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Marine foundation construction","Construction staging","Earned-value comparison"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The public project material supports marine construction and sequencing studies; detailed foundation design must be obtained from project-specific technical records.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The August 2018 scorecard distinguishes planned, earned and actual expenditure at its reporting date; it is not the final closeout account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The 2018 update gives planned versus current completion/operational milestones; the ribbon-cutting release records the August 2018 event.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Owner completion and award accounts are available; a full geotechnical completion report was not located.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare construction sequencing and foundation-installation risks for a major river structure while maintaining navigation.","inputs":["Extract the published work packages, dated cost scorecard and operational milestone.","Identify missing geotechnical design and production-rate information before pricing a study alternative."],"deliverables":["Develop a river-access, foundation-installation and closure sequence.","Reconcile planned, earned and actual cost terminology without treating budgeted quantities as final expenditures.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Olmsted Locks and Dam — August 2018 update","url":"https://www.iwr.usace.army.mil/Portals/70/docs/IWUB/board_meetings/meeting88/UB88_01_Olmsted_Locks_and_Dam_Update_Rissler_28Aug18.pdf","publisher":"USACE","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Corps cuts ribbon on Olmsted project","url":"https://www.lrd.usace.army.mil/News/News-Releases/Article/1617621/corps-cuts-ribbon-on-olmsted-locks-and-dam-project/","publisher":"USACE","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Olmsted Locks and Dam aerial view.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","publisher":"Wikimedia Commons / LouisvilleUSACE","year":2013,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"olmsted-locks.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olmsted-locks/download/schematic"},{"id":"project-image","title":"Olmsted Locks and Dam aerial view.jpg","kind":"project-image","fileName":"olmsted-locks.jpg","mimeType":"image/jpeg","bytes":337003,"sha256":"25c89d760530e1e3eca24c97144ecde5f02a5b58c8e74840e0b040e9d1a01086","sourceId":"s3","license":"Public domain","width":1280,"height":989,"credit":"LouisvilleUSACE","sourceUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg#Licensing","imageDate":"2013-08-21 11:35","evidenceFile":"image-provenance/olmsted-locks-commons.json","evidenceSha256":"b6891b8530650f83a47ef38a15779f5a5821a64128e800d64de25c6d704f68a6","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/ca/Olmsted_Locks_and_Dam_aerial_view.jpg","downloadUrl":"/cases/olmsted-locks/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"olmsted-locks-capstone.md","mimeType":"text/markdown","bytes":3361,"sha256":"4315f61fa271ea7990fca5219e1d9baf260650bd49dba05b560e1fe1f1807ed9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olmsted-locks/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement.","caption":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement. U.S. Army Corps of Engineers project photograph.","credit":"LouisvilleUSACE","sourceUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg#Licensing","width":1280,"height":989,"imageDate":"2013-08-21 11:35"},"figureCaption":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement. U.S. Army Corps of Engineers project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":26,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/olmsted-locks-commons.json","evidenceSha256":"b6891b8530650f83a47ef38a15779f5a5821a64128e800d64de25c6d704f68a6","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":341349,"sourceCount":3,"url":"/cases/olmsted-locks"},{"id":"mud-creek","title":"Mud Creek, Highway 1 — landslide mapping and road recovery","summary":"Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.","topics":["slopes","coastal-offshore","monitoring","earthworks"],"country":"United States","region":"Big Sur, California","owner":"Caltrans / USGS and NASA investigation partners","year":2017,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Change detection","Coastal slope behaviour","Road-alignment alternatives"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"USGS provides the investigation and monitoring context; the linked science page is not the final road-reconstruction design.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"NASA’s 2019 account cites $54 million in road repairs; a detailed final estimate is not attached.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"The failure occurred on 20 May 2017; source publications document pre/post-event observations.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Research observations are linked; final road as-built documents were not established.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a road-recovery alternatives study using mapped change and a clearly defined stability/erosion investigation plan.","inputs":["Identify the source surveys, coordinate reference, acquisition dates and remaining moving areas.","Keep differing published volume estimates tied to their methods and dates."],"deliverables":["Create a change-map interpretation and preliminary geotechnical ground model.","Compare realignment and reconstruction concepts with residual movement and coastal erosion risks.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"The Mud Creek Landslide, May 20, 2017","url":"https://www.usgs.gov/special-topics/big-sur-landslides/science/mud-creek-landslide-may-20-2017","publisher":"USGS","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Drought, deluge turned stable landslide into disaster","url":"https://www.jpl.nasa.gov/news/drought-deluge-turned-stable-landslide-into-disaster/","publisher":"NASA JPL","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Big Sur Mud Creek Slide May 2017.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","publisher":"Wikimedia Commons / Pacific Coastal and Marine Science Center","year":2017,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"mud-creek.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mud-creek/download/schematic"},{"id":"project-image","title":"Big Sur Mud Creek Slide May 2017.jpg","kind":"project-image","fileName":"mud-creek.jpg","mimeType":"image/jpeg","bytes":357896,"sha256":"bf6c766da30a2ff6c07c80c56f6d0062a06e92f7ef3a2dce0b2a3bf6e997b3ce","sourceId":"s3","license":"Public domain","width":1280,"height":847,"credit":"Pacific Coastal and Marine Science Center","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg#Licensing","imageDate":"2017-05-27","evidenceFile":"image-provenance/mud-creek-commons.json","evidenceSha256":"5d22a8ea6622f52ea2221f5311d6ff3b31bad54960946b8901258e7f09ecc441","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a5/Big_Sur_Mud_Creek_Slide_May_2017.jpg","downloadUrl":"/cases/mud-creek/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"mud-creek-capstone.md","mimeType":"text/markdown","bytes":3138,"sha256":"8abafd73397f4b1cada679751451832c1ce649b1605fd0f570bc16c0aad99c37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mud-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Mud Creek landslide on California’s Big Sur coast in May 2017.","caption":"The Mud Creek landslide on California’s Big Sur coast in May 2017. The slide buried Highway 1 and extended the shoreline. USGS photograph.","credit":"Pacific Coastal and Marine Science Center","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg#Licensing","width":1280,"height":847,"imageDate":"2017-05-27"},"figureCaption":"The Mud Creek landslide on California’s Big Sur coast in May 2017. The slide buried Highway 1 and extended the shoreline. USGS photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":28,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/mud-creek-commons.json","evidenceSha256":"5d22a8ea6622f52ea2221f5311d6ff3b31bad54960946b8901258e7f09ecc441","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":362063,"sourceCount":3,"url":"/cases/mud-creek"},{"id":"block-island-wind","title":"Block Island Wind Farm — pile foundations and measured stiffness","summary":"The five-turbine offshore project has public foundation-installation observations and subsequent structural-monitoring studies.","topics":["coastal-offshore","deep-foundations","lateral-foundations","monitoring","seismic"],"country":"United States","region":"Offshore Rhode Island","owner":"Deepwater Wind / project partners","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Jacket piles","Foundation stiffness","Structural health monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The original geotechnical consultant describes interpreted profiles and pile-capacity work. BSEE publishes a foundation-stiffness study for one turbine.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The BSEE page lists a $608,722 monitoring-research award; this is not the wind-farm construction cost.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"partial","summary":"The Rhode Island owner/regulator record identifies commercial operation in December 2016.","sourceIds":["s3"]},"records":{"availability":"partial","summary":"The regulator records and BSEE technical attachments support construction/performance review.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare predicted and observed foundation stiffness for an offshore wind support, including how uncertain soil springs affect structural response.","inputs":["Extract pile/structure information from published monitoring and technical reports.","Distinguish one instrumented turbine from the full wind farm and retain marine ground-condition differences."],"deliverables":["Prepare an axial/lateral soil-spring sensitivity model and identify validation data.","Develop an installation and monitoring plan with offshore access and scour considerations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Block Island windfarm structural monitoring, TAP 806","url":"https://www.bsee.gov/research-records/tap-806-block-island-windfarm-structural-monitoring","publisher":"BSEE","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Block Island offshore wind farm — geotechnical engineering","url":"https://www.gza.com/projects/block-island-offshore-wind-farm","publisher":"GZA, project geotechnical consultant","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Block Island Wind Farm project records","url":"https://www.crmc.ri.gov/windenergy/blockislandwind.html","publisher":"Rhode Island Coastal Resources Management Council","year":2016,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Offshore Foundation Install 18.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","publisher":"Wikimedia Commons / BOEM-OPA","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"block-island-wind.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/block-island-wind/download/schematic"},{"id":"project-image","title":"Offshore Foundation Install 18.jpg","kind":"project-image","fileName":"block-island-wind.jpg","mimeType":"image/jpeg","bytes":226374,"sha256":"475bb6cc47f26f4dd77af72f39cee01b6c412a83262e3afd9ec312f36db9f2c2","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":941,"credit":"BOEM-OPA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-08-25 14:32:56","evidenceFile":"image-provenance/block-island-wind-commons.json","evidenceSha256":"6956e188a9bc1a7f8a6b86695ee9d106d4fba8a7f93b931a111c2cc68de31a23","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d0/Offshore_Foundation_Install_18.jpg","downloadUrl":"/cases/block-island-wind/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"block-island-wind-capstone.md","mimeType":"text/markdown","bytes":3287,"sha256":"c1cd6a9f8b988043bd356d43464ce3e47a76b4751e48fa08e57a40ffcaefdd0d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/block-island-wind/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015.","caption":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015. The jackets were built in Louisiana and transported to the offshore site.","credit":"BOEM-OPA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":941,"imageDate":"2015-08-25 14:32:56"},"figureCaption":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015. The jackets were built in Louisiana and transported to the offshore site.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":41,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/block-island-wind-commons.json","evidenceSha256":"6956e188a9bc1a7f8a6b86695ee9d106d4fba8a7f93b931a111c2cc68de31a23","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":230868,"sourceCount":4,"url":"/cases/block-island-wind"},{"id":"beaver-dam-wash","title":"Beaver Dam Wash Bridge — scour-resistant replacement","summary":"Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.","topics":["scour-erosion","deep-foundations","coastal-offshore","delivery"],"country":"United States","region":"Mohave County, Arizona","owner":"Mohave County Public Works","year":2005,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Channel migration","Scour protection","Bridge alternatives"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents the selected longer bridge and gabion training-dike approach, with alternatives and economic justification.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $6.5 million for resilience improvements; use its stated scope when comparing alternatives.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The damaging event occurred in 2005; the case describes emergency access followed by replacement planning.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case records the selected resilience solution and lessons learned.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a crossing concept that addresses both local foundation scour and movement of the channel approaching the bridge.","inputs":["Extract the replacement alternatives, channel-change observations and protection measures.","Identify missing hydraulic and geotechnical inputs for a detailed design."],"deliverables":["Compare foundation depth and protection footprints for the alternatives.","Prepare a training-dike concept and a life-cycle maintenance/inspection plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-023 — Beaver Dam Wash bridge","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","publisher":"FHWA / Mohave County","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["beaver-dam-wash","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"beaver-dam-wash.svg","mimeType":"image/svg+xml","bytes":1056,"sha256":"ca50c03b28c61244d08ee83702433916e462ad2ee363e42240a9f0377b8c9c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/beaver-dam-wash/download/schematic"},{"id":"beaver-dam-wash","title":"FHWA-HIF-23-023, Beaver Dam Wash bridge","kind":"report","fileName":"beaver-dam-wash.pdf","mimeType":"application/pdf","bytes":702064,"sha256":"b6eb1c0c1b14505816aec4a0976b5eefafe6792d573bf1f92815ace9144f222f","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/beaver-dam-wash/download/beaver-dam-wash"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"beaver-dam-wash-reference-values.csv","mimeType":"text/csv","bytes":316,"sha256":"59cd33750e4d9acacdef6fb1d3d64718afdd918c65a6b95e1810b9711a6ea2c5","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/beaver-dam-wash/download/reference-values"},{"id":"project-image","title":"Beaver Dam Wash — replacement bridge","kind":"project-image","fileName":"beaver-dam-wash-r13.jpeg","mimeType":"image/jpeg","bytes":65879,"sha256":"1a0c97ba212bac01a7c42e6f0a083b4726a2eb395d317612fef735777e2e8dad","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":592,"height":442,"credit":"Mohave County, published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","imageDate":null,"evidenceFile":"image-provenance/beaver-dam-wash-r13-source.json","evidenceSha256":"462593532e8e6601c25d49cc8fe98590898d6af49b74f0cba439405d59cde406","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","originalSha256":"b6eb1c0c1b14505816aec4a0976b5eefafe6792d573bf1f92815ace9144f222f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/beaver-dam-wash/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"beaver-dam-wash-capstone.md","mimeType":"text/markdown","bytes":3165,"sha256":"766648b23e2c30c1c194e868dfb83cbe7cd8b45f1e1660d9947127c91ff5a14c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/beaver-dam-wash/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","caption":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","credit":"Mohave County, published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","width":592,"height":442,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":44,"referenceValues":[{"label":"Resilience-improvement cost","value":6500000,"unit":"USD","scope":"Bridge-replacement resilience measures in the case summary.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/beaver-dam-wash-r13-source.json","evidenceSha256":"462593532e8e6601c25d49cc8fe98590898d6af49b74f0cba439405d59cde406","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":706601,"sourceCount":1,"url":"/cases/beaver-dam-wash"},{"id":"us98-revetment","title":"US 98, Florida — coastal roadway revetment","summary":"Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.","topics":["scour-erosion","coastal-offshore","reinforced-soil","earthworks","delivery"],"country":"United States","region":"Florida Panhandle","owner":"Florida Department of Transportation","year":2018,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Articulated concrete blocks","Filters","Coastal erosion"],"documentationLevel":"technical-case","design":{"availability":"available","summary":"The FHWA case includes an as-built shoulder section, construction details and comparison with retaining-wall protection.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $5.25 million for resilience improvements and a separate 1,000-ft comparison: $490,000 protection versus $724,000 reconstruction.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The study concerns recovery after the October 2018 hurricane; it also compares performance of protection installed after an earlier storm.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"An as-built shoulder detail and observed performance comparisons appear in the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a roadway-embankment protection concept with particular attention to drains and interfaces where protection can be discontinuous.","inputs":["Extract the published shoulder section and treatment layers.","Establish wave/current demands and filtration requirements from appropriate site data."],"deliverables":["Check filter compatibility, toe/interface stability and treatment limits.","Reproduce the stated cost comparison and test sensitivity to storm recurrence and residual damage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-025 — Hurricane Michael US 98 revetment","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","publisher":"FHWA / FDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us98-revetment","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us98-revetment.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/schematic"},{"id":"us98-revetment","title":"FHWA-HIF-23-025, US98 revetment","kind":"report","fileName":"us98-revetment.pdf","mimeType":"application/pdf","bytes":523326,"sha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/us98-revetment/download/us98-revetment"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us98-revetment-reference-values.csv","mimeType":"text/csv","bytes":875,"sha256":"ebdcd5f5ffad1d2b5e9513da41212acf5e40f818570234f82356c2bf7ff5a976","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us98-revetment/download/reference-values"},{"id":"project-image","title":"US 98 — concrete-block coastal revetment","kind":"project-image","fileName":"us98-revetment-r13.jpeg","mimeType":"image/jpeg","bytes":50907,"sha256":"2c0e7866aa35ba362b4dfdcda8d9076ca7eba3715ccab0e01743150f686e3760","sourceId":"s1","license":"U.S. government photograph — credited to FHWA in the source","width":513,"height":385,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","imageDate":null,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","originalSha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us98-revetment/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us98-revetment-capstone.md","mimeType":"text/markdown","bytes":3797,"sha256":"7b8952f37ce686120c8c8bfddac5f073549d9d12f5da1ebf66a55dc89a96e6ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","caption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","license":"U.S. government photograph — credited to FHWA in the source","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","width":513,"height":385,"imageDate":null,"imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph"},"figureCaption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":45,"referenceValues":[{"label":"Resilience-improvement cost","value":5250000,"unit":"USD","scope":"Reported project resilience improvements.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Protection comparison cost","value":490000,"unit":"USD per 1,000 ft","scope":"Articulated-concrete-block protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reconstruction comparison cost","value":724000,"unit":"USD per 1,000 ft","scope":"Road reconstruction without equivalent protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":580308,"sourceCount":1,"url":"/cases/us98-revetment"},{"id":"kansai-airport","title":"Kansai International Airport — reclamation and long-term settlement","summary":"An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.","topics":["settlement","ground-improvement","problem-soils","monitoring","coastal-offshore"],"country":"Japan","region":"Osaka Bay","owner":"Kansai Airports","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sand drains","Consolidation","Differential settlement","Jacking"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The operator explains sand drains, reclaimed-fill compaction and jacking of individual columns. Published settlement histories allow comparison of shallow and deeper clay contributions.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator supplies monitoring updates and explains continuing adjustment; the airport is an operating asset, not a concluded settlement experiment.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-management plan for a reclaimed airport platform whose terminal and utility connections must remain serviceable.","inputs":["Separate pre-opening settlement from post-opening movement in the owner data.","Define a study clay profile and drainage lengths; clearly label parameters not provided by the owner."],"deliverables":["Fit a consolidation trend and test sensitivity to deep-clay compressibility.","Detail adjustable supports and flexible utility interfaces with a survey-and-maintenance programme.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does accelerating upper-layer consolidation not eliminate deeper-layer settlement?","Which measurements should trigger a building adjustment rather than a change in the ground model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Subsidence countermeasures and monitored status","url":"https://www.kansai-airports.co.jp/en/sustainability/society/tech-subsidence-countermeasures/","publisher":"Kansai Airports","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Uneven settlement and jacking-up","url":"https://www.kansai-airports.co.jp/en/sustainability/society/tech-jacking-up/","publisher":"Kansai Airports","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Kansai closeup.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","publisher":"Wikimedia Commons / NASA Earth Observatory","year":2003,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"kansai-airport.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kansai-airport/download/schematic"},{"id":"project-image","title":"Kansai closeup.jpg","kind":"project-image","fileName":"kansai-airport.jpg","mimeType":"image/jpeg","bytes":67326,"sha256":"820c6c19f570694e31a5f52cb274dc257136eb7470b63062a15935302651c7f1","sourceId":"s3","license":"Public domain","width":800,"height":600,"credit":"NASA Earth Observatory","sourceUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg#Licensing","imageDate":"2003-09-19","evidenceFile":"image-provenance/kansai-airport-commons.json","evidenceSha256":"2496b2e3dbfa9199043b8545d26458c7bcdda034ed833e65f0801d1ca420d53a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Kansai_closeup.jpg","downloadUrl":"/cases/kansai-airport/download/project-image","originalSha1":"55c3ecb6fd4c95b23d3591a32493baddcdb45f4f","originalSha256":"820c6c19f570694e31a5f52cb274dc257136eb7470b63062a15935302651c7f1","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"kansai-airport-capstone.md","mimeType":"text/markdown","bytes":3282,"sha256":"ca2f810824f14286d8f604345aa661f6abeadb02f3c83425fedd0f5254b0087d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kansai-airport/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Satellite view of Kansai International Airport and its reclaimed offshore island works.","caption":"Satellite view of Kansai International Airport and its reclaimed offshore island works. The image provides project context for the owner’s settlement and foundation-adjustment records.","credit":"NASA Earth Observatory","sourceUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg#Licensing","width":800,"height":600,"imageDate":"2003-09-19","imageDownloadAllowed":true},"figureCaption":"Satellite view of Kansai International Airport and its reclaimed offshore island works. The image provides project context for the owner’s settlement and foundation-adjustment records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":48,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/kansai-airport-commons.json","evidenceSha256":"2496b2e3dbfa9199043b8545d26458c7bcdda034ed833e65f0801d1ca420d53a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":71786,"sourceCount":3,"url":"/cases/kansai-airport"},{"id":"rion-antirion","title":"Rion–Antirion Bridge — seismic caissons on improved seabed","summary":"The bridge foundations combine large caissons, a gravel interface and steel inclusions in weak seabed deposits. The designer distinguishes this system from piles structurally connected to a raft.","topics":["shallow-foundations","ground-improvement","seismic","coastal-offshore","lateral-foundations"],"country":"Greece","region":"Gulf of Corinth","owner":"Gefyra","year":2004,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seabed inclusions","Caisson sliding","Seismic capacity design"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Designer accounts explain the seismic load-transfer concept, alternative selection and verification studies. Their inclusion terminology is retained because the caisson is not fixed to the inclusions.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The designer account describes an approximately €800 million overall project. It is not a foundation-package bill or a certified final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The designer account reports completion in summer 2004 ahead of the contractual deadline.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate a gravity caisson on reinforced seabed with controlled sliding and uplift under earthquake loading.","inputs":["Extract the published soil layering, caisson geometry and reinforcement concept.","Use separate interface and reinforced-ground strengths; do not model the inclusions as connected piles."],"deliverables":["Check bearing, sliding and uplift for a defined seismic load envelope.","Compare alternative foundation concepts and propose validation by model tests and monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which load path is lost if the gravel layer is incorrectly modeled as a fixed connection?","How can controlled foundation movement reduce structural force while requiring displacement checks?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of Rion Antirion Bridge","url":"https://www.ice.org.uk/areas-of-interest/buildings-and-structures/design-and-construction-of-rion-antirion","publisher":"Bridge design team / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation design paper","url":"https://ascelibrary.org/doi/10.1061/40744%28154%297","publisher":"Alain Pecker / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","publisher":"Wikimedia Commons / Julien Seguinot from Lille, France","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rion-antirion.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/schematic"},{"id":"project-image","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg","kind":"project-image","fileName":"rion-antirion.jpg","mimeType":"image/jpeg","bytes":393534,"sha256":"a3d2e41eaadeb905afedcc04ba5700e30410d24dbf4cd468265faa4b86936bc9","sourceId":"s3","license":"CC BY-SA 2.0","width":1280,"height":853,"credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-09-30 15:33","evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/9f/Rio-Antirrio_bridge_from_Peloponnese_%2850451233726%29.jpg","downloadUrl":"/cases/rion-antirion/download/project-image","originalSha1":"e79018f5e06ee63197783330d3fe440d7aa3cebb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rion-antirion-capstone.md","mimeType":"text/markdown","bytes":3295,"sha256":"e769c46de36c7f364d44c5e2ab1ce02b58a85a6298e8ea0522acc1691d78bc0c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Rion–Antirion Bridge viewed from the Peloponnese.","caption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":853,"imageDate":"2020-09-30 15:33","imageDownloadAllowed":true},"figureCaption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":53,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":397715,"sourceCount":3,"url":"/cases/rion-antirion"},{"id":"changi-east","title":"Changi East reclamation — instrumented vertical-drain design","summary":"The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.","topics":["settlement","ground-improvement","laboratory-testing","site-investigation","coastal-offshore"],"country":"Singapore","region":"Eastern Singapore","owner":"Singapore reclamation authorities","year":2005,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vertical drains","Radial consolidation","Pore-pressure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The papers provide field and laboratory characterization and consolidation-monitoring methods for the historic reclamation phases. They should not be mistaken for current Terminal 5 construction records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The research account covers the historic reclamation phases completed by 2005, not the schedule of present airport expansion.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select drain spacing and surcharge duration for a reclamation cell using both settlement and pore-pressure acceptance measures.","inputs":["Extract a single pilot-cell stratigraphy, drain spacing and loading history from the papers.","Identify horizontal consolidation coefficients and laboratory versus field scale differences."],"deliverables":["Calculate consolidation time with drain smear and well resistance sensitivities.","Create a surcharge-removal decision that reconciles settlement and piezometer observations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can settlement-based and pore-pressure-based degrees of consolidation disagree?","What evidence would justify changing drain spacing after a pilot trial?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Soil improvement works for an offshore land reclamation","url":"https://doi.org/10.1680/geng.2009.162.1.21","publisher":"Project investigators / ICE Geotechnical Engineering","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Research-oriented ground investigation at Changi","url":"https://www.sciencedirect.com/org/science/article/pii/S205261561700014X","publisher":"Project investigators / ICE Geotechnical Research","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Reclamation of a slurry pond in Singapore","url":"https://doi.org/10.1680/geng.2009.162.1.13","publisher":"Institution of Civil Engineers","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"changi-east.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/schematic"},{"id":"project-image","title":"Changi East reclamation — historical slurry pond","kind":"project-image","fileName":"changi-east-r13.png","mimeType":"image/png","bytes":62386,"sha256":"4f62cd73fd4d72c53798f8a5ac698776331144b757d2814d6ad4c0cbf4599d37","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":248,"credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","imageDate":null,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","transformations":"Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","originalUrl":"https://pdfs.semanticscholar.org/b85d/a748e31f6ee68e6b2d2076def3513f3cb316.pdf","originalSha256":"7a40c8913a894c9fef0283fae1eb9bcd280f828c5054512d20515287d3286e26","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/changi-east/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"changi-east-capstone.md","mimeType":"text/markdown","bytes":3304,"sha256":"8e246b3753d44e7c2626bb72152377dffbf29f9f2be0c1f274cc61f2ec018be8","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.","caption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","width":400,"height":248,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":55,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","visualReview":"Inspected the complete first paper page, its Figure 2 caption, and the extracted 400 by 248 pixel photograph. The image shows the enclosed slurry pond and surrounding reclamation land; it is not the adjacent site-plan diagram or an author portrait.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4482,"sourceCount":3,"url":"/cases/changi-east"},{"id":"port-brisbane","title":"Port of Brisbane — vacuum consolidation beside a marine park","summary":"A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.","topics":["ground-improvement","settlement","seepage","problem-soils","coastal-offshore"],"country":"Australia","region":"Fisherman Islands, Queensland","owner":"Port of Brisbane","year":2009,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vacuum preloading","Vertical drains","Cutoff isolation","Lateral movement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner, contractor and consultant paper records the trial design objectives, instrumentation and interpreted performance. Its successful trial does not establish identical behavior in every reclamation cell.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare vacuum-assisted and fill-only preloading for an environmentally constrained soft-ground boundary.","inputs":["Extract the trial profile, drainage arrangement and cutoff function.","List the settlement, pore-pressure and lateral-displacement observations needed to separate mechanisms."],"deliverables":["Compare consolidation time and stability for vacuum-plus-fill versus higher surcharge.","Specify vacuum-loss response, cutoff continuity tests and a monitoring plan at the sensitive boundary.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would an undetected sand connection reduce the effective vacuum in the clay?","Why must improved consolidation time be assessed alongside lateral movement?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Successful application of vacuum consolidation","url":"https://rpsonline.com.sg/proceedings/9789810831240/html/GI125.php","publisher":"Port of Brisbane, Menard and Coffey project authors","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Performance and prediction of vacuum combined surcharge consolidation","url":"https://ascelibrary.com/doi/10.1061/%28ASCE%29GT.1943-5606.0000519","publisher":"Indraratna and project coauthors / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Port of Brisbane and Brisbane Airport June 2015.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","publisher":"Wikimedia Commons / Nick-D","year":2015,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"port-brisbane.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-brisbane/download/schematic"},{"id":"project-image","title":"Port of Brisbane and Brisbane Airport June 2015.jpg","kind":"project-image","fileName":"port-brisbane.jpg","mimeType":"image/jpeg","bytes":144392,"sha256":"64dc5639a068a195aeddfa35450009393fb02813c20b5a6d70334cd8a822135f","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":959,"credit":"Nick-D","sourceUrl":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2015-06-30 11:56:37","evidenceFile":"image-provenance/port-brisbane-commons.json","evidenceSha256":"a5d5469a7028e7ab4d41f10074f724774726a497f48327df25bc2effa337a475","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/69/Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","downloadUrl":"/cases/port-brisbane/download/project-image","originalSha1":"3412db9547a125dd74c90c8c2c9006240612c154","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"port-brisbane-capstone.md","mimeType":"text/markdown","bytes":3302,"sha256":"fee1d5cbb729910937eee63cc5be6be0cefc54d4bf4492c6c67611e85d30f71b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-brisbane/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Port of Brisbane and adjoining airport in 2015.","caption":"Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.","credit":"Nick-D","sourceUrl":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":959,"imageDate":"2015-06-30 11:56:37","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":56,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/port-brisbane-commons.json","evidenceSha256":"a5d5469a7028e7ab4d41f10074f724774726a497f48327df25bc2effa337a475","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":148882,"sourceCount":3,"url":"/cases/port-brisbane"},{"id":"palm-jumeirah","title":"Palm Jumeirah — densification of reclaimed sand","summary":"The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.","topics":["ground-improvement","coastal-offshore","seismic","earthworks"],"country":"United Arab Emirates","region":"Dubai","owner":"Nakheel","year":2006,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","Densification verification","Liquefaction screening"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner-associated account describes the compaction process and construction sequence. Site-specific CPT data and the complete foundation design package are not provided.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a field trial and acceptance programme for vibrocompaction of a reclaimed waterfront building plot.","inputs":["Use the source to define the treatment sequence and imported/backfill material interfaces.","Specify a study sand profile and groundwater level, then identify tests required before adopting design parameters."],"deliverables":["Compare trial-grid spacings using settlement and CPT-based acceptance criteria.","Develop treatment quantities, verification coverage and a response to refusal or poor improvement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why should vibratory power records be supplemented with independent ground testing?","How do fines content and drainage affect the suitability of vibrocompaction?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Vibro-compaction at Palm Jumeirah","url":"https://www.theviewpalm.ae/en/museum/vibro-compaction","publisher":"The View at The Palm / project exhibition","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Palm Jumeirah on 8 May 2008 Pict 1.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","publisher":"Wikimedia Commons / Imre Solt","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"palm-jumeirah.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/palm-jumeirah/download/schematic"},{"id":"project-image","title":"Palm Jumeirah on 8 May 2008 Pict 1.jpg","kind":"project-image","fileName":"palm-jumeirah.jpg","mimeType":"image/jpeg","bytes":280492,"sha256":"6317897946868e65597bcbc43a59bc9ddd1543a3ba8b07b4b117ebd928b81b9d","sourceId":"s2","license":"CC BY-SA 3.0","width":1229,"height":834,"credit":"Imre Solt","sourceUrl":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/","imageDate":"2008-05-08","evidenceFile":"image-provenance/palm-jumeirah-commons.json","evidenceSha256":"3d6fd60500ff7e59fa17eae9ca370fe5cb3fbb367e86fac739101d61a978d745","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/09/Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","downloadUrl":"/cases/palm-jumeirah/download/project-image","originalSha1":"9801565839b06dc5480f7e16e994dd5a0aeecc35","originalSha256":"6317897946868e65597bcbc43a59bc9ddd1543a3ba8b07b4b117ebd928b81b9d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"palm-jumeirah-capstone.md","mimeType":"text/markdown","bytes":2974,"sha256":"a3757f6fd38ceeed2ee732037f47ceea1e441f986a62f88dc5a160a9de2ded99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/palm-jumeirah/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Palm Jumeirah viewed from a helicopter in May 2008.","caption":"Palm Jumeirah viewed from a helicopter in May 2008. The actual reclaimed island is shown after the principal ground-treatment period.","credit":"Imre Solt","sourceUrl":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/","width":1229,"height":834,"imageDate":"2008-05-08","imageDownloadAllowed":true},"figureCaption":"Palm Jumeirah viewed from a helicopter in May 2008. The actual reclaimed island is shown after the principal ground-treatment period.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":57,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/palm-jumeirah-commons.json","evidenceSha256":"3d6fd60500ff7e59fa17eae9ca370fe5cb3fbb367e86fac739101d61a978d745","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":284654,"sourceCount":2,"url":"/cases/palm-jumeirah"},{"id":"treasure-island","title":"Treasure Island redevelopment — liquefaction, settlement and shoreline stability","summary":"Redevelopment of the former naval station must address liquefiable fill, compressible bay mud and perimeter stability. City documents connect geotechnical work with groundwater, contaminated-soil management and phased infrastructure delivery.","topics":["ground-improvement","seismic","settlement","geoenvironmental","coastal-offshore"],"country":"United States","region":"San Francisco Bay","owner":"Treasure Island Development Authority / TICD","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Liquefaction mitigation","Bay-mud consolidation","Shoreline stabilization"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The city’s management plan identifies ground risks and candidate mitigation measures. It is a programme-level source; a measure mentioned there is not automatically the final design for every parcel.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The planning authority describes multiple major phases and phased approvals. Use the selected phase’s current documents for a detailed programme.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a staged redevelopment concept that coordinates ground improvement with contaminated-soil handling and future flood levels.","inputs":["Separate dredged sand, young bay mud and shoreline fills in a study ground model.","Select one development phase and identify which remediation and infrastructure works precede buildings."],"deliverables":["Compare densification, drainage and soil mixing for the selected ground risks.","Prepare a compatible earthworks, groundwater and monitoring plan with defined parcel interfaces.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Could improving liquefaction resistance leave long-term bay-mud settlement unresolved?","How would an improvement method alter the contaminated-water management needs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Revised soil and groundwater management plan","url":"https://www.sf.gov/sites/default/files/2023-12/SGMP_0004-007-005%20Treasure%20Island_Rev%2003-17-23-compressed.pdf","publisher":"City and County of San Francisco","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Adopted development plans and environmental review","url":"https://sfplanning.org/project/treasure-island-yerba-buena-island","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Treasure Island Causeway reconstruction, August 2021.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","publisher":"Wikimedia Commons / Pi.1415926535","year":null,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"treasure-island.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/treasure-island/download/schematic"},{"id":"project-image","title":"Treasure Island Causeway reconstruction, August 2021.jpg","kind":"project-image","fileName":"treasure-island.jpg","mimeType":"image/jpeg","bytes":384762,"sha256":"ab06e2607cce980b060c769b65dedc04cc6f58aedb8a3f6f9e0a633aaaf4d210","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":875,"credit":"Pi.1415926535","sourceUrl":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"Taken on 7 August 2021","evidenceFile":"image-provenance/treasure-island-commons.json","evidenceSha256":"b3087047b946aa578f559ea9164f8b3af9921eb3ea276b6fcbf2645aec9835f2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/21/Treasure_Island_Causeway_reconstruction%2C_August_2021.jpg","downloadUrl":"/cases/treasure-island/download/project-image","originalSha1":"963a01ab4c3fafe7def018b05bd960bc5dc07be2","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"treasure-island-capstone.md","mimeType":"text/markdown","bytes":3420,"sha256":"1aaa50d130048eb8cc82973857ff9d6ceedc527db7ff8de88eef85412d11832e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/treasure-island/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Reconstruction of the Treasure Island Causeway in August 2021.","caption":"Reconstruction of the Treasure Island Causeway in August 2021. This is a real redevelopment work area at the island connection, not a diagram of every ground-improvement method.","credit":"Pi.1415926535","sourceUrl":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":875,"imageDate":"Taken on 7 August 2021","imageDownloadAllowed":true},"figureCaption":"Reconstruction of the Treasure Island Causeway in August 2021. This is a real redevelopment work area at the island connection, not a diagram of every ground-improvement method.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":58,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/treasure-island-commons.json","evidenceSha256":"b3087047b946aa578f559ea9164f8b3af9921eb3ea276b6fcbf2645aec9835f2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":389370,"sourceCount":3,"url":"/cases/treasure-island"},{"id":"lake-borgne-barrier","title":"Lake Borgne surge barrier — pile-supported flood protection","summary":"The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.","topics":["deep-foundations","lateral-foundations","coastal-offshore","seepage","monitoring"],"country":"United States","region":"New Orleans, Louisiana","owner":"Flood Protection Authority East / USACE","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven piles","Lateral pile response","Global stability","Floodwall transitions"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner and consultant sources explain the built system and geotechnical scope. Published summaries use differing pile counts and stages; no single count is inferred across them.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The operator describes an approximately $1.3 billion whole-barrier project, not a geotechnical-package final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator records transfer of operating and maintenance responsibilities following construction in 2013.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a representative barrier-wall foundation and its transition into an earthen levee.","inputs":["Extract the wall, gate and levee interface functions from the owner material.","Define study water levels, wave actions and soft-soil strength profiles with explicit source limits."],"deliverables":["Check axial/lateral pile response, group behavior and global stability.","Design transition details and instrumentation to compare storm response with predictions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a locally adequate pile group still sit within an unstable soil mass?","Why do differential movement and seepage deserve special attention at levee transitions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Barrier operations and system description","url":"https://www.floodauthority.org/the-system/lake-borgne-surge-barrier/","publisher":"Flood Protection Authority East","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geotechnical engineering account","url":"https://ardaman.com/ihnc-lake-borgne-barrier-giww-to-mrgo-st-bernard-parish-louisiana-usace-new-orleans-district/","publisher":"Ardaman & Associates","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"IHNC Surge Barrier Construction from Air.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","publisher":"Wikimedia Commons / Ray Devlin","year":2010,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lake-borgne-barrier.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/schematic"},{"id":"project-image","title":"IHNC Surge Barrier Construction from Air.jpg","kind":"project-image","fileName":"lake-borgne-barrier.jpg","mimeType":"image/jpeg","bytes":101254,"sha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","sourceId":"s3","license":"CC BY 2.0","width":800,"height":533,"credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2010-01-11 16:26:30","evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/42/IHNC_Surge_Barrier_Construction_from_Air.jpg","downloadUrl":"/cases/lake-borgne-barrier/download/project-image","originalSha1":"ec096cf2cb2f46b2508af820b50bbfcb78c8a3d3","originalSha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lake-borgne-barrier-capstone.md","mimeType":"text/markdown","bytes":3192,"sha256":"3d36487e28f0ac12f46bdcec3ecfa9d5a263ed5a4ad8e7455a843d1d326bbdf0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans.","caption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":800,"height":533,"imageDate":"2010-01-11 16:26:30","imageDownloadAllowed":true},"figureCaption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":72,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":105645,"sourceCount":3,"url":"/cases/lake-borgne-barrier"},{"id":"west-closure-complex","title":"West Closure Complex — foundations on soft deltaic deposits","summary":"The gate and pumping complex is founded in soft, compressible deltaic deposits. USACE authors describe exploration, laboratory characterization and pile testing used to develop design strength profiles.","topics":["deep-foundations","laboratory-testing","site-investigation","problem-soils","coastal-offshore"],"country":"United States","region":"New Orleans, Louisiana","owner":"US Army Corps of Engineers","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["CPT interpretation","Strength profiling","Static and dynamic pile tests"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical publication explains the characterization programme and foundation-selection evidence. A complete final calculation set and acceptance database are not supplied by the abstract.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design an investigation and test-pile programme for a critical coastal pumping structure on organic clay and silt.","inputs":["Identify the published depositional units and component-specific foundation requirements.","Specify the additional parameters needed for axial, lateral and settlement analyses."],"deliverables":["Develop characteristic strength profiles and compare test-pile interpretations.","Prepare component foundation alternatives with construction access and long-term subsidence allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which laboratory sampling problems are most consequential in soft organic deltaic soils?","How can a test-pile programme distinguish drivability constraints from long-term capacity?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geocharacterization for design and construction of West Closure Complex","url":"https://ascelibrary.org/doi/10.1061/9780784413272.039","publisher":"USACE project authors / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Indexed technical-paper details","url":"https://trid.trb.org/View/1303129","publisher":"Transportation Research Board","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"West Closure Complex testing, Louisiana 2023 - 01.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","publisher":"Wikimedia Commons / Team New Orleans, US Army Corps of Engineers","year":2023,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"west-closure-complex.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-closure-complex/download/schematic"},{"id":"project-image","title":"West Closure Complex testing, Louisiana 2023 - 01.jpg","kind":"project-image","fileName":"west-closure-complex.jpg","mimeType":"image/jpeg","bytes":151852,"sha256":"24ff3fd3f6dcdabc9dc258256e332c4cd04548f9398b99d6a9568ecf307d5697","sourceId":"s3","license":"Public domain","width":1280,"height":854,"credit":"Team New Orleans, US Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg#Licensing","imageDate":"2023-05-11 10:19:39","evidenceFile":"image-provenance/west-closure-complex-commons.json","evidenceSha256":"8d095d27d0a6bde356c186d31570a687b18cca899f9d4b359ceef56a389fc721","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/1/13/West_Closure_Complex_testing%2C_Louisiana_2023_-_01.jpg","downloadUrl":"/cases/west-closure-complex/download/project-image","originalSha1":"13204edda35ce31161453465ac85aa6fac1fe530","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"west-closure-complex-capstone.md","mimeType":"text/markdown","bytes":3328,"sha256":"fec13d74d145a189bb0a084cecd6f93a464bf18f7883a87b18e15f167b3f654e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-closure-complex/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The West Closure Complex during its 2023 annual operational testing.","caption":"The West Closure Complex during its 2023 annual operational testing. This is the completed gate and pumping project discussed in the foundation-characterization paper.","credit":"Team New Orleans, US Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg#Licensing","width":1280,"height":854,"imageDate":"2023-05-11 10:19:39","imageDownloadAllowed":true},"figureCaption":"The West Closure Complex during its 2023 annual operational testing. This is the completed gate and pumping project discussed in the foundation-characterization paper.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":73,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/west-closure-complex-commons.json","evidenceSha256":"8d095d27d0a6bde356c186d31570a687b18cca899f9d4b359ceef56a389fc721","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":156379,"sourceCount":3,"url":"/cases/west-closure-complex"},{"id":"marmaray-tunnel","title":"Marmaray crossing — immersed-tunnel foundations in seismic ground","summary":"The immersed crossing combined a gravel foundation, under-base grouting and treatment of liquefiable deposits. A project paper explains element connections and the transition to adjacent bored tunnels under severe seismic demands.","topics":["tunnels","seismic","ground-improvement","coastal-offshore"],"country":"Türkiye","region":"Bosphorus, Istanbul","owner":"Republic of Türkiye transport authorities","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Immersed tube","Compaction grouting","Under-base grouting","Seismic joints"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project authors describe the selected foundation and connection systems. Geotechnical parameters and element-specific loads must be extracted from the full paper before numerical design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a foundation and transition-zone concept for an immersed tunnel crossing soft deposits in an earthquake-prone strait.","inputs":["Separate seabed improvement, bedding preparation and under-base contact grouting.","Identify stiffness contrasts where immersed and bored tunnel sections meet."],"deliverables":["Check buoyancy, bearing contact and differential settlement under study load cases.","Prepare a ground-treatment verification and immersion monitoring sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why may a sand bedding option be unsuitable under the selected seismic demand?","How could a local bedding void change joint rotation and water-tightness demands?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Marmaray Bosphorus Crossing project paper","url":"https://www.sciencedirect.com/science/article/pii/S088677982100479X","publisher":"Project engineering authors / Tunnelling and Underground Space Technology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Marmaraytunnel3.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","publisher":"Wikimedia Commons / MEOGLOBAL Muhammed Enes Okullu","year":2012,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"marmaray-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marmaray-tunnel/download/schematic"},{"id":"project-image","title":"Marmaraytunnel3.JPG","kind":"project-image","fileName":"marmaray-tunnel.jpg","mimeType":"image/jpeg","bytes":276229,"sha256":"f3e756697f35224ea5239acf7a0a600b46fd3ea202d70966e50b0a832af8112e","sourceId":"s2","license":"Public domain","width":1280,"height":853,"credit":"MEOGLOBAL Muhammed Enes Okullu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing","imageDate":"2012-05-03","evidenceFile":"image-provenance/marmaray-tunnel-commons.json","evidenceSha256":"992a4c95cfe9d3bca4c2fd091ac9dbb0a06c833a5565a04236133b0da1ec4683","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/ab/Marmaraytunnel3.JPG","downloadUrl":"/cases/marmaray-tunnel/download/project-image","originalSha1":"bfd7bab91a5facb7c191df4e6e033099c5f5a320","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"marmaray-tunnel-capstone.md","mimeType":"text/markdown","bytes":3023,"sha256":"1220cb630342933c1c5a8fc2369b3e4f60800acbf176234665b3ea1f50a8780d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marmaray-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Interior of the Marmaray tunnel project in 2012.","caption":"Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.","credit":"MEOGLOBAL Muhammed Enes Okullu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing","width":1280,"height":853,"imageDate":"2012-05-03","imageDownloadAllowed":true},"figureCaption":"Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":76,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/marmaray-tunnel-commons.json","evidenceSha256":"992a4c95cfe9d3bca4c2fd091ac9dbb0a06c833a5565a04236133b0da1ec4683","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":280377,"sourceCount":2,"url":"/cases/marmaray-tunnel"},{"id":"hongkong-zhuhai-macao","title":"Hong Kong–Zhuhai–Macao crossing — immersed-tunnel settlement transitions","summary":"Artificial islands connect a long immersed crossing founded above variable soft deposits. Project papers describe composite foundation treatment, island formation and full-scale testing near transition zones.","topics":["tunnels","coastal-offshore","ground-improvement","settlement"],"country":"China","region":"Pearl River estuary","owner":"Hong Kong–Zhuhai–Macao Bridge Authority","year":2018,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Immersed-tunnel bedding","Jet grouting","Preloading","Transition settlement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors document implemented island/tunnel concepts; a separate test study evaluates preload and jet-grout treatment. A test section is not assumed to represent the full crossing.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The project paper describes island/tunnel work beginning in 2011 and handover in 2018; these milestones do not cover every contract in the full bridge system.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a settlement transition between an artificial island and an immersed-tunnel approach.","inputs":["Extract the transition geometry and distinguish soft seabed from later backfill.","Identify the test conditions and measured response used to judge treatment effectiveness."],"deliverables":["Compare composite-ground and untreated-ground settlement profiles.","Prepare treatment verification, dredging tolerance and immersion sequence requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is differential settlement at an island transition more consequential than uniform tunnel settlement?","How could sediment accumulation undermine a correctly designed bedding layer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Novelties in the islands and tunnel project","url":"https://www.sciencedirect.com/science/article/pii/S0886779821004788","publisher":"Project authors / Tunnelling and Underground Space Technology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Full-scale jet-grouting loading test","url":"https://ascelibrary.org/doi/10.1061/%28ASCE%29GM.1943-5622.0002625","publisher":"Project researchers / ASCE International Journal of Geomechanics","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","publisher":"Wikimedia Commons / Tksteven","year":2013,"access":"public-link","license":"CC BY 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hongkong-zhuhai-macao.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hongkong-zhuhai-macao/download/schematic"},{"id":"project-image","title":"Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG","kind":"project-image","fileName":"hongkong-zhuhai-macao.jpg","mimeType":"image/jpeg","bytes":252028,"sha256":"d7563419a811f7da36efb6afb13d22b3c9bdc67b63a65c0d79bd8ba53adcd21c","sourceId":"s3","license":"CC BY 3.0","width":1024,"height":768,"credit":"Tksteven","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","licenseUrl":"https://creativecommons.org/licenses/by/3.0","imageDate":"2013-02-11 15:19:38","evidenceFile":"image-provenance/hongkong-zhuhai-macao-commons.json","evidenceSha256":"e5d16295088c059e0cb1ffc80e0738fc71a6b60b7ce3f31ca3831aceec427f6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/7/78/Eastern_artificial_island_for_the_tunnel_section%2C_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","downloadUrl":"/cases/hongkong-zhuhai-macao/download/project-image","originalSha1":"6ec561ebc1adfc53a5867ac30ff2729cd80c458d","originalSha256":"d7563419a811f7da36efb6afb13d22b3c9bdc67b63a65c0d79bd8ba53adcd21c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hongkong-zhuhai-macao-capstone.md","mimeType":"text/markdown","bytes":3373,"sha256":"d3990d19ae12ff46c5c5c8650b34676fdad3037a61c38dba8bc5319e2623d603","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hongkong-zhuhai-macao/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section.","caption":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.","credit":"Tksteven","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","license":"CC BY 3.0","licenseUrl":"https://creativecommons.org/licenses/by/3.0","width":1024,"height":768,"imageDate":"2013-02-11 15:19:38","imageDownloadAllowed":true},"figureCaption":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":82,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hongkong-zhuhai-macao-commons.json","evidenceSha256":"e5d16295088c059e0cb1ffc80e0738fc71a6b60b7ce3f31ca3831aceec427f6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":256526,"sourceCount":3,"url":"/cases/hongkong-zhuhai-macao"},{"id":"kobe-port-island","title":"Kobe Port — quay-wall displacement during liquefaction","summary":"Many caisson quay walls moved seaward during the 1995 earthquake. Port researchers studied the combined contributions of inertia and excess pore pressure beneath and behind the walls.","topics":["seismic","retaining-walls","coastal-offshore","ground-improvement"],"country":"Japan","region":"Kobe","owner":"Port of Kobe / Japanese port researchers","year":1995,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Caisson quay walls","Effective-stress analysis","Lateral spreading"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The primary papers report observed damage and effective-stress analyses. The detailed modeled example is on Rokko Island; a general Kobe photograph is not mislabeled as that precise section.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare quay-wall retrofit options that address both foundation liquefaction and inertial sliding.","inputs":["Select one documented wall section and extract its foundation/backfill geometry.","Separate observed displacements from values reproduced by the numerical model."],"deliverables":["Check sliding and bearing before and after pore-pressure increase.","Compare ground treatment, drainage and geometry changes for controlling permanent displacement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a wall remain upright while losing operational serviceability?","Which deformation component would a simple static sliding check miss?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of caisson-type quay walls at Kobe Port","url":"https://www.jstage.jst.go.jp/article/sandf1995/36/Special/36_119/_article/-char/en","publisher":"Inagaki and port-research coauthors / Soils and Foundations","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Effective-stress analysis of a Kobe quay wall","url":"https://www.pari.go.jp/PDF/no0813-07.pdf","publisher":"Port and Harbour Research Institute","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Minatojimanakamachi c184.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","publisher":"Wikimedia Commons / 神戸市","year":null,"access":"public-link","license":"CC BY 2.1 jp","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"kobe-port-island.svg","mimeType":"image/svg+xml","bytes":989,"sha256":"7ed6562b41c1ef6286cc62d81928348d9f071653ee41e073ab8e6a4e68cf4e34","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kobe-port-island/download/schematic"},{"id":"project-image","title":"Minatojimanakamachi c184.jpg","kind":"project-image","fileName":"kobe-port-island.jpg","mimeType":"image/jpeg","bytes":476339,"sha256":"a63966b46b6f031e47094ed34cf561ab7b5ea124d02dbebcc0ed0c8a87f7b0df","sourceId":"s3","license":"CC BY 2.1 jp","width":998,"height":595,"credit":"神戸市","sourceUrl":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.1/jp/deed.en","imageDate":"Taken on 17 January 1995","evidenceFile":"image-provenance/kobe-port-island-commons.json","evidenceSha256":"8ab22636f60ccd60c3c506d526e8109d4bda8c91483f197686de20f24a74c874","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/67/Minatojimanakamachi_c184.jpg","downloadUrl":"/cases/kobe-port-island/download/project-image","originalSha1":"000dc3efb2977bd78da58b6b4ddf2fbf5e28edc6","originalSha256":"a63966b46b6f031e47094ed34cf561ab7b5ea124d02dbebcc0ed0c8a87f7b0df","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"kobe-port-island-capstone.md","mimeType":"text/markdown","bytes":3123,"sha256":"4ec6c5e445fffd1b61f806f0455d306e48f28f911efd5a2358b0504085057248","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kobe-port-island/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995.","caption":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995. The photograph documents the port-area earthquake; the detailed quay-wall model cited in the case is a separate Rokko Island section.","credit":"神戸市","sourceUrl":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","license":"CC BY 2.1 jp","licenseUrl":"https://creativecommons.org/licenses/by/2.1/jp/deed.en","width":998,"height":595,"imageDate":"Taken on 17 January 1995","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995. The photograph documents the port-area earthquake; the detailed quay-wall model cited in the case is a separate Rokko Island section.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":93,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/kobe-port-island-commons.json","evidenceSha256":"8ab22636f60ccd60c3c506d526e8109d4bda8c91483f197686de20f24a74c874","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":480451,"sourceCount":3,"url":"/cases/kobe-port-island"},{"id":"randle-reef","title":"Randle Reef — harbour sediment containment and final capping","summary":"Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.","topics":["geoenvironmental","coastal-offshore","retaining-walls","settlement"],"country":"Canada","region":"Hamilton Harbour, Ontario","owner":"Canada Water Agency and project partners","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sediment containment","Steel walls","Consolidation","Environmental capping"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The official project record identifies the staged remedy. The final cap is not labeled complete: the reviewed owner update schedules that phase for 2027.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The reviewed owner update schedules Stage 3 completion for 2027, subject to the additional structural work described there.","sourceIds":["s1"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a staged containment-cell concept that can receive dredged sediment and later support a capped working surface.","inputs":["Extract the containment, dredging and cap-stage functions from the owner record.","Define sediment compressibility, drainage and future surface loads as explicit study inputs."],"deliverables":["Compare wall stability and fill settlement during successive dredging stages.","Develop cap tolerances, consolidation monitoring and handover criteria for long-term operation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does sediment settlement affect cap grading and surface drainage?","Why is completion of contaminant placement different from completion of the containment facility?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Randle Reef remediation stages and status","url":"https://www.canada.ca/en/canada-water-agency/freshwater-ecosystem-initiatives/great-lakes/great-lakes-protection/areas-concern/hamilton-harbour/randle-reef.html","publisher":"Canada Water Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Randle Reef — project milestones and photographs","url":"https://randlereef.ca/","publisher":"Randle Reef project / Bay Area Restoration Council","year":2024,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"randle-reef.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/schematic"},{"id":"project-image","title":"Randle Reef — July 2024 project aerial","kind":"project-image","fileName":"randle-reef-r13.jpg","mimeType":"image/jpeg","bytes":148502,"sha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","sourceId":"s2","license":"No open reuse license verified; original copyright retained","width":410,"height":230,"credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","licenseUrl":"https://randlereef.ca/","imageDate":"2024-07","evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","transformations":"Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://randlereef.ca/images/Milestones/2024-07-01-RR-1.jpg","originalSha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/randle-reef/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"randle-reef-capstone.md","mimeType":"text/markdown","bytes":3111,"sha256":"4357e7687177934b826133161deabfbee508806634260af74dd729247c2ea234","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"July 2024 aerial photograph of the Randle Reef sediment containment facility in Hamilton Harbour.","caption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://randlereef.ca/","width":410,"height":230,"imageDate":"2024-07","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":97,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","visualReview":"Inspected the complete published 410 × 230 image. It shows the actual containment cell with surrounding water, retaining perimeter and construction-stage fill. The image is not relabeled as a final-completion record.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4102,"sourceCount":2,"url":"/cases/randle-reef"},{"id":"port-of-anchorage","title":"Port of Alaska — test piles and seismic waterfront foundations","summary":"Modernization studies used offshore investigation and a test-pile programme to examine drivability, capacity and underwater noise. The petroleum/cement terminal team also characterized cyclic behavior and soil–structure interaction.","topics":["deep-foundations","lateral-foundations","laboratory-testing","seismic","coastal-offshore"],"country":"United States","region":"Anchorage, Alaska","owner":"Don Young Port of Alaska","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven pipe piles","Cyclic soil testing","Site response","Noise attenuation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner provides a test-pile report and the geotechnical consultant explains terminal investigation gaps. The programme-wide trial and terminal design are distinguished in the study brief.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a waterfront pile-test programme that answers structural, geotechnical and marine-environmental questions together.","inputs":["Extract the trial-pile purpose and installation/test sequence from the owner report.","Identify tidal-silt cyclic behavior, offshore strengths and shear-wave velocity gaps described by the designer."],"deliverables":["Compare pile capacity and drivability interpretations for a study wharf bent.","Plan static/dynamic testing, cyclic material tests and underwater-noise verification.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can changing the installation method satisfy noise limits yet affect pile capacity?","Why does an essential waterfront facility need deformation checks beyond ordinary axial resistance?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modernization test-pile programme and report","url":"https://www.portofalaska.com/modernization-project/test-pile-program-summary/","publisher":"Don Young Port of Alaska","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Petroleum Cement Terminal geotechnical investigation","url":"https://www.rmconsult.com/projects/port-of-alaska-petroleum-cement-terminal-geotechnical/","publisher":"R&M Consultants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Terminal engineering project account","url":"https://www.rmconsult.com/projects/port-of-alaska-petroleum-cement-terminal/","publisher":"R&M Consultants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Anchorage Alaska aerial view.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers, photographer not specified or unknown","year":1999,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"port-of-anchorage.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-of-anchorage/download/schematic"},{"id":"project-image","title":"Anchorage Alaska aerial view.jpg","kind":"project-image","fileName":"port-of-anchorage.jpg","mimeType":"image/jpeg","bytes":384244,"sha256":"c2bd6a0bb19c2276a49b485f47e1072f250b9b1767b9227f8b7514dea12d6634","sourceId":"s4","license":"Public domain","width":1280,"height":769,"credit":"U.S. Army Corps of Engineers, photographer not specified or unknown","sourceUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg#Licensing","imageDate":"1999-02-20","evidenceFile":"image-provenance/port-of-anchorage-commons.json","evidenceSha256":"ff2e3e8fe1f994820c8639a1ee26eaf5db81a5ebfda8ab8220368093c6e2207a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/67/Anchorage_Alaska_aerial_view.jpg","downloadUrl":"/cases/port-of-anchorage/download/project-image","originalSha1":"11a58562274dd12774ff3b6e9641cb7583a04c59","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"port-of-anchorage-capstone.md","mimeType":"text/markdown","bytes":3590,"sha256":"723fcf83c2e8348839d3b7975f57ee3ab426108ba4d1b423a77fcd9f6efb101a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-of-anchorage/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska.","caption":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska. This is port context; the photograph is not represented as a record of the later test-pile or petroleum/cement-terminal construction stage.","credit":"U.S. Army Corps of Engineers, photographer not specified or unknown","sourceUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg#Licensing","width":1280,"height":769,"imageDate":"1999-02-20","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska. This is port context; the photograph is not represented as a record of the later test-pile or petroleum/cement-terminal construction stage.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":100,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/port-of-anchorage-commons.json","evidenceSha256":"ff2e3e8fe1f994820c8639a1ee26eaf5db81a5ebfda8ab8220368093c6e2207a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":389033,"sourceCount":4,"url":"/cases/port-of-anchorage"},{"id":"sutong-bridge","title":"Sutong Bridge — deep pile groups and riverbed scour protection","summary":"The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.","topics":["deep-foundations","lateral-foundations","scour-erosion","site-investigation","monitoring","coastal-offshore"],"country":"China","region":"Yangtze River, Jiangsu","owner":"Sutong Bridge project authorities","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Large drilled-shaft groups","Post-grouting","Group interaction","Scour protection","Cofferdams"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The foundation papers describe 131 shafts beneath each main pylon, project-specific test/model evidence and construction methods. Published pile dimensions and group coefficients apply to the stated foundation and cannot be adopted as universal design factors.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The source papers include pile testing, model studies and field-monitoring comparisons, while a complete current inspection and as-built record set was not established.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coupled foundation-and-scour assessment for one Sutong main pylon, preserving the distinction between individual-pile testing and group response.","inputs":["Select the north or south foundation and retain its own shaft geometry, stratigraphy, load tests and pile-cap configuration.","Extract the design scour/protection assumptions and identify temporary construction conditions separately from permanent conditions."],"deliverables":["Compare single-shaft and group axial/lateral response using transparent assumptions and documented calibration evidence.","Prepare a scour-monitoring and protection-maintenance concept with a construction-stage cofferdam risk register.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would a tip post-grouting result on a single shaft not directly establish the settlement of the full pylon pile group?","How could local bed erosion change lateral foundation response even before the calculated axial resistance becomes critical?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of the Sutong Bridge foundations","url":"https://www.xcdsystem.com/dfi/journal/?abstractid=2007010101","publisher":"Project designers and constructors / DFI Journal","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Super-large bridge pile foundation in soft soil — testing and monitoring","url":"https://scholarsmine.mst.edu/icchge/7icchge/session08/1/","publisher":"Yang, Dai and Gong / Missouri S&T","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Scour protection for deep-water pylon foundations","url":"https://www.engineering.org.cn/sscae/EN/1160099698767880365","publisher":"Project authors / Strategic Study of CAE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Sutong Bridge in construction2.jpg","url":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","publisher":"Trevor and Joce","year":2007,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sutong-bridge.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"sutong-bridge-reference-values.csv","mimeType":"text/csv","bytes":964,"sha256":"54b76bad46f0abfe39229fdb6dfc70c2341fb243dea6db60699071418a1032b2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/sutong-bridge/download/reference-values"},{"id":"project-image","title":"Sutong Bridge — construction over the Yangtze","kind":"project-image","fileName":"sutong-bridge.jpg","mimeType":"image/jpeg","bytes":216713,"sha256":"cde90ed38819bb57406e5fc776e0ca7aa7dc3eb74adc203bb315a6aa21b51804","sourceId":"s4","license":"CC BY-SA 2.0","width":386,"height":588,"credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2007-08-23 12:57","evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d2/Sutong_Bridge_in_construction2.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/sutong-bridge/download/project-image","originalSha1":"0068ceeba8bd5efef4ff854c6ad6f377810c71aa","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sutong-bridge-capstone.md","mimeType":"text/markdown","bytes":4785,"sha256":"5f940d78551b92642633723f99f53ef00b6175da520c7ec011354b245973f91c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","caption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":386,"height":588,"imageDate":"2007-08-23 12:57","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":112,"referenceValues":[{"label":"Bored piles per main pylon foundation","value":131,"unit":"piles","scope":"Large main-pylon group described in the DFI foundation paper; not the whole-bridge pile total.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — shorter group","value":114,"unit":"m","scope":"One of the two reported main-pylon pile lengths; verify group location in the source before modelling.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — longer group","value":117,"unit":"m","scope":"Other reported main-pylon pile length; not an uncertainty range for every pile.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":223661,"sourceCount":4,"url":"/cases/sutong-bridge"},{"id":"osman-gazi-bridge","title":"Osman Gazi Bridge — seismic caissons on gravel beds","summary":"The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.","topics":["lateral-foundations","seismic","ground-improvement","coastal-offshore","site-investigation","delivery"],"country":"Türkiye","region":"Izmit Bay","owner":"Gebze–Orhangazi–Izmir motorway project","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seismic soil–structure interaction","Caisson foundations","Ground improvement","Interface sliding"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The design paper models gravel-bed and reinforced-subsoil response using nonlinear foundation elements. Contractor records explain floating and sinking the caissons onto prepared crushed rock. A controlled-sliding concept needs both displacement and residual-performance checks.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"IHI describes a 42-month construction period. Treat that as the contractor’s overall project account, not a detailed foundation activity schedule.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The construction accounts document the built crossing; the design-stage soil–structure model is not a substitute for measured earthquake performance.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare fixed-base and nonlinear-foundation representations for a bridge tower supported on a prepared gravel interface.","inputs":["Extract foundation arrangement, soil improvement and the interface behaviour from the design-stage paper.","Identify the earthquake performance objectives and distinguish assumptions in the analysis from measured field response."],"deliverables":["Construct a reduced nonlinear spring/interface model and compare sliding, rocking and residual displacement under selected study motions.","Prepare seabed preparation, caisson placement, survey-tolerance and post-earthquake inspection requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When can intentional foundation sliding reduce structural demand while increasing permanent displacement and service-restoration work?","Which installation tolerances and seabed observations are needed to make the assumed gravel-interface behaviour credible?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modelling of soil–structure interaction for seismic analyses of the Izmit Bay Bridge","url":"https://www.cfms-sols.org/sites/default/files/Actes/763-768.pdf","publisher":"Project design authors / CFMS conference proceedings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Osman Gazi Bridge construction sequence","url":"https://www.ihi.co.jp/iis/en/gallery/movie/izmit_movie.html","publisher":"IHI Infra-square","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Osman Gazi Bridge project account","url":"https://www.webuildgroup.com/en/projects/bridges-viaducts/osman-gazi-bridge/","publisher":"Webuild","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Osman-Gazi-Bridge-620x410.jpg","url":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","publisher":"Erdmkiliic","year":2016,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"osman-gazi-bridge.svg","mimeType":"image/svg+xml","bytes":1201,"sha256":"0f34c5a583e4d9e8427d0110ef6d716d217e38ffb3b4ade758e04d51b5451084","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/schematic"},{"id":"project-image","title":"Osman Gazi Bridge — suspension crossing","kind":"project-image","fileName":"osman-gazi-bridge.jpg","mimeType":"image/jpeg","bytes":152148,"sha256":"0c746b33551461f356d58e95fe70fe4588a48903a60efef88a9c49d11e78123b","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2016-07-07","evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/Osman-Gazi-Bridge-620x410.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/osman-gazi-bridge/download/project-image","originalSha1":"1ec066ac577efd9795f0ed8a5eb0f7511078f1be","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"osman-gazi-bridge-capstone.md","mimeType":"text/markdown","bytes":3672,"sha256":"d6891d8af9dd21f85ea6c6bbfdf985f634c0fca28dd9c3214f6d365b1b7b4fb7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","caption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2016-07-07","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":113,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157021,"sourceCount":4,"url":"/cases/osman-gazi-bridge"},{"id":"hywind-scotland","title":"Hywind Scotland — suction anchors for floating wind","summary":"Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.","topics":["coastal-offshore","lateral-foundations","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"Buchan Deep, offshore Peterhead","owner":"Equinor / Masdar","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Suction anchors","Inclined cyclic loading","Mooring–soil interaction","Installation and decommissioning"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Project sources describe the spar, mooring lines and suction anchors; the 2022 decommissioning programme gives asset-specific arrangements. Distinguish the floating turbine substructure from its seabed anchor foundation and do not transfer onshore monopile checks directly.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The operator records commissioning in 2017. The 2022 decommissioning document is a programme, not evidence that removal has occurred.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The published field study reports subsea observations from 2018 and 2020. These observations show asset inspection opportunities and are not a complete geotechnical acceptance certificate.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a suction-anchor concept and inspection strategy for one mooring line, including cyclic demand and removal feasibility.","inputs":["Trace the three-point mooring arrangement and identify the anchor information actually supplied by the project.","Develop explicit study soil profiles and load envelopes when borehole/CPT data or proprietary design loads are unavailable."],"deliverables":["Compare installation suction, holding capacity and cyclic degradation scenarios, retaining the distinction between drained and undrained assumptions.","Prepare an ROV inspection plan, cable/mooring interaction review and a decommissioning sequence with geotechnical risks.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can an anchor meet a monotonic holding-capacity check yet remain unsuitable under repeated inclined mooring loads?","How would the preferred removal method change if the as-installed suction anchor has tilted or developed significant internal soil plugging?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Hywind Scotland — operator project information","url":"https://www.equinor.com/energy/hywind-scotland","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pilot Park decommissioning programme, May 2022","url":"https://cdn.equinor.com/files/h61q9gi9/global/1b585f93025b2cf77ece1bb597520ff325454abc.pdf?hywind-scotland-pilot-park-decommissioning-programme-submission-may-2022-equinor.pdf=","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Artificial hard-substrate colonisation — field inspection of structures, moorings and anchors","url":"https://wes.copernicus.org/articles/7/801/2022/","publisher":"Karlsson et al. / Wind Energy Science","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Hywind Wind Farm, off Peterhead - geograph.org.uk - 7226685.jpg","url":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","publisher":"Mike Pennington","year":2022,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hywind-scotland.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/schematic"},{"id":"project-image","title":"Hywind Scotland — floating turbines offshore Peterhead","kind":"project-image","fileName":"hywind-scotland.jpg","mimeType":"image/jpeg","bytes":184836,"sha256":"69d6f91c41a64fb6d8b73f64d25fc5e470c5c2dbaa26c9e97b497bcbef3d07e8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":854,"credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2022-06-22","evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/65/Hywind_Wind_Farm%2C_off_Peterhead_-_geograph.org.uk_-_7226685.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/hywind-scotland/download/project-image","originalSha1":"73679c0939c31070d5973600125fa5b98e70746c","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hywind-scotland-capstone.md","mimeType":"text/markdown","bytes":3976,"sha256":"85e5f997085ffbc3896b28ac27ae3e0c519a862847311a508ef90f2414b41c54","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","caption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":854,"imageDate":"2022-06-22","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":114,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":190019,"sourceCount":4,"url":"/cases/hywind-scotland"},{"id":"eastern-scheldt-barrier","title":"Eastern Scheldt Barrier — foundation mats and scour resilience","summary":"The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.","topics":["coastal-offshore","shallow-foundations","scour-erosion","ground-improvement","monitoring","delivery"],"country":"Netherlands","region":"Zeeland","owner":"Rijkswaterstaat","year":1986,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Graded foundation mats","Marine scour protection","Filter compatibility","Hydraulic–geotechnical interaction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Rijkswaterstaat documents the barrier arrangement and construction period. USACE guidance describes the Eastern Scheldt graded foundation-mat approach, while recent Deltares work reassesses hydraulic loads for renewal. Hydraulic model results must be translated into geotechnical limit states.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Rijkswaterstaat dates construction to 1976–1986. Deltares describes later 2024–2025 testing for renewal, a separate phase of the asset lifecycle.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner provides an operating history; the recent research supports maintenance decisions, not a new claim that every original foundation detail is verified under future loads.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a study section of a barrier foundation and protection apron, linking hydraulic demand to filter stability, bearing and erosion-resistant details.","inputs":["Use the owner source for the barrier configuration and the technical guidance for the mat/filter concept.","Define study bed-material gradations, hydraulic loading and foundation parameters; record what is measured and what is assumed."],"deliverables":["Check filter retention/permeability and sensitivity to edge scour and loss of support near the protection apron.","Prepare construction placement tolerances, underwater inspection criteria and a renewal plan under changed hydraulic loads.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a stable surface armour layer still permit undermining through an incompatible filter or an exposed apron edge?","Which results from a hydraulic scale model can directly inform foundation checks, and which require a separate soil-response model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eastern Scheldt Barrier — owner project record","url":"https://www.rijkswaterstaat.nl/en/projects/iconic-structures/eastern-scheldt-barrier","publisher":"Rijkswaterstaat","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"ETL 1110-2-565 — scour-protection and foundation-mat discussion","url":"https://www.publications.usace.army.mil/Portals/76/Publications/EngineerTechnicalLetters/ETL_1110-2-565.pdf","publisher":"U.S. Army Corps of Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Barrier renewal scale-model tests, 2024–2025","url":"https://www.deltares.nl/en/news/mini-eastern-scheldt-barrier-passes-extreme-storm-tests","publisher":"Deltares","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Oosterscheldekering.jpg","url":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","publisher":"Klankbeeld","year":2025,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eastern-scheldt-barrier.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eastern-scheldt-barrier-reference-values.csv","mimeType":"text/csv","bytes":644,"sha256":"e611fa5ed1abaf9bdc927b2b599be79f50f803e70bb4fdcf5b9df61e14162090","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eastern-scheldt-barrier/download/reference-values"},{"id":"project-image","title":"Eastern Scheldt Barrier — view from Westerschouwen","kind":"project-image","fileName":"eastern-scheldt-barrier.jpg","mimeType":"image/jpeg","bytes":225473,"sha256":"6be491da8741403f8266f67a77fc1e5e8b735b92cb7b2d27384dff4b3517a1e3","sourceId":"s4","license":"CC BY 4.0","width":1280,"height":720,"credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2025-01-28 15:00:00","evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e8/Oosterscheldekering.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eastern-scheldt-barrier/download/project-image","originalSha1":"b70e8701cc9305b1c2e1913069101ff01517625d","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eastern-scheldt-barrier-capstone.md","mimeType":"text/markdown","bytes":4598,"sha256":"7f3a6d20167aaefea6b90d8406ae9221540013fa07968034ca578ad67a99cc1e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","caption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":720,"imageDate":"2025-01-28 15:00:00","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","qualityNotes":["The USACE technical-letter PDF is linked at its official source; that host denied a local download during this review. The local project brief and photograph remain available."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":115,"referenceValues":[{"label":"Total barrier length","value":9,"unit":"km","scope":"Owner-reported overall barrier length, including fixed sections.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."},{"label":"Movable-section length","value":3,"unit":"km","scope":"Movable portion within the overall barrier; not a separate structure to add to the 9 km total.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":231922,"sourceCount":4,"url":"/cases/eastern-scheldt-barrier"},{"id":"venice-mose","title":"Venice MOSE — marine caisson placement and movement monitoring","summary":"The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.","topics":["coastal-offshore","shallow-foundations","settlement","ground-improvement","monitoring","delivery"],"country":"Italy","region":"Venice Lagoon","owner":"Italian Ministry of Infrastructure / MOSE project","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine caisson foundations","Ground–structure interaction","Precision grouting","GNSS/InSAR monitoring"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The designers explain caisson foundations, settlement assessment and watertight interfaces. The monitoring paper studies MOSE shoulder structures using GNSS and InSAR. Measurements of a shoulder cannot automatically be assigned to every gate caisson or inlet.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The locally available article provides component-specific deformation evidence. Its underlying MOSE GNSS observations have restricted access; open access to the article does not make those raw records downloadable. Complete construction acceptance records and final accounts were not provided.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a placement-and-monitoring design for a selected MOSE inlet caisson or shoulder, with explicit tolerances and a defensible spatial interpretation of movements.","inputs":["Select one inlet and one structure type; compile its geometry and support concept from the designer source.","Extract monitoring periods, reference frame, instrument precision and measured components from the published deformation study."],"deliverables":["Evaluate bearing and differential-settlement sensitivity for the selected foundation and define placement/grouting tolerances.","Design a combined survey/InSAR monitoring workflow that separates regional subsidence, structural movement and measurement noise.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would agreement between satellite line-of-sight and GNSS observations still require care before inferring a vertical settlement at a nearby gate?","How should a marine caisson placement sequence respond when the achieved support level differs from the alignment tolerance assumed by the gate designer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"MOSE — designer account of barrier and caisson foundations","url":"https://www.technital.net/projects/marine-and-coastal/special-marine-works/ingenieria-maritima-y-costera-mobile-surge-barriers-at-the-three-inlets-of-the-venice-lagoon-mose-italy","publisher":"Technital","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Integrated GNSS and InSAR analysis of MOSE shoulder structures","url":"https://www.mdpi.com/2072-4292/17/6/1059","publisher":"Project research authors / Remote Sensing","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"MOSE marine caisson foundation works","url":"https://proserveltd.co.uk/casestudies/venice/","publisher":"Proserve","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","url":"https://www.mdpi.com/2072-4292/17/6/1059/pdf","publisher":"Massimo Fabris and Mario Floris / Remote Sensing (MDPI)","year":2025,"access":"public-link","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","notes":"","checked":"2026-11-22","localAssetIds":["mose-monitoring-2025"]},{"id":"s5","title":"MOSE Project Venice.jpg","url":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","publisher":"Wikimedia Commons contributor","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"venice-mose.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/schematic"},{"id":"mose-monitoring-2025","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","kind":"report","fileName":"mose-monitoring-2025.pdf","mimeType":"application/pdf","bytes":7574597,"sha256":"4c89f5e78f6cd7fcbead8a0bebb6c7d5977141553ebb5a1c583a0827438270bf","sourceId":"s4","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","rightsUrl":"https://creativecommons.org/licenses/by/4.0/","rightsBasis":"The article first page and publisher page explicitly license this work under CC BY 4.0. The original PDF is redistributed unchanged, with author credit and DOI retained.","rightsEvidenceUrl":"https://www.mdpi.com/2072-4292/17/6/1059","pages":21,"downloadUrl":"/cases/venice-mose/download/mose-monitoring-2025"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"venice-mose-reference-values.csv","mimeType":"text/csv","bytes":611,"sha256":"71e6e7c4d13ce07281889fb2d4d103f8b1dc271e11b43c23d1c3378905ee0d3d","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/venice-mose/download/reference-values"},{"id":"project-image","title":"MOSE at the Lido inlet — construction in 2009","kind":"project-image","fileName":"venice-mose.jpg","mimeType":"image/jpeg","bytes":193898,"sha256":"ce7841b2d704bbc54e8005c5b4c7810008885b90c3caa31c55647589b3fc4d9f","sourceId":"s5","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-07-25 08:19:50","evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/27/MOSE_Project_Venice.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/venice-mose/download/project-image","originalSha1":"068a07bb2f08ce4ce810f1aeeb43e296ec7026dc","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"venice-mose-capstone.md","mimeType":"text/markdown","bytes":4928,"sha256":"087b1e2f4c7f9465eb18640c48853afe32fcd4bc0e4ca8168332f337007a53cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","caption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"2009-07-25 08:19:50","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","qualityNotes":["The locally downloadable monitoring article is CC BY 4.0. Its underlying MOSE GNSS observations are restricted by Consorzio Venezia Nuova; do not describe those raw observations as an open downloadable dataset."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":116,"referenceValues":[{"label":"MOSE continuous GNSS stations","value":36,"unit":"stations","scope":"32 stations on shoulder structures plus four local reference stations in the studied MOSE network.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."},{"label":"External reference-network stations","value":8,"unit":"stations","scope":"External stations used with the MOSE network; separate from its four local reference stations.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":7775241,"sourceCount":5,"url":"/cases/venice-mose"}]}