{"schemaVersion":1,"updated":"2026-11-22","total":7,"records":[{"id":"inuvik-tuktoyaktuk","title":"Inuvik–Tuktoyaktuk Highway — embankment over permafrost","summary":"The highway used fill placement and separation geotextile to protect permafrost, with much construction undertaken in winter.","topics":["cold-regions","earthworks","problem-soils","monitoring"],"country":"Canada","region":"Northwest Territories","owner":"Government of the Northwest Territories","year":2017,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Permafrost preservation","Fill-only construction","Thermal monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The owner describes the construction strategy; a Canadian geological report documents regional ground temperatures before and after construction.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner project page documents opening and winter construction strategy; use source milestones rather than an assumed year-round programme.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The owner page and regional ground-temperature report support performance review.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an embankment concept for ice-rich permafrost and compare seasonal construction and thaw-settlement risk.","inputs":["Extract the owner’s construction constraints and select a monitored ground-temperature location.","Record how ground-ice and soil-property information differ along the alignment."],"deliverables":["Prepare a thermal/thaw-settlement screening model and sensitivity to warming and drainage.","Plan borrow, winter hauling, geotextile placement and long-term temperature monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Inuvik Tuktoyaktuk Highway project","url":"https://www.inf.gov.nt.ca/en/ITH","publisher":"Government of the Northwest Territories","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Permafrost ground-temperature synthesis 2013–2019, GSC OF 8656","url":"https://publications.gc.ca/collections/collection_2021/rncan-nrcan/m183-2/M183-2-8656-eng.pdf","publisher":"Geological Survey of Canada / NWT Geological Survey","year":2020,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ITH Caribou Hills.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","publisher":"Wikimedia Commons / Samuell","year":2021,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"inuvik-tuktoyaktuk.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/schematic"},{"id":"project-image","title":"ITH Caribou Hills.jpg","kind":"project-image","fileName":"inuvik-tuktoyaktuk.jpg","mimeType":"image/jpeg","bytes":291929,"sha256":"55ee8cf3a180f741ff152d7c513710111400d26fa703c4819812f989a97ae89b","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":853,"credit":"Samuell","sourceUrl":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2021-02-13 17:33:04","evidenceFile":"image-provenance/inuvik-tuktoyaktuk-commons.json","evidenceSha256":"4c6669c299ecf13f73a372be900e2dffe1f4f769b807e13b8c03bd847a5d6646","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/85/ITH_Caribou_Hills.jpg","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"inuvik-tuktoyaktuk-capstone.md","mimeType":"text/markdown","bytes":3026,"sha256":"30173d5e66902d254c9880b2330409a9eda5a055399b3e40289fe7f9edbe9560","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik.","caption":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik. Photograph of the actual permafrost-road project corridor.","credit":"Samuell","sourceUrl":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":853,"imageDate":"2021-02-13 17:33:04"},"figureCaption":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik. Photograph of the actual permafrost-road project corridor.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":37,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/inuvik-tuktoyaktuk-commons.json","evidenceSha256":"4c6669c299ecf13f73a372be900e2dffe1f4f769b807e13b8c03bd847a5d6646","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":295923,"sourceCount":3,"url":"/cases/inuvik-tuktoyaktuk"},{"id":"dalton-air-convection","title":"Dalton Highway MP 209–222 — air-convection embankment trial","summary":"Twelve embankment test sections compared air-convection shoulder geometry and rock classes over thaw-unstable permafrost near milepost 219.","topics":["cold-regions","earthworks","monitoring","delivery"],"country":"United States","region":"Alaska","owner":"Alaska Department of Transportation and Public Facilities","year":2022,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Air-convection embankment","Insulation","Thermal monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The final report documents sections installed in 2017–2018 and three years of monitoring; it evaluates thermal performance rather than a complete climate-life prediction.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Test sections were installed in 2017–2018 and monitored for three years.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The 2022 final report presents the trial performance evaluation.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select an embankment shoulder treatment using measured thermal response and construction quantity comparisons.","inputs":["Extract section dimensions, rock class and ground-temperature records.","Separate effects of embankment height, rock size and shoulder width."],"deliverables":["Compare thermal performance and rock quantities for the test configurations.","Specify monitoring and maintenance needed to retain open pore spaces and drainage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Air Convection Embankment experimental feature — final report","url":"https://rosap.ntl.bts.gov/view/dot/65788","publisher":"Alaska DOT&PF","year":2022,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"dalton-air-convection.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/dalton-air-convection/download/schematic"},{"id":"project-image","title":"Dalton Highway — air-convection embankment placement","kind":"project-image","fileName":"dalton-air-convection-r13.jpeg","mimeType":"image/jpeg","bytes":266437,"sha256":"41cd81354e831ab47d34011a8f272506fbc40a1cf387a967fe8e943ae878971d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1472,"height":1103,"credit":"Alaska DOT&PF; report by Matt Billings and Michael Berggren (2022)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/65788","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/65788","imageDate":null,"evidenceFile":"image-provenance/dalton-air-convection-r13-source.json","evidenceSha256":"1b5ef9ae1e3e062b9b5e227cc5c3cbb23389ce29fda155dc9bf4906d670eef2c","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://rosap.ntl.bts.gov/view/dot/65788/dot_65788_DS1.pdf","originalSha256":"f6f2a75551ad504c4d381a1170961c89e6da7a9201e2a5498a3340cbd863068c","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/dalton-air-convection/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"dalton-air-convection-capstone.md","mimeType":"text/markdown","bytes":2644,"sha256":"e683517c5d3198347da8f1c967c583b58f2e6093f00c2cc29af1a274f241b638","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/dalton-air-convection/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","caption":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","credit":"Alaska DOT&PF; report by Matt Billings and Michael Berggren (2022)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/65788","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/65788","width":1472,"height":1103,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":38,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/dalton-air-convection-r13-source.json","evidenceSha256":"1b5ef9ae1e3e062b9b5e227cc5c3cbb23389ce29fda155dc9bf4906d670eef2c","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3612,"sourceCount":1,"url":"/cases/dalton-air-convection"},{"id":"trans-alaska-pipeline","title":"Trans-Alaska Pipeline — thermally stabilized supports in permafrost","summary":"The pipeline uses elevated supports where thaw-sensitive permafrost would be disturbed by warm oil. Operator and state-geology sources describe thermal support members, heat-pipe monitoring and maintenance.","topics":["cold-regions","deep-foundations","monitoring","problem-soils"],"country":"United States","region":"Alaska","owner":"Alyeska Pipeline Service Company","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Thermosyphons","Thaw settlement","Thermal piles","Infrared surveillance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources explain design modes and thermal monitoring. They do not justify assuming that every support experiences the same ground temperature or ice content.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The sources describe an operating maintenance system and ongoing observations, not a once-only completed cooling treatment.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design an elevated pipe support whose foundation must remain stable as the seasonal thermal regime changes.","inputs":["Distinguish thaw-stable and thaw-unstable ground and identify the operator’s design modes.","Define a study soil-ice profile, climate series and support load using clearly stated assumptions."],"deliverables":["Compare thaw-settlement risk for untreated and passively cooled supports.","Prepare heat-pipe inspection, performance assessment and repair priorities.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is a foundation’s thermal condition as important as its initial bearing capacity?","Which observations distinguish a failed heat pipe from a change in regional ground temperature?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Permafrost and pipeline design modes","url":"https://alyeska-pipe.com/environmental-protection/","publisher":"Alyeska Pipeline Service Company","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Guide to permafrost and pipeline thermal supports","url":"https://dggs.alaska.gov/webpubs/dggs/gb/text/gb011.pdf","publisher":"Alaska Division of Geological & Geophysical Surveys","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Pipeline vertical support member.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","publisher":"Wikimedia Commons / JKBrooks85","year":2009,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"trans-alaska-pipeline.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/trans-alaska-pipeline/download/schematic"},{"id":"project-image","title":"Pipeline vertical support member.jpg","kind":"project-image","fileName":"trans-alaska-pipeline.jpg","mimeType":"image/jpeg","bytes":276864,"sha256":"95af32a5a9e743df4620352815794b8e849ecacf42f144afd7539bfb960faf59","sourceId":"s3","license":"Public domain","width":1280,"height":1786,"credit":"JKBrooks85","sourceUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg#Licensing","imageDate":"2009-07-15","evidenceFile":"image-provenance/trans-alaska-pipeline-commons.json","evidenceSha256":"35ae4095e2d748ed8f40f58a36da1e011fc8623305a2e9c5960b497c63202f7a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/7/7c/Pipeline_vertical_support_member.jpg","downloadUrl":"/cases/trans-alaska-pipeline/download/project-image","originalSha1":"d00ccb10f81ff141b64657c56034afc9de8df237","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"trans-alaska-pipeline-capstone.md","mimeType":"text/markdown","bytes":3223,"sha256":"ec3686dad92cdeee5d12b99ad4f7a2c3957dd463a9f24f58d97ff6e6ea2535eb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/trans-alaska-pipeline/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators.","caption":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators. The photograph shows the actual foundation-cooling detail used to protect frozen ground around supports.","credit":"JKBrooks85","sourceUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg#Licensing","width":1280,"height":1786,"imageDate":"2009-07-15","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators. The photograph shows the actual foundation-cooling detail used to protect frozen ground around supports.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":85,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/trans-alaska-pipeline-commons.json","evidenceSha256":"35ae4095e2d748ed8f40f58a36da1e011fc8623305a2e9c5960b497c63202f7a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":281055,"sourceCount":3,"url":"/cases/trans-alaska-pipeline"},{"id":"qinghai-tibet-railway","title":"Qinghai–Tibet Railway — crushed-rock embankments over warming permafrost","summary":"Instrumented railway embankments provide evidence on the cooling and deformation of crushed-rock configurations. Researchers compare thermal performance, sunny/shady slope effects and continuing permafrost change.","topics":["cold-regions","earthworks","monitoring","problem-soils"],"country":"China","region":"Qinghai–Tibet Plateau","owner":"Qinghai–Tibet Railway","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Air-convection embankments","Thermal monitoring","Thaw deformation"],"documentationLevel":"monitoring-study","design":{"availability":"partial","summary":"The monitoring paper reports several embankment configurations. Later proposed reinforcement is research, not proof that every monitored section was reconstructed with that measure.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select an embankment cross-section for warm permafrost using both thermal and deformation performance.","inputs":["Extract the monitoring period and distinguish the compared crushed-rock arrangements.","Define climate, aspect and rock-layer permeability sensitivities for the study section."],"deliverables":["Compare seasonal cooling and thaw-depth trends under alternative geometries.","Develop maintenance checks for clogging, slope asymmetry and track-level movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a rock layer lose cooling effectiveness even when its thickness is unchanged?","Why should the warmest year and cumulative thermal trend both inform maintenance decisions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Cooling performance and deformation of railway embankments","url":"https://www.sciencedirect.com/science/article/pii/S0013795219312098","publisher":"Tai and coauthors / Engineering Geology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Performance and reinforcement study","url":"https://pmc.ncbi.nlm.nih.gov/articles/PMC11471204/","publisher":"Research authors / open journal article","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Lhassa-Xining railway.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","publisher":"Wikimedia Commons / This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","year":2012,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"qinghai-tibet-railway.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/qinghai-tibet-railway/download/schematic"},{"id":"project-image","title":"Lhassa-Xining railway.JPG","kind":"project-image","fileName":"qinghai-tibet-railway.jpg","mimeType":"image/jpeg","bytes":577578,"sha256":"e3bdb64f0cac308615d1017bb64abcec0d6a428ad400ccf8d23332aaaef94bc0","sourceId":"s3","license":"CC0","width":1280,"height":961,"credit":"This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","sourceUrl":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2012-05-14","evidenceFile":"image-provenance/qinghai-tibet-railway-commons.json","evidenceSha256":"570452a99f700b14e881a3d7d43b31edcc6795fb8a69c2b1e322e281bafca47d","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/90/Lhassa-Xining_railway.JPG","downloadUrl":"/cases/qinghai-tibet-railway/download/project-image","originalSha1":"e561258d5e03d572416a91865a11a4421aca973f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"qinghai-tibet-railway-capstone.md","mimeType":"text/markdown","bytes":3908,"sha256":"9fd34b9e382fbf6d1d0107977d066f9ff370d3eb2ecab7364cad29b308c04651","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/qinghai-tibet-railway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Qinghai–Tibet railway route beyond Golmud.","caption":"The Qinghai–Tibet railway route beyond Golmud. This is corridor context; it is not labeled as one of the instrumented cross-sections in the cited monitoring papers.","credit":"This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","sourceUrl":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":961,"imageDate":"2012-05-14","imageDownloadAllowed":true},"figureCaption":"The Qinghai–Tibet railway route beyond Golmud. This is corridor context; it is not labeled as one of the instrumented cross-sections in the cited monitoring papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":86,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/qinghai-tibet-railway-commons.json","evidenceSha256":"570452a99f700b14e881a3d7d43b31edcc6795fb8a69c2b1e322e281bafca47d","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":582454,"sourceCount":3,"url":"/cases/qinghai-tibet-railway"},{"id":"svalbard-seed-vault","title":"Svalbard Seed Vault — tunnel waterproofing and frozen ground","summary":"The Seed Vault upgrade replaced its access tunnel with a watertight concrete structure and moved heat-producing services. The construction account includes artificial ground freezing to support the replacement works.","topics":["cold-regions","tunnels","ground-improvement","seepage","rock","delivery"],"country":"Norway","region":"Longyearbyen, Svalbard","owner":"Norwegian Ministry of Agriculture and Food / Statsbygg","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Tunnel waterproofing","Thermal disturbance","Groundwater exclusion"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner sources describe the 2016–2019 upgrade and freezing used during tunnel construction. The seed-storage chambers and the entrance tunnel have different thermal and groundwater functions; do not treat the entire facility as one homogeneous frozen-ground boundary.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner identifies the main upgrade period as 2016–2019; the 2018 construction update describes the work while it was in progress.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner reports a waterproofed entrance tunnel and upgraded cooling. Published descriptions do not provide the full freeze-pipe commissioning records or as-built waterproofing details.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a watertight tunnel replacement in warming permafrost, combining temporary frozen-ground support with a permanent drainage, waterproofing and thermal strategy.","inputs":["Map the access tunnel, rock chambers, service heat sources and surface-water pathways from the owner descriptions.","Define study values for unfrozen permeability, ice content, thermal properties and freezing-system temperature, flagging them as assumptions."],"deliverables":["Estimate freeze-wall development and thaw sensitivity around the excavation, then assess leakage and uplift for the permanent tunnel.","Prepare freezing verification holes, temperature monitoring, excavation hold points and a seasonal surface-water diversion plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does removing internal heat generation help even when the final tunnel lining is designed to be watertight?","What measurements would establish adequate frozen-ground continuity before excavation without confusing cold air with frozen soil?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Construction improvements and temporary ground freezing","url":"https://www.seedvault.no/2018/09/04/seed-vault-construction-improvements-proceed-as-planned/","publisher":"Svalbard Global Seed Vault / Norwegian Ministry of Agriculture and Food","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Purpose, operations and 2016–2019 upgrade","url":"https://www.seedvault.no/about/purpose-operations-and-organisation/","publisher":"Svalbard Global Seed Vault","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Facility operation and tunnel arrangement","url":"https://www.nordgen.org/our-work/svalbard-global-seed-vault/frequently-asked-questions/","publisher":"NordGen","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Svalbard Global Seed Vault Exterior 2020.jpg","url":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","publisher":"Cierra Martin for Crop Trust","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"svalbard-seed-vault.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/schematic"},{"id":"project-image","title":"Svalbard Global Seed Vault — exterior in 2020","kind":"project-image","fileName":"svalbard-seed-vault.jpg","mimeType":"image/jpeg","bytes":345849,"sha256":"3514d4606ff689bef0b68899a77237a3b3cf4225b33b29b32b01f7ab01657dc8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":913,"credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-02-25","evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e3/Svalbard_Global_Seed_Vault_Exterior_2020.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/svalbard-seed-vault/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"svalbard-seed-vault-capstone.md","mimeType":"text/markdown","bytes":3964,"sha256":"7be9dac2dda47c60c428fcb9c412c0a4663488f05b6fa991da6346122ad9c1cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","caption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":913,"imageDate":"2020-02-25","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":106,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350781,"sourceCount":4,"url":"/cases/svalbard-seed-vault"},{"id":"halley-vi","title":"Halley VI — relocatable foundations on accumulating snow","summary":"The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.","topics":["cold-regions","shallow-foundations","settlement","monitoring","delivery"],"country":"Antarctica","region":"Brunt Ice Shelf, Antarctica","owner":"British Antarctic Survey","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow bearing and creep","Jackable foundations","Differential movement","Relocation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"BAS documents the hydraulic-leg concept, seasonal raising procedure and 2016/17 relocation. Ground support is deformable snow/ice, so a conventional soil bearing-capacity calculation alone does not represent the governing behaviour.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"BAS records relocation to a new site during the 2016/17 Antarctic season.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"BAS publishes operational descriptions of raising and maintaining the station. A complete calibrated snow-foundation model and support-load register are not supplied.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an operating and lifting plan for a modular station on snow, explicitly separating creep settlement, drifting accumulation and large-scale ice-shelf movement.","inputs":["Extract the actual support arrangement and raising sequence from BAS material.","Define a labelled study range for snow density, creep response, wind/drift loading and allowable module distortion."],"deliverables":["Compare support pressure and time-dependent movement for alternative ski contact areas and raising intervals.","Prepare a one-leg-at-a-time lifting sequence, temporary support checks, survey tolerances and relocation triggers.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can increasing foundation contact area reduce bearing pressure yet leave annual raising and relocation necessary?","How would uneven snow placement beneath one leg appear in level surveys, and how could it be distinguished from a drifting snow-surface change?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Halley VI Research Station — facility and support system","url":"https://www.bas.ac.uk/polar-operations/sites-and-facilities/facility/halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Halley Research Station relocation","url":"https://www.bas.ac.uk/project/moving-halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Preparing Halley VI for winter — annual raising operations","url":"https://www.bas.ac.uk/blogpost/seasons-end-hibernating-halley-vi-for-the-winter/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Halley VI Antarctic Research Station - view from North East.jpg","url":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","publisher":"Hugh Broughton Architects","year":2012,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"halley-vi.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/schematic"},{"id":"project-image","title":"Halley VI — raised modular research station","kind":"project-image","fileName":"halley-vi.jpg","mimeType":"image/jpeg","bytes":118311,"sha256":"daf2edd100b8853181848248a42315aa652f50e61d8c92c94f7b17560bc5e234","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2012-02-23 23:15:19","evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b1/Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/halley-vi/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"halley-vi-capstone.md","mimeType":"text/markdown","bytes":3692,"sha256":"9819e7bcf0b22239b8d6f67c7382c97ac1900cc0daccdb36464ab15043bcb185","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","caption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2012-02-23 23:15:19","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":107,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":122971,"sourceCount":4,"url":"/cases/halley-vi"},{"id":"south-pole-station","title":"South Pole Station — snow-foundation settlement and levelling","summary":"The elevated station experiences nonuniform support-column settlement in deep permanent snow. USACE reports analyze surveys, floor levelness and maintenance decisions, making a useful observational-design case.","topics":["cold-regions","settlement","shallow-foundations","monitoring","laboratory-testing"],"country":"Antarctica","region":"Geographic South Pole","owner":"National Science Foundation / U.S. Antarctic Program","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow creep settlement","Survey adjustment","Differential settlement","Maintenance prediction"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The 2019 CRREL study evaluates column surveys and shimming, while the 2025 master plan describes continued monitoring and future lifting needs. These dated records should remain distinct from a new design assumption or a claim that a planned major lift has occurred.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The 2019 report provides support-column analysis. The 2025 plan describes 32 supporting columns, recurring surveys and future lifting requirements; it does not certify that a lift has already been completed.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Use the public support-column study to develop a forecast-and-levelling workflow for an elevated structure on compressible snow.","inputs":["Extract column identifiers, survey dates, reference levels and documented shimming events from the CRREL report.","Separate snow-surface accumulation from foundation movement and account for staged construction and unequal column loads."],"deliverables":["Fit a transparent settlement forecast with residual and extrapolation checks; compare the prediction with withheld survey dates if available.","Produce a floor-levelness map, column-priority list and maintenance decision rule with survey uncertainty.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How could a survey reference that moves with the snowpack distort a long-term foundation settlement assessment?","Which evidence would justify a major building lift instead of continued local shimming, and what data would a planner need to schedule it?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Analysis of recent support-column survey results — ERDC/CRREL SR-19-3","url":"https://www.erdc.usace.army.mil/Media/Publication-Notices/Article/1897499/publication-notice-analysis-of-recent-support-column-survey-results-for-the-ele/","publisher":"Blaisdell, Weale and Barna / USACE CRREL","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"South Pole Station Master Plan, 2025","url":"https://www.usap.gov/news/documents/SouthPoleMasterPlan.pdf","publisher":"U.S. Antarctic Program / National Science Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Amundsen-scott-south pole station 2007.jpg","url":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","publisher":"Bill Spindler, U.S. Antarctic Program, National Science Foundation","year":2008,"access":"public-link","license":"Public domain","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"south-pole-station.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/south-pole-station/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"south-pole-station-reference-values.csv","mimeType":"text/csv","bytes":388,"sha256":"32fad7f12be05aeb15f9c891c912b2289a32149d761d154bf07f70b1e4af4db0","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/south-pole-station/download/reference-values"},{"id":"project-image","title":"Amundsen–Scott South Pole Station — elevated facility","kind":"project-image","fileName":"south-pole-station.jpg","mimeType":"image/jpeg","bytes":293744,"sha256":"75b10c9ceee46be2a59db22cfabcbd129f5fa6431f92863bde15db9d21a27517","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"Bill Spindler, U.S. Antarctic Program, National Science Foundation / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","imageDate":"2008-02","evidenceFile":"image-provenance/south-pole-station-r14-source.json","evidenceSha256":"3538e99d4ef6c9ac2e03bda2557ab5de9b5f0a17ddf1f11ca501b96202e5c8c1","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/91/Amundsen-scott-south_pole_station_2007.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/south-pole-station/download/project-image","imageDownloadAllowed":true,"rightsStatus":"public-domain","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"south-pole-station-capstone.md","mimeType":"text/markdown","bytes":4423,"sha256":"987067e31bfc68faa4f9f4165f8cd5ebfce8a2b5425dda599cdedee3eac08a35","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/south-pole-station/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","caption":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","credit":"Bill Spindler, U.S. Antarctic Program, National Science Foundation / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","width":1280,"height":960,"imageDate":"2008-02","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"public-domain"},"figureCaption":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","qualityNotes":["The 2019 CRREL support-column report is indexed at the official publication notice, but its download host denied access during this review. The station master plan is a separate linked source."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":108,"referenceValues":[{"label":"Elevated-station support columns","value":32,"unit":"columns","scope":"Support-column count in the 2025 master plan; this does not specify a uniform load distribution.","sourceId":"s2","locator":"Elevated Station / foundation levelling","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/south-pole-station-r14-source.json","evidenceSha256":"3538e99d4ef6c9ac2e03bda2557ab5de9b5f0a17ddf1f11ca501b96202e5c8c1","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":299523,"sourceCount":3,"url":"/cases/south-pole-station"}]}