{"schemaVersion":1,"updated":"2026-11-22","total":20,"records":[{"id":"woodrow-wilson-foundations","title":"Woodrow Wilson Bridge — foundation selection and testing","summary":"Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.","topics":["deep-foundations","lateral-foundations","site-investigation","seismic","scour-erosion"],"country":"United States","region":"Potomac River, Virginia–Maryland","owner":"Virginia DOT / Maryland State Highway Administration","year":2008,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Pile foundations","Foundation alternatives","Soil–structure interaction","Scour allowance"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project papers document foundation optimization and constructed-foundation practice; verify the paper’s stage before treating an alternative as the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The 2008 paper provides a later construction-stage foundation account.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select and justify a bridge-pier foundation for a tidal river crossing using the project’s alternatives and investigation strategy.","inputs":["Extract boring profiles, selected pile geometry, load-test evidence and scour assumptions where published.","Record separately the design spectrum and the soil profile used in the foundation response study."],"deliverables":["Develop axial/group and lateral-response checks for a selected pier.","Compare two foundation alternatives with construction plant, testing and navigational constraints.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation optimization and design for replacement of the Woodrow Wilson Bridge","url":"https://scholarsmine.mst.edu/icchge/5icchge/session09/6/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2004,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"New I-95 Woodrow Wilson Bridge Foundations","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08/6/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Woodrow Wilson Bridge aerial 2012.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","publisher":"Wikimedia Commons / Doc Searls from Santa Barbara, USA","year":2012,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"woodrow-wilson-foundations.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/woodrow-wilson-foundations/download/schematic"},{"id":"project-image","title":"Woodrow Wilson Bridge aerial 2012.jpg","kind":"project-image","fileName":"woodrow-wilson-foundations.jpg","mimeType":"image/jpeg","bytes":247837,"sha256":"60e13516a959b10477debf6f01d67a1822be0c401b935c64eb09f3f83924f637","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":606,"credit":"Doc Searls from Santa Barbara, USA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2012-03-14 11:10","evidenceFile":"image-provenance/woodrow-wilson-foundations-commons.json","evidenceSha256":"f0b310a9f2468aa50476d768691bcc900e19a1771b989a996335547c471d2250","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/33/Woodrow_Wilson_Bridge_aerial_2012.jpg","downloadUrl":"/cases/woodrow-wilson-foundations/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"woodrow-wilson-foundations-capstone.md","mimeType":"text/markdown","bytes":3290,"sha256":"6afb567962ac563d089f9502685d44763d9e16214c58e0ec6573023f216cba28","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/woodrow-wilson-foundations/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012.","caption":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.","credit":"Doc Searls from Santa Barbara, USA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":606,"imageDate":"2012-03-14 11:10"},"figureCaption":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":5,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/woodrow-wilson-foundations-commons.json","evidenceSha256":"f0b310a9f2468aa50476d768691bcc900e19a1771b989a996335547c471d2250","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":252326,"sourceCount":3,"url":"/cases/woodrow-wilson-foundations"},{"id":"virginia-route288","title":"Virginia Route 288 — drilled-shaft quality evaluation","summary":"This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.","topics":["deep-foundations","site-investigation","monitoring","delivery"],"country":"United States","region":"Richmond region, Virginia","owner":"Virginia Department of Transportation","year":2004,"yearLabel":"Case reference year","projectType":"Construction quality and testing","methods":["Drilled shafts","Crosshole sonic logging","Pile integrity testing"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper addresses foundation evaluation and test interpretation; it is not the complete bridge design package.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published test and anomaly discussions support a quality-control exercise; the complete acceptance register is not included.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an inspection and acceptance plan for drilled shafts, including how to investigate an anomalous test result before deciding on remediation.","inputs":["Identify the shaft construction method, test types and reported anomalies.","Separate an instrument anomaly from an independently confirmed physical defect."],"deliverables":["Prepare a shaft inspection checklist and evidence-based test decision tree.","Design a supplemental investigation and a repair-verification programme for a selected anomaly.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case history: Foundation evaluation for the Virginia Highway 288 project","url":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2004,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"virginia-route288.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/virginia-route288/download/schematic"},{"id":"project-image","title":"Virginia Route 288 — drilled-shaft microcamera inspection","kind":"project-image","fileName":"virginia-route288-r13.png","mimeType":"image/png","bytes":456787,"sha256":"0e633fcb38fe2e682fcd020e9f07729175f71d1d5dab2fe370d72a0e407d32b2","sourceId":"s1","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":527,"height":395,"credit":"Emad Farouz, Paul Landers and Scott Webster (2004)","sourceUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2001-12-03","evidenceFile":"image-provenance/virginia-route288-r13-source.json","evidenceSha256":"33377d6ce9ec887fbd81fc654caa1a31cbfeab71987daed3c688f9b0b68a8d4a","transformations":"The source PDF stores the photograph as three overlapping strips. Rendered the complete original Figure 9 image rectangle without retouching, annotations, or loss of the embedded timestamp. Surrounding page text was excluded.","originalUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","originalSha256":"66f2fafdab1063fc379bef39de6061d2314de6c969a97b611a5bdb21a7661300","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-inspection-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/virginia-route288/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"virginia-route288-capstone.md","mimeType":"text/markdown","bytes":2920,"sha256":"2932362755e4b7365bb1e297f4cf3595cf28358867724afc354b70d5405cf7ea","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/virginia-route288/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","caption":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","credit":"Emad Farouz, Paul Landers and Scott Webster (2004)","sourceUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":527,"height":395,"imageDate":"2001-12-03","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-inspection-photograph"},"figureCaption":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":6,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/virginia-route288-r13-source.json","evidenceSha256":"33377d6ce9ec887fbd81fc654caa1a31cbfeab71987daed3c688f9b0b68a8d4a","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":460906,"sourceCount":1,"url":"/cases/virginia-route288"},{"id":"nj-turnpike-micropiles","title":"New Jersey Turnpike bridges — micropile underpinning","summary":"Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.","topics":["deep-foundations","scour-erosion","monitoring","delivery"],"country":"United States","region":"New Jersey","owner":"New Jersey highway agencies; see source","year":2008,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Hollow-bar micropiles","Underpinning","Verification/proof testing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case reports an 80-kip design load per micropile, cased exposure to scour level and different bond lengths at the four bridges.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports production proof tests and sacrificial verification tests.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan underpinning of an operating bridge with limited access and a temporary cofferdam.","inputs":["Select one of the four bridges and retain its soil profile, bond length and grout diameter.","Extract verification and production proof-test criteria."],"deliverables":["Check grout-ground bond, steel capacity and corrosion/scour exposure.","Prepare a load-transfer sequence and a test-and-acceptance schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Existing bridge retrofits, Turnpike, New Jersey","url":"https://www.geoinstitute.org/node/8358","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Gómez et al. (2008), Hollow Core Bar Micropile—Design Parameters Interpreted from 404 Load Tests.","checked":"2026-11-22"},{"id":"s2","title":"Bond Strength of Hollow-Core Bar Micropiles","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","notes":"Project image source. Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nj-turnpike-micropiles.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/schematic"},{"id":"project-image","title":"New Jersey Turnpike — micropile installation beneath a bridge","kind":"project-image","fileName":"nj-turnpike-micropiles-r13.jpeg","mimeType":"image/jpeg","bytes":28249,"sha256":"4678f47c6011a4c3fa0d2d05bb71100f88236b51368c43788e87e1e54853f8cd","sourceId":"s2","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":426,"height":374,"credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2008","evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://scholarsmine.mst.edu/cgi/viewcontent.cgi?article=2920&context=icchge","originalSha256":"a179eebce7ffb4e8e8313d962d90c9afe1486157038f57824499780f01df1b8e","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/nj-turnpike-micropiles/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nj-turnpike-micropiles-capstone.md","mimeType":"text/markdown","bytes":2919,"sha256":"2f89cefca8d0332f0acc0a04130440eb9e506f61c8d196d4ad95ebc36da9c74d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","caption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":426,"height":374,"imageDate":"2008","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph"},"figureCaption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":7,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":32367,"sourceCount":2,"url":"/cases/nj-turnpike-micropiles"},{"id":"snake-river-micropiles","title":"US 26/89, Snake River Canyon — micropile slope stabilization","summary":"A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.","topics":["slopes","deep-foundations","lateral-foundations","retaining-walls","monitoring"],"country":"United States","region":"Wyoming","owner":"Wyoming Department of Transportation","year":1997,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Reticulated micropiles","Ground anchors","Residual shear strength"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The published case describes battered micropiles, anchor layout, soil-rock sliding interface and instrumentation.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Construction ran from April to September 1997; monitoring continued through June 1998.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Inclinometers, piezometers, strain gauges, load cells and survey measurements are described.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a stabilizing micropile/anchor system for a sliding block and compare it with unloading or road relocation.","inputs":["Extract the sliding interface and adopted residual strength.","Use the reported wall arrangement and identify how load transfers into stable ground."],"deliverables":["Prepare slope equilibrium and structural load-sharing calculations.","Specify anchor testing, pile checks and a deformation-trigger response plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"US Highway 26/89 slope stabilization, Wyoming","url":"https://www.geoinstitute.org/node/8359","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Wolosick, Turner and Hasenkamp (1998), Reticulated Minipile Walls for Landslide Stabilization.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"snake-river-micropiles.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/snake-river-micropiles/download/schematic"},{"id":"project-image","title":"Snake River Canyon — US 26/89 stabilization site","kind":"project-image","fileName":"snake-river-micropiles-r13.png","mimeType":"image/png","bytes":684301,"sha256":"0d7194dbae94485262504b5d595cda83c0c0500adb745aa79d412702c6cc9c45","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":679,"height":453,"credit":"Hayward Baker, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8359","licenseUrl":"https://www.geoinstitute.org/node/8359","imageDate":null,"evidenceFile":"image-provenance/snake-river-micropiles-r13-source.json","evidenceSha256":"e7ecfd47a0e5e7019bdb4e32a6dddba47c407db700196586e66cccee1d973f4f","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/Mp2.png","originalSha256":"0d7194dbae94485262504b5d595cda83c0c0500adb745aa79d412702c6cc9c45","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/snake-river-micropiles/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"snake-river-micropiles-capstone.md","mimeType":"text/markdown","bytes":2608,"sha256":"b8148f68e3eada63d34fa56f9c18b0076cc5505415a4860870633529c44779ab","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/snake-river-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","caption":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","credit":"Hayward Baker, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8359","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8359","width":679,"height":453,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":8,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/snake-river-micropiles-r13-source.json","evidenceSha256":"e7ecfd47a0e5e7019bdb4e32a6dddba47c407db700196586e66cccee1d973f4f","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3637,"sourceCount":1,"url":"/cases/snake-river-micropiles"},{"id":"olmsted-locks","title":"Olmsted Locks and Dam — marine construction and project controls","summary":"The navigation replacement became operational in 2018 after a long construction programme. USACE publishes project-control updates and completion material.","topics":["dams-levees","deep-foundations","coastal-offshore","delivery"],"country":"United States","region":"Ohio River, Illinois–Kentucky","owner":"US Army Corps of Engineers","year":2018,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Marine foundation construction","Construction staging","Earned-value comparison"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The public project material supports marine construction and sequencing studies; detailed foundation design must be obtained from project-specific technical records.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The August 2018 scorecard distinguishes planned, earned and actual expenditure at its reporting date; it is not the final closeout account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The 2018 update gives planned versus current completion/operational milestones; the ribbon-cutting release records the August 2018 event.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Owner completion and award accounts are available; a full geotechnical completion report was not located.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare construction sequencing and foundation-installation risks for a major river structure while maintaining navigation.","inputs":["Extract the published work packages, dated cost scorecard and operational milestone.","Identify missing geotechnical design and production-rate information before pricing a study alternative."],"deliverables":["Develop a river-access, foundation-installation and closure sequence.","Reconcile planned, earned and actual cost terminology without treating budgeted quantities as final expenditures.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Olmsted Locks and Dam — August 2018 update","url":"https://www.iwr.usace.army.mil/Portals/70/docs/IWUB/board_meetings/meeting88/UB88_01_Olmsted_Locks_and_Dam_Update_Rissler_28Aug18.pdf","publisher":"USACE","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Corps cuts ribbon on Olmsted project","url":"https://www.lrd.usace.army.mil/News/News-Releases/Article/1617621/corps-cuts-ribbon-on-olmsted-locks-and-dam-project/","publisher":"USACE","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Olmsted Locks and Dam aerial view.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","publisher":"Wikimedia Commons / LouisvilleUSACE","year":2013,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"olmsted-locks.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olmsted-locks/download/schematic"},{"id":"project-image","title":"Olmsted Locks and Dam aerial view.jpg","kind":"project-image","fileName":"olmsted-locks.jpg","mimeType":"image/jpeg","bytes":337003,"sha256":"25c89d760530e1e3eca24c97144ecde5f02a5b58c8e74840e0b040e9d1a01086","sourceId":"s3","license":"Public domain","width":1280,"height":989,"credit":"LouisvilleUSACE","sourceUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg#Licensing","imageDate":"2013-08-21 11:35","evidenceFile":"image-provenance/olmsted-locks-commons.json","evidenceSha256":"b6891b8530650f83a47ef38a15779f5a5821a64128e800d64de25c6d704f68a6","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/ca/Olmsted_Locks_and_Dam_aerial_view.jpg","downloadUrl":"/cases/olmsted-locks/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"olmsted-locks-capstone.md","mimeType":"text/markdown","bytes":3361,"sha256":"4315f61fa271ea7990fca5219e1d9baf260650bd49dba05b560e1fe1f1807ed9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olmsted-locks/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement.","caption":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement. U.S. Army Corps of Engineers project photograph.","credit":"LouisvilleUSACE","sourceUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg#Licensing","width":1280,"height":989,"imageDate":"2013-08-21 11:35"},"figureCaption":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement. U.S. Army Corps of Engineers project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":26,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/olmsted-locks-commons.json","evidenceSha256":"b6891b8530650f83a47ef38a15779f5a5821a64128e800d64de25c6d704f68a6","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":341349,"sourceCount":3,"url":"/cases/olmsted-locks"},{"id":"block-island-wind","title":"Block Island Wind Farm — pile foundations and measured stiffness","summary":"The five-turbine offshore project has public foundation-installation observations and subsequent structural-monitoring studies.","topics":["coastal-offshore","deep-foundations","lateral-foundations","monitoring","seismic"],"country":"United States","region":"Offshore Rhode Island","owner":"Deepwater Wind / project partners","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Jacket piles","Foundation stiffness","Structural health monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The original geotechnical consultant describes interpreted profiles and pile-capacity work. BSEE publishes a foundation-stiffness study for one turbine.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The BSEE page lists a $608,722 monitoring-research award; this is not the wind-farm construction cost.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"partial","summary":"The Rhode Island owner/regulator record identifies commercial operation in December 2016.","sourceIds":["s3"]},"records":{"availability":"partial","summary":"The regulator records and BSEE technical attachments support construction/performance review.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare predicted and observed foundation stiffness for an offshore wind support, including how uncertain soil springs affect structural response.","inputs":["Extract pile/structure information from published monitoring and technical reports.","Distinguish one instrumented turbine from the full wind farm and retain marine ground-condition differences."],"deliverables":["Prepare an axial/lateral soil-spring sensitivity model and identify validation data.","Develop an installation and monitoring plan with offshore access and scour considerations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Block Island windfarm structural monitoring, TAP 806","url":"https://www.bsee.gov/research-records/tap-806-block-island-windfarm-structural-monitoring","publisher":"BSEE","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Block Island offshore wind farm — geotechnical engineering","url":"https://www.gza.com/projects/block-island-offshore-wind-farm","publisher":"GZA, project geotechnical consultant","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Block Island Wind Farm project records","url":"https://www.crmc.ri.gov/windenergy/blockislandwind.html","publisher":"Rhode Island Coastal Resources Management Council","year":2016,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Offshore Foundation Install 18.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","publisher":"Wikimedia Commons / BOEM-OPA","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"block-island-wind.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/block-island-wind/download/schematic"},{"id":"project-image","title":"Offshore Foundation Install 18.jpg","kind":"project-image","fileName":"block-island-wind.jpg","mimeType":"image/jpeg","bytes":226374,"sha256":"475bb6cc47f26f4dd77af72f39cee01b6c412a83262e3afd9ec312f36db9f2c2","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":941,"credit":"BOEM-OPA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-08-25 14:32:56","evidenceFile":"image-provenance/block-island-wind-commons.json","evidenceSha256":"6956e188a9bc1a7f8a6b86695ee9d106d4fba8a7f93b931a111c2cc68de31a23","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d0/Offshore_Foundation_Install_18.jpg","downloadUrl":"/cases/block-island-wind/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"block-island-wind-capstone.md","mimeType":"text/markdown","bytes":3287,"sha256":"c1cd6a9f8b988043bd356d43464ce3e47a76b4751e48fa08e57a40ffcaefdd0d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/block-island-wind/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015.","caption":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015. The jackets were built in Louisiana and transported to the offshore site.","credit":"BOEM-OPA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":941,"imageDate":"2015-08-25 14:32:56"},"figureCaption":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015. The jackets were built in Louisiana and transported to the offshore site.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":41,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/block-island-wind-commons.json","evidenceSha256":"6956e188a9bc1a7f8a6b86695ee9d106d4fba8a7f93b931a111c2cc68de31a23","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":230868,"sourceCount":4,"url":"/cases/block-island-wind"},{"id":"us231-landslide","title":"US 231, Lacey Springs — bridging a moving landslide","summary":"After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.","topics":["slopes","deep-foundations","lateral-foundations","monitoring","delivery"],"country":"United States","region":"Lacey Springs, Alabama","owner":"Alabama Department of Transportation","year":2020,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Landslide avoidance","Drilled shafts","Instrumentation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"FHWA documents alternative selection, drilled-shaft monitoring and construction delivery. It does not supply the full bridge/shaft design set.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $27.4 million for the repair/betterment and describes comparison with more expensive alternatives.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The bridges opened on 28 September 2020; the case describes incentives and advance purchase of casings and girders.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case discusses post-opening performance and ongoing instrumentation.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare slope stabilization with a bridge solution that transfers loads through unstable ground while preserving the road alignment.","inputs":["Extract the evaluated alternatives, slope geometry constraints and monitored quantities.","Identify the shear surface and pile-soil relative movement needed for a study shaft design."],"deliverables":["Prepare an alternatives decision matrix and a lateral soil-loading sensitivity study.","Develop an instrument layout with action levels and an accelerated procurement schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-028 — US 231 landslide repair","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","publisher":"FHWA / ALDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us231-landslide-repair","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us231-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us231-landslide/download/schematic"},{"id":"us231-landslide-repair","title":"FHWA-HIF-23-028, US231 landslide repair","kind":"report","fileName":"us231-landslide-repair.pdf","mimeType":"application/pdf","bytes":383622,"sha256":"0a5b9919d751adb355239d412946675bfefd4a7f291651073059edcb7b1114d8","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship; original state-agency photograph credits retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/72760","pages":2,"downloadUrl":"/cases/us231-landslide/download/us231-landslide-repair"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us231-landslide-reference-values.csv","mimeType":"text/csv","bytes":604,"sha256":"d55a19765753cfb5c1130dc843fd71aa0c087da6a9453cea9d72b6ce51778005","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us231-landslide/download/reference-values"},{"id":"project-image","title":"US 231 — completed bridges over the slide area","kind":"project-image","fileName":"us231-landslide-r13.jpeg","mimeType":"image/jpeg","bytes":67649,"sha256":"b728910614d015886a43573f82e0d8105eefbf36625f378c9b767c67aa34be08","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":778,"height":401,"credit":"Alabama Department of Transportation (ALDOT), published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","imageDate":null,"evidenceFile":"image-provenance/us231-landslide-r13-source.json","evidenceSha256":"073254ab95646ec6e74219206613cae5e26f89adfb9b853f3e9b026882a6f1fc","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","originalSha256":"0a5b9919d751adb355239d412946675bfefd4a7f291651073059edcb7b1114d8","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/us231-landslide/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us231-landslide-capstone.md","mimeType":"text/markdown","bytes":3543,"sha256":"5d0783dcad1f51544fac4c829e19d66bc6ed984bd1285c1d76c61c3f57350ea0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us231-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","caption":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","credit":"Alabama Department of Transportation (ALDOT), published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","width":778,"height":401,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":43,"referenceValues":[{"label":"Repair/betterment cost","value":27400000,"unit":"USD","scope":"Two-bridge resilience solution; FHWA-reported package.","sourceId":"s1","locator":"Project Snapshot and page 2","basis":"As reported; no escalation or inflation adjustment."},{"label":"Contract opening incentive","value":2490000,"unit":"USD","scope":"Incentive described for opening by 2 November 2020; not an extra cost assumed to have been paid.","sourceId":"s1","locator":"Challenges and Lessons Learned","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us231-landslide-r13-source.json","evidenceSha256":"073254ab95646ec6e74219206613cae5e26f89adfb9b853f3e9b026882a6f1fc","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":388798,"sourceCount":1,"url":"/cases/us231-landslide"},{"id":"beaver-dam-wash","title":"Beaver Dam Wash Bridge — scour-resistant replacement","summary":"Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.","topics":["scour-erosion","deep-foundations","coastal-offshore","delivery"],"country":"United States","region":"Mohave County, Arizona","owner":"Mohave County Public Works","year":2005,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Channel migration","Scour protection","Bridge alternatives"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents the selected longer bridge and gabion training-dike approach, with alternatives and economic justification.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $6.5 million for resilience improvements; use its stated scope when comparing alternatives.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The damaging event occurred in 2005; the case describes emergency access followed by replacement planning.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case records the selected resilience solution and lessons learned.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a crossing concept that addresses both local foundation scour and movement of the channel approaching the bridge.","inputs":["Extract the replacement alternatives, channel-change observations and protection measures.","Identify missing hydraulic and geotechnical inputs for a detailed design."],"deliverables":["Compare foundation depth and protection footprints for the alternatives.","Prepare a training-dike concept and a life-cycle maintenance/inspection plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-023 — Beaver Dam Wash bridge","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","publisher":"FHWA / Mohave County","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["beaver-dam-wash","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"beaver-dam-wash.svg","mimeType":"image/svg+xml","bytes":1056,"sha256":"ca50c03b28c61244d08ee83702433916e462ad2ee363e42240a9f0377b8c9c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/beaver-dam-wash/download/schematic"},{"id":"beaver-dam-wash","title":"FHWA-HIF-23-023, Beaver Dam Wash bridge","kind":"report","fileName":"beaver-dam-wash.pdf","mimeType":"application/pdf","bytes":702064,"sha256":"b6eb1c0c1b14505816aec4a0976b5eefafe6792d573bf1f92815ace9144f222f","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/beaver-dam-wash/download/beaver-dam-wash"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"beaver-dam-wash-reference-values.csv","mimeType":"text/csv","bytes":316,"sha256":"59cd33750e4d9acacdef6fb1d3d64718afdd918c65a6b95e1810b9711a6ea2c5","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/beaver-dam-wash/download/reference-values"},{"id":"project-image","title":"Beaver Dam Wash — replacement bridge","kind":"project-image","fileName":"beaver-dam-wash-r13.jpeg","mimeType":"image/jpeg","bytes":65879,"sha256":"1a0c97ba212bac01a7c42e6f0a083b4726a2eb395d317612fef735777e2e8dad","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":592,"height":442,"credit":"Mohave County, published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","imageDate":null,"evidenceFile":"image-provenance/beaver-dam-wash-r13-source.json","evidenceSha256":"462593532e8e6601c25d49cc8fe98590898d6af49b74f0cba439405d59cde406","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","originalSha256":"b6eb1c0c1b14505816aec4a0976b5eefafe6792d573bf1f92815ace9144f222f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/beaver-dam-wash/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"beaver-dam-wash-capstone.md","mimeType":"text/markdown","bytes":3165,"sha256":"766648b23e2c30c1c194e868dfb83cbe7cd8b45f1e1660d9947127c91ff5a14c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/beaver-dam-wash/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","caption":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","credit":"Mohave County, published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","width":592,"height":442,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":44,"referenceValues":[{"label":"Resilience-improvement cost","value":6500000,"unit":"USD","scope":"Bridge-replacement resilience measures in the case summary.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/beaver-dam-wash-r13-source.json","evidenceSha256":"462593532e8e6601c25d49cc8fe98590898d6af49b74f0cba439405d59cde406","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":706601,"sourceCount":1,"url":"/cases/beaver-dam-wash"},{"id":"burj-khalifa","title":"Burj Khalifa — piled-raft settlement design","summary":"The tower uses a piled raft in weak sedimentary rock. The foundation designer publishes an analysis process linking ground characterization, trial pile testing and settlement predictions for super-tall towers.","topics":["deep-foundations","shallow-foundations","settlement","laboratory-testing"],"country":"United Arab Emirates","region":"Dubai","owner":"Emaar Properties","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Piled raft","Load sharing","Pile load tests"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The designer paper provides a foundation-design case and discusses piled-raft interaction. Access to a publication does not establish availability of the complete issued-for-construction package.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare a conventional pile-group design with a settlement-led piled-raft concept for a heavily loaded tower on weak rock.","inputs":["Extract the published stratigraphy, raft geometry and pile test interpretation.","Set an explicit study loading envelope instead of inferring column loads from building height."],"deliverables":["Assess pile–raft load sharing and differential settlement under gravity and overturning actions.","Prepare a trial-pile programme and a monitoring layout that can distinguish group interaction from single-pile behavior.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When does an acceptable single-pile capacity still produce unacceptable raft settlement?","How sensitive is load sharing to the stiffness assigned to weathered rock?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geotechnical foundation design for some of the world’s tallest buildings","url":"https://www.jstage.jst.go.jp/article/jgssp/2/2/2_ESD-KL-2/_article/-char/en","publisher":"Frances Badelow and Harry G. Poulos / Japanese Geotechnical Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Tower raft construction","url":"https://www.multiplex.global/projects/burj-khalifa-tower-raft/","publisher":"Multiplex","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Burj Khalifa (16260269606).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","publisher":"Wikimedia Commons / Laika ac","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"burj-khalifa.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/burj-khalifa/download/schematic"},{"id":"project-image","title":"Burj Khalifa (16260269606).jpg","kind":"project-image","fileName":"burj-khalifa.jpg","mimeType":"image/jpeg","bytes":182077,"sha256":"8076b1a767a9e03b29c96f35dd1453a58e86e4b2edf03fbe14b93b18b3c41bb7","sourceId":"s3","license":"CC BY-SA 2.0","width":1280,"height":853,"credit":"Laika ac","sourceUrl":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-01-02 02:34","evidenceFile":"image-provenance/burj-khalifa-commons.json","evidenceSha256":"4d1264dcd302baee5b9cb830b9c828715714cae0cd06cb5e42a2e4f6340c02bc","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a6/Burj_Khalifa_%2816260269606%29.jpg","downloadUrl":"/cases/burj-khalifa/download/project-image","originalSha1":"95070e3053de0d9a27330f7ab02fe3ea714e68d5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"burj-khalifa-capstone.md","mimeType":"text/markdown","bytes":3189,"sha256":"402a9cf33e6b720a84554a80b913297eb995eeecc398abea894bef0643a1329a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/burj-khalifa/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Burj Khalifa in Dubai.","caption":"Burj Khalifa in Dubai. The tower photograph identifies the project; its piled raft lies below ground and is described in the foundation-design paper.","credit":"Laika ac","sourceUrl":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":853,"imageDate":"2015-01-02 02:34","imageDownloadAllowed":true},"figureCaption":"Burj Khalifa in Dubai. The tower photograph identifies the project; its piled raft lies below ground and is described in the foundation-design paper.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":49,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/burj-khalifa-commons.json","evidenceSha256":"4d1264dcd302baee5b9cb830b9c828715714cae0cd06cb5e42a2e4f6340c02bc","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":186465,"sourceCount":3,"url":"/cases/burj-khalifa"},{"id":"shanghai-tower","title":"Shanghai Tower — excavation compensation and pile–raft interaction","summary":"Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.","topics":["deep-foundations","settlement","excavation","monitoring"],"country":"China","region":"Shanghai","owner":"Shanghai Tower Construction and Development","year":2015,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Piled raft","Excavation compensation","Variable stiffness"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The cited studies include a design optimization and a re-analysis. The latter is an author’s model of the project, not an assertion that its proposed alternative was constructed.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconcile excavation relief and subsequent structural loading in a settlement model for a tower founded in deep urban deposits.","inputs":["Extract the construction-stage loads and compressible layers described in the papers.","Maintain separate ledgers for excavation unloading, dead load, live load and sustained loading."],"deliverables":["Compare a compensated-foundation calculation with a simplified interacting pile–raft model.","Propose a pile-stiffness distribution and explain its effect on raft curvature.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can apparent compensation of total stress justify ignoring differential settlement?","Which measured response would reveal an overly stiff pile-group assumption?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation re-analysis using compensated pile foundation theory","url":"https://onlinelibrary.wiley.com/doi/10.1002/tal.1087","publisher":"Project researchers / The Structural Design of Tall and Special Buildings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pile-raft foundation optimization analysis of Shanghai Tower","url":"https://tgjc.whrsm.ac.cn/EN/Y2018/V32/I3/243","publisher":"Zeng Chaojie / Soil Engineering and Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Shanghai - Shanghai Tower - 0001.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","publisher":"Wikimedia Commons / Stefan Fussan","year":2016,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"shanghai-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/schematic"},{"id":"project-image","title":"Shanghai - Shanghai Tower - 0001.jpg","kind":"project-image","fileName":"shanghai-tower.jpg","mimeType":"image/jpeg","bytes":714199,"sha256":"a540e70593ff3ea46a5baca90d32d4970546a3250d424431e2b792b02e6b7495","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":2114,"credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2016-09-18","evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e0/Shanghai_-_Shanghai_Tower_-_0001.jpg","downloadUrl":"/cases/shanghai-tower/download/project-image","originalSha1":"fbf6b991ef2d29b0baf093451432884e609fef5a","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"shanghai-tower-capstone.md","mimeType":"text/markdown","bytes":3209,"sha256":"7ddd952b24548584f1328900dafc4c9f5aedfac7b7cc92766795ff25ac33f2d7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Shanghai Tower in Shanghai.","caption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":2114,"imageDate":"2016-09-18","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":50,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":718607,"sourceCount":3,"url":"/cases/shanghai-tower"},{"id":"marina-bay-sands","title":"Marina Bay Sands — deep foundations on reclaimed ground","summary":"The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.","topics":["deep-foundations","excavation","dewatering","delivery"],"country":"Singapore","region":"Marina Bay, Singapore","owner":"Marina Bay Sands","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Bored piles","Buried obstructions","Excavation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Contractor accounts identify foundation and enabling works; complete ground parameters and structural reactions are not supplied. Those require explicit study assumptions or additional records.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a bored-pile and basement construction sequence across reclaimed fill containing a former seawall.","inputs":["Map the reported obstruction and the interfaces between enabling work, piling and excavation.","Specify a supplemental investigation for fill variability, groundwater and founding strata."],"deliverables":["Compare pile installation risks with alternative obstruction-removal sequences.","Prepare a support-of-excavation concept and hold points for pile integrity and base cleanliness.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a buried seawall affect both pile verticality and groundwater flow?","Which enabling work must precede production piling to avoid repeated access conflicts?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Integrated Marina Bay Sands foundation works","url":"https://bachy-soletanche.com.sg/offer-portfolio/intergrated-marina-bay-sands/","publisher":"Bachy Soletanche Singapore","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Marina Bay Sands piling account","url":"https://www.foundation-alliance.com/offer-portfolio/marina-bay-sands-integrated-resort/","publisher":"Foundation Alliance","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Integrated resort project description","url":"https://www.safdiearchitects.com/projects/marina-bay-sands-integrated-resort","publisher":"Safdie Architects","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Marina Bay Sands Casino construction site (3366800416).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","publisher":"Wikimedia Commons / Andy Mitchell from Glasgow, UK","year":2009,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"marina-bay-sands.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marina-bay-sands/download/schematic"},{"id":"project-image","title":"Marina Bay Sands Casino construction site (3366800416).jpg","kind":"project-image","fileName":"marina-bay-sands.jpg","mimeType":"image/jpeg","bytes":244129,"sha256":"2a5a80337ab4ffe4d286095b8b3633abe0ad94560b395921912b1835b2f744ce","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":914,"credit":"Andy Mitchell from Glasgow, UK","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2009-03-15 09:27","evidenceFile":"image-provenance/marina-bay-sands-commons.json","evidenceSha256":"47217317dc7da1b4d94d0d773a1fd52f47d46ed11173214699791f999adb49d4","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/39/Marina_Bay_Sands_Casino_construction_site_%283366800416%29.jpg","downloadUrl":"/cases/marina-bay-sands/download/project-image","originalSha1":"f290a1a2bff0a5176279b2e6a1c41ae4bec103b4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"marina-bay-sands-capstone.md","mimeType":"text/markdown","bytes":3397,"sha256":"84e154eed3631098278d4a705936e3ff54bf5f5e75fceb9df18326d7e54916ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marina-bay-sands/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the Marina Bay Sands resort in Singapore.","caption":"Construction of the Marina Bay Sands resort in Singapore. The source identifies the actual development discussed in the foundation contractors’ accounts.","credit":"Andy Mitchell from Glasgow, UK","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":914,"imageDate":"2009-03-15 09:27","imageDownloadAllowed":true},"figureCaption":"Construction of the Marina Bay Sands resort in Singapore. The source identifies the actual development discussed in the foundation contractors’ accounts.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":51,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/marina-bay-sands-commons.json","evidenceSha256":"47217317dc7da1b4d94d0d773a1fd52f47d46ed11173214699791f999adb49d4","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":248725,"sourceCount":4,"url":"/cases/marina-bay-sands"},{"id":"millau-viaduct","title":"Millau Viaduct — rock foundations and observational control","summary":"Very tall bridge piers transfer load through large shaft-and-raft foundations in limestone and marl. The geotechnical authors report measured foundation movement and the observational design strategy.","topics":["rock","deep-foundations","settlement","monitoring"],"country":"France","region":"Tarn Valley","owner":"Compagnie Eiffage du Viaduc de Millau","year":2004,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock sockets","Foundation rotation","Observational method"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"An open research paper describes investigation, foundation geometry and monitoring. The consultant account distinguishes pier geology and a local abutment adaptation.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Eiffage records construction during 2001–2004 and inauguration in December 2004; this is a milestone history, not the full contractor programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The geotechnical paper reports the monitored foundation behavior after construction.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Check a tall-pier foundation on contrasting rock units, with rotation limits governing the design.","inputs":["Extract published shaft, raft and rock-unit descriptions for one selected pier.","Separate measured translations from rotations and identify the construction stages."],"deliverables":["Compare bearing, sliding and rotational stiffness for limestone and marl assumptions.","Draft an instrumentation plan and pre-agreed foundation intervention sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can small differential movements matter more than total bearing capacity for this bridge?","How should an unexpected weak zone change the verification and contingency plan?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Millau viaduct geotechnical studies and foundations","url":"https://www.sciencedirect.com/science/article/pii/S167477551300036X","publisher":"Geotechnical project authors / Journal of Rock Mechanics and Geotechnical Engineering","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation engineering project account","url":"https://www.terrasol.fr/wp-content/uploads/2017/12/oa07_845_millau_viaduct_eng.pdf","publisher":"Terrasol","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Construction milestones","url":"https://www.eiffagegeniecivil.com/milau-viaduct","publisher":"Eiffage Génie Civil","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Viaduc millau 1.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","publisher":"Wikimedia Commons / Emeraude","year":2004,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"millau-viaduct.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millau-viaduct/download/schematic"},{"id":"project-image","title":"Viaduc millau 1.JPG","kind":"project-image","fileName":"millau-viaduct.jpg","mimeType":"image/jpeg","bytes":51310,"sha256":"9467ba872ccc50d998b9cc2bfb5188db5146d84c983f005b7d3b9847e693a6b9","sourceId":"s4","license":"Public domain","width":480,"height":640,"credit":"Emeraude","sourceUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG#Licensing","imageDate":"2004-03-14","evidenceFile":"image-provenance/millau-viaduct-commons.json","evidenceSha256":"e7a265ad5c20e75ffa310179ed68178f1fb3cf4910a87d8e54fabfba3627795e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/9c/Viaduc_millau_1.JPG","downloadUrl":"/cases/millau-viaduct/download/project-image","originalSha1":"cfe891bbedddcb693b57292d9abae9380c489b21","originalSha256":"9467ba872ccc50d998b9cc2bfb5188db5146d84c983f005b7d3b9847e693a6b9","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"millau-viaduct-capstone.md","mimeType":"text/markdown","bytes":3222,"sha256":"694e38240fd87fccdac897252bff729b43efe470995f39c65b3c150cb2d6baca","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millau-viaduct/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Millau Viaduct during construction.","caption":"The Millau Viaduct during construction. The tall piers and valley setting provide context for the published rock-foundation and monitoring case.","credit":"Emeraude","sourceUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG#Licensing","width":480,"height":640,"imageDate":"2004-03-14","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Millau Viaduct during construction. The tall piers and valley setting provide context for the published rock-foundation and monitoring case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":52,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/millau-viaduct-commons.json","evidenceSha256":"e7a265ad5c20e75ffa310179ed68178f1fb3cf4910a87d8e54fabfba3627795e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":55549,"sourceCount":4,"url":"/cases/millau-viaduct"},{"id":"chek-lap-kok","title":"Hong Kong International Airport — foundations across rock and reclamation","summary":"The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.","topics":["site-investigation","deep-foundations","shallow-foundations","ground-improvement","settlement"],"country":"China","region":"Chek Lap Kok","owner":"Airport Authority Hong Kong","year":1998,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","CPT verification","Mixed foundation systems"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources describe actual foundation choices and field characterization. They do not provide a single uniform soil profile for the whole airport.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design the transition between a shallow foundation on rock and a piled concourse on reclaimed deposits.","inputs":["Distinguish original rock, weathered zones and reclaimed sand in a project ground model.","Extract the reported investigation and density-verification approach from the vibrocompaction paper."],"deliverables":["Compare settlement and construction risk for two terminal foundation zones.","Define CPT acceptance criteria and an interface detail for differential movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which discontinuity is more important: the former shoreline or the top of competent rock?","How can improvement verification avoid hiding local loose pockets behind an average density?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Airport design and construction history","url":"https://www.mottmac.com/en/projects/hong-kong-international-the-airport-that-changed-the-world/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Review of vibrocompaction at Hong Kong’s new airport","url":"https://www.tandfonline.com/doi/abs/10.1080/1023697X.1998.10667731","publisher":"Petra Berner, Airport Authority / HKIE Transactions","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","publisher":"Wikimedia Commons / PSnyan","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"chek-lap-kok.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"fc361c835a99c48885fcadacff7f4f786820aca6f6b5404b5974cf6cce064489","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/schematic"},{"id":"project-image","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg","kind":"project-image","fileName":"chek-lap-kok.jpg","mimeType":"image/jpeg","bytes":179932,"sha256":"c87c0cdcf9398738ded1b460f6b9732fe4d96156b32027b16c219767feb56c88","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 17 October 2008","evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Hong_Kong_Internatinal_Airport_from_Air%28Chek_Lap_Kok%2C%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF%29_-_panoramio.jpg","downloadUrl":"/cases/chek-lap-kok/download/project-image","originalSha1":"cea44a0793016f2db57daf5f9cfda0023fdfba2d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"chek-lap-kok-capstone.md","mimeType":"text/markdown","bytes":3461,"sha256":"45bad050968b234d820c46685e9c15826621090d33708b2cdeff712cf44cc2a1","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hong Kong International Airport at Chek Lap Kok viewed from the air.","caption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 17 October 2008","imageDownloadAllowed":true},"figureCaption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":54,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":184279,"sourceCount":3,"url":"/cases/chek-lap-kok"},{"id":"millennium-tower","title":"Millennium Tower — perimeter-pile underpinning and monitored load transfer","summary":"The remedial designer describes transferring part of the building load to new perimeter piles founded in rock. Installation-induced movement required changes to both pile construction and the final pile arrangement.","topics":["deep-foundations","settlement","monitoring","delivery"],"country":"United States","region":"San Francisco","owner":"Millennium Tower Homeowners Association","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underpinning","Rock-founded piles","Jacked load transfer"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The designer distinguishes the earlier 52-pile proposal from the implemented 18-pile solution. The city’s earlier environmental sheet is retained as proposal-stage evidence, not the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The remedial designer reports completion in September 2023 with occupancy maintained during the work.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The designer reports initial post-work behavior and a ten-year monitoring requirement; long-term performance is still a monitoring question.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a monitored perimeter underpinning concept while keeping an occupied building in service.","inputs":["Compare the original proposal and later constructed solution without mixing their quantities.","Extract the load-transfer concept and identify the pile-installation effects that prompted revision."],"deliverables":["Balance imposed pile load, existing-foundation capacity and differential movement.","Prepare installation trials, staged jacking steps and ten-year monitoring objectives.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can installing a settlement remedy initially increase settlement?","How should load-transfer fuses protect the original foundation if future differential movement occurs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Perimeter-pile upgrade and observed outcome","url":"https://www.sgh.com/project-story/millennium-tower/","publisher":"Simpson Gumpertz & Heger, remedial designer","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"2019 proposed upgrade information sheet","url":"https://media.api.sf.gov/documents/301_Mission_Information_Sheet_CEQA_Notice.pdf","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Millennium Tower adding pile section 2.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"millennium-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/schematic"},{"id":"project-image","title":"Millennium Tower adding pile section 2.agr.jpg","kind":"project-image","fileName":"millennium-tower.jpg","mimeType":"image/jpeg","bytes":858661,"sha256":"351acb58a3af5bd4bd050a171a013934d81a3c8d9e2085f72a092435946fb878","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1707,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-02-22 16:17:55","evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/07/Millennium_Tower_adding_pile_section_2.agr.jpg","downloadUrl":"/cases/millennium-tower/download/project-image","originalSha1":"d4e2c44c3246b245231a17a0d012fb7bd9790ff5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"millennium-tower-capstone.md","mimeType":"text/markdown","bytes":3232,"sha256":"25bd5057fc007e9cb063539a06b2a2495726a31f43bf1ebbbd69ecd1f5cba045","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco.","caption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1707,"imageDate":"2022-02-22 16:17:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":61,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":863092,"sourceCount":3,"url":"/cases/millennium-tower"},{"id":"lake-borgne-barrier","title":"Lake Borgne surge barrier — pile-supported flood protection","summary":"The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.","topics":["deep-foundations","lateral-foundations","coastal-offshore","seepage","monitoring"],"country":"United States","region":"New Orleans, Louisiana","owner":"Flood Protection Authority East / USACE","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven piles","Lateral pile response","Global stability","Floodwall transitions"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner and consultant sources explain the built system and geotechnical scope. Published summaries use differing pile counts and stages; no single count is inferred across them.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The operator describes an approximately $1.3 billion whole-barrier project, not a geotechnical-package final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator records transfer of operating and maintenance responsibilities following construction in 2013.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a representative barrier-wall foundation and its transition into an earthen levee.","inputs":["Extract the wall, gate and levee interface functions from the owner material.","Define study water levels, wave actions and soft-soil strength profiles with explicit source limits."],"deliverables":["Check axial/lateral pile response, group behavior and global stability.","Design transition details and instrumentation to compare storm response with predictions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a locally adequate pile group still sit within an unstable soil mass?","Why do differential movement and seepage deserve special attention at levee transitions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Barrier operations and system description","url":"https://www.floodauthority.org/the-system/lake-borgne-surge-barrier/","publisher":"Flood Protection Authority East","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geotechnical engineering account","url":"https://ardaman.com/ihnc-lake-borgne-barrier-giww-to-mrgo-st-bernard-parish-louisiana-usace-new-orleans-district/","publisher":"Ardaman & Associates","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"IHNC Surge Barrier Construction from Air.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","publisher":"Wikimedia Commons / Ray Devlin","year":2010,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lake-borgne-barrier.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/schematic"},{"id":"project-image","title":"IHNC Surge Barrier Construction from Air.jpg","kind":"project-image","fileName":"lake-borgne-barrier.jpg","mimeType":"image/jpeg","bytes":101254,"sha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","sourceId":"s3","license":"CC BY 2.0","width":800,"height":533,"credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2010-01-11 16:26:30","evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/42/IHNC_Surge_Barrier_Construction_from_Air.jpg","downloadUrl":"/cases/lake-borgne-barrier/download/project-image","originalSha1":"ec096cf2cb2f46b2508af820b50bbfcb78c8a3d3","originalSha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lake-borgne-barrier-capstone.md","mimeType":"text/markdown","bytes":3192,"sha256":"3d36487e28f0ac12f46bdcec3ecfa9d5a263ed5a4ad8e7455a843d1d326bbdf0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans.","caption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":800,"height":533,"imageDate":"2010-01-11 16:26:30","imageDownloadAllowed":true},"figureCaption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":72,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":105645,"sourceCount":3,"url":"/cases/lake-borgne-barrier"},{"id":"west-closure-complex","title":"West Closure Complex — foundations on soft deltaic deposits","summary":"The gate and pumping complex is founded in soft, compressible deltaic deposits. USACE authors describe exploration, laboratory characterization and pile testing used to develop design strength profiles.","topics":["deep-foundations","laboratory-testing","site-investigation","problem-soils","coastal-offshore"],"country":"United States","region":"New Orleans, Louisiana","owner":"US Army Corps of Engineers","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["CPT interpretation","Strength profiling","Static and dynamic pile tests"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical publication explains the characterization programme and foundation-selection evidence. A complete final calculation set and acceptance database are not supplied by the abstract.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design an investigation and test-pile programme for a critical coastal pumping structure on organic clay and silt.","inputs":["Identify the published depositional units and component-specific foundation requirements.","Specify the additional parameters needed for axial, lateral and settlement analyses."],"deliverables":["Develop characteristic strength profiles and compare test-pile interpretations.","Prepare component foundation alternatives with construction access and long-term subsidence allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which laboratory sampling problems are most consequential in soft organic deltaic soils?","How can a test-pile programme distinguish drivability constraints from long-term capacity?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geocharacterization for design and construction of West Closure Complex","url":"https://ascelibrary.org/doi/10.1061/9780784413272.039","publisher":"USACE project authors / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Indexed technical-paper details","url":"https://trid.trb.org/View/1303129","publisher":"Transportation Research Board","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"West Closure Complex testing, Louisiana 2023 - 01.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","publisher":"Wikimedia Commons / Team New Orleans, US Army Corps of Engineers","year":2023,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"west-closure-complex.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-closure-complex/download/schematic"},{"id":"project-image","title":"West Closure Complex testing, Louisiana 2023 - 01.jpg","kind":"project-image","fileName":"west-closure-complex.jpg","mimeType":"image/jpeg","bytes":151852,"sha256":"24ff3fd3f6dcdabc9dc258256e332c4cd04548f9398b99d6a9568ecf307d5697","sourceId":"s3","license":"Public domain","width":1280,"height":854,"credit":"Team New Orleans, US Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg#Licensing","imageDate":"2023-05-11 10:19:39","evidenceFile":"image-provenance/west-closure-complex-commons.json","evidenceSha256":"8d095d27d0a6bde356c186d31570a687b18cca899f9d4b359ceef56a389fc721","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/1/13/West_Closure_Complex_testing%2C_Louisiana_2023_-_01.jpg","downloadUrl":"/cases/west-closure-complex/download/project-image","originalSha1":"13204edda35ce31161453465ac85aa6fac1fe530","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"west-closure-complex-capstone.md","mimeType":"text/markdown","bytes":3328,"sha256":"fec13d74d145a189bb0a084cecd6f93a464bf18f7883a87b18e15f167b3f654e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-closure-complex/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The West Closure Complex during its 2023 annual operational testing.","caption":"The West Closure Complex during its 2023 annual operational testing. This is the completed gate and pumping project discussed in the foundation-characterization paper.","credit":"Team New Orleans, US Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg#Licensing","width":1280,"height":854,"imageDate":"2023-05-11 10:19:39","imageDownloadAllowed":true},"figureCaption":"The West Closure Complex during its 2023 annual operational testing. This is the completed gate and pumping project discussed in the foundation-characterization paper.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":73,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/west-closure-complex-commons.json","evidenceSha256":"8d095d27d0a6bde356c186d31570a687b18cca899f9d4b359ceef56a389fc721","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":156379,"sourceCount":3,"url":"/cases/west-closure-complex"},{"id":"trans-alaska-pipeline","title":"Trans-Alaska Pipeline — thermally stabilized supports in permafrost","summary":"The pipeline uses elevated supports where thaw-sensitive permafrost would be disturbed by warm oil. Operator and state-geology sources describe thermal support members, heat-pipe monitoring and maintenance.","topics":["cold-regions","deep-foundations","monitoring","problem-soils"],"country":"United States","region":"Alaska","owner":"Alyeska Pipeline Service Company","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Thermosyphons","Thaw settlement","Thermal piles","Infrared surveillance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources explain design modes and thermal monitoring. They do not justify assuming that every support experiences the same ground temperature or ice content.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The sources describe an operating maintenance system and ongoing observations, not a once-only completed cooling treatment.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design an elevated pipe support whose foundation must remain stable as the seasonal thermal regime changes.","inputs":["Distinguish thaw-stable and thaw-unstable ground and identify the operator’s design modes.","Define a study soil-ice profile, climate series and support load using clearly stated assumptions."],"deliverables":["Compare thaw-settlement risk for untreated and passively cooled supports.","Prepare heat-pipe inspection, performance assessment and repair priorities.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is a foundation’s thermal condition as important as its initial bearing capacity?","Which observations distinguish a failed heat pipe from a change in regional ground temperature?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Permafrost and pipeline design modes","url":"https://alyeska-pipe.com/environmental-protection/","publisher":"Alyeska Pipeline Service Company","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Guide to permafrost and pipeline thermal supports","url":"https://dggs.alaska.gov/webpubs/dggs/gb/text/gb011.pdf","publisher":"Alaska Division of Geological & Geophysical Surveys","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Pipeline vertical support member.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","publisher":"Wikimedia Commons / JKBrooks85","year":2009,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"trans-alaska-pipeline.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/trans-alaska-pipeline/download/schematic"},{"id":"project-image","title":"Pipeline vertical support member.jpg","kind":"project-image","fileName":"trans-alaska-pipeline.jpg","mimeType":"image/jpeg","bytes":276864,"sha256":"95af32a5a9e743df4620352815794b8e849ecacf42f144afd7539bfb960faf59","sourceId":"s3","license":"Public domain","width":1280,"height":1786,"credit":"JKBrooks85","sourceUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg#Licensing","imageDate":"2009-07-15","evidenceFile":"image-provenance/trans-alaska-pipeline-commons.json","evidenceSha256":"35ae4095e2d748ed8f40f58a36da1e011fc8623305a2e9c5960b497c63202f7a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/7/7c/Pipeline_vertical_support_member.jpg","downloadUrl":"/cases/trans-alaska-pipeline/download/project-image","originalSha1":"d00ccb10f81ff141b64657c56034afc9de8df237","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"trans-alaska-pipeline-capstone.md","mimeType":"text/markdown","bytes":3223,"sha256":"ec3686dad92cdeee5d12b99ad4f7a2c3957dd463a9f24f58d97ff6e6ea2535eb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/trans-alaska-pipeline/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators.","caption":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators. The photograph shows the actual foundation-cooling detail used to protect frozen ground around supports.","credit":"JKBrooks85","sourceUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg#Licensing","width":1280,"height":1786,"imageDate":"2009-07-15","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators. The photograph shows the actual foundation-cooling detail used to protect frozen ground around supports.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":85,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/trans-alaska-pipeline-commons.json","evidenceSha256":"35ae4095e2d748ed8f40f58a36da1e011fc8623305a2e9c5960b497c63202f7a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":281055,"sourceCount":3,"url":"/cases/trans-alaska-pipeline"},{"id":"port-of-anchorage","title":"Port of Alaska — test piles and seismic waterfront foundations","summary":"Modernization studies used offshore investigation and a test-pile programme to examine drivability, capacity and underwater noise. The petroleum/cement terminal team also characterized cyclic behavior and soil–structure interaction.","topics":["deep-foundations","lateral-foundations","laboratory-testing","seismic","coastal-offshore"],"country":"United States","region":"Anchorage, Alaska","owner":"Don Young Port of Alaska","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven pipe piles","Cyclic soil testing","Site response","Noise attenuation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner provides a test-pile report and the geotechnical consultant explains terminal investigation gaps. The programme-wide trial and terminal design are distinguished in the study brief.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a waterfront pile-test programme that answers structural, geotechnical and marine-environmental questions together.","inputs":["Extract the trial-pile purpose and installation/test sequence from the owner report.","Identify tidal-silt cyclic behavior, offshore strengths and shear-wave velocity gaps described by the designer."],"deliverables":["Compare pile capacity and drivability interpretations for a study wharf bent.","Plan static/dynamic testing, cyclic material tests and underwater-noise verification.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can changing the installation method satisfy noise limits yet affect pile capacity?","Why does an essential waterfront facility need deformation checks beyond ordinary axial resistance?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modernization test-pile programme and report","url":"https://www.portofalaska.com/modernization-project/test-pile-program-summary/","publisher":"Don Young Port of Alaska","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Petroleum Cement Terminal geotechnical investigation","url":"https://www.rmconsult.com/projects/port-of-alaska-petroleum-cement-terminal-geotechnical/","publisher":"R&M Consultants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Terminal engineering project account","url":"https://www.rmconsult.com/projects/port-of-alaska-petroleum-cement-terminal/","publisher":"R&M Consultants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Anchorage Alaska aerial view.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers, photographer not specified or unknown","year":1999,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"port-of-anchorage.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-of-anchorage/download/schematic"},{"id":"project-image","title":"Anchorage Alaska aerial view.jpg","kind":"project-image","fileName":"port-of-anchorage.jpg","mimeType":"image/jpeg","bytes":384244,"sha256":"c2bd6a0bb19c2276a49b485f47e1072f250b9b1767b9227f8b7514dea12d6634","sourceId":"s4","license":"Public domain","width":1280,"height":769,"credit":"U.S. Army Corps of Engineers, photographer not specified or unknown","sourceUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg#Licensing","imageDate":"1999-02-20","evidenceFile":"image-provenance/port-of-anchorage-commons.json","evidenceSha256":"ff2e3e8fe1f994820c8639a1ee26eaf5db81a5ebfda8ab8220368093c6e2207a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/67/Anchorage_Alaska_aerial_view.jpg","downloadUrl":"/cases/port-of-anchorage/download/project-image","originalSha1":"11a58562274dd12774ff3b6e9641cb7583a04c59","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"port-of-anchorage-capstone.md","mimeType":"text/markdown","bytes":3590,"sha256":"723fcf83c2e8348839d3b7975f57ee3ab426108ba4d1b423a77fcd9f6efb101a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-of-anchorage/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska.","caption":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska. This is port context; the photograph is not represented as a record of the later test-pile or petroleum/cement-terminal construction stage.","credit":"U.S. Army Corps of Engineers, photographer not specified or unknown","sourceUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg#Licensing","width":1280,"height":769,"imageDate":"1999-02-20","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska. This is port context; the photograph is not represented as a record of the later test-pile or petroleum/cement-terminal construction stage.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":100,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/port-of-anchorage-commons.json","evidenceSha256":"ff2e3e8fe1f994820c8639a1ee26eaf5db81a5ebfda8ab8220368093c6e2207a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":389033,"sourceCount":4,"url":"/cases/port-of-anchorage"},{"id":"london-bank-station","title":"Bank station upgrade — tunnelling through existing pile zones","summary":"The capacity upgrade required new tunnels beside operating infrastructure and existing building piles. The designer describes staged building-impact assessment and a load-transfer solution that retained foundation reuse options.","topics":["tunnels","deep-foundations","lateral-foundations","monitoring"],"country":"United Kingdom","region":"City of London","owner":"London Underground","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Tunnel–pile interaction","Load transfer","Three-dimensional assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The impact-assessment engineer describes the pile interactions and modeling approach; the contractor records completion. Public summaries do not include every building-specific check.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The contractor records project completion in February 2023; the designer’s earlier timeframe refers to its own service scope.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess a new tunnel intersecting the influence zone of existing piled foundations without assuming the building can be demolished.","inputs":["Extract the reported pile types and identify which are directly intercepted.","Separate empirical screening from the later three-dimensional assessment."],"deliverables":["Compare pile load redistribution and building movement for alternative tunnel sequences.","Design a conceptual load-transfer structure with monitoring and verification hold points.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When is a greenfield settlement trough insufficient for a piled building?","How can a retrofit preserve future foundation reuse while controlling present construction risk?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Building impact assessment for Bank station","url":"https://www.dr-sauer.com/projects/bank-station-capacity-upgrade-building-impact-assessment","publisher":"Dr. Sauer & Partners","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Completed station upgrade","url":"https://www.dragados.com/en/our-experience/our-projects/bank-station-capacity-upgrade","publisher":"Dragados","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"BSCU - Bank Station Cannon Street Entrance - Cannon Street, February 2023 44.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","publisher":"Wikimedia Commons / TheFrog001","year":2023,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"london-bank-station.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/london-bank-station/download/schematic"},{"id":"project-image","title":"BSCU - Bank Station Cannon Street Entrance - Cannon Street, February 2023 44.jpg","kind":"project-image","fileName":"london-bank-station.jpg","mimeType":"image/jpeg","bytes":288002,"sha256":"210ae3c5517a74552a2a317efa775f15a1f01c5798ac06246add01986e509bad","sourceId":"s3","license":"CC0","width":1280,"height":960,"credit":"TheFrog001","sourceUrl":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2023-02-28 17:58:12","evidenceFile":"image-provenance/london-bank-station-commons.json","evidenceSha256":"e9420ca11e7ffb2e72446888c3e2ff14821e3f56f03075e35c0a3794e59297f7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f5/BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street%2C_February_2023_44.jpg","downloadUrl":"/cases/london-bank-station/download/project-image","originalSha1":"ee0124a274c02d78077408d5ddfe9242f19638bc","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"london-bank-station-capstone.md","mimeType":"text/markdown","bytes":3302,"sha256":"7481286fea1cc7b54d484a2ad7211302e6236d1c1ecf4f59f7f4b0c2a949b9fa","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/london-bank-station/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The new Cannon Street entrance to Bank station in February 2023.","caption":"The new Cannon Street entrance to Bank station in February 2023. The photograph shows the actual capacity-upgrade project after completion of the new entrance.","credit":"TheFrog001","sourceUrl":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":960,"imageDate":"2023-02-28 17:58:12","imageDownloadAllowed":true},"figureCaption":"The new Cannon Street entrance to Bank station in February 2023. The photograph shows the actual capacity-upgrade project after completion of the new entrance.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":102,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/london-bank-station-commons.json","evidenceSha256":"e9420ca11e7ffb2e72446888c3e2ff14821e3f56f03075e35c0a3794e59297f7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":292429,"sourceCount":3,"url":"/cases/london-bank-station"},{"id":"sutong-bridge","title":"Sutong Bridge — deep pile groups and riverbed scour protection","summary":"The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.","topics":["deep-foundations","lateral-foundations","scour-erosion","site-investigation","monitoring","coastal-offshore"],"country":"China","region":"Yangtze River, Jiangsu","owner":"Sutong Bridge project authorities","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Large drilled-shaft groups","Post-grouting","Group interaction","Scour protection","Cofferdams"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The foundation papers describe 131 shafts beneath each main pylon, project-specific test/model evidence and construction methods. Published pile dimensions and group coefficients apply to the stated foundation and cannot be adopted as universal design factors.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The source papers include pile testing, model studies and field-monitoring comparisons, while a complete current inspection and as-built record set was not established.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coupled foundation-and-scour assessment for one Sutong main pylon, preserving the distinction between individual-pile testing and group response.","inputs":["Select the north or south foundation and retain its own shaft geometry, stratigraphy, load tests and pile-cap configuration.","Extract the design scour/protection assumptions and identify temporary construction conditions separately from permanent conditions."],"deliverables":["Compare single-shaft and group axial/lateral response using transparent assumptions and documented calibration evidence.","Prepare a scour-monitoring and protection-maintenance concept with a construction-stage cofferdam risk register.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would a tip post-grouting result on a single shaft not directly establish the settlement of the full pylon pile group?","How could local bed erosion change lateral foundation response even before the calculated axial resistance becomes critical?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of the Sutong Bridge foundations","url":"https://www.xcdsystem.com/dfi/journal/?abstractid=2007010101","publisher":"Project designers and constructors / DFI Journal","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Super-large bridge pile foundation in soft soil — testing and monitoring","url":"https://scholarsmine.mst.edu/icchge/7icchge/session08/1/","publisher":"Yang, Dai and Gong / Missouri S&T","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Scour protection for deep-water pylon foundations","url":"https://www.engineering.org.cn/sscae/EN/1160099698767880365","publisher":"Project authors / Strategic Study of CAE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Sutong Bridge in construction2.jpg","url":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","publisher":"Trevor and Joce","year":2007,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sutong-bridge.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"sutong-bridge-reference-values.csv","mimeType":"text/csv","bytes":964,"sha256":"54b76bad46f0abfe39229fdb6dfc70c2341fb243dea6db60699071418a1032b2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/sutong-bridge/download/reference-values"},{"id":"project-image","title":"Sutong Bridge — construction over the Yangtze","kind":"project-image","fileName":"sutong-bridge.jpg","mimeType":"image/jpeg","bytes":216713,"sha256":"cde90ed38819bb57406e5fc776e0ca7aa7dc3eb74adc203bb315a6aa21b51804","sourceId":"s4","license":"CC BY-SA 2.0","width":386,"height":588,"credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2007-08-23 12:57","evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d2/Sutong_Bridge_in_construction2.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/sutong-bridge/download/project-image","originalSha1":"0068ceeba8bd5efef4ff854c6ad6f377810c71aa","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sutong-bridge-capstone.md","mimeType":"text/markdown","bytes":4785,"sha256":"5f940d78551b92642633723f99f53ef00b6175da520c7ec011354b245973f91c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","caption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":386,"height":588,"imageDate":"2007-08-23 12:57","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":112,"referenceValues":[{"label":"Bored piles per main pylon foundation","value":131,"unit":"piles","scope":"Large main-pylon group described in the DFI foundation paper; not the whole-bridge pile total.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — shorter group","value":114,"unit":"m","scope":"One of the two reported main-pylon pile lengths; verify group location in the source before modelling.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — longer group","value":117,"unit":"m","scope":"Other reported main-pylon pile length; not an uncertainty range for every pile.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":223661,"sourceCount":4,"url":"/cases/sutong-bridge"}]}