{"schemaVersion":1,"updated":"2026-11-22","total":43,"records":[{"id":"bowman-road-grs","title":"Bowman Road Bridge — reinforced-soil abutments","summary":"The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.","topics":["reinforced-soil","shallow-foundations","settlement","delivery"],"country":"United States","region":"Defiance County, Ohio","owner":"Defiance County","year":2005,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["GRS-IBS","Bearing and settlement","Reinforcement demand"],"documentationLevel":"worked-design","design":{"availability":"available","summary":"The archived FHWA worked example supplies bridge geometry, bearing loads, abutment sizing and internal/external checks. Use current guidance for a new design.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"FHWA reports $266,000 for the Bowman Road abutment, beams and waterproofing, compared with a $338,000 independent estimate for the conventional alternative. This historical comparison is not a certified final account.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"Production construction occurred in 2005; the reviewed sources discuss accelerated construction rather than a complete contractor programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"FHWA reports settlement and approach performance after opening.","sourceIds":["s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a replacement rural bridge abutment using the Bowman Road example as the reference project; compare reinforced soil with a conventional abutment.","inputs":["Extract span, reactions, abutment dimensions and reinforcement assumptions from the worked example.","Identify scour, drainage and foundation information that the example assumes."],"deliverables":["Reproduce the reference checks and document any difference caused by a current design basis.","Prepare an abutment section, reinforcement schedule, drainage detail and bridge-approach settlement check.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"GRS-IBS Interim Implementation Guide — Bowman Road design example","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"GRS-IBS bid-price analysis and cost comparisons","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm","publisher":"FHWA","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GRS-IBS synthesis — field case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s4","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/11026.pdf","publisher":"FHWA","year":2012,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["bowman-grs-guide"]},{"id":"s5","title":"FHWA-HRT-11-027, case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/11027.pdf","publisher":"FHWA","year":2011,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-synthesis"]},{"id":"s6","title":"FHWA-HRT-19-024, bid price analysis","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/19024.pdf","publisher":"FHWA","year":2019,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-bid-comparison"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bowman-road-grs.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/schematic"},{"id":"bowman-grs-guide","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","kind":"report","fileName":"bowman-grs-guide.pdf","mimeType":"application/pdf","bytes":9102045,"sha256":"fcc4772db9661f4ced0e7bf1d8c7cc47edcfac470f89a9869df71844c39a0807","sourceId":"s4","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; publication attribution and errata retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/39209","pages":176,"downloadUrl":"/cases/bowman-road-grs/download/bowman-grs-guide"},{"id":"grs-synthesis","title":"FHWA-HRT-11-027, case histories","kind":"report","fileName":"grs-synthesis.pdf","mimeType":"application/pdf","bytes":1733657,"sha256":"f81f37d091959f40e56e560052d16fd6d1235a836af77c99bbb267d9010daf59","sourceId":"s5","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; original publication retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/34474","pages":68,"downloadUrl":"/cases/bowman-road-grs/download/grs-synthesis"},{"id":"grs-bid-comparison","title":"FHWA-HRT-19-024, bid price analysis","kind":"report","fileName":"grs-bid-comparison.pdf","mimeType":"application/pdf","bytes":2719769,"sha256":"aa9e358d09b308d2131d1175a307b0f7fe66797d606a89015bed7f33a3bba3cc","sourceId":"s6","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship recorded by the National Transportation Library.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/40086","pages":16,"downloadUrl":"/cases/bowman-road-grs/download/grs-bid-comparison"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"bowman-road-grs-reference-values.csv","mimeType":"text/csv","bytes":1138,"sha256":"ded6368d90b3ccf2ad594fbefa7f56f0df2128d370be3afed39fbacf6277a527","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/bowman-road-grs/download/reference-values"},{"id":"project-image","title":"Bowman Road Bridge — FHWA Figure 23","kind":"project-image","fileName":"bowman-road-grs.jpeg","mimeType":"image/jpeg","bytes":13695,"sha256":"4d6c07c0f10c365be283b508151090886d0d43d6043e22e1fa50d652c37eaebb","sourceId":"s3","license":"Public domain — U.S. federal government work","width":401,"height":301,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/bowman-road-grs/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bowman-road-grs-capstone.md","mimeType":"text/markdown","bytes":5028,"sha256":"9b84946c504990c8bdb70c4aecd0bccb2c4e927c1cc7195c2794593bfa798a94","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23).","caption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":401,"height":301,"imageDate":null},"figureCaption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":1,"referenceValues":[{"label":"GRS abutment cost","value":95000,"unit":"USD","scope":"Bowman Road GRS-IBS abutment; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"GRS beams and waterproofing","value":171000,"unit":"USD","scope":"Bowman Road beams and waterproofing; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reported GRS total","value":266000,"unit":"USD","scope":"Combined abutment, beams and waterproofing in Table 1; not a certified final account.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Conventional alternative estimate","value":338000,"unit":"USD","scope":"Independent cost estimate for the alternative in Table 1; not an awarded contract.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":3,"downloadBytes":13576453,"sourceCount":6,"url":"/cases/bowman-road-grs"},{"id":"i15-salt-lake","title":"I-15 reconstruction — soft-ground embankments and geofoam","summary":"Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.","topics":["settlement","ground-improvement","reinforced-soil","monitoring","delivery"],"country":"United States","region":"Salt Lake City, Utah","owner":"Utah Department of Transportation","year":2001,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Vertical drains and surcharge","Two-stage MSE","Consolidation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"The reports document alternative embankment systems and monitored geofoam sections, including the 100 South crossing.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The monitoring reports cover reconstruction and the following decade; extract dates for the chosen section rather than using a corridor-wide programme.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Long-term settlement and numerical-model comparisons are available in the research reports.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Choose an embankment solution above sensitive buried utilities and soft clay, then reconcile the design prediction with the long-term monitoring record.","inputs":["Extract stratigraphy, groundwater and construction loading from the selected instrumented section.","Digitize a clearly identified settlement series with units and dates."],"deliverables":["Compare earth fill, preload/drains and geofoam for settlement, time and buoyancy.","Prepare a staged-load calculation, utility protection detail and monitoring acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"I-15 reconstruction long-term embankment monitoring study","url":"https://rosap.ntl.bts.gov/view/dot/31963","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Design and evaluation of EPS geofoam embankments","url":"https://rosap.ntl.bts.gov/view/dot/31962","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Use of Geofoam for I-15 Reconstruction in Salt Lake City, UT","url":"https://geofoam.syr.edu/utah.html","publisher":"Syracuse University Geofoam Research Center","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Original published image file copied unchanged; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"i15-salt-lake.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/schematic"},{"id":"project-image","title":"I-15 geofoam embankment at 100 South","kind":"project-image","fileName":"i15-salt-lake-r13.jpg","mimeType":"image/jpeg","bytes":35444,"sha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":305,"credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","licenseUrl":"https://geofoam.syr.edu/utah.html","imageDate":null,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://geofoam.syr.edu/I15/fig2.jpg","originalSha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/i15-salt-lake/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"i15-salt-lake-capstone.md","mimeType":"text/markdown","bytes":3144,"sha256":"2f5d23d456cf891b53e2856f43a44d2aa142b9eb42e4bd26cf2ba3cbb33ffe33","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","caption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://geofoam.syr.edu/utah.html","width":400,"height":305,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":3,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4322,"sourceCount":3,"url":"/cases/i15-salt-lake"},{"id":"west-davis-geofoam","title":"West Davis Highway ramp — lightweight fill beside live transport","summary":"UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.","topics":["ground-improvement","settlement","earthworks","delivery"],"country":"United States","region":"Farmington, Utah","owner":"Utah Department of Transportation","year":2023,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Settlement control","Construction access"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The owner describes the lightweight-fill choice and construction; detailed geotechnical design calculations are not supplied on the news page.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner update documents ramp construction in August 2023.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The source includes construction photographs; complete as-built drawings were not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a lightweight ramp concept while preserving adjacent road and rail service.","inputs":["Use the owner’s site description and identify missing foundation-soil data.","Set an explicit study profile, load case and allowable movement with instructor approval."],"deliverables":["Check foundation stress, settlement, block compression and groundwater uplift.","Draw block arrangement, pavement separation and lateral protection details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"UDOT uses Styrofoam blocks to build freeway ramp in Davis County","url":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","publisher":"UDOT","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"west-davis-geofoam.svg","mimeType":"image/svg+xml","bytes":1799,"sha256":"e23761dbae30acfd1a743186545c5dcb2378a1245850347956435a393d209bfe","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/schematic"},{"id":"project-image","title":"West Davis Highway geofoam ramp — UDOT aerial photograph","kind":"project-image","fileName":"west-davis-geofoam.jpg","mimeType":"image/jpeg","bytes":410515,"sha256":"ab0b77da1950e4c96176524133fdba24a8ba723c6ae986fac408e5789d53dd3f","sourceId":"s1","license":"UDOT public reuse with attribution — social-media policy","width":1536,"height":1152,"credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","imageDate":null,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","transformations":"Unmodified image bytes from UDOT’s 1536-pixel file; responsive display sizing only.","downloadUrl":"/cases/west-davis-geofoam/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"west-davis-geofoam-capstone.md","mimeType":"text/markdown","bytes":2842,"sha256":"b5fb2c304589779ef896527dbaa582a8964ff846f3a2fbf5fcc79dbbaf04c8e9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the West Davis Highway geofoam ramp under construction beside live transport routes.","caption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","license":"UDOT public reuse with attribution — social-media policy","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","width":1536,"height":1152,"imageDate":null},"figureCaption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":4,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":415156,"sourceCount":1,"url":"/cases/west-davis-geofoam"},{"id":"virginia-route288","title":"Virginia Route 288 — drilled-shaft quality evaluation","summary":"This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.","topics":["deep-foundations","site-investigation","monitoring","delivery"],"country":"United States","region":"Richmond region, Virginia","owner":"Virginia Department of Transportation","year":2004,"yearLabel":"Case reference year","projectType":"Construction quality and testing","methods":["Drilled shafts","Crosshole sonic logging","Pile integrity testing"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper addresses foundation evaluation and test interpretation; it is not the complete bridge design package.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published test and anomaly discussions support a quality-control exercise; the complete acceptance register is not included.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an inspection and acceptance plan for drilled shafts, including how to investigate an anomalous test result before deciding on remediation.","inputs":["Identify the shaft construction method, test types and reported anomalies.","Separate an instrument anomaly from an independently confirmed physical defect."],"deliverables":["Prepare a shaft inspection checklist and evidence-based test decision tree.","Design a supplemental investigation and a repair-verification programme for a selected anomaly.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case history: Foundation evaluation for the Virginia Highway 288 project","url":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2004,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"virginia-route288.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/virginia-route288/download/schematic"},{"id":"project-image","title":"Virginia Route 288 — drilled-shaft microcamera inspection","kind":"project-image","fileName":"virginia-route288-r13.png","mimeType":"image/png","bytes":456787,"sha256":"0e633fcb38fe2e682fcd020e9f07729175f71d1d5dab2fe370d72a0e407d32b2","sourceId":"s1","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":527,"height":395,"credit":"Emad Farouz, Paul Landers and Scott Webster (2004)","sourceUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2001-12-03","evidenceFile":"image-provenance/virginia-route288-r13-source.json","evidenceSha256":"33377d6ce9ec887fbd81fc654caa1a31cbfeab71987daed3c688f9b0b68a8d4a","transformations":"The source PDF stores the photograph as three overlapping strips. Rendered the complete original Figure 9 image rectangle without retouching, annotations, or loss of the embedded timestamp. Surrounding page text was excluded.","originalUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","originalSha256":"66f2fafdab1063fc379bef39de6061d2314de6c969a97b611a5bdb21a7661300","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-inspection-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/virginia-route288/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"virginia-route288-capstone.md","mimeType":"text/markdown","bytes":2920,"sha256":"2932362755e4b7365bb1e297f4cf3595cf28358867724afc354b70d5405cf7ea","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/virginia-route288/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","caption":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","credit":"Emad Farouz, Paul Landers and Scott Webster (2004)","sourceUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":527,"height":395,"imageDate":"2001-12-03","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-inspection-photograph"},"figureCaption":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":6,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/virginia-route288-r13-source.json","evidenceSha256":"33377d6ce9ec887fbd81fc654caa1a31cbfeab71987daed3c688f9b0b68a8d4a","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":460906,"sourceCount":1,"url":"/cases/virginia-route288"},{"id":"nj-turnpike-micropiles","title":"New Jersey Turnpike bridges — micropile underpinning","summary":"Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.","topics":["deep-foundations","scour-erosion","monitoring","delivery"],"country":"United States","region":"New Jersey","owner":"New Jersey highway agencies; see source","year":2008,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Hollow-bar micropiles","Underpinning","Verification/proof testing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case reports an 80-kip design load per micropile, cased exposure to scour level and different bond lengths at the four bridges.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports production proof tests and sacrificial verification tests.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan underpinning of an operating bridge with limited access and a temporary cofferdam.","inputs":["Select one of the four bridges and retain its soil profile, bond length and grout diameter.","Extract verification and production proof-test criteria."],"deliverables":["Check grout-ground bond, steel capacity and corrosion/scour exposure.","Prepare a load-transfer sequence and a test-and-acceptance schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Existing bridge retrofits, Turnpike, New Jersey","url":"https://www.geoinstitute.org/node/8358","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Gómez et al. (2008), Hollow Core Bar Micropile—Design Parameters Interpreted from 404 Load Tests.","checked":"2026-11-22"},{"id":"s2","title":"Bond Strength of Hollow-Core Bar Micropiles","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","notes":"Project image source. Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nj-turnpike-micropiles.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/schematic"},{"id":"project-image","title":"New Jersey Turnpike — micropile installation beneath a bridge","kind":"project-image","fileName":"nj-turnpike-micropiles-r13.jpeg","mimeType":"image/jpeg","bytes":28249,"sha256":"4678f47c6011a4c3fa0d2d05bb71100f88236b51368c43788e87e1e54853f8cd","sourceId":"s2","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":426,"height":374,"credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2008","evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://scholarsmine.mst.edu/cgi/viewcontent.cgi?article=2920&context=icchge","originalSha256":"a179eebce7ffb4e8e8313d962d90c9afe1486157038f57824499780f01df1b8e","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/nj-turnpike-micropiles/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nj-turnpike-micropiles-capstone.md","mimeType":"text/markdown","bytes":2919,"sha256":"2f89cefca8d0332f0acc0a04130440eb9e506f61c8d196d4ad95ebc36da9c74d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","caption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":426,"height":374,"imageDate":"2008","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph"},"figureCaption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":7,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":32367,"sourceCount":2,"url":"/cases/nj-turnpike-micropiles"},{"id":"us14-nicollet","title":"US 14 near Nicollet — preload and vertical drains","summary":"A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.","topics":["settlement","ground-improvement","problem-soils","monitoring","delivery"],"country":"United States","region":"Nicollet, Minnesota","owner":"Minnesota Department of Transportation","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Prefabricated vertical drains","Staged surcharge","Observational consolidation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors describe drain spacing, surcharge, staged lifts, waiting periods and primary/post-surcharge secondary settlement.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source lists estimated alternatives from $0.3 million for surcharge-only to $1.8 million for a land bridge; these are comparison estimates, not audited final costs.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The documented drain/surcharge design targeted a five-month waiting period after staged filling.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The submitted case describes automated settlement, piezometric and earth-pressure monitoring.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a preload programme that meets a highway opening deadline while controlling stability and residual settlement.","inputs":["Extract layer thicknesses, compression parameters and drain layout from the cited papers.","Use measured settlement and pore-pressure stages to define the observation period."],"deliverables":["Compare untreated waiting time with vertical/radial drainage and secondary compression.","Set stage-release criteria and a contingency for slow pore-pressure dissipation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"PVD and fill preloading — US Highway 14","url":"https://www.geoinstitute.org/node/16159","publisher":"ASCE Geo-Institute / named case-history author","year":2024,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case submitted by the project manager and MnDOT foundations engineer; technical papers by Lamb/Chow/Bentler (2018, 2019).","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us14-nicollet.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us14-nicollet/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us14-nicollet-reference-values.csv","mimeType":"text/csv","bytes":1496,"sha256":"007a382e255f2ad4f1b9b13dceb0a7669748d03a85a1b7e11acb980d9a7ba8f7","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us14-nicollet/download/reference-values"},{"id":"project-image","title":"US 14, Nicollet — prefabricated vertical drains","kind":"project-image","fileName":"us14-nicollet-r13.jpg","mimeType":"image/jpeg","bytes":256005,"sha256":"def13de472acda2ba590bff1ac10ad55ee8c048ab95c68ddc8dc39dce688635d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1920,"height":1080,"credit":"Project photograph published by ASCE Geo-Institute; case submitted by Liang Chern Chow and Rich Lamb","sourceUrl":"https://www.geoinstitute.org/node/16159","licenseUrl":"https://www.geoinstitute.org/node/16159","imageDate":null,"evidenceFile":"image-provenance/us14-nicollet-r13-source.json","evidenceSha256":"d1426baf3baf7a5516e7c258c631b742342f5d3434b36c023779179195338e5b","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/casehistory1.jpg","originalSha256":"def13de472acda2ba590bff1ac10ad55ee8c048ab95c68ddc8dc39dce688635d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/us14-nicollet/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us14-nicollet-capstone.md","mimeType":"text/markdown","bytes":4241,"sha256":"e99fc8e22bb8ef2a80b680d8678aed4180f17eb7ba1a1d4ae67d4f03094675f0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us14-nicollet/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","caption":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","credit":"Project photograph published by ASCE Geo-Institute; case submitted by Liang Chern Chow and Rich Lamb","sourceUrl":"https://www.geoinstitute.org/node/16159","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16159","width":1920,"height":1080,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":11,"referenceValues":[{"label":"Organic-soil thickness","value":34,"unit":"ft","scope":"Reported soft to very soft organic deposit above glacial till.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Reported investigation interpretation."},{"label":"Typical drain spacing","value":6,"unit":"ft","scope":"Triangular drain pattern over 80% of the embankment length.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Reported design geometry."},{"label":"Surcharge-only estimate","value":300000,"unit":"USD","scope":"Alternative with extended waiting period.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Drains and surcharge estimate","value":500000,"unit":"USD","scope":"Alternative including extended wait and geotechnical monitoring.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Geofoam estimate","value":800000,"unit":"USD","scope":"Lightweight-fill alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Column-supported estimate","value":1200000,"unit":"USD","scope":"Column-supported embankment alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Land-bridge estimate","value":1800000,"unit":"USD","scope":"Land-bridge alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us14-nicollet-r13-source.json","evidenceSha256":"d1426baf3baf7a5516e7c258c631b742342f5d3434b36c023779179195338e5b","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":6915,"sourceCount":1,"url":"/cases/us14-nicollet"},{"id":"prudential-centre","title":"Prudential Center — shallow foundations after improvement","summary":"The arena foundation study compared deep foundations with spread footings on improved ground. Test sections supported the selected compaction and replacement approach.","topics":["shallow-foundations","ground-improvement","site-investigation","delivery"],"country":"United States","region":"Newark, New Jersey","owner":"New Jersey Devils","year":2006,"yearLabel":"Case reference year","projectType":"Redevelopment","methods":["Foundation alternatives","Dynamic compaction","Trial sections"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case describes trial treatment, foundation selection and protection of adjacent historic development.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The case reports roughly $1.5 million for improvement plus shallow foundations versus an estimated $3 million driven-pile alternative.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The case connects foundation selection to readiness for the 2007–2008 hockey season; a full contractor schedule is not supplied.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Test-section and post-improvement field checks are discussed.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Perform a value-engineering comparison for a large building on heterogeneous urban fill while protecting neighbouring structures.","inputs":["Extract the trial-section results and stated allowable-bearing assumptions.","Separate measured treatment response from the original designers’ interpreted bearing values."],"deliverables":["Check bearing, differential settlement and vibration-sensitive construction zones.","Prepare an alternatives matrix with cost scope and construction-risk allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Prudential Center, Newark, New Jersey","url":"https://www.geoinstitute.org/node/16271","publisher":"ASCE Geo-Institute / named case-history author","year":2013,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper Woods, Drumheller and Huber (2013).","checked":"2026-11-22"},{"id":"s2","title":"New Jersey - Newark - Prudential Center IMG 2295 - National Newark Building - Leecourt-Newark Building - Penn Station.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","publisher":"Wikimedia Commons / Bjoertvedt","year":2018,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"prudential-centre.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/prudential-centre/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"prudential-centre-reference-values.csv","mimeType":"text/csv","bytes":742,"sha256":"9543f67494a4bf3029bd31ac796b2b285ee15d0e9c2721e0657bb8f8392b6d68","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/prudential-centre/download/reference-values"},{"id":"project-image","title":"New Jersey - Newark - Prudential Center IMG 2295 - National Newark Building - Leecourt-Newark Building - Penn Station.jpg","kind":"project-image","fileName":"prudential-centre.jpg","mimeType":"image/jpeg","bytes":229002,"sha256":"fd961e3f456289c12b8e9851c5d3d52e6f742c388195fa6d6df5e8377526366b","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":556,"credit":"Bjoertvedt","sourceUrl":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2018-06-30 14:40:28","evidenceFile":"image-provenance/prudential-centre-commons.json","evidenceSha256":"1befa45140ee1090a128a92a838148a1c778e95268f262855b15321a82d424a5","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","downloadUrl":"/cases/prudential-centre/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"prudential-centre-capstone.md","mimeType":"text/markdown","bytes":4036,"sha256":"5c29b435d4dfd10f8273c13b5a15b7c7b92a108255546ee544c862a6fcada1b5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/prudential-centre/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed Prudential Center arena in Newark, New Jersey.","caption":"The completed Prudential Center arena in Newark, New Jersey. The photograph identifies the project discussed in the ground-improvement case history; the subsurface work is not visible.","credit":"Bjoertvedt","sourceUrl":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":556,"imageDate":"2018-06-30 14:40:28"},"figureCaption":"The completed Prudential Center arena in Newark, New Jersey. The photograph identifies the project discussed in the ground-improvement case history; the subsurface work is not visible.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":16,"referenceValues":[{"label":"Improvement plus shallow foundations","value":1500000,"unit":"USD","scope":"Approximate reported cost; not the arena total.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."},{"label":"Driven-pile alternative","value":3000000,"unit":"USD","scope":"Order-of-magnitude estimated alternative; not an executed pile contract.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."},{"label":"Trial-supported bearing pressure","value":3,"unit":"tsf","scope":"Reported allowable bearing pressure after trial assessment; not a transferable design value.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Site-specific reported allowable value."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/prudential-centre-commons.json","evidenceSha256":"1befa45140ee1090a128a92a838148a1c778e95268f262855b15321a82d424a5","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":234666,"sourceCount":2,"url":"/cases/prudential-centre"},{"id":"boston-central-artery","title":"Boston Central Artery/Tunnel — deep mixing and ground movement","summary":"Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.","topics":["excavation","ground-improvement","tunnels","monitoring","delivery"],"country":"United States","region":"Boston, Massachusetts","owner":"Massachusetts highway agencies","year":2006,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Deep mixing","Excavation movement","Observational control"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper covers soil properties, mixing characteristics and measured response. FHWA separately documents project financial-management lessons.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"FHWA discusses major-project contingency management; it is not a priced geotechnical work breakdown.","sourceIds":["s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published research compares construction-induced ground movements and stabilization behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a ground-treatment and monitoring concept for a deep urban cut in soft clay, with construction risks included in the estimate.","inputs":["Extract the selected site section and treatment properties from the project paper.","Define movements tolerated by nearby structures and utilities as a study requirement."],"deliverables":["Compare untreated and treated basal stability and movement mechanisms.","Prepare a monitoring-trigger plan and a geotechnical contingency allowance.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lessons learned for ground movements and soil stabilization from the Boston Central Artery","url":"https://doi.org/10.1061/(ASCE)1090-0241(2006)132:8(966)","publisher":"O’Rourke and McGinn / ASCE","year":2006,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Full technical article may require subscription.","checked":"2026-11-22"},{"id":"s2","title":"Contingency fund management — lessons learned","url":"https://www.fhwa.dot.gov/majorprojects/financial_plans/lessons_learned.cfm","publisher":"FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Big Dig construction 589.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":1989,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"boston-central-artery.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/schematic"},{"id":"project-image","title":"Big Dig construction 589.agr.jpg","kind":"project-image","fileName":"boston-central-artery.jpg","mimeType":"image/jpeg","bytes":339680,"sha256":"01902e3f96aad17c3cb58875d0a7591633c218d8dabbe0755b42916933825fe4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"1989-05","evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/46/Big_Dig_construction_589.agr.jpg","downloadUrl":"/cases/boston-central-artery/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"boston-central-artery-capstone.md","mimeType":"text/markdown","bytes":3134,"sha256":"f3d0712edf16c7e0d9920a6b8a1af90de9cdaed03a9c5eade371264e7933c719","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction for Boston’s Central Artery/Tunnel project in May 1989.","caption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"1989-05"},"figureCaption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":17,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":343945,"sourceCount":3,"url":"/cases/boston-central-artery"},{"id":"seattle-sr99","title":"Seattle SR 99 tunnel — soft-ground tunnelling and settlement","summary":"The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.","topics":["tunnels","excavation","dewatering","monitoring","delivery"],"country":"United States","region":"Seattle, Washington","owner":"Washington State Department of Transportation","year":2019,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Earth-pressure-balance tunnelling","Settlement","Groundwater control"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The environmental geology/soils appendix and design-build procurement records establish ground risks and contract context, not a complete as-built tunnel design.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSDOT identifies February 2019 completion; procurement and construction milestones are available on the owner pages.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner’s completed-project page records the outcome and links supporting material.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-risk and monitoring plan for an urban bored tunnel, including shaft construction and dewatering interactions.","inputs":["Extract route geology, groundwater and protected assets from Appendix P.","Separate environmental alternatives from the subsequently selected design-build solution."],"deliverables":["Estimate surface settlement for documented or explicitly assumed loss scenarios.","Prepare shaft/uplift checks and a response plan for unexpected settlement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SR 99 tunnel — completed February 2019","url":"https://apps.wsdot.wa.gov/construction-planning/search-projects/sr-99-tunnel","publisher":"WSDOT","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Alaskan Way Viaduct FEIS Appendix P — geology and soils","url":"https://data.wsdot.wa.gov/publications/Viaduct/AWVFEIS-AppendixP.pdf","publisher":"WSDOT","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"SR 99 bored tunnel design-build procurement","url":"https://wsdot.wa.gov/business-wsdot/contracting-opportunities/sr-99-alaskan-way-viaduct-sr-99-bored-tunnel-design-build-project","publisher":"WSDOT","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Bertha TBM retrieval site.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","publisher":"Wikimedia Commons / SounderBruce from Seattle, United States","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"seattle-sr99.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/schematic"},{"id":"project-image","title":"Bertha TBM retrieval site.jpg","kind":"project-image","fileName":"seattle-sr99.jpg","mimeType":"image/jpeg","bytes":152931,"sha256":"4fa4ed3313fbe70109c8c909325c418043dd5c73592739c5fb1ad31a1a870385","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":406,"credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-07-15 12:27","evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/82/Bertha_TBM_retrieval_site.jpg","downloadUrl":"/cases/seattle-sr99/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"seattle-sr99-capstone.md","mimeType":"text/markdown","bytes":3334,"sha256":"c959a6fd7180face32361696df394f5ca309f8ad094b3f5b8ff41fe7dd4ed30e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015.","caption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":406,"imageDate":"2015-07-15 12:27"},"figureCaption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":18,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157390,"sourceCount":4,"url":"/cases/seattle-sr99"},{"id":"wolf-creek","title":"Wolf Creek Dam — karst-foundation cutoff wall","summary":"A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.","topics":["dams-levees","seepage","rock","ground-improvement","delivery"],"country":"United States","region":"Jamestown, Kentucky","owner":"US Army Corps of Engineers","year":2013,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Cutoff wall","Karst grouting","Dam seepage control"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The completion account describes approximately 1,197 overlapping piles forming a 4,000-foot barrier. It does not provide a complete issued-for-construction package.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The March 2013 USACE account identifies a $594 million rehabilitation project; this is programme scope, not the wall’s final unit-price account.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Last pile placement was reported on 6 March 2013, nine months ahead of the then-planned December completion.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"USACE records barrier completion and the subsequent reservoir review.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare a cutoff wall and grouting strategy for an operating dam over soluble rock, including continuity verification and reservoir constraints.","inputs":["Extract the documented barrier dimensions and geological problem.","Define an explicitly sourced or assumed permeability model for the study seepage calculation."],"deliverables":["Develop a seepage/uplift comparison and a wall-continuity QA plan.","Prepare a construction platform section and a reservoir/instrumentation hold-point sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Nashville District completes Wolf Creek Dam barrier wall","url":"https://www.dvidshub.net/news/103103/nashville-district-completes-wolf-creek-dam-barrier-wall","publisher":"USACE / DVIDS","year":2013,"access":"public-link","license":"US government public information; original credits retained","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Wolf Creek Dam barrier-wall construction — published image and source","url":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","publisher":"DVIDS / U.S. Army Corps of Engineers","year":2012,"access":"public-link","license":"Public domain — U.S. federal government work","notes":"Project image source. Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"wolf-creek.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/wolf-creek/download/schematic"},{"id":"project-image","title":"Wolf Creek Dam barrier-wall construction","kind":"project-image","fileName":"wolf-creek.jpg","mimeType":"image/jpeg","bytes":360915,"sha256":"3b361e7407fd987273b67296a8243d56d96b8acaacef0a11a35bbbf016ef58cc","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1000,"height":664,"credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","licenseUrl":"https://www.dvidshub.net/about/copyright","imageDate":"2012-05-02","evidenceFile":"image-provenance/wolf-creek-source.json","evidenceSha256":"7c60540ea61fdb963e680eb0e27ef54375564f419bba957c0086c51479fca3e5","transformations":"Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/wolf-creek/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"wolf-creek-capstone.md","mimeType":"text/markdown","bytes":3149,"sha256":"a6a8f5863cc2de9de547b3be3d54e50e32e3a1475422a83b73f24b26ce485245","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/wolf-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012.","caption":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012. U.S. Army Corps of Engineers photograph by Leon Roberts.","credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.dvidshub.net/about/copyright","width":1000,"height":664,"imageDate":"2012-05-02"},"figureCaption":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012. U.S. Army Corps of Engineers photograph by Leon Roberts.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":20,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/wolf-creek-source.json","evidenceSha256":"7c60540ea61fdb963e680eb0e27ef54375564f419bba957c0086c51479fca3e5","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":365049,"sourceCount":2,"url":"/cases/wolf-creek"},{"id":"center-hill","title":"Center Hill Dam — grouting, cutoff wall and stabilizing berm","summary":"A staged rehabilitation treated foundation seepage and auxiliary-dam risks using grouting, a deep cutoff wall and a roller-compacted-concrete berm.","topics":["dams-levees","seepage","rock","ground-improvement","delivery"],"country":"United States","region":"DeKalb County, Tennessee","owner":"US Army Corps of Engineers","year":2020,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Foundation grouting","Cutoff wall","Stabilizing berm"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"USACE describes three major repair phases and their completed components; detailed construction plans are not attached to the completion release.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The completion release reports $353 million overall, with $107 million grouting, $122 million cutoff and $50 million berm contracts; scopes differ from the programme total.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Reported phases were grouting in 2008–2010, cutoff in 2012–2015 and final berm completion celebrated in July 2020.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The USACE release documents the final repair phase and constructed features.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a risk-based sequence of dam repairs in which initial grouting also informs the later cutoff design.","inputs":["Extract phase scope, wall depth and published contract-period information.","Identify the piezometric and geological evidence needed to assess each repaired failure mode."],"deliverables":["Prepare a seepage/stability failure-mode map and an investigation-to-construction decision process.","Compare a single-stage programme with the documented phased strategy.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Berm construction completes last repair phase for dam rehabilitation","url":"https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2261687/berm-construction-completes-last-repair-phase-for-dam-rehabilitation/","publisher":"USACE","year":2020,"access":"public-link","license":"USACE public information; original credits retained","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Center Hill auxiliary-dam RCC berm — published image and source","url":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","publisher":"DVIDS / U.S. Army Corps of Engineers","year":2020,"access":"public-link","license":"Public domain — U.S. federal government work","notes":"Project image source. Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"center-hill.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/center-hill/download/schematic"},{"id":"project-image","title":"Center Hill auxiliary-dam RCC berm","kind":"project-image","fileName":"center-hill.jpg","mimeType":"image/jpeg","bytes":293503,"sha256":"a0d33fc9f80d78aecd1af015fbcb8573ffccfdd3639abf05c4993f77dfefa73c","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1000,"height":667,"credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","licenseUrl":"https://www.dvidshub.net/about/copyright","imageDate":"2020","evidenceFile":"image-provenance/center-hill-source.json","evidenceSha256":"7491f54c4d276ee87d196bb5ab594f571734776ba54d95bb86336014027cecf1","transformations":"Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/center-hill/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"center-hill-capstone.md","mimeType":"text/markdown","bytes":3178,"sha256":"fd3962a5077f1d6636c34b684c2ab4f19da43c9623771422cb63d524eb0013d6","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/center-hill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020..","caption":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020.","credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.dvidshub.net/about/copyright","width":1000,"height":667,"imageDate":"2020"},"figureCaption":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":21,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/center-hill-source.json","evidenceSha256":"7491f54c4d276ee87d196bb5ab594f571734776ba54d95bb86336014027cecf1","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":297666,"sourceCount":2,"url":"/cases/center-hill"},{"id":"herbert-hoover","title":"Herbert Hoover Dike — seepage barriers and structure replacement","summary":"The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.","topics":["dams-levees","seepage","ground-improvement","monitoring","delivery"],"country":"United States","region":"Lake Okeechobee, Florida","owner":"US Army Corps of Engineers","year":2023,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Cutoff walls","Internal erosion","Embankment armoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE documents more than 56 miles of cutoff wall and replacement of 28 water-control structures, alongside other risk-reduction work.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The January 2023 announcement reports $1.5 billion invested; the later Fall 2023 update reports over $1.6 billion since 2001. Preserve the different dates and scopes.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE celebrated construction completion in January 2023 after a programme begun in 2005.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The completion release and later update describe completed risk-reduction features.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a reach-prioritization and treatment plan for a long embankment system with penetrations and heterogeneous seepage risk.","inputs":["Extract the completed work types and distinguish dike length from treated cutoff length.","Select one study reach and record what local borings, heads and structure details remain necessary."],"deliverables":["Compare seepage-control alternatives at a typical reach and at a culvert penetration.","Build a work-package schedule and QA plan for interfaces between walls and structures.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Herbert Hoover Dike rehabilitation completion","url":"https://www.saj.usace.army.mil/Media/News-Releases/Article/3276863/usace-marks-herbert-hoover-dike-rehabilitation-project-completion-with-ribbon-c/","publisher":"USACE","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Herbert Hoover Dike — Fall 2023 project update","url":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","publisher":"USACE","year":2023,"access":"public-link","license":"USACE public information; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["herbert-hoover-update","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"herbert-hoover.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/herbert-hoover/download/schematic"},{"id":"herbert-hoover-update","title":"Herbert Hoover Dike project update, Fall 2023","kind":"report","fileName":"herbert-hoover-update.pdf","mimeType":"application/pdf","bytes":1823491,"sha256":"01202f04ff137dff3893984e220dba8cc131287ee65070944b1b0c4dea9d6e69","sourceId":"s2","license":"USACE public information; original credits retained","rightsUrl":"https://www.usace.army.mil/Privacy-and-Security/","rightsBasis":"USACE public-information policy permits copying and distribution unless otherwise indicated.","rightsEvidenceUrl":"https://www.usace.army.mil/Privacy-and-Security/","pages":2,"downloadUrl":"/cases/herbert-hoover/download/herbert-hoover-update"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"herbert-hoover-reference-values.csv","mimeType":"text/csv","bytes":767,"sha256":"03152f87e5ef980f6f0c4ca7440c17766655c72932e645aa4edb92b3a26c9f9e","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/herbert-hoover/download/reference-values"},{"id":"project-image","title":"Herbert Hoover Dike cutoff-wall construction","kind":"project-image","fileName":"herbert-hoover.jpeg","mimeType":"image/jpeg","bytes":1250146,"sha256":"901a3bac7b402ad688e24f2fe77941a34e7cd9d3602d4edc5ac331ccd350cf6a","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1200,"height":800,"credit":"U.S. Army Corps of Engineers, Jacksonville District","sourceUrl":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","licenseUrl":"https://www.usace.army.mil/Privacy-and-Security/","imageDate":null,"evidenceFile":"image-provenance/herbert-hoover-source.json","evidenceSha256":"0bf437e163401247f8725180dba9abdf6f6aa5a4234808386c3f48ac5f91252e","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/herbert-hoover/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"herbert-hoover-capstone.md","mimeType":"text/markdown","bytes":4026,"sha256":"ee6a2a35f3d9cab06c07dbb0f25fb69ea7cc757392cba4fbaaf9563b9c91d87d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/herbert-hoover/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee.","caption":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee. Original USACE photograph from the Fall 2023 project update.","credit":"U.S. Army Corps of Engineers, Jacksonville District","sourceUrl":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.usace.army.mil/Privacy-and-Security/","width":1200,"height":800,"imageDate":null},"figureCaption":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee. Original USACE photograph from the Fall 2023 project update.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":22,"referenceValues":[{"label":"Completed cutoff-wall length","value":56.2,"unit":"mile","scope":"Partial-penetration wall described in the Fall 2023 update.","sourceId":"s2","locator":"Embankment cutoff wall","basis":"Reported completed length."},{"label":"Replaced water-control structures","value":28,"unit":"count","scope":"Replacement work within the rehabilitation programme.","sourceId":"s2","locator":"Water control structures","basis":"Reported completed quantity."},{"label":"Removed or abandoned structures","value":4,"unit":"count","scope":"Structures no longer required.","sourceId":"s2","locator":"Water control structures","basis":"Reported completed quantity."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/herbert-hoover-source.json","evidenceSha256":"0bf437e163401247f8725180dba9abdf6f6aa5a4234808386c3f48ac5f91252e","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":3079415,"sourceCount":2,"url":"/cases/herbert-hoover"},{"id":"folsom-spillway","title":"Folsom auxiliary spillway — rock excavation and foundation preparation","summary":"The auxiliary spillway required major rock excavation and preparation of the control-structure foundation before concrete placement.","topics":["rock","dams-levees","excavation","delivery"],"country":"United States","region":"Folsom, California","owner":"USACE / Bureau of Reclamation","year":2017,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Rock excavation","Foundation preparation","Controlled blasting"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"USACE construction accounts describe blasting completion, foundation cleaning and the subsequent control structure and chute.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"USACE describes a $900 million cooperative effort, a programme total rather than a rock-excavation unit-rate schedule.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"The source records initial excavation in 2008, final concrete stages in 2016 and the October 2017 completion ceremony.","sourceIds":["s2"]},"records":{"availability":"partial","summary":"The owner’s completion release identifies the constructed auxiliary spillway.","sourceIds":["s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a rock-foundation excavation and acceptance programme beside an operating dam and public transport route.","inputs":["Extract published construction stages and final structure dimensions.","Establish study discontinuity, groundwater and blast-vibration parameters explicitly."],"deliverables":["Prepare a temporary rock-slope/bench concept and foundation mapping checklist.","Design sequencing between blasting, cleaning, drainage, acceptance and concrete placement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Corps completes blasting for Folsom Dam spillway","url":"https://www.spk.usace.army.mil/Media/News-Stories/Article/479150/corps-completes-blasting-for-folsom-dam-spillway/","publisher":"USACE","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Folsom auxiliary spillway completion ceremony","url":"https://www.spk.usace.army.mil/Media/News-Releases/Article/1347967/folsom-auxiliary-spillway-completion-ceremony-marks-conclusion-of-historic-proj/","publisher":"USACE","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Corps completes final rock blasting for Folsom Dam spillway (7074960195).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers Sacramento District","year":2012,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"folsom-spillway.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/folsom-spillway/download/schematic"},{"id":"project-image","title":"Corps completes final rock blasting for Folsom Dam spillway (7074960195).jpg","kind":"project-image","fileName":"folsom-spillway.jpg","mimeType":"image/jpeg","bytes":464701,"sha256":"7a19a74d7b3b5a33de9a62801a125a79786fab6e5e3741f2489f8163752e394c","sourceId":"s3","license":"Public domain","width":1280,"height":853,"credit":"U.S. Army Corps of Engineers Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg#Licensing","imageDate":"2012-04-09 13:07","evidenceFile":"image-provenance/folsom-spillway-commons.json","evidenceSha256":"f8c58b1165831e3d43c019c6198f439b3999d2ca0dd921846e86483602a54411","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a9/Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_%287074960195%29.jpg","downloadUrl":"/cases/folsom-spillway/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"folsom-spillway-capstone.md","mimeType":"text/markdown","bytes":3360,"sha256":"9db574128d7dfcb79de13e692011843039bad04940c148f1a0128a63dc749079","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/folsom-spillway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012.","caption":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012. U.S. Army Corps of Engineers construction photograph.","credit":"U.S. Army Corps of Engineers Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg#Licensing","width":1280,"height":853,"imageDate":"2012-04-09 13:07"},"figureCaption":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012. U.S. Army Corps of Engineers construction photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":23,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/folsom-spillway-commons.json","evidenceSha256":"f8c58b1165831e3d43c019c6198f439b3999d2ca0dd921846e86483602a54411","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":469078,"sourceCount":3,"url":"/cases/folsom-spillway"},{"id":"oroville-spillways","title":"Oroville spillway recovery — erosion-resistant foundation reconstruction","summary":"Recovery rebuilt the main spillway and added a secant pile wall, splashpad and buttress at the emergency spillway after the 2017 incident.","topics":["rock","scour-erosion","dams-levees","seepage","delivery"],"country":"United States","region":"Oroville, California","owner":"California Department of Water Resources","year":2018,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Erosion control","Secant pile wall","Rock foundation drainage"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"DWR’s recovery page links investigations and describes the final-design reconstruction; the project update distinguishes initial mobilization from the completed design.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The September 2018 update estimated $940 million recovery through 2019, plus $160 million emergency response; these are dated estimates, not a final account.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"Temporary main-spillway readiness was targeted for November 2017; final-design reconstruction was completed in 2018.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"DWR links consultant, inspection and forensic records from the recovery page.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an emergency-to-permanent reconstruction plan that addresses erosion, uplift and uncertain rock quality.","inputs":["Review the forensic findings and identify the selected failure mechanisms.","Extract the repair cross sections and distinguish temporary from permanent work."],"deliverables":["Prepare a foundation-drainage and erosion-protection concept with construction hold points.","Reconcile changing estimate scopes and show how geological uncertainty enters contingency.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Oroville Spillways Recovery","url":"https://water.ca.gov/Programs/State-Water-Project/SWP-Facilities/Oroville/Oroville-Spillways","publisher":"California DWR","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"September 2018 construction and cost estimate update","url":"https://water.ca.gov/News/News-Releases/2018/Sept-18/Oroville-Spillways-Construction-and-Cost-Estimate-Update","publisher":"California DWR","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Oroville Dam weir and emergency spillway erosion.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","publisher":"Wikimedia Commons / California Department of Water Resources","year":2017,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"oroville-spillways.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oroville-spillways/download/schematic"},{"id":"project-image","title":"Oroville Dam weir and emergency spillway erosion.jpg","kind":"project-image","fileName":"oroville-spillways.jpg","mimeType":"image/jpeg","bytes":320332,"sha256":"f4bd13af9ead3b5be6c9e4a05f99af18dd1c77f2fec0b5b3abc0cde34b401542","sourceId":"s3","license":"Public domain","width":1200,"height":900,"credit":"California Department of Water Resources","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg#Licensing","imageDate":"2017-02-13","evidenceFile":"image-provenance/oroville-spillways-commons.json","evidenceSha256":"e0d98727520124a4f3f46bcb4cef896752cbd9e8edd6e0aa990b908411566689","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bc/Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","downloadUrl":"/cases/oroville-spillways/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"oroville-spillways-capstone.md","mimeType":"text/markdown","bytes":3348,"sha256":"56fa6675b828b6b1cd30cec6dd7461afa664e2b2ba051586c8e6dce28299e59a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oroville-spillways/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident.","caption":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident. California Department of Water Resources project photograph.","credit":"California Department of Water Resources","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg#Licensing","width":1200,"height":900,"imageDate":"2017-02-13"},"figureCaption":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident. California Department of Water Resources project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":24,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/oroville-spillways-commons.json","evidenceSha256":"e0d98727520124a4f3f46bcb4cef896752cbd9e8edd6e0aa990b908411566689","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":324697,"sourceCount":3,"url":"/cases/oroville-spillways"},{"id":"olmsted-locks","title":"Olmsted Locks and Dam — marine construction and project controls","summary":"The navigation replacement became operational in 2018 after a long construction programme. USACE publishes project-control updates and completion material.","topics":["dams-levees","deep-foundations","coastal-offshore","delivery"],"country":"United States","region":"Ohio River, Illinois–Kentucky","owner":"US Army Corps of Engineers","year":2018,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Marine foundation construction","Construction staging","Earned-value comparison"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The public project material supports marine construction and sequencing studies; detailed foundation design must be obtained from project-specific technical records.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The August 2018 scorecard distinguishes planned, earned and actual expenditure at its reporting date; it is not the final closeout account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The 2018 update gives planned versus current completion/operational milestones; the ribbon-cutting release records the August 2018 event.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Owner completion and award accounts are available; a full geotechnical completion report was not located.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare construction sequencing and foundation-installation risks for a major river structure while maintaining navigation.","inputs":["Extract the published work packages, dated cost scorecard and operational milestone.","Identify missing geotechnical design and production-rate information before pricing a study alternative."],"deliverables":["Develop a river-access, foundation-installation and closure sequence.","Reconcile planned, earned and actual cost terminology without treating budgeted quantities as final expenditures.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Olmsted Locks and Dam — August 2018 update","url":"https://www.iwr.usace.army.mil/Portals/70/docs/IWUB/board_meetings/meeting88/UB88_01_Olmsted_Locks_and_Dam_Update_Rissler_28Aug18.pdf","publisher":"USACE","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Corps cuts ribbon on Olmsted project","url":"https://www.lrd.usace.army.mil/News/News-Releases/Article/1617621/corps-cuts-ribbon-on-olmsted-locks-and-dam-project/","publisher":"USACE","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Olmsted Locks and Dam aerial view.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","publisher":"Wikimedia Commons / LouisvilleUSACE","year":2013,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"olmsted-locks.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olmsted-locks/download/schematic"},{"id":"project-image","title":"Olmsted Locks and Dam aerial view.jpg","kind":"project-image","fileName":"olmsted-locks.jpg","mimeType":"image/jpeg","bytes":337003,"sha256":"25c89d760530e1e3eca24c97144ecde5f02a5b58c8e74840e0b040e9d1a01086","sourceId":"s3","license":"Public domain","width":1280,"height":989,"credit":"LouisvilleUSACE","sourceUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg#Licensing","imageDate":"2013-08-21 11:35","evidenceFile":"image-provenance/olmsted-locks-commons.json","evidenceSha256":"b6891b8530650f83a47ef38a15779f5a5821a64128e800d64de25c6d704f68a6","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/ca/Olmsted_Locks_and_Dam_aerial_view.jpg","downloadUrl":"/cases/olmsted-locks/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"olmsted-locks-capstone.md","mimeType":"text/markdown","bytes":3361,"sha256":"4315f61fa271ea7990fca5219e1d9baf260650bd49dba05b560e1fe1f1807ed9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olmsted-locks/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement.","caption":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement. U.S. Army Corps of Engineers project photograph.","credit":"LouisvilleUSACE","sourceUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Olmsted_Locks_and_Dam_aerial_view.jpg#Licensing","width":1280,"height":989,"imageDate":"2013-08-21 11:35"},"figureCaption":"Aerial view of the Olmsted Locks and Dam construction site, with lower pier shells being prepared for concrete placement. U.S. Army Corps of Engineers project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":26,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/olmsted-locks-commons.json","evidenceSha256":"b6891b8530650f83a47ef38a15779f5a5821a64128e800d64de25c6d704f68a6","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":341349,"sourceCount":3,"url":"/cases/olmsted-locks"},{"id":"grizzly-creek","title":"I-70 Grizzly Creek — post-fire rockfall risk and betterment","summary":"After the 2020 fire, CDOT compared rockfall mitigation using risk and benefit-cost analysis. Subsequent debris flows exceeded some installed protection capacities.","topics":["rock","slopes","scour-erosion","delivery"],"country":"United States","region":"Glenwood Canyon, Colorado","owner":"Colorado Department of Transportation","year":2021,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Rockfall protection","Risk-based selection","Benefit-cost analysis"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents selected fence treatments, cost assumptions and the importance of distinguishing routine rockfall from larger debris-flow events.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The report lists a $2.692 million fence estimate and benefit-cost ratios for one- and five-year periods; other summary totals have different scopes.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Fences were installed in spring 2021; intense rainfall caused damaging debris flows in July 2021.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case records both reduced minor-rockfall disruption and damage during larger subsequent events.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select a rockfall-protection strategy under changing post-fire hazard and explicitly describe the residual risk from events beyond its capacity.","inputs":["Extract the source cost table, hazard categories and analysis periods.","Verify energy units and fence specifications against design documents before using them; the summary’s unit labels require confirmation."],"deliverables":["Recalculate the published benefit-cost comparison with transparent assumptions.","Develop a fence layout concept, inspection triggers and a response to debris-flow exceedance.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-029 — reducing risk through rockfall mitigation","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_colorado_grizzlycreek.pdf","publisher":"FHWA / CDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["grizzly-creek-rockfall","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"grizzly-creek.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/grizzly-creek/download/schematic"},{"id":"grizzly-creek-rockfall","title":"FHWA-HIF-23-029, Grizzly Creek rockfall","kind":"report","fileName":"grizzly-creek-rockfall.pdf","mimeType":"application/pdf","bytes":719478,"sha256":"8051f0614203a8cb8749182bd5ffbe8c56bb3b094e9d4fdd341be3757026c733","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/grizzly-creek/download/grizzly-creek-rockfall"},{"id":"project-image","title":"Grizzly Creek burn scar beside I-70 — FHWA Figure 1","kind":"project-image","fileName":"grizzly-creek.jpeg","mimeType":"image/jpeg","bytes":208925,"sha256":"6b408b3327d7bf2f33726e93280cc2b73c473ddac3ef901ef911ea3b9543c23b","sourceId":"s1","license":"Public domain — U.S. federal government work","width":1175,"height":661,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_colorado_grizzlycreek.pdf","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/grizzly-creek-source.json","evidenceSha256":"0e4132c03c8e5e5e14d66e6ac6d452de1ae48d1bc5c08bed5213881269447cf2","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/grizzly-creek/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"grizzly-creek-capstone.md","mimeType":"text/markdown","bytes":2956,"sha256":"b5d9d9eff8777971cac43f025eb24699e0f66497d7e1e95007d6bb13ea3718f0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/grizzly-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Burn scars from the Grizzly Creek fire above I-70 in Glenwood Canyon, Colorado.","caption":"Burn scars from the Grizzly Creek fire above I-70 in Glenwood Canyon, Colorado. FHWA photograph from its rockfall and debris-flow mitigation case study.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_colorado_grizzlycreek.pdf","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":1175,"height":661,"imageDate":null},"figureCaption":"Burn scars from the Grizzly Creek fire above I-70 in Glenwood Canyon, Colorado. FHWA photograph from its rockfall and debris-flow mitigation case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":29,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/grizzly-creek-source.json","evidenceSha256":"0e4132c03c8e5e5e14d66e6ac6d452de1ae48d1bc5c08bed5213881269447cf2","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":932376,"sourceCount":1,"url":"/cases/grizzly-creek"},{"id":"ocoee-us64","title":"US 64 Ocoee Gorge — emergency rockslide stabilization","summary":"Rockslides near Ocoee Dam 2 required rock removal, bolting and stabilization while weather and difficult access affected the reopening programme.","topics":["rock","slopes","retaining-walls","delivery"],"country":"United States","region":"Polk County, Tennessee","owner":"Tennessee Department of Transportation","year":2010,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Rock bolting","Scaling and controlled removal","Weather-constrained work"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner update documents stabilization quantities and sequencing. The technical conference account describes geological failure mechanisms.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The March 2010 owner update revised the expected reopening date to April 16 after weather delays; this was a forecast at publication.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Progress quantities and a technical case paper are linked; a final account was not found.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a temporary and permanent rock-slope repair plan with worker exclusion zones and weather allowances.","inputs":["Extract the documented failures, access limitations and installed treatment quantities.","Identify discontinuity mapping and block geometry required for a study design."],"deliverables":["Prepare a kinematic stability assessment and concept bolt/fence layout.","Build a weather-sensitive schedule and quantity-based estimate.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"US 64 to reopen April 16 — project update","url":"https://comptroller.extglb.tn.gov/news/2010/3/19/u.s.-64-to-reopen-april-16.html","publisher":"Tennessee DOT","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Emergency rockslide mitigation in the Ocoee River Gorge","url":"https://www.researchgate.net/publication/335319508_Emergency_Rockslide_Mitigation_in_Eastern_Tennessee_US_64_Through_the_Ocoee_River_Gorge_2009-2010","publisher":"Jay Smerekanicz / project conference paper","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"US 64, Polk County, Tennessee — Emergency Rock Slope Stabilization in the Ocoee Gorge","url":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","publisher":"American Society of Highway Engineers / TDOT project author","year":2009,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"ocoee-us64.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ocoee-us64/download/schematic"},{"id":"project-image","title":"US 64 Ocoee Gorge — rockslide stabilization site","kind":"project-image","fileName":"ocoee-us64-r13.jpeg","mimeType":"image/jpeg","bytes":170821,"sha256":"579ec113a100e26fc42fe511826fd4fcbad9af811273131115dc3a92a1c3dd55","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":542,"height":267,"credit":"Photograph published with Vanessa Bateman’s TDOT project article in ASHE SCANNER, Spring 2011","sourceUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","licenseUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","imageDate":"2009-11-20","evidenceFile":"image-provenance/ocoee-us64-r13-source.json","evidenceSha256":"bab1cbd782e3171d399080740ebd1e88dcb69f166a7781eb8ea937fb6af56334","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","originalSha256":"885dab5a39ccf863a025149d6649977f4694a858081971d527ec2be4babee623","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/ocoee-us64/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"ocoee-us64-capstone.md","mimeType":"text/markdown","bytes":3238,"sha256":"8a31f23ebaecfdf9f45b2a3cef4498b5fdf7b17eb249476bed62871221313169","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ocoee-us64/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.","caption":"The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.","credit":"Photograph published with Vanessa Bateman’s TDOT project article in ASHE SCANNER, Spring 2011","sourceUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","width":542,"height":267,"imageDate":"2009-11-20","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":30,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/ocoee-us64-r13-source.json","evidenceSha256":"bab1cbd782e3171d399080740ebd1e88dcb69f166a7781eb8ea937fb6af56334","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4255,"sourceCount":3,"url":"/cases/ocoee-us64"},{"id":"ball-state-geothermal","title":"Ball State University — campus ground-source borefields","summary":"The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.","topics":["geothermal","site-investigation","dewatering","delivery"],"country":"United States","region":"Muncie, Indiana","owner":"Ball State University","year":2012,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Borefield layout","Thermal ground response","Drilling logistics"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The university white paper describes approximately 3,600 boreholes, depths of 400–500ft and restored surface uses; these are closed loops, not pumping wells.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The first phase began operating in spring 2012; the later university paper describes the completed base project.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Owner information and a system map are linked; detailed bore logs and final bills were not established.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a ground-source borefield feasibility study that integrates thermal properties, drilling constraints and protection of groundwater.","inputs":["Extract the owner’s borefield arrangement and distinguish heat demand from ground capacity.","Define site-specific thermal-response and groundwater information needed before sizing."],"deliverables":["Prepare a borehole/loop concept and thermal-interference sensitivity study.","Develop drilling, grouting, testing and surface-restoration work packages.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geothermal energy system","url":"https://bsu.edu/about/geothermal","publisher":"Ball State University","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geothermal white paper, January 2019","url":"https://www.bsu.edu/-/media/www/departmentalcontent/cap/cote/021419geothermalwhitepaperjanuary2019.pdf","publisher":"Ball State University","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GeothermalConstruction073011.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","publisher":"Wikimedia Commons / Travisleehardin","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"ball-state-geothermal.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ball-state-geothermal/download/schematic"},{"id":"project-image","title":"GeothermalConstruction073011.jpg","kind":"project-image","fileName":"ball-state-geothermal.jpg","mimeType":"image/jpeg","bytes":391205,"sha256":"b868dba6d8cf0ee3d2c41c41e43b9d48cfbbba7f642ee47ad0551a976352bfc1","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Travisleehardin","sourceUrl":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 30 July 2011","evidenceFile":"image-provenance/ball-state-geothermal-commons.json","evidenceSha256":"82e4b1e5c89994e49ef1a6440f2a443e78d523712954dffd40d297383c97b1fd","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d3/GeothermalConstruction073011.jpg","downloadUrl":"/cases/ball-state-geothermal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"ball-state-geothermal-capstone.md","mimeType":"text/markdown","bytes":3087,"sha256":"3ade5cc33c34a3ba8e308b4fe8867dc99ded41e7bd1fabd5e4ec7c8868394008","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ball-state-geothermal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Geothermal-loop construction at Ball State University, July 30, 2011.","caption":"Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.","credit":"Travisleehardin","sourceUrl":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 30 July 2011"},"figureCaption":"Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":36,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/ball-state-geothermal-commons.json","evidenceSha256":"82e4b1e5c89994e49ef1a6440f2a443e78d523712954dffd40d297383c97b1fd","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":395349,"sourceCount":3,"url":"/cases/ball-state-geothermal"},{"id":"dalton-air-convection","title":"Dalton Highway MP 209–222 — air-convection embankment trial","summary":"Twelve embankment test sections compared air-convection shoulder geometry and rock classes over thaw-unstable permafrost near milepost 219.","topics":["cold-regions","earthworks","monitoring","delivery"],"country":"United States","region":"Alaska","owner":"Alaska Department of Transportation and Public Facilities","year":2022,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Air-convection embankment","Insulation","Thermal monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The final report documents sections installed in 2017–2018 and three years of monitoring; it evaluates thermal performance rather than a complete climate-life prediction.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Test sections were installed in 2017–2018 and monitored for three years.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The 2022 final report presents the trial performance evaluation.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select an embankment shoulder treatment using measured thermal response and construction quantity comparisons.","inputs":["Extract section dimensions, rock class and ground-temperature records.","Separate effects of embankment height, rock size and shoulder width."],"deliverables":["Compare thermal performance and rock quantities for the test configurations.","Specify monitoring and maintenance needed to retain open pore spaces and drainage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Air Convection Embankment experimental feature — final report","url":"https://rosap.ntl.bts.gov/view/dot/65788","publisher":"Alaska DOT&PF","year":2022,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"dalton-air-convection.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/dalton-air-convection/download/schematic"},{"id":"project-image","title":"Dalton Highway — air-convection embankment placement","kind":"project-image","fileName":"dalton-air-convection-r13.jpeg","mimeType":"image/jpeg","bytes":266437,"sha256":"41cd81354e831ab47d34011a8f272506fbc40a1cf387a967fe8e943ae878971d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1472,"height":1103,"credit":"Alaska DOT&PF; report by Matt Billings and Michael Berggren (2022)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/65788","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/65788","imageDate":null,"evidenceFile":"image-provenance/dalton-air-convection-r13-source.json","evidenceSha256":"1b5ef9ae1e3e062b9b5e227cc5c3cbb23389ce29fda155dc9bf4906d670eef2c","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://rosap.ntl.bts.gov/view/dot/65788/dot_65788_DS1.pdf","originalSha256":"f6f2a75551ad504c4d381a1170961c89e6da7a9201e2a5498a3340cbd863068c","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/dalton-air-convection/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"dalton-air-convection-capstone.md","mimeType":"text/markdown","bytes":2644,"sha256":"e683517c5d3198347da8f1c967c583b58f2e6093f00c2cc29af1a274f241b638","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/dalton-air-convection/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","caption":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","credit":"Alaska DOT&PF; report by Matt Billings and Michael Berggren (2022)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/65788","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/65788","width":1472,"height":1103,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":38,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/dalton-air-convection-r13-source.json","evidenceSha256":"1b5ef9ae1e3e062b9b5e227cc5c3cbb23389ce29fda155dc9bf4906d670eef2c","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3612,"sourceCount":1,"url":"/cases/dalton-air-convection"},{"id":"us231-landslide","title":"US 231, Lacey Springs — bridging a moving landslide","summary":"After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.","topics":["slopes","deep-foundations","lateral-foundations","monitoring","delivery"],"country":"United States","region":"Lacey Springs, Alabama","owner":"Alabama Department of Transportation","year":2020,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Landslide avoidance","Drilled shafts","Instrumentation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"FHWA documents alternative selection, drilled-shaft monitoring and construction delivery. It does not supply the full bridge/shaft design set.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $27.4 million for the repair/betterment and describes comparison with more expensive alternatives.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The bridges opened on 28 September 2020; the case describes incentives and advance purchase of casings and girders.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case discusses post-opening performance and ongoing instrumentation.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare slope stabilization with a bridge solution that transfers loads through unstable ground while preserving the road alignment.","inputs":["Extract the evaluated alternatives, slope geometry constraints and monitored quantities.","Identify the shear surface and pile-soil relative movement needed for a study shaft design."],"deliverables":["Prepare an alternatives decision matrix and a lateral soil-loading sensitivity study.","Develop an instrument layout with action levels and an accelerated procurement schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-028 — US 231 landslide repair","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","publisher":"FHWA / ALDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us231-landslide-repair","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us231-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us231-landslide/download/schematic"},{"id":"us231-landslide-repair","title":"FHWA-HIF-23-028, US231 landslide repair","kind":"report","fileName":"us231-landslide-repair.pdf","mimeType":"application/pdf","bytes":383622,"sha256":"0a5b9919d751adb355239d412946675bfefd4a7f291651073059edcb7b1114d8","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship; original state-agency photograph credits retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/72760","pages":2,"downloadUrl":"/cases/us231-landslide/download/us231-landslide-repair"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us231-landslide-reference-values.csv","mimeType":"text/csv","bytes":604,"sha256":"d55a19765753cfb5c1130dc843fd71aa0c087da6a9453cea9d72b6ce51778005","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us231-landslide/download/reference-values"},{"id":"project-image","title":"US 231 — completed bridges over the slide area","kind":"project-image","fileName":"us231-landslide-r13.jpeg","mimeType":"image/jpeg","bytes":67649,"sha256":"b728910614d015886a43573f82e0d8105eefbf36625f378c9b767c67aa34be08","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":778,"height":401,"credit":"Alabama Department of Transportation (ALDOT), published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","imageDate":null,"evidenceFile":"image-provenance/us231-landslide-r13-source.json","evidenceSha256":"073254ab95646ec6e74219206613cae5e26f89adfb9b853f3e9b026882a6f1fc","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","originalSha256":"0a5b9919d751adb355239d412946675bfefd4a7f291651073059edcb7b1114d8","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/us231-landslide/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us231-landslide-capstone.md","mimeType":"text/markdown","bytes":3543,"sha256":"5d0783dcad1f51544fac4c829e19d66bc6ed984bd1285c1d76c61c3f57350ea0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us231-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","caption":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","credit":"Alabama Department of Transportation (ALDOT), published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","width":778,"height":401,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":43,"referenceValues":[{"label":"Repair/betterment cost","value":27400000,"unit":"USD","scope":"Two-bridge resilience solution; FHWA-reported package.","sourceId":"s1","locator":"Project Snapshot and page 2","basis":"As reported; no escalation or inflation adjustment."},{"label":"Contract opening incentive","value":2490000,"unit":"USD","scope":"Incentive described for opening by 2 November 2020; not an extra cost assumed to have been paid.","sourceId":"s1","locator":"Challenges and Lessons Learned","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us231-landslide-r13-source.json","evidenceSha256":"073254ab95646ec6e74219206613cae5e26f89adfb9b853f3e9b026882a6f1fc","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":388798,"sourceCount":1,"url":"/cases/us231-landslide"},{"id":"beaver-dam-wash","title":"Beaver Dam Wash Bridge — scour-resistant replacement","summary":"Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.","topics":["scour-erosion","deep-foundations","coastal-offshore","delivery"],"country":"United States","region":"Mohave County, Arizona","owner":"Mohave County Public Works","year":2005,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Channel migration","Scour protection","Bridge alternatives"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents the selected longer bridge and gabion training-dike approach, with alternatives and economic justification.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $6.5 million for resilience improvements; use its stated scope when comparing alternatives.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The damaging event occurred in 2005; the case describes emergency access followed by replacement planning.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case records the selected resilience solution and lessons learned.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a crossing concept that addresses both local foundation scour and movement of the channel approaching the bridge.","inputs":["Extract the replacement alternatives, channel-change observations and protection measures.","Identify missing hydraulic and geotechnical inputs for a detailed design."],"deliverables":["Compare foundation depth and protection footprints for the alternatives.","Prepare a training-dike concept and a life-cycle maintenance/inspection plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-023 — Beaver Dam Wash bridge","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","publisher":"FHWA / Mohave County","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["beaver-dam-wash","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"beaver-dam-wash.svg","mimeType":"image/svg+xml","bytes":1056,"sha256":"ca50c03b28c61244d08ee83702433916e462ad2ee363e42240a9f0377b8c9c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/beaver-dam-wash/download/schematic"},{"id":"beaver-dam-wash","title":"FHWA-HIF-23-023, Beaver Dam Wash bridge","kind":"report","fileName":"beaver-dam-wash.pdf","mimeType":"application/pdf","bytes":702064,"sha256":"b6eb1c0c1b14505816aec4a0976b5eefafe6792d573bf1f92815ace9144f222f","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/beaver-dam-wash/download/beaver-dam-wash"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"beaver-dam-wash-reference-values.csv","mimeType":"text/csv","bytes":316,"sha256":"59cd33750e4d9acacdef6fb1d3d64718afdd918c65a6b95e1810b9711a6ea2c5","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/beaver-dam-wash/download/reference-values"},{"id":"project-image","title":"Beaver Dam Wash — replacement bridge","kind":"project-image","fileName":"beaver-dam-wash-r13.jpeg","mimeType":"image/jpeg","bytes":65879,"sha256":"1a0c97ba212bac01a7c42e6f0a083b4726a2eb395d317612fef735777e2e8dad","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":592,"height":442,"credit":"Mohave County, published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","imageDate":null,"evidenceFile":"image-provenance/beaver-dam-wash-r13-source.json","evidenceSha256":"462593532e8e6601c25d49cc8fe98590898d6af49b74f0cba439405d59cde406","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","originalSha256":"b6eb1c0c1b14505816aec4a0976b5eefafe6792d573bf1f92815ace9144f222f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/beaver-dam-wash/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"beaver-dam-wash-capstone.md","mimeType":"text/markdown","bytes":3165,"sha256":"766648b23e2c30c1c194e868dfb83cbe7cd8b45f1e1660d9947127c91ff5a14c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/beaver-dam-wash/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","caption":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","credit":"Mohave County, published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","width":592,"height":442,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":44,"referenceValues":[{"label":"Resilience-improvement cost","value":6500000,"unit":"USD","scope":"Bridge-replacement resilience measures in the case summary.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/beaver-dam-wash-r13-source.json","evidenceSha256":"462593532e8e6601c25d49cc8fe98590898d6af49b74f0cba439405d59cde406","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":706601,"sourceCount":1,"url":"/cases/beaver-dam-wash"},{"id":"us98-revetment","title":"US 98, Florida — coastal roadway revetment","summary":"Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.","topics":["scour-erosion","coastal-offshore","reinforced-soil","earthworks","delivery"],"country":"United States","region":"Florida Panhandle","owner":"Florida Department of Transportation","year":2018,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Articulated concrete blocks","Filters","Coastal erosion"],"documentationLevel":"technical-case","design":{"availability":"available","summary":"The FHWA case includes an as-built shoulder section, construction details and comparison with retaining-wall protection.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $5.25 million for resilience improvements and a separate 1,000-ft comparison: $490,000 protection versus $724,000 reconstruction.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The study concerns recovery after the October 2018 hurricane; it also compares performance of protection installed after an earlier storm.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"An as-built shoulder detail and observed performance comparisons appear in the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a roadway-embankment protection concept with particular attention to drains and interfaces where protection can be discontinuous.","inputs":["Extract the published shoulder section and treatment layers.","Establish wave/current demands and filtration requirements from appropriate site data."],"deliverables":["Check filter compatibility, toe/interface stability and treatment limits.","Reproduce the stated cost comparison and test sensitivity to storm recurrence and residual damage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-025 — Hurricane Michael US 98 revetment","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","publisher":"FHWA / FDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us98-revetment","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us98-revetment.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/schematic"},{"id":"us98-revetment","title":"FHWA-HIF-23-025, US98 revetment","kind":"report","fileName":"us98-revetment.pdf","mimeType":"application/pdf","bytes":523326,"sha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/us98-revetment/download/us98-revetment"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us98-revetment-reference-values.csv","mimeType":"text/csv","bytes":875,"sha256":"ebdcd5f5ffad1d2b5e9513da41212acf5e40f818570234f82356c2bf7ff5a976","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us98-revetment/download/reference-values"},{"id":"project-image","title":"US 98 — concrete-block coastal revetment","kind":"project-image","fileName":"us98-revetment-r13.jpeg","mimeType":"image/jpeg","bytes":50907,"sha256":"2c0e7866aa35ba362b4dfdcda8d9076ca7eba3715ccab0e01743150f686e3760","sourceId":"s1","license":"U.S. government photograph — credited to FHWA in the source","width":513,"height":385,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","imageDate":null,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","originalSha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us98-revetment/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us98-revetment-capstone.md","mimeType":"text/markdown","bytes":3797,"sha256":"7b8952f37ce686120c8c8bfddac5f073549d9d12f5da1ebf66a55dc89a96e6ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","caption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","license":"U.S. government photograph — credited to FHWA in the source","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","width":513,"height":385,"imageDate":null,"imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph"},"figureCaption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":45,"referenceValues":[{"label":"Resilience-improvement cost","value":5250000,"unit":"USD","scope":"Reported project resilience improvements.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Protection comparison cost","value":490000,"unit":"USD per 1,000 ft","scope":"Articulated-concrete-block protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reconstruction comparison cost","value":724000,"unit":"USD per 1,000 ft","scope":"Road reconstruction without equivalent protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":580308,"sourceCount":1,"url":"/cases/us98-revetment"},{"id":"us34-erosion","title":"US 34, Iowa — flood-resistant embankment matting","summary":"After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.","topics":["scour-erosion","earthworks","reinforced-soil","delivery"],"country":"United States","region":"Mills County, Iowa","owner":"Iowa Department of Transportation","year":2021,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Erosion-resistant matting","Embankment protection","Life-cycle comparison"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents flexible matting, economic assumptions and the treated extent; full construction drawings are not attached.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The case separates $6.8 million emergency restoration from $2.3 million resilience improvements and reports a benefit-cost ratio of 1.07.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Emergency restoration was completed in May 2019; the matting installation followed approval in 2021.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case describes installed protection along 2.25 miles and the economic review.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a flood-resistant embankment protection scheme that explicitly includes residual damage in its economic assessment.","inputs":["Extract the damaged/treatment extents and recurrence assumptions.","Identify geotechnical filter, anchorage and subgrade conditions needed beyond the case summary."],"deliverables":["Prepare a typical treatment section and interface/filter checks.","Reproduce the benefit-cost calculation and vary residual repair costs and flood frequency.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-027 — US 34 erosion control","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","publisher":"FHWA / Iowa DOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us34-erosion","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us34-erosion.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us34-erosion/download/schematic"},{"id":"us34-erosion","title":"FHWA-HIF-23-027, US34 erosion control","kind":"report","fileName":"us34-erosion.pdf","mimeType":"application/pdf","bytes":366024,"sha256":"7942f01369a05652a64ffb9fff38fbdf367db6975c699bcb2de9e6920e2b9cf6","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":2,"downloadUrl":"/cases/us34-erosion/download/us34-erosion"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us34-erosion-reference-values.csv","mimeType":"text/csv","bytes":953,"sha256":"39a03e8e7b91c4f7c1241dd2ede1cb6d0f02a09e905ce7bc52576222b171f78e","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us34-erosion/download/reference-values"},{"id":"project-image","title":"US 34 flood damage — FHWA Figure 2","kind":"project-image","fileName":"us34-erosion.jpeg","mimeType":"image/jpeg","bytes":120095,"sha256":"a7b471f0ab8cb533098c5e0129b471c60b2cb76e148c205314b7e9c13737259f","sourceId":"s1","license":"Public domain — U.S. federal government work","width":791,"height":505,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/us34-erosion-source.json","evidenceSha256":"4fd46c5561bab26a65674c90334464d50d19f44de1eb5bd69693ee64d7c631e9","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us34-erosion/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us34-erosion-capstone.md","mimeType":"text/markdown","bytes":3808,"sha256":"739db4e27ca57483140774286d65b7273782d3f9cd4796652900b372f1e10d17","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us34-erosion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding.","caption":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding. FHWA photograph of the Iowa project documented in the erosion-protection case.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":791,"height":505,"imageDate":null},"figureCaption":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding. FHWA photograph of the Iowa project documented in the erosion-protection case.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":46,"referenceValues":[{"label":"Emergency restoration cost","value":6800000,"unit":"USD","scope":"Emergency restoration following the 2019 event.","sourceId":"s1","locator":"Page 1, emergency restoration","basis":"As reported; no escalation or inflation adjustment."},{"label":"Resilience-improvement cost","value":2300000,"unit":"USD","scope":"Concrete-block matting resilience treatment.","sourceId":"s1","locator":"Page 1, Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Treatment extent","value":2.25,"unit":"mile","scope":"Reported embankment protection extent.","sourceId":"s1","locator":"Resilience Features","basis":"Reported project length."},{"label":"Reported benefit-cost ratio","value":1.07,"unit":"dimensionless","scope":"Source economic evaluation; reproduce its assumptions before comparison.","sourceId":"s1","locator":"Resilience Features","basis":"Source calculation result."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us34-erosion-source.json","evidenceSha256":"4fd46c5561bab26a65674c90334464d50d19f44de1eb5bd69693ee64d7c631e9","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":492283,"sourceCount":1,"url":"/cases/us34-erosion"},{"id":"marina-bay-sands","title":"Marina Bay Sands — deep foundations on reclaimed ground","summary":"The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.","topics":["deep-foundations","excavation","dewatering","delivery"],"country":"Singapore","region":"Marina Bay, Singapore","owner":"Marina Bay Sands","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Bored piles","Buried obstructions","Excavation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Contractor accounts identify foundation and enabling works; complete ground parameters and structural reactions are not supplied. Those require explicit study assumptions or additional records.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a bored-pile and basement construction sequence across reclaimed fill containing a former seawall.","inputs":["Map the reported obstruction and the interfaces between enabling work, piling and excavation.","Specify a supplemental investigation for fill variability, groundwater and founding strata."],"deliverables":["Compare pile installation risks with alternative obstruction-removal sequences.","Prepare a support-of-excavation concept and hold points for pile integrity and base cleanliness.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a buried seawall affect both pile verticality and groundwater flow?","Which enabling work must precede production piling to avoid repeated access conflicts?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Integrated Marina Bay Sands foundation works","url":"https://bachy-soletanche.com.sg/offer-portfolio/intergrated-marina-bay-sands/","publisher":"Bachy Soletanche Singapore","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Marina Bay Sands piling account","url":"https://www.foundation-alliance.com/offer-portfolio/marina-bay-sands-integrated-resort/","publisher":"Foundation Alliance","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Integrated resort project description","url":"https://www.safdiearchitects.com/projects/marina-bay-sands-integrated-resort","publisher":"Safdie Architects","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Marina Bay Sands Casino construction site (3366800416).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","publisher":"Wikimedia Commons / Andy Mitchell from Glasgow, UK","year":2009,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"marina-bay-sands.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marina-bay-sands/download/schematic"},{"id":"project-image","title":"Marina Bay Sands Casino construction site (3366800416).jpg","kind":"project-image","fileName":"marina-bay-sands.jpg","mimeType":"image/jpeg","bytes":244129,"sha256":"2a5a80337ab4ffe4d286095b8b3633abe0ad94560b395921912b1835b2f744ce","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":914,"credit":"Andy Mitchell from Glasgow, UK","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2009-03-15 09:27","evidenceFile":"image-provenance/marina-bay-sands-commons.json","evidenceSha256":"47217317dc7da1b4d94d0d773a1fd52f47d46ed11173214699791f999adb49d4","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/39/Marina_Bay_Sands_Casino_construction_site_%283366800416%29.jpg","downloadUrl":"/cases/marina-bay-sands/download/project-image","originalSha1":"f290a1a2bff0a5176279b2e6a1c41ae4bec103b4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"marina-bay-sands-capstone.md","mimeType":"text/markdown","bytes":3397,"sha256":"84e154eed3631098278d4a705936e3ff54bf5f5e75fceb9df18326d7e54916ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marina-bay-sands/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the Marina Bay Sands resort in Singapore.","caption":"Construction of the Marina Bay Sands resort in Singapore. The source identifies the actual development discussed in the foundation contractors’ accounts.","credit":"Andy Mitchell from Glasgow, UK","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":914,"imageDate":"2009-03-15 09:27","imageDownloadAllowed":true},"figureCaption":"Construction of the Marina Bay Sands resort in Singapore. The source identifies the actual development discussed in the foundation contractors’ accounts.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":51,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/marina-bay-sands-commons.json","evidenceSha256":"47217317dc7da1b4d94d0d773a1fd52f47d46ed11173214699791f999adb49d4","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":248725,"sourceCount":4,"url":"/cases/marina-bay-sands"},{"id":"millennium-tower","title":"Millennium Tower — perimeter-pile underpinning and monitored load transfer","summary":"The remedial designer describes transferring part of the building load to new perimeter piles founded in rock. Installation-induced movement required changes to both pile construction and the final pile arrangement.","topics":["deep-foundations","settlement","monitoring","delivery"],"country":"United States","region":"San Francisco","owner":"Millennium Tower Homeowners Association","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underpinning","Rock-founded piles","Jacked load transfer"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The designer distinguishes the earlier 52-pile proposal from the implemented 18-pile solution. The city’s earlier environmental sheet is retained as proposal-stage evidence, not the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The remedial designer reports completion in September 2023 with occupancy maintained during the work.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The designer reports initial post-work behavior and a ten-year monitoring requirement; long-term performance is still a monitoring question.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a monitored perimeter underpinning concept while keeping an occupied building in service.","inputs":["Compare the original proposal and later constructed solution without mixing their quantities.","Extract the load-transfer concept and identify the pile-installation effects that prompted revision."],"deliverables":["Balance imposed pile load, existing-foundation capacity and differential movement.","Prepare installation trials, staged jacking steps and ten-year monitoring objectives.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can installing a settlement remedy initially increase settlement?","How should load-transfer fuses protect the original foundation if future differential movement occurs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Perimeter-pile upgrade and observed outcome","url":"https://www.sgh.com/project-story/millennium-tower/","publisher":"Simpson Gumpertz & Heger, remedial designer","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"2019 proposed upgrade information sheet","url":"https://media.api.sf.gov/documents/301_Mission_Information_Sheet_CEQA_Notice.pdf","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Millennium Tower adding pile section 2.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"millennium-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/schematic"},{"id":"project-image","title":"Millennium Tower adding pile section 2.agr.jpg","kind":"project-image","fileName":"millennium-tower.jpg","mimeType":"image/jpeg","bytes":858661,"sha256":"351acb58a3af5bd4bd050a171a013934d81a3c8d9e2085f72a092435946fb878","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1707,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-02-22 16:17:55","evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/07/Millennium_Tower_adding_pile_section_2.agr.jpg","downloadUrl":"/cases/millennium-tower/download/project-image","originalSha1":"d4e2c44c3246b245231a17a0d012fb7bd9790ff5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"millennium-tower-capstone.md","mimeType":"text/markdown","bytes":3232,"sha256":"25bd5057fc007e9cb063539a06b2a2495726a31f43bf1ebbbd69ecd1f5cba045","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco.","caption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1707,"imageDate":"2022-02-22 16:17:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":61,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":863092,"sourceCount":3,"url":"/cases/millennium-tower"},{"id":"san-vicente-dam","title":"San Vicente Dam raise — rock preparation and RCC interface","summary":"The existing concrete dam was raised using roller-compacted concrete. Owner documents connect excavation to competent rock, treatment of localized poor material and seepage control with the enlarged structure.","topics":["rock","dams-levees","seepage","excavation","delivery"],"country":"United States","region":"San Diego County, California","owner":"San Diego County Water Authority","year":2014,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock excavation","Dental concrete","Consolidation grouting","RCC"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The environmental design commitments describe proposed foundation measures; the completion account establishes the constructed dam raise. Detailed final foundation treatment records are not included.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports foundation preparation beginning in June 2009 and construction ending in June 2014.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan foundation preparation and construction of an RCC enlargement beside an existing gravity dam.","inputs":["Extract the owner’s foundation-treatment commitments and construction milestones.","Identify rock defects, existing-dam support and old/new concrete interfaces needing detailed verification."],"deliverables":["Prepare excavation acceptance criteria, dental-concrete details and grout/drain layouts.","Check a representative enlarged section for sliding and uplift, with treatment effectiveness sensitivities.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does excavating beside the original dam change temporary stability requirements?","Which field observations should decide whether a weak rock pocket is removed or treated?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geology and soils design commitments","url":"https://www.sdcwa.org/sites/default/files/files/environmental-docs/csp/Section%2003_08%2C%20Alt%201%20Geology%20%2008%2024%2007.pdf","publisher":"San Diego County Water Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Completion of the dam raise","url":"https://www.sdcwa.org/historic-san-vicente-dam-raise-project-completed/","publisher":"San Diego County Water Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Drone Photography San Vicente Reservoir and Dam San Diego.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","publisher":"Wikimedia Commons / Redideo","year":2024,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"san-vicente-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/san-vicente-dam/download/schematic"},{"id":"project-image","title":"Drone Photography San Vicente Reservoir and Dam San Diego.jpg","kind":"project-image","fileName":"san-vicente-dam.jpg","mimeType":"image/jpeg","bytes":169202,"sha256":"13b8f0c81856c9a03fefd07c981f6913f52c9e46eb2ba83a8706c2f6db0b55e2","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":715,"credit":"Redideo","sourceUrl":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2024-04-21","evidenceFile":"image-provenance/san-vicente-dam-commons.json","evidenceSha256":"e1a6c813b0c557b0253bdb3b0e6764fe4402a1e58f2a6282e512b67dd9e29779","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","downloadUrl":"/cases/san-vicente-dam/download/project-image","originalSha1":"a17feb3503b42dbb142e24edfd3a3f2663af8f7b","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"san-vicente-dam-capstone.md","mimeType":"text/markdown","bytes":3308,"sha256":"f5024109cac1cebbe29b76af2538e1c2ea9fba72955662e777a3a827ca7baefa","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/san-vicente-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County.","caption":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County. The photograph shows the actual completed dam, not a rendering of the proposed raise.","credit":"Redideo","sourceUrl":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":715,"imageDate":"2024-04-21","imageDownloadAllowed":true},"figureCaption":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County. The photograph shows the actual completed dam, not a rendering of the proposed raise.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":62,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/san-vicente-dam-commons.json","evidenceSha256":"e1a6c813b0c557b0253bdb3b0e6764fe4402a1e58f2a6282e512b67dd9e29779","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":173527,"sourceCount":3,"url":"/cases/san-vicente-dam"},{"id":"calaveras-dam","title":"Calaveras Dam replacement — seismic foundations and unexpected landslides","summary":"Replacement of a seismically vulnerable dam encountered an additional ancient landslide during abutment excavation. Public environmental and budget records document supplemental investigation, design revisions and delivery consequences.","topics":["dams-levees","seismic","slopes","rock","site-investigation","delivery"],"country":"United States","region":"Sunol Valley, California","owner":"San Francisco Public Utilities Commission","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Abutment excavation","Seismic embankment design","Landslide stabilization"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The environmental addendum explains the left-abutment investigation and revised slope treatment. The consultant describes final-design responsibilities, while city oversight records track budget changes.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The 2019 city analysis traces a budget change from $416 million to $823 million across successive revisions. These are programme budgets with multiple causes, not a foundation-only final account.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Revise a dam-abutment excavation after construction exposes an unrecognized landslide mass.","inputs":["Extract the mapped hazard, supplemental investigation and treatment objective from the addendum.","Separate original design assumptions, newly observed conditions and later access-road damage."],"deliverables":["Compare removal and retained-remnant stabilization with groundwater sensitivities.","Develop a revised excavation sequence, material handling plan and change-control estimate.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What observations would distinguish an ancient shear surface from ordinary weathered rock?","How should uncertainty in the residual landslide geometry affect contingency quantities?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Environmental addendum after left-abutment discoveries","url":"https://sfplanning.s3.amazonaws.com/sfmea/2005.0161E_Adm1.pdf","publisher":"San Francisco Planning / SFPUC","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Final design and geotechnical investigations","url":"https://aecom.com/projects/calaveras-dam-replacement-project/","publisher":"AECOM","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"2019 budget and legislative analysis","url":"https://sfgov.legistar.com/View.ashx?GUID=E44CE420-A2F2-4DE8-BA38-A16B402F5B23&ID=7102715&M=F","publisher":"San Francisco Budget and Legislative Analyst","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Aerial view of Calaveras Reservoir showing the reconstruction of the dam wall.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_Calaveras_Reservoir_showing_the_reconstruction_of_the_dam_wall.JPG","publisher":"Wikimedia Commons / Kyle Hawton","year":2015,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"calaveras-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/calaveras-dam/download/schematic"},{"id":"project-image","title":"Aerial view of Calaveras Reservoir showing the reconstruction of the dam wall.JPG","kind":"project-image","fileName":"calaveras-dam.jpg","mimeType":"image/jpeg","bytes":263048,"sha256":"4b2838d0f8faaf72aa29c476d993568f3533c88816ec281b3be550b2f7b06bba","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":720,"credit":"Kyle Hawton","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_Calaveras_Reservoir_showing_the_reconstruction_of_the_dam_wall.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2015-03-22 14:12:56","evidenceFile":"image-provenance/calaveras-dam-commons.json","evidenceSha256":"dfe8d170b97213af3fa3c4663da03310fe5fe662f0642aa16a8ccbb7d763b7b7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/67/Aerial_view_of_Calaveras_Reservoir_showing_the_reconstruction_of_the_dam_wall.JPG","downloadUrl":"/cases/calaveras-dam/download/project-image","originalSha1":"3c6bd773968322a17452887f8c6e484af5dc8bf4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"calaveras-dam-capstone.md","mimeType":"text/markdown","bytes":3596,"sha256":"28570b7ef1084de40740abad204dfe5b3b1cf54b66164bb11fc8d3e016bd0939","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/calaveras-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Calaveras Reservoir during reconstruction of the dam.","caption":"Aerial view of Calaveras Reservoir during reconstruction of the dam. The image shows the actual replacement-project work area.","credit":"Kyle Hawton","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_Calaveras_Reservoir_showing_the_reconstruction_of_the_dam_wall.JPG","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":720,"imageDate":"2015-03-22 14:12:56","imageDownloadAllowed":true},"figureCaption":"Aerial view of Calaveras Reservoir during reconstruction of the dam. The image shows the actual replacement-project work area.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":63,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/calaveras-dam-commons.json","evidenceSha256":"dfe8d170b97213af3fa3c4663da03310fe5fe662f0642aa16a8ccbb7d763b7b7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":267629,"sourceCount":4,"url":"/cases/calaveras-dam"},{"id":"bluestone-dam","title":"Bluestone Dam — rock anchors and spillway-foundation protection","summary":"The safety programme combines anchoring, drainage and armor over the bedrock stilling basin. Construction must be staged while the spillway remains an active river-release route.","topics":["dams-levees","rock","scour-erosion","dewatering","delivery"],"country":"United States","region":"Hinton, West Virginia","owner":"US Army Corps of Engineers","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock anchors","Uplift drainage","Stilling-basin armor","Cofferdams"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE describes completed earlier phases and the ongoing stilling-basin work. The project is not labeled fully complete; the owner’s 2026 programme forecasts completion in 2030.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The 2020 notice identifies a $319.6 million Phase 5 contract. It is not a final cost for all phases.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The 2026 owner update reports one half complete and forecasts overall completion in 2030; this supersedes the older 2020 contract forecast.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Stage foundation anchoring and armor placement in half of an operating stilling basin.","inputs":["Extract the owner’s phase boundaries, diversion concept and uplift-control components.","Define a study flood window and rock discontinuity model for temporary and permanent checks."],"deliverables":["Check anchor demand and drain effectiveness for intact and blocked-drain scenarios.","Prepare a cofferdam sequence and flood-response plan with excavation hold points.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does temporary river diversion alter uplift beneath the work area?","Which inspection or proof-test result should delay concreting over an anchor zone?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Safety assurance project and 2026 progress","url":"https://www.lrd.usace.army.mil/Missions/Projects/Article/3631104/bluestone-dam-dam-safety-assurance-mega-project/","publisher":"USACE Great Lakes and Ohio River Division","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Phase 5 contract milestone","url":"https://www.usace.army.mil/Media/News/Article/2126116/bluestone-pdt-achieves-milestone/","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Bluestone Dam 2022a.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","publisher":"Wikimedia Commons / Antony-22","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bluestone-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bluestone-dam/download/schematic"},{"id":"project-image","title":"Bluestone Dam 2022a.jpg","kind":"project-image","fileName":"bluestone-dam.jpg","mimeType":"image/jpeg","bytes":346957,"sha256":"1956f06dd42d585fa5868ce36388d01e769be3f4e1558d874872a4fa7143082e","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Antony-22","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-04-02 13:13:58","evidenceFile":"image-provenance/bluestone-dam-commons.json","evidenceSha256":"55a381e13ba93c79b945faaf64fc9910ada6981407ff3b529abc3e1d4a12faa5","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/90/Bluestone_Dam_2022a.jpg","downloadUrl":"/cases/bluestone-dam/download/project-image","originalSha1":"7a54bc8e6d12bb134ada88de7744b4def9c86426","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bluestone-dam-capstone.md","mimeType":"text/markdown","bytes":3056,"sha256":"db4860c066a5468d0b6af254a88a791ef3657652ddccc228ec5e7352a5e98892","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bluestone-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bluestone Dam in 2022, showing work in the spillway area.","caption":"Bluestone Dam in 2022, showing work in the spillway area. The photograph corresponds to the ongoing dam-safety programme.","credit":"Antony-22","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2022-04-02 13:13:58","imageDownloadAllowed":true},"figureCaption":"Bluestone Dam in 2022, showing work in the spillway area. The photograph corresponds to the ongoing dam-safety programme.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":67,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bluestone-dam-commons.json","evidenceSha256":"55a381e13ba93c79b945faaf64fc9910ada6981407ff3b529abc3e1d4a12faa5","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350998,"sourceCount":3,"url":"/cases/bluestone-dam"},{"id":"mosul-dam","title":"Mosul Dam — maintenance grouting in soluble foundations","summary":"The dam overlies soluble limestone and gypsum. A rehabilitation programme strengthened maintenance grouting, equipment and instrumentation; continuing operation depends on sustained foundation management.","topics":["dams-levees","seepage","rock","monitoring","delivery"],"country":"Iraq","region":"Tigris River, northern Iraq","owner":"Iraq Ministry of Water Resources","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Maintenance grouting","Karst dissolution","Instrumented surveillance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE’s project history explains the grouting-gallery purpose and the 2016–2019 rehabilitation. It does not portray dissolution as permanently eliminated.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The history documents the 2016–2019 task force; operation and maintenance remained the responsibility of Iraq’s Ministry of Water Resources.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The source records equipment, workforce and instrumentation improvements, with continued grouting required.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an operations-linked grouting and surveillance plan for a dam on a dissolving foundation.","inputs":["Identify the soluble strata, access-gallery function and monitoring system described by the project team.","Define study groundwater chemistry and hydraulic gradients, marking them as assumptions where unpublished."],"deliverables":["Compare targeted and blanket grouting using permeability and grout-take scenarios.","Create inspection, drilling, instrumentation and response schedules that remain workable during outages.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is completion of a rehabilitation contract different from ending maintenance grouting?","How can changing grout take indicate either successful closure or a new flow path?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Mosul Dam Task Force project history","url":"https://www.tad.usace.army.mil/About/History/","publisher":"USACE Transatlantic Division","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Mosul Dam seepage.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","publisher":"Wikimedia Commons / This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","year":2007,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"mosul-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mosul-dam/download/schematic"},{"id":"project-image","title":"Mosul Dam seepage.jpg","kind":"project-image","fileName":"mosul-dam.jpg","mimeType":"image/jpeg","bytes":36400,"sha256":"5ed3cd442242ea44ce7714f6406861853e493e1e3c9f7ff7bfd283766ce3331c","sourceId":"s2","license":"Public domain","width":652,"height":390,"credit":"This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","sourceUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg#Licensing","imageDate":"2007","evidenceFile":"image-provenance/mosul-dam-commons.json","evidenceSha256":"24cc7f7e6d87e0313bf07045244006791851a33a996e3b1856e722d1eb96c160","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/ef/Mosul_Dam_seepage.jpg","downloadUrl":"/cases/mosul-dam/download/project-image","originalSha1":"aa0bd6259fd94c99184966d5b6f57b00092cb239","originalSha256":"5ed3cd442242ea44ce7714f6406861853e493e1e3c9f7ff7bfd283766ce3331c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"mosul-dam-capstone.md","mimeType":"text/markdown","bytes":3389,"sha256":"d6549148f14ee3077870d6d17abbffd5fefc264b92192bbca050323f1979172b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mosul-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Seepage east of and below the Mosul Dam spillway.","caption":"Seepage east of and below the Mosul Dam spillway. The source photograph documents the actual dam setting relevant to the foundation-management case.","credit":"This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","sourceUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg#Licensing","width":652,"height":390,"imageDate":"2007","imageDownloadAllowed":true},"figureCaption":"Seepage east of and below the Mosul Dam spillway. The source photograph documents the actual dam setting relevant to the foundation-management case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":68,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/mosul-dam-commons.json","evidenceSha256":"24cc7f7e6d87e0313bf07045244006791851a33a996e3b1856e722d1eb96c160","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":40774,"sourceCount":2,"url":"/cases/mosul-dam"},{"id":"hoover-dam","title":"Hoover Dam — rock-foundation preparation and remedial grouting","summary":"Construction removed river deposits to competent rock and treated the foundation and abutments. Later drainage and remedial grouting addressed uplift and leakage observed during initial reservoir filling.","topics":["rock","dams-levees","seepage","excavation","delivery"],"country":"United States","region":"Colorado River, Nevada–Arizona","owner":"US Bureau of Reclamation","year":1947,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock excavation","Grout curtain","Drainage galleries","Uplift"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"Reclamation’s construction history and foundation-grouting standard explain original preparation and the later remedial programme. Concrete contraction-joint grouting must not be confused with rock-foundation grouting.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The design standard records effectiveness of remedial work and later observations; it is not a present-day dam-safety evaluation.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reassess foundation seepage after reservoir filling reveals pressures above the original design expectation.","inputs":["Separate original grout holes, later remedial work and concrete-joint treatment in the source record.","Extract the reported rationale for changed grout mixes and additional drainage."],"deliverables":["Calculate uplift distributions for alternative drain and curtain effectiveness assumptions.","Design a trial grouting plan with staged pressure limits and monitoring of adjacent drainage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why might a deeper curtain and additional drains be complementary rather than competing remedies?","What observations would show that apparent grout refusal is caused by premature setting?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Hoover Dam construction history","url":"https://www.usbr.gov/history/hoover.html","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation grouting design standard, Hoover case","url":"https://www.usbr.gov/tsc/techreferences/designstandards-datacollectionguides/finalds-pdfs/DS13-15.pdf","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Hoover Dam, Nevada (Arizona-Nevada, USA) -- 2012 -- 6099.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","publisher":"Wikimedia Commons / Dietmar Rabich","year":null,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hoover-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hoover-dam/download/schematic"},{"id":"project-image","title":"Hoover Dam, Nevada (Arizona-Nevada, USA) -- 2012 -- 6099.jpg","kind":"project-image","fileName":"hoover-dam.jpg","mimeType":"image/jpeg","bytes":465705,"sha256":"85015660314ac149a4557cb3f98fe7fb03d50be0ec1b734ca92b8a807c6b734e","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Dietmar Rabich","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"Taken on 26 July 2012, 13:37","evidenceFile":"image-provenance/hoover-dam-commons.json","evidenceSha256":"ec32fc3ca7a4a63c78fa79cebdf26ae9a3b975af6c12b7c48725cb839261eca2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f6/Hoover_Dam%2C_Nevada_%28Arizona-Nevada%2C_USA%29_--_2012_--_6099.jpg","downloadUrl":"/cases/hoover-dam/download/project-image","originalSha1":"4d420802cfaaf32abceb2ae2056cfe87dbc710f9","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hoover-dam-capstone.md","mimeType":"text/markdown","bytes":3357,"sha256":"9454c025e84aa35fa0a13d2587b628d4c439ff0309ef32c508d072347e950f19","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hoover-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hoover Dam and its canyon setting.","caption":"Hoover Dam and its canyon setting. The photograph identifies the completed project; original and remedial foundation grouting are described in Reclamation’s records.","credit":"Dietmar Rabich","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"Taken on 26 July 2012, 13:37","imageDownloadAllowed":true},"figureCaption":"Hoover Dam and its canyon setting. The photograph identifies the completed project; original and remedial foundation grouting are described in Reclamation’s records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":69,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hoover-dam-commons.json","evidenceSha256":"ec32fc3ca7a4a63c78fa79cebdf26ae9a3b975af6c12b7c48725cb839261eca2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":470079,"sourceCount":3,"url":"/cases/hoover-dam"},{"id":"gotthard-base-tunnel","title":"Gotthard Base Tunnel — squeezing rock and adaptive support","summary":"Deep tunnel sections encountered squeezing rock and strongly variable geological behavior. The Swiss geotechnical society’s project history explains both anticipated and unexpected support challenges at Sedrun and Faido.","topics":["tunnels","rock","site-investigation","monitoring","delivery"],"country":"Switzerland","region":"Swiss Alps","owner":"AlpTransit Gotthard","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Squeezing-ground support","Convergence monitoring","Geological prediction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The heritage case includes geology and support-system discussions from project records. It supports assessment of alternatives and field observations rather than transfer of one support class to all rock.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The engineering overview records opening in June 2016 after a long multi-heading construction programme.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select and revise a tunnel support scheme when measured convergence exceeds the original forecast.","inputs":["Choose one published squeezing section and extract its geology and support sequence.","Distinguish forecast ground conditions from observations obtained during excavation."],"deliverables":["Compare yielding and stiff support with a convergence–confinement study.","Prepare an observational trigger plan and construction-time implications for revised support.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can stronger initial support fail to stop continuing squeezing?","Which measurements indicate that a support change is needed before the next excavation round?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Gotthard Base Tunnel engineering heritage case","url":"https://htc.issmge.org/virtual-time-capsule/member-societies/swiss-geotechnical-society-geotechnik-schweiz/gotthard-base-tunnel","publisher":"Swiss Geotechnical Society / ISSMGE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Project engineering overview","url":"https://www.satw.ch/en/gotthard-base-tunnel-1","publisher":"Swiss Academy of Engineering Sciences","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"20141120 gotthard-basistunnel05-wiki.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","publisher":"Wikimedia Commons / Hannes Ortlieb ( Diskussion )","year":2014,"access":"public-link","license":"CC BY-SA 3.0 de","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"gotthard-base-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/gotthard-base-tunnel/download/schematic"},{"id":"project-image","title":"20141120 gotthard-basistunnel05-wiki.jpg","kind":"project-image","fileName":"gotthard-base-tunnel.jpg","mimeType":"image/jpeg","bytes":270024,"sha256":"c34e7149142543a6d7467bab8777410c8eda3fd5bea95792762d9de0b49230d5","sourceId":"s3","license":"CC BY-SA 3.0 de","width":1280,"height":853,"credit":"Hannes Ortlieb ( Diskussion )","sourceUrl":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/de/deed.en","imageDate":"2014-11-20","evidenceFile":"image-provenance/gotthard-base-tunnel-commons.json","evidenceSha256":"b0b8e93d8f2238bc07cd984600507c4e88264e3ece95c7661871510ceae09f35","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/69/20141120_gotthard-basistunnel05-wiki.jpg","downloadUrl":"/cases/gotthard-base-tunnel/download/project-image","originalSha1":"e74de4bfce9b76c9c98d216f3edbb245cb2a7ec5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"gotthard-base-tunnel-capstone.md","mimeType":"text/markdown","bytes":3256,"sha256":"76ba7c8ccd685844c7f7ec46648cb4988358b8db5be5d2a9269651d4d408168b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/gotthard-base-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014.","caption":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.","credit":"Hannes Ortlieb ( Diskussion )","sourceUrl":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","license":"CC BY-SA 3.0 de","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/de/deed.en","width":1280,"height":853,"imageDate":"2014-11-20","imageDownloadAllowed":true},"figureCaption":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":74,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/gotthard-base-tunnel-commons.json","evidenceSha256":"b0b8e93d8f2238bc07cd984600507c4e88264e3ece95c7661871510ceae09f35","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":274405,"sourceCount":3,"url":"/cases/gotthard-base-tunnel"},{"id":"tideway-tunnel","title":"Thames Tideway Tunnel — variable geology and deep shafts","summary":"The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.","topics":["tunnels","dewatering","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"London","owner":"Tideway","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry tunnelling","Deep shafts","Ground model refinement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project geologist’s technical lecture and designer account provide ground-model and machine-selection reasoning. Completion of tunnelling in a contract area is not the same as completion of the whole sewer system.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare tunnelling and shaft-construction risks across clay, sand and chalk reaches of an urban sewer alignment.","inputs":["Extract the geological units and identify where face pressure is governed by water rather than soil strength.","Choose one contract reach and preserve the distinction between main and connection tunnels."],"deliverables":["Prepare an excavation-method selection matrix and groundwater-control concepts.","Develop a monitoring and geological-reporting plan for updating production forecasts.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What does an intact sample fail to reveal about in-situ chalk permeability?","How should a changed ground model alter contingency time and intervention planning?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Engineering geology and construction performance","url":"https://ice.org.uk/events/recorded-lectures/engineering-geology-of-the-thames-tideway-tunnel","publisher":"Tim Newman / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Engineering the Thames Tideway sewer","url":"https://www.mottmac.com/en-gb/projects/how-londons-thames-tideway-super-sewer-was-engineered/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Thames Tideway Tunnel construction, Nine Elms.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","publisher":"Wikimedia Commons / AndyScott","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tideway-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/schematic"},{"id":"project-image","title":"Thames Tideway Tunnel construction, Nine Elms.jpg","kind":"project-image","fileName":"tideway-tunnel.jpg","mimeType":"image/jpeg","bytes":574175,"sha256":"407b83af897291400982623e5865b9a4baefbb086e090062f79b6911b9d9e3f4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1925,"credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-03-23 14:14:14","evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/4f/Thames_Tideway_Tunnel_construction%2C_Nine_Elms.jpg","downloadUrl":"/cases/tideway-tunnel/download/project-image","originalSha1":"a8e1f4ec3dc41e3101fff83dea35e08e296a2037","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tideway-tunnel-capstone.md","mimeType":"text/markdown","bytes":3265,"sha256":"ba22b9318da7099b0a5527de83a4cf0224651f9706d87d28d94497b3cc7bfb99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Thames Tideway Tunnel construction at Nine Elms, London.","caption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1925,"imageDate":"2022-03-23 14:14:14","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":78,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":578565,"sourceCount":3,"url":"/cases/tideway-tunnel"},{"id":"second-avenue-subway","title":"Second Avenue Subway Phase 1 — ground freezing at a TBM launch","summary":"Unexpected poor ground near the east running-tunnel launch required a revised sequence. The construction manager describes soil freezing while the TBM first advanced through the western alignment.","topics":["tunnels","ground-improvement","monitoring","delivery"],"country":"United States","region":"Manhattan, New York","owner":"Metropolitan Transportation Authority","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","TBM launch support","Settlement control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The construction-manager account identifies the actual temporary treatment and sequencing response. It does not imply that the entire subway alignment was frozen.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSP records west and east running-tunnel completion in 2011 and Phase 1 opening in January 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Recover a tunnelling programme when a localized launch zone cannot support the planned hard-rock TBM excavation.","inputs":["Extract the reported launch problem and revised east/west drive sequence.","Define a study freezing geometry and groundwater flow scenario for the local weak zone."],"deliverables":["Estimate freeze formation time and identify verification boreholes and temperature targets.","Plan thawing and lining load transfer with utilities and adjacent building monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can closely spaced borings still miss a localized poor-ground pocket?","How does moving the TBM to a different drive reduce schedule risk without removing ground risk?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Opening and construction challenges","url":"https://www.wsp.com/en-us/insights/new-york-opens-its-second-avenue-subway","publisher":"WSP, construction manager","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Phase 1 project methods","url":"https://www.wsp.com/en-gb/projects/second-avenue-subway","publisher":"WSP","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Second Avenue Subway November 2013 (11344196583) (2).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","publisher":"Wikimedia Commons / Metropolitan Transportation Authority of the State of New York","year":2013,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"second-avenue-subway.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/second-avenue-subway/download/schematic"},{"id":"project-image","title":"Second Avenue Subway November 2013 (11344196583) (2).jpg","kind":"project-image","fileName":"second-avenue-subway.jpg","mimeType":"image/jpeg","bytes":544351,"sha256":"6683f5afad3af69a041d3b73709795ba2cb397ef47ff446be5e6577b1be71970","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":852,"credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2013-11-23 13:26","evidenceFile":"image-provenance/second-avenue-subway-commons.json","evidenceSha256":"ad23a21be5fd939864d642accfbf5f27829c9a31abdd0977487f66394614ac4b","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Second_Avenue_Subway_November_2013_%2811344196583%29_%282%29.jpg","downloadUrl":"/cases/second-avenue-subway/download/project-image","originalSha1":"0cae68c05f3f00662ab2261e99e53be5714184e8","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"second-avenue-subway-capstone.md","mimeType":"text/markdown","bytes":3216,"sha256":"b90c172254070205460219585cba13957e4c0b6c883c5b18b7e41dee3f25896a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/second-avenue-subway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the future 86th Street station in November 2013.","caption":"Construction of the future 86th Street station in November 2013. MTA photograph from Second Avenue Subway Phase 1; the localized launch-freezing operation occurred elsewhere on the same phase.","credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":852,"imageDate":"2013-11-23 13:26","imageDownloadAllowed":true},"figureCaption":"Construction of the future 86th Street station in November 2013. MTA photograph from Second Avenue Subway Phase 1; the localized launch-freezing operation occurred elsewhere on the same phase.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":80,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/second-avenue-subway-commons.json","evidenceSha256":"ad23a21be5fd939864d642accfbf5f27829c9a31abdd0977487f66394614ac4b","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":548692,"sourceCount":3,"url":"/cases/second-avenue-subway"},{"id":"auckland-city-rail","title":"Auckland City Rail Link — ground models and settlement baselines","summary":"The urban rail link traverses weak rock, younger sediments, volcanic material and reclamation. Project engineers describe how phased investigations and a shared three-dimensional ground model informed procurement and risk allocation.","topics":["tunnels","site-investigation","monitoring","delivery"],"country":"New Zealand","region":"Central Auckland","owner":"City Rail Link Limited","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geotechnical baseline reports","EPB tunnelling","Settlement assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The geotechnical paper explains the baseline-report process, while owner pages link settlement assessments and TBM information. Those records support a procurement study without inventing a final asset-acceptance status.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a defensible ground baseline and investigation plan for an urban railway with several geological transitions.","inputs":["Extract the geological units and trace how investigation priorities changed through design.","Choose one alignment section and identify factual data separately from interpretation."],"deliverables":["Create a baseline table of expected conditions and measurable exceedance criteria.","Develop a building settlement screening and instrumentation strategy linked to tunnel operations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which uncertainties should remain explicit in a baseline rather than being hidden in an average profile?","How can a shared geological model improve procurement while still requiring independent interpretation?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Managing ground risk from concept to procurement","url":"https://www.nzgs.org/libraries/managing-ground-risk-for-aucklands-city-rail-link-project-concept-design-to-procurement/","publisher":"Project engineers / New Zealand Geotechnical Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"TBM technical facts","url":"https://www.cityraillink.co.nz/tunnel-boring-machine-key-facts","publisher":"City Rail Link Limited","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Consents and settlement assessments","url":"https://www.cityraillink.co.nz/consents-in-your-area","publisher":"City Rail Link Limited","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"CRL Albert Street 2452.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","publisher":"Wikimedia Commons / Schwede66","year":2018,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"auckland-city-rail.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/auckland-city-rail/download/schematic"},{"id":"project-image","title":"CRL Albert Street 2452.jpg","kind":"project-image","fileName":"auckland-city-rail.jpg","mimeType":"image/jpeg","bytes":335829,"sha256":"9f57ec9525f4422ccf4aab9a56c5d8b30f5836b5eb79c2fd3d9fa0bbe507bcd6","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Schwede66","sourceUrl":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2018-03-06 07:48:51","evidenceFile":"image-provenance/auckland-city-rail-commons.json","evidenceSha256":"798247ba9b24a81b1bbb676d213e54e192861dc5f1566b0513fc29a0de4de7e7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0a/CRL_Albert_Street_2452.jpg","downloadUrl":"/cases/auckland-city-rail/download/project-image","originalSha1":"12611ec2058caffaa71507bb9e901326c9b29c39","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"auckland-city-rail-capstone.md","mimeType":"text/markdown","bytes":3369,"sha256":"aa8cd7d0034de7bd80af2853144a3ab04107a646cfef16d40bf7000246a3d3bb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/auckland-city-rail/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"City Rail Link construction on Albert Street in Auckland.","caption":"City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.","credit":"Schwede66","sourceUrl":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2018-03-06 07:48:51","imageDownloadAllowed":true},"figureCaption":"City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":84,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/auckland-city-rail-commons.json","evidenceSha256":"798247ba9b24a81b1bbb676d213e54e192861dc5f1566b0513fc29a0de4de7e7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":340323,"sourceCount":4,"url":"/cases/auckland-city-rail"},{"id":"nicoll-highway","title":"Nicoll Highway collapse — excavation design and monitoring decisions","summary":"The official inquiry identified errors in retaining-wall and strut-connection design and failures to respond adequately to warning signs. The case joins ground-model selection, temporary-structure detailing and construction governance.","topics":["excavation","retaining-walls","monitoring","delivery"],"country":"Singapore","region":"Singapore","owner":"Singapore Land Transport Authority / Committee of Inquiry","year":2004,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Braced excavation","Undrained analysis","Strut connections","Trigger response"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The government executive summary supplies findings from the inquiry. It is not a complete finite-element input file or a basis for reproducing all trial evidence.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Audit a deep-excavation design and its monitoring response before allowing the next excavation stage.","inputs":["Separate wall-system assumptions from structural connection capacity in the inquiry findings.","Build a timeline of reported warnings and the decisions that followed."],"deliverables":["Compare appropriate undrained modeling assumptions and perform an independent brace-load check.","Write stop-work criteria and an escalation chain with accountable technical review.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can matching measured wall movement with a flawed back-analysis increase risk?","What should happen when instrumentation review levels are repeatedly exceeded?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Final Committee of Inquiry executive summary","url":"https://www.nas.gov.sg/archivesonline/data/pdfdoc/20050513987.pdf","publisher":"Singapore Ministry of Manpower / Committee of Inquiry","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Nicoll Highway collapse site 20240420 084318.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","publisher":"Wikimedia Commons / ZKang123","year":2024,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nicoll-highway.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nicoll-highway/download/schematic"},{"id":"project-image","title":"Nicoll Highway collapse site 20240420 084318.jpg","kind":"project-image","fileName":"nicoll-highway.jpg","mimeType":"image/jpeg","bytes":413344,"sha256":"01166dcd29cd06c988ce62bd23006a1e3c32242081861387a420c628f3da0c12","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ZKang123","sourceUrl":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2024-04-20 08:43:18","evidenceFile":"image-provenance/nicoll-highway-commons.json","evidenceSha256":"f602ded2258765be6bc19708d0174afcae8ed2a6c3f3ffb780c9a55f494a3199","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/30/Nicoll_Highway_collapse_site_20240420_084318.jpg","downloadUrl":"/cases/nicoll-highway/download/project-image","originalSha1":"25a928d56919a1390026c07139abffea22a64a07","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nicoll-highway-capstone.md","mimeType":"text/markdown","bytes":3033,"sha256":"86db0bc61b262d41febb7bd4f24e7935905a9c1323d16a6a05644e1c95c4ac99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nicoll-highway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Nicoll Highway collapse site photographed in April 2024.","caption":"The Nicoll Highway collapse site photographed in April 2024. The image identifies the location twenty years after the event and is not a photograph taken during the collapse.","credit":"ZKang123","sourceUrl":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2024-04-20 08:43:18","imageDownloadAllowed":true},"figureCaption":"The Nicoll Highway collapse site photographed in April 2024. The image identifies the location twenty years after the event and is not a photograph taken during the collapse.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":101,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nicoll-highway-commons.json","evidenceSha256":"f602ded2258765be6bc19708d0174afcae8ed2a6c3f3ffb780c9a55f494a3199","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":417508,"sourceCount":2,"url":"/cases/nicoll-highway"},{"id":"eth-honggerberg","title":"ETH Hönggerberg — seasonal borehole heat storage","summary":"The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.","topics":["geothermal","site-investigation","dewatering","monitoring","delivery"],"country":"Switzerland","region":"Zurich","owner":"ETH Zurich","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Borehole heat exchangers","Seasonal thermal storage","Thermal interference","Construction staging"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"ETH documents 160 additional probes at 200 m depth on a 5 m grid, beside an existing field of 126 probes. The published project description supports layout and heat-balance studies; it does not supply a complete thermal-response test dataset.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner dates HC4 expansion drilling to October 2024–May 2025 and operational handover to July 2025. Later proposed fields are outside this completed expansion.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The owner confirms connection of the enlarged HC4 field to the campus network; continuous raw operating data and final drilling records were not provided on the reviewed pages.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased borehole-field expansion for an operating campus and test whether spacing, ground properties and annual heat imbalance control the design.","inputs":["Use the published HC4 depth, spacing and probe counts; assemble an explicitly labelled study load series for heating and cooling.","Identify borehole logs, groundwater flow, thermal conductivity and borehole-resistance measurements still needed before design."],"deliverables":["Compare a line-source screening calculation with a multi-borehole response model under balanced and unbalanced annual loads.","Lay out drilling access, buried services, grouting verification, commissioning tests and long-term temperature monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would persistent net heat injection change performance even if the first operating year meets the heating and cooling demand?","What additional thermal-response or groundwater observations would justify reducing uncertainty at the 5 m borehole spacing?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"HC4 geothermal probe-field expansion and commissioning","url":"https://ethz.ch/staffnet/en/news-and-events/internal-news/archive/2025/08/hoenggerberg-campus-becomes-more-sustainable-above-and-below-ground.html","publisher":"ETH Zurich Real Estate Management","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Energy supply and the campus anergy grid","url":"https://ethz.ch/en/the-eth-zurich/organisation/departments/engineering-and-systems/energie.html","publisher":"ETH Zurich","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ETH Hönggerberg campus, seen from Hönggerbergstrasse.jpg","url":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","publisher":"Balise42","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eth-honggerberg.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eth-honggerberg-reference-values.csv","mimeType":"text/csv","bytes":1393,"sha256":"0746df014858f90951177b8dd60717dcd4fd0c62a7496d26412f00d0525e7c28","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eth-honggerberg/download/reference-values"},{"id":"project-image","title":"ETH Hönggerberg campus — setting of the anergy grid","kind":"project-image","fileName":"eth-honggerberg.jpg","mimeType":"image/jpeg","bytes":299237,"sha256":"3bfed12bb7a9484ceb0020eb752234d62054091b0f07478ee2a2b3a9b01c5ce9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":854,"credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-09-16 10:13:12","evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/94/ETH_H%C3%B6nggerberg_campus%2C_seen_from_H%C3%B6nggerbergstrasse.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eth-honggerberg/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eth-honggerberg-capstone.md","mimeType":"text/markdown","bytes":5102,"sha256":"e859f8b70fe4a7e15e0b6156c663fbf6c8ef78fcddde30913231a93546dc88b4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","caption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":854,"imageDate":"2023-09-16 10:13:12","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":103,"referenceValues":[{"label":"Added HC4 probes","value":160,"unit":"probes","scope":"HC4 expansion drilled October 2024–May 2025.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported probe depth","value":200,"unit":"m","scope":"New HC4 geothermal probes; do not infer the full site stratigraphy.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported grid spacing","value":5,"unit":"m","scope":"Spacing stated for the HC4 expansion.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Existing HC4 probes","value":126,"unit":"probes","scope":"Pre-expansion field, distinct from the 160 additional probes.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":306789,"sourceCount":3,"url":"/cases/eth-honggerberg"},{"id":"svalbard-seed-vault","title":"Svalbard Seed Vault — tunnel waterproofing and frozen ground","summary":"The Seed Vault upgrade replaced its access tunnel with a watertight concrete structure and moved heat-producing services. The construction account includes artificial ground freezing to support the replacement works.","topics":["cold-regions","tunnels","ground-improvement","seepage","rock","delivery"],"country":"Norway","region":"Longyearbyen, Svalbard","owner":"Norwegian Ministry of Agriculture and Food / Statsbygg","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Tunnel waterproofing","Thermal disturbance","Groundwater exclusion"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner sources describe the 2016–2019 upgrade and freezing used during tunnel construction. The seed-storage chambers and the entrance tunnel have different thermal and groundwater functions; do not treat the entire facility as one homogeneous frozen-ground boundary.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner identifies the main upgrade period as 2016–2019; the 2018 construction update describes the work while it was in progress.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner reports a waterproofed entrance tunnel and upgraded cooling. Published descriptions do not provide the full freeze-pipe commissioning records or as-built waterproofing details.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a watertight tunnel replacement in warming permafrost, combining temporary frozen-ground support with a permanent drainage, waterproofing and thermal strategy.","inputs":["Map the access tunnel, rock chambers, service heat sources and surface-water pathways from the owner descriptions.","Define study values for unfrozen permeability, ice content, thermal properties and freezing-system temperature, flagging them as assumptions."],"deliverables":["Estimate freeze-wall development and thaw sensitivity around the excavation, then assess leakage and uplift for the permanent tunnel.","Prepare freezing verification holes, temperature monitoring, excavation hold points and a seasonal surface-water diversion plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does removing internal heat generation help even when the final tunnel lining is designed to be watertight?","What measurements would establish adequate frozen-ground continuity before excavation without confusing cold air with frozen soil?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Construction improvements and temporary ground freezing","url":"https://www.seedvault.no/2018/09/04/seed-vault-construction-improvements-proceed-as-planned/","publisher":"Svalbard Global Seed Vault / Norwegian Ministry of Agriculture and Food","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Purpose, operations and 2016–2019 upgrade","url":"https://www.seedvault.no/about/purpose-operations-and-organisation/","publisher":"Svalbard Global Seed Vault","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Facility operation and tunnel arrangement","url":"https://www.nordgen.org/our-work/svalbard-global-seed-vault/frequently-asked-questions/","publisher":"NordGen","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Svalbard Global Seed Vault Exterior 2020.jpg","url":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","publisher":"Cierra Martin for Crop Trust","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"svalbard-seed-vault.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/schematic"},{"id":"project-image","title":"Svalbard Global Seed Vault — exterior in 2020","kind":"project-image","fileName":"svalbard-seed-vault.jpg","mimeType":"image/jpeg","bytes":345849,"sha256":"3514d4606ff689bef0b68899a77237a3b3cf4225b33b29b32b01f7ab01657dc8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":913,"credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-02-25","evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e3/Svalbard_Global_Seed_Vault_Exterior_2020.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/svalbard-seed-vault/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"svalbard-seed-vault-capstone.md","mimeType":"text/markdown","bytes":3964,"sha256":"7be9dac2dda47c60c428fcb9c412c0a4663488f05b6fa991da6346122ad9c1cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","caption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":913,"imageDate":"2020-02-25","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":106,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350781,"sourceCount":4,"url":"/cases/svalbard-seed-vault"},{"id":"halley-vi","title":"Halley VI — relocatable foundations on accumulating snow","summary":"The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.","topics":["cold-regions","shallow-foundations","settlement","monitoring","delivery"],"country":"Antarctica","region":"Brunt Ice Shelf, Antarctica","owner":"British Antarctic Survey","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow bearing and creep","Jackable foundations","Differential movement","Relocation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"BAS documents the hydraulic-leg concept, seasonal raising procedure and 2016/17 relocation. Ground support is deformable snow/ice, so a conventional soil bearing-capacity calculation alone does not represent the governing behaviour.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"BAS records relocation to a new site during the 2016/17 Antarctic season.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"BAS publishes operational descriptions of raising and maintaining the station. A complete calibrated snow-foundation model and support-load register are not supplied.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an operating and lifting plan for a modular station on snow, explicitly separating creep settlement, drifting accumulation and large-scale ice-shelf movement.","inputs":["Extract the actual support arrangement and raising sequence from BAS material.","Define a labelled study range for snow density, creep response, wind/drift loading and allowable module distortion."],"deliverables":["Compare support pressure and time-dependent movement for alternative ski contact areas and raising intervals.","Prepare a one-leg-at-a-time lifting sequence, temporary support checks, survey tolerances and relocation triggers.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can increasing foundation contact area reduce bearing pressure yet leave annual raising and relocation necessary?","How would uneven snow placement beneath one leg appear in level surveys, and how could it be distinguished from a drifting snow-surface change?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Halley VI Research Station — facility and support system","url":"https://www.bas.ac.uk/polar-operations/sites-and-facilities/facility/halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Halley Research Station relocation","url":"https://www.bas.ac.uk/project/moving-halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Preparing Halley VI for winter — annual raising operations","url":"https://www.bas.ac.uk/blogpost/seasons-end-hibernating-halley-vi-for-the-winter/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Halley VI Antarctic Research Station - view from North East.jpg","url":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","publisher":"Hugh Broughton Architects","year":2012,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"halley-vi.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/schematic"},{"id":"project-image","title":"Halley VI — raised modular research station","kind":"project-image","fileName":"halley-vi.jpg","mimeType":"image/jpeg","bytes":118311,"sha256":"daf2edd100b8853181848248a42315aa652f50e61d8c92c94f7b17560bc5e234","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2012-02-23 23:15:19","evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b1/Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/halley-vi/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"halley-vi-capstone.md","mimeType":"text/markdown","bytes":3692,"sha256":"9819e7bcf0b22239b8d6f67c7382c97ac1900cc0daccdb36464ab15043bcb185","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","caption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2012-02-23 23:15:19","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":107,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":122971,"sourceCount":4,"url":"/cases/halley-vi"},{"id":"glenwood-canyon","title":"Glenwood Canyon — reinforced walls on compressible foundations","summary":"Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.","topics":["reinforced-soil","retaining-walls","settlement","monitoring","earthworks","delivery"],"country":"United States","region":"I-70, Colorado","owner":"Colorado Department of Transportation","year":1992,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geosynthetic-reinforced soil","Foundation consolidation","Staged facing","Instrumented performance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The CDOT research synthesis describes the instrumented Glenwood Canyon GRS test wall and long-term differential settlement. A separate 1988 wall study addresses staged facing installation. These are distinct wall experiments within the corridor and should not be combined into one fictitious section.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT dates final-corridor construction to 1980–1992. The selected experimental wall has its own earlier construction and monitoring dates.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The technical report gives measured reinforced-wall performance; the owner history records completion of the broader corridor.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select one documented Glenwood Canyon reinforced-wall section and reconcile its reinforcement response with foundation settlement and facing movements.","inputs":["Identify the chosen test section, reinforcement, fill and underlying compressible profile in the technical report.","Compile displacement and settlement observations with dates; keep results from other wall systems in a separate comparison."],"deliverables":["Check reinforcement/internal stability separately from foundation settlement and global stability.","Compare single-stage construction with delayed permanent facing, including drainage and survey control.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a reinforced-soil mass remain stable while differential foundation settlement still creates unacceptable facing movement?","Which measured response would distinguish reinforcement stretching from compression of the underlying lacustrine deposits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of reinforced-soil structures — Glenwood Canyon case section","url":"https://rosap.ntl.bts.gov/view/dot/42215/dot_42215_DS1.pdf","publisher":"Colorado Department of Transportation / FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Embankment settlement in Glenwood Canyon — CDOH-DTD-R-88-8","url":"https://trid.trb.org/View/286942","publisher":"Colorado Department of Highways / FHWA; TRB record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"I-70 Glenwood Canyon project history","url":"https://www.codot.gov/about/CDOTHistory/50th-anniversary/glenwood-canyon","publisher":"Colorado Department of Transportation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"I-70 Glenwood Canyon-terabass.jpg","url":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","publisher":"Terabass","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glenwood-canyon.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/schematic"},{"id":"project-image","title":"I-70 in Glenwood Canyon — constrained highway corridor","kind":"project-image","fileName":"glenwood-canyon.jpg","mimeType":"image/jpeg","bytes":369614,"sha256":"363c30effe911ccd3b235683fa83b24984de39d8dd378c8e8921a3d3603a11d1","sourceId":"s4","license":"CC BY-SA 3.0","width":1280,"height":854,"credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-09-09","evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/62/I-70_Glenwood_Canyon-terabass.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/glenwood-canyon/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glenwood-canyon-capstone.md","mimeType":"text/markdown","bytes":3767,"sha256":"ab9a0c2f868a5433e8f7ca3687d87cab146c6924c87f98c0e922a89e18ea1cc5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","caption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":854,"imageDate":"2009-09-09","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","qualityNotes":["The corridor photograph is site context; the buried conditions and reinforcement are established by the selected report section, not by the photograph."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":109,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":374502,"sourceCount":4,"url":"/cases/glenwood-canyon"},{"id":"osman-gazi-bridge","title":"Osman Gazi Bridge — seismic caissons on gravel beds","summary":"The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.","topics":["lateral-foundations","seismic","ground-improvement","coastal-offshore","site-investigation","delivery"],"country":"Türkiye","region":"Izmit Bay","owner":"Gebze–Orhangazi–Izmir motorway project","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seismic soil–structure interaction","Caisson foundations","Ground improvement","Interface sliding"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The design paper models gravel-bed and reinforced-subsoil response using nonlinear foundation elements. Contractor records explain floating and sinking the caissons onto prepared crushed rock. A controlled-sliding concept needs both displacement and residual-performance checks.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"IHI describes a 42-month construction period. Treat that as the contractor’s overall project account, not a detailed foundation activity schedule.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The construction accounts document the built crossing; the design-stage soil–structure model is not a substitute for measured earthquake performance.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare fixed-base and nonlinear-foundation representations for a bridge tower supported on a prepared gravel interface.","inputs":["Extract foundation arrangement, soil improvement and the interface behaviour from the design-stage paper.","Identify the earthquake performance objectives and distinguish assumptions in the analysis from measured field response."],"deliverables":["Construct a reduced nonlinear spring/interface model and compare sliding, rocking and residual displacement under selected study motions.","Prepare seabed preparation, caisson placement, survey-tolerance and post-earthquake inspection requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When can intentional foundation sliding reduce structural demand while increasing permanent displacement and service-restoration work?","Which installation tolerances and seabed observations are needed to make the assumed gravel-interface behaviour credible?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modelling of soil–structure interaction for seismic analyses of the Izmit Bay Bridge","url":"https://www.cfms-sols.org/sites/default/files/Actes/763-768.pdf","publisher":"Project design authors / CFMS conference proceedings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Osman Gazi Bridge construction sequence","url":"https://www.ihi.co.jp/iis/en/gallery/movie/izmit_movie.html","publisher":"IHI Infra-square","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Osman Gazi Bridge project account","url":"https://www.webuildgroup.com/en/projects/bridges-viaducts/osman-gazi-bridge/","publisher":"Webuild","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Osman-Gazi-Bridge-620x410.jpg","url":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","publisher":"Erdmkiliic","year":2016,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"osman-gazi-bridge.svg","mimeType":"image/svg+xml","bytes":1201,"sha256":"0f34c5a583e4d9e8427d0110ef6d716d217e38ffb3b4ade758e04d51b5451084","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/schematic"},{"id":"project-image","title":"Osman Gazi Bridge — suspension crossing","kind":"project-image","fileName":"osman-gazi-bridge.jpg","mimeType":"image/jpeg","bytes":152148,"sha256":"0c746b33551461f356d58e95fe70fe4588a48903a60efef88a9c49d11e78123b","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2016-07-07","evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/Osman-Gazi-Bridge-620x410.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/osman-gazi-bridge/download/project-image","originalSha1":"1ec066ac577efd9795f0ed8a5eb0f7511078f1be","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"osman-gazi-bridge-capstone.md","mimeType":"text/markdown","bytes":3672,"sha256":"d6891d8af9dd21f85ea6c6bbfdf985f634c0fca28dd9c3214f6d365b1b7b4fb7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","caption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2016-07-07","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":113,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157021,"sourceCount":4,"url":"/cases/osman-gazi-bridge"},{"id":"hywind-scotland","title":"Hywind Scotland — suction anchors for floating wind","summary":"Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.","topics":["coastal-offshore","lateral-foundations","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"Buchan Deep, offshore Peterhead","owner":"Equinor / Masdar","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Suction anchors","Inclined cyclic loading","Mooring–soil interaction","Installation and decommissioning"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Project sources describe the spar, mooring lines and suction anchors; the 2022 decommissioning programme gives asset-specific arrangements. Distinguish the floating turbine substructure from its seabed anchor foundation and do not transfer onshore monopile checks directly.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The operator records commissioning in 2017. The 2022 decommissioning document is a programme, not evidence that removal has occurred.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The published field study reports subsea observations from 2018 and 2020. These observations show asset inspection opportunities and are not a complete geotechnical acceptance certificate.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a suction-anchor concept and inspection strategy for one mooring line, including cyclic demand and removal feasibility.","inputs":["Trace the three-point mooring arrangement and identify the anchor information actually supplied by the project.","Develop explicit study soil profiles and load envelopes when borehole/CPT data or proprietary design loads are unavailable."],"deliverables":["Compare installation suction, holding capacity and cyclic degradation scenarios, retaining the distinction between drained and undrained assumptions.","Prepare an ROV inspection plan, cable/mooring interaction review and a decommissioning sequence with geotechnical risks.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can an anchor meet a monotonic holding-capacity check yet remain unsuitable under repeated inclined mooring loads?","How would the preferred removal method change if the as-installed suction anchor has tilted or developed significant internal soil plugging?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Hywind Scotland — operator project information","url":"https://www.equinor.com/energy/hywind-scotland","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pilot Park decommissioning programme, May 2022","url":"https://cdn.equinor.com/files/h61q9gi9/global/1b585f93025b2cf77ece1bb597520ff325454abc.pdf?hywind-scotland-pilot-park-decommissioning-programme-submission-may-2022-equinor.pdf=","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Artificial hard-substrate colonisation — field inspection of structures, moorings and anchors","url":"https://wes.copernicus.org/articles/7/801/2022/","publisher":"Karlsson et al. / Wind Energy Science","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Hywind Wind Farm, off Peterhead - geograph.org.uk - 7226685.jpg","url":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","publisher":"Mike Pennington","year":2022,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hywind-scotland.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/schematic"},{"id":"project-image","title":"Hywind Scotland — floating turbines offshore Peterhead","kind":"project-image","fileName":"hywind-scotland.jpg","mimeType":"image/jpeg","bytes":184836,"sha256":"69d6f91c41a64fb6d8b73f64d25fc5e470c5c2dbaa26c9e97b497bcbef3d07e8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":854,"credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2022-06-22","evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/65/Hywind_Wind_Farm%2C_off_Peterhead_-_geograph.org.uk_-_7226685.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/hywind-scotland/download/project-image","originalSha1":"73679c0939c31070d5973600125fa5b98e70746c","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hywind-scotland-capstone.md","mimeType":"text/markdown","bytes":3976,"sha256":"85e5f997085ffbc3896b28ac27ae3e0c519a862847311a508ef90f2414b41c54","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","caption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":854,"imageDate":"2022-06-22","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":114,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":190019,"sourceCount":4,"url":"/cases/hywind-scotland"},{"id":"eastern-scheldt-barrier","title":"Eastern Scheldt Barrier — foundation mats and scour resilience","summary":"The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.","topics":["coastal-offshore","shallow-foundations","scour-erosion","ground-improvement","monitoring","delivery"],"country":"Netherlands","region":"Zeeland","owner":"Rijkswaterstaat","year":1986,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Graded foundation mats","Marine scour protection","Filter compatibility","Hydraulic–geotechnical interaction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Rijkswaterstaat documents the barrier arrangement and construction period. USACE guidance describes the Eastern Scheldt graded foundation-mat approach, while recent Deltares work reassesses hydraulic loads for renewal. Hydraulic model results must be translated into geotechnical limit states.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Rijkswaterstaat dates construction to 1976–1986. Deltares describes later 2024–2025 testing for renewal, a separate phase of the asset lifecycle.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner provides an operating history; the recent research supports maintenance decisions, not a new claim that every original foundation detail is verified under future loads.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a study section of a barrier foundation and protection apron, linking hydraulic demand to filter stability, bearing and erosion-resistant details.","inputs":["Use the owner source for the barrier configuration and the technical guidance for the mat/filter concept.","Define study bed-material gradations, hydraulic loading and foundation parameters; record what is measured and what is assumed."],"deliverables":["Check filter retention/permeability and sensitivity to edge scour and loss of support near the protection apron.","Prepare construction placement tolerances, underwater inspection criteria and a renewal plan under changed hydraulic loads.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a stable surface armour layer still permit undermining through an incompatible filter or an exposed apron edge?","Which results from a hydraulic scale model can directly inform foundation checks, and which require a separate soil-response model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eastern Scheldt Barrier — owner project record","url":"https://www.rijkswaterstaat.nl/en/projects/iconic-structures/eastern-scheldt-barrier","publisher":"Rijkswaterstaat","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"ETL 1110-2-565 — scour-protection and foundation-mat discussion","url":"https://www.publications.usace.army.mil/Portals/76/Publications/EngineerTechnicalLetters/ETL_1110-2-565.pdf","publisher":"U.S. Army Corps of Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Barrier renewal scale-model tests, 2024–2025","url":"https://www.deltares.nl/en/news/mini-eastern-scheldt-barrier-passes-extreme-storm-tests","publisher":"Deltares","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Oosterscheldekering.jpg","url":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","publisher":"Klankbeeld","year":2025,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eastern-scheldt-barrier.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eastern-scheldt-barrier-reference-values.csv","mimeType":"text/csv","bytes":644,"sha256":"e611fa5ed1abaf9bdc927b2b599be79f50f803e70bb4fdcf5b9df61e14162090","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eastern-scheldt-barrier/download/reference-values"},{"id":"project-image","title":"Eastern Scheldt Barrier — view from Westerschouwen","kind":"project-image","fileName":"eastern-scheldt-barrier.jpg","mimeType":"image/jpeg","bytes":225473,"sha256":"6be491da8741403f8266f67a77fc1e5e8b735b92cb7b2d27384dff4b3517a1e3","sourceId":"s4","license":"CC BY 4.0","width":1280,"height":720,"credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2025-01-28 15:00:00","evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e8/Oosterscheldekering.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eastern-scheldt-barrier/download/project-image","originalSha1":"b70e8701cc9305b1c2e1913069101ff01517625d","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eastern-scheldt-barrier-capstone.md","mimeType":"text/markdown","bytes":4598,"sha256":"7f3a6d20167aaefea6b90d8406ae9221540013fa07968034ca578ad67a99cc1e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","caption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":720,"imageDate":"2025-01-28 15:00:00","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","qualityNotes":["The USACE technical-letter PDF is linked at its official source; that host denied a local download during this review. The local project brief and photograph remain available."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":115,"referenceValues":[{"label":"Total barrier length","value":9,"unit":"km","scope":"Owner-reported overall barrier length, including fixed sections.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."},{"label":"Movable-section length","value":3,"unit":"km","scope":"Movable portion within the overall barrier; not a separate structure to add to the 9 km total.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":231922,"sourceCount":4,"url":"/cases/eastern-scheldt-barrier"},{"id":"venice-mose","title":"Venice MOSE — marine caisson placement and movement monitoring","summary":"The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.","topics":["coastal-offshore","shallow-foundations","settlement","ground-improvement","monitoring","delivery"],"country":"Italy","region":"Venice Lagoon","owner":"Italian Ministry of Infrastructure / MOSE project","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine caisson foundations","Ground–structure interaction","Precision grouting","GNSS/InSAR monitoring"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The designers explain caisson foundations, settlement assessment and watertight interfaces. The monitoring paper studies MOSE shoulder structures using GNSS and InSAR. Measurements of a shoulder cannot automatically be assigned to every gate caisson or inlet.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The locally available article provides component-specific deformation evidence. Its underlying MOSE GNSS observations have restricted access; open access to the article does not make those raw records downloadable. Complete construction acceptance records and final accounts were not provided.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a placement-and-monitoring design for a selected MOSE inlet caisson or shoulder, with explicit tolerances and a defensible spatial interpretation of movements.","inputs":["Select one inlet and one structure type; compile its geometry and support concept from the designer source.","Extract monitoring periods, reference frame, instrument precision and measured components from the published deformation study."],"deliverables":["Evaluate bearing and differential-settlement sensitivity for the selected foundation and define placement/grouting tolerances.","Design a combined survey/InSAR monitoring workflow that separates regional subsidence, structural movement and measurement noise.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would agreement between satellite line-of-sight and GNSS observations still require care before inferring a vertical settlement at a nearby gate?","How should a marine caisson placement sequence respond when the achieved support level differs from the alignment tolerance assumed by the gate designer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"MOSE — designer account of barrier and caisson foundations","url":"https://www.technital.net/projects/marine-and-coastal/special-marine-works/ingenieria-maritima-y-costera-mobile-surge-barriers-at-the-three-inlets-of-the-venice-lagoon-mose-italy","publisher":"Technital","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Integrated GNSS and InSAR analysis of MOSE shoulder structures","url":"https://www.mdpi.com/2072-4292/17/6/1059","publisher":"Project research authors / Remote Sensing","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"MOSE marine caisson foundation works","url":"https://proserveltd.co.uk/casestudies/venice/","publisher":"Proserve","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","url":"https://www.mdpi.com/2072-4292/17/6/1059/pdf","publisher":"Massimo Fabris and Mario Floris / Remote Sensing (MDPI)","year":2025,"access":"public-link","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","notes":"","checked":"2026-11-22","localAssetIds":["mose-monitoring-2025"]},{"id":"s5","title":"MOSE Project Venice.jpg","url":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","publisher":"Wikimedia Commons contributor","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"venice-mose.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/schematic"},{"id":"mose-monitoring-2025","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","kind":"report","fileName":"mose-monitoring-2025.pdf","mimeType":"application/pdf","bytes":7574597,"sha256":"4c89f5e78f6cd7fcbead8a0bebb6c7d5977141553ebb5a1c583a0827438270bf","sourceId":"s4","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","rightsUrl":"https://creativecommons.org/licenses/by/4.0/","rightsBasis":"The article first page and publisher page explicitly license this work under CC BY 4.0. The original PDF is redistributed unchanged, with author credit and DOI retained.","rightsEvidenceUrl":"https://www.mdpi.com/2072-4292/17/6/1059","pages":21,"downloadUrl":"/cases/venice-mose/download/mose-monitoring-2025"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"venice-mose-reference-values.csv","mimeType":"text/csv","bytes":611,"sha256":"71e6e7c4d13ce07281889fb2d4d103f8b1dc271e11b43c23d1c3378905ee0d3d","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/venice-mose/download/reference-values"},{"id":"project-image","title":"MOSE at the Lido inlet — construction in 2009","kind":"project-image","fileName":"venice-mose.jpg","mimeType":"image/jpeg","bytes":193898,"sha256":"ce7841b2d704bbc54e8005c5b4c7810008885b90c3caa31c55647589b3fc4d9f","sourceId":"s5","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-07-25 08:19:50","evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/27/MOSE_Project_Venice.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/venice-mose/download/project-image","originalSha1":"068a07bb2f08ce4ce810f1aeeb43e296ec7026dc","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"venice-mose-capstone.md","mimeType":"text/markdown","bytes":4928,"sha256":"087b1e2f4c7f9465eb18640c48853afe32fcd4bc0e4ca8168332f337007a53cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","caption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"2009-07-25 08:19:50","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","qualityNotes":["The locally downloadable monitoring article is CC BY 4.0. Its underlying MOSE GNSS observations are restricted by Consorzio Venezia Nuova; do not describe those raw observations as an open downloadable dataset."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":116,"referenceValues":[{"label":"MOSE continuous GNSS stations","value":36,"unit":"stations","scope":"32 stations on shoulder structures plus four local reference stations in the studied MOSE network.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."},{"label":"External reference-network stations","value":8,"unit":"stations","scope":"External stations used with the MOSE network; separate from its four local reference stations.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":7775241,"sourceCount":5,"url":"/cases/venice-mose"}]}