{"schemaVersion":1,"updated":"2026-11-22","total":21,"records":[{"id":"seattle-sr99","title":"Seattle SR 99 tunnel — soft-ground tunnelling and settlement","summary":"The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.","topics":["tunnels","excavation","dewatering","monitoring","delivery"],"country":"United States","region":"Seattle, Washington","owner":"Washington State Department of Transportation","year":2019,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Earth-pressure-balance tunnelling","Settlement","Groundwater control"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The environmental geology/soils appendix and design-build procurement records establish ground risks and contract context, not a complete as-built tunnel design.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSDOT identifies February 2019 completion; procurement and construction milestones are available on the owner pages.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner’s completed-project page records the outcome and links supporting material.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-risk and monitoring plan for an urban bored tunnel, including shaft construction and dewatering interactions.","inputs":["Extract route geology, groundwater and protected assets from Appendix P.","Separate environmental alternatives from the subsequently selected design-build solution."],"deliverables":["Estimate surface settlement for documented or explicitly assumed loss scenarios.","Prepare shaft/uplift checks and a response plan for unexpected settlement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SR 99 tunnel — completed February 2019","url":"https://apps.wsdot.wa.gov/construction-planning/search-projects/sr-99-tunnel","publisher":"WSDOT","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Alaskan Way Viaduct FEIS Appendix P — geology and soils","url":"https://data.wsdot.wa.gov/publications/Viaduct/AWVFEIS-AppendixP.pdf","publisher":"WSDOT","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"SR 99 bored tunnel design-build procurement","url":"https://wsdot.wa.gov/business-wsdot/contracting-opportunities/sr-99-alaskan-way-viaduct-sr-99-bored-tunnel-design-build-project","publisher":"WSDOT","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Bertha TBM retrieval site.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","publisher":"Wikimedia Commons / SounderBruce from Seattle, United States","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"seattle-sr99.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/schematic"},{"id":"project-image","title":"Bertha TBM retrieval site.jpg","kind":"project-image","fileName":"seattle-sr99.jpg","mimeType":"image/jpeg","bytes":152931,"sha256":"4fa4ed3313fbe70109c8c909325c418043dd5c73592739c5fb1ad31a1a870385","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":406,"credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-07-15 12:27","evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/82/Bertha_TBM_retrieval_site.jpg","downloadUrl":"/cases/seattle-sr99/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"seattle-sr99-capstone.md","mimeType":"text/markdown","bytes":3334,"sha256":"c959a6fd7180face32361696df394f5ca309f8ad094b3f5b8ff41fe7dd4ed30e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015.","caption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":406,"imageDate":"2015-07-15 12:27"},"figureCaption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":18,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157390,"sourceCount":4,"url":"/cases/seattle-sr99"},{"id":"milltown-dam-removal","title":"Milltown Reservoir — dam removal and contaminated sediment remediation","summary":"Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.","topics":["geoenvironmental","dewatering","earthworks","dams-levees","monitoring"],"country":"United States","region":"Missoula County, Montana","owner":"US EPA / Montana and responsible-party partners","year":2009,"yearLabel":"Case reference year","projectType":"Remediation and restoration","methods":["Sediment dewatering","Excavation and capping","Groundwater response"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"EPA’s five-year review describes the implemented remedy and site components. Different operable units have different completion status.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The 2021 review records remedial work beginning in 2006 and final dam removal in March 2009; later site restoration and monitoring followed.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The five-year review evaluates remedy performance; it does not state that every Clark Fork operable unit is complete.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased contaminated-sediment removal plan while maintaining downstream water quality and protecting nearby wells.","inputs":["Extract the remedy scope for the reservoir operable unit, not the entire Clark Fork site.","Identify sediment handling, groundwater and restored-channel monitoring information."],"deliverables":["Prepare a dewatering/well-impact assessment and sediment handling sequence.","Compare excavation, onsite containment and capping with monitoring/closure criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Third five-year review — Milltown Reservoir/Clark Fork","url":"https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P101GPHY.TXT","publisher":"US EPA","year":2021,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Milltown Reservoir Sediments cleanup profile","url":"https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0800445","publisher":"US EPA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Excavation.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","publisher":"Wikimedia Commons / M Kustudia","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"milltown-dam-removal.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/milltown-dam-removal/download/schematic"},{"id":"project-image","title":"Excavation.jpg","kind":"project-image","fileName":"milltown-dam-removal.jpg","mimeType":"image/jpeg","bytes":92446,"sha256":"c89444bbdf35eaa35ede26e64248eef43c17962bdb52b85aa8b7ea6a94ab395b","sourceId":"s3","license":"CC BY-SA 3.0","width":640,"height":473,"credit":"M Kustudia","sourceUrl":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-10-14","evidenceFile":"image-provenance/milltown-dam-removal-commons.json","evidenceSha256":"b542555b3a16fa6c34d99f848043d15ea64dc6789961e70910b6bfc421dd6895","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/8f/Excavation.jpg","downloadUrl":"/cases/milltown-dam-removal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"milltown-dam-removal-capstone.md","mimeType":"text/markdown","bytes":3054,"sha256":"7aee3520ebde422ce33cc80a110f0ed5313bdaa02a3ba95536fc18e40182447a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/milltown-dam-removal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Remediation work at the Milltown Reservoir Superfund site in Montana.","caption":"Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.","credit":"M Kustudia","sourceUrl":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":640,"height":473,"imageDate":"2008-10-14"},"figureCaption":"Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":34,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/milltown-dam-removal-commons.json","evidenceSha256":"b542555b3a16fa6c34d99f848043d15ea64dc6789961e70910b6bfc421dd6895","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":96491,"sourceCount":3,"url":"/cases/milltown-dam-removal"},{"id":"ball-state-geothermal","title":"Ball State University — campus ground-source borefields","summary":"The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.","topics":["geothermal","site-investigation","dewatering","delivery"],"country":"United States","region":"Muncie, Indiana","owner":"Ball State University","year":2012,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Borefield layout","Thermal ground response","Drilling logistics"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The university white paper describes approximately 3,600 boreholes, depths of 400–500ft and restored surface uses; these are closed loops, not pumping wells.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The first phase began operating in spring 2012; the later university paper describes the completed base project.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Owner information and a system map are linked; detailed bore logs and final bills were not established.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a ground-source borefield feasibility study that integrates thermal properties, drilling constraints and protection of groundwater.","inputs":["Extract the owner’s borefield arrangement and distinguish heat demand from ground capacity.","Define site-specific thermal-response and groundwater information needed before sizing."],"deliverables":["Prepare a borehole/loop concept and thermal-interference sensitivity study.","Develop drilling, grouting, testing and surface-restoration work packages.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geothermal energy system","url":"https://bsu.edu/about/geothermal","publisher":"Ball State University","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geothermal white paper, January 2019","url":"https://www.bsu.edu/-/media/www/departmentalcontent/cap/cote/021419geothermalwhitepaperjanuary2019.pdf","publisher":"Ball State University","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GeothermalConstruction073011.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","publisher":"Wikimedia Commons / Travisleehardin","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"ball-state-geothermal.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ball-state-geothermal/download/schematic"},{"id":"project-image","title":"GeothermalConstruction073011.jpg","kind":"project-image","fileName":"ball-state-geothermal.jpg","mimeType":"image/jpeg","bytes":391205,"sha256":"b868dba6d8cf0ee3d2c41c41e43b9d48cfbbba7f642ee47ad0551a976352bfc1","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Travisleehardin","sourceUrl":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 30 July 2011","evidenceFile":"image-provenance/ball-state-geothermal-commons.json","evidenceSha256":"82e4b1e5c89994e49ef1a6440f2a443e78d523712954dffd40d297383c97b1fd","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d3/GeothermalConstruction073011.jpg","downloadUrl":"/cases/ball-state-geothermal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"ball-state-geothermal-capstone.md","mimeType":"text/markdown","bytes":3087,"sha256":"3ade5cc33c34a3ba8e308b4fe8867dc99ded41e7bd1fabd5e4ec7c8868394008","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ball-state-geothermal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Geothermal-loop construction at Ball State University, July 30, 2011.","caption":"Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.","credit":"Travisleehardin","sourceUrl":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 30 July 2011"},"figureCaption":"Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":36,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/ball-state-geothermal-commons.json","evidenceSha256":"82e4b1e5c89994e49ef1a6440f2a443e78d523712954dffd40d297383c97b1fd","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":395349,"sourceCount":3,"url":"/cases/ball-state-geothermal"},{"id":"pisa-stabilization","title":"Leaning Tower of Pisa — controlled underexcavation","summary":"A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.","topics":["shallow-foundations","settlement","dewatering","monitoring"],"country":"Italy","region":"Pisa","owner":"Italian Government / Opera della Primaziale Pisana","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underexcavation","Differential settlement","Piezometric control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors describe the stabilization mechanism and subsequent instrument readings. The case supports an observational-method study rather than copying a universal underpinning detail.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The author paper reports post-stabilization monitoring; it is not a current inspection certificate.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a staged underexcavation trial for an eccentric masonry-tower footing, using Pisa to define observations and stop criteria.","inputs":["Extract the foundation geometry, rotation history and monitored groundwater response from the author paper.","Distinguish the temporary stabilization operations from the permanent soil-removal and drainage measures."],"deliverables":["Calculate the direction and sensitivity of foundation rotation for small asymmetric volume removals.","Specify incremental excavation stages, survey precision, trigger values and contingency actions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can removing support on the higher side improve stability without simply increasing bearing resistance?","How would a seasonal groundwater rise change the interpretation of the measured tilt?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Behaviour after stabilization operations","url":"https://www.geocasehistoriesjournal.org/issues/volume-1-3/leaning-tower-of-pisa-behaviour-after-stabilization-operations","publisher":"Burland, Jamiolkowski and Viggiani / International Journal of Geoengineering Case Histories","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Restoration works contractor account","url":"https://trevispa.com/en/progetti/the-restoration-of-the-leaning-tower-of-pisa/","publisher":"Trevi","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Exterior of the Leaning Tower (Pisa) in April 2024.1.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","publisher":"Wikimedia Commons / PaestumPaestum","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"pisa-stabilization.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pisa-stabilization/download/schematic"},{"id":"project-image","title":"Exterior of the Leaning Tower (Pisa) in April 2024.1.jpg","kind":"project-image","fileName":"pisa-stabilization.jpg","mimeType":"image/jpeg","bytes":750557,"sha256":"4fe52d89c0578296c480ba671b8cd8d23bf1447b768d11a5661f9fb513ab7de9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":2490,"credit":"PaestumPaestum","sourceUrl":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-05-24 10:50:55","evidenceFile":"image-provenance/pisa-stabilization-commons.json","evidenceSha256":"27d6f137275dbf0bc47e7965477a8700394301d62fe5df53dcebb2fbbdff28d3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fb/Exterior_of_the_Leaning_Tower_%28Pisa%29_in_April_2024.1.jpg","downloadUrl":"/cases/pisa-stabilization/download/project-image","originalSha1":"d9e3fbde3af929fa625c4a633098fac6402952c4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"pisa-stabilization-capstone.md","mimeType":"text/markdown","bytes":3389,"sha256":"e8e53ea3c4f4a2019e709e9ffbf8d8406576dd631ea06e16190cb69970eb28c4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pisa-stabilization/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Leaning Tower of Pisa after the stabilization works.","caption":"The Leaning Tower of Pisa after the stabilization works. The photograph identifies the actual monument; the soil-removal operations are documented in the linked engineering accounts.","credit":"PaestumPaestum","sourceUrl":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":2490,"imageDate":"2023-05-24 10:50:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Leaning Tower of Pisa after the stabilization works. The photograph identifies the actual monument; the soil-removal operations are documented in the linked engineering accounts.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":47,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/pisa-stabilization-commons.json","evidenceSha256":"27d6f137275dbf0bc47e7965477a8700394301d62fe5df53dcebb2fbbdff28d3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":754832,"sourceCount":3,"url":"/cases/pisa-stabilization"},{"id":"marina-bay-sands","title":"Marina Bay Sands — deep foundations on reclaimed ground","summary":"The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.","topics":["deep-foundations","excavation","dewatering","delivery"],"country":"Singapore","region":"Marina Bay, Singapore","owner":"Marina Bay Sands","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Bored piles","Buried obstructions","Excavation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Contractor accounts identify foundation and enabling works; complete ground parameters and structural reactions are not supplied. Those require explicit study assumptions or additional records.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a bored-pile and basement construction sequence across reclaimed fill containing a former seawall.","inputs":["Map the reported obstruction and the interfaces between enabling work, piling and excavation.","Specify a supplemental investigation for fill variability, groundwater and founding strata."],"deliverables":["Compare pile installation risks with alternative obstruction-removal sequences.","Prepare a support-of-excavation concept and hold points for pile integrity and base cleanliness.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a buried seawall affect both pile verticality and groundwater flow?","Which enabling work must precede production piling to avoid repeated access conflicts?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Integrated Marina Bay Sands foundation works","url":"https://bachy-soletanche.com.sg/offer-portfolio/intergrated-marina-bay-sands/","publisher":"Bachy Soletanche Singapore","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Marina Bay Sands piling account","url":"https://www.foundation-alliance.com/offer-portfolio/marina-bay-sands-integrated-resort/","publisher":"Foundation Alliance","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Integrated resort project description","url":"https://www.safdiearchitects.com/projects/marina-bay-sands-integrated-resort","publisher":"Safdie Architects","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Marina Bay Sands Casino construction site (3366800416).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","publisher":"Wikimedia Commons / Andy Mitchell from Glasgow, UK","year":2009,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"marina-bay-sands.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marina-bay-sands/download/schematic"},{"id":"project-image","title":"Marina Bay Sands Casino construction site (3366800416).jpg","kind":"project-image","fileName":"marina-bay-sands.jpg","mimeType":"image/jpeg","bytes":244129,"sha256":"2a5a80337ab4ffe4d286095b8b3633abe0ad94560b395921912b1835b2f744ce","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":914,"credit":"Andy Mitchell from Glasgow, UK","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2009-03-15 09:27","evidenceFile":"image-provenance/marina-bay-sands-commons.json","evidenceSha256":"47217317dc7da1b4d94d0d773a1fd52f47d46ed11173214699791f999adb49d4","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/39/Marina_Bay_Sands_Casino_construction_site_%283366800416%29.jpg","downloadUrl":"/cases/marina-bay-sands/download/project-image","originalSha1":"f290a1a2bff0a5176279b2e6a1c41ae4bec103b4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"marina-bay-sands-capstone.md","mimeType":"text/markdown","bytes":3397,"sha256":"84e154eed3631098278d4a705936e3ff54bf5f5e75fceb9df18326d7e54916ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marina-bay-sands/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the Marina Bay Sands resort in Singapore.","caption":"Construction of the Marina Bay Sands resort in Singapore. The source identifies the actual development discussed in the foundation contractors’ accounts.","credit":"Andy Mitchell from Glasgow, UK","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":914,"imageDate":"2009-03-15 09:27","imageDownloadAllowed":true},"figureCaption":"Construction of the Marina Bay Sands resort in Singapore. The source identifies the actual development discussed in the foundation contractors’ accounts.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":51,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/marina-bay-sands-commons.json","evidenceSha256":"47217317dc7da1b4d94d0d773a1fd52f47d46ed11173214699791f999adb49d4","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":248725,"sourceCount":4,"url":"/cases/marina-bay-sands"},{"id":"transbay-transit","title":"Transbay Transit Center — deep excavation beside existing foundations","summary":"The transit-center excavation required a stiff, low-permeability perimeter and protection of nearby foundations. Public authority records explain proposed test shafts, soil improvement and groundwater concerns during design.","topics":["excavation","dewatering","ground-improvement","monitoring"],"country":"United States","region":"San Francisco","owner":"Transbay Joint Powers Authority","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Braced excavation","Soil improvement trials","Groundwater cutoff"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The public testing scope and meeting records describe design-stage reasoning. They are not the final as-built shoring design or a finding about responsibility for neighboring building movement.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The testing-scope record discusses a reduced test programme within a $5 million request. This is a proposed testing allocation, not the transit center’s final foundation cost.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a deep-excavation risk assessment for a transit box bordered by loaded foundations in compressible urban deposits.","inputs":["Extract the authority’s proposed testing objectives and soil profile descriptions.","Identify neighboring foundation levels and the movement paths that excavation could influence."],"deliverables":["Compare wall stiffness, brace staging and groundwater control using an explicit study section.","Write a trial-shaft verification plan and a monitoring-trigger matrix for adjacent properties.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which test result could change the proposed soil-improvement method before production?","How do drawdown settlement and wall-deflection settlement require different monitoring?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geotechnical shoring wall testing scope","url":"https://www.tjpa.org/media/30638/download?inline=","publisher":"Transbay Joint Powers Authority / Arup","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Shoring and excavation presentation record","url":"https://www.tjpa.org/media/36745/download?inline=","publisher":"Transbay Joint Powers Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Transbay Transit Center under construction, Spring 2013.png — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","publisher":"Wikimedia Commons / Jdelx","year":2013,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"transbay-transit.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/transbay-transit/download/schematic"},{"id":"project-image","title":"Transbay Transit Center under construction, Spring 2013.png","kind":"project-image","fileName":"transbay-transit.png","mimeType":"image/png","bytes":519266,"sha256":"c04ab6b0f8323c972cf506cdbd118dc783408a3ad20d3e0dc32c90d9c120edcd","sourceId":"s3","license":"CC BY-SA 3.0","width":657,"height":485,"credit":"Jdelx","sourceUrl":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2013-10-05 02:27:07","evidenceFile":"image-provenance/transbay-transit-commons.json","evidenceSha256":"97a2ded657ba021a83ec7d0f0c66e35ff4137b24a1d3a142f5ce9f6130ea35cb","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bc/Transbay_Transit_Center_under_construction%2C_Spring_2013.png","downloadUrl":"/cases/transbay-transit/download/project-image","originalSha1":"45ddeb57f1fa0a8bcc6dabbdd6c5976b9922bcfe","originalSha256":"c04ab6b0f8323c972cf506cdbd118dc783408a3ad20d3e0dc32c90d9c120edcd","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"transbay-transit-capstone.md","mimeType":"text/markdown","bytes":3287,"sha256":"af827fc3762380e4e65f15d9e88f68b50574dab5ae5e6feff893e6cbfc4a9430","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/transbay-transit/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Transbay Transit Center construction site in 2013.","caption":"The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.","credit":"Jdelx","sourceUrl":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":657,"height":485,"imageDate":"2013-10-05 02:27:07","imageDownloadAllowed":true},"figureCaption":"The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":59,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/transbay-transit-commons.json","evidenceSha256":"97a2ded657ba021a83ec7d0f0c66e35ff4137b24a1d3a142f5ce9f6130ea35cb","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":523684,"sourceCount":3,"url":"/cases/transbay-transit"},{"id":"salesforce-tower","title":"Salesforce Tower — staged excavation and artesian-pressure control","summary":"The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.","topics":["excavation","dewatering","ground-improvement","retaining-walls"],"country":"United States","region":"San Francisco","owner":"Salesforce Tower development team","year":2018,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Secant pile ring","Deep soil mixing","Basal stability","Bracing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The engineer-of-record account identifies installed systems and construction stages. It does not publish the full calculation package or groundwater time series.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Coordinate nested excavation stages where the deepest core excavation extends below the surrounding basement.","inputs":["Extract the reported support components and their excavation-stage relationships.","Define study water pressures and soil strengths and identify which require field confirmation."],"deliverables":["Check basal uplift/heave and wall movements at each excavation stage.","Draw load-transfer interfaces between the braced perimeter, circular ring and plaza support.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which stage creates the most adverse hydraulic gradient below the excavation?","What happens to support loads when a local deeper excavation is opened inside a braced box?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Salesforce Tower excavation support","url":"https://www.sgh.com/project/salesforce-tower-excavation-support/","publisher":"Simpson Gumpertz & Heger, excavation engineer of record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Salesforce Tower Construction, San Francisco.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","publisher":"Wikimedia Commons / Dllu","year":2017,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"salesforce-tower.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/salesforce-tower/download/schematic"},{"id":"project-image","title":"Salesforce Tower Construction, San Francisco.jpg","kind":"project-image","fileName":"salesforce-tower.jpg","mimeType":"image/jpeg","bytes":662808,"sha256":"5630df54a1978429dd7eb555cad00b9e05fb8e9eba4371296acee8730134033b","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":1976,"credit":"Dllu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2017-02-16 13:41:48","evidenceFile":"image-provenance/salesforce-tower-commons.json","evidenceSha256":"161950b9f4e2d949725b84432afcc1da5e41df9c96b3af5e704fa7e158fbe44a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/2c/Salesforce_Tower_Construction%2C_San_Francisco.jpg","downloadUrl":"/cases/salesforce-tower/download/project-image","originalSha1":"32e98d418758e271623698b321c477b96dfebc6f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"salesforce-tower-capstone.md","mimeType":"text/markdown","bytes":3035,"sha256":"84e87c2b3acdd462bd4d53a1ebf4e55b3f4229c74e69044637af024eea66a624","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/salesforce-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Salesforce Tower during construction in San Francisco.","caption":"Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.","credit":"Dllu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1976,"imageDate":"2017-02-16 13:41:48","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":60,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/salesforce-tower-commons.json","evidenceSha256":"161950b9f4e2d949725b84432afcc1da5e41df9c96b3af5e704fa7e158fbe44a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":666974,"sourceCount":2,"url":"/cases/salesforce-tower"},{"id":"bluestone-dam","title":"Bluestone Dam — rock anchors and spillway-foundation protection","summary":"The safety programme combines anchoring, drainage and armor over the bedrock stilling basin. Construction must be staged while the spillway remains an active river-release route.","topics":["dams-levees","rock","scour-erosion","dewatering","delivery"],"country":"United States","region":"Hinton, West Virginia","owner":"US Army Corps of Engineers","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock anchors","Uplift drainage","Stilling-basin armor","Cofferdams"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE describes completed earlier phases and the ongoing stilling-basin work. The project is not labeled fully complete; the owner’s 2026 programme forecasts completion in 2030.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The 2020 notice identifies a $319.6 million Phase 5 contract. It is not a final cost for all phases.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The 2026 owner update reports one half complete and forecasts overall completion in 2030; this supersedes the older 2020 contract forecast.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Stage foundation anchoring and armor placement in half of an operating stilling basin.","inputs":["Extract the owner’s phase boundaries, diversion concept and uplift-control components.","Define a study flood window and rock discontinuity model for temporary and permanent checks."],"deliverables":["Check anchor demand and drain effectiveness for intact and blocked-drain scenarios.","Prepare a cofferdam sequence and flood-response plan with excavation hold points.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does temporary river diversion alter uplift beneath the work area?","Which inspection or proof-test result should delay concreting over an anchor zone?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Safety assurance project and 2026 progress","url":"https://www.lrd.usace.army.mil/Missions/Projects/Article/3631104/bluestone-dam-dam-safety-assurance-mega-project/","publisher":"USACE Great Lakes and Ohio River Division","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Phase 5 contract milestone","url":"https://www.usace.army.mil/Media/News/Article/2126116/bluestone-pdt-achieves-milestone/","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Bluestone Dam 2022a.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","publisher":"Wikimedia Commons / Antony-22","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bluestone-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bluestone-dam/download/schematic"},{"id":"project-image","title":"Bluestone Dam 2022a.jpg","kind":"project-image","fileName":"bluestone-dam.jpg","mimeType":"image/jpeg","bytes":346957,"sha256":"1956f06dd42d585fa5868ce36388d01e769be3f4e1558d874872a4fa7143082e","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Antony-22","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-04-02 13:13:58","evidenceFile":"image-provenance/bluestone-dam-commons.json","evidenceSha256":"55a381e13ba93c79b945faaf64fc9910ada6981407ff3b529abc3e1d4a12faa5","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/90/Bluestone_Dam_2022a.jpg","downloadUrl":"/cases/bluestone-dam/download/project-image","originalSha1":"7a54bc8e6d12bb134ada88de7744b4def9c86426","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bluestone-dam-capstone.md","mimeType":"text/markdown","bytes":3056,"sha256":"db4860c066a5468d0b6af254a88a791ef3657652ddccc228ec5e7352a5e98892","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bluestone-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bluestone Dam in 2022, showing work in the spillway area.","caption":"Bluestone Dam in 2022, showing work in the spillway area. The photograph corresponds to the ongoing dam-safety programme.","credit":"Antony-22","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2022-04-02 13:13:58","imageDownloadAllowed":true},"figureCaption":"Bluestone Dam in 2022, showing work in the spillway area. The photograph corresponds to the ongoing dam-safety programme.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":67,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bluestone-dam-commons.json","evidenceSha256":"55a381e13ba93c79b945faaf64fc9910ada6981407ff3b529abc3e1d4a12faa5","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350998,"sourceCount":3,"url":"/cases/bluestone-dam"},{"id":"glen-canyon-dam","title":"Glen Canyon Dam — sandstone abutments and controlled seepage","summary":"The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.","topics":["rock","dams-levees","seepage","dewatering","site-investigation"],"country":"United States","region":"Page, Arizona","owner":"US Bureau of Reclamation","year":1966,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock bolting","Abutment stability","Seepage measurement","River diversion"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner history explains the construction systems; the USGS regional map supports geological context. Regional mapping does not replace discontinuity surveys at individual abutments.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Reclamation records major construction milestones and dedication in 1966; detailed daily excavation records are not included.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop rock-abutment support and seepage-monitoring concepts for a dam in fractured sandstone.","inputs":["Use the regional map and owner account to distinguish formation-scale geology from local joints.","Identify the temporary diversion and excavation stages that precede concrete placement."],"deliverables":["Perform a study wedge-stability check with bolt and groundwater sensitivities.","Design a drainage and weir-monitoring layout that distinguishes changing seepage paths from reservoir-level effects.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is measurable seepage not by itself evidence of dam failure?","What site mapping is required before using a regional joint orientation in a support design?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Glen Canyon construction, geology and monitoring","url":"https://www.usbr.gov/uc/rm/crsp/gc/","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geologic map of the Glen Canyon Dam quadrangle","url":"https://pubs.usgs.gov/publication/sim3268","publisher":"US Geological Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Glen Canyon Dam 1962.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","publisher":"Wikimedia Commons / U.S. Bureau of Reclamation","year":1962,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glen-canyon-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glen-canyon-dam/download/schematic"},{"id":"project-image","title":"Glen Canyon Dam 1962.jpg","kind":"project-image","fileName":"glen-canyon-dam.jpg","mimeType":"image/jpeg","bytes":417488,"sha256":"9d600d85f07d11d5b66cab14776d263c4e47c5e81665b6b2d1137d1ced913cef","sourceId":"s3","license":"Public domain","width":439,"height":550,"credit":"U.S. Bureau of Reclamation","sourceUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg#Licensing","imageDate":"1962","evidenceFile":"image-provenance/glen-canyon-dam-commons.json","evidenceSha256":"c1a950a228699d14eebae0da50d05260e7eae33821540a6ef62b5fba484d0bc4","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/ae/Glen_Canyon_Dam_1962.jpg","downloadUrl":"/cases/glen-canyon-dam/download/project-image","originalSha1":"b6a0eb9c6a8100448477e78cd35499d7c07e7d28","originalSha256":"9d600d85f07d11d5b66cab14776d263c4e47c5e81665b6b2d1137d1ced913cef","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glen-canyon-dam-capstone.md","mimeType":"text/markdown","bytes":3082,"sha256":"7812eb24234b655ed2da8b5f24604a3588ab0a135414f74e6e24bd7b9db2dd95","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glen-canyon-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Glen Canyon Dam under construction in 1962.","caption":"Glen Canyon Dam under construction in 1962. The historical photograph shows the actual dam and sandstone canyon abutments.","credit":"U.S. Bureau of Reclamation","sourceUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg#Licensing","width":439,"height":550,"imageDate":"1962","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Glen Canyon Dam under construction in 1962. The historical photograph shows the actual dam and sandstone canyon abutments.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":70,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glen-canyon-dam-commons.json","evidenceSha256":"c1a950a228699d14eebae0da50d05260e7eae33821540a6ef62b5fba484d0bc4","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":421587,"sourceCount":3,"url":"/cases/glen-canyon-dam"},{"id":"channel-tunnel","title":"Channel Tunnel — geological alignment and water-pressure control","summary":"The alignment sought low-permeability marly chalk while accommodating more fractured ground on the French side. Project geologists describe how marine seismic surveys and boreholes informed route selection and machine requirements.","topics":["tunnels","rock","site-investigation","dewatering"],"country":"United Kingdom / France","region":"English Channel","owner":"Eurotunnel","year":1994,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine ground investigation","Geological alignment","Face-pressure control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The account is written by geologists involved in design and construction and includes the geological section. It does not provide all TBM operating logs.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select a sub-sea tunnel alignment that balances cover, geological continuity and water-inflow risk.","inputs":["Extract the main stratigraphic marker and the reported contrast between the two shores.","Identify where sparse boreholes require interpretation supported by seismic profiles."],"deliverables":["Prepare a route-risk section and specify investigation priorities.","Compare open and closed-face excavation assumptions with water-pressure and fault-zone scenarios.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is the shortest geometric route not necessarily the lowest ground-risk route?","What evidence should trigger closed-mode operation before a permeable zone is entered?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Channel Tunnel geology by project geologists","url":"https://www.geolsoc.org.uk/science-and-policy/100-great-geosites/industrial-and-economic-importance/channel-tunnel/","publisher":"Bill Rankin and Ron Williams / Geological Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Site of the Channel Tunnel Construction in May 1991.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","publisher":"Wikimedia Commons / The Basingstoker","year":null,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"channel-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/channel-tunnel/download/schematic"},{"id":"project-image","title":"Site of the Channel Tunnel Construction in May 1991.jpg","kind":"project-image","fileName":"channel-tunnel.jpg","mimeType":"image/jpeg","bytes":294751,"sha256":"f4aaa8dd8d642ab88dc0d9b42b5b4256db7db5a638caa32ec433aa1961dcde9e","sourceId":"s2","license":"CC BY-SA 2.0","width":1280,"height":821,"credit":"The Basingstoker","sourceUrl":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"Unknown date","evidenceFile":"image-provenance/channel-tunnel-commons.json","evidenceSha256":"9649b153db1a0137d64094b16abc794aca62ee229ecfa64ae4748d3f01da2f74","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a0/Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","downloadUrl":"/cases/channel-tunnel/download/project-image","originalSha1":"8ccf8054cb87766b63fdca45e2f2a8059e15029b","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"channel-tunnel-capstone.md","mimeType":"text/markdown","bytes":3106,"sha256":"12ad7d067a39fc330a07359b02e2fa40ea999e32678268d8ca45ee7002155e26","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/channel-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Channel Tunnel construction site in May 1991.","caption":"The Channel Tunnel construction site in May 1991. The historical project photograph provides context for the geological alignment and excavation study.","credit":"The Basingstoker","sourceUrl":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":821,"imageDate":"Unknown date","imageDownloadAllowed":true},"figureCaption":"The Channel Tunnel construction site in May 1991. The historical project photograph provides context for the geological alignment and excavation study.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":75,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/channel-tunnel-commons.json","evidenceSha256":"9649b153db1a0137d64094b16abc794aca62ee229ecfa64ae4748d3f01da2f74","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":298982,"sourceCount":2,"url":"/cases/channel-tunnel"},{"id":"eurasia-tunnel","title":"Eurasia Tunnel — high-pressure mixed-ground TBM crossing","summary":"The road tunnel passes through rock and marine sediments at high water pressure. The designers describe slurry-shield excavation, specialized lining details and seismic joints near changes in ground stiffness.","topics":["tunnels","seismic","dewatering","site-investigation"],"country":"Türkiye","region":"Bosphorus, Istanbul","owner":"Eurasia Tunnel concession / transport authority","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry shield","Mixed-face excavation","High-pressure lining","Seismic joints"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The design consultant and supervising engineer describe ground conditions, machine selection and the installed systems. They do not supply a complete downloadable design calculation set.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Italferr records TBM excavation during 2014–2015, opening to traffic in December 2016 and final acceptance in February 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Define a TBM operating envelope and segmental-lining checks for a deep water-bearing rock-to-soil transition.","inputs":["Map the reported stiffness transitions and separate water pressure from effective ground stress.","Identify the design-stage and construction-stage dates in the engineering accounts."],"deliverables":["Compare face-pressure limits for blowout, inflow and ground loss.","Prepare a lining/joint load summary and contingency measures for interventions under pressure.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why should seismic joints be linked to ground stiffness rather than regular spacing alone?","Which ground investigation would most reduce uncertainty at a mixed-face transition?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eurasia Tunnel design account","url":"https://www.wsp.com/en-us/projects/eurasia-tunnel-istanbul-strait-road-tube-crossing","publisher":"WSP","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Supervision and technical summary","url":"https://www.italferr.it/content/dam/italferr_nd/inglese/document/SCHEDA%20TECNICA%20EURASYA%20TUNNEL%20ENG1.pdf","publisher":"Italferr","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Eurasia tunnel Asia entrance 01.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","publisher":"Wikimedia Commons / Alessandro57","year":2026,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eurasia-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eurasia-tunnel/download/schematic"},{"id":"project-image","title":"Eurasia tunnel Asia entrance 01.jpg","kind":"project-image","fileName":"eurasia-tunnel.jpg","mimeType":"image/jpeg","bytes":311150,"sha256":"a70a83d8bcede2460dad6a00f50fbba6bc19afef5862ba33691ddfac8dee4ff9","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1705,"credit":"Alessandro57","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2026-07-24 15:29:41","evidenceFile":"image-provenance/eurasia-tunnel-commons.json","evidenceSha256":"4f618700c50021f9d429c13b5f18989c9579c0ad1b094084d10d5fbaeea320d5","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/8a/Eurasia_tunnel_Asia_entrance_01.jpg","downloadUrl":"/cases/eurasia-tunnel/download/project-image","originalSha1":"5a67caa8bf97490596743334a14bce0ff75c510c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eurasia-tunnel-capstone.md","mimeType":"text/markdown","bytes":3141,"sha256":"6a381930ec696f509d49754ffba8bc7339c8fe035c793a92086038fa0640bab3","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eurasia-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Asian entrance of the Eurasia Tunnel in Istanbul.","caption":"The Asian entrance of the Eurasia Tunnel in Istanbul. The photograph shows the completed road-tunnel project; the deep mixed-ground crossing is below the strait.","credit":"Alessandro57","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1705,"imageDate":"2026-07-24 15:29:41","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Asian entrance of the Eurasia Tunnel in Istanbul. The photograph shows the completed road-tunnel project; the deep mixed-ground crossing is below the strait.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":77,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eurasia-tunnel-commons.json","evidenceSha256":"4f618700c50021f9d429c13b5f18989c9579c0ad1b094084d10d5fbaeea320d5","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":315416,"sourceCount":3,"url":"/cases/eurasia-tunnel"},{"id":"tideway-tunnel","title":"Thames Tideway Tunnel — variable geology and deep shafts","summary":"The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.","topics":["tunnels","dewatering","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"London","owner":"Tideway","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry tunnelling","Deep shafts","Ground model refinement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project geologist’s technical lecture and designer account provide ground-model and machine-selection reasoning. Completion of tunnelling in a contract area is not the same as completion of the whole sewer system.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare tunnelling and shaft-construction risks across clay, sand and chalk reaches of an urban sewer alignment.","inputs":["Extract the geological units and identify where face pressure is governed by water rather than soil strength.","Choose one contract reach and preserve the distinction between main and connection tunnels."],"deliverables":["Prepare an excavation-method selection matrix and groundwater-control concepts.","Develop a monitoring and geological-reporting plan for updating production forecasts.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What does an intact sample fail to reveal about in-situ chalk permeability?","How should a changed ground model alter contingency time and intervention planning?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Engineering geology and construction performance","url":"https://ice.org.uk/events/recorded-lectures/engineering-geology-of-the-thames-tideway-tunnel","publisher":"Tim Newman / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Engineering the Thames Tideway sewer","url":"https://www.mottmac.com/en-gb/projects/how-londons-thames-tideway-super-sewer-was-engineered/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Thames Tideway Tunnel construction, Nine Elms.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","publisher":"Wikimedia Commons / AndyScott","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tideway-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/schematic"},{"id":"project-image","title":"Thames Tideway Tunnel construction, Nine Elms.jpg","kind":"project-image","fileName":"tideway-tunnel.jpg","mimeType":"image/jpeg","bytes":574175,"sha256":"407b83af897291400982623e5865b9a4baefbb086e090062f79b6911b9d9e3f4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1925,"credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-03-23 14:14:14","evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/4f/Thames_Tideway_Tunnel_construction%2C_Nine_Elms.jpg","downloadUrl":"/cases/tideway-tunnel/download/project-image","originalSha1":"a8e1f4ec3dc41e3101fff83dea35e08e296a2037","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tideway-tunnel-capstone.md","mimeType":"text/markdown","bytes":3265,"sha256":"ba22b9318da7099b0a5527de83a4cf0224651f9706d87d28d94497b3cc7bfb99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Thames Tideway Tunnel construction at Nine Elms, London.","caption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1925,"imageDate":"2022-03-23 14:14:14","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":78,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":578565,"sourceCount":3,"url":"/cases/tideway-tunnel"},{"id":"lee-tunnel","title":"Lee Tunnel — diaphragm-wall shafts in water-bearing chalk","summary":"Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.","topics":["tunnels","excavation","dewatering","retaining-walls"],"country":"United Kingdom","region":"East London","owner":"Thames Water","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Diaphragm-wall shafts","Hoop action","Curtain grouting","Slurry TBM"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The contractor account describes geology and shaft systems; the contract case supplies delivery context. Its later Tideway forecasts are historical and are not treated as current milestones.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The contract case describes a £675 million overall project. It is not a shaft-only cost or an independently audited final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The contract case reports operation beginning in 2016 and overall completion in 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a circular access shaft with large openings through mixed superficial deposits and chalk.","inputs":["Extract the reported shaft geometry range and rock description.","Identify openings and non-axisymmetric actions that violate a simple uniform hoop model."],"deliverables":["Check wall forces, basal water pressure and the staged excavation sequence.","Specify verticality, panel-joint and grouting acceptance checks before deep excavation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How do large shaft openings alter the advantages of circular wall action?","Which checks become most sensitive when chalk fractures connect to overlying sands?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lee Tunnel foundations and shafts","url":"https://www.bacsol.co.uk/project/lee-tunnel-london","publisher":"Bachy Soletanche","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s2","title":"Lee Tunnel delivery case","url":"https://www.neccontract.com/projects/lee-sewage-tunnel-uk","publisher":"NEC Contracts / project participants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lee-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lee-tunnel/download/schematic"},{"id":"project-image","title":"Lee Tunnel — diaphragm-wall shaft","kind":"project-image","fileName":"lee-tunnel-r13.jpg","mimeType":"image/jpeg","bytes":228064,"sha256":"fc396c5f49b66dd83e44ab6a653056fe8d94c89b90f8994e87f69391358eef32","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":600,"height":400,"credit":"Bachy Soletanche","sourceUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","licenseUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","imageDate":null,"evidenceFile":"image-provenance/lee-tunnel-r13-source.json","evidenceSha256":"5cc7371182aedd09643f171ed244c2357082c4601da5804250e5e0010cf8673a","transformations":"Copied the publisher’s 600 × 400 JPEG derivative unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://www.bacsol.co.uk/wp-content/uploads/2020/08/Retaining-Wall-Solution-Lee-Tunnel-Diaphragm-Wall-Shaft-7-600x400.jpg","originalSha256":"fc396c5f49b66dd83e44ab6a653056fe8d94c89b90f8994e87f69391358eef32","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/lee-tunnel/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lee-tunnel-capstone.md","mimeType":"text/markdown","bytes":2910,"sha256":"a2d8ea7378ad7a5316b4aff6b33df06977e908282baab4aa1e0a4f0859b388cc","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lee-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction photograph looking down into a circular Lee Tunnel diaphragm-wall shaft.","caption":"Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.","credit":"Bachy Soletanche","sourceUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","width":600,"height":400,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":79,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lee-tunnel-r13-source.json","evidenceSha256":"5cc7371182aedd09643f171ed244c2357082c4601da5804250e5e0010cf8673a","visualReview":"Inspected the entire published 600 × 400 photograph. It shows the full visible circular shaft lining, suspended construction lines and equipment below. No generative or unrelated replacement was used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4035,"sourceCount":2,"url":"/cases/lee-tunnel"},{"id":"east-side-access","title":"East Side Access — frozen support beneath Northern Boulevard","summary":"A short mined connection beneath active transport infrastructure used a frozen soil arch for temporary support and groundwater cutoff. The project sources distinguish local freezing from the wider East Side Access tunnel programme.","topics":["tunnels","ground-improvement","dewatering","monitoring"],"country":"United States","region":"Queens, New York","owner":"Metropolitan Transportation Authority","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Sequential excavation","Heave and settlement control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The contractor case and design-team account describe the Northern Boulevard crossing and movement control. Photographs of the wider project are identified as context unless the crossing itself is shown.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a short mined crossing beneath an operating subway box where drawdown and ground movement are tightly constrained.","inputs":["Extract the access-shaft arrangement, groundwater setting and supported transport structures.","Distinguish freeze-induced heave from excavation-induced settlement in the monitoring plan."],"deliverables":["Develop staged thermal and stability checks for a frozen arch.","Coordinate compensation grouting, lining installation and controlled thaw with operating railway limits.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which monitoring trends would indicate that freezing is protecting the face but damaging the asset above?","Why must the temporary frozen ground remain effective until lining load transfer is complete?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Northern Boulevard crossing case","url":"https://www.geoinstitute.org/node/16177","publisher":"Project case author / ASCE Geo-Institute","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"East Side Access design and construction account","url":"https://www.mottmac.com/en-us/projects/transforming-rail-on-manhattans-east-side/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ESA 0968 (8311751208).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","publisher":"Wikimedia Commons / Metropolitan Transportation Authority of the State of New York","year":2012,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"east-side-access.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-side-access/download/schematic"},{"id":"project-image","title":"ESA 0968 (8311751208).jpg","kind":"project-image","fileName":"east-side-access.jpg","mimeType":"image/jpeg","bytes":368730,"sha256":"b28bf3330220485b79647239eaf8a823d8cd8a8f655976d19808683423d66f38","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":852,"credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2012-12-20 10:55","evidenceFile":"image-provenance/east-side-access-commons.json","evidenceSha256":"3b73a5b980a975dc875f8b13a25fae5c42e9eaeca85f68dbd88dfe46f47b2bb2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e4/ESA_0968_%288311751208%29.jpg","downloadUrl":"/cases/east-side-access/download/project-image","originalSha1":"bed1ed4d21b8d615f8d47b1c8e599c6f7e8358a6","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"east-side-access-capstone.md","mimeType":"text/markdown","bytes":3336,"sha256":"dc67afd8eb763990e864f661eb9dbdfc1820f32ec6b4f975be6fad9154e02a62","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-side-access/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Excavation beneath Northern Boulevard in Queens in December 2012.","caption":"Excavation beneath Northern Boulevard in Queens in December 2012. The MTA photograph shows the actual East Side Access crossing where frozen ground and temporary supports protected the roadway and subway structures above.","credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":852,"imageDate":"2012-12-20 10:55","imageDownloadAllowed":true},"figureCaption":"Excavation beneath Northern Boulevard in Queens in December 2012. The MTA photograph shows the actual East Side Access crossing where frozen ground and temporary supports protected the roadway and subway structures above.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":81,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/east-side-access-commons.json","evidenceSha256":"3b73a5b980a975dc875f8b13a25fae5c42e9eaeca85f68dbd88dfe46f47b2bb2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":373191,"sourceCount":3,"url":"/cases/east-side-access"},{"id":"smart-tunnel","title":"SMART Tunnel — tunnelling through urban karst","summary":"The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.","topics":["tunnels","rock","dewatering","ground-improvement","site-investigation"],"country":"Malaysia","region":"Kuala Lumpur","owner":"Department of Irrigation and Drainage / Malaysian Highway Authority","year":2007,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Karst investigation","Slurry shield","Fissure and compaction grouting"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The primary construction accounts explain the selected methods and localized treatment purposes. They do not establish that karst uncertainty can be removed by one uniform grouting grid.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The builder identifies operation from 2007; the page is a project history rather than a detailed monthly programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan ground investigation and treatment for a tunnel encountering pinnacles, cavities and variable cover beneath a city.","inputs":["Extract the reported karst features and the purpose of each grouting method.","Specify investigation coverage at shafts, interventions and transitions rather than uniform spacing alone."],"deliverables":["Develop face-pressure and groundwater-control concepts for mixed ground.","Prepare a cavity/sinkhole response plan with survey triggers and treatment verification.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can groundwater drawdown cause a surface collapse away from the tunnel face?","Which evidence separates a treatable local void from a larger connected karst system?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SMART construction and geology","url":"https://www.smarttunnel.com.my/construction/print_project_construction.htm","publisher":"SMART project","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Ground-treatment contractor case","url":"https://www.kellerasean.com/projects/storm-water-management-and-road-tunnel","publisher":"Keller","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Builder project record","url":"https://gamuda.com/our-expertise/engineering-construction/stormwater-management-and-road-tunnel-smart/","publisher":"Gamuda","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"KL-SMARTtunnelentrance.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","publisher":"Wikimedia Commons / Azreey","year":2007,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"smart-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/smart-tunnel/download/schematic"},{"id":"project-image","title":"KL-SMARTtunnelentrance.JPG","kind":"project-image","fileName":"smart-tunnel.jpg","mimeType":"image/jpeg","bytes":577763,"sha256":"96788f96ef8b17d718aeb536a6282dc215767c1c9217e99d6a7999c55a4d275d","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Azreey","sourceUrl":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2007-12-27","evidenceFile":"image-provenance/smart-tunnel-commons.json","evidenceSha256":"d6654eb1d691f51c5618edc29c7f59f575cfe4d5c70ce3a39979b2a84f69a950","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/26/KL-SMARTtunnelentrance.JPG","downloadUrl":"/cases/smart-tunnel/download/project-image","originalSha1":"a5a0765e43e062f683adc413aa657655bbd67c36","originalSha256":"96788f96ef8b17d718aeb536a6282dc215767c1c9217e99d6a7999c55a4d275d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"smart-tunnel-capstone.md","mimeType":"text/markdown","bytes":3195,"sha256":"41d78160bf08853a679ec43e844ed00eefd919e2d2cb15461408fd68297d66db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/smart-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The northbound entrance to Kuala Lumpur’s SMART Tunnel.","caption":"The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.","credit":"Azreey","sourceUrl":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2007-12-27","imageDownloadAllowed":true},"figureCaption":"The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":83,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/smart-tunnel-commons.json","evidenceSha256":"d6654eb1d691f51c5618edc29c7f59f575cfe4d5c70ce3a39979b2a84f69a950","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":582083,"sourceCount":4,"url":"/cases/smart-tunnel"},{"id":"love-canal","title":"Love Canal — containment cap and barrier drainage","summary":"The remedy contains waste beneath a cap and intercepts contaminated groundwater for treatment. EPA records describe the expanded synthetic cover, barrier drains and continuing inspection programme.","topics":["geoenvironmental","seepage","dewatering","monitoring"],"country":"United States","region":"Niagara Falls, New York","owner":"US EPA / New York State Department of Environmental Conservation","year":1985,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Composite cap","Barrier drains","Hydraulic containment"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The EPA site record and technical report describe constructed containment and operating components. Removal from a regulatory list does not mean the buried waste or maintenance requirements disappeared.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"EPA describes continuing operations, inspection and maintenance of the containment system.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate whether a containment remedy can maintain inward groundwater gradients under changing infiltration and pump performance.","inputs":["Extract the cap, trench and pumping arrangement from EPA’s report.","Distinguish site boundaries, capped footprint and the actual waste-disposal area."],"deliverables":["Prepare a water balance and capture-zone sensitivity study.","Design inspection priorities and failure-response actions for cap damage or pumping interruption.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What monitoring evidence would reveal a bypass around the barrier-drain system?","Why is a clean-looking surface not sufficient evidence of remedy performance?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Site cleanup and continuing operation","url":"https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0201290","publisher":"US Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Technical containment-system report","url":"https://semspub.epa.gov/work/02/534007.pdf","publisher":"US Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Looking into Love Canal.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","publisher":"Wikimedia Commons / Buffalutheran","year":2012,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"love-canal.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/love-canal/download/schematic"},{"id":"project-image","title":"Looking into Love Canal.jpg","kind":"project-image","fileName":"love-canal.jpg","mimeType":"image/jpeg","bytes":269116,"sha256":"96a2bf4eab0121fa484bdcd20caba1e9984c522c62cd60399ea71de5b086b32d","sourceId":"s3","license":"CC0","width":1280,"height":857,"credit":"Buffalutheran","sourceUrl":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2012-06-15","evidenceFile":"image-provenance/love-canal-commons.json","evidenceSha256":"d4d3d8a037738385c27b7d752567521ce0c0f66f401d7abb350d853fc3e8517e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/5e/Looking_into_Love_Canal.jpg","downloadUrl":"/cases/love-canal/download/project-image","originalSha1":"06e5138c9746943f5e099648990419918b5a1f5e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"love-canal-capstone.md","mimeType":"text/markdown","bytes":3097,"sha256":"9eafc46a13cafa86303fecdba9599259b4e8f1e29833f65a946bebc5ef4d8983","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/love-canal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"View into the Love Canal containment area in 2012.","caption":"View into the Love Canal containment area in 2012. This is the actual remediated site, where the buried waste and collection systems require continuing management.","credit":"Buffalutheran","sourceUrl":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":857,"imageDate":"2012-06-15","imageDownloadAllowed":true},"figureCaption":"View into the Love Canal containment area in 2012. This is the actual remediated site, where the buried waste and collection systems require continuing management.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":95,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/love-canal-commons.json","evidenceSha256":"d4d3d8a037738385c27b7d752567521ce0c0f66f401d7abb350d853fc3e8517e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":273204,"sourceCount":3,"url":"/cases/love-canal"},{"id":"one-new-change","title":"One New Change — basement effects on St Paul’s groundwater","summary":"Redevelopment beside St Paul’s Cathedral required assessment of groundwater changes in shallow deposits supporting the historic structure. The designer describes conceptual and numerical groundwater modeling followed by construction monitoring.","topics":["excavation","dewatering","shallow-foundations","monitoring"],"country":"United Kingdom","region":"City of London","owner":"Land Securities","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Groundwater modeling","Basement cutoff effects","Heritage monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Arup explains the groundwater model and observed construction response. The public account does not provide the full calibrated model or authorize unrestricted basement work near the cathedral.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The designer reports groundwater and structural monitoring during construction with negligible observed effect on the cathedral.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess whether a new basement diverts shallow groundwater enough to affect a neighboring heritage foundation.","inputs":["Extract the reported aquifer, foundation and basement relationships.","Identify man-made drainage and historic excavations that may change natural flow paths."],"deliverables":["Compare preconstruction and basement scenarios with recharge and permeability sensitivities.","Specify piezometers and structural surveys capable of distinguishing seasonal changes from construction effects.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can a watertight basement cause damaging groundwater change without active dewatering?","Which calibration observations are needed before trusting a model’s small predicted effect?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground engineering and groundwater protection at One New Change","url":"https://www.arup.com/en-us/projects/one-new-change/","publisher":"Arup","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"London - New Change - One New Change 2010 by Jean Nouvel - View West on St Paul's Cathedral 1697 by Sir Christopher Wren III.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","publisher":"Wikimedia Commons / Txllxt TxllxT","year":2011,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"one-new-change.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/one-new-change/download/schematic"},{"id":"project-image","title":"London - New Change - One New Change 2010 by Jean Nouvel - View West on St Paul's Cathedral 1697 by Sir Christopher Wren III.jpg","kind":"project-image","fileName":"one-new-change.jpg","mimeType":"image/jpeg","bytes":247667,"sha256":"9a6679e879bd9eb087a955a9593eea26025ed3624038d8b664b67ba27ee88c45","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Txllxt TxllxT","sourceUrl":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2011-06-20 14:27:18","evidenceFile":"image-provenance/one-new-change-commons.json","evidenceSha256":"6b3c5058ed26b68bc8857ee718d90dc0816f85f95f68c713496d1cdb57cb101d","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/38/London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","downloadUrl":"/cases/one-new-change/download/project-image","originalSha1":"241c5d5b01283a7a875ec9b5aa600bf482fccca1","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"one-new-change-capstone.md","mimeType":"text/markdown","bytes":3362,"sha256":"dfdc5008d7df14d8e08879a051b14fcd5dee3a5bb724e23de542d930e7f416e6","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/one-new-change/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"View from One New Change toward St Paul’s Cathedral.","caption":"View from One New Change toward St Paul’s Cathedral. The photograph shows the adjacent development and heritage structure whose groundwater interaction was assessed.","credit":"Txllxt TxllxT","sourceUrl":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2011-06-20 14:27:18","imageDownloadAllowed":true},"figureCaption":"View from One New Change toward St Paul’s Cathedral. The photograph shows the adjacent development and heritage structure whose groundwater interaction was assessed.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":98,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/one-new-change-commons.json","evidenceSha256":"6b3c5058ed26b68bc8857ee718d90dc0816f85f95f68c713496d1cdb57cb101d","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":252160,"sourceCount":2,"url":"/cases/one-new-change"},{"id":"eth-honggerberg","title":"ETH Hönggerberg — seasonal borehole heat storage","summary":"The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.","topics":["geothermal","site-investigation","dewatering","monitoring","delivery"],"country":"Switzerland","region":"Zurich","owner":"ETH Zurich","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Borehole heat exchangers","Seasonal thermal storage","Thermal interference","Construction staging"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"ETH documents 160 additional probes at 200 m depth on a 5 m grid, beside an existing field of 126 probes. The published project description supports layout and heat-balance studies; it does not supply a complete thermal-response test dataset.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner dates HC4 expansion drilling to October 2024–May 2025 and operational handover to July 2025. Later proposed fields are outside this completed expansion.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The owner confirms connection of the enlarged HC4 field to the campus network; continuous raw operating data and final drilling records were not provided on the reviewed pages.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased borehole-field expansion for an operating campus and test whether spacing, ground properties and annual heat imbalance control the design.","inputs":["Use the published HC4 depth, spacing and probe counts; assemble an explicitly labelled study load series for heating and cooling.","Identify borehole logs, groundwater flow, thermal conductivity and borehole-resistance measurements still needed before design."],"deliverables":["Compare a line-source screening calculation with a multi-borehole response model under balanced and unbalanced annual loads.","Lay out drilling access, buried services, grouting verification, commissioning tests and long-term temperature monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would persistent net heat injection change performance even if the first operating year meets the heating and cooling demand?","What additional thermal-response or groundwater observations would justify reducing uncertainty at the 5 m borehole spacing?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"HC4 geothermal probe-field expansion and commissioning","url":"https://ethz.ch/staffnet/en/news-and-events/internal-news/archive/2025/08/hoenggerberg-campus-becomes-more-sustainable-above-and-below-ground.html","publisher":"ETH Zurich Real Estate Management","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Energy supply and the campus anergy grid","url":"https://ethz.ch/en/the-eth-zurich/organisation/departments/engineering-and-systems/energie.html","publisher":"ETH Zurich","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ETH Hönggerberg campus, seen from Hönggerbergstrasse.jpg","url":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","publisher":"Balise42","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eth-honggerberg.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eth-honggerberg-reference-values.csv","mimeType":"text/csv","bytes":1393,"sha256":"0746df014858f90951177b8dd60717dcd4fd0c62a7496d26412f00d0525e7c28","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eth-honggerberg/download/reference-values"},{"id":"project-image","title":"ETH Hönggerberg campus — setting of the anergy grid","kind":"project-image","fileName":"eth-honggerberg.jpg","mimeType":"image/jpeg","bytes":299237,"sha256":"3bfed12bb7a9484ceb0020eb752234d62054091b0f07478ee2a2b3a9b01c5ce9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":854,"credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-09-16 10:13:12","evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/94/ETH_H%C3%B6nggerberg_campus%2C_seen_from_H%C3%B6nggerbergstrasse.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eth-honggerberg/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eth-honggerberg-capstone.md","mimeType":"text/markdown","bytes":5102,"sha256":"e859f8b70fe4a7e15e0b6156c663fbf6c8ef78fcddde30913231a93546dc88b4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","caption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":854,"imageDate":"2023-09-16 10:13:12","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":103,"referenceValues":[{"label":"Added HC4 probes","value":160,"unit":"probes","scope":"HC4 expansion drilled October 2024–May 2025.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported probe depth","value":200,"unit":"m","scope":"New HC4 geothermal probes; do not infer the full site stratigraphy.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported grid spacing","value":5,"unit":"m","scope":"Spacing stated for the HC4 expansion.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Existing HC4 probes","value":126,"unit":"probes","scope":"Pre-expansion field, distinct from the 160 additional probes.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":306789,"sourceCount":3,"url":"/cases/eth-honggerberg"},{"id":"arlanda-aquifer","title":"Stockholm Arlanda — aquifer thermal energy storage","summary":"The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.","topics":["geothermal","dewatering","site-investigation","monitoring"],"country":"Sweden","region":"Stockholm Arlanda Airport","owner":"Swedavia","year":2009,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Aquifer thermal energy storage","Pumping and reinjection","Thermal plume transport","Water balance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Swedavia describes seasonal circulation through the Brunkebergsåsen aquifer, reinjection of the extracted volume and uses for recovered heat. Detailed well construction, transmissivity and monitoring time series must be obtained separately.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports that the aquifer system began operation in summer 2009.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The owner describes the operating principle and an annual energy-reduction estimate. Treat that estimate as an owner-reported system value, not an independently reproduced geotechnical result.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Size a conceptual paired-well seasonal storage system for an airport, keeping hydraulic interference, heat migration and groundwater protection visible in the design.","inputs":["Establish an assumed stratigraphic section and transmissivity range, clearly separated from the owner’s published system description.","Build seasonal heating/cooling loads and identify water-quality limits, abstraction permissions and nearby receptors."],"deliverables":["Calculate pumping drawdown, reinjection mounding and a first thermal travel-time estimate, then test sensitivity to groundwater flow.","Prepare a well spacing concept, mass/energy balance, monitoring network and recovery-efficiency evaluation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How could returning the same volume of groundwater still change temperatures or groundwater quality outside the intended storage zone?","Which combination of pumping tests and thermal tracers would best distinguish inadequate transmissivity from early thermal breakthrough?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"The aquifer — owner explanation of airport seasonal storage","url":"https://www.swedavia.com/about-swedavia/the-aquifer/","publisher":"Swedavia","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Stockholm-Arlanda Airport aerial view.JPG","url":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","publisher":"Nemracc","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"arlanda-aquifer.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/arlanda-aquifer/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"arlanda-aquifer-reference-values.csv","mimeType":"text/csv","bytes":375,"sha256":"8a4f1706bee52daf9c8d4a97180a76295841b01271e437878d6c32986279c518","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/arlanda-aquifer/download/reference-values"},{"id":"project-image","title":"Stockholm Arlanda Airport — aerial site view","kind":"project-image","fileName":"arlanda-aquifer.jpg","mimeType":"image/jpeg","bytes":268995,"sha256":"a4465724499f43a3e188c68f6d065eb106cf5d3e7abddf0469b56d0789048f8a","sourceId":"s2","license":"CC BY-SA 3.0","width":1269,"height":650,"credit":"Nemracc / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-01-11 08:37:35","evidenceFile":"image-provenance/arlanda-aquifer-r14-source.json","evidenceSha256":"fbacca4ee162dee050c65db5b09456023adf2f565c6392f39bea524e93cbd441","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f2/Stockholm-Arlanda_Airport_aerial_view.JPG?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/arlanda-aquifer/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"arlanda-aquifer-capstone.md","mimeType":"text/markdown","bytes":3872,"sha256":"f9b0bd622d058575a97b9b95083312cd054f93e88a524a051a0178d17246b6ff","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/arlanda-aquifer/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","caption":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","credit":"Nemracc / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1269,"height":650,"imageDate":"2008-01-11 08:37:35","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":104,"referenceValues":[{"label":"Owner-reported annual energy reduction","value":19,"unit":"GWh/year","scope":"Airport system estimate from the owner description; not a measured heat-pump COP.","sourceId":"s1","locator":"Annual energy reduction","basis":"Owner-reported estimate; no independent performance reconstruction or guarantee implied."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/arlanda-aquifer-r14-source.json","evidenceSha256":"fbacca4ee162dee050c65db5b09456023adf2f565c6392f39bea524e93cbd441","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":274299,"sourceCount":2,"url":"/cases/arlanda-aquifer"},{"id":"heerlen-minewater","title":"Heerlen — heat recovery and storage in flooded mines","summary":"Flooded coal-mine workings provide thermal resources and storage for a district network. Published project accounts explain the transition from extracting mine heat to exchanging and regenerating it through building clusters.","topics":["geothermal","rock","dewatering","geoenvironmental","monitoring"],"country":"Netherlands","region":"Heerlen, Limburg","owner":"Mijnwater / Municipality of Heerlen","year":2014,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Mine-water heat recovery","Coupled groundwater and heat transport","Thermal regeneration","Mine-void risk assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project paper describes Minewater 2.0 and the STORM demonstrator documents hot, cold and reinjection wells. Mine connectivity, well condition, water chemistry and pressure limits remain site-specific inputs for any new scheme.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The project paper identifies pilot operation from October 2008 and the first Minewater 2.0 phase from June 2013.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The STORM project records staged controller deployment and monitoring at the Heerlen demonstration site; it is not a complete mine-closure or well-acceptance dossier.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a hydrothermal operating concept for a flooded-mine network, with explicit mine-stability, water-quality and seasonal heat-recovery constraints.","inputs":["Trace the reported hot/cold-well arrangement and distinguish the original pilot from the later cluster network.","Assemble mine plans, hydraulic connections, pumping response and chemistry data; document gaps instead of assuming a uniform porous aquifer."],"deliverables":["Construct a reduced network water/heat balance and test thermal short-circuiting and seasonal regeneration scenarios.","Prepare well-integrity, mine-stability and water-quality monitoring plans with operating limits and contingency actions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a system that initially supplies heat become unsustainable if recharge and heat exchange are ignored?","How would a poorly mapped mine connection alter pumping response, thermal breakthrough and the choice of observation wells?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Minewater 2.0 — project authors’ account","url":"https://www.sciencedirect.com/science/article/pii/S187661021400174X","publisher":"Verhoeven et al. / Energy Procedia","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Heerlen demonstration site and well/network configuration","url":"https://storm-dhc.eu/en/mijnwater-bv-site","publisher":"STORM project / VITO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Heerlerheide Schacht ONIII (1).jpg","url":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","publisher":"Hans Erren","year":2012,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"heerlen-minewater.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/heerlen-minewater/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"heerlen-minewater-reference-values.csv","mimeType":"text/csv","bytes":532,"sha256":"a2efc312f0bbcd2b120f9231b984aff1643b05c6e92016837cfe49dfb2cbceb2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/heerlen-minewater/download/reference-values"},{"id":"project-image","title":"Heerlerheide — former Oranje-Nassau III mine shaft","kind":"project-image","fileName":"heerlen-minewater.jpg","mimeType":"image/jpeg","bytes":333440,"sha256":"baa063d001e8d1878b3fcb4bc810e00f26ce5b5768ff10ffafb48b0cde985468","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":648,"credit":"Hans Erren / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2012-08-01 18:48:42","evidenceFile":"image-provenance/heerlen-minewater-r14-source.json","evidenceSha256":"ead9774990be9695ae89799195ff0a7032b9f83c5146cdf65c8ff6331c92f048","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Heerlerheide_Schacht_ONIII_%281%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/heerlen-minewater/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"heerlen-minewater-capstone.md","mimeType":"text/markdown","bytes":4155,"sha256":"3757cab5372b656f41e48fd4cc3e273c7a8e68bc26af1ec2053b87ecd31e0fde","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/heerlen-minewater/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","caption":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","credit":"Hans Erren / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":648,"imageDate":"2012-08-01 18:48:42","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":105,"referenceValues":[{"label":"Hot-well temperature","value":28,"unit":"°C","scope":"Two hot wells in the documented STORM demonstration configuration.","sourceId":"s2","locator":"Site description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Cold-well temperature","value":16,"unit":"°C","scope":"Two cold wells in the documented STORM demonstration configuration.","sourceId":"s2","locator":"Site description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/heerlen-minewater-r14-source.json","evidenceSha256":"ead9774990be9695ae89799195ff0a7032b9f83c5146cdf65c8ff6331c92f048","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":339184,"sourceCount":3,"url":"/cases/heerlen-minewater"},{"id":"berkeley-pit","title":"Berkeley Pit — mine flooding and hydraulic containment","summary":"The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.","topics":["geoenvironmental","dewatering","rock","seepage","monitoring"],"country":"United States","region":"Butte, Montana","owner":"EPA oversight / responsible mining parties","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Mine-water balance","Hydraulic containment","Pumping and treatment","Monitoring interpretation"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"EPA identifies the Butte Mine Flooding operable unit and continuing treatment. The official monitoring archive provides dated discharge reports; pit water, connected mine water and surrounding aquifers must be represented as a connected system.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Public discharge reports and EPA status material document continuing treatment and monitoring. They are dated operational records, not evidence that treatment can be discontinued.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a water-balance and containment assessment for the flooded mine, with sensitivity to uncertain inflow and temporary treatment interruption.","inputs":["Use a dated monthly monitoring report for observed discharge and compliance data.","Identify pit and mine-water levels, the relevant control elevation and its datum, and unmeasured groundwater exchanges."],"deliverables":["Build a time-dependent storage/pumping model that distinguishes observations, calibrated flows and conservative assumptions.","Develop outage scenarios, monitoring triggers and a recovery pumping strategy with treatment-capacity constraints.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would a stable pit level conceal a change in groundwater capture or treatment demand?","What evidence is needed before comparing a reported control elevation with survey data recorded in a different vertical datum?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Current site status — Butte Mine Flooding OU3","url":"https://www.epa.gov/butte/current-site-status","publisher":"U.S. Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"January 2025 monthly discharge monitoring report","url":"https://digitalcommons.mtech.edu/superfund_silverbowbutte/1282/","publisher":"Thompson and Griffis / Montana Technological University archive","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Berkeley Pit water-treatment explanation","url":"https://pitwatch.org/learn/water-treatment/","publisher":"PitWatch / Butte Mine Flooding information programme","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"2013 Berkeley Pit, Butte, Montana (1).jpg","url":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","publisher":"Chris06","year":2013,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"berkeley-pit.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/berkeley-pit/download/schematic"},{"id":"project-image","title":"Berkeley Pit — flooded mine excavation","kind":"project-image","fileName":"berkeley-pit.jpg","mimeType":"image/jpeg","bytes":297779,"sha256":"27b5d65db09c4b1d2ba719119c2740d3cb439ae5250b4e5c9ace6f2032d4f473","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":903,"credit":"Chris06 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2013-08-03","evidenceFile":"image-provenance/berkeley-pit-r14-source.json","evidenceSha256":"8258faad4b0bffb33e50f379f8fc7e4acf937b5946609c3dc163c7733f9ca2b8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a8/2013_Berkeley_Pit%2C_Butte%2C_Montana_%281%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/berkeley-pit/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"berkeley-pit-capstone.md","mimeType":"text/markdown","bytes":3653,"sha256":"a8e1cd9696e424949050088262199d4660028a778e7daa8a242dd143c1df072d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/berkeley-pit/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","caption":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","credit":"Chris06 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":903,"imageDate":"2013-08-03","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":111,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/berkeley-pit-r14-source.json","evidenceSha256":"8258faad4b0bffb33e50f379f8fc7e4acf937b5946609c3dc163c7733f9ca2b8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":302423,"sourceCount":4,"url":"/cases/berkeley-pit"}]}