{"schemaVersion":1,"updated":"2026-11-22","total":17,"records":[{"id":"west-davis-geofoam","title":"West Davis Highway ramp — lightweight fill beside live transport","summary":"UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.","topics":["ground-improvement","settlement","earthworks","delivery"],"country":"United States","region":"Farmington, Utah","owner":"Utah Department of Transportation","year":2023,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Settlement control","Construction access"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The owner describes the lightweight-fill choice and construction; detailed geotechnical design calculations are not supplied on the news page.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner update documents ramp construction in August 2023.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The source includes construction photographs; complete as-built drawings were not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a lightweight ramp concept while preserving adjacent road and rail service.","inputs":["Use the owner’s site description and identify missing foundation-soil data.","Set an explicit study profile, load case and allowable movement with instructor approval."],"deliverables":["Check foundation stress, settlement, block compression and groundwater uplift.","Draw block arrangement, pavement separation and lateral protection details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"UDOT uses Styrofoam blocks to build freeway ramp in Davis County","url":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","publisher":"UDOT","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"west-davis-geofoam.svg","mimeType":"image/svg+xml","bytes":1799,"sha256":"e23761dbae30acfd1a743186545c5dcb2378a1245850347956435a393d209bfe","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/schematic"},{"id":"project-image","title":"West Davis Highway geofoam ramp — UDOT aerial photograph","kind":"project-image","fileName":"west-davis-geofoam.jpg","mimeType":"image/jpeg","bytes":410515,"sha256":"ab0b77da1950e4c96176524133fdba24a8ba723c6ae986fac408e5789d53dd3f","sourceId":"s1","license":"UDOT public reuse with attribution — social-media policy","width":1536,"height":1152,"credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","imageDate":null,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","transformations":"Unmodified image bytes from UDOT’s 1536-pixel file; responsive display sizing only.","downloadUrl":"/cases/west-davis-geofoam/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"west-davis-geofoam-capstone.md","mimeType":"text/markdown","bytes":2842,"sha256":"b5fb2c304589779ef896527dbaa582a8964ff846f3a2fbf5fcc79dbbaf04c8e9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the West Davis Highway geofoam ramp under construction beside live transport routes.","caption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","license":"UDOT public reuse with attribution — social-media policy","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","width":1536,"height":1152,"imageDate":null},"figureCaption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":4,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":415156,"sourceCount":1,"url":"/cases/west-davis-geofoam"},{"id":"olyphant-distribution","title":"Olyphant distribution centre — variable mine-spoil improvement","summary":"A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.","topics":["ground-improvement","shallow-foundations","problem-soils","earthworks"],"country":"United States","region":"Olyphant, Pennsylvania","owner":"D&L Realty","year":2022,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Dynamic compaction","Aggregate piers","Performance verification"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project engineer’s case describes the change in treatment, post-improvement SPT checks and aggregate-pier modulus tests.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports about $950,000 for dynamic compaction only; earthwork and aggregate-pier costs are unavailable.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The documented project period is 2021–2022.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case includes post-improvement SPT and pier-modulus verification.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a ground-improvement design with an explicit decision rule for changing treatment in saturated or poorly responding zones.","inputs":["Extract fill depths, initial/post-treatment tests and observed crater response.","Separate warehouse foundation requirements from yard pavement requirements."],"deliverables":["Develop treatment zoning and a field trial with measurable acceptance criteria.","Compare additional compaction, aggregate piers and excavation/replacement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Distribution Center Site, Olyphant, PA","url":"https://www.geoinstitute.org/node/16272","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper by Woods et al., 2023 DFI conference.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"olyphant-distribution.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olyphant-distribution/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"olyphant-distribution-reference-values.csv","mimeType":"text/csv","bytes":303,"sha256":"d8e12ade8ad0afe7e13e24904df73ef410ab81246c1bad7429660474dab67db5","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/olyphant-distribution/download/reference-values"},{"id":"project-image","title":"Olyphant distribution centre — ground-improvement site","kind":"project-image","fileName":"olyphant-distribution-r13.jpg","mimeType":"image/jpeg","bytes":221097,"sha256":"3150a03207445e707145f91b89198c78b9e39ad4825baae9e4f25854c5b70ba9","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1024,"height":683,"credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16272","licenseUrl":"https://www.geoinstitute.org/node/16272","imageDate":null,"evidenceFile":"image-provenance/olyphant-distribution-r13-source.json","evidenceSha256":"26c7c3c9e1ec0483ce092180cb01289e8ec92ded9ea4a33d4423e2547b5ec3d1","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/olyphant_center.jpg","originalSha256":"3150a03207445e707145f91b89198c78b9e39ad4825baae9e4f25854c5b70ba9","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/olyphant-distribution/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"olyphant-distribution-capstone.md","mimeType":"text/markdown","bytes":3085,"sha256":"045c75f6403a1a2cc930baac411103cf2ddb62188ab04145e021984c45afbc77","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olyphant-distribution/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","caption":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16272","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16272","width":1024,"height":683,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":13,"referenceValues":[{"label":"Dynamic-compaction package","value":950000,"unit":"USD","scope":"Approximate dynamic-compaction cost; earthworks and aggregate columns excluded.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/olyphant-distribution-r13-source.json","evidenceSha256":"26c7c3c9e1ec0483ce092180cb01289e8ec92ded9ea4a33d4423e2547b5ec3d1","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4576,"sourceCount":1,"url":"/cases/olyphant-distribution"},{"id":"mud-creek","title":"Mud Creek, Highway 1 — landslide mapping and road recovery","summary":"Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.","topics":["slopes","coastal-offshore","monitoring","earthworks"],"country":"United States","region":"Big Sur, California","owner":"Caltrans / USGS and NASA investigation partners","year":2017,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Change detection","Coastal slope behaviour","Road-alignment alternatives"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"USGS provides the investigation and monitoring context; the linked science page is not the final road-reconstruction design.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"NASA’s 2019 account cites $54 million in road repairs; a detailed final estimate is not attached.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"The failure occurred on 20 May 2017; source publications document pre/post-event observations.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Research observations are linked; final road as-built documents were not established.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a road-recovery alternatives study using mapped change and a clearly defined stability/erosion investigation plan.","inputs":["Identify the source surveys, coordinate reference, acquisition dates and remaining moving areas.","Keep differing published volume estimates tied to their methods and dates."],"deliverables":["Create a change-map interpretation and preliminary geotechnical ground model.","Compare realignment and reconstruction concepts with residual movement and coastal erosion risks.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"The Mud Creek Landslide, May 20, 2017","url":"https://www.usgs.gov/special-topics/big-sur-landslides/science/mud-creek-landslide-may-20-2017","publisher":"USGS","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Drought, deluge turned stable landslide into disaster","url":"https://www.jpl.nasa.gov/news/drought-deluge-turned-stable-landslide-into-disaster/","publisher":"NASA JPL","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Big Sur Mud Creek Slide May 2017.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","publisher":"Wikimedia Commons / Pacific Coastal and Marine Science Center","year":2017,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"mud-creek.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mud-creek/download/schematic"},{"id":"project-image","title":"Big Sur Mud Creek Slide May 2017.jpg","kind":"project-image","fileName":"mud-creek.jpg","mimeType":"image/jpeg","bytes":357896,"sha256":"bf6c766da30a2ff6c07c80c56f6d0062a06e92f7ef3a2dce0b2a3bf6e997b3ce","sourceId":"s3","license":"Public domain","width":1280,"height":847,"credit":"Pacific Coastal and Marine Science Center","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg#Licensing","imageDate":"2017-05-27","evidenceFile":"image-provenance/mud-creek-commons.json","evidenceSha256":"5d22a8ea6622f52ea2221f5311d6ff3b31bad54960946b8901258e7f09ecc441","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a5/Big_Sur_Mud_Creek_Slide_May_2017.jpg","downloadUrl":"/cases/mud-creek/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"mud-creek-capstone.md","mimeType":"text/markdown","bytes":3138,"sha256":"8abafd73397f4b1cada679751451832c1ce649b1605fd0f570bc16c0aad99c37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mud-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Mud Creek landslide on California’s Big Sur coast in May 2017.","caption":"The Mud Creek landslide on California’s Big Sur coast in May 2017. The slide buried Highway 1 and extended the shoreline. USGS photograph.","credit":"Pacific Coastal and Marine Science Center","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg#Licensing","width":1280,"height":847,"imageDate":"2017-05-27"},"figureCaption":"The Mud Creek landslide on California’s Big Sur coast in May 2017. The slide buried Highway 1 and extended the shoreline. USGS photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":28,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/mud-creek-commons.json","evidenceSha256":"5d22a8ea6622f52ea2221f5311d6ff3b31bad54960946b8901258e7f09ecc441","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":362063,"sourceCount":3,"url":"/cases/mud-creek"},{"id":"milltown-dam-removal","title":"Milltown Reservoir — dam removal and contaminated sediment remediation","summary":"Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.","topics":["geoenvironmental","dewatering","earthworks","dams-levees","monitoring"],"country":"United States","region":"Missoula County, Montana","owner":"US EPA / Montana and responsible-party partners","year":2009,"yearLabel":"Case reference year","projectType":"Remediation and restoration","methods":["Sediment dewatering","Excavation and capping","Groundwater response"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"EPA’s five-year review describes the implemented remedy and site components. Different operable units have different completion status.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The 2021 review records remedial work beginning in 2006 and final dam removal in March 2009; later site restoration and monitoring followed.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The five-year review evaluates remedy performance; it does not state that every Clark Fork operable unit is complete.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased contaminated-sediment removal plan while maintaining downstream water quality and protecting nearby wells.","inputs":["Extract the remedy scope for the reservoir operable unit, not the entire Clark Fork site.","Identify sediment handling, groundwater and restored-channel monitoring information."],"deliverables":["Prepare a dewatering/well-impact assessment and sediment handling sequence.","Compare excavation, onsite containment and capping with monitoring/closure criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Third five-year review — Milltown Reservoir/Clark Fork","url":"https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P101GPHY.TXT","publisher":"US EPA","year":2021,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Milltown Reservoir Sediments cleanup profile","url":"https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0800445","publisher":"US EPA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Excavation.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","publisher":"Wikimedia Commons / M Kustudia","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"milltown-dam-removal.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/milltown-dam-removal/download/schematic"},{"id":"project-image","title":"Excavation.jpg","kind":"project-image","fileName":"milltown-dam-removal.jpg","mimeType":"image/jpeg","bytes":92446,"sha256":"c89444bbdf35eaa35ede26e64248eef43c17962bdb52b85aa8b7ea6a94ab395b","sourceId":"s3","license":"CC BY-SA 3.0","width":640,"height":473,"credit":"M Kustudia","sourceUrl":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-10-14","evidenceFile":"image-provenance/milltown-dam-removal-commons.json","evidenceSha256":"b542555b3a16fa6c34d99f848043d15ea64dc6789961e70910b6bfc421dd6895","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/8f/Excavation.jpg","downloadUrl":"/cases/milltown-dam-removal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"milltown-dam-removal-capstone.md","mimeType":"text/markdown","bytes":3054,"sha256":"7aee3520ebde422ce33cc80a110f0ed5313bdaa02a3ba95536fc18e40182447a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/milltown-dam-removal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Remediation work at the Milltown Reservoir Superfund site in Montana.","caption":"Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.","credit":"M Kustudia","sourceUrl":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":640,"height":473,"imageDate":"2008-10-14"},"figureCaption":"Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":34,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/milltown-dam-removal-commons.json","evidenceSha256":"b542555b3a16fa6c34d99f848043d15ea64dc6789961e70910b6bfc421dd6895","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":96491,"sourceCount":3,"url":"/cases/milltown-dam-removal"},{"id":"hanford-barrier","title":"Prototype Hanford Barrier — long-term infiltration control","summary":"Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.","topics":["geoenvironmental","seepage","monitoring","earthworks"],"country":"United States","region":"Hanford Site, Washington","owner":"US Department of Energy / PNNL","year":2024,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Evapotranspiration cover","Unsaturated flow","Water balance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The FY 2024 report presents barrier sections, instrumentation and water-balance observations; it is a performance report, not a universal cover design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The report covers July 2023–June 2024 observations and was published in 2025.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Annual measured-performance results and instrument maintenance are documented.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a cover-design and monitoring study that accounts for both central capillary storage and lateral edge drainage.","inputs":["Extract layer geometry, climate observations and the stated drainage criterion.","Distinguish central-cover performance from gravel/riprap side-slope behaviour."],"deliverables":["Prepare a seasonal water-storage calculation and a sensitivity study for precipitation and vegetation.","Design a monitoring layout that can detect edge effects and instrument failure.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Prototype Hanford Barrier performance monitoring — FY 2024","url":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","publisher":"PNNL / US DOE","year":2025,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"The report is openly downloadable at the publisher; PNNL reuse terms require separate consideration, so it is linked rather than mirrored.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hanford-barrier.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hanford-barrier/download/schematic"},{"id":"project-image","title":"Prototype Hanford Barrier — original annotated aerial photograph","kind":"project-image","fileName":"hanford-barrier.jpeg","mimeType":"image/jpeg","bytes":459599,"sha256":"63cb16ca1395d7d5ff0fde51b014a0d920e143cf1127e6bd90d4abdf56479bc1","sourceId":"s1","license":"PNNL permission for noncommercial scientific and educational use","width":1449,"height":1177,"credit":"Pacific Northwest National Laboratory / U.S. Department of Energy; Figure 1 in Thomle and Linneman (2025), modified in that report from DOE-RL (2016)","sourceUrl":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","licenseUrl":"https://www.pnnl.gov/important-notices","imageDate":"1994-08-09","evidenceFile":"image-provenance/hanford-barrier-source.json","evidenceSha256":"d2328302fe4d206a8b7ebc2cef155b3bc29e55e057a951732eb7e5fdfc0306d1","transformations":"Unchanged complete original embedded image extracted from the identified PDF. Original labels retained; no crop, retouching, or newly added annotation.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/hanford-barrier/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hanford-barrier-capstone.md","mimeType":"text/markdown","bytes":3018,"sha256":"3674df64a7230934309cfd38e9079fda91df6bba4d8bcecbdddb3652ef3cf96d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hanford-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Annotated aerial photograph of the completed Prototype Hanford Barrier in August 1994.","caption":"Annotated aerial photograph of the completed Prototype Hanford Barrier on August 9, 1994, reproduced as Figure 1 in PNNL-36586 (2025). The labels and outlines are part of the original published figure.","credit":"Pacific Northwest National Laboratory / U.S. Department of Energy; Figure 1 in Thomle and Linneman (2025), modified in that report from DOE-RL (2016)","sourceUrl":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","license":"PNNL permission for noncommercial scientific and educational use","licenseUrl":"https://www.pnnl.gov/important-notices","width":1449,"height":1177,"imageDate":"1994-08-09","preserveWholeImage":true},"figureCaption":"Annotated aerial photograph of the completed Prototype Hanford Barrier on August 9, 1994, reproduced as Figure 1 in PNNL-36586 (2025). The labels and outlines are part of the original published figure.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":35,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hanford-barrier-source.json","evidenceSha256":"d2328302fe4d206a8b7ebc2cef155b3bc29e55e057a951732eb7e5fdfc0306d1","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":463608,"sourceCount":1,"url":"/cases/hanford-barrier"},{"id":"inuvik-tuktoyaktuk","title":"Inuvik–Tuktoyaktuk Highway — embankment over permafrost","summary":"The highway used fill placement and separation geotextile to protect permafrost, with much construction undertaken in winter.","topics":["cold-regions","earthworks","problem-soils","monitoring"],"country":"Canada","region":"Northwest Territories","owner":"Government of the Northwest Territories","year":2017,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Permafrost preservation","Fill-only construction","Thermal monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The owner describes the construction strategy; a Canadian geological report documents regional ground temperatures before and after construction.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner project page documents opening and winter construction strategy; use source milestones rather than an assumed year-round programme.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The owner page and regional ground-temperature report support performance review.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an embankment concept for ice-rich permafrost and compare seasonal construction and thaw-settlement risk.","inputs":["Extract the owner’s construction constraints and select a monitored ground-temperature location.","Record how ground-ice and soil-property information differ along the alignment."],"deliverables":["Prepare a thermal/thaw-settlement screening model and sensitivity to warming and drainage.","Plan borrow, winter hauling, geotextile placement and long-term temperature monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Inuvik Tuktoyaktuk Highway project","url":"https://www.inf.gov.nt.ca/en/ITH","publisher":"Government of the Northwest Territories","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Permafrost ground-temperature synthesis 2013–2019, GSC OF 8656","url":"https://publications.gc.ca/collections/collection_2021/rncan-nrcan/m183-2/M183-2-8656-eng.pdf","publisher":"Geological Survey of Canada / NWT Geological Survey","year":2020,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ITH Caribou Hills.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","publisher":"Wikimedia Commons / Samuell","year":2021,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"inuvik-tuktoyaktuk.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/schematic"},{"id":"project-image","title":"ITH Caribou Hills.jpg","kind":"project-image","fileName":"inuvik-tuktoyaktuk.jpg","mimeType":"image/jpeg","bytes":291929,"sha256":"55ee8cf3a180f741ff152d7c513710111400d26fa703c4819812f989a97ae89b","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":853,"credit":"Samuell","sourceUrl":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2021-02-13 17:33:04","evidenceFile":"image-provenance/inuvik-tuktoyaktuk-commons.json","evidenceSha256":"4c6669c299ecf13f73a372be900e2dffe1f4f769b807e13b8c03bd847a5d6646","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/85/ITH_Caribou_Hills.jpg","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"inuvik-tuktoyaktuk-capstone.md","mimeType":"text/markdown","bytes":3026,"sha256":"30173d5e66902d254c9880b2330409a9eda5a055399b3e40289fe7f9edbe9560","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik.","caption":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik. Photograph of the actual permafrost-road project corridor.","credit":"Samuell","sourceUrl":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":853,"imageDate":"2021-02-13 17:33:04"},"figureCaption":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik. Photograph of the actual permafrost-road project corridor.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":37,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/inuvik-tuktoyaktuk-commons.json","evidenceSha256":"4c6669c299ecf13f73a372be900e2dffe1f4f769b807e13b8c03bd847a5d6646","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":295923,"sourceCount":3,"url":"/cases/inuvik-tuktoyaktuk"},{"id":"dalton-air-convection","title":"Dalton Highway MP 209–222 — air-convection embankment trial","summary":"Twelve embankment test sections compared air-convection shoulder geometry and rock classes over thaw-unstable permafrost near milepost 219.","topics":["cold-regions","earthworks","monitoring","delivery"],"country":"United States","region":"Alaska","owner":"Alaska Department of Transportation and Public Facilities","year":2022,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Air-convection embankment","Insulation","Thermal monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The final report documents sections installed in 2017–2018 and three years of monitoring; it evaluates thermal performance rather than a complete climate-life prediction.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Test sections were installed in 2017–2018 and monitored for three years.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The 2022 final report presents the trial performance evaluation.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select an embankment shoulder treatment using measured thermal response and construction quantity comparisons.","inputs":["Extract section dimensions, rock class and ground-temperature records.","Separate effects of embankment height, rock size and shoulder width."],"deliverables":["Compare thermal performance and rock quantities for the test configurations.","Specify monitoring and maintenance needed to retain open pore spaces and drainage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Air Convection Embankment experimental feature — final report","url":"https://rosap.ntl.bts.gov/view/dot/65788","publisher":"Alaska DOT&PF","year":2022,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"dalton-air-convection.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/dalton-air-convection/download/schematic"},{"id":"project-image","title":"Dalton Highway — air-convection embankment placement","kind":"project-image","fileName":"dalton-air-convection-r13.jpeg","mimeType":"image/jpeg","bytes":266437,"sha256":"41cd81354e831ab47d34011a8f272506fbc40a1cf387a967fe8e943ae878971d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1472,"height":1103,"credit":"Alaska DOT&PF; report by Matt Billings and Michael Berggren (2022)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/65788","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/65788","imageDate":null,"evidenceFile":"image-provenance/dalton-air-convection-r13-source.json","evidenceSha256":"1b5ef9ae1e3e062b9b5e227cc5c3cbb23389ce29fda155dc9bf4906d670eef2c","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://rosap.ntl.bts.gov/view/dot/65788/dot_65788_DS1.pdf","originalSha256":"f6f2a75551ad504c4d381a1170961c89e6da7a9201e2a5498a3340cbd863068c","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/dalton-air-convection/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"dalton-air-convection-capstone.md","mimeType":"text/markdown","bytes":2644,"sha256":"e683517c5d3198347da8f1c967c583b58f2e6093f00c2cc29af1a274f241b638","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/dalton-air-convection/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","caption":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","credit":"Alaska DOT&PF; report by Matt Billings and Michael Berggren (2022)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/65788","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/65788","width":1472,"height":1103,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":38,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/dalton-air-convection-r13-source.json","evidenceSha256":"1b5ef9ae1e3e062b9b5e227cc5c3cbb23389ce29fda155dc9bf4906d670eef2c","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3612,"sourceCount":1,"url":"/cases/dalton-air-convection"},{"id":"ky499-swelling","title":"KY 499, Estill County — pavement swelling investigation","summary":"Field and laboratory work investigated heave of a relatively young pavement over compacted clay shale and distinguished wetting expansion from a suspected sulfate reaction.","topics":["problem-soils","laboratory-testing","earthworks","site-investigation"],"country":"United States","region":"Estill County, Kentucky","owner":"Kentucky Transportation Cabinet / University of Kentucky","year":2005,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Swell testing","Moisture effects","Subgrade diagnosis"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The report tests the cause of distress and discusses the lime-treated subgrade; it does not establish a generic stabilization prescription.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The technical report contains field/laboratory findings; a later construction closeout record was not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a laboratory investigation that distinguishes alternative heave mechanisms before selecting pavement rehabilitation.","inputs":["Extract moisture, shale and swell-test results from the investigation.","Identify sampling depth, test stress and wetting conditions needed for a field-heave estimate."],"deliverables":["Develop a mechanism-based diagnosis and a layered heave sensitivity calculation.","Compare moisture control, removal/replacement and treatment using compatible test evidence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Swelling Pavement: KY 499 Estill County, KTC-05-01","url":"https://uknowledge.uky.edu/ktc_researchreports/150/","publisher":"Kentucky Transportation Center / project researchers","year":2005,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"ky499-swelling.svg","mimeType":"image/svg+xml","bytes":1074,"sha256":"f31305ba349170d998041ee804cfc6952d08a61de199d40088aca881bad4100f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ky499-swelling/download/schematic"},{"id":"project-image","title":"KY 499, Estill County — observed pavement swelling","kind":"project-image","fileName":"ky499-swelling-r13.jpeg","mimeType":"image/jpeg","bytes":14332,"sha256":"25b496c7f022b670a9288eba0f888ca9ee8acc5a142642e0c4c54bdf2609db34","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":346,"height":216,"credit":"Tony L. Beckham and Tommy C. Hopkins; Kentucky Transportation Center, University of Kentucky (2005)","sourceUrl":"https://uknowledge.uky.edu/ktc_researchreports/150/","licenseUrl":"https://uknowledge.uky.edu/ktc_researchreports/150/","imageDate":null,"evidenceFile":"image-provenance/ky499-swelling-r13-source.json","evidenceSha256":"f2514f82e5836ee60da40128ec81fe228f8d1c8c55402ad9585d6a22c4b056d6","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://uknowledge.uky.edu/cgi/viewcontent.cgi?article=1153&context=ktc_researchreports","originalSha256":"80004554769d719cae1616026c44940197d11fac6c367330df6a0f0d63ac1474","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/ky499-swelling/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"ky499-swelling-capstone.md","mimeType":"text/markdown","bytes":2872,"sha256":"581410bda52ce64a5f6f4e201c2afaaa755d7ed584e3d457ae6bef68a6c48c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ky499-swelling/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Observed pavement distortion on KY 499 in Estill County, Kentucky, documented in the swelling investigation report.","caption":"Observed pavement distortion on KY 499 in Estill County, Kentucky, documented in the swelling investigation report.","credit":"Tony L. Beckham and Tommy C. Hopkins; Kentucky Transportation Center, University of Kentucky (2005)","sourceUrl":"https://uknowledge.uky.edu/ktc_researchreports/150/","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://uknowledge.uky.edu/ktc_researchreports/150/","width":346,"height":216,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Observed pavement distortion on KY 499 in Estill County, Kentucky, documented in the swelling investigation report.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":39,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/ky499-swelling-r13-source.json","evidenceSha256":"f2514f82e5836ee60da40128ec81fe228f8d1c8c55402ad9585d6a22c4b056d6","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3946,"sourceCount":1,"url":"/cases/ky499-swelling"},{"id":"texas-sh6-sh21","title":"Texas SH 6 and SH 21 — expansive-subgrade distress","summary":"A TxDOT-funded project investigated swelling clay beneath distressed pavement sections and evaluated characterization and stabilization alternatives.","topics":["problem-soils","laboratory-testing","earthworks","site-investigation"],"country":"United States","region":"Texas","owner":"Texas Department of Transportation / Texas A&M","year":1996,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Expansive subgrade","Moisture/strength characterization","Treatment selection"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The final research report covers site investigation, interpretation and treatment recommendations; the public catalog alone is not a rehabilitation plan set.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"A final research report is publicly indexed; complete construction records are not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a subgrade investigation and rehabilitation alternatives study for a selected documented pavement section.","inputs":["Extract one site’s profile, moisture and laboratory data from the final report.","Keep the two highway sections distinct when comparing properties and distress."],"deliverables":["Prepare a parameter register, moisture/heave mechanism assessment and test matrix.","Compare a moisture barrier, soil replacement and a verified stabilizer treatment.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Investigation of swelling clay soils in subgrades of SH 6 and SH 21","url":"https://rosap.ntl.bts.gov/view/dot/84762","publisher":"TxDOT / Texas A&M","year":1996,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"texas-sh6-sh21.svg","mimeType":"image/svg+xml","bytes":1074,"sha256":"f31305ba349170d998041ee804cfc6952d08a61de199d40088aca881bad4100f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/texas-sh6-sh21/download/schematic"},{"id":"project-image","title":"Texas SH 6 — pavement distress over swelling clay","kind":"project-image","fileName":"texas-sh6-sh21-r13.png","mimeType":"image/png","bytes":274228,"sha256":"0cd4b7b8af15bdf841f4bfb2310c699fd7a2209492d7e470b1dcec98ca4aa54d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":701,"height":469,"credit":"Seong-wan Park, Robert L. Lytton and Joe W. Button; Texas Transportation Institute / Texas A&M (1996)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/84762","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/84762","imageDate":"1996","evidenceFile":"image-provenance/texas-sh6-sh21-r13-source.json","evidenceSha256":"0ba8ade57932edc72eae1aae2584a6aa62831778b5d368a0d5118747d782e11c","transformations":"Rendered the original Figure 6 photograph region from the scanned report page. Surrounding page margins and caption excluded; no alteration, reconstruction, or retouching within the photograph.","originalUrl":"https://static.tti.tamu.edu/tti.tamu.edu/documents/2965-1F.pdf","originalSha256":"8ca2867a7d79f743350f9ac93847c2c1cd02eec21a912b3b924cf8f25996008d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/texas-sh6-sh21/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"texas-sh6-sh21-capstone.md","mimeType":"text/markdown","bytes":2803,"sha256":"6dc6b1867827ec8c1bb1abebd7ac50b29e8c78784634e9d27226dbdd57d3ef70","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/texas-sh6-sh21/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","caption":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","credit":"Seong-wan Park, Robert L. Lytton and Joe W. Button; Texas Transportation Institute / Texas A&M (1996)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/84762","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/84762","width":701,"height":469,"imageDate":"1996","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":40,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/texas-sh6-sh21-r13-source.json","evidenceSha256":"0ba8ade57932edc72eae1aae2584a6aa62831778b5d368a0d5118747d782e11c","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3877,"sourceCount":1,"url":"/cases/texas-sh6-sh21"},{"id":"us98-revetment","title":"US 98, Florida — coastal roadway revetment","summary":"Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.","topics":["scour-erosion","coastal-offshore","reinforced-soil","earthworks","delivery"],"country":"United States","region":"Florida Panhandle","owner":"Florida Department of Transportation","year":2018,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Articulated concrete blocks","Filters","Coastal erosion"],"documentationLevel":"technical-case","design":{"availability":"available","summary":"The FHWA case includes an as-built shoulder section, construction details and comparison with retaining-wall protection.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $5.25 million for resilience improvements and a separate 1,000-ft comparison: $490,000 protection versus $724,000 reconstruction.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The study concerns recovery after the October 2018 hurricane; it also compares performance of protection installed after an earlier storm.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"An as-built shoulder detail and observed performance comparisons appear in the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a roadway-embankment protection concept with particular attention to drains and interfaces where protection can be discontinuous.","inputs":["Extract the published shoulder section and treatment layers.","Establish wave/current demands and filtration requirements from appropriate site data."],"deliverables":["Check filter compatibility, toe/interface stability and treatment limits.","Reproduce the stated cost comparison and test sensitivity to storm recurrence and residual damage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-025 — Hurricane Michael US 98 revetment","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","publisher":"FHWA / FDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us98-revetment","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us98-revetment.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/schematic"},{"id":"us98-revetment","title":"FHWA-HIF-23-025, US98 revetment","kind":"report","fileName":"us98-revetment.pdf","mimeType":"application/pdf","bytes":523326,"sha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/us98-revetment/download/us98-revetment"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us98-revetment-reference-values.csv","mimeType":"text/csv","bytes":875,"sha256":"ebdcd5f5ffad1d2b5e9513da41212acf5e40f818570234f82356c2bf7ff5a976","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us98-revetment/download/reference-values"},{"id":"project-image","title":"US 98 — concrete-block coastal revetment","kind":"project-image","fileName":"us98-revetment-r13.jpeg","mimeType":"image/jpeg","bytes":50907,"sha256":"2c0e7866aa35ba362b4dfdcda8d9076ca7eba3715ccab0e01743150f686e3760","sourceId":"s1","license":"U.S. government photograph — credited to FHWA in the source","width":513,"height":385,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","imageDate":null,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","originalSha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us98-revetment/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us98-revetment-capstone.md","mimeType":"text/markdown","bytes":3797,"sha256":"7b8952f37ce686120c8c8bfddac5f073549d9d12f5da1ebf66a55dc89a96e6ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","caption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","license":"U.S. government photograph — credited to FHWA in the source","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","width":513,"height":385,"imageDate":null,"imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph"},"figureCaption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":45,"referenceValues":[{"label":"Resilience-improvement cost","value":5250000,"unit":"USD","scope":"Reported project resilience improvements.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Protection comparison cost","value":490000,"unit":"USD per 1,000 ft","scope":"Articulated-concrete-block protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reconstruction comparison cost","value":724000,"unit":"USD per 1,000 ft","scope":"Road reconstruction without equivalent protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":580308,"sourceCount":1,"url":"/cases/us98-revetment"},{"id":"us34-erosion","title":"US 34, Iowa — flood-resistant embankment matting","summary":"After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.","topics":["scour-erosion","earthworks","reinforced-soil","delivery"],"country":"United States","region":"Mills County, Iowa","owner":"Iowa Department of Transportation","year":2021,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Erosion-resistant matting","Embankment protection","Life-cycle comparison"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents flexible matting, economic assumptions and the treated extent; full construction drawings are not attached.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The case separates $6.8 million emergency restoration from $2.3 million resilience improvements and reports a benefit-cost ratio of 1.07.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Emergency restoration was completed in May 2019; the matting installation followed approval in 2021.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case describes installed protection along 2.25 miles and the economic review.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a flood-resistant embankment protection scheme that explicitly includes residual damage in its economic assessment.","inputs":["Extract the damaged/treatment extents and recurrence assumptions.","Identify geotechnical filter, anchorage and subgrade conditions needed beyond the case summary."],"deliverables":["Prepare a typical treatment section and interface/filter checks.","Reproduce the benefit-cost calculation and vary residual repair costs and flood frequency.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-027 — US 34 erosion control","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","publisher":"FHWA / Iowa DOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us34-erosion","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us34-erosion.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us34-erosion/download/schematic"},{"id":"us34-erosion","title":"FHWA-HIF-23-027, US34 erosion control","kind":"report","fileName":"us34-erosion.pdf","mimeType":"application/pdf","bytes":366024,"sha256":"7942f01369a05652a64ffb9fff38fbdf367db6975c699bcb2de9e6920e2b9cf6","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":2,"downloadUrl":"/cases/us34-erosion/download/us34-erosion"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us34-erosion-reference-values.csv","mimeType":"text/csv","bytes":953,"sha256":"39a03e8e7b91c4f7c1241dd2ede1cb6d0f02a09e905ce7bc52576222b171f78e","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us34-erosion/download/reference-values"},{"id":"project-image","title":"US 34 flood damage — FHWA Figure 2","kind":"project-image","fileName":"us34-erosion.jpeg","mimeType":"image/jpeg","bytes":120095,"sha256":"a7b471f0ab8cb533098c5e0129b471c60b2cb76e148c205314b7e9c13737259f","sourceId":"s1","license":"Public domain — U.S. federal government work","width":791,"height":505,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/us34-erosion-source.json","evidenceSha256":"4fd46c5561bab26a65674c90334464d50d19f44de1eb5bd69693ee64d7c631e9","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us34-erosion/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us34-erosion-capstone.md","mimeType":"text/markdown","bytes":3808,"sha256":"739db4e27ca57483140774286d65b7273782d3f9cd4796652900b372f1e10d17","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us34-erosion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding.","caption":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding. FHWA photograph of the Iowa project documented in the erosion-protection case.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":791,"height":505,"imageDate":null},"figureCaption":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding. FHWA photograph of the Iowa project documented in the erosion-protection case.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":46,"referenceValues":[{"label":"Emergency restoration cost","value":6800000,"unit":"USD","scope":"Emergency restoration following the 2019 event.","sourceId":"s1","locator":"Page 1, emergency restoration","basis":"As reported; no escalation or inflation adjustment."},{"label":"Resilience-improvement cost","value":2300000,"unit":"USD","scope":"Concrete-block matting resilience treatment.","sourceId":"s1","locator":"Page 1, Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Treatment extent","value":2.25,"unit":"mile","scope":"Reported embankment protection extent.","sourceId":"s1","locator":"Resilience Features","basis":"Reported project length."},{"label":"Reported benefit-cost ratio","value":1.07,"unit":"dimensionless","scope":"Source economic evaluation; reproduce its assumptions before comparison.","sourceId":"s1","locator":"Resilience Features","basis":"Source calculation result."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us34-erosion-source.json","evidenceSha256":"4fd46c5561bab26a65674c90334464d50d19f44de1eb5bd69693ee64d7c631e9","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":492283,"sourceCount":1,"url":"/cases/us34-erosion"},{"id":"palm-jumeirah","title":"Palm Jumeirah — densification of reclaimed sand","summary":"The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.","topics":["ground-improvement","coastal-offshore","seismic","earthworks"],"country":"United Arab Emirates","region":"Dubai","owner":"Nakheel","year":2006,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","Densification verification","Liquefaction screening"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner-associated account describes the compaction process and construction sequence. Site-specific CPT data and the complete foundation design package are not provided.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a field trial and acceptance programme for vibrocompaction of a reclaimed waterfront building plot.","inputs":["Use the source to define the treatment sequence and imported/backfill material interfaces.","Specify a study sand profile and groundwater level, then identify tests required before adopting design parameters."],"deliverables":["Compare trial-grid spacings using settlement and CPT-based acceptance criteria.","Develop treatment quantities, verification coverage and a response to refusal or poor improvement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why should vibratory power records be supplemented with independent ground testing?","How do fines content and drainage affect the suitability of vibrocompaction?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Vibro-compaction at Palm Jumeirah","url":"https://www.theviewpalm.ae/en/museum/vibro-compaction","publisher":"The View at The Palm / project exhibition","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Palm Jumeirah on 8 May 2008 Pict 1.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","publisher":"Wikimedia Commons / Imre Solt","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"palm-jumeirah.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/palm-jumeirah/download/schematic"},{"id":"project-image","title":"Palm Jumeirah on 8 May 2008 Pict 1.jpg","kind":"project-image","fileName":"palm-jumeirah.jpg","mimeType":"image/jpeg","bytes":280492,"sha256":"6317897946868e65597bcbc43a59bc9ddd1543a3ba8b07b4b117ebd928b81b9d","sourceId":"s2","license":"CC BY-SA 3.0","width":1229,"height":834,"credit":"Imre Solt","sourceUrl":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/","imageDate":"2008-05-08","evidenceFile":"image-provenance/palm-jumeirah-commons.json","evidenceSha256":"3d6fd60500ff7e59fa17eae9ca370fe5cb3fbb367e86fac739101d61a978d745","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/09/Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","downloadUrl":"/cases/palm-jumeirah/download/project-image","originalSha1":"9801565839b06dc5480f7e16e994dd5a0aeecc35","originalSha256":"6317897946868e65597bcbc43a59bc9ddd1543a3ba8b07b4b117ebd928b81b9d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"palm-jumeirah-capstone.md","mimeType":"text/markdown","bytes":2974,"sha256":"a3757f6fd38ceeed2ee732037f47ceea1e441f986a62f88dc5a160a9de2ded99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/palm-jumeirah/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Palm Jumeirah viewed from a helicopter in May 2008.","caption":"Palm Jumeirah viewed from a helicopter in May 2008. The actual reclaimed island is shown after the principal ground-treatment period.","credit":"Imre Solt","sourceUrl":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/","width":1229,"height":834,"imageDate":"2008-05-08","imageDownloadAllowed":true},"figureCaption":"Palm Jumeirah viewed from a helicopter in May 2008. The actual reclaimed island is shown after the principal ground-treatment period.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":57,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/palm-jumeirah-commons.json","evidenceSha256":"3d6fd60500ff7e59fa17eae9ca370fe5cb3fbb367e86fac739101d61a978d745","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":284654,"sourceCount":2,"url":"/cases/palm-jumeirah"},{"id":"isabella-dam","title":"Isabella Dam modifications — seismic, seepage and spillway risk","summary":"The main and auxiliary dams were modified to address combined seismic, seepage and flood-passage concerns. Owner records describe dam raises, downstream buttress work, filters, drainage and major spillway excavation.","topics":["dams-levees","seepage","seismic","rock","earthworks"],"country":"United States","region":"Kern County, California","owner":"US Army Corps of Engineers","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Embankment buttress","Filter compatibility","Rock excavation","Dam raise"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE publishes the programme scope and completion milestones. A study should keep the different failure modes separate before combining their risk-reduction measures.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The owner identifies a $204 million Phase II construction contract awarded in 2017. This amount is contract scope, not the whole programme’s final cost.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE reports substantial completion of the Phase II dam and spillway work in 2022; related facilities are separate phases.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"USACE documents a reduced dam-risk classification and lifting of operating restrictions in 2023.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coordinated rehabilitation concept for an embankment dam with both seepage and seismic deficiencies.","inputs":["Extract the owner’s modification components and their targeted failure modes.","Build study sections for the embankment, filter/drain system and spillway excavation."],"deliverables":["Compare stability and seepage checks before and after buttressing and drainage improvements.","Sequence the work to preserve flood passage and define filter-placement quality controls.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which risk remains if a dam raise is designed without checking seepage gradients?","How should rock excavation and embankment placement share temporary drainage and access?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Isabella Dam safety modification project","url":"https://www.spk.usace.army.mil/Missions/Civil-Works/Isabella-Dam-Safety-Modification-Project/show/all/","publisher":"USACE Sacramento District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Operating restrictions lifted after improvements","url":"https://www.spk.usace.army.mil/Media/News-Releases/Article/3465598/usace-lowers-isabella-dam-risk-rating-lifts-operating-restrictions/","publisher":"USACE Sacramento District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Aerial view of the Isabella Dam Safety Modification Project.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers, Sacramento District","year":2022,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"isabella-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/isabella-dam/download/schematic"},{"id":"project-image","title":"Aerial view of the Isabella Dam Safety Modification Project.jpg","kind":"project-image","fileName":"isabella-dam.jpg","mimeType":"image/jpeg","bytes":575748,"sha256":"f66ddb737d1275d09742d361d46183bcf320b45382a1625ec3e4af5f0f9d5750","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"U.S. Army Corps of Engineers, Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg#Licensing","imageDate":"2022-09-13 20:00:00","evidenceFile":"image-provenance/isabella-dam-commons.json","evidenceSha256":"585cadac20100e6a89c699ae881d201bb11fd0a8f347cfe93812aaa5a2d07c09","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bd/Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","downloadUrl":"/cases/isabella-dam/download/project-image","originalSha1":"bb9ba911a669570736c2b7ca7f7f5b5e1079e431","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"isabella-dam-capstone.md","mimeType":"text/markdown","bytes":3526,"sha256":"4abb6ee3c8ffc12bed66ea962c61321ddb882f4d54ec0ee44678422325316d28","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/isabella-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022.","caption":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022. USACE construction photograph of the actual dams and spillway works.","credit":"U.S. Army Corps of Engineers, Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg#Licensing","width":1280,"height":960,"imageDate":"2022-09-13 20:00:00","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022. USACE construction photograph of the actual dams and spillway works.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":64,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/isabella-dam-commons.json","evidenceSha256":"585cadac20100e6a89c699ae881d201bb11fd0a8f347cfe93812aaa5a2d07c09","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":580259,"sourceCount":3,"url":"/cases/isabella-dam"},{"id":"qinghai-tibet-railway","title":"Qinghai–Tibet Railway — crushed-rock embankments over warming permafrost","summary":"Instrumented railway embankments provide evidence on the cooling and deformation of crushed-rock configurations. Researchers compare thermal performance, sunny/shady slope effects and continuing permafrost change.","topics":["cold-regions","earthworks","monitoring","problem-soils"],"country":"China","region":"Qinghai–Tibet Plateau","owner":"Qinghai–Tibet Railway","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Air-convection embankments","Thermal monitoring","Thaw deformation"],"documentationLevel":"monitoring-study","design":{"availability":"partial","summary":"The monitoring paper reports several embankment configurations. Later proposed reinforcement is research, not proof that every monitored section was reconstructed with that measure.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select an embankment cross-section for warm permafrost using both thermal and deformation performance.","inputs":["Extract the monitoring period and distinguish the compared crushed-rock arrangements.","Define climate, aspect and rock-layer permeability sensitivities for the study section."],"deliverables":["Compare seasonal cooling and thaw-depth trends under alternative geometries.","Develop maintenance checks for clogging, slope asymmetry and track-level movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a rock layer lose cooling effectiveness even when its thickness is unchanged?","Why should the warmest year and cumulative thermal trend both inform maintenance decisions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Cooling performance and deformation of railway embankments","url":"https://www.sciencedirect.com/science/article/pii/S0013795219312098","publisher":"Tai and coauthors / Engineering Geology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Performance and reinforcement study","url":"https://pmc.ncbi.nlm.nih.gov/articles/PMC11471204/","publisher":"Research authors / open journal article","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Lhassa-Xining railway.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","publisher":"Wikimedia Commons / This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","year":2012,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"qinghai-tibet-railway.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/qinghai-tibet-railway/download/schematic"},{"id":"project-image","title":"Lhassa-Xining railway.JPG","kind":"project-image","fileName":"qinghai-tibet-railway.jpg","mimeType":"image/jpeg","bytes":577578,"sha256":"e3bdb64f0cac308615d1017bb64abcec0d6a428ad400ccf8d23332aaaef94bc0","sourceId":"s3","license":"CC0","width":1280,"height":961,"credit":"This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","sourceUrl":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2012-05-14","evidenceFile":"image-provenance/qinghai-tibet-railway-commons.json","evidenceSha256":"570452a99f700b14e881a3d7d43b31edcc6795fb8a69c2b1e322e281bafca47d","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/90/Lhassa-Xining_railway.JPG","downloadUrl":"/cases/qinghai-tibet-railway/download/project-image","originalSha1":"e561258d5e03d572416a91865a11a4421aca973f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"qinghai-tibet-railway-capstone.md","mimeType":"text/markdown","bytes":3908,"sha256":"9fd34b9e382fbf6d1d0107977d066f9ff370d3eb2ecab7364cad29b308c04651","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/qinghai-tibet-railway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Qinghai–Tibet railway route beyond Golmud.","caption":"The Qinghai–Tibet railway route beyond Golmud. This is corridor context; it is not labeled as one of the instrumented cross-sections in the cited monitoring papers.","credit":"This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","sourceUrl":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":961,"imageDate":"2012-05-14","imageDownloadAllowed":true},"figureCaption":"The Qinghai–Tibet railway route beyond Golmud. This is corridor context; it is not labeled as one of the instrumented cross-sections in the cited monitoring papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":86,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/qinghai-tibet-railway-commons.json","evidenceSha256":"570452a99f700b14e881a3d7d43b31edcc6795fb8a69c2b1e322e281bafca47d","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":582454,"sourceCount":3,"url":"/cases/qinghai-tibet-railway"},{"id":"sydney-olympic-remediation","title":"Sydney Olympic Park — engineered waste mounds and leachate management","summary":"Rehabilitated waste areas form parkland above engineered containment. The authority describes the continuing management of landfills and a wetland-based system for treating collected leachate.","topics":["geoenvironmental","seepage","earthworks","monitoring"],"country":"Australia","region":"Homebush Bay, New South Wales","owner":"Sydney Olympic Park Authority","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Waste containment","Leachate collection","Water balance","Post-closure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner explains the treatment strategy and the regulator specifies ongoing management obligations. Parkland use does not remove containment and monitoring duties.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The authority and regulator describe ongoing containment management rather than an unrestricted clean-soil site.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a post-remediation management plan that keeps recreational land use compatible with waste containment.","inputs":["Map the relationship between waste mounds, drainage and treatment from the owner description.","Identify obligations in the regulator’s ongoing maintenance order."],"deliverables":["Prepare a leachate water balance with wet and dry season scenarios.","Specify cap inspections, settlement surveys and action limits at public-use interfaces.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can changing irrigation practice affect both vegetation and leachate generation?","Which engineering responsibilities persist after a site opens as a public park?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Landfill leachate treatment","url":"https://www.sydneyolympicpark.nsw.gov.au/parklands/sustainability/innovative-landfill-waste-water-treatment","publisher":"Sydney Olympic Park Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Ongoing maintenance order amendment","url":"https://app.epa.nsw.gov.au/resources/clm/docs/html/n20224440.htm","publisher":"NSW Environment Protection Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Sydney Olympic Park, New South Wales (aerial view, 2010).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","publisher":"Wikimedia Commons / YellowMonkey","year":2010,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sydney-olympic-remediation.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sydney-olympic-remediation/download/schematic"},{"id":"project-image","title":"Sydney Olympic Park, New South Wales (aerial view, 2010).jpg","kind":"project-image","fileName":"sydney-olympic-remediation.jpg","mimeType":"image/jpeg","bytes":351233,"sha256":"a4369361c1b211df204b80c3292789fc5ea9a54345749b0befae6ac299d70882","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":889,"credit":"YellowMonkey","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2010-01-01","evidenceFile":"image-provenance/sydney-olympic-remediation-commons.json","evidenceSha256":"cdab9d43e8077cf22f651fc63274c75be0763dc1ba041684fa59ead7b5100639","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/c1/Sydney_Olympic_Park%2C_New_South_Wales_%28aerial_view%2C_2010%29.jpg","downloadUrl":"/cases/sydney-olympic-remediation/download/project-image","originalSha1":"e881304a765e0c1c4d5397317cab6c75eb67fb1e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sydney-olympic-remediation-capstone.md","mimeType":"text/markdown","bytes":3230,"sha256":"a6c0372ecc5957e69050d7a4744dcff5e6adc3be3c5a8d343ed4ef429a2157cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sydney-olympic-remediation/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Sydney Olympic Park in 2010.","caption":"Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.","credit":"YellowMonkey","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":889,"imageDate":"2010-01-01","imageDownloadAllowed":true},"figureCaption":"Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":96,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sydney-olympic-remediation-commons.json","evidenceSha256":"cdab9d43e8077cf22f651fc63274c75be0763dc1ba041684fa59ead7b5100639","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":355454,"sourceCount":3,"url":"/cases/sydney-olympic-remediation"},{"id":"glenwood-canyon","title":"Glenwood Canyon — reinforced walls on compressible foundations","summary":"Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.","topics":["reinforced-soil","retaining-walls","settlement","monitoring","earthworks","delivery"],"country":"United States","region":"I-70, Colorado","owner":"Colorado Department of Transportation","year":1992,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geosynthetic-reinforced soil","Foundation consolidation","Staged facing","Instrumented performance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The CDOT research synthesis describes the instrumented Glenwood Canyon GRS test wall and long-term differential settlement. A separate 1988 wall study addresses staged facing installation. These are distinct wall experiments within the corridor and should not be combined into one fictitious section.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT dates final-corridor construction to 1980–1992. The selected experimental wall has its own earlier construction and monitoring dates.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The technical report gives measured reinforced-wall performance; the owner history records completion of the broader corridor.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select one documented Glenwood Canyon reinforced-wall section and reconcile its reinforcement response with foundation settlement and facing movements.","inputs":["Identify the chosen test section, reinforcement, fill and underlying compressible profile in the technical report.","Compile displacement and settlement observations with dates; keep results from other wall systems in a separate comparison."],"deliverables":["Check reinforcement/internal stability separately from foundation settlement and global stability.","Compare single-stage construction with delayed permanent facing, including drainage and survey control.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a reinforced-soil mass remain stable while differential foundation settlement still creates unacceptable facing movement?","Which measured response would distinguish reinforcement stretching from compression of the underlying lacustrine deposits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of reinforced-soil structures — Glenwood Canyon case section","url":"https://rosap.ntl.bts.gov/view/dot/42215/dot_42215_DS1.pdf","publisher":"Colorado Department of Transportation / FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Embankment settlement in Glenwood Canyon — CDOH-DTD-R-88-8","url":"https://trid.trb.org/View/286942","publisher":"Colorado Department of Highways / FHWA; TRB record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"I-70 Glenwood Canyon project history","url":"https://www.codot.gov/about/CDOTHistory/50th-anniversary/glenwood-canyon","publisher":"Colorado Department of Transportation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"I-70 Glenwood Canyon-terabass.jpg","url":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","publisher":"Terabass","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glenwood-canyon.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/schematic"},{"id":"project-image","title":"I-70 in Glenwood Canyon — constrained highway corridor","kind":"project-image","fileName":"glenwood-canyon.jpg","mimeType":"image/jpeg","bytes":369614,"sha256":"363c30effe911ccd3b235683fa83b24984de39d8dd378c8e8921a3d3603a11d1","sourceId":"s4","license":"CC BY-SA 3.0","width":1280,"height":854,"credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-09-09","evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/62/I-70_Glenwood_Canyon-terabass.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/glenwood-canyon/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glenwood-canyon-capstone.md","mimeType":"text/markdown","bytes":3767,"sha256":"ab9a0c2f868a5433e8f7ca3687d87cab146c6924c87f98c0e922a89e18ea1cc5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","caption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":854,"imageDate":"2009-09-09","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","qualityNotes":["The corridor photograph is site context; the buried conditions and reinforcement are established by the selected report section, not by the photograph."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":109,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":374502,"sourceCount":4,"url":"/cases/glenwood-canyon"},{"id":"rocky-flats","title":"Rocky Flats — engineered covers and long-term groundwater care","summary":"The remediated site retains engineered landfill covers, groundwater collection/treatment systems and long-term inspections. Public surveillance records support a capstone on containment performance after closure.","topics":["geoenvironmental","seepage","slopes","earthworks","monitoring"],"country":"United States","region":"Colorado Front Range","owner":"U.S. Department of Energy, Office of Legacy Management","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Landfill-cover water balance","Infiltration control","Cover-slope stability","Groundwater monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"DOE records distinguish the Original and Present Landfills and the associated water-management systems. Select a specific unit before evaluating infiltration, cover stability or treatment performance; site-wide cleanup is not evidence that all residual hazards were removed.","sourceIds":["s1","s2","s3","s4"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The May 2026 DOE fact sheet separates the 2005 physical closure from continuing cover maintenance, groundwater treatment and monitoring. The owner also lists a new five-year remedy review due in 2027; that future review is not a completed record.","sourceIds":["s1","s2","s3","s4"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess one documented cover or groundwater-control unit and design an inspection-and-maintenance programme that can identify declining performance.","inputs":["Select a dated DOE cover inspection, groundwater record and corresponding remedy description.","Assemble precipitation, runoff pathways, cover stratigraphy and measured movements where public; label any substituted parameters."],"deliverables":["Evaluate cover infiltration and stability under normal operation, blocked drainage and a severe precipitation scenario.","Prepare a monitoring dashboard specification, repair triggers and a long-term maintenance cost model using current study rates.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a vegetated cover appear healthy while preferential seepage or a slope movement is degrading its containment function?","Which measurements would reveal whether a groundwater change originates at the cover, the collection system or regional recharge?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Rocky Flats Site — remedy and stewardship responsibilities","url":"https://www.energy.gov/lm/rocky-flats-site-colorado","publisher":"U.S. Department of Energy","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Rocky Flats key document archive — monitoring and inspections","url":"https://www.energy.gov/lm/rocky-flats-site-colorado-key-document-archive","publisher":"U.S. Department of Energy","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Original Landfill inspection-frequency contact record, 2025-03","url":"https://lmpublicsearch.lm.doe.gov/LMSites/RFLMA%20CR%202025-03.pdf","publisher":"U.S. Department of Energy / Rocky Flats regulators","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Rocky Flats Site fact sheet, May 2026","url":"https://www.energy.gov/documents/rocky-flats-site-colorado-fact-sheet","publisher":"U.S. Department of Energy, Office of Legacy Management","year":null,"access":"public-link","license":"US Department of Energy public-domain publication; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["rocky-flats-factsheet-2026"]},{"id":"s5","title":"Aerial View of Rocky Flats in 2007 (14597931675).jpg","url":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","publisher":"USEPA Environmental-Protection-Agency","year":2014,"access":"public-link","license":"Public domain","notes":"Project image source. Publisher-native 300 × 210 JPEG retained unchanged; no local upscaling, crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rocky-flats.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rocky-flats/download/schematic"},{"id":"rocky-flats-factsheet-2026","title":"Rocky Flats Site, Colorado — DOE fact sheet, May 2026","kind":"report","fileName":"rocky-flats-factsheet-2026.pdf","mimeType":"application/pdf","bytes":4278537,"sha256":"fa3fa6e60923be177cdc512bb53099361d20a3b2441ffa0f3507cb9e85b93121","sourceId":"s4","license":"US Department of Energy public-domain publication; original credits retained","rightsUrl":"https://www.energy.gov/web-policies","rightsBasis":"DOE-authored site fact sheet; DOE web policy permits distribution of government information. The four-page original has no separate third-party copyright notice and is retained unchanged with all credits.","rightsEvidenceUrl":"https://www.energy.gov/web-policies","pages":4,"downloadUrl":"/cases/rocky-flats/download/rocky-flats-factsheet-2026"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"rocky-flats-reference-values.csv","mimeType":"text/csv","bytes":1032,"sha256":"f58cae5cc633707ae1377b8d404c0a00e3a111a42ea49d3940b22d5e32a1c361","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/rocky-flats/download/reference-values"},{"id":"project-image","title":"Rocky Flats — site after building removal","kind":"project-image","fileName":"rocky-flats.jpg","mimeType":"image/jpeg","bytes":26010,"sha256":"8437d2bc32ef137793a3f53dca6f25f0fa81eaf9f810bdce49c02f5612c24dd1","sourceId":"s5","license":"Public domain","width":300,"height":210,"credit":"USEPA Environmental-Protection-Agency / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","imageDate":"2014-07-07 13:46","evidenceFile":"image-provenance/rocky-flats-r14-source.json","evidenceSha256":"9f571755569d1dbcea1f0b130b2d172dac5094df7de004c5c58c4c33c1adb3f5","transformations":"Publisher-native 300 × 210 JPEG retained unchanged; no local upscaling, crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/45/Aerial_View_of_Rocky_Flats_in_2007_%2814597931675%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/rocky-flats/download/project-image","imageDownloadAllowed":true,"rightsStatus":"public-domain","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rocky-flats-capstone.md","mimeType":"text/markdown","bytes":5243,"sha256":"e18c9ea27f777db1cc3f999ea5b03b616ef943c524086271527cb86314ec28c3","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rocky-flats/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","caption":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","credit":"USEPA Environmental-Protection-Agency / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","width":300,"height":210,"imageDate":"2014-07-07 13:46","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"public-domain"},"figureCaption":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","qualityNotes":["The local DOE fact sheet describes the remedy and ongoing responsibilities. Final cover cross-sections and monitoring time series remain in the linked site archive."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":110,"referenceValues":[{"label":"Closed landfills under continuing care","value":2,"unit":"landfills","scope":"DOE Office of Legacy Management responsibilities as described in May 2026.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."},{"label":"Groundwater collection systems","value":4,"unit":"systems","scope":"Continuing collection-system responsibilities, separate from treatment-system count.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."},{"label":"Groundwater treatment systems","value":3,"unit":"systems","scope":"Continuing treatment-system responsibilities; not four because collection and treatment are different systems.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rocky-flats-r14-source.json","evidenceSha256":"9f571755569d1dbcea1f0b130b2d172dac5094df7de004c5c58c4c33c1adb3f5","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":4311813,"sourceCount":5,"url":"/cases/rocky-flats"}]}