{"schemaVersion":1,"updated":"2026-11-22","total":15,"records":[{"id":"river-road-soil-nails","title":"River Road, Tucson — tall soil-nailed cuts","summary":"Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.","topics":["retaining-walls","excavation","site-investigation","monitoring"],"country":"United States","region":"Pima County, Arizona","owner":"Pima County Department of Transportation","year":2004,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Soil nailing","Top-down excavation","Face stability"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case describes hollow-bar nails, wall geometry, drainage, facing checks and a loose-seam treatment during excavation.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports wall and adjacent-structure monitoring; complete construction drawings are not provided.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a soil-nailed cut design that protects nearby buildings and includes a response to unexpected ravelling material.","inputs":["Extract wall sections, adopted strength, nail rows and drilling restrictions.","Identify what the limited original investigation could not resolve."],"deliverables":["Check global stability, nail pullout, nail tensile resistance and facing demand.","Prepare lift sequencing, temporary-face support, drainage and monitoring details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"River Road widening and realigning, Pima County","url":"https://www.geoinstitute.org/node/8324","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Nowatzki and Samtani (2004), Design, Construction, and Performance of an 18-meter Soil Nail Wall.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"river-road-soil-nails.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/river-road-soil-nails/download/schematic"},{"id":"project-image","title":"River Road, Tucson — aerial photograph of the completed soil-nailed walls","kind":"project-image","fileName":"river-road-soil-nails-r13.png","mimeType":"image/png","bytes":707435,"sha256":"a5544ab2ed10f27ba121c94a3f85409559aede2a1ab1e0fde5607b93a7f9d425","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":630,"height":463,"credit":"© 2011 Google; image reproduced in the ASCE Geo-Institute case history","sourceUrl":"https://www.geoinstitute.org/node/8324","licenseUrl":"https://www.geoinstitute.org/node/8324","imageDate":"2011","evidenceFile":"image-provenance/river-road-soil-nails-r13-source.json","evidenceSha256":"aa28a499ffc7d675c6ed4baa2d32891f10127b351edf5339935edcfd27ab07ac","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/DGHB1.png","originalSha256":"a5544ab2ed10f27ba121c94a3f85409559aede2a1ab1e0fde5607b93a7f9d425","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"aerial-project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/river-road-soil-nails/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"river-road-soil-nails-capstone.md","mimeType":"text/markdown","bytes":2731,"sha256":"026237657dd16c5343f449d7ff39374b1c1a7491481203eff4d07ff89e138da9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/river-road-soil-nails/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","caption":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","credit":"© 2011 Google; image reproduced in the ASCE Geo-Institute case history","sourceUrl":"https://www.geoinstitute.org/node/8324","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8324","width":630,"height":463,"imageDate":"2011","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"aerial-project-photograph"},"figureCaption":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":9,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/river-road-soil-nails-r13-source.json","evidenceSha256":"aa28a499ffc7d675c6ed4baa2d32891f10127b351edf5339935edcfd27ab07ac","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3862,"sourceCount":1,"url":"/cases/river-road-soil-nails"},{"id":"boston-central-artery","title":"Boston Central Artery/Tunnel — deep mixing and ground movement","summary":"Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.","topics":["excavation","ground-improvement","tunnels","monitoring","delivery"],"country":"United States","region":"Boston, Massachusetts","owner":"Massachusetts highway agencies","year":2006,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Deep mixing","Excavation movement","Observational control"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper covers soil properties, mixing characteristics and measured response. FHWA separately documents project financial-management lessons.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"FHWA discusses major-project contingency management; it is not a priced geotechnical work breakdown.","sourceIds":["s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published research compares construction-induced ground movements and stabilization behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a ground-treatment and monitoring concept for a deep urban cut in soft clay, with construction risks included in the estimate.","inputs":["Extract the selected site section and treatment properties from the project paper.","Define movements tolerated by nearby structures and utilities as a study requirement."],"deliverables":["Compare untreated and treated basal stability and movement mechanisms.","Prepare a monitoring-trigger plan and a geotechnical contingency allowance.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lessons learned for ground movements and soil stabilization from the Boston Central Artery","url":"https://doi.org/10.1061/(ASCE)1090-0241(2006)132:8(966)","publisher":"O’Rourke and McGinn / ASCE","year":2006,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Full technical article may require subscription.","checked":"2026-11-22"},{"id":"s2","title":"Contingency fund management — lessons learned","url":"https://www.fhwa.dot.gov/majorprojects/financial_plans/lessons_learned.cfm","publisher":"FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Big Dig construction 589.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":1989,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"boston-central-artery.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/schematic"},{"id":"project-image","title":"Big Dig construction 589.agr.jpg","kind":"project-image","fileName":"boston-central-artery.jpg","mimeType":"image/jpeg","bytes":339680,"sha256":"01902e3f96aad17c3cb58875d0a7591633c218d8dabbe0755b42916933825fe4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"1989-05","evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/46/Big_Dig_construction_589.agr.jpg","downloadUrl":"/cases/boston-central-artery/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"boston-central-artery-capstone.md","mimeType":"text/markdown","bytes":3134,"sha256":"f3d0712edf16c7e0d9920a6b8a1af90de9cdaed03a9c5eade371264e7933c719","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction for Boston’s Central Artery/Tunnel project in May 1989.","caption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"1989-05"},"figureCaption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":17,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":343945,"sourceCount":3,"url":"/cases/boston-central-artery"},{"id":"seattle-sr99","title":"Seattle SR 99 tunnel — soft-ground tunnelling and settlement","summary":"The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.","topics":["tunnels","excavation","dewatering","monitoring","delivery"],"country":"United States","region":"Seattle, Washington","owner":"Washington State Department of Transportation","year":2019,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Earth-pressure-balance tunnelling","Settlement","Groundwater control"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The environmental geology/soils appendix and design-build procurement records establish ground risks and contract context, not a complete as-built tunnel design.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSDOT identifies February 2019 completion; procurement and construction milestones are available on the owner pages.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner’s completed-project page records the outcome and links supporting material.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-risk and monitoring plan for an urban bored tunnel, including shaft construction and dewatering interactions.","inputs":["Extract route geology, groundwater and protected assets from Appendix P.","Separate environmental alternatives from the subsequently selected design-build solution."],"deliverables":["Estimate surface settlement for documented or explicitly assumed loss scenarios.","Prepare shaft/uplift checks and a response plan for unexpected settlement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SR 99 tunnel — completed February 2019","url":"https://apps.wsdot.wa.gov/construction-planning/search-projects/sr-99-tunnel","publisher":"WSDOT","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Alaskan Way Viaduct FEIS Appendix P — geology and soils","url":"https://data.wsdot.wa.gov/publications/Viaduct/AWVFEIS-AppendixP.pdf","publisher":"WSDOT","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"SR 99 bored tunnel design-build procurement","url":"https://wsdot.wa.gov/business-wsdot/contracting-opportunities/sr-99-alaskan-way-viaduct-sr-99-bored-tunnel-design-build-project","publisher":"WSDOT","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Bertha TBM retrieval site.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","publisher":"Wikimedia Commons / SounderBruce from Seattle, United States","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"seattle-sr99.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/schematic"},{"id":"project-image","title":"Bertha TBM retrieval site.jpg","kind":"project-image","fileName":"seattle-sr99.jpg","mimeType":"image/jpeg","bytes":152931,"sha256":"4fa4ed3313fbe70109c8c909325c418043dd5c73592739c5fb1ad31a1a870385","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":406,"credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-07-15 12:27","evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/82/Bertha_TBM_retrieval_site.jpg","downloadUrl":"/cases/seattle-sr99/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"seattle-sr99-capstone.md","mimeType":"text/markdown","bytes":3334,"sha256":"c959a6fd7180face32361696df394f5ca309f8ad094b3f5b8ff41fe7dd4ed30e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015.","caption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":406,"imageDate":"2015-07-15 12:27"},"figureCaption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":18,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157390,"sourceCount":4,"url":"/cases/seattle-sr99"},{"id":"crossrail-farringdon","title":"Crossrail Farringdon — compensation grouting near existing assets","summary":"Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.","topics":["tunnels","ground-improvement","monitoring","excavation"],"country":"United Kingdom","region":"London, England","owner":"Crossrail","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Compensation grouting","Asset protection","Observational tunnelling"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project papers document local asset constraints, grouting and a structural mitigation solution; they do not constitute the entire station design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The learning-legacy papers report implementation and measured behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan mitigation for a sensitive structure above station tunnelling and decide when grouting alone is insufficient.","inputs":["Extract asset geometry, movement triggers and the documented construction sequence.","Distinguish monitoring observations from predicted ground movement."],"deliverables":["Prepare an asset damage assessment and mitigation alternatives.","Design monitoring review stages, trigger actions and verification of movement recovery.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lindsey Street Bridge — a structural solution to settlement mitigation","url":"https://learninglegacy.crossrail.co.uk/documents/lindsey-street-bridge-structural-solution-settlement-mitigation/","publisher":"Crossrail Learning Legacy / project authors","year":2016,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Data management, analysis and visualisation on Drive X","url":"https://learninglegacy.crossrail.co.uk/documents/data-management-analysis-and-visualisation-on-crossrail-drive-x-western-tunnels/index.html","publisher":"Crossrail Learning Legacy / project authors","year":2014,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Crossrail construction site, Farringdon - geograph.org.uk - 2259281.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","publisher":"Wikimedia Commons / Robin Webster","year":2011,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"crossrail-farringdon.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/crossrail-farringdon/download/schematic"},{"id":"project-image","title":"Crossrail construction site, Farringdon - geograph.org.uk - 2259281.jpg","kind":"project-image","fileName":"crossrail-farringdon.jpg","mimeType":"image/jpeg","bytes":135906,"sha256":"1e3b65e2566983c683fe4504c5ba077cc460e02e69371e8bbfc9b3bc55379987","sourceId":"s3","license":"CC BY-SA 2.0","width":640,"height":480,"credit":"Robin Webster","sourceUrl":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2011-02-05","evidenceFile":"image-provenance/crossrail-farringdon-commons.json","evidenceSha256":"c294f4b8021c7d8438edc8ab746650f06bb15707370570c92ff491e623289a26","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/96/Crossrail_construction_site%2C_Farringdon_-_geograph.org.uk_-_2259281.jpg","downloadUrl":"/cases/crossrail-farringdon/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"crossrail-farringdon-capstone.md","mimeType":"text/markdown","bytes":3376,"sha256":"3517728f9e88964f9f1290a79106101005b9cc1a4f5a51adc183182f4d16870c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/crossrail-farringdon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site.","caption":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site. This is a site photograph; the Lindsey Street Bridge settlement-mitigation details are in the linked project account.","credit":"Robin Webster","sourceUrl":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":640,"height":480,"imageDate":"2011-02-05"},"figureCaption":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site. This is a site photograph; the Lindsey Street Bridge settlement-mitigation details are in the linked project account.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":19,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/crossrail-farringdon-commons.json","evidenceSha256":"c294f4b8021c7d8438edc8ab746650f06bb15707370570c92ff491e623289a26","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":140407,"sourceCount":3,"url":"/cases/crossrail-farringdon"},{"id":"folsom-spillway","title":"Folsom auxiliary spillway — rock excavation and foundation preparation","summary":"The auxiliary spillway required major rock excavation and preparation of the control-structure foundation before concrete placement.","topics":["rock","dams-levees","excavation","delivery"],"country":"United States","region":"Folsom, California","owner":"USACE / Bureau of Reclamation","year":2017,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Rock excavation","Foundation preparation","Controlled blasting"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"USACE construction accounts describe blasting completion, foundation cleaning and the subsequent control structure and chute.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"USACE describes a $900 million cooperative effort, a programme total rather than a rock-excavation unit-rate schedule.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"The source records initial excavation in 2008, final concrete stages in 2016 and the October 2017 completion ceremony.","sourceIds":["s2"]},"records":{"availability":"partial","summary":"The owner’s completion release identifies the constructed auxiliary spillway.","sourceIds":["s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a rock-foundation excavation and acceptance programme beside an operating dam and public transport route.","inputs":["Extract published construction stages and final structure dimensions.","Establish study discontinuity, groundwater and blast-vibration parameters explicitly."],"deliverables":["Prepare a temporary rock-slope/bench concept and foundation mapping checklist.","Design sequencing between blasting, cleaning, drainage, acceptance and concrete placement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Corps completes blasting for Folsom Dam spillway","url":"https://www.spk.usace.army.mil/Media/News-Stories/Article/479150/corps-completes-blasting-for-folsom-dam-spillway/","publisher":"USACE","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Folsom auxiliary spillway completion ceremony","url":"https://www.spk.usace.army.mil/Media/News-Releases/Article/1347967/folsom-auxiliary-spillway-completion-ceremony-marks-conclusion-of-historic-proj/","publisher":"USACE","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Corps completes final rock blasting for Folsom Dam spillway (7074960195).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers Sacramento District","year":2012,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"folsom-spillway.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/folsom-spillway/download/schematic"},{"id":"project-image","title":"Corps completes final rock blasting for Folsom Dam spillway (7074960195).jpg","kind":"project-image","fileName":"folsom-spillway.jpg","mimeType":"image/jpeg","bytes":464701,"sha256":"7a19a74d7b3b5a33de9a62801a125a79786fab6e5e3741f2489f8163752e394c","sourceId":"s3","license":"Public domain","width":1280,"height":853,"credit":"U.S. Army Corps of Engineers Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg#Licensing","imageDate":"2012-04-09 13:07","evidenceFile":"image-provenance/folsom-spillway-commons.json","evidenceSha256":"f8c58b1165831e3d43c019c6198f439b3999d2ca0dd921846e86483602a54411","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a9/Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_%287074960195%29.jpg","downloadUrl":"/cases/folsom-spillway/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"folsom-spillway-capstone.md","mimeType":"text/markdown","bytes":3360,"sha256":"9db574128d7dfcb79de13e692011843039bad04940c148f1a0128a63dc749079","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/folsom-spillway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012.","caption":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012. U.S. Army Corps of Engineers construction photograph.","credit":"U.S. Army Corps of Engineers Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg#Licensing","width":1280,"height":853,"imageDate":"2012-04-09 13:07"},"figureCaption":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012. U.S. Army Corps of Engineers construction photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":23,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/folsom-spillway-commons.json","evidenceSha256":"f8c58b1165831e3d43c019c6198f439b3999d2ca0dd921846e86483602a54411","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":469078,"sourceCount":3,"url":"/cases/folsom-spillway"},{"id":"shanghai-tower","title":"Shanghai Tower — excavation compensation and pile–raft interaction","summary":"Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.","topics":["deep-foundations","settlement","excavation","monitoring"],"country":"China","region":"Shanghai","owner":"Shanghai Tower Construction and Development","year":2015,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Piled raft","Excavation compensation","Variable stiffness"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The cited studies include a design optimization and a re-analysis. The latter is an author’s model of the project, not an assertion that its proposed alternative was constructed.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconcile excavation relief and subsequent structural loading in a settlement model for a tower founded in deep urban deposits.","inputs":["Extract the construction-stage loads and compressible layers described in the papers.","Maintain separate ledgers for excavation unloading, dead load, live load and sustained loading."],"deliverables":["Compare a compensated-foundation calculation with a simplified interacting pile–raft model.","Propose a pile-stiffness distribution and explain its effect on raft curvature.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can apparent compensation of total stress justify ignoring differential settlement?","Which measured response would reveal an overly stiff pile-group assumption?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation re-analysis using compensated pile foundation theory","url":"https://onlinelibrary.wiley.com/doi/10.1002/tal.1087","publisher":"Project researchers / The Structural Design of Tall and Special Buildings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pile-raft foundation optimization analysis of Shanghai Tower","url":"https://tgjc.whrsm.ac.cn/EN/Y2018/V32/I3/243","publisher":"Zeng Chaojie / Soil Engineering and Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Shanghai - Shanghai Tower - 0001.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","publisher":"Wikimedia Commons / Stefan Fussan","year":2016,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"shanghai-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/schematic"},{"id":"project-image","title":"Shanghai - Shanghai Tower - 0001.jpg","kind":"project-image","fileName":"shanghai-tower.jpg","mimeType":"image/jpeg","bytes":714199,"sha256":"a540e70593ff3ea46a5baca90d32d4970546a3250d424431e2b792b02e6b7495","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":2114,"credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2016-09-18","evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e0/Shanghai_-_Shanghai_Tower_-_0001.jpg","downloadUrl":"/cases/shanghai-tower/download/project-image","originalSha1":"fbf6b991ef2d29b0baf093451432884e609fef5a","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"shanghai-tower-capstone.md","mimeType":"text/markdown","bytes":3209,"sha256":"7ddd952b24548584f1328900dafc4c9f5aedfac7b7cc92766795ff25ac33f2d7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Shanghai Tower in Shanghai.","caption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":2114,"imageDate":"2016-09-18","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":50,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":718607,"sourceCount":3,"url":"/cases/shanghai-tower"},{"id":"marina-bay-sands","title":"Marina Bay Sands — deep foundations on reclaimed ground","summary":"The integrated resort was constructed on reclaimed waterfront land. The foundation contractors describe bored piling and advance removal of a buried seawall within a tightly constrained site.","topics":["deep-foundations","excavation","dewatering","delivery"],"country":"Singapore","region":"Marina Bay, Singapore","owner":"Marina Bay Sands","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Bored piles","Buried obstructions","Excavation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Contractor accounts identify foundation and enabling works; complete ground parameters and structural reactions are not supplied. Those require explicit study assumptions or additional records.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a bored-pile and basement construction sequence across reclaimed fill containing a former seawall.","inputs":["Map the reported obstruction and the interfaces between enabling work, piling and excavation.","Specify a supplemental investigation for fill variability, groundwater and founding strata."],"deliverables":["Compare pile installation risks with alternative obstruction-removal sequences.","Prepare a support-of-excavation concept and hold points for pile integrity and base cleanliness.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a buried seawall affect both pile verticality and groundwater flow?","Which enabling work must precede production piling to avoid repeated access conflicts?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Integrated Marina Bay Sands foundation works","url":"https://bachy-soletanche.com.sg/offer-portfolio/intergrated-marina-bay-sands/","publisher":"Bachy Soletanche Singapore","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Marina Bay Sands piling account","url":"https://www.foundation-alliance.com/offer-portfolio/marina-bay-sands-integrated-resort/","publisher":"Foundation Alliance","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Integrated resort project description","url":"https://www.safdiearchitects.com/projects/marina-bay-sands-integrated-resort","publisher":"Safdie Architects","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Marina Bay Sands Casino construction site (3366800416).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","publisher":"Wikimedia Commons / Andy Mitchell from Glasgow, UK","year":2009,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"marina-bay-sands.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marina-bay-sands/download/schematic"},{"id":"project-image","title":"Marina Bay Sands Casino construction site (3366800416).jpg","kind":"project-image","fileName":"marina-bay-sands.jpg","mimeType":"image/jpeg","bytes":244129,"sha256":"2a5a80337ab4ffe4d286095b8b3633abe0ad94560b395921912b1835b2f744ce","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":914,"credit":"Andy Mitchell from Glasgow, UK","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2009-03-15 09:27","evidenceFile":"image-provenance/marina-bay-sands-commons.json","evidenceSha256":"47217317dc7da1b4d94d0d773a1fd52f47d46ed11173214699791f999adb49d4","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/39/Marina_Bay_Sands_Casino_construction_site_%283366800416%29.jpg","downloadUrl":"/cases/marina-bay-sands/download/project-image","originalSha1":"f290a1a2bff0a5176279b2e6a1c41ae4bec103b4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"marina-bay-sands-capstone.md","mimeType":"text/markdown","bytes":3397,"sha256":"84e154eed3631098278d4a705936e3ff54bf5f5e75fceb9df18326d7e54916ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marina-bay-sands/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the Marina Bay Sands resort in Singapore.","caption":"Construction of the Marina Bay Sands resort in Singapore. The source identifies the actual development discussed in the foundation contractors’ accounts.","credit":"Andy Mitchell from Glasgow, UK","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marina_Bay_Sands_Casino_construction_site_(3366800416).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":914,"imageDate":"2009-03-15 09:27","imageDownloadAllowed":true},"figureCaption":"Construction of the Marina Bay Sands resort in Singapore. The source identifies the actual development discussed in the foundation contractors’ accounts.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":51,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/marina-bay-sands-commons.json","evidenceSha256":"47217317dc7da1b4d94d0d773a1fd52f47d46ed11173214699791f999adb49d4","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":248725,"sourceCount":4,"url":"/cases/marina-bay-sands"},{"id":"transbay-transit","title":"Transbay Transit Center — deep excavation beside existing foundations","summary":"The transit-center excavation required a stiff, low-permeability perimeter and protection of nearby foundations. Public authority records explain proposed test shafts, soil improvement and groundwater concerns during design.","topics":["excavation","dewatering","ground-improvement","monitoring"],"country":"United States","region":"San Francisco","owner":"Transbay Joint Powers Authority","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Braced excavation","Soil improvement trials","Groundwater cutoff"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The public testing scope and meeting records describe design-stage reasoning. They are not the final as-built shoring design or a finding about responsibility for neighboring building movement.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The testing-scope record discusses a reduced test programme within a $5 million request. This is a proposed testing allocation, not the transit center’s final foundation cost.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a deep-excavation risk assessment for a transit box bordered by loaded foundations in compressible urban deposits.","inputs":["Extract the authority’s proposed testing objectives and soil profile descriptions.","Identify neighboring foundation levels and the movement paths that excavation could influence."],"deliverables":["Compare wall stiffness, brace staging and groundwater control using an explicit study section.","Write a trial-shaft verification plan and a monitoring-trigger matrix for adjacent properties.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which test result could change the proposed soil-improvement method before production?","How do drawdown settlement and wall-deflection settlement require different monitoring?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geotechnical shoring wall testing scope","url":"https://www.tjpa.org/media/30638/download?inline=","publisher":"Transbay Joint Powers Authority / Arup","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Shoring and excavation presentation record","url":"https://www.tjpa.org/media/36745/download?inline=","publisher":"Transbay Joint Powers Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Transbay Transit Center under construction, Spring 2013.png — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","publisher":"Wikimedia Commons / Jdelx","year":2013,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"transbay-transit.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/transbay-transit/download/schematic"},{"id":"project-image","title":"Transbay Transit Center under construction, Spring 2013.png","kind":"project-image","fileName":"transbay-transit.png","mimeType":"image/png","bytes":519266,"sha256":"c04ab6b0f8323c972cf506cdbd118dc783408a3ad20d3e0dc32c90d9c120edcd","sourceId":"s3","license":"CC BY-SA 3.0","width":657,"height":485,"credit":"Jdelx","sourceUrl":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2013-10-05 02:27:07","evidenceFile":"image-provenance/transbay-transit-commons.json","evidenceSha256":"97a2ded657ba021a83ec7d0f0c66e35ff4137b24a1d3a142f5ce9f6130ea35cb","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bc/Transbay_Transit_Center_under_construction%2C_Spring_2013.png","downloadUrl":"/cases/transbay-transit/download/project-image","originalSha1":"45ddeb57f1fa0a8bcc6dabbdd6c5976b9922bcfe","originalSha256":"c04ab6b0f8323c972cf506cdbd118dc783408a3ad20d3e0dc32c90d9c120edcd","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"transbay-transit-capstone.md","mimeType":"text/markdown","bytes":3287,"sha256":"af827fc3762380e4e65f15d9e88f68b50574dab5ae5e6feff893e6cbfc4a9430","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/transbay-transit/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Transbay Transit Center construction site in 2013.","caption":"The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.","credit":"Jdelx","sourceUrl":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":657,"height":485,"imageDate":"2013-10-05 02:27:07","imageDownloadAllowed":true},"figureCaption":"The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":59,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/transbay-transit-commons.json","evidenceSha256":"97a2ded657ba021a83ec7d0f0c66e35ff4137b24a1d3a142f5ce9f6130ea35cb","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":523684,"sourceCount":3,"url":"/cases/transbay-transit"},{"id":"salesforce-tower","title":"Salesforce Tower — staged excavation and artesian-pressure control","summary":"The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.","topics":["excavation","dewatering","ground-improvement","retaining-walls"],"country":"United States","region":"San Francisco","owner":"Salesforce Tower development team","year":2018,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Secant pile ring","Deep soil mixing","Basal stability","Bracing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The engineer-of-record account identifies installed systems and construction stages. It does not publish the full calculation package or groundwater time series.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Coordinate nested excavation stages where the deepest core excavation extends below the surrounding basement.","inputs":["Extract the reported support components and their excavation-stage relationships.","Define study water pressures and soil strengths and identify which require field confirmation."],"deliverables":["Check basal uplift/heave and wall movements at each excavation stage.","Draw load-transfer interfaces between the braced perimeter, circular ring and plaza support.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which stage creates the most adverse hydraulic gradient below the excavation?","What happens to support loads when a local deeper excavation is opened inside a braced box?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Salesforce Tower excavation support","url":"https://www.sgh.com/project/salesforce-tower-excavation-support/","publisher":"Simpson Gumpertz & Heger, excavation engineer of record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Salesforce Tower Construction, San Francisco.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","publisher":"Wikimedia Commons / Dllu","year":2017,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"salesforce-tower.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/salesforce-tower/download/schematic"},{"id":"project-image","title":"Salesforce Tower Construction, San Francisco.jpg","kind":"project-image","fileName":"salesforce-tower.jpg","mimeType":"image/jpeg","bytes":662808,"sha256":"5630df54a1978429dd7eb555cad00b9e05fb8e9eba4371296acee8730134033b","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":1976,"credit":"Dllu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2017-02-16 13:41:48","evidenceFile":"image-provenance/salesforce-tower-commons.json","evidenceSha256":"161950b9f4e2d949725b84432afcc1da5e41df9c96b3af5e704fa7e158fbe44a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/2c/Salesforce_Tower_Construction%2C_San_Francisco.jpg","downloadUrl":"/cases/salesforce-tower/download/project-image","originalSha1":"32e98d418758e271623698b321c477b96dfebc6f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"salesforce-tower-capstone.md","mimeType":"text/markdown","bytes":3035,"sha256":"84e87c2b3acdd462bd4d53a1ebf4e55b3f4229c74e69044637af024eea66a624","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/salesforce-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Salesforce Tower during construction in San Francisco.","caption":"Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.","credit":"Dllu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1976,"imageDate":"2017-02-16 13:41:48","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":60,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/salesforce-tower-commons.json","evidenceSha256":"161950b9f4e2d949725b84432afcc1da5e41df9c96b3af5e704fa7e158fbe44a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":666974,"sourceCount":2,"url":"/cases/salesforce-tower"},{"id":"san-vicente-dam","title":"San Vicente Dam raise — rock preparation and RCC interface","summary":"The existing concrete dam was raised using roller-compacted concrete. Owner documents connect excavation to competent rock, treatment of localized poor material and seepage control with the enlarged structure.","topics":["rock","dams-levees","seepage","excavation","delivery"],"country":"United States","region":"San Diego County, California","owner":"San Diego County Water Authority","year":2014,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock excavation","Dental concrete","Consolidation grouting","RCC"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The environmental design commitments describe proposed foundation measures; the completion account establishes the constructed dam raise. Detailed final foundation treatment records are not included.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports foundation preparation beginning in June 2009 and construction ending in June 2014.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan foundation preparation and construction of an RCC enlargement beside an existing gravity dam.","inputs":["Extract the owner’s foundation-treatment commitments and construction milestones.","Identify rock defects, existing-dam support and old/new concrete interfaces needing detailed verification."],"deliverables":["Prepare excavation acceptance criteria, dental-concrete details and grout/drain layouts.","Check a representative enlarged section for sliding and uplift, with treatment effectiveness sensitivities.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does excavating beside the original dam change temporary stability requirements?","Which field observations should decide whether a weak rock pocket is removed or treated?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geology and soils design commitments","url":"https://www.sdcwa.org/sites/default/files/files/environmental-docs/csp/Section%2003_08%2C%20Alt%201%20Geology%20%2008%2024%2007.pdf","publisher":"San Diego County Water Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Completion of the dam raise","url":"https://www.sdcwa.org/historic-san-vicente-dam-raise-project-completed/","publisher":"San Diego County Water Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Drone Photography San Vicente Reservoir and Dam San Diego.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","publisher":"Wikimedia Commons / Redideo","year":2024,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"san-vicente-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/san-vicente-dam/download/schematic"},{"id":"project-image","title":"Drone Photography San Vicente Reservoir and Dam San Diego.jpg","kind":"project-image","fileName":"san-vicente-dam.jpg","mimeType":"image/jpeg","bytes":169202,"sha256":"13b8f0c81856c9a03fefd07c981f6913f52c9e46eb2ba83a8706c2f6db0b55e2","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":715,"credit":"Redideo","sourceUrl":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2024-04-21","evidenceFile":"image-provenance/san-vicente-dam-commons.json","evidenceSha256":"e1a6c813b0c557b0253bdb3b0e6764fe4402a1e58f2a6282e512b67dd9e29779","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","downloadUrl":"/cases/san-vicente-dam/download/project-image","originalSha1":"a17feb3503b42dbb142e24edfd3a3f2663af8f7b","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"san-vicente-dam-capstone.md","mimeType":"text/markdown","bytes":3308,"sha256":"f5024109cac1cebbe29b76af2538e1c2ea9fba72955662e777a3a827ca7baefa","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/san-vicente-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County.","caption":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County. The photograph shows the actual completed dam, not a rendering of the proposed raise.","credit":"Redideo","sourceUrl":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":715,"imageDate":"2024-04-21","imageDownloadAllowed":true},"figureCaption":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County. The photograph shows the actual completed dam, not a rendering of the proposed raise.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":62,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/san-vicente-dam-commons.json","evidenceSha256":"e1a6c813b0c557b0253bdb3b0e6764fe4402a1e58f2a6282e512b67dd9e29779","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":173527,"sourceCount":3,"url":"/cases/san-vicente-dam"},{"id":"hoover-dam","title":"Hoover Dam — rock-foundation preparation and remedial grouting","summary":"Construction removed river deposits to competent rock and treated the foundation and abutments. Later drainage and remedial grouting addressed uplift and leakage observed during initial reservoir filling.","topics":["rock","dams-levees","seepage","excavation","delivery"],"country":"United States","region":"Colorado River, Nevada–Arizona","owner":"US Bureau of Reclamation","year":1947,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock excavation","Grout curtain","Drainage galleries","Uplift"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"Reclamation’s construction history and foundation-grouting standard explain original preparation and the later remedial programme. Concrete contraction-joint grouting must not be confused with rock-foundation grouting.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The design standard records effectiveness of remedial work and later observations; it is not a present-day dam-safety evaluation.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reassess foundation seepage after reservoir filling reveals pressures above the original design expectation.","inputs":["Separate original grout holes, later remedial work and concrete-joint treatment in the source record.","Extract the reported rationale for changed grout mixes and additional drainage."],"deliverables":["Calculate uplift distributions for alternative drain and curtain effectiveness assumptions.","Design a trial grouting plan with staged pressure limits and monitoring of adjacent drainage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why might a deeper curtain and additional drains be complementary rather than competing remedies?","What observations would show that apparent grout refusal is caused by premature setting?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Hoover Dam construction history","url":"https://www.usbr.gov/history/hoover.html","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation grouting design standard, Hoover case","url":"https://www.usbr.gov/tsc/techreferences/designstandards-datacollectionguides/finalds-pdfs/DS13-15.pdf","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Hoover Dam, Nevada (Arizona-Nevada, USA) -- 2012 -- 6099.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","publisher":"Wikimedia Commons / Dietmar Rabich","year":null,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hoover-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hoover-dam/download/schematic"},{"id":"project-image","title":"Hoover Dam, Nevada (Arizona-Nevada, USA) -- 2012 -- 6099.jpg","kind":"project-image","fileName":"hoover-dam.jpg","mimeType":"image/jpeg","bytes":465705,"sha256":"85015660314ac149a4557cb3f98fe7fb03d50be0ec1b734ca92b8a807c6b734e","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Dietmar Rabich","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"Taken on 26 July 2012, 13:37","evidenceFile":"image-provenance/hoover-dam-commons.json","evidenceSha256":"ec32fc3ca7a4a63c78fa79cebdf26ae9a3b975af6c12b7c48725cb839261eca2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f6/Hoover_Dam%2C_Nevada_%28Arizona-Nevada%2C_USA%29_--_2012_--_6099.jpg","downloadUrl":"/cases/hoover-dam/download/project-image","originalSha1":"4d420802cfaaf32abceb2ae2056cfe87dbc710f9","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hoover-dam-capstone.md","mimeType":"text/markdown","bytes":3357,"sha256":"9454c025e84aa35fa0a13d2587b628d4c439ff0309ef32c508d072347e950f19","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hoover-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hoover Dam and its canyon setting.","caption":"Hoover Dam and its canyon setting. The photograph identifies the completed project; original and remedial foundation grouting are described in Reclamation’s records.","credit":"Dietmar Rabich","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"Taken on 26 July 2012, 13:37","imageDownloadAllowed":true},"figureCaption":"Hoover Dam and its canyon setting. The photograph identifies the completed project; original and remedial foundation grouting are described in Reclamation’s records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":69,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hoover-dam-commons.json","evidenceSha256":"ec32fc3ca7a4a63c78fa79cebdf26ae9a3b975af6c12b7c48725cb839261eca2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":470079,"sourceCount":3,"url":"/cases/hoover-dam"},{"id":"lee-tunnel","title":"Lee Tunnel — diaphragm-wall shafts in water-bearing chalk","summary":"Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.","topics":["tunnels","excavation","dewatering","retaining-walls"],"country":"United Kingdom","region":"East London","owner":"Thames Water","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Diaphragm-wall shafts","Hoop action","Curtain grouting","Slurry TBM"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The contractor account describes geology and shaft systems; the contract case supplies delivery context. Its later Tideway forecasts are historical and are not treated as current milestones.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The contract case describes a £675 million overall project. It is not a shaft-only cost or an independently audited final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The contract case reports operation beginning in 2016 and overall completion in 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a circular access shaft with large openings through mixed superficial deposits and chalk.","inputs":["Extract the reported shaft geometry range and rock description.","Identify openings and non-axisymmetric actions that violate a simple uniform hoop model."],"deliverables":["Check wall forces, basal water pressure and the staged excavation sequence.","Specify verticality, panel-joint and grouting acceptance checks before deep excavation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How do large shaft openings alter the advantages of circular wall action?","Which checks become most sensitive when chalk fractures connect to overlying sands?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lee Tunnel foundations and shafts","url":"https://www.bacsol.co.uk/project/lee-tunnel-london","publisher":"Bachy Soletanche","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s2","title":"Lee Tunnel delivery case","url":"https://www.neccontract.com/projects/lee-sewage-tunnel-uk","publisher":"NEC Contracts / project participants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lee-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lee-tunnel/download/schematic"},{"id":"project-image","title":"Lee Tunnel — diaphragm-wall shaft","kind":"project-image","fileName":"lee-tunnel-r13.jpg","mimeType":"image/jpeg","bytes":228064,"sha256":"fc396c5f49b66dd83e44ab6a653056fe8d94c89b90f8994e87f69391358eef32","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":600,"height":400,"credit":"Bachy Soletanche","sourceUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","licenseUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","imageDate":null,"evidenceFile":"image-provenance/lee-tunnel-r13-source.json","evidenceSha256":"5cc7371182aedd09643f171ed244c2357082c4601da5804250e5e0010cf8673a","transformations":"Copied the publisher’s 600 × 400 JPEG derivative unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://www.bacsol.co.uk/wp-content/uploads/2020/08/Retaining-Wall-Solution-Lee-Tunnel-Diaphragm-Wall-Shaft-7-600x400.jpg","originalSha256":"fc396c5f49b66dd83e44ab6a653056fe8d94c89b90f8994e87f69391358eef32","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/lee-tunnel/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lee-tunnel-capstone.md","mimeType":"text/markdown","bytes":2910,"sha256":"a2d8ea7378ad7a5316b4aff6b33df06977e908282baab4aa1e0a4f0859b388cc","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lee-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction photograph looking down into a circular Lee Tunnel diaphragm-wall shaft.","caption":"Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.","credit":"Bachy Soletanche","sourceUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","width":600,"height":400,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":79,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lee-tunnel-r13-source.json","evidenceSha256":"5cc7371182aedd09643f171ed244c2357082c4601da5804250e5e0010cf8673a","visualReview":"Inspected the entire published 600 × 400 photograph. It shows the full visible circular shaft lining, suspended construction lines and equipment below. No generative or unrelated replacement was used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4035,"sourceCount":2,"url":"/cases/lee-tunnel"},{"id":"one-new-change","title":"One New Change — basement effects on St Paul’s groundwater","summary":"Redevelopment beside St Paul’s Cathedral required assessment of groundwater changes in shallow deposits supporting the historic structure. The designer describes conceptual and numerical groundwater modeling followed by construction monitoring.","topics":["excavation","dewatering","shallow-foundations","monitoring"],"country":"United Kingdom","region":"City of London","owner":"Land Securities","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Groundwater modeling","Basement cutoff effects","Heritage monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Arup explains the groundwater model and observed construction response. The public account does not provide the full calibrated model or authorize unrestricted basement work near the cathedral.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The designer reports groundwater and structural monitoring during construction with negligible observed effect on the cathedral.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess whether a new basement diverts shallow groundwater enough to affect a neighboring heritage foundation.","inputs":["Extract the reported aquifer, foundation and basement relationships.","Identify man-made drainage and historic excavations that may change natural flow paths."],"deliverables":["Compare preconstruction and basement scenarios with recharge and permeability sensitivities.","Specify piezometers and structural surveys capable of distinguishing seasonal changes from construction effects.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can a watertight basement cause damaging groundwater change without active dewatering?","Which calibration observations are needed before trusting a model’s small predicted effect?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground engineering and groundwater protection at One New Change","url":"https://www.arup.com/en-us/projects/one-new-change/","publisher":"Arup","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"London - New Change - One New Change 2010 by Jean Nouvel - View West on St Paul's Cathedral 1697 by Sir Christopher Wren III.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","publisher":"Wikimedia Commons / Txllxt TxllxT","year":2011,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"one-new-change.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/one-new-change/download/schematic"},{"id":"project-image","title":"London - New Change - One New Change 2010 by Jean Nouvel - View West on St Paul's Cathedral 1697 by Sir Christopher Wren III.jpg","kind":"project-image","fileName":"one-new-change.jpg","mimeType":"image/jpeg","bytes":247667,"sha256":"9a6679e879bd9eb087a955a9593eea26025ed3624038d8b664b67ba27ee88c45","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Txllxt TxllxT","sourceUrl":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2011-06-20 14:27:18","evidenceFile":"image-provenance/one-new-change-commons.json","evidenceSha256":"6b3c5058ed26b68bc8857ee718d90dc0816f85f95f68c713496d1cdb57cb101d","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/38/London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","downloadUrl":"/cases/one-new-change/download/project-image","originalSha1":"241c5d5b01283a7a875ec9b5aa600bf482fccca1","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"one-new-change-capstone.md","mimeType":"text/markdown","bytes":3362,"sha256":"dfdc5008d7df14d8e08879a051b14fcd5dee3a5bb724e23de542d930e7f416e6","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/one-new-change/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"View from One New Change toward St Paul’s Cathedral.","caption":"View from One New Change toward St Paul’s Cathedral. The photograph shows the adjacent development and heritage structure whose groundwater interaction was assessed.","credit":"Txllxt TxllxT","sourceUrl":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2011-06-20 14:27:18","imageDownloadAllowed":true},"figureCaption":"View from One New Change toward St Paul’s Cathedral. The photograph shows the adjacent development and heritage structure whose groundwater interaction was assessed.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":98,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/one-new-change-commons.json","evidenceSha256":"6b3c5058ed26b68bc8857ee718d90dc0816f85f95f68c713496d1cdb57cb101d","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":252160,"sourceCount":2,"url":"/cases/one-new-change"},{"id":"northern-line-extension","title":"Northern Line Extension — settlement assessment and station-box interfaces","summary":"The extension combines bored tunnels with deep station boxes and nearby developments. Owner settlement commitments and designer accounts link prediction, condition surveys and construction monitoring.","topics":["tunnels","excavation","monitoring","lateral-foundations"],"country":"United Kingdom","region":"Kennington to Battersea, London","owner":"Transport for London","year":2021,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Settlement troughs","Building damage assessment","Diaphragm walls"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The environmental assessment is a design-stage screening document, while the designer reports built features and opening. Predicted settlement values must not be presented as measured outcomes.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The designer records passenger opening in September 2021; the settlement-assessment documents predate construction.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a staged settlement assessment for a tunnel approaching a station box beneath a dense urban neighborhood.","inputs":["Extract the screening assumptions and distinguish greenfield analysis from building interaction.","Identify the owner’s survey and monitoring commitments for affected properties."],"deliverables":["Calculate overlapping tunnel/box settlement envelopes with volume-loss sensitivity.","Propose building-specific follow-up analyses and monitoring/compensation arrangements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a conservative greenfield prediction be unsuitable as a direct building-damage estimate?","How should deep foundations crossing the tunnel influence the screening process?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground movement assessment","url":"https://content.tfl.gov.uk/nle-twa-environmental-statement-volume-iic-appendix-i-part-4-a17-4d.pdf","publisher":"Buro Happold / Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Settlement commitments","url":"https://tfl.gov.uk/cdn/static/cms/documents/commitment-1-settlement.pdf","publisher":"Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Designer project account","url":"https://www.mottmac.com/en/projects/northern-line-extension/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Northern line extension construction site, SW8.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","publisher":"Wikimedia Commons / sludgegulper","year":2016,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"northern-line-extension.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/schematic"},{"id":"project-image","title":"Northern line extension construction site, SW8.jpg","kind":"project-image","fileName":"northern-line-extension.jpg","mimeType":"image/jpeg","bytes":422345,"sha256":"f4462889444ce02b4c781ef4bbf522a5573244ce74ff062bf476cfbd50c698fd","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":1707,"credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2016-03-11 12:38:22","evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/3c/Northern_line_extension_construction_site%2C_SW8.jpg","downloadUrl":"/cases/northern-line-extension/download/project-image","originalSha1":"3806f56827ba3cb38637a262dcd624ef348b915e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"northern-line-extension-capstone.md","mimeType":"text/markdown","bytes":3319,"sha256":"cb2697c5975600fbf469eabdf4cd496ff91056b5d2ddf37e77b93a4e903f748f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Battersea station construction site for the Northern Line Extension.","caption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":1707,"imageDate":"2016-03-11 12:38:22","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":99,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":426789,"sourceCount":4,"url":"/cases/northern-line-extension"},{"id":"nicoll-highway","title":"Nicoll Highway collapse — excavation design and monitoring decisions","summary":"The official inquiry identified errors in retaining-wall and strut-connection design and failures to respond adequately to warning signs. The case joins ground-model selection, temporary-structure detailing and construction governance.","topics":["excavation","retaining-walls","monitoring","delivery"],"country":"Singapore","region":"Singapore","owner":"Singapore Land Transport Authority / Committee of Inquiry","year":2004,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Braced excavation","Undrained analysis","Strut connections","Trigger response"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The government executive summary supplies findings from the inquiry. It is not a complete finite-element input file or a basis for reproducing all trial evidence.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Audit a deep-excavation design and its monitoring response before allowing the next excavation stage.","inputs":["Separate wall-system assumptions from structural connection capacity in the inquiry findings.","Build a timeline of reported warnings and the decisions that followed."],"deliverables":["Compare appropriate undrained modeling assumptions and perform an independent brace-load check.","Write stop-work criteria and an escalation chain with accountable technical review.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can matching measured wall movement with a flawed back-analysis increase risk?","What should happen when instrumentation review levels are repeatedly exceeded?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Final Committee of Inquiry executive summary","url":"https://www.nas.gov.sg/archivesonline/data/pdfdoc/20050513987.pdf","publisher":"Singapore Ministry of Manpower / Committee of Inquiry","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Nicoll Highway collapse site 20240420 084318.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","publisher":"Wikimedia Commons / ZKang123","year":2024,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nicoll-highway.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nicoll-highway/download/schematic"},{"id":"project-image","title":"Nicoll Highway collapse site 20240420 084318.jpg","kind":"project-image","fileName":"nicoll-highway.jpg","mimeType":"image/jpeg","bytes":413344,"sha256":"01166dcd29cd06c988ce62bd23006a1e3c32242081861387a420c628f3da0c12","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ZKang123","sourceUrl":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2024-04-20 08:43:18","evidenceFile":"image-provenance/nicoll-highway-commons.json","evidenceSha256":"f602ded2258765be6bc19708d0174afcae8ed2a6c3f3ffb780c9a55f494a3199","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/30/Nicoll_Highway_collapse_site_20240420_084318.jpg","downloadUrl":"/cases/nicoll-highway/download/project-image","originalSha1":"25a928d56919a1390026c07139abffea22a64a07","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nicoll-highway-capstone.md","mimeType":"text/markdown","bytes":3033,"sha256":"86db0bc61b262d41febb7bd4f24e7935905a9c1323d16a6a05644e1c95c4ac99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nicoll-highway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Nicoll Highway collapse site photographed in April 2024.","caption":"The Nicoll Highway collapse site photographed in April 2024. The image identifies the location twenty years after the event and is not a photograph taken during the collapse.","credit":"ZKang123","sourceUrl":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2024-04-20 08:43:18","imageDownloadAllowed":true},"figureCaption":"The Nicoll Highway collapse site photographed in April 2024. The image identifies the location twenty years after the event and is not a photograph taken during the collapse.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":101,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nicoll-highway-commons.json","evidenceSha256":"f602ded2258765be6bc19708d0174afcae8ed2a6c3f3ffb780c9a55f494a3199","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":417508,"sourceCount":2,"url":"/cases/nicoll-highway"}]}