{"schemaVersion":1,"updated":"2026-11-22","total":11,"records":[{"id":"tempe-landfill","title":"Tempe Marketplace — foundations over former landfill","summary":"The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.","topics":["ground-improvement","shallow-foundations","geoenvironmental","monitoring"],"country":"United States","region":"Tempe, Arizona","owner":"Owner not stated in reviewed case","year":2015,"yearLabel":"Case reference year","projectType":"Redevelopment","methods":["Dynamic compaction","Shallow foundations","Vibration control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case gives separate treatment passes for general areas and building zones and describes plate-load verification.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"Reported compaction rates were approximately $1.00/ft² for initial passes plus $1.25/ft² for additional building passes; supporting earthwork is excluded.","sourceIds":["s1"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Plate-load and vibration monitoring are described; raw test datasets are not supplied.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a redevelopment foundation strategy that addresses both geotechnical settlement and environmental constraints of former landfill ground.","inputs":["Extract the source’s treatment energy, grid and verification approach.","Identify gas, contamination and decomposable-waste data absent from the geotechnical summary."],"deliverables":["Compare foundations on treated ground with an alternative deep-foundation option.","Prepare a trial-pad programme, vibration limits and residual-settlement allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Tempe Marketplace, Tempe, AZ","url":"https://www.geoinstitute.org/node/16274","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper Woods, Shaffer and Drumheller (2023). The source’s 2015 case date is retained without equating it with opening of the entire retail centre.","checked":"2026-11-22"},{"id":"s2","title":"Tempe Marketplace - 2008-04-17 - Image1.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","publisher":"Wikimedia Commons / Cygnusloop99","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tempe-landfill.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tempe-landfill/download/schematic"},{"id":"project-image","title":"Tempe Marketplace - 2008-04-17 - Image1.JPG","kind":"project-image","fileName":"tempe-landfill.jpg","mimeType":"image/jpeg","bytes":309826,"sha256":"1560b21832ab7c98fa55efb7be6044ca924367f3340cdf77bb7c3cf9282d77d7","sourceId":"s2","license":"CC BY-SA 3.0","width":1280,"height":853,"credit":"Cygnusloop99","sourceUrl":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-04-17","evidenceFile":"image-provenance/tempe-landfill-commons.json","evidenceSha256":"a45cb5b1e75e9c2628f52e3a6cb5899a90bdafe2aadcdc163fe79a85135d487b","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/23/Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","downloadUrl":"/cases/tempe-landfill/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tempe-landfill-capstone.md","mimeType":"text/markdown","bytes":2951,"sha256":"2820f23d69644226442f02bb4d45826cd449c4ec74f941dfd807f6ad3ab035f9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tempe-landfill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Tempe Marketplace after construction, April 2008.","caption":"Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.","credit":"Cygnusloop99","sourceUrl":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":853,"imageDate":"2008-04-17"},"figureCaption":"Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":14,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tempe-landfill-commons.json","evidenceSha256":"a45cb5b1e75e9c2628f52e3a6cb5899a90bdafe2aadcdc163fe79a85135d487b","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":313965,"sourceCount":2,"url":"/cases/tempe-landfill"},{"id":"milltown-dam-removal","title":"Milltown Reservoir — dam removal and contaminated sediment remediation","summary":"Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.","topics":["geoenvironmental","dewatering","earthworks","dams-levees","monitoring"],"country":"United States","region":"Missoula County, Montana","owner":"US EPA / Montana and responsible-party partners","year":2009,"yearLabel":"Case reference year","projectType":"Remediation and restoration","methods":["Sediment dewatering","Excavation and capping","Groundwater response"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"EPA’s five-year review describes the implemented remedy and site components. Different operable units have different completion status.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The 2021 review records remedial work beginning in 2006 and final dam removal in March 2009; later site restoration and monitoring followed.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The five-year review evaluates remedy performance; it does not state that every Clark Fork operable unit is complete.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased contaminated-sediment removal plan while maintaining downstream water quality and protecting nearby wells.","inputs":["Extract the remedy scope for the reservoir operable unit, not the entire Clark Fork site.","Identify sediment handling, groundwater and restored-channel monitoring information."],"deliverables":["Prepare a dewatering/well-impact assessment and sediment handling sequence.","Compare excavation, onsite containment and capping with monitoring/closure criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Third five-year review — Milltown Reservoir/Clark Fork","url":"https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P101GPHY.TXT","publisher":"US EPA","year":2021,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Milltown Reservoir Sediments cleanup profile","url":"https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0800445","publisher":"US EPA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Excavation.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","publisher":"Wikimedia Commons / M Kustudia","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"milltown-dam-removal.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/milltown-dam-removal/download/schematic"},{"id":"project-image","title":"Excavation.jpg","kind":"project-image","fileName":"milltown-dam-removal.jpg","mimeType":"image/jpeg","bytes":92446,"sha256":"c89444bbdf35eaa35ede26e64248eef43c17962bdb52b85aa8b7ea6a94ab395b","sourceId":"s3","license":"CC BY-SA 3.0","width":640,"height":473,"credit":"M Kustudia","sourceUrl":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-10-14","evidenceFile":"image-provenance/milltown-dam-removal-commons.json","evidenceSha256":"b542555b3a16fa6c34d99f848043d15ea64dc6789961e70910b6bfc421dd6895","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/8f/Excavation.jpg","downloadUrl":"/cases/milltown-dam-removal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"milltown-dam-removal-capstone.md","mimeType":"text/markdown","bytes":3054,"sha256":"7aee3520ebde422ce33cc80a110f0ed5313bdaa02a3ba95536fc18e40182447a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/milltown-dam-removal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Remediation work at the Milltown Reservoir Superfund site in Montana.","caption":"Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.","credit":"M Kustudia","sourceUrl":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":640,"height":473,"imageDate":"2008-10-14"},"figureCaption":"Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":34,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/milltown-dam-removal-commons.json","evidenceSha256":"b542555b3a16fa6c34d99f848043d15ea64dc6789961e70910b6bfc421dd6895","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":96491,"sourceCount":3,"url":"/cases/milltown-dam-removal"},{"id":"hanford-barrier","title":"Prototype Hanford Barrier — long-term infiltration control","summary":"Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.","topics":["geoenvironmental","seepage","monitoring","earthworks"],"country":"United States","region":"Hanford Site, Washington","owner":"US Department of Energy / PNNL","year":2024,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Evapotranspiration cover","Unsaturated flow","Water balance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The FY 2024 report presents barrier sections, instrumentation and water-balance observations; it is a performance report, not a universal cover design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The report covers July 2023–June 2024 observations and was published in 2025.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Annual measured-performance results and instrument maintenance are documented.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a cover-design and monitoring study that accounts for both central capillary storage and lateral edge drainage.","inputs":["Extract layer geometry, climate observations and the stated drainage criterion.","Distinguish central-cover performance from gravel/riprap side-slope behaviour."],"deliverables":["Prepare a seasonal water-storage calculation and a sensitivity study for precipitation and vegetation.","Design a monitoring layout that can detect edge effects and instrument failure.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Prototype Hanford Barrier performance monitoring — FY 2024","url":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","publisher":"PNNL / US DOE","year":2025,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"The report is openly downloadable at the publisher; PNNL reuse terms require separate consideration, so it is linked rather than mirrored.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hanford-barrier.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hanford-barrier/download/schematic"},{"id":"project-image","title":"Prototype Hanford Barrier — original annotated aerial photograph","kind":"project-image","fileName":"hanford-barrier.jpeg","mimeType":"image/jpeg","bytes":459599,"sha256":"63cb16ca1395d7d5ff0fde51b014a0d920e143cf1127e6bd90d4abdf56479bc1","sourceId":"s1","license":"PNNL permission for noncommercial scientific and educational use","width":1449,"height":1177,"credit":"Pacific Northwest National Laboratory / U.S. Department of Energy; Figure 1 in Thomle and Linneman (2025), modified in that report from DOE-RL (2016)","sourceUrl":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","licenseUrl":"https://www.pnnl.gov/important-notices","imageDate":"1994-08-09","evidenceFile":"image-provenance/hanford-barrier-source.json","evidenceSha256":"d2328302fe4d206a8b7ebc2cef155b3bc29e55e057a951732eb7e5fdfc0306d1","transformations":"Unchanged complete original embedded image extracted from the identified PDF. Original labels retained; no crop, retouching, or newly added annotation.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/hanford-barrier/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hanford-barrier-capstone.md","mimeType":"text/markdown","bytes":3018,"sha256":"3674df64a7230934309cfd38e9079fda91df6bba4d8bcecbdddb3652ef3cf96d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hanford-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Annotated aerial photograph of the completed Prototype Hanford Barrier in August 1994.","caption":"Annotated aerial photograph of the completed Prototype Hanford Barrier on August 9, 1994, reproduced as Figure 1 in PNNL-36586 (2025). The labels and outlines are part of the original published figure.","credit":"Pacific Northwest National Laboratory / U.S. Department of Energy; Figure 1 in Thomle and Linneman (2025), modified in that report from DOE-RL (2016)","sourceUrl":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","license":"PNNL permission for noncommercial scientific and educational use","licenseUrl":"https://www.pnnl.gov/important-notices","width":1449,"height":1177,"imageDate":"1994-08-09","preserveWholeImage":true},"figureCaption":"Annotated aerial photograph of the completed Prototype Hanford Barrier on August 9, 1994, reproduced as Figure 1 in PNNL-36586 (2025). The labels and outlines are part of the original published figure.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":35,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hanford-barrier-source.json","evidenceSha256":"d2328302fe4d206a8b7ebc2cef155b3bc29e55e057a951732eb7e5fdfc0306d1","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":463608,"sourceCount":1,"url":"/cases/hanford-barrier"},{"id":"treasure-island","title":"Treasure Island redevelopment — liquefaction, settlement and shoreline stability","summary":"Redevelopment of the former naval station must address liquefiable fill, compressible bay mud and perimeter stability. City documents connect geotechnical work with groundwater, contaminated-soil management and phased infrastructure delivery.","topics":["ground-improvement","seismic","settlement","geoenvironmental","coastal-offshore"],"country":"United States","region":"San Francisco Bay","owner":"Treasure Island Development Authority / TICD","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Liquefaction mitigation","Bay-mud consolidation","Shoreline stabilization"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The city’s management plan identifies ground risks and candidate mitigation measures. It is a programme-level source; a measure mentioned there is not automatically the final design for every parcel.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The planning authority describes multiple major phases and phased approvals. Use the selected phase’s current documents for a detailed programme.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a staged redevelopment concept that coordinates ground improvement with contaminated-soil handling and future flood levels.","inputs":["Separate dredged sand, young bay mud and shoreline fills in a study ground model.","Select one development phase and identify which remediation and infrastructure works precede buildings."],"deliverables":["Compare densification, drainage and soil mixing for the selected ground risks.","Prepare a compatible earthworks, groundwater and monitoring plan with defined parcel interfaces.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Could improving liquefaction resistance leave long-term bay-mud settlement unresolved?","How would an improvement method alter the contaminated-water management needs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Revised soil and groundwater management plan","url":"https://www.sf.gov/sites/default/files/2023-12/SGMP_0004-007-005%20Treasure%20Island_Rev%2003-17-23-compressed.pdf","publisher":"City and County of San Francisco","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Adopted development plans and environmental review","url":"https://sfplanning.org/project/treasure-island-yerba-buena-island","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Treasure Island Causeway reconstruction, August 2021.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","publisher":"Wikimedia Commons / Pi.1415926535","year":null,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"treasure-island.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/treasure-island/download/schematic"},{"id":"project-image","title":"Treasure Island Causeway reconstruction, August 2021.jpg","kind":"project-image","fileName":"treasure-island.jpg","mimeType":"image/jpeg","bytes":384762,"sha256":"ab06e2607cce980b060c769b65dedc04cc6f58aedb8a3f6f9e0a633aaaf4d210","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":875,"credit":"Pi.1415926535","sourceUrl":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"Taken on 7 August 2021","evidenceFile":"image-provenance/treasure-island-commons.json","evidenceSha256":"b3087047b946aa578f559ea9164f8b3af9921eb3ea276b6fcbf2645aec9835f2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/21/Treasure_Island_Causeway_reconstruction%2C_August_2021.jpg","downloadUrl":"/cases/treasure-island/download/project-image","originalSha1":"963a01ab4c3fafe7def018b05bd960bc5dc07be2","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"treasure-island-capstone.md","mimeType":"text/markdown","bytes":3420,"sha256":"1aaa50d130048eb8cc82973857ff9d6ceedc527db7ff8de88eef85412d11832e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/treasure-island/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Reconstruction of the Treasure Island Causeway in August 2021.","caption":"Reconstruction of the Treasure Island Causeway in August 2021. This is a real redevelopment work area at the island connection, not a diagram of every ground-improvement method.","credit":"Pi.1415926535","sourceUrl":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":875,"imageDate":"Taken on 7 August 2021","imageDownloadAllowed":true},"figureCaption":"Reconstruction of the Treasure Island Causeway in August 2021. This is a real redevelopment work area at the island connection, not a diagram of every ground-improvement method.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":58,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/treasure-island-commons.json","evidenceSha256":"b3087047b946aa578f559ea9164f8b3af9921eb3ea276b6fcbf2645aec9835f2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":389370,"sourceCount":3,"url":"/cases/treasure-island"},{"id":"freshkills-landfill","title":"Freshkills Park — landfill cap, drainage and long-term integrity","summary":"Former waste mounds are being converted to parkland above engineered cover and gas/leachate systems. The project explains how cover layers limit infiltration, protect barriers and drain slopes.","topics":["geoenvironmental","reinforced-soil","settlement","slopes"],"country":"United States","region":"Staten Island, New York","owner":"New York City","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Composite cover","Interface stability","Leachate control","Waste settlement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project’s landfill-engineering descriptions identify layer functions and monitoring needs. Published expectations for later park phases are not treated as final completion records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a park-compatible cover section that remains functional as underlying waste settles.","inputs":["Extract the barrier, drainage, protection and vegetation functions from the project account.","Define study waste-settlement and rainfall conditions without treating landscaping as structural cover."],"deliverables":["Check interface sliding and drainage capacity for the selected slope.","Detail utility penetrations, gas collection interfaces and a settlement/erosion maintenance plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can differential settlement damage a low-permeability cover without visible surface cracking?","Why must planting and visitor access be coordinated with gas and leachate infrastructure?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Landfill engineering systems","url":"https://freshkillspark.org/the-park/landfill-engineering","publisher":"Freshkills Park / New York City project","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Covering, stabilizing and maintaining","url":"https://freshkillspark.org/landfill-engineering/covering-stabilizing-maintaining","publisher":"Freshkills Park","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","publisher":"Wikimedia Commons / Master Sgt. Mark Olsen","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"freshkills-landfill.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/freshkills-landfill/download/schematic"},{"id":"project-image","title":"Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg","kind":"project-image","fileName":"freshkills-landfill.jpg","mimeType":"image/jpeg","bytes":450785,"sha256":"5251a14d60d70cdf43e8b1f9d40fa2414fcc37c14d14cb6a0da53fca4fcd1bc0","sourceId":"s3","license":"Public domain","width":1280,"height":816,"credit":"Master Sgt. Mark Olsen","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing","imageDate":"Taken on 3 October 2001","evidenceFile":"image-provenance/freshkills-landfill-commons.json","evidenceSha256":"d4019d87a4f791f31f0117545d4c2fe381f92a396a324526924c135ac6f47c3e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/08/Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","downloadUrl":"/cases/freshkills-landfill/download/project-image","originalSha1":"b72773f0a41399c197eae4d74b920815b06bcb86","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"freshkills-landfill-capstone.md","mimeType":"text/markdown","bytes":3372,"sha256":"c49404fa89808b5b9fe490e5b9952afbe7e4bf7418806ef6a1726affa36a8094","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/freshkills-landfill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Fresh Kills Landfill in October 2001.","caption":"Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.","credit":"Master Sgt. Mark Olsen","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing","width":1280,"height":816,"imageDate":"Taken on 3 October 2001","imageDownloadAllowed":true},"figureCaption":"Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":94,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/freshkills-landfill-commons.json","evidenceSha256":"d4019d87a4f791f31f0117545d4c2fe381f92a396a324526924c135ac6f47c3e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":455148,"sourceCount":3,"url":"/cases/freshkills-landfill"},{"id":"love-canal","title":"Love Canal — containment cap and barrier drainage","summary":"The remedy contains waste beneath a cap and intercepts contaminated groundwater for treatment. EPA records describe the expanded synthetic cover, barrier drains and continuing inspection programme.","topics":["geoenvironmental","seepage","dewatering","monitoring"],"country":"United States","region":"Niagara Falls, New York","owner":"US EPA / New York State Department of Environmental Conservation","year":1985,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Composite cap","Barrier drains","Hydraulic containment"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The EPA site record and technical report describe constructed containment and operating components. Removal from a regulatory list does not mean the buried waste or maintenance requirements disappeared.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"EPA describes continuing operations, inspection and maintenance of the containment system.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate whether a containment remedy can maintain inward groundwater gradients under changing infiltration and pump performance.","inputs":["Extract the cap, trench and pumping arrangement from EPA’s report.","Distinguish site boundaries, capped footprint and the actual waste-disposal area."],"deliverables":["Prepare a water balance and capture-zone sensitivity study.","Design inspection priorities and failure-response actions for cap damage or pumping interruption.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What monitoring evidence would reveal a bypass around the barrier-drain system?","Why is a clean-looking surface not sufficient evidence of remedy performance?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Site cleanup and continuing operation","url":"https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0201290","publisher":"US Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Technical containment-system report","url":"https://semspub.epa.gov/work/02/534007.pdf","publisher":"US Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Looking into Love Canal.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","publisher":"Wikimedia Commons / Buffalutheran","year":2012,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"love-canal.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/love-canal/download/schematic"},{"id":"project-image","title":"Looking into Love Canal.jpg","kind":"project-image","fileName":"love-canal.jpg","mimeType":"image/jpeg","bytes":269116,"sha256":"96a2bf4eab0121fa484bdcd20caba1e9984c522c62cd60399ea71de5b086b32d","sourceId":"s3","license":"CC0","width":1280,"height":857,"credit":"Buffalutheran","sourceUrl":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2012-06-15","evidenceFile":"image-provenance/love-canal-commons.json","evidenceSha256":"d4d3d8a037738385c27b7d752567521ce0c0f66f401d7abb350d853fc3e8517e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/5e/Looking_into_Love_Canal.jpg","downloadUrl":"/cases/love-canal/download/project-image","originalSha1":"06e5138c9746943f5e099648990419918b5a1f5e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"love-canal-capstone.md","mimeType":"text/markdown","bytes":3097,"sha256":"9eafc46a13cafa86303fecdba9599259b4e8f1e29833f65a946bebc5ef4d8983","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/love-canal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"View into the Love Canal containment area in 2012.","caption":"View into the Love Canal containment area in 2012. This is the actual remediated site, where the buried waste and collection systems require continuing management.","credit":"Buffalutheran","sourceUrl":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":857,"imageDate":"2012-06-15","imageDownloadAllowed":true},"figureCaption":"View into the Love Canal containment area in 2012. This is the actual remediated site, where the buried waste and collection systems require continuing management.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":95,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/love-canal-commons.json","evidenceSha256":"d4d3d8a037738385c27b7d752567521ce0c0f66f401d7abb350d853fc3e8517e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":273204,"sourceCount":3,"url":"/cases/love-canal"},{"id":"sydney-olympic-remediation","title":"Sydney Olympic Park — engineered waste mounds and leachate management","summary":"Rehabilitated waste areas form parkland above engineered containment. The authority describes the continuing management of landfills and a wetland-based system for treating collected leachate.","topics":["geoenvironmental","seepage","earthworks","monitoring"],"country":"Australia","region":"Homebush Bay, New South Wales","owner":"Sydney Olympic Park Authority","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Waste containment","Leachate collection","Water balance","Post-closure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner explains the treatment strategy and the regulator specifies ongoing management obligations. Parkland use does not remove containment and monitoring duties.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The authority and regulator describe ongoing containment management rather than an unrestricted clean-soil site.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a post-remediation management plan that keeps recreational land use compatible with waste containment.","inputs":["Map the relationship between waste mounds, drainage and treatment from the owner description.","Identify obligations in the regulator’s ongoing maintenance order."],"deliverables":["Prepare a leachate water balance with wet and dry season scenarios.","Specify cap inspections, settlement surveys and action limits at public-use interfaces.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can changing irrigation practice affect both vegetation and leachate generation?","Which engineering responsibilities persist after a site opens as a public park?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Landfill leachate treatment","url":"https://www.sydneyolympicpark.nsw.gov.au/parklands/sustainability/innovative-landfill-waste-water-treatment","publisher":"Sydney Olympic Park Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Ongoing maintenance order amendment","url":"https://app.epa.nsw.gov.au/resources/clm/docs/html/n20224440.htm","publisher":"NSW Environment Protection Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Sydney Olympic Park, New South Wales (aerial view, 2010).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","publisher":"Wikimedia Commons / YellowMonkey","year":2010,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sydney-olympic-remediation.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sydney-olympic-remediation/download/schematic"},{"id":"project-image","title":"Sydney Olympic Park, New South Wales (aerial view, 2010).jpg","kind":"project-image","fileName":"sydney-olympic-remediation.jpg","mimeType":"image/jpeg","bytes":351233,"sha256":"a4369361c1b211df204b80c3292789fc5ea9a54345749b0befae6ac299d70882","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":889,"credit":"YellowMonkey","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2010-01-01","evidenceFile":"image-provenance/sydney-olympic-remediation-commons.json","evidenceSha256":"cdab9d43e8077cf22f651fc63274c75be0763dc1ba041684fa59ead7b5100639","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/c1/Sydney_Olympic_Park%2C_New_South_Wales_%28aerial_view%2C_2010%29.jpg","downloadUrl":"/cases/sydney-olympic-remediation/download/project-image","originalSha1":"e881304a765e0c1c4d5397317cab6c75eb67fb1e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sydney-olympic-remediation-capstone.md","mimeType":"text/markdown","bytes":3230,"sha256":"a6c0372ecc5957e69050d7a4744dcff5e6adc3be3c5a8d343ed4ef429a2157cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sydney-olympic-remediation/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Sydney Olympic Park in 2010.","caption":"Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.","credit":"YellowMonkey","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":889,"imageDate":"2010-01-01","imageDownloadAllowed":true},"figureCaption":"Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":96,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sydney-olympic-remediation-commons.json","evidenceSha256":"cdab9d43e8077cf22f651fc63274c75be0763dc1ba041684fa59ead7b5100639","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":355454,"sourceCount":3,"url":"/cases/sydney-olympic-remediation"},{"id":"randle-reef","title":"Randle Reef — harbour sediment containment and final capping","summary":"Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.","topics":["geoenvironmental","coastal-offshore","retaining-walls","settlement"],"country":"Canada","region":"Hamilton Harbour, Ontario","owner":"Canada Water Agency and project partners","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sediment containment","Steel walls","Consolidation","Environmental capping"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The official project record identifies the staged remedy. The final cap is not labeled complete: the reviewed owner update schedules that phase for 2027.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The reviewed owner update schedules Stage 3 completion for 2027, subject to the additional structural work described there.","sourceIds":["s1"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a staged containment-cell concept that can receive dredged sediment and later support a capped working surface.","inputs":["Extract the containment, dredging and cap-stage functions from the owner record.","Define sediment compressibility, drainage and future surface loads as explicit study inputs."],"deliverables":["Compare wall stability and fill settlement during successive dredging stages.","Develop cap tolerances, consolidation monitoring and handover criteria for long-term operation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does sediment settlement affect cap grading and surface drainage?","Why is completion of contaminant placement different from completion of the containment facility?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Randle Reef remediation stages and status","url":"https://www.canada.ca/en/canada-water-agency/freshwater-ecosystem-initiatives/great-lakes/great-lakes-protection/areas-concern/hamilton-harbour/randle-reef.html","publisher":"Canada Water Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Randle Reef — project milestones and photographs","url":"https://randlereef.ca/","publisher":"Randle Reef project / Bay Area Restoration Council","year":2024,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"randle-reef.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/schematic"},{"id":"project-image","title":"Randle Reef — July 2024 project aerial","kind":"project-image","fileName":"randle-reef-r13.jpg","mimeType":"image/jpeg","bytes":148502,"sha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","sourceId":"s2","license":"No open reuse license verified; original copyright retained","width":410,"height":230,"credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","licenseUrl":"https://randlereef.ca/","imageDate":"2024-07","evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","transformations":"Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://randlereef.ca/images/Milestones/2024-07-01-RR-1.jpg","originalSha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/randle-reef/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"randle-reef-capstone.md","mimeType":"text/markdown","bytes":3111,"sha256":"4357e7687177934b826133161deabfbee508806634260af74dd729247c2ea234","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"July 2024 aerial photograph of the Randle Reef sediment containment facility in Hamilton Harbour.","caption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://randlereef.ca/","width":410,"height":230,"imageDate":"2024-07","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":97,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","visualReview":"Inspected the complete published 410 × 230 image. It shows the actual containment cell with surrounding water, retaining perimeter and construction-stage fill. The image is not relabeled as a final-completion record.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4102,"sourceCount":2,"url":"/cases/randle-reef"},{"id":"heerlen-minewater","title":"Heerlen — heat recovery and storage in flooded mines","summary":"Flooded coal-mine workings provide thermal resources and storage for a district network. Published project accounts explain the transition from extracting mine heat to exchanging and regenerating it through building clusters.","topics":["geothermal","rock","dewatering","geoenvironmental","monitoring"],"country":"Netherlands","region":"Heerlen, Limburg","owner":"Mijnwater / Municipality of Heerlen","year":2014,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Mine-water heat recovery","Coupled groundwater and heat transport","Thermal regeneration","Mine-void risk assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project paper describes Minewater 2.0 and the STORM demonstrator documents hot, cold and reinjection wells. Mine connectivity, well condition, water chemistry and pressure limits remain site-specific inputs for any new scheme.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The project paper identifies pilot operation from October 2008 and the first Minewater 2.0 phase from June 2013.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The STORM project records staged controller deployment and monitoring at the Heerlen demonstration site; it is not a complete mine-closure or well-acceptance dossier.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a hydrothermal operating concept for a flooded-mine network, with explicit mine-stability, water-quality and seasonal heat-recovery constraints.","inputs":["Trace the reported hot/cold-well arrangement and distinguish the original pilot from the later cluster network.","Assemble mine plans, hydraulic connections, pumping response and chemistry data; document gaps instead of assuming a uniform porous aquifer."],"deliverables":["Construct a reduced network water/heat balance and test thermal short-circuiting and seasonal regeneration scenarios.","Prepare well-integrity, mine-stability and water-quality monitoring plans with operating limits and contingency actions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a system that initially supplies heat become unsustainable if recharge and heat exchange are ignored?","How would a poorly mapped mine connection alter pumping response, thermal breakthrough and the choice of observation wells?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Minewater 2.0 — project authors’ account","url":"https://www.sciencedirect.com/science/article/pii/S187661021400174X","publisher":"Verhoeven et al. / Energy Procedia","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Heerlen demonstration site and well/network configuration","url":"https://storm-dhc.eu/en/mijnwater-bv-site","publisher":"STORM project / VITO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Heerlerheide Schacht ONIII (1).jpg","url":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","publisher":"Hans Erren","year":2012,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"heerlen-minewater.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/heerlen-minewater/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"heerlen-minewater-reference-values.csv","mimeType":"text/csv","bytes":532,"sha256":"a2efc312f0bbcd2b120f9231b984aff1643b05c6e92016837cfe49dfb2cbceb2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/heerlen-minewater/download/reference-values"},{"id":"project-image","title":"Heerlerheide — former Oranje-Nassau III mine shaft","kind":"project-image","fileName":"heerlen-minewater.jpg","mimeType":"image/jpeg","bytes":333440,"sha256":"baa063d001e8d1878b3fcb4bc810e00f26ce5b5768ff10ffafb48b0cde985468","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":648,"credit":"Hans Erren / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2012-08-01 18:48:42","evidenceFile":"image-provenance/heerlen-minewater-r14-source.json","evidenceSha256":"ead9774990be9695ae89799195ff0a7032b9f83c5146cdf65c8ff6331c92f048","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Heerlerheide_Schacht_ONIII_%281%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/heerlen-minewater/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"heerlen-minewater-capstone.md","mimeType":"text/markdown","bytes":4155,"sha256":"3757cab5372b656f41e48fd4cc3e273c7a8e68bc26af1ec2053b87ecd31e0fde","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/heerlen-minewater/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","caption":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","credit":"Hans Erren / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":648,"imageDate":"2012-08-01 18:48:42","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":105,"referenceValues":[{"label":"Hot-well temperature","value":28,"unit":"°C","scope":"Two hot wells in the documented STORM demonstration configuration.","sourceId":"s2","locator":"Site description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Cold-well temperature","value":16,"unit":"°C","scope":"Two cold wells in the documented STORM demonstration configuration.","sourceId":"s2","locator":"Site description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/heerlen-minewater-r14-source.json","evidenceSha256":"ead9774990be9695ae89799195ff0a7032b9f83c5146cdf65c8ff6331c92f048","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":339184,"sourceCount":3,"url":"/cases/heerlen-minewater"},{"id":"rocky-flats","title":"Rocky Flats — engineered covers and long-term groundwater care","summary":"The remediated site retains engineered landfill covers, groundwater collection/treatment systems and long-term inspections. Public surveillance records support a capstone on containment performance after closure.","topics":["geoenvironmental","seepage","slopes","earthworks","monitoring"],"country":"United States","region":"Colorado Front Range","owner":"U.S. Department of Energy, Office of Legacy Management","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Landfill-cover water balance","Infiltration control","Cover-slope stability","Groundwater monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"DOE records distinguish the Original and Present Landfills and the associated water-management systems. Select a specific unit before evaluating infiltration, cover stability or treatment performance; site-wide cleanup is not evidence that all residual hazards were removed.","sourceIds":["s1","s2","s3","s4"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The May 2026 DOE fact sheet separates the 2005 physical closure from continuing cover maintenance, groundwater treatment and monitoring. The owner also lists a new five-year remedy review due in 2027; that future review is not a completed record.","sourceIds":["s1","s2","s3","s4"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess one documented cover or groundwater-control unit and design an inspection-and-maintenance programme that can identify declining performance.","inputs":["Select a dated DOE cover inspection, groundwater record and corresponding remedy description.","Assemble precipitation, runoff pathways, cover stratigraphy and measured movements where public; label any substituted parameters."],"deliverables":["Evaluate cover infiltration and stability under normal operation, blocked drainage and a severe precipitation scenario.","Prepare a monitoring dashboard specification, repair triggers and a long-term maintenance cost model using current study rates.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a vegetated cover appear healthy while preferential seepage or a slope movement is degrading its containment function?","Which measurements would reveal whether a groundwater change originates at the cover, the collection system or regional recharge?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Rocky Flats Site — remedy and stewardship responsibilities","url":"https://www.energy.gov/lm/rocky-flats-site-colorado","publisher":"U.S. Department of Energy","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Rocky Flats key document archive — monitoring and inspections","url":"https://www.energy.gov/lm/rocky-flats-site-colorado-key-document-archive","publisher":"U.S. Department of Energy","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Original Landfill inspection-frequency contact record, 2025-03","url":"https://lmpublicsearch.lm.doe.gov/LMSites/RFLMA%20CR%202025-03.pdf","publisher":"U.S. Department of Energy / Rocky Flats regulators","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Rocky Flats Site fact sheet, May 2026","url":"https://www.energy.gov/documents/rocky-flats-site-colorado-fact-sheet","publisher":"U.S. Department of Energy, Office of Legacy Management","year":null,"access":"public-link","license":"US Department of Energy public-domain publication; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["rocky-flats-factsheet-2026"]},{"id":"s5","title":"Aerial View of Rocky Flats in 2007 (14597931675).jpg","url":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","publisher":"USEPA Environmental-Protection-Agency","year":2014,"access":"public-link","license":"Public domain","notes":"Project image source. Publisher-native 300 × 210 JPEG retained unchanged; no local upscaling, crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rocky-flats.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rocky-flats/download/schematic"},{"id":"rocky-flats-factsheet-2026","title":"Rocky Flats Site, Colorado — DOE fact sheet, May 2026","kind":"report","fileName":"rocky-flats-factsheet-2026.pdf","mimeType":"application/pdf","bytes":4278537,"sha256":"fa3fa6e60923be177cdc512bb53099361d20a3b2441ffa0f3507cb9e85b93121","sourceId":"s4","license":"US Department of Energy public-domain publication; original credits retained","rightsUrl":"https://www.energy.gov/web-policies","rightsBasis":"DOE-authored site fact sheet; DOE web policy permits distribution of government information. The four-page original has no separate third-party copyright notice and is retained unchanged with all credits.","rightsEvidenceUrl":"https://www.energy.gov/web-policies","pages":4,"downloadUrl":"/cases/rocky-flats/download/rocky-flats-factsheet-2026"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"rocky-flats-reference-values.csv","mimeType":"text/csv","bytes":1032,"sha256":"f58cae5cc633707ae1377b8d404c0a00e3a111a42ea49d3940b22d5e32a1c361","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/rocky-flats/download/reference-values"},{"id":"project-image","title":"Rocky Flats — site after building removal","kind":"project-image","fileName":"rocky-flats.jpg","mimeType":"image/jpeg","bytes":26010,"sha256":"8437d2bc32ef137793a3f53dca6f25f0fa81eaf9f810bdce49c02f5612c24dd1","sourceId":"s5","license":"Public domain","width":300,"height":210,"credit":"USEPA Environmental-Protection-Agency / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","imageDate":"2014-07-07 13:46","evidenceFile":"image-provenance/rocky-flats-r14-source.json","evidenceSha256":"9f571755569d1dbcea1f0b130b2d172dac5094df7de004c5c58c4c33c1adb3f5","transformations":"Publisher-native 300 × 210 JPEG retained unchanged; no local upscaling, crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/45/Aerial_View_of_Rocky_Flats_in_2007_%2814597931675%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/rocky-flats/download/project-image","imageDownloadAllowed":true,"rightsStatus":"public-domain","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rocky-flats-capstone.md","mimeType":"text/markdown","bytes":5243,"sha256":"e18c9ea27f777db1cc3f999ea5b03b616ef943c524086271527cb86314ec28c3","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rocky-flats/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","caption":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","credit":"USEPA Environmental-Protection-Agency / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","width":300,"height":210,"imageDate":"2014-07-07 13:46","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"public-domain"},"figureCaption":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","qualityNotes":["The local DOE fact sheet describes the remedy and ongoing responsibilities. Final cover cross-sections and monitoring time series remain in the linked site archive."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":110,"referenceValues":[{"label":"Closed landfills under continuing care","value":2,"unit":"landfills","scope":"DOE Office of Legacy Management responsibilities as described in May 2026.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."},{"label":"Groundwater collection systems","value":4,"unit":"systems","scope":"Continuing collection-system responsibilities, separate from treatment-system count.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."},{"label":"Groundwater treatment systems","value":3,"unit":"systems","scope":"Continuing treatment-system responsibilities; not four because collection and treatment are different systems.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rocky-flats-r14-source.json","evidenceSha256":"9f571755569d1dbcea1f0b130b2d172dac5094df7de004c5c58c4c33c1adb3f5","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":4311813,"sourceCount":5,"url":"/cases/rocky-flats"},{"id":"berkeley-pit","title":"Berkeley Pit — mine flooding and hydraulic containment","summary":"The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.","topics":["geoenvironmental","dewatering","rock","seepage","monitoring"],"country":"United States","region":"Butte, Montana","owner":"EPA oversight / responsible mining parties","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Mine-water balance","Hydraulic containment","Pumping and treatment","Monitoring interpretation"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"EPA identifies the Butte Mine Flooding operable unit and continuing treatment. The official monitoring archive provides dated discharge reports; pit water, connected mine water and surrounding aquifers must be represented as a connected system.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Public discharge reports and EPA status material document continuing treatment and monitoring. They are dated operational records, not evidence that treatment can be discontinued.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a water-balance and containment assessment for the flooded mine, with sensitivity to uncertain inflow and temporary treatment interruption.","inputs":["Use a dated monthly monitoring report for observed discharge and compliance data.","Identify pit and mine-water levels, the relevant control elevation and its datum, and unmeasured groundwater exchanges."],"deliverables":["Build a time-dependent storage/pumping model that distinguishes observations, calibrated flows and conservative assumptions.","Develop outage scenarios, monitoring triggers and a recovery pumping strategy with treatment-capacity constraints.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would a stable pit level conceal a change in groundwater capture or treatment demand?","What evidence is needed before comparing a reported control elevation with survey data recorded in a different vertical datum?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Current site status — Butte Mine Flooding OU3","url":"https://www.epa.gov/butte/current-site-status","publisher":"U.S. Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"January 2025 monthly discharge monitoring report","url":"https://digitalcommons.mtech.edu/superfund_silverbowbutte/1282/","publisher":"Thompson and Griffis / Montana Technological University archive","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Berkeley Pit water-treatment explanation","url":"https://pitwatch.org/learn/water-treatment/","publisher":"PitWatch / Butte Mine Flooding information programme","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"2013 Berkeley Pit, Butte, Montana (1).jpg","url":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","publisher":"Chris06","year":2013,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"berkeley-pit.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/berkeley-pit/download/schematic"},{"id":"project-image","title":"Berkeley Pit — flooded mine excavation","kind":"project-image","fileName":"berkeley-pit.jpg","mimeType":"image/jpeg","bytes":297779,"sha256":"27b5d65db09c4b1d2ba719119c2740d3cb439ae5250b4e5c9ace6f2032d4f473","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":903,"credit":"Chris06 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2013-08-03","evidenceFile":"image-provenance/berkeley-pit-r14-source.json","evidenceSha256":"8258faad4b0bffb33e50f379f8fc7e4acf937b5946609c3dc163c7733f9ca2b8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a8/2013_Berkeley_Pit%2C_Butte%2C_Montana_%281%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/berkeley-pit/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"berkeley-pit-capstone.md","mimeType":"text/markdown","bytes":3653,"sha256":"a8e1cd9696e424949050088262199d4660028a778e7daa8a242dd143c1df072d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/berkeley-pit/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","caption":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","credit":"Chris06 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":903,"imageDate":"2013-08-03","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":111,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/berkeley-pit-r14-source.json","evidenceSha256":"8258faad4b0bffb33e50f379f8fc7e4acf937b5946609c3dc163c7733f9ca2b8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":302423,"sourceCount":4,"url":"/cases/berkeley-pit"}]}