{"schemaVersion":1,"updated":"2026-11-22","total":4,"records":[{"id":"ball-state-geothermal","title":"Ball State University — campus ground-source borefields","summary":"The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.","topics":["geothermal","site-investigation","dewatering","delivery"],"country":"United States","region":"Muncie, Indiana","owner":"Ball State University","year":2012,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Borefield layout","Thermal ground response","Drilling logistics"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The university white paper describes approximately 3,600 boreholes, depths of 400–500ft and restored surface uses; these are closed loops, not pumping wells.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The first phase began operating in spring 2012; the later university paper describes the completed base project.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Owner information and a system map are linked; detailed bore logs and final bills were not established.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a ground-source borefield feasibility study that integrates thermal properties, drilling constraints and protection of groundwater.","inputs":["Extract the owner’s borefield arrangement and distinguish heat demand from ground capacity.","Define site-specific thermal-response and groundwater information needed before sizing."],"deliverables":["Prepare a borehole/loop concept and thermal-interference sensitivity study.","Develop drilling, grouting, testing and surface-restoration work packages.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geothermal energy system","url":"https://bsu.edu/about/geothermal","publisher":"Ball State University","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geothermal white paper, January 2019","url":"https://www.bsu.edu/-/media/www/departmentalcontent/cap/cote/021419geothermalwhitepaperjanuary2019.pdf","publisher":"Ball State University","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GeothermalConstruction073011.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","publisher":"Wikimedia Commons / Travisleehardin","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"ball-state-geothermal.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ball-state-geothermal/download/schematic"},{"id":"project-image","title":"GeothermalConstruction073011.jpg","kind":"project-image","fileName":"ball-state-geothermal.jpg","mimeType":"image/jpeg","bytes":391205,"sha256":"b868dba6d8cf0ee3d2c41c41e43b9d48cfbbba7f642ee47ad0551a976352bfc1","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Travisleehardin","sourceUrl":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 30 July 2011","evidenceFile":"image-provenance/ball-state-geothermal-commons.json","evidenceSha256":"82e4b1e5c89994e49ef1a6440f2a443e78d523712954dffd40d297383c97b1fd","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d3/GeothermalConstruction073011.jpg","downloadUrl":"/cases/ball-state-geothermal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"ball-state-geothermal-capstone.md","mimeType":"text/markdown","bytes":3087,"sha256":"3ade5cc33c34a3ba8e308b4fe8867dc99ded41e7bd1fabd5e4ec7c8868394008","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ball-state-geothermal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Geothermal-loop construction at Ball State University, July 30, 2011.","caption":"Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.","credit":"Travisleehardin","sourceUrl":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 30 July 2011"},"figureCaption":"Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":36,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/ball-state-geothermal-commons.json","evidenceSha256":"82e4b1e5c89994e49ef1a6440f2a443e78d523712954dffd40d297383c97b1fd","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":395349,"sourceCount":3,"url":"/cases/ball-state-geothermal"},{"id":"eth-honggerberg","title":"ETH Hönggerberg — seasonal borehole heat storage","summary":"The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.","topics":["geothermal","site-investigation","dewatering","monitoring","delivery"],"country":"Switzerland","region":"Zurich","owner":"ETH Zurich","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Borehole heat exchangers","Seasonal thermal storage","Thermal interference","Construction staging"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"ETH documents 160 additional probes at 200 m depth on a 5 m grid, beside an existing field of 126 probes. The published project description supports layout and heat-balance studies; it does not supply a complete thermal-response test dataset.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner dates HC4 expansion drilling to October 2024–May 2025 and operational handover to July 2025. Later proposed fields are outside this completed expansion.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The owner confirms connection of the enlarged HC4 field to the campus network; continuous raw operating data and final drilling records were not provided on the reviewed pages.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased borehole-field expansion for an operating campus and test whether spacing, ground properties and annual heat imbalance control the design.","inputs":["Use the published HC4 depth, spacing and probe counts; assemble an explicitly labelled study load series for heating and cooling.","Identify borehole logs, groundwater flow, thermal conductivity and borehole-resistance measurements still needed before design."],"deliverables":["Compare a line-source screening calculation with a multi-borehole response model under balanced and unbalanced annual loads.","Lay out drilling access, buried services, grouting verification, commissioning tests and long-term temperature monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would persistent net heat injection change performance even if the first operating year meets the heating and cooling demand?","What additional thermal-response or groundwater observations would justify reducing uncertainty at the 5 m borehole spacing?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"HC4 geothermal probe-field expansion and commissioning","url":"https://ethz.ch/staffnet/en/news-and-events/internal-news/archive/2025/08/hoenggerberg-campus-becomes-more-sustainable-above-and-below-ground.html","publisher":"ETH Zurich Real Estate Management","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Energy supply and the campus anergy grid","url":"https://ethz.ch/en/the-eth-zurich/organisation/departments/engineering-and-systems/energie.html","publisher":"ETH Zurich","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ETH Hönggerberg campus, seen from Hönggerbergstrasse.jpg","url":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","publisher":"Balise42","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eth-honggerberg.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eth-honggerberg-reference-values.csv","mimeType":"text/csv","bytes":1393,"sha256":"0746df014858f90951177b8dd60717dcd4fd0c62a7496d26412f00d0525e7c28","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eth-honggerberg/download/reference-values"},{"id":"project-image","title":"ETH Hönggerberg campus — setting of the anergy grid","kind":"project-image","fileName":"eth-honggerberg.jpg","mimeType":"image/jpeg","bytes":299237,"sha256":"3bfed12bb7a9484ceb0020eb752234d62054091b0f07478ee2a2b3a9b01c5ce9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":854,"credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-09-16 10:13:12","evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/94/ETH_H%C3%B6nggerberg_campus%2C_seen_from_H%C3%B6nggerbergstrasse.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eth-honggerberg/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eth-honggerberg-capstone.md","mimeType":"text/markdown","bytes":5102,"sha256":"e859f8b70fe4a7e15e0b6156c663fbf6c8ef78fcddde30913231a93546dc88b4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","caption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":854,"imageDate":"2023-09-16 10:13:12","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":103,"referenceValues":[{"label":"Added HC4 probes","value":160,"unit":"probes","scope":"HC4 expansion drilled October 2024–May 2025.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported probe depth","value":200,"unit":"m","scope":"New HC4 geothermal probes; do not infer the full site stratigraphy.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported grid spacing","value":5,"unit":"m","scope":"Spacing stated for the HC4 expansion.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Existing HC4 probes","value":126,"unit":"probes","scope":"Pre-expansion field, distinct from the 160 additional probes.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":306789,"sourceCount":3,"url":"/cases/eth-honggerberg"},{"id":"arlanda-aquifer","title":"Stockholm Arlanda — aquifer thermal energy storage","summary":"The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.","topics":["geothermal","dewatering","site-investigation","monitoring"],"country":"Sweden","region":"Stockholm Arlanda Airport","owner":"Swedavia","year":2009,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Aquifer thermal energy storage","Pumping and reinjection","Thermal plume transport","Water balance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Swedavia describes seasonal circulation through the Brunkebergsåsen aquifer, reinjection of the extracted volume and uses for recovered heat. Detailed well construction, transmissivity and monitoring time series must be obtained separately.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports that the aquifer system began operation in summer 2009.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The owner describes the operating principle and an annual energy-reduction estimate. Treat that estimate as an owner-reported system value, not an independently reproduced geotechnical result.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Size a conceptual paired-well seasonal storage system for an airport, keeping hydraulic interference, heat migration and groundwater protection visible in the design.","inputs":["Establish an assumed stratigraphic section and transmissivity range, clearly separated from the owner’s published system description.","Build seasonal heating/cooling loads and identify water-quality limits, abstraction permissions and nearby receptors."],"deliverables":["Calculate pumping drawdown, reinjection mounding and a first thermal travel-time estimate, then test sensitivity to groundwater flow.","Prepare a well spacing concept, mass/energy balance, monitoring network and recovery-efficiency evaluation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How could returning the same volume of groundwater still change temperatures or groundwater quality outside the intended storage zone?","Which combination of pumping tests and thermal tracers would best distinguish inadequate transmissivity from early thermal breakthrough?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"The aquifer — owner explanation of airport seasonal storage","url":"https://www.swedavia.com/about-swedavia/the-aquifer/","publisher":"Swedavia","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Stockholm-Arlanda Airport aerial view.JPG","url":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","publisher":"Nemracc","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"arlanda-aquifer.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/arlanda-aquifer/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"arlanda-aquifer-reference-values.csv","mimeType":"text/csv","bytes":375,"sha256":"8a4f1706bee52daf9c8d4a97180a76295841b01271e437878d6c32986279c518","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/arlanda-aquifer/download/reference-values"},{"id":"project-image","title":"Stockholm Arlanda Airport — aerial site view","kind":"project-image","fileName":"arlanda-aquifer.jpg","mimeType":"image/jpeg","bytes":268995,"sha256":"a4465724499f43a3e188c68f6d065eb106cf5d3e7abddf0469b56d0789048f8a","sourceId":"s2","license":"CC BY-SA 3.0","width":1269,"height":650,"credit":"Nemracc / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-01-11 08:37:35","evidenceFile":"image-provenance/arlanda-aquifer-r14-source.json","evidenceSha256":"fbacca4ee162dee050c65db5b09456023adf2f565c6392f39bea524e93cbd441","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f2/Stockholm-Arlanda_Airport_aerial_view.JPG?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/arlanda-aquifer/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"arlanda-aquifer-capstone.md","mimeType":"text/markdown","bytes":3872,"sha256":"f9b0bd622d058575a97b9b95083312cd054f93e88a524a051a0178d17246b6ff","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/arlanda-aquifer/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","caption":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","credit":"Nemracc / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1269,"height":650,"imageDate":"2008-01-11 08:37:35","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":104,"referenceValues":[{"label":"Owner-reported annual energy reduction","value":19,"unit":"GWh/year","scope":"Airport system estimate from the owner description; not a measured heat-pump COP.","sourceId":"s1","locator":"Annual energy reduction","basis":"Owner-reported estimate; no independent performance reconstruction or guarantee implied."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/arlanda-aquifer-r14-source.json","evidenceSha256":"fbacca4ee162dee050c65db5b09456023adf2f565c6392f39bea524e93cbd441","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":274299,"sourceCount":2,"url":"/cases/arlanda-aquifer"},{"id":"heerlen-minewater","title":"Heerlen — heat recovery and storage in flooded mines","summary":"Flooded coal-mine workings provide thermal resources and storage for a district network. Published project accounts explain the transition from extracting mine heat to exchanging and regenerating it through building clusters.","topics":["geothermal","rock","dewatering","geoenvironmental","monitoring"],"country":"Netherlands","region":"Heerlen, Limburg","owner":"Mijnwater / Municipality of Heerlen","year":2014,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Mine-water heat recovery","Coupled groundwater and heat transport","Thermal regeneration","Mine-void risk assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project paper describes Minewater 2.0 and the STORM demonstrator documents hot, cold and reinjection wells. Mine connectivity, well condition, water chemistry and pressure limits remain site-specific inputs for any new scheme.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The project paper identifies pilot operation from October 2008 and the first Minewater 2.0 phase from June 2013.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The STORM project records staged controller deployment and monitoring at the Heerlen demonstration site; it is not a complete mine-closure or well-acceptance dossier.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a hydrothermal operating concept for a flooded-mine network, with explicit mine-stability, water-quality and seasonal heat-recovery constraints.","inputs":["Trace the reported hot/cold-well arrangement and distinguish the original pilot from the later cluster network.","Assemble mine plans, hydraulic connections, pumping response and chemistry data; document gaps instead of assuming a uniform porous aquifer."],"deliverables":["Construct a reduced network water/heat balance and test thermal short-circuiting and seasonal regeneration scenarios.","Prepare well-integrity, mine-stability and water-quality monitoring plans with operating limits and contingency actions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a system that initially supplies heat become unsustainable if recharge and heat exchange are ignored?","How would a poorly mapped mine connection alter pumping response, thermal breakthrough and the choice of observation wells?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Minewater 2.0 — project authors’ account","url":"https://www.sciencedirect.com/science/article/pii/S187661021400174X","publisher":"Verhoeven et al. / Energy Procedia","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Heerlen demonstration site and well/network configuration","url":"https://storm-dhc.eu/en/mijnwater-bv-site","publisher":"STORM project / VITO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Heerlerheide Schacht ONIII (1).jpg","url":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","publisher":"Hans Erren","year":2012,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"heerlen-minewater.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/heerlen-minewater/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"heerlen-minewater-reference-values.csv","mimeType":"text/csv","bytes":532,"sha256":"a2efc312f0bbcd2b120f9231b984aff1643b05c6e92016837cfe49dfb2cbceb2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/heerlen-minewater/download/reference-values"},{"id":"project-image","title":"Heerlerheide — former Oranje-Nassau III mine shaft","kind":"project-image","fileName":"heerlen-minewater.jpg","mimeType":"image/jpeg","bytes":333440,"sha256":"baa063d001e8d1878b3fcb4bc810e00f26ce5b5768ff10ffafb48b0cde985468","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":648,"credit":"Hans Erren / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2012-08-01 18:48:42","evidenceFile":"image-provenance/heerlen-minewater-r14-source.json","evidenceSha256":"ead9774990be9695ae89799195ff0a7032b9f83c5146cdf65c8ff6331c92f048","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Heerlerheide_Schacht_ONIII_%281%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/heerlen-minewater/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"heerlen-minewater-capstone.md","mimeType":"text/markdown","bytes":4155,"sha256":"3757cab5372b656f41e48fd4cc3e273c7a8e68bc26af1ec2053b87ecd31e0fde","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/heerlen-minewater/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","caption":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","credit":"Hans Erren / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":648,"imageDate":"2012-08-01 18:48:42","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":105,"referenceValues":[{"label":"Hot-well temperature","value":28,"unit":"°C","scope":"Two hot wells in the documented STORM demonstration configuration.","sourceId":"s2","locator":"Site description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Cold-well temperature","value":16,"unit":"°C","scope":"Two cold wells in the documented STORM demonstration configuration.","sourceId":"s2","locator":"Site description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/heerlen-minewater-r14-source.json","evidenceSha256":"ead9774990be9695ae89799195ff0a7032b9f83c5146cdf65c8ff6331c92f048","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":339184,"sourceCount":3,"url":"/cases/heerlen-minewater"}]}