{"schemaVersion":1,"updated":"2026-11-22","total":35,"records":[{"id":"i15-salt-lake","title":"I-15 reconstruction — soft-ground embankments and geofoam","summary":"Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.","topics":["settlement","ground-improvement","reinforced-soil","monitoring","delivery"],"country":"United States","region":"Salt Lake City, Utah","owner":"Utah Department of Transportation","year":2001,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Vertical drains and surcharge","Two-stage MSE","Consolidation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"The reports document alternative embankment systems and monitored geofoam sections, including the 100 South crossing.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The monitoring reports cover reconstruction and the following decade; extract dates for the chosen section rather than using a corridor-wide programme.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Long-term settlement and numerical-model comparisons are available in the research reports.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Choose an embankment solution above sensitive buried utilities and soft clay, then reconcile the design prediction with the long-term monitoring record.","inputs":["Extract stratigraphy, groundwater and construction loading from the selected instrumented section.","Digitize a clearly identified settlement series with units and dates."],"deliverables":["Compare earth fill, preload/drains and geofoam for settlement, time and buoyancy.","Prepare a staged-load calculation, utility protection detail and monitoring acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"I-15 reconstruction long-term embankment monitoring study","url":"https://rosap.ntl.bts.gov/view/dot/31963","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Design and evaluation of EPS geofoam embankments","url":"https://rosap.ntl.bts.gov/view/dot/31962","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Use of Geofoam for I-15 Reconstruction in Salt Lake City, UT","url":"https://geofoam.syr.edu/utah.html","publisher":"Syracuse University Geofoam Research Center","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Original published image file copied unchanged; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"i15-salt-lake.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/schematic"},{"id":"project-image","title":"I-15 geofoam embankment at 100 South","kind":"project-image","fileName":"i15-salt-lake-r13.jpg","mimeType":"image/jpeg","bytes":35444,"sha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":305,"credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","licenseUrl":"https://geofoam.syr.edu/utah.html","imageDate":null,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://geofoam.syr.edu/I15/fig2.jpg","originalSha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/i15-salt-lake/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"i15-salt-lake-capstone.md","mimeType":"text/markdown","bytes":3144,"sha256":"2f5d23d456cf891b53e2856f43a44d2aa142b9eb42e4bd26cf2ba3cbb33ffe33","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","caption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://geofoam.syr.edu/utah.html","width":400,"height":305,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":3,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4322,"sourceCount":3,"url":"/cases/i15-salt-lake"},{"id":"west-davis-geofoam","title":"West Davis Highway ramp — lightweight fill beside live transport","summary":"UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.","topics":["ground-improvement","settlement","earthworks","delivery"],"country":"United States","region":"Farmington, Utah","owner":"Utah Department of Transportation","year":2023,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Settlement control","Construction access"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The owner describes the lightweight-fill choice and construction; detailed geotechnical design calculations are not supplied on the news page.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner update documents ramp construction in August 2023.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The source includes construction photographs; complete as-built drawings were not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a lightweight ramp concept while preserving adjacent road and rail service.","inputs":["Use the owner’s site description and identify missing foundation-soil data.","Set an explicit study profile, load case and allowable movement with instructor approval."],"deliverables":["Check foundation stress, settlement, block compression and groundwater uplift.","Draw block arrangement, pavement separation and lateral protection details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"UDOT uses Styrofoam blocks to build freeway ramp in Davis County","url":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","publisher":"UDOT","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"west-davis-geofoam.svg","mimeType":"image/svg+xml","bytes":1799,"sha256":"e23761dbae30acfd1a743186545c5dcb2378a1245850347956435a393d209bfe","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/schematic"},{"id":"project-image","title":"West Davis Highway geofoam ramp — UDOT aerial photograph","kind":"project-image","fileName":"west-davis-geofoam.jpg","mimeType":"image/jpeg","bytes":410515,"sha256":"ab0b77da1950e4c96176524133fdba24a8ba723c6ae986fac408e5789d53dd3f","sourceId":"s1","license":"UDOT public reuse with attribution — social-media policy","width":1536,"height":1152,"credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","imageDate":null,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","transformations":"Unmodified image bytes from UDOT’s 1536-pixel file; responsive display sizing only.","downloadUrl":"/cases/west-davis-geofoam/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"west-davis-geofoam-capstone.md","mimeType":"text/markdown","bytes":2842,"sha256":"b5fb2c304589779ef896527dbaa582a8964ff846f3a2fbf5fcc79dbbaf04c8e9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the West Davis Highway geofoam ramp under construction beside live transport routes.","caption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","license":"UDOT public reuse with attribution — social-media policy","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","width":1536,"height":1152,"imageDate":null},"figureCaption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":4,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":415156,"sourceCount":1,"url":"/cases/west-davis-geofoam"},{"id":"us14-nicollet","title":"US 14 near Nicollet — preload and vertical drains","summary":"A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.","topics":["settlement","ground-improvement","problem-soils","monitoring","delivery"],"country":"United States","region":"Nicollet, Minnesota","owner":"Minnesota Department of Transportation","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Prefabricated vertical drains","Staged surcharge","Observational consolidation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors describe drain spacing, surcharge, staged lifts, waiting periods and primary/post-surcharge secondary settlement.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source lists estimated alternatives from $0.3 million for surcharge-only to $1.8 million for a land bridge; these are comparison estimates, not audited final costs.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The documented drain/surcharge design targeted a five-month waiting period after staged filling.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The submitted case describes automated settlement, piezometric and earth-pressure monitoring.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a preload programme that meets a highway opening deadline while controlling stability and residual settlement.","inputs":["Extract layer thicknesses, compression parameters and drain layout from the cited papers.","Use measured settlement and pore-pressure stages to define the observation period."],"deliverables":["Compare untreated waiting time with vertical/radial drainage and secondary compression.","Set stage-release criteria and a contingency for slow pore-pressure dissipation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"PVD and fill preloading — US Highway 14","url":"https://www.geoinstitute.org/node/16159","publisher":"ASCE Geo-Institute / named case-history author","year":2024,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case submitted by the project manager and MnDOT foundations engineer; technical papers by Lamb/Chow/Bentler (2018, 2019).","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us14-nicollet.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us14-nicollet/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us14-nicollet-reference-values.csv","mimeType":"text/csv","bytes":1496,"sha256":"007a382e255f2ad4f1b9b13dceb0a7669748d03a85a1b7e11acb980d9a7ba8f7","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us14-nicollet/download/reference-values"},{"id":"project-image","title":"US 14, Nicollet — prefabricated vertical drains","kind":"project-image","fileName":"us14-nicollet-r13.jpg","mimeType":"image/jpeg","bytes":256005,"sha256":"def13de472acda2ba590bff1ac10ad55ee8c048ab95c68ddc8dc39dce688635d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1920,"height":1080,"credit":"Project photograph published by ASCE Geo-Institute; case submitted by Liang Chern Chow and Rich Lamb","sourceUrl":"https://www.geoinstitute.org/node/16159","licenseUrl":"https://www.geoinstitute.org/node/16159","imageDate":null,"evidenceFile":"image-provenance/us14-nicollet-r13-source.json","evidenceSha256":"d1426baf3baf7a5516e7c258c631b742342f5d3434b36c023779179195338e5b","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/casehistory1.jpg","originalSha256":"def13de472acda2ba590bff1ac10ad55ee8c048ab95c68ddc8dc39dce688635d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/us14-nicollet/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us14-nicollet-capstone.md","mimeType":"text/markdown","bytes":4241,"sha256":"e99fc8e22bb8ef2a80b680d8678aed4180f17eb7ba1a1d4ae67d4f03094675f0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us14-nicollet/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","caption":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","credit":"Project photograph published by ASCE Geo-Institute; case submitted by Liang Chern Chow and Rich Lamb","sourceUrl":"https://www.geoinstitute.org/node/16159","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16159","width":1920,"height":1080,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":11,"referenceValues":[{"label":"Organic-soil thickness","value":34,"unit":"ft","scope":"Reported soft to very soft organic deposit above glacial till.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Reported investigation interpretation."},{"label":"Typical drain spacing","value":6,"unit":"ft","scope":"Triangular drain pattern over 80% of the embankment length.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Reported design geometry."},{"label":"Surcharge-only estimate","value":300000,"unit":"USD","scope":"Alternative with extended waiting period.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Drains and surcharge estimate","value":500000,"unit":"USD","scope":"Alternative including extended wait and geotechnical monitoring.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Geofoam estimate","value":800000,"unit":"USD","scope":"Lightweight-fill alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Column-supported estimate","value":1200000,"unit":"USD","scope":"Column-supported embankment alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Land-bridge estimate","value":1800000,"unit":"USD","scope":"Land-bridge alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us14-nicollet-r13-source.json","evidenceSha256":"d1426baf3baf7a5516e7c258c631b742342f5d3434b36c023779179195338e5b","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":6915,"sourceCount":1,"url":"/cases/us14-nicollet"},{"id":"charleston-hlt-drains","title":"Hugh K. Leatherman Terminal — vertical-drain installation control","summary":"Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.","topics":["settlement","ground-improvement","coastal-offshore","monitoring"],"country":"United States","region":"Charleston, South Carolina","owner":"South Carolina State Ports Authority","year":2018,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Vertical drains","Surcharge","As-installed monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The submitted case describes variable drain depths and as-installed data acquisition during surcharge-ground improvement.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The source reports delivery of the drain programme on schedule but does not supply the complete programme.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"As-installed depth/location data are described; the underlying installation register is not locally supplied.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan drain installation and acceptance for a reclaimed port platform with spatially variable compressible deposits.","inputs":["Extract drain-depth ranges and the documented installation-control workflow.","Map the missing ground profile and design settlement inputs before sizing drain spacing."],"deliverables":["Develop zone-specific consolidation calculations and installation tolerances.","Prepare a spatial acceptance register and a response to short or misplaced drains.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Port of Charleston HLT wall remediation — PVD case","url":"https://www.geoinstitute.org/node/15986","publisher":"ASCE Geo-Institute / named case-history author","year":2020,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Source budget refers to the described package; it must not be interpreted as the entire terminal cost.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"charleston-hlt-drains.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/charleston-hlt-drains/download/schematic"},{"id":"project-image","title":"Hugh K. Leatherman Terminal — vertical-drain installation","kind":"project-image","fileName":"charleston-hlt-drains-r13.png","mimeType":"image/png","bytes":345339,"sha256":"2b3c4d924e04dd99a7742029b8a6d757fd230f1a87104579ccf746338f164813","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":413,"height":306,"credit":"Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history","sourceUrl":"https://www.geoinstitute.org/node/15986","licenseUrl":"https://www.geoinstitute.org/node/15986","imageDate":null,"evidenceFile":"image-provenance/charleston-hlt-drains-r13-source.json","evidenceSha256":"25eb76e4ff6e80a492861b0bc96ebabe9040069368342729cd8273c879ace608","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/Port%20of%20Charleston%20Picture1.png","originalSha256":"2b3c4d924e04dd99a7742029b8a6d757fd230f1a87104579ccf746338f164813","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/charleston-hlt-drains/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"charleston-hlt-drains-capstone.md","mimeType":"text/markdown","bytes":2752,"sha256":"81f1f270e586fe4a0953132af5d87be94da0333d6cfd15b52bf8670292d27182","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/charleston-hlt-drains/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","caption":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","credit":"Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history","sourceUrl":"https://www.geoinstitute.org/node/15986","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/15986","width":413,"height":306,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":12,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/charleston-hlt-drains-r13-source.json","evidenceSha256":"25eb76e4ff6e80a492861b0bc96ebabe9040069368342729cd8273c879ace608","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3930,"sourceCount":1,"url":"/cases/charleston-hlt-drains"},{"id":"olyphant-distribution","title":"Olyphant distribution centre — variable mine-spoil improvement","summary":"A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.","topics":["ground-improvement","shallow-foundations","problem-soils","earthworks"],"country":"United States","region":"Olyphant, Pennsylvania","owner":"D&L Realty","year":2022,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Dynamic compaction","Aggregate piers","Performance verification"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project engineer’s case describes the change in treatment, post-improvement SPT checks and aggregate-pier modulus tests.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports about $950,000 for dynamic compaction only; earthwork and aggregate-pier costs are unavailable.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The documented project period is 2021–2022.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case includes post-improvement SPT and pier-modulus verification.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a ground-improvement design with an explicit decision rule for changing treatment in saturated or poorly responding zones.","inputs":["Extract fill depths, initial/post-treatment tests and observed crater response.","Separate warehouse foundation requirements from yard pavement requirements."],"deliverables":["Develop treatment zoning and a field trial with measurable acceptance criteria.","Compare additional compaction, aggregate piers and excavation/replacement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Distribution Center Site, Olyphant, PA","url":"https://www.geoinstitute.org/node/16272","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper by Woods et al., 2023 DFI conference.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"olyphant-distribution.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olyphant-distribution/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"olyphant-distribution-reference-values.csv","mimeType":"text/csv","bytes":303,"sha256":"d8e12ade8ad0afe7e13e24904df73ef410ab81246c1bad7429660474dab67db5","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/olyphant-distribution/download/reference-values"},{"id":"project-image","title":"Olyphant distribution centre — ground-improvement site","kind":"project-image","fileName":"olyphant-distribution-r13.jpg","mimeType":"image/jpeg","bytes":221097,"sha256":"3150a03207445e707145f91b89198c78b9e39ad4825baae9e4f25854c5b70ba9","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1024,"height":683,"credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16272","licenseUrl":"https://www.geoinstitute.org/node/16272","imageDate":null,"evidenceFile":"image-provenance/olyphant-distribution-r13-source.json","evidenceSha256":"26c7c3c9e1ec0483ce092180cb01289e8ec92ded9ea4a33d4423e2547b5ec3d1","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/olyphant_center.jpg","originalSha256":"3150a03207445e707145f91b89198c78b9e39ad4825baae9e4f25854c5b70ba9","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/olyphant-distribution/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"olyphant-distribution-capstone.md","mimeType":"text/markdown","bytes":3085,"sha256":"045c75f6403a1a2cc930baac411103cf2ddb62188ab04145e021984c45afbc77","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olyphant-distribution/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","caption":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16272","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16272","width":1024,"height":683,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":13,"referenceValues":[{"label":"Dynamic-compaction package","value":950000,"unit":"USD","scope":"Approximate dynamic-compaction cost; earthworks and aggregate columns excluded.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/olyphant-distribution-r13-source.json","evidenceSha256":"26c7c3c9e1ec0483ce092180cb01289e8ec92ded9ea4a33d4423e2547b5ec3d1","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4576,"sourceCount":1,"url":"/cases/olyphant-distribution"},{"id":"tempe-landfill","title":"Tempe Marketplace — foundations over former landfill","summary":"The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.","topics":["ground-improvement","shallow-foundations","geoenvironmental","monitoring"],"country":"United States","region":"Tempe, Arizona","owner":"Owner not stated in reviewed case","year":2015,"yearLabel":"Case reference year","projectType":"Redevelopment","methods":["Dynamic compaction","Shallow foundations","Vibration control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case gives separate treatment passes for general areas and building zones and describes plate-load verification.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"Reported compaction rates were approximately $1.00/ft² for initial passes plus $1.25/ft² for additional building passes; supporting earthwork is excluded.","sourceIds":["s1"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Plate-load and vibration monitoring are described; raw test datasets are not supplied.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a redevelopment foundation strategy that addresses both geotechnical settlement and environmental constraints of former landfill ground.","inputs":["Extract the source’s treatment energy, grid and verification approach.","Identify gas, contamination and decomposable-waste data absent from the geotechnical summary."],"deliverables":["Compare foundations on treated ground with an alternative deep-foundation option.","Prepare a trial-pad programme, vibration limits and residual-settlement allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Tempe Marketplace, Tempe, AZ","url":"https://www.geoinstitute.org/node/16274","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper Woods, Shaffer and Drumheller (2023). The source’s 2015 case date is retained without equating it with opening of the entire retail centre.","checked":"2026-11-22"},{"id":"s2","title":"Tempe Marketplace - 2008-04-17 - Image1.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","publisher":"Wikimedia Commons / Cygnusloop99","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tempe-landfill.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tempe-landfill/download/schematic"},{"id":"project-image","title":"Tempe Marketplace - 2008-04-17 - Image1.JPG","kind":"project-image","fileName":"tempe-landfill.jpg","mimeType":"image/jpeg","bytes":309826,"sha256":"1560b21832ab7c98fa55efb7be6044ca924367f3340cdf77bb7c3cf9282d77d7","sourceId":"s2","license":"CC BY-SA 3.0","width":1280,"height":853,"credit":"Cygnusloop99","sourceUrl":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-04-17","evidenceFile":"image-provenance/tempe-landfill-commons.json","evidenceSha256":"a45cb5b1e75e9c2628f52e3a6cb5899a90bdafe2aadcdc163fe79a85135d487b","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/23/Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","downloadUrl":"/cases/tempe-landfill/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tempe-landfill-capstone.md","mimeType":"text/markdown","bytes":2951,"sha256":"2820f23d69644226442f02bb4d45826cd449c4ec74f941dfd807f6ad3ab035f9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tempe-landfill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Tempe Marketplace after construction, April 2008.","caption":"Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.","credit":"Cygnusloop99","sourceUrl":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":853,"imageDate":"2008-04-17"},"figureCaption":"Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":14,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tempe-landfill-commons.json","evidenceSha256":"a45cb5b1e75e9c2628f52e3a6cb5899a90bdafe2aadcdc163fe79a85135d487b","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":313965,"sourceCount":2,"url":"/cases/tempe-landfill"},{"id":"jfk-hangar","title":"JFK hangar expansion — liquefaction mitigation by compaction","summary":"A hangar expansion used dynamic compaction to reduce liquefaction susceptibility in sandy fill and outwash, with vibration controls beside operating airport facilities.","topics":["ground-improvement","seismic","shallow-foundations","monitoring"],"country":"United States","region":"Queens, New York","owner":"Airport project owner not stated in reviewed case","year":1999,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Dynamic compaction","Liquefaction assessment","Vibration isolation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project case describes compaction passes, grid spacing, groundwater and post-treatment penetration testing.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The submitted case identifies 1998–1999 as the project period.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case reports improvement depth inferred from post-treatment SPTs.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Specify improvement and verification for an airport foundation site while maintaining service of nearby utilities and structures.","inputs":["Extract pre/post-treatment penetration-test evidence and groundwater depth.","Establish the design earthquake and appropriate corrections independently; the summary alone is not a complete liquefaction input set."],"deliverables":["Compare triggering and settlement checks before and after treatment.","Set field acceptance, vibration monitoring and stop-work criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"JFK Airport, Queens, NY","url":"https://www.geoinstitute.org/node/16275","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Meyer et al. (2001), Liquefaction Mitigation at JFK Airport Using Dynamic Compaction.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"jfk-hangar.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/jfk-hangar/download/schematic"},{"id":"project-image","title":"JFK hangar expansion — dynamic compaction","kind":"project-image","fileName":"jfk-hangar-r13.png","mimeType":"image/png","bytes":1687455,"sha256":"85f72cbdde8a47d0f8c8e73b4cd3965fb4dfcf2ec32d1f2467e0f60f0ac3ea5d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1011,"height":1280,"credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16275","licenseUrl":"https://www.geoinstitute.org/node/16275","imageDate":null,"evidenceFile":"image-provenance/jfk-hangar-r13-source.json","evidenceSha256":"de48924e56741ae6177849fc79762d2aed8c54398996f286b15d5417d57a1933","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/jfk.png","originalSha256":"85f72cbdde8a47d0f8c8e73b4cd3965fb4dfcf2ec32d1f2467e0f60f0ac3ea5d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/jfk-hangar/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"jfk-hangar-capstone.md","mimeType":"text/markdown","bytes":2611,"sha256":"295a20b1e182cfb1a7d1ae4d10af7ffc5ba10f958ca9ee54a2f13ba245066f64","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/jfk-hangar/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","caption":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16275","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16275","width":1011,"height":1280,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":15,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/jfk-hangar-r13-source.json","evidenceSha256":"de48924e56741ae6177849fc79762d2aed8c54398996f286b15d5417d57a1933","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3799,"sourceCount":1,"url":"/cases/jfk-hangar"},{"id":"prudential-centre","title":"Prudential Center — shallow foundations after improvement","summary":"The arena foundation study compared deep foundations with spread footings on improved ground. Test sections supported the selected compaction and replacement approach.","topics":["shallow-foundations","ground-improvement","site-investigation","delivery"],"country":"United States","region":"Newark, New Jersey","owner":"New Jersey Devils","year":2006,"yearLabel":"Case reference year","projectType":"Redevelopment","methods":["Foundation alternatives","Dynamic compaction","Trial sections"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case describes trial treatment, foundation selection and protection of adjacent historic development.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The case reports roughly $1.5 million for improvement plus shallow foundations versus an estimated $3 million driven-pile alternative.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The case connects foundation selection to readiness for the 2007–2008 hockey season; a full contractor schedule is not supplied.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Test-section and post-improvement field checks are discussed.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Perform a value-engineering comparison for a large building on heterogeneous urban fill while protecting neighbouring structures.","inputs":["Extract the trial-section results and stated allowable-bearing assumptions.","Separate measured treatment response from the original designers’ interpreted bearing values."],"deliverables":["Check bearing, differential settlement and vibration-sensitive construction zones.","Prepare an alternatives matrix with cost scope and construction-risk allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Prudential Center, Newark, New Jersey","url":"https://www.geoinstitute.org/node/16271","publisher":"ASCE Geo-Institute / named case-history author","year":2013,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper Woods, Drumheller and Huber (2013).","checked":"2026-11-22"},{"id":"s2","title":"New Jersey - Newark - Prudential Center IMG 2295 - National Newark Building - Leecourt-Newark Building - Penn Station.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","publisher":"Wikimedia Commons / Bjoertvedt","year":2018,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"prudential-centre.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/prudential-centre/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"prudential-centre-reference-values.csv","mimeType":"text/csv","bytes":742,"sha256":"9543f67494a4bf3029bd31ac796b2b285ee15d0e9c2721e0657bb8f8392b6d68","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/prudential-centre/download/reference-values"},{"id":"project-image","title":"New Jersey - Newark - Prudential Center IMG 2295 - National Newark Building - Leecourt-Newark Building - Penn Station.jpg","kind":"project-image","fileName":"prudential-centre.jpg","mimeType":"image/jpeg","bytes":229002,"sha256":"fd961e3f456289c12b8e9851c5d3d52e6f742c388195fa6d6df5e8377526366b","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":556,"credit":"Bjoertvedt","sourceUrl":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2018-06-30 14:40:28","evidenceFile":"image-provenance/prudential-centre-commons.json","evidenceSha256":"1befa45140ee1090a128a92a838148a1c778e95268f262855b15321a82d424a5","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","downloadUrl":"/cases/prudential-centre/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"prudential-centre-capstone.md","mimeType":"text/markdown","bytes":4036,"sha256":"5c29b435d4dfd10f8273c13b5a15b7c7b92a108255546ee544c862a6fcada1b5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/prudential-centre/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed Prudential Center arena in Newark, New Jersey.","caption":"The completed Prudential Center arena in Newark, New Jersey. The photograph identifies the project discussed in the ground-improvement case history; the subsurface work is not visible.","credit":"Bjoertvedt","sourceUrl":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":556,"imageDate":"2018-06-30 14:40:28"},"figureCaption":"The completed Prudential Center arena in Newark, New Jersey. The photograph identifies the project discussed in the ground-improvement case history; the subsurface work is not visible.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":16,"referenceValues":[{"label":"Improvement plus shallow foundations","value":1500000,"unit":"USD","scope":"Approximate reported cost; not the arena total.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."},{"label":"Driven-pile alternative","value":3000000,"unit":"USD","scope":"Order-of-magnitude estimated alternative; not an executed pile contract.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."},{"label":"Trial-supported bearing pressure","value":3,"unit":"tsf","scope":"Reported allowable bearing pressure after trial assessment; not a transferable design value.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Site-specific reported allowable value."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/prudential-centre-commons.json","evidenceSha256":"1befa45140ee1090a128a92a838148a1c778e95268f262855b15321a82d424a5","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":234666,"sourceCount":2,"url":"/cases/prudential-centre"},{"id":"boston-central-artery","title":"Boston Central Artery/Tunnel — deep mixing and ground movement","summary":"Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.","topics":["excavation","ground-improvement","tunnels","monitoring","delivery"],"country":"United States","region":"Boston, Massachusetts","owner":"Massachusetts highway agencies","year":2006,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Deep mixing","Excavation movement","Observational control"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper covers soil properties, mixing characteristics and measured response. FHWA separately documents project financial-management lessons.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"FHWA discusses major-project contingency management; it is not a priced geotechnical work breakdown.","sourceIds":["s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published research compares construction-induced ground movements and stabilization behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a ground-treatment and monitoring concept for a deep urban cut in soft clay, with construction risks included in the estimate.","inputs":["Extract the selected site section and treatment properties from the project paper.","Define movements tolerated by nearby structures and utilities as a study requirement."],"deliverables":["Compare untreated and treated basal stability and movement mechanisms.","Prepare a monitoring-trigger plan and a geotechnical contingency allowance.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lessons learned for ground movements and soil stabilization from the Boston Central Artery","url":"https://doi.org/10.1061/(ASCE)1090-0241(2006)132:8(966)","publisher":"O’Rourke and McGinn / ASCE","year":2006,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Full technical article may require subscription.","checked":"2026-11-22"},{"id":"s2","title":"Contingency fund management — lessons learned","url":"https://www.fhwa.dot.gov/majorprojects/financial_plans/lessons_learned.cfm","publisher":"FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Big Dig construction 589.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":1989,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"boston-central-artery.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/schematic"},{"id":"project-image","title":"Big Dig construction 589.agr.jpg","kind":"project-image","fileName":"boston-central-artery.jpg","mimeType":"image/jpeg","bytes":339680,"sha256":"01902e3f96aad17c3cb58875d0a7591633c218d8dabbe0755b42916933825fe4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"1989-05","evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/46/Big_Dig_construction_589.agr.jpg","downloadUrl":"/cases/boston-central-artery/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"boston-central-artery-capstone.md","mimeType":"text/markdown","bytes":3134,"sha256":"f3d0712edf16c7e0d9920a6b8a1af90de9cdaed03a9c5eade371264e7933c719","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction for Boston’s Central Artery/Tunnel project in May 1989.","caption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"1989-05"},"figureCaption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":17,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":343945,"sourceCount":3,"url":"/cases/boston-central-artery"},{"id":"crossrail-farringdon","title":"Crossrail Farringdon — compensation grouting near existing assets","summary":"Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.","topics":["tunnels","ground-improvement","monitoring","excavation"],"country":"United Kingdom","region":"London, England","owner":"Crossrail","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Compensation grouting","Asset protection","Observational tunnelling"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project papers document local asset constraints, grouting and a structural mitigation solution; they do not constitute the entire station design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The learning-legacy papers report implementation and measured behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan mitigation for a sensitive structure above station tunnelling and decide when grouting alone is insufficient.","inputs":["Extract asset geometry, movement triggers and the documented construction sequence.","Distinguish monitoring observations from predicted ground movement."],"deliverables":["Prepare an asset damage assessment and mitigation alternatives.","Design monitoring review stages, trigger actions and verification of movement recovery.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lindsey Street Bridge — a structural solution to settlement mitigation","url":"https://learninglegacy.crossrail.co.uk/documents/lindsey-street-bridge-structural-solution-settlement-mitigation/","publisher":"Crossrail Learning Legacy / project authors","year":2016,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Data management, analysis and visualisation on Drive X","url":"https://learninglegacy.crossrail.co.uk/documents/data-management-analysis-and-visualisation-on-crossrail-drive-x-western-tunnels/index.html","publisher":"Crossrail Learning Legacy / project authors","year":2014,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Crossrail construction site, Farringdon - geograph.org.uk - 2259281.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","publisher":"Wikimedia Commons / Robin Webster","year":2011,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"crossrail-farringdon.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/crossrail-farringdon/download/schematic"},{"id":"project-image","title":"Crossrail construction site, Farringdon - geograph.org.uk - 2259281.jpg","kind":"project-image","fileName":"crossrail-farringdon.jpg","mimeType":"image/jpeg","bytes":135906,"sha256":"1e3b65e2566983c683fe4504c5ba077cc460e02e69371e8bbfc9b3bc55379987","sourceId":"s3","license":"CC BY-SA 2.0","width":640,"height":480,"credit":"Robin Webster","sourceUrl":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2011-02-05","evidenceFile":"image-provenance/crossrail-farringdon-commons.json","evidenceSha256":"c294f4b8021c7d8438edc8ab746650f06bb15707370570c92ff491e623289a26","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/96/Crossrail_construction_site%2C_Farringdon_-_geograph.org.uk_-_2259281.jpg","downloadUrl":"/cases/crossrail-farringdon/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"crossrail-farringdon-capstone.md","mimeType":"text/markdown","bytes":3376,"sha256":"3517728f9e88964f9f1290a79106101005b9cc1a4f5a51adc183182f4d16870c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/crossrail-farringdon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site.","caption":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site. This is a site photograph; the Lindsey Street Bridge settlement-mitigation details are in the linked project account.","credit":"Robin Webster","sourceUrl":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":640,"height":480,"imageDate":"2011-02-05"},"figureCaption":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site. This is a site photograph; the Lindsey Street Bridge settlement-mitigation details are in the linked project account.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":19,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/crossrail-farringdon-commons.json","evidenceSha256":"c294f4b8021c7d8438edc8ab746650f06bb15707370570c92ff491e623289a26","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":140407,"sourceCount":3,"url":"/cases/crossrail-farringdon"},{"id":"wolf-creek","title":"Wolf Creek Dam — karst-foundation cutoff wall","summary":"A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.","topics":["dams-levees","seepage","rock","ground-improvement","delivery"],"country":"United States","region":"Jamestown, Kentucky","owner":"US Army Corps of Engineers","year":2013,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Cutoff wall","Karst grouting","Dam seepage control"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The completion account describes approximately 1,197 overlapping piles forming a 4,000-foot barrier. It does not provide a complete issued-for-construction package.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The March 2013 USACE account identifies a $594 million rehabilitation project; this is programme scope, not the wall’s final unit-price account.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Last pile placement was reported on 6 March 2013, nine months ahead of the then-planned December completion.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"USACE records barrier completion and the subsequent reservoir review.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare a cutoff wall and grouting strategy for an operating dam over soluble rock, including continuity verification and reservoir constraints.","inputs":["Extract the documented barrier dimensions and geological problem.","Define an explicitly sourced or assumed permeability model for the study seepage calculation."],"deliverables":["Develop a seepage/uplift comparison and a wall-continuity QA plan.","Prepare a construction platform section and a reservoir/instrumentation hold-point sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Nashville District completes Wolf Creek Dam barrier wall","url":"https://www.dvidshub.net/news/103103/nashville-district-completes-wolf-creek-dam-barrier-wall","publisher":"USACE / DVIDS","year":2013,"access":"public-link","license":"US government public information; original credits retained","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Wolf Creek Dam barrier-wall construction — published image and source","url":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","publisher":"DVIDS / U.S. Army Corps of Engineers","year":2012,"access":"public-link","license":"Public domain — U.S. federal government work","notes":"Project image source. Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"wolf-creek.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/wolf-creek/download/schematic"},{"id":"project-image","title":"Wolf Creek Dam barrier-wall construction","kind":"project-image","fileName":"wolf-creek.jpg","mimeType":"image/jpeg","bytes":360915,"sha256":"3b361e7407fd987273b67296a8243d56d96b8acaacef0a11a35bbbf016ef58cc","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1000,"height":664,"credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","licenseUrl":"https://www.dvidshub.net/about/copyright","imageDate":"2012-05-02","evidenceFile":"image-provenance/wolf-creek-source.json","evidenceSha256":"7c60540ea61fdb963e680eb0e27ef54375564f419bba957c0086c51479fca3e5","transformations":"Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/wolf-creek/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"wolf-creek-capstone.md","mimeType":"text/markdown","bytes":3149,"sha256":"a6a8f5863cc2de9de547b3be3d54e50e32e3a1475422a83b73f24b26ce485245","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/wolf-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012.","caption":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012. U.S. Army Corps of Engineers photograph by Leon Roberts.","credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.dvidshub.net/about/copyright","width":1000,"height":664,"imageDate":"2012-05-02"},"figureCaption":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012. U.S. Army Corps of Engineers photograph by Leon Roberts.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":20,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/wolf-creek-source.json","evidenceSha256":"7c60540ea61fdb963e680eb0e27ef54375564f419bba957c0086c51479fca3e5","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":365049,"sourceCount":2,"url":"/cases/wolf-creek"},{"id":"center-hill","title":"Center Hill Dam — grouting, cutoff wall and stabilizing berm","summary":"A staged rehabilitation treated foundation seepage and auxiliary-dam risks using grouting, a deep cutoff wall and a roller-compacted-concrete berm.","topics":["dams-levees","seepage","rock","ground-improvement","delivery"],"country":"United States","region":"DeKalb County, Tennessee","owner":"US Army Corps of Engineers","year":2020,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Foundation grouting","Cutoff wall","Stabilizing berm"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"USACE describes three major repair phases and their completed components; detailed construction plans are not attached to the completion release.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The completion release reports $353 million overall, with $107 million grouting, $122 million cutoff and $50 million berm contracts; scopes differ from the programme total.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Reported phases were grouting in 2008–2010, cutoff in 2012–2015 and final berm completion celebrated in July 2020.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The USACE release documents the final repair phase and constructed features.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a risk-based sequence of dam repairs in which initial grouting also informs the later cutoff design.","inputs":["Extract phase scope, wall depth and published contract-period information.","Identify the piezometric and geological evidence needed to assess each repaired failure mode."],"deliverables":["Prepare a seepage/stability failure-mode map and an investigation-to-construction decision process.","Compare a single-stage programme with the documented phased strategy.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Berm construction completes last repair phase for dam rehabilitation","url":"https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2261687/berm-construction-completes-last-repair-phase-for-dam-rehabilitation/","publisher":"USACE","year":2020,"access":"public-link","license":"USACE public information; original credits retained","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Center Hill auxiliary-dam RCC berm — published image and source","url":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","publisher":"DVIDS / U.S. Army Corps of Engineers","year":2020,"access":"public-link","license":"Public domain — U.S. federal government work","notes":"Project image source. Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"center-hill.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/center-hill/download/schematic"},{"id":"project-image","title":"Center Hill auxiliary-dam RCC berm","kind":"project-image","fileName":"center-hill.jpg","mimeType":"image/jpeg","bytes":293503,"sha256":"a0d33fc9f80d78aecd1af015fbcb8573ffccfdd3639abf05c4993f77dfefa73c","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1000,"height":667,"credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","licenseUrl":"https://www.dvidshub.net/about/copyright","imageDate":"2020","evidenceFile":"image-provenance/center-hill-source.json","evidenceSha256":"7491f54c4d276ee87d196bb5ab594f571734776ba54d95bb86336014027cecf1","transformations":"Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/center-hill/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"center-hill-capstone.md","mimeType":"text/markdown","bytes":3178,"sha256":"fd3962a5077f1d6636c34b684c2ab4f19da43c9623771422cb63d524eb0013d6","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/center-hill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020..","caption":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020.","credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.dvidshub.net/about/copyright","width":1000,"height":667,"imageDate":"2020"},"figureCaption":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":21,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/center-hill-source.json","evidenceSha256":"7491f54c4d276ee87d196bb5ab594f571734776ba54d95bb86336014027cecf1","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":297666,"sourceCount":2,"url":"/cases/center-hill"},{"id":"herbert-hoover","title":"Herbert Hoover Dike — seepage barriers and structure replacement","summary":"The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.","topics":["dams-levees","seepage","ground-improvement","monitoring","delivery"],"country":"United States","region":"Lake Okeechobee, Florida","owner":"US Army Corps of Engineers","year":2023,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Cutoff walls","Internal erosion","Embankment armoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE documents more than 56 miles of cutoff wall and replacement of 28 water-control structures, alongside other risk-reduction work.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The January 2023 announcement reports $1.5 billion invested; the later Fall 2023 update reports over $1.6 billion since 2001. Preserve the different dates and scopes.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE celebrated construction completion in January 2023 after a programme begun in 2005.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The completion release and later update describe completed risk-reduction features.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a reach-prioritization and treatment plan for a long embankment system with penetrations and heterogeneous seepage risk.","inputs":["Extract the completed work types and distinguish dike length from treated cutoff length.","Select one study reach and record what local borings, heads and structure details remain necessary."],"deliverables":["Compare seepage-control alternatives at a typical reach and at a culvert penetration.","Build a work-package schedule and QA plan for interfaces between walls and structures.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Herbert Hoover Dike rehabilitation completion","url":"https://www.saj.usace.army.mil/Media/News-Releases/Article/3276863/usace-marks-herbert-hoover-dike-rehabilitation-project-completion-with-ribbon-c/","publisher":"USACE","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Herbert Hoover Dike — Fall 2023 project update","url":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","publisher":"USACE","year":2023,"access":"public-link","license":"USACE public information; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["herbert-hoover-update","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"herbert-hoover.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/herbert-hoover/download/schematic"},{"id":"herbert-hoover-update","title":"Herbert Hoover Dike project update, Fall 2023","kind":"report","fileName":"herbert-hoover-update.pdf","mimeType":"application/pdf","bytes":1823491,"sha256":"01202f04ff137dff3893984e220dba8cc131287ee65070944b1b0c4dea9d6e69","sourceId":"s2","license":"USACE public information; original credits retained","rightsUrl":"https://www.usace.army.mil/Privacy-and-Security/","rightsBasis":"USACE public-information policy permits copying and distribution unless otherwise indicated.","rightsEvidenceUrl":"https://www.usace.army.mil/Privacy-and-Security/","pages":2,"downloadUrl":"/cases/herbert-hoover/download/herbert-hoover-update"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"herbert-hoover-reference-values.csv","mimeType":"text/csv","bytes":767,"sha256":"03152f87e5ef980f6f0c4ca7440c17766655c72932e645aa4edb92b3a26c9f9e","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/herbert-hoover/download/reference-values"},{"id":"project-image","title":"Herbert Hoover Dike cutoff-wall construction","kind":"project-image","fileName":"herbert-hoover.jpeg","mimeType":"image/jpeg","bytes":1250146,"sha256":"901a3bac7b402ad688e24f2fe77941a34e7cd9d3602d4edc5ac331ccd350cf6a","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1200,"height":800,"credit":"U.S. Army Corps of Engineers, Jacksonville District","sourceUrl":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","licenseUrl":"https://www.usace.army.mil/Privacy-and-Security/","imageDate":null,"evidenceFile":"image-provenance/herbert-hoover-source.json","evidenceSha256":"0bf437e163401247f8725180dba9abdf6f6aa5a4234808386c3f48ac5f91252e","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/herbert-hoover/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"herbert-hoover-capstone.md","mimeType":"text/markdown","bytes":4026,"sha256":"ee6a2a35f3d9cab06c07dbb0f25fb69ea7cc757392cba4fbaaf9563b9c91d87d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/herbert-hoover/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee.","caption":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee. Original USACE photograph from the Fall 2023 project update.","credit":"U.S. Army Corps of Engineers, Jacksonville District","sourceUrl":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.usace.army.mil/Privacy-and-Security/","width":1200,"height":800,"imageDate":null},"figureCaption":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee. Original USACE photograph from the Fall 2023 project update.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":22,"referenceValues":[{"label":"Completed cutoff-wall length","value":56.2,"unit":"mile","scope":"Partial-penetration wall described in the Fall 2023 update.","sourceId":"s2","locator":"Embankment cutoff wall","basis":"Reported completed length."},{"label":"Replaced water-control structures","value":28,"unit":"count","scope":"Replacement work within the rehabilitation programme.","sourceId":"s2","locator":"Water control structures","basis":"Reported completed quantity."},{"label":"Removed or abandoned structures","value":4,"unit":"count","scope":"Structures no longer required.","sourceId":"s2","locator":"Water control structures","basis":"Reported completed quantity."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/herbert-hoover-source.json","evidenceSha256":"0bf437e163401247f8725180dba9abdf6f6aa5a4234808386c3f48ac5f91252e","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":3079415,"sourceCount":2,"url":"/cases/herbert-hoover"},{"id":"canterbury-trials","title":"Canterbury residential ground-improvement trials","summary":"The 2012 trials compared shallow rafts, mixing columns, a perimeter curtain and densification approaches to support residential foundation repair and rebuilding.","topics":["ground-improvement","seismic","shallow-foundations","laboratory-testing"],"country":"New Zealand","region":"Christchurch, Canterbury","owner":"New Zealand building ministry and trial partners","year":2012,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Liquefaction mitigation","Ground-treatment trials","Residential foundations"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"MBIE publishes the trial report and method descriptions. Trial configurations must not be treated as a site-independent residential design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The official page links the trial report and its findings.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a comparative field-trial and foundation-selection study for liquefiable residential ground.","inputs":["Extract trial geometry, ground conditions, loading and measured response from the 2012 report.","Keep the 2012 programme distinct from the separate 2013 EQC science trials."],"deliverables":["Create a treatment-selection matrix and testable acceptance criteria.","Prepare a study foundation detail and a plan to verify performance beyond the trial footprint.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Christchurch ground improvement trials","url":"https://www.building.govt.nz/building-code-compliance/canterbury-rebuild/supplementary-guidance/christchurch-ground-improvement-trials","publisher":"MBIE","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Queen Elizabeth Park — Murray Kennedy earthquake collection","url":"https://www.canterburystories.nz/collections/community/murray-kennedy/ccl-cs-13063","publisher":"Christchurch City Libraries — Canterbury Stories","year":2011,"access":"public-link","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","notes":"Project image source. Original published image file copied unchanged; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"canterbury-trials.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/canterbury-trials/download/schematic"},{"id":"project-image","title":"QEII Park — liquefaction at the Canterbury trial site","kind":"project-image","fileName":"canterbury-trials-r13.jpg","mimeType":"image/jpeg","bytes":344886,"sha256":"f6adc5f101e5d8a9bd75c44f89e831d5b16a95ba16f83219fabeb30eec655b6f","sourceId":"s2","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":1440,"height":1080,"credit":"Murray Kennedy; Christchurch City Libraries, CCL-DW-74261 / CCL-MuKe-P3110219","sourceUrl":"https://www.canterburystories.nz/collections/community/murray-kennedy/ccl-cs-13063","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2011-03-11","evidenceFile":"image-provenance/canterbury-trials-r13-source.json","evidenceSha256":"fdbad02509140c2afe2393db0241818a10a4e720a1d8786c5ef50559689c82f1","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.canterburystories.nz/sites/default/files/2020-08/13063-Service%20File.jpg","originalSha256":"f6adc5f101e5d8a9bd75c44f89e831d5b16a95ba16f83219fabeb30eec655b6f","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"pre-trial-site-context-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/canterbury-trials/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"canterbury-trials-capstone.md","mimeType":"text/markdown","bytes":3076,"sha256":"446a28a3aec317c5647b377613b087e81be41ba1b2a67b990618aee808f588be","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/canterbury-trials/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial photograph of liquefaction at QEII Park and its surroundings on 11 March 2011. This records the site context before the later ground-improvement trials, not the trial construction.","caption":"Aerial photograph of liquefaction at QEII Park and its surroundings on 11 March 2011. This records the site context before the later ground-improvement trials, not the trial construction.","credit":"Murray Kennedy; Christchurch City Libraries, CCL-DW-74261 / CCL-MuKe-P3110219","sourceUrl":"https://www.canterburystories.nz/collections/community/murray-kennedy/ccl-cs-13063","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":1440,"height":1080,"imageDate":"2011-03-11","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"pre-trial-site-context-photograph"},"figureCaption":"Aerial photograph of liquefaction at QEII Park and its surroundings on 11 March 2011. This records the site context before the later ground-improvement trials, not the trial construction.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":33,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/canterbury-trials-r13-source.json","evidenceSha256":"fdbad02509140c2afe2393db0241818a10a4e720a1d8786c5ef50559689c82f1","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":349150,"sourceCount":2,"url":"/cases/canterbury-trials"},{"id":"kansai-airport","title":"Kansai International Airport — reclamation and long-term settlement","summary":"An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.","topics":["settlement","ground-improvement","problem-soils","monitoring","coastal-offshore"],"country":"Japan","region":"Osaka Bay","owner":"Kansai Airports","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sand drains","Consolidation","Differential settlement","Jacking"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The operator explains sand drains, reclaimed-fill compaction and jacking of individual columns. Published settlement histories allow comparison of shallow and deeper clay contributions.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator supplies monitoring updates and explains continuing adjustment; the airport is an operating asset, not a concluded settlement experiment.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-management plan for a reclaimed airport platform whose terminal and utility connections must remain serviceable.","inputs":["Separate pre-opening settlement from post-opening movement in the owner data.","Define a study clay profile and drainage lengths; clearly label parameters not provided by the owner."],"deliverables":["Fit a consolidation trend and test sensitivity to deep-clay compressibility.","Detail adjustable supports and flexible utility interfaces with a survey-and-maintenance programme.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does accelerating upper-layer consolidation not eliminate deeper-layer settlement?","Which measurements should trigger a building adjustment rather than a change in the ground model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Subsidence countermeasures and monitored status","url":"https://www.kansai-airports.co.jp/en/sustainability/society/tech-subsidence-countermeasures/","publisher":"Kansai Airports","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Uneven settlement and jacking-up","url":"https://www.kansai-airports.co.jp/en/sustainability/society/tech-jacking-up/","publisher":"Kansai Airports","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Kansai closeup.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","publisher":"Wikimedia Commons / NASA Earth Observatory","year":2003,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"kansai-airport.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kansai-airport/download/schematic"},{"id":"project-image","title":"Kansai closeup.jpg","kind":"project-image","fileName":"kansai-airport.jpg","mimeType":"image/jpeg","bytes":67326,"sha256":"820c6c19f570694e31a5f52cb274dc257136eb7470b63062a15935302651c7f1","sourceId":"s3","license":"Public domain","width":800,"height":600,"credit":"NASA Earth Observatory","sourceUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg#Licensing","imageDate":"2003-09-19","evidenceFile":"image-provenance/kansai-airport-commons.json","evidenceSha256":"2496b2e3dbfa9199043b8545d26458c7bcdda034ed833e65f0801d1ca420d53a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Kansai_closeup.jpg","downloadUrl":"/cases/kansai-airport/download/project-image","originalSha1":"55c3ecb6fd4c95b23d3591a32493baddcdb45f4f","originalSha256":"820c6c19f570694e31a5f52cb274dc257136eb7470b63062a15935302651c7f1","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"kansai-airport-capstone.md","mimeType":"text/markdown","bytes":3282,"sha256":"ca2f810824f14286d8f604345aa661f6abeadb02f3c83425fedd0f5254b0087d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kansai-airport/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Satellite view of Kansai International Airport and its reclaimed offshore island works.","caption":"Satellite view of Kansai International Airport and its reclaimed offshore island works. The image provides project context for the owner’s settlement and foundation-adjustment records.","credit":"NASA Earth Observatory","sourceUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg#Licensing","width":800,"height":600,"imageDate":"2003-09-19","imageDownloadAllowed":true},"figureCaption":"Satellite view of Kansai International Airport and its reclaimed offshore island works. The image provides project context for the owner’s settlement and foundation-adjustment records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":48,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/kansai-airport-commons.json","evidenceSha256":"2496b2e3dbfa9199043b8545d26458c7bcdda034ed833e65f0801d1ca420d53a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":71786,"sourceCount":3,"url":"/cases/kansai-airport"},{"id":"rion-antirion","title":"Rion–Antirion Bridge — seismic caissons on improved seabed","summary":"The bridge foundations combine large caissons, a gravel interface and steel inclusions in weak seabed deposits. The designer distinguishes this system from piles structurally connected to a raft.","topics":["shallow-foundations","ground-improvement","seismic","coastal-offshore","lateral-foundations"],"country":"Greece","region":"Gulf of Corinth","owner":"Gefyra","year":2004,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seabed inclusions","Caisson sliding","Seismic capacity design"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Designer accounts explain the seismic load-transfer concept, alternative selection and verification studies. Their inclusion terminology is retained because the caisson is not fixed to the inclusions.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The designer account describes an approximately €800 million overall project. It is not a foundation-package bill or a certified final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The designer account reports completion in summer 2004 ahead of the contractual deadline.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate a gravity caisson on reinforced seabed with controlled sliding and uplift under earthquake loading.","inputs":["Extract the published soil layering, caisson geometry and reinforcement concept.","Use separate interface and reinforced-ground strengths; do not model the inclusions as connected piles."],"deliverables":["Check bearing, sliding and uplift for a defined seismic load envelope.","Compare alternative foundation concepts and propose validation by model tests and monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which load path is lost if the gravel layer is incorrectly modeled as a fixed connection?","How can controlled foundation movement reduce structural force while requiring displacement checks?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of Rion Antirion Bridge","url":"https://www.ice.org.uk/areas-of-interest/buildings-and-structures/design-and-construction-of-rion-antirion","publisher":"Bridge design team / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation design paper","url":"https://ascelibrary.org/doi/10.1061/40744%28154%297","publisher":"Alain Pecker / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","publisher":"Wikimedia Commons / Julien Seguinot from Lille, France","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rion-antirion.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/schematic"},{"id":"project-image","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg","kind":"project-image","fileName":"rion-antirion.jpg","mimeType":"image/jpeg","bytes":393534,"sha256":"a3d2e41eaadeb905afedcc04ba5700e30410d24dbf4cd468265faa4b86936bc9","sourceId":"s3","license":"CC BY-SA 2.0","width":1280,"height":853,"credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-09-30 15:33","evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/9f/Rio-Antirrio_bridge_from_Peloponnese_%2850451233726%29.jpg","downloadUrl":"/cases/rion-antirion/download/project-image","originalSha1":"e79018f5e06ee63197783330d3fe440d7aa3cebb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rion-antirion-capstone.md","mimeType":"text/markdown","bytes":3295,"sha256":"e769c46de36c7f364d44c5e2ab1ce02b58a85a6298e8ea0522acc1691d78bc0c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Rion–Antirion Bridge viewed from the Peloponnese.","caption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":853,"imageDate":"2020-09-30 15:33","imageDownloadAllowed":true},"figureCaption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":53,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":397715,"sourceCount":3,"url":"/cases/rion-antirion"},{"id":"chek-lap-kok","title":"Hong Kong International Airport — foundations across rock and reclamation","summary":"The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.","topics":["site-investigation","deep-foundations","shallow-foundations","ground-improvement","settlement"],"country":"China","region":"Chek Lap Kok","owner":"Airport Authority Hong Kong","year":1998,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","CPT verification","Mixed foundation systems"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources describe actual foundation choices and field characterization. They do not provide a single uniform soil profile for the whole airport.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design the transition between a shallow foundation on rock and a piled concourse on reclaimed deposits.","inputs":["Distinguish original rock, weathered zones and reclaimed sand in a project ground model.","Extract the reported investigation and density-verification approach from the vibrocompaction paper."],"deliverables":["Compare settlement and construction risk for two terminal foundation zones.","Define CPT acceptance criteria and an interface detail for differential movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which discontinuity is more important: the former shoreline or the top of competent rock?","How can improvement verification avoid hiding local loose pockets behind an average density?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Airport design and construction history","url":"https://www.mottmac.com/en/projects/hong-kong-international-the-airport-that-changed-the-world/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Review of vibrocompaction at Hong Kong’s new airport","url":"https://www.tandfonline.com/doi/abs/10.1080/1023697X.1998.10667731","publisher":"Petra Berner, Airport Authority / HKIE Transactions","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","publisher":"Wikimedia Commons / PSnyan","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"chek-lap-kok.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"fc361c835a99c48885fcadacff7f4f786820aca6f6b5404b5974cf6cce064489","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/schematic"},{"id":"project-image","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg","kind":"project-image","fileName":"chek-lap-kok.jpg","mimeType":"image/jpeg","bytes":179932,"sha256":"c87c0cdcf9398738ded1b460f6b9732fe4d96156b32027b16c219767feb56c88","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 17 October 2008","evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Hong_Kong_Internatinal_Airport_from_Air%28Chek_Lap_Kok%2C%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF%29_-_panoramio.jpg","downloadUrl":"/cases/chek-lap-kok/download/project-image","originalSha1":"cea44a0793016f2db57daf5f9cfda0023fdfba2d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"chek-lap-kok-capstone.md","mimeType":"text/markdown","bytes":3461,"sha256":"45bad050968b234d820c46685e9c15826621090d33708b2cdeff712cf44cc2a1","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hong Kong International Airport at Chek Lap Kok viewed from the air.","caption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 17 October 2008","imageDownloadAllowed":true},"figureCaption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":54,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":184279,"sourceCount":3,"url":"/cases/chek-lap-kok"},{"id":"changi-east","title":"Changi East reclamation — instrumented vertical-drain design","summary":"The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.","topics":["settlement","ground-improvement","laboratory-testing","site-investigation","coastal-offshore"],"country":"Singapore","region":"Eastern Singapore","owner":"Singapore reclamation authorities","year":2005,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vertical drains","Radial consolidation","Pore-pressure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The papers provide field and laboratory characterization and consolidation-monitoring methods for the historic reclamation phases. They should not be mistaken for current Terminal 5 construction records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The research account covers the historic reclamation phases completed by 2005, not the schedule of present airport expansion.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select drain spacing and surcharge duration for a reclamation cell using both settlement and pore-pressure acceptance measures.","inputs":["Extract a single pilot-cell stratigraphy, drain spacing and loading history from the papers.","Identify horizontal consolidation coefficients and laboratory versus field scale differences."],"deliverables":["Calculate consolidation time with drain smear and well resistance sensitivities.","Create a surcharge-removal decision that reconciles settlement and piezometer observations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can settlement-based and pore-pressure-based degrees of consolidation disagree?","What evidence would justify changing drain spacing after a pilot trial?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Soil improvement works for an offshore land reclamation","url":"https://doi.org/10.1680/geng.2009.162.1.21","publisher":"Project investigators / ICE Geotechnical Engineering","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Research-oriented ground investigation at Changi","url":"https://www.sciencedirect.com/org/science/article/pii/S205261561700014X","publisher":"Project investigators / ICE Geotechnical Research","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Reclamation of a slurry pond in Singapore","url":"https://doi.org/10.1680/geng.2009.162.1.13","publisher":"Institution of Civil Engineers","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"changi-east.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/schematic"},{"id":"project-image","title":"Changi East reclamation — historical slurry pond","kind":"project-image","fileName":"changi-east-r13.png","mimeType":"image/png","bytes":62386,"sha256":"4f62cd73fd4d72c53798f8a5ac698776331144b757d2814d6ad4c0cbf4599d37","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":248,"credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","imageDate":null,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","transformations":"Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","originalUrl":"https://pdfs.semanticscholar.org/b85d/a748e31f6ee68e6b2d2076def3513f3cb316.pdf","originalSha256":"7a40c8913a894c9fef0283fae1eb9bcd280f828c5054512d20515287d3286e26","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/changi-east/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"changi-east-capstone.md","mimeType":"text/markdown","bytes":3304,"sha256":"8e246b3753d44e7c2626bb72152377dffbf29f9f2be0c1f274cc61f2ec018be8","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.","caption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","width":400,"height":248,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":55,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","visualReview":"Inspected the complete first paper page, its Figure 2 caption, and the extracted 400 by 248 pixel photograph. The image shows the enclosed slurry pond and surrounding reclamation land; it is not the adjacent site-plan diagram or an author portrait.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4482,"sourceCount":3,"url":"/cases/changi-east"},{"id":"port-brisbane","title":"Port of Brisbane — vacuum consolidation beside a marine park","summary":"A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.","topics":["ground-improvement","settlement","seepage","problem-soils","coastal-offshore"],"country":"Australia","region":"Fisherman Islands, Queensland","owner":"Port of Brisbane","year":2009,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vacuum preloading","Vertical drains","Cutoff isolation","Lateral movement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner, contractor and consultant paper records the trial design objectives, instrumentation and interpreted performance. Its successful trial does not establish identical behavior in every reclamation cell.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare vacuum-assisted and fill-only preloading for an environmentally constrained soft-ground boundary.","inputs":["Extract the trial profile, drainage arrangement and cutoff function.","List the settlement, pore-pressure and lateral-displacement observations needed to separate mechanisms."],"deliverables":["Compare consolidation time and stability for vacuum-plus-fill versus higher surcharge.","Specify vacuum-loss response, cutoff continuity tests and a monitoring plan at the sensitive boundary.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would an undetected sand connection reduce the effective vacuum in the clay?","Why must improved consolidation time be assessed alongside lateral movement?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Successful application of vacuum consolidation","url":"https://rpsonline.com.sg/proceedings/9789810831240/html/GI125.php","publisher":"Port of Brisbane, Menard and Coffey project authors","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Performance and prediction of vacuum combined surcharge consolidation","url":"https://ascelibrary.com/doi/10.1061/%28ASCE%29GT.1943-5606.0000519","publisher":"Indraratna and project coauthors / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Port of Brisbane and Brisbane Airport June 2015.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","publisher":"Wikimedia Commons / Nick-D","year":2015,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"port-brisbane.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-brisbane/download/schematic"},{"id":"project-image","title":"Port of Brisbane and Brisbane Airport June 2015.jpg","kind":"project-image","fileName":"port-brisbane.jpg","mimeType":"image/jpeg","bytes":144392,"sha256":"64dc5639a068a195aeddfa35450009393fb02813c20b5a6d70334cd8a822135f","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":959,"credit":"Nick-D","sourceUrl":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2015-06-30 11:56:37","evidenceFile":"image-provenance/port-brisbane-commons.json","evidenceSha256":"a5d5469a7028e7ab4d41f10074f724774726a497f48327df25bc2effa337a475","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/69/Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","downloadUrl":"/cases/port-brisbane/download/project-image","originalSha1":"3412db9547a125dd74c90c8c2c9006240612c154","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"port-brisbane-capstone.md","mimeType":"text/markdown","bytes":3302,"sha256":"fee1d5cbb729910937eee63cc5be6be0cefc54d4bf4492c6c67611e85d30f71b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-brisbane/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Port of Brisbane and adjoining airport in 2015.","caption":"Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.","credit":"Nick-D","sourceUrl":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":959,"imageDate":"2015-06-30 11:56:37","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":56,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/port-brisbane-commons.json","evidenceSha256":"a5d5469a7028e7ab4d41f10074f724774726a497f48327df25bc2effa337a475","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":148882,"sourceCount":3,"url":"/cases/port-brisbane"},{"id":"palm-jumeirah","title":"Palm Jumeirah — densification of reclaimed sand","summary":"The artificial island’s reclaimed sand was treated by vibrocompaction before infrastructure construction. The project’s visitor centre explains the working sequence and its role in controlling settlement and liquefaction susceptibility.","topics":["ground-improvement","coastal-offshore","seismic","earthworks"],"country":"United Arab Emirates","region":"Dubai","owner":"Nakheel","year":2006,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","Densification verification","Liquefaction screening"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner-associated account describes the compaction process and construction sequence. Site-specific CPT data and the complete foundation design package are not provided.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a field trial and acceptance programme for vibrocompaction of a reclaimed waterfront building plot.","inputs":["Use the source to define the treatment sequence and imported/backfill material interfaces.","Specify a study sand profile and groundwater level, then identify tests required before adopting design parameters."],"deliverables":["Compare trial-grid spacings using settlement and CPT-based acceptance criteria.","Develop treatment quantities, verification coverage and a response to refusal or poor improvement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why should vibratory power records be supplemented with independent ground testing?","How do fines content and drainage affect the suitability of vibrocompaction?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Vibro-compaction at Palm Jumeirah","url":"https://www.theviewpalm.ae/en/museum/vibro-compaction","publisher":"The View at The Palm / project exhibition","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Palm Jumeirah on 8 May 2008 Pict 1.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","publisher":"Wikimedia Commons / Imre Solt","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"palm-jumeirah.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/palm-jumeirah/download/schematic"},{"id":"project-image","title":"Palm Jumeirah on 8 May 2008 Pict 1.jpg","kind":"project-image","fileName":"palm-jumeirah.jpg","mimeType":"image/jpeg","bytes":280492,"sha256":"6317897946868e65597bcbc43a59bc9ddd1543a3ba8b07b4b117ebd928b81b9d","sourceId":"s2","license":"CC BY-SA 3.0","width":1229,"height":834,"credit":"Imre Solt","sourceUrl":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/","imageDate":"2008-05-08","evidenceFile":"image-provenance/palm-jumeirah-commons.json","evidenceSha256":"3d6fd60500ff7e59fa17eae9ca370fe5cb3fbb367e86fac739101d61a978d745","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/09/Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","downloadUrl":"/cases/palm-jumeirah/download/project-image","originalSha1":"9801565839b06dc5480f7e16e994dd5a0aeecc35","originalSha256":"6317897946868e65597bcbc43a59bc9ddd1543a3ba8b07b4b117ebd928b81b9d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"palm-jumeirah-capstone.md","mimeType":"text/markdown","bytes":2974,"sha256":"a3757f6fd38ceeed2ee732037f47ceea1e441f986a62f88dc5a160a9de2ded99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/palm-jumeirah/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Palm Jumeirah viewed from a helicopter in May 2008.","caption":"Palm Jumeirah viewed from a helicopter in May 2008. The actual reclaimed island is shown after the principal ground-treatment period.","credit":"Imre Solt","sourceUrl":"https://commons.wikimedia.org/wiki/File:Palm_Jumeirah_on_8_May_2008_Pict_1.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/","width":1229,"height":834,"imageDate":"2008-05-08","imageDownloadAllowed":true},"figureCaption":"Palm Jumeirah viewed from a helicopter in May 2008. The actual reclaimed island is shown after the principal ground-treatment period.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":57,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/palm-jumeirah-commons.json","evidenceSha256":"3d6fd60500ff7e59fa17eae9ca370fe5cb3fbb367e86fac739101d61a978d745","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":284654,"sourceCount":2,"url":"/cases/palm-jumeirah"},{"id":"treasure-island","title":"Treasure Island redevelopment — liquefaction, settlement and shoreline stability","summary":"Redevelopment of the former naval station must address liquefiable fill, compressible bay mud and perimeter stability. City documents connect geotechnical work with groundwater, contaminated-soil management and phased infrastructure delivery.","topics":["ground-improvement","seismic","settlement","geoenvironmental","coastal-offshore"],"country":"United States","region":"San Francisco Bay","owner":"Treasure Island Development Authority / TICD","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Liquefaction mitigation","Bay-mud consolidation","Shoreline stabilization"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The city’s management plan identifies ground risks and candidate mitigation measures. It is a programme-level source; a measure mentioned there is not automatically the final design for every parcel.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The planning authority describes multiple major phases and phased approvals. Use the selected phase’s current documents for a detailed programme.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a staged redevelopment concept that coordinates ground improvement with contaminated-soil handling and future flood levels.","inputs":["Separate dredged sand, young bay mud and shoreline fills in a study ground model.","Select one development phase and identify which remediation and infrastructure works precede buildings."],"deliverables":["Compare densification, drainage and soil mixing for the selected ground risks.","Prepare a compatible earthworks, groundwater and monitoring plan with defined parcel interfaces.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Could improving liquefaction resistance leave long-term bay-mud settlement unresolved?","How would an improvement method alter the contaminated-water management needs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Revised soil and groundwater management plan","url":"https://www.sf.gov/sites/default/files/2023-12/SGMP_0004-007-005%20Treasure%20Island_Rev%2003-17-23-compressed.pdf","publisher":"City and County of San Francisco","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Adopted development plans and environmental review","url":"https://sfplanning.org/project/treasure-island-yerba-buena-island","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Treasure Island Causeway reconstruction, August 2021.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","publisher":"Wikimedia Commons / Pi.1415926535","year":null,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"treasure-island.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/treasure-island/download/schematic"},{"id":"project-image","title":"Treasure Island Causeway reconstruction, August 2021.jpg","kind":"project-image","fileName":"treasure-island.jpg","mimeType":"image/jpeg","bytes":384762,"sha256":"ab06e2607cce980b060c769b65dedc04cc6f58aedb8a3f6f9e0a633aaaf4d210","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":875,"credit":"Pi.1415926535","sourceUrl":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"Taken on 7 August 2021","evidenceFile":"image-provenance/treasure-island-commons.json","evidenceSha256":"b3087047b946aa578f559ea9164f8b3af9921eb3ea276b6fcbf2645aec9835f2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/21/Treasure_Island_Causeway_reconstruction%2C_August_2021.jpg","downloadUrl":"/cases/treasure-island/download/project-image","originalSha1":"963a01ab4c3fafe7def018b05bd960bc5dc07be2","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"treasure-island-capstone.md","mimeType":"text/markdown","bytes":3420,"sha256":"1aaa50d130048eb8cc82973857ff9d6ceedc527db7ff8de88eef85412d11832e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/treasure-island/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Reconstruction of the Treasure Island Causeway in August 2021.","caption":"Reconstruction of the Treasure Island Causeway in August 2021. This is a real redevelopment work area at the island connection, not a diagram of every ground-improvement method.","credit":"Pi.1415926535","sourceUrl":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":875,"imageDate":"Taken on 7 August 2021","imageDownloadAllowed":true},"figureCaption":"Reconstruction of the Treasure Island Causeway in August 2021. This is a real redevelopment work area at the island connection, not a diagram of every ground-improvement method.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":58,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/treasure-island-commons.json","evidenceSha256":"b3087047b946aa578f559ea9164f8b3af9921eb3ea276b6fcbf2645aec9835f2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":389370,"sourceCount":3,"url":"/cases/treasure-island"},{"id":"transbay-transit","title":"Transbay Transit Center — deep excavation beside existing foundations","summary":"The transit-center excavation required a stiff, low-permeability perimeter and protection of nearby foundations. Public authority records explain proposed test shafts, soil improvement and groundwater concerns during design.","topics":["excavation","dewatering","ground-improvement","monitoring"],"country":"United States","region":"San Francisco","owner":"Transbay Joint Powers Authority","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Braced excavation","Soil improvement trials","Groundwater cutoff"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The public testing scope and meeting records describe design-stage reasoning. They are not the final as-built shoring design or a finding about responsibility for neighboring building movement.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The testing-scope record discusses a reduced test programme within a $5 million request. This is a proposed testing allocation, not the transit center’s final foundation cost.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a deep-excavation risk assessment for a transit box bordered by loaded foundations in compressible urban deposits.","inputs":["Extract the authority’s proposed testing objectives and soil profile descriptions.","Identify neighboring foundation levels and the movement paths that excavation could influence."],"deliverables":["Compare wall stiffness, brace staging and groundwater control using an explicit study section.","Write a trial-shaft verification plan and a monitoring-trigger matrix for adjacent properties.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which test result could change the proposed soil-improvement method before production?","How do drawdown settlement and wall-deflection settlement require different monitoring?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geotechnical shoring wall testing scope","url":"https://www.tjpa.org/media/30638/download?inline=","publisher":"Transbay Joint Powers Authority / Arup","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Shoring and excavation presentation record","url":"https://www.tjpa.org/media/36745/download?inline=","publisher":"Transbay Joint Powers Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Transbay Transit Center under construction, Spring 2013.png — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","publisher":"Wikimedia Commons / Jdelx","year":2013,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"transbay-transit.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/transbay-transit/download/schematic"},{"id":"project-image","title":"Transbay Transit Center under construction, Spring 2013.png","kind":"project-image","fileName":"transbay-transit.png","mimeType":"image/png","bytes":519266,"sha256":"c04ab6b0f8323c972cf506cdbd118dc783408a3ad20d3e0dc32c90d9c120edcd","sourceId":"s3","license":"CC BY-SA 3.0","width":657,"height":485,"credit":"Jdelx","sourceUrl":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2013-10-05 02:27:07","evidenceFile":"image-provenance/transbay-transit-commons.json","evidenceSha256":"97a2ded657ba021a83ec7d0f0c66e35ff4137b24a1d3a142f5ce9f6130ea35cb","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bc/Transbay_Transit_Center_under_construction%2C_Spring_2013.png","downloadUrl":"/cases/transbay-transit/download/project-image","originalSha1":"45ddeb57f1fa0a8bcc6dabbdd6c5976b9922bcfe","originalSha256":"c04ab6b0f8323c972cf506cdbd118dc783408a3ad20d3e0dc32c90d9c120edcd","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"transbay-transit-capstone.md","mimeType":"text/markdown","bytes":3287,"sha256":"af827fc3762380e4e65f15d9e88f68b50574dab5ae5e6feff893e6cbfc4a9430","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/transbay-transit/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Transbay Transit Center construction site in 2013.","caption":"The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.","credit":"Jdelx","sourceUrl":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":657,"height":485,"imageDate":"2013-10-05 02:27:07","imageDownloadAllowed":true},"figureCaption":"The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":59,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/transbay-transit-commons.json","evidenceSha256":"97a2ded657ba021a83ec7d0f0c66e35ff4137b24a1d3a142f5ce9f6130ea35cb","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":523684,"sourceCount":3,"url":"/cases/transbay-transit"},{"id":"salesforce-tower","title":"Salesforce Tower — staged excavation and artesian-pressure control","summary":"The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.","topics":["excavation","dewatering","ground-improvement","retaining-walls"],"country":"United States","region":"San Francisco","owner":"Salesforce Tower development team","year":2018,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Secant pile ring","Deep soil mixing","Basal stability","Bracing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The engineer-of-record account identifies installed systems and construction stages. It does not publish the full calculation package or groundwater time series.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Coordinate nested excavation stages where the deepest core excavation extends below the surrounding basement.","inputs":["Extract the reported support components and their excavation-stage relationships.","Define study water pressures and soil strengths and identify which require field confirmation."],"deliverables":["Check basal uplift/heave and wall movements at each excavation stage.","Draw load-transfer interfaces between the braced perimeter, circular ring and plaza support.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which stage creates the most adverse hydraulic gradient below the excavation?","What happens to support loads when a local deeper excavation is opened inside a braced box?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Salesforce Tower excavation support","url":"https://www.sgh.com/project/salesforce-tower-excavation-support/","publisher":"Simpson Gumpertz & Heger, excavation engineer of record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Salesforce Tower Construction, San Francisco.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","publisher":"Wikimedia Commons / Dllu","year":2017,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"salesforce-tower.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/salesforce-tower/download/schematic"},{"id":"project-image","title":"Salesforce Tower Construction, San Francisco.jpg","kind":"project-image","fileName":"salesforce-tower.jpg","mimeType":"image/jpeg","bytes":662808,"sha256":"5630df54a1978429dd7eb555cad00b9e05fb8e9eba4371296acee8730134033b","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":1976,"credit":"Dllu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2017-02-16 13:41:48","evidenceFile":"image-provenance/salesforce-tower-commons.json","evidenceSha256":"161950b9f4e2d949725b84432afcc1da5e41df9c96b3af5e704fa7e158fbe44a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/2c/Salesforce_Tower_Construction%2C_San_Francisco.jpg","downloadUrl":"/cases/salesforce-tower/download/project-image","originalSha1":"32e98d418758e271623698b321c477b96dfebc6f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"salesforce-tower-capstone.md","mimeType":"text/markdown","bytes":3035,"sha256":"84e87c2b3acdd462bd4d53a1ebf4e55b3f4229c74e69044637af024eea66a624","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/salesforce-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Salesforce Tower during construction in San Francisco.","caption":"Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.","credit":"Dllu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1976,"imageDate":"2017-02-16 13:41:48","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":60,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/salesforce-tower-commons.json","evidenceSha256":"161950b9f4e2d949725b84432afcc1da5e41df9c96b3af5e704fa7e158fbe44a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":666974,"sourceCount":2,"url":"/cases/salesforce-tower"},{"id":"east-branch-dam","title":"East Branch Dam — cutoff-wall construction and verification","summary":"A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.","topics":["dams-levees","seepage","ground-improvement","monitoring"],"country":"United States","region":"Elk County, Pennsylvania","owner":"US Army Corps of Engineers","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seepage cutoff","Wall continuity","Verification drilling"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner releases establish the rehabilitation scope and outcome. The cited verification reference is an abstract, so complete verification datasets are not claimed locally.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The owner reports a $132.5 million cutoff-wall rehabilitation contract awarded in 2014, not a certified final expenditure.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The owner’s 2020 releases describe repair completion and reservoir-operating changes.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a cutoff-wall quality-assurance programme that can demonstrate continuity without damaging the finished barrier.","inputs":["Extract the owner’s treatment objective and the technical abstract’s verification problem.","Specify study foundation permeability zones and their uncertainty before comparing barrier options."],"deliverables":["Estimate seepage reduction for intact and defective wall scenarios.","Develop test-panel, drilling, permeability-testing and reservoir-response acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can a low-permeability test core establish continuity between adjacent panels?","What monitoring evidence is needed before relaxing an operating restriction?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Repair-project conclusion","url":"https://www.usace.army.mil/Media/News/Article/2453263/thats-a-wrap-corps-concludes-east-branch-dam-repair-project/","publisher":"USACE Pittsburgh District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Return to normal operations announcement","url":"https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2386554/east-branch-dam-safety-modification-project-returning-to-normal-operations-weat/","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Lessons during cutoff-wall verification drilling","url":"https://damsafety.org/reference/east-branch-dam-lessons-learned-during-cutoff-wall-verification-drilling","publisher":"USACE authors / ASDSO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"USACE East Branch Clarion River Lake and Dam.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","publisher":"Wikimedia Commons / Margaret Luzier, U.S. Army Corps of Engineers","year":1985,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"east-branch-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-branch-dam/download/schematic"},{"id":"project-image","title":"USACE East Branch Clarion River Lake and Dam.jpg","kind":"project-image","fileName":"east-branch-dam.jpg","mimeType":"image/jpeg","bytes":295707,"sha256":"3a7264103efa49f7a3c6af162e3c91518990dbc92b306642e9d07fe5b08de9d8","sourceId":"s4","license":"Public domain","width":1280,"height":854,"credit":"Margaret Luzier, U.S. Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing","imageDate":"1985-09-01","evidenceFile":"image-provenance/east-branch-dam-commons.json","evidenceSha256":"c1163c137e1710737ad46d4a734fa7fc01a733a7ca0c14b7a83b70471c24912a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b5/USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","downloadUrl":"/cases/east-branch-dam/download/project-image","originalSha1":"b4e50869d539b41ada751c645b44bb0bc14f6900","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"east-branch-dam-capstone.md","mimeType":"text/markdown","bytes":3598,"sha256":"0424302e3006289b5f388519b956d139f36356bd9b7283fd3dc7b8a8a3076f4c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-branch-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania.","caption":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.","credit":"Margaret Luzier, U.S. Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing","width":1280,"height":854,"imageDate":"1985-09-01","imageDownloadAllowed":true},"figureCaption":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":65,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/east-branch-dam-commons.json","evidenceSha256":"c1163c137e1710737ad46d4a734fa7fc01a733a7ca0c14b7a83b70471c24912a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":300290,"sourceCount":4,"url":"/cases/east-branch-dam"},{"id":"clearwater-dam","title":"Clearwater Dam — karst pretreatment and a hanging cutoff","summary":"A sinkhole prompted foundation exploration and grouting before construction of a deep seepage cutoff. The owner explains why treating solution-enlarged fractures was necessary for slurry-supported excavation.","topics":["dams-levees","seepage","rock","ground-improvement"],"country":"United States","region":"Wayne and Reynolds counties, Missouri","owner":"US Army Corps of Engineers","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Karst grouting","Hydromill cutoff","Slurry loss control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE’s rehabilitation account describes the grouting sequence, epikarst treatment and cutoff construction. Its forecast of later completion is retained as a forecast rather than a final-account statement.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The owner page forecast approximately $240 million for the overall rehabilitation. It is not presented here as a verified final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE records placement of the final cutoff panel on 6 December 2011; the page’s remaining-work milestones were forecasts.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a pretreatment and cutoff-wall sequence for a dam with connected karst features.","inputs":["Extract the reported seepage problem and the relationship between pretreatment and panel excavation.","Define a study range for rock permeability and connected-void sizes."],"deliverables":["Compare seepage paths around a hanging cutoff and through a locally defective panel.","Specify staged grouting, slurry-loss response and test-panel acceptance requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can grouting be necessary even when a cutoff wall is the main permanent barrier?","How should treatment change when drilling loses circulation in a solution feature?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Clearwater major rehabilitation","url":"https://www.swl.usace.army.mil/Missions/Civil-Works/Program-and-Project-Management/Clearwater-Major-Rehab/","publisher":"USACE Little Rock District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Cutoff-wall construction account","url":"https://www.keller-na.com/projects/clearwater-lake-dam","publisher":"Keller","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"clearwater-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/clearwater-dam/download/schematic"},{"id":"project-image","title":"Clearwater Lake Dam — rehabilitation works in Missouri","kind":"project-image","fileName":"clearwater-dam-r13.jpg","mimeType":"image/jpeg","bytes":157363,"sha256":"6ba4f3f9f46427acca852befd6cbcf86ed02208a0029c7b3d592a2bc62707bea","sourceId":"s2","license":"No open reuse license verified; original copyright retained","width":900,"height":561,"credit":"Keller / Keller Management Services, LLC","sourceUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","licenseUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","imageDate":null,"evidenceFile":"image-provenance/clearwater-dam-r13-source.json","evidenceSha256":"c4e83124dafe5ca3ef277b3db6f7ac973e45d1e9d7dd7b6067175829993234e6","transformations":"Resized the full 2500 × 1559 source photograph proportionally to 900 × 561 pixels, JPEG quality 90; no cropping, added labels, or retouching.","originalUrl":"https://www.keller-na.com/sites/keller-na/files/2019-11/Clearwater-Lake-Dam-aerial.jpg","originalSha256":"a42680ec532691b4140cd8daf9878188de455cc941f6b4b7c9dd8eb695ee1575","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/clearwater-dam/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"clearwater-dam-capstone.md","mimeType":"text/markdown","bytes":3059,"sha256":"784e54f18432f07f72ef06f300e14058dcca60705b6602c74041dc9056c09cb9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/clearwater-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction equipment along the crest of Clearwater Lake Dam in Missouri.","caption":"Aerial view of Clearwater Lake Dam in Missouri during the rehabilitation works, from Keller’s project account. The photograph shows construction along the dam crest.","credit":"Keller / Keller Management Services, LLC","sourceUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","width":900,"height":561,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Aerial view of Clearwater Lake Dam in Missouri during the rehabilitation works, from Keller’s project account. The photograph shows construction along the dam crest.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":66,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/clearwater-dam-r13-source.json","evidenceSha256":"c4e83124dafe5ca3ef277b3db6f7ac973e45d1e9d7dd7b6067175829993234e6","visualReview":"Inspected the full uncropped photograph and its 900 pixel derivative. It shows a reservoir, the Missouri dam embankment, and construction equipment on the crest. No embedded credit or other edge content was removed.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4044,"sourceCount":2,"url":"/cases/clearwater-dam"},{"id":"marmaray-tunnel","title":"Marmaray crossing — immersed-tunnel foundations in seismic ground","summary":"The immersed crossing combined a gravel foundation, under-base grouting and treatment of liquefiable deposits. A project paper explains element connections and the transition to adjacent bored tunnels under severe seismic demands.","topics":["tunnels","seismic","ground-improvement","coastal-offshore"],"country":"Türkiye","region":"Bosphorus, Istanbul","owner":"Republic of Türkiye transport authorities","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Immersed tube","Compaction grouting","Under-base grouting","Seismic joints"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project authors describe the selected foundation and connection systems. Geotechnical parameters and element-specific loads must be extracted from the full paper before numerical design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a foundation and transition-zone concept for an immersed tunnel crossing soft deposits in an earthquake-prone strait.","inputs":["Separate seabed improvement, bedding preparation and under-base contact grouting.","Identify stiffness contrasts where immersed and bored tunnel sections meet."],"deliverables":["Check buoyancy, bearing contact and differential settlement under study load cases.","Prepare a ground-treatment verification and immersion monitoring sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why may a sand bedding option be unsuitable under the selected seismic demand?","How could a local bedding void change joint rotation and water-tightness demands?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Marmaray Bosphorus Crossing project paper","url":"https://www.sciencedirect.com/science/article/pii/S088677982100479X","publisher":"Project engineering authors / Tunnelling and Underground Space Technology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Marmaraytunnel3.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","publisher":"Wikimedia Commons / MEOGLOBAL Muhammed Enes Okullu","year":2012,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"marmaray-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marmaray-tunnel/download/schematic"},{"id":"project-image","title":"Marmaraytunnel3.JPG","kind":"project-image","fileName":"marmaray-tunnel.jpg","mimeType":"image/jpeg","bytes":276229,"sha256":"f3e756697f35224ea5239acf7a0a600b46fd3ea202d70966e50b0a832af8112e","sourceId":"s2","license":"Public domain","width":1280,"height":853,"credit":"MEOGLOBAL Muhammed Enes Okullu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing","imageDate":"2012-05-03","evidenceFile":"image-provenance/marmaray-tunnel-commons.json","evidenceSha256":"992a4c95cfe9d3bca4c2fd091ac9dbb0a06c833a5565a04236133b0da1ec4683","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/ab/Marmaraytunnel3.JPG","downloadUrl":"/cases/marmaray-tunnel/download/project-image","originalSha1":"bfd7bab91a5facb7c191df4e6e033099c5f5a320","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"marmaray-tunnel-capstone.md","mimeType":"text/markdown","bytes":3023,"sha256":"1220cb630342933c1c5a8fc2369b3e4f60800acbf176234665b3ea1f50a8780d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marmaray-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Interior of the Marmaray tunnel project in 2012.","caption":"Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.","credit":"MEOGLOBAL Muhammed Enes Okullu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing","width":1280,"height":853,"imageDate":"2012-05-03","imageDownloadAllowed":true},"figureCaption":"Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":76,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/marmaray-tunnel-commons.json","evidenceSha256":"992a4c95cfe9d3bca4c2fd091ac9dbb0a06c833a5565a04236133b0da1ec4683","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":280377,"sourceCount":2,"url":"/cases/marmaray-tunnel"},{"id":"second-avenue-subway","title":"Second Avenue Subway Phase 1 — ground freezing at a TBM launch","summary":"Unexpected poor ground near the east running-tunnel launch required a revised sequence. The construction manager describes soil freezing while the TBM first advanced through the western alignment.","topics":["tunnels","ground-improvement","monitoring","delivery"],"country":"United States","region":"Manhattan, New York","owner":"Metropolitan Transportation Authority","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","TBM launch support","Settlement control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The construction-manager account identifies the actual temporary treatment and sequencing response. It does not imply that the entire subway alignment was frozen.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSP records west and east running-tunnel completion in 2011 and Phase 1 opening in January 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Recover a tunnelling programme when a localized launch zone cannot support the planned hard-rock TBM excavation.","inputs":["Extract the reported launch problem and revised east/west drive sequence.","Define a study freezing geometry and groundwater flow scenario for the local weak zone."],"deliverables":["Estimate freeze formation time and identify verification boreholes and temperature targets.","Plan thawing and lining load transfer with utilities and adjacent building monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can closely spaced borings still miss a localized poor-ground pocket?","How does moving the TBM to a different drive reduce schedule risk without removing ground risk?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Opening and construction challenges","url":"https://www.wsp.com/en-us/insights/new-york-opens-its-second-avenue-subway","publisher":"WSP, construction manager","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Phase 1 project methods","url":"https://www.wsp.com/en-gb/projects/second-avenue-subway","publisher":"WSP","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Second Avenue Subway November 2013 (11344196583) (2).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","publisher":"Wikimedia Commons / Metropolitan Transportation Authority of the State of New York","year":2013,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"second-avenue-subway.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/second-avenue-subway/download/schematic"},{"id":"project-image","title":"Second Avenue Subway November 2013 (11344196583) (2).jpg","kind":"project-image","fileName":"second-avenue-subway.jpg","mimeType":"image/jpeg","bytes":544351,"sha256":"6683f5afad3af69a041d3b73709795ba2cb397ef47ff446be5e6577b1be71970","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":852,"credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2013-11-23 13:26","evidenceFile":"image-provenance/second-avenue-subway-commons.json","evidenceSha256":"ad23a21be5fd939864d642accfbf5f27829c9a31abdd0977487f66394614ac4b","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Second_Avenue_Subway_November_2013_%2811344196583%29_%282%29.jpg","downloadUrl":"/cases/second-avenue-subway/download/project-image","originalSha1":"0cae68c05f3f00662ab2261e99e53be5714184e8","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"second-avenue-subway-capstone.md","mimeType":"text/markdown","bytes":3216,"sha256":"b90c172254070205460219585cba13957e4c0b6c883c5b18b7e41dee3f25896a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/second-avenue-subway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the future 86th Street station in November 2013.","caption":"Construction of the future 86th Street station in November 2013. MTA photograph from Second Avenue Subway Phase 1; the localized launch-freezing operation occurred elsewhere on the same phase.","credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":852,"imageDate":"2013-11-23 13:26","imageDownloadAllowed":true},"figureCaption":"Construction of the future 86th Street station in November 2013. MTA photograph from Second Avenue Subway Phase 1; the localized launch-freezing operation occurred elsewhere on the same phase.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":80,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/second-avenue-subway-commons.json","evidenceSha256":"ad23a21be5fd939864d642accfbf5f27829c9a31abdd0977487f66394614ac4b","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":548692,"sourceCount":3,"url":"/cases/second-avenue-subway"},{"id":"east-side-access","title":"East Side Access — frozen support beneath Northern Boulevard","summary":"A short mined connection beneath active transport infrastructure used a frozen soil arch for temporary support and groundwater cutoff. The project sources distinguish local freezing from the wider East Side Access tunnel programme.","topics":["tunnels","ground-improvement","dewatering","monitoring"],"country":"United States","region":"Queens, New York","owner":"Metropolitan Transportation Authority","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Sequential excavation","Heave and settlement control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The contractor case and design-team account describe the Northern Boulevard crossing and movement control. Photographs of the wider project are identified as context unless the crossing itself is shown.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a short mined crossing beneath an operating subway box where drawdown and ground movement are tightly constrained.","inputs":["Extract the access-shaft arrangement, groundwater setting and supported transport structures.","Distinguish freeze-induced heave from excavation-induced settlement in the monitoring plan."],"deliverables":["Develop staged thermal and stability checks for a frozen arch.","Coordinate compensation grouting, lining installation and controlled thaw with operating railway limits.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which monitoring trends would indicate that freezing is protecting the face but damaging the asset above?","Why must the temporary frozen ground remain effective until lining load transfer is complete?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Northern Boulevard crossing case","url":"https://www.geoinstitute.org/node/16177","publisher":"Project case author / ASCE Geo-Institute","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"East Side Access design and construction account","url":"https://www.mottmac.com/en-us/projects/transforming-rail-on-manhattans-east-side/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ESA 0968 (8311751208).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","publisher":"Wikimedia Commons / Metropolitan Transportation Authority of the State of New York","year":2012,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"east-side-access.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-side-access/download/schematic"},{"id":"project-image","title":"ESA 0968 (8311751208).jpg","kind":"project-image","fileName":"east-side-access.jpg","mimeType":"image/jpeg","bytes":368730,"sha256":"b28bf3330220485b79647239eaf8a823d8cd8a8f655976d19808683423d66f38","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":852,"credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2012-12-20 10:55","evidenceFile":"image-provenance/east-side-access-commons.json","evidenceSha256":"3b73a5b980a975dc875f8b13a25fae5c42e9eaeca85f68dbd88dfe46f47b2bb2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e4/ESA_0968_%288311751208%29.jpg","downloadUrl":"/cases/east-side-access/download/project-image","originalSha1":"bed1ed4d21b8d615f8d47b1c8e599c6f7e8358a6","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"east-side-access-capstone.md","mimeType":"text/markdown","bytes":3336,"sha256":"dc67afd8eb763990e864f661eb9dbdfc1820f32ec6b4f975be6fad9154e02a62","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-side-access/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Excavation beneath Northern Boulevard in Queens in December 2012.","caption":"Excavation beneath Northern Boulevard in Queens in December 2012. The MTA photograph shows the actual East Side Access crossing where frozen ground and temporary supports protected the roadway and subway structures above.","credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":852,"imageDate":"2012-12-20 10:55","imageDownloadAllowed":true},"figureCaption":"Excavation beneath Northern Boulevard in Queens in December 2012. The MTA photograph shows the actual East Side Access crossing where frozen ground and temporary supports protected the roadway and subway structures above.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":81,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/east-side-access-commons.json","evidenceSha256":"3b73a5b980a975dc875f8b13a25fae5c42e9eaeca85f68dbd88dfe46f47b2bb2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":373191,"sourceCount":3,"url":"/cases/east-side-access"},{"id":"hongkong-zhuhai-macao","title":"Hong Kong–Zhuhai–Macao crossing — immersed-tunnel settlement transitions","summary":"Artificial islands connect a long immersed crossing founded above variable soft deposits. Project papers describe composite foundation treatment, island formation and full-scale testing near transition zones.","topics":["tunnels","coastal-offshore","ground-improvement","settlement"],"country":"China","region":"Pearl River estuary","owner":"Hong Kong–Zhuhai–Macao Bridge Authority","year":2018,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Immersed-tunnel bedding","Jet grouting","Preloading","Transition settlement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors document implemented island/tunnel concepts; a separate test study evaluates preload and jet-grout treatment. A test section is not assumed to represent the full crossing.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The project paper describes island/tunnel work beginning in 2011 and handover in 2018; these milestones do not cover every contract in the full bridge system.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a settlement transition between an artificial island and an immersed-tunnel approach.","inputs":["Extract the transition geometry and distinguish soft seabed from later backfill.","Identify the test conditions and measured response used to judge treatment effectiveness."],"deliverables":["Compare composite-ground and untreated-ground settlement profiles.","Prepare treatment verification, dredging tolerance and immersion sequence requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is differential settlement at an island transition more consequential than uniform tunnel settlement?","How could sediment accumulation undermine a correctly designed bedding layer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Novelties in the islands and tunnel project","url":"https://www.sciencedirect.com/science/article/pii/S0886779821004788","publisher":"Project authors / Tunnelling and Underground Space Technology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Full-scale jet-grouting loading test","url":"https://ascelibrary.org/doi/10.1061/%28ASCE%29GM.1943-5622.0002625","publisher":"Project researchers / ASCE International Journal of Geomechanics","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","publisher":"Wikimedia Commons / Tksteven","year":2013,"access":"public-link","license":"CC BY 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hongkong-zhuhai-macao.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hongkong-zhuhai-macao/download/schematic"},{"id":"project-image","title":"Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG","kind":"project-image","fileName":"hongkong-zhuhai-macao.jpg","mimeType":"image/jpeg","bytes":252028,"sha256":"d7563419a811f7da36efb6afb13d22b3c9bdc67b63a65c0d79bd8ba53adcd21c","sourceId":"s3","license":"CC BY 3.0","width":1024,"height":768,"credit":"Tksteven","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","licenseUrl":"https://creativecommons.org/licenses/by/3.0","imageDate":"2013-02-11 15:19:38","evidenceFile":"image-provenance/hongkong-zhuhai-macao-commons.json","evidenceSha256":"e5d16295088c059e0cb1ffc80e0738fc71a6b60b7ce3f31ca3831aceec427f6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/7/78/Eastern_artificial_island_for_the_tunnel_section%2C_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","downloadUrl":"/cases/hongkong-zhuhai-macao/download/project-image","originalSha1":"6ec561ebc1adfc53a5867ac30ff2729cd80c458d","originalSha256":"d7563419a811f7da36efb6afb13d22b3c9bdc67b63a65c0d79bd8ba53adcd21c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hongkong-zhuhai-macao-capstone.md","mimeType":"text/markdown","bytes":3373,"sha256":"d3990d19ae12ff46c5c5c8650b34676fdad3037a61c38dba8bc5319e2623d603","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hongkong-zhuhai-macao/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section.","caption":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.","credit":"Tksteven","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","license":"CC BY 3.0","licenseUrl":"https://creativecommons.org/licenses/by/3.0","width":1024,"height":768,"imageDate":"2013-02-11 15:19:38","imageDownloadAllowed":true},"figureCaption":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":82,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hongkong-zhuhai-macao-commons.json","evidenceSha256":"e5d16295088c059e0cb1ffc80e0738fc71a6b60b7ce3f31ca3831aceec427f6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":256526,"sourceCount":3,"url":"/cases/hongkong-zhuhai-macao"},{"id":"smart-tunnel","title":"SMART Tunnel — tunnelling through urban karst","summary":"The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.","topics":["tunnels","rock","dewatering","ground-improvement","site-investigation"],"country":"Malaysia","region":"Kuala Lumpur","owner":"Department of Irrigation and Drainage / Malaysian Highway Authority","year":2007,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Karst investigation","Slurry shield","Fissure and compaction grouting"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The primary construction accounts explain the selected methods and localized treatment purposes. They do not establish that karst uncertainty can be removed by one uniform grouting grid.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The builder identifies operation from 2007; the page is a project history rather than a detailed monthly programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan ground investigation and treatment for a tunnel encountering pinnacles, cavities and variable cover beneath a city.","inputs":["Extract the reported karst features and the purpose of each grouting method.","Specify investigation coverage at shafts, interventions and transitions rather than uniform spacing alone."],"deliverables":["Develop face-pressure and groundwater-control concepts for mixed ground.","Prepare a cavity/sinkhole response plan with survey triggers and treatment verification.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can groundwater drawdown cause a surface collapse away from the tunnel face?","Which evidence separates a treatable local void from a larger connected karst system?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SMART construction and geology","url":"https://www.smarttunnel.com.my/construction/print_project_construction.htm","publisher":"SMART project","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Ground-treatment contractor case","url":"https://www.kellerasean.com/projects/storm-water-management-and-road-tunnel","publisher":"Keller","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Builder project record","url":"https://gamuda.com/our-expertise/engineering-construction/stormwater-management-and-road-tunnel-smart/","publisher":"Gamuda","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"KL-SMARTtunnelentrance.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","publisher":"Wikimedia Commons / Azreey","year":2007,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"smart-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/smart-tunnel/download/schematic"},{"id":"project-image","title":"KL-SMARTtunnelentrance.JPG","kind":"project-image","fileName":"smart-tunnel.jpg","mimeType":"image/jpeg","bytes":577763,"sha256":"96788f96ef8b17d718aeb536a6282dc215767c1c9217e99d6a7999c55a4d275d","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Azreey","sourceUrl":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2007-12-27","evidenceFile":"image-provenance/smart-tunnel-commons.json","evidenceSha256":"d6654eb1d691f51c5618edc29c7f59f575cfe4d5c70ce3a39979b2a84f69a950","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/26/KL-SMARTtunnelentrance.JPG","downloadUrl":"/cases/smart-tunnel/download/project-image","originalSha1":"a5a0765e43e062f683adc413aa657655bbd67c36","originalSha256":"96788f96ef8b17d718aeb536a6282dc215767c1c9217e99d6a7999c55a4d275d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"smart-tunnel-capstone.md","mimeType":"text/markdown","bytes":3195,"sha256":"41d78160bf08853a679ec43e844ed00eefd919e2d2cb15461408fd68297d66db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/smart-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The northbound entrance to Kuala Lumpur’s SMART Tunnel.","caption":"The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.","credit":"Azreey","sourceUrl":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2007-12-27","imageDownloadAllowed":true},"figureCaption":"The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":83,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/smart-tunnel-commons.json","evidenceSha256":"d6654eb1d691f51c5618edc29c7f59f575cfe4d5c70ce3a39979b2a84f69a950","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":582083,"sourceCount":4,"url":"/cases/smart-tunnel"},{"id":"kobe-port-island","title":"Kobe Port — quay-wall displacement during liquefaction","summary":"Many caisson quay walls moved seaward during the 1995 earthquake. Port researchers studied the combined contributions of inertia and excess pore pressure beneath and behind the walls.","topics":["seismic","retaining-walls","coastal-offshore","ground-improvement"],"country":"Japan","region":"Kobe","owner":"Port of Kobe / Japanese port researchers","year":1995,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Caisson quay walls","Effective-stress analysis","Lateral spreading"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The primary papers report observed damage and effective-stress analyses. The detailed modeled example is on Rokko Island; a general Kobe photograph is not mislabeled as that precise section.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare quay-wall retrofit options that address both foundation liquefaction and inertial sliding.","inputs":["Select one documented wall section and extract its foundation/backfill geometry.","Separate observed displacements from values reproduced by the numerical model."],"deliverables":["Check sliding and bearing before and after pore-pressure increase.","Compare ground treatment, drainage and geometry changes for controlling permanent displacement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a wall remain upright while losing operational serviceability?","Which deformation component would a simple static sliding check miss?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of caisson-type quay walls at Kobe Port","url":"https://www.jstage.jst.go.jp/article/sandf1995/36/Special/36_119/_article/-char/en","publisher":"Inagaki and port-research coauthors / Soils and Foundations","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Effective-stress analysis of a Kobe quay wall","url":"https://www.pari.go.jp/PDF/no0813-07.pdf","publisher":"Port and Harbour Research Institute","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Minatojimanakamachi c184.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","publisher":"Wikimedia Commons / 神戸市","year":null,"access":"public-link","license":"CC BY 2.1 jp","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"kobe-port-island.svg","mimeType":"image/svg+xml","bytes":989,"sha256":"7ed6562b41c1ef6286cc62d81928348d9f071653ee41e073ab8e6a4e68cf4e34","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kobe-port-island/download/schematic"},{"id":"project-image","title":"Minatojimanakamachi c184.jpg","kind":"project-image","fileName":"kobe-port-island.jpg","mimeType":"image/jpeg","bytes":476339,"sha256":"a63966b46b6f031e47094ed34cf561ab7b5ea124d02dbebcc0ed0c8a87f7b0df","sourceId":"s3","license":"CC BY 2.1 jp","width":998,"height":595,"credit":"神戸市","sourceUrl":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.1/jp/deed.en","imageDate":"Taken on 17 January 1995","evidenceFile":"image-provenance/kobe-port-island-commons.json","evidenceSha256":"8ab22636f60ccd60c3c506d526e8109d4bda8c91483f197686de20f24a74c874","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/67/Minatojimanakamachi_c184.jpg","downloadUrl":"/cases/kobe-port-island/download/project-image","originalSha1":"000dc3efb2977bd78da58b6b4ddf2fbf5e28edc6","originalSha256":"a63966b46b6f031e47094ed34cf561ab7b5ea124d02dbebcc0ed0c8a87f7b0df","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"kobe-port-island-capstone.md","mimeType":"text/markdown","bytes":3123,"sha256":"4ec6c5e445fffd1b61f806f0455d306e48f28f911efd5a2358b0504085057248","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kobe-port-island/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995.","caption":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995. The photograph documents the port-area earthquake; the detailed quay-wall model cited in the case is a separate Rokko Island section.","credit":"神戸市","sourceUrl":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","license":"CC BY 2.1 jp","licenseUrl":"https://creativecommons.org/licenses/by/2.1/jp/deed.en","width":998,"height":595,"imageDate":"Taken on 17 January 1995","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995. The photograph documents the port-area earthquake; the detailed quay-wall model cited in the case is a separate Rokko Island section.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":93,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/kobe-port-island-commons.json","evidenceSha256":"8ab22636f60ccd60c3c506d526e8109d4bda8c91483f197686de20f24a74c874","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":480451,"sourceCount":3,"url":"/cases/kobe-port-island"},{"id":"svalbard-seed-vault","title":"Svalbard Seed Vault — tunnel waterproofing and frozen ground","summary":"The Seed Vault upgrade replaced its access tunnel with a watertight concrete structure and moved heat-producing services. The construction account includes artificial ground freezing to support the replacement works.","topics":["cold-regions","tunnels","ground-improvement","seepage","rock","delivery"],"country":"Norway","region":"Longyearbyen, Svalbard","owner":"Norwegian Ministry of Agriculture and Food / Statsbygg","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Tunnel waterproofing","Thermal disturbance","Groundwater exclusion"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner sources describe the 2016–2019 upgrade and freezing used during tunnel construction. The seed-storage chambers and the entrance tunnel have different thermal and groundwater functions; do not treat the entire facility as one homogeneous frozen-ground boundary.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner identifies the main upgrade period as 2016–2019; the 2018 construction update describes the work while it was in progress.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner reports a waterproofed entrance tunnel and upgraded cooling. Published descriptions do not provide the full freeze-pipe commissioning records or as-built waterproofing details.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a watertight tunnel replacement in warming permafrost, combining temporary frozen-ground support with a permanent drainage, waterproofing and thermal strategy.","inputs":["Map the access tunnel, rock chambers, service heat sources and surface-water pathways from the owner descriptions.","Define study values for unfrozen permeability, ice content, thermal properties and freezing-system temperature, flagging them as assumptions."],"deliverables":["Estimate freeze-wall development and thaw sensitivity around the excavation, then assess leakage and uplift for the permanent tunnel.","Prepare freezing verification holes, temperature monitoring, excavation hold points and a seasonal surface-water diversion plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does removing internal heat generation help even when the final tunnel lining is designed to be watertight?","What measurements would establish adequate frozen-ground continuity before excavation without confusing cold air with frozen soil?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Construction improvements and temporary ground freezing","url":"https://www.seedvault.no/2018/09/04/seed-vault-construction-improvements-proceed-as-planned/","publisher":"Svalbard Global Seed Vault / Norwegian Ministry of Agriculture and Food","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Purpose, operations and 2016–2019 upgrade","url":"https://www.seedvault.no/about/purpose-operations-and-organisation/","publisher":"Svalbard Global Seed Vault","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Facility operation and tunnel arrangement","url":"https://www.nordgen.org/our-work/svalbard-global-seed-vault/frequently-asked-questions/","publisher":"NordGen","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Svalbard Global Seed Vault Exterior 2020.jpg","url":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","publisher":"Cierra Martin for Crop Trust","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"svalbard-seed-vault.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/schematic"},{"id":"project-image","title":"Svalbard Global Seed Vault — exterior in 2020","kind":"project-image","fileName":"svalbard-seed-vault.jpg","mimeType":"image/jpeg","bytes":345849,"sha256":"3514d4606ff689bef0b68899a77237a3b3cf4225b33b29b32b01f7ab01657dc8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":913,"credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-02-25","evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e3/Svalbard_Global_Seed_Vault_Exterior_2020.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/svalbard-seed-vault/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"svalbard-seed-vault-capstone.md","mimeType":"text/markdown","bytes":3964,"sha256":"7be9dac2dda47c60c428fcb9c412c0a4663488f05b6fa991da6346122ad9c1cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","caption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":913,"imageDate":"2020-02-25","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":106,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350781,"sourceCount":4,"url":"/cases/svalbard-seed-vault"},{"id":"osman-gazi-bridge","title":"Osman Gazi Bridge — seismic caissons on gravel beds","summary":"The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.","topics":["lateral-foundations","seismic","ground-improvement","coastal-offshore","site-investigation","delivery"],"country":"Türkiye","region":"Izmit Bay","owner":"Gebze–Orhangazi–Izmir motorway project","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seismic soil–structure interaction","Caisson foundations","Ground improvement","Interface sliding"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The design paper models gravel-bed and reinforced-subsoil response using nonlinear foundation elements. Contractor records explain floating and sinking the caissons onto prepared crushed rock. A controlled-sliding concept needs both displacement and residual-performance checks.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"IHI describes a 42-month construction period. Treat that as the contractor’s overall project account, not a detailed foundation activity schedule.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The construction accounts document the built crossing; the design-stage soil–structure model is not a substitute for measured earthquake performance.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare fixed-base and nonlinear-foundation representations for a bridge tower supported on a prepared gravel interface.","inputs":["Extract foundation arrangement, soil improvement and the interface behaviour from the design-stage paper.","Identify the earthquake performance objectives and distinguish assumptions in the analysis from measured field response."],"deliverables":["Construct a reduced nonlinear spring/interface model and compare sliding, rocking and residual displacement under selected study motions.","Prepare seabed preparation, caisson placement, survey-tolerance and post-earthquake inspection requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When can intentional foundation sliding reduce structural demand while increasing permanent displacement and service-restoration work?","Which installation tolerances and seabed observations are needed to make the assumed gravel-interface behaviour credible?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modelling of soil–structure interaction for seismic analyses of the Izmit Bay Bridge","url":"https://www.cfms-sols.org/sites/default/files/Actes/763-768.pdf","publisher":"Project design authors / CFMS conference proceedings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Osman Gazi Bridge construction sequence","url":"https://www.ihi.co.jp/iis/en/gallery/movie/izmit_movie.html","publisher":"IHI Infra-square","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Osman Gazi Bridge project account","url":"https://www.webuildgroup.com/en/projects/bridges-viaducts/osman-gazi-bridge/","publisher":"Webuild","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Osman-Gazi-Bridge-620x410.jpg","url":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","publisher":"Erdmkiliic","year":2016,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"osman-gazi-bridge.svg","mimeType":"image/svg+xml","bytes":1201,"sha256":"0f34c5a583e4d9e8427d0110ef6d716d217e38ffb3b4ade758e04d51b5451084","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/schematic"},{"id":"project-image","title":"Osman Gazi Bridge — suspension crossing","kind":"project-image","fileName":"osman-gazi-bridge.jpg","mimeType":"image/jpeg","bytes":152148,"sha256":"0c746b33551461f356d58e95fe70fe4588a48903a60efef88a9c49d11e78123b","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2016-07-07","evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/Osman-Gazi-Bridge-620x410.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/osman-gazi-bridge/download/project-image","originalSha1":"1ec066ac577efd9795f0ed8a5eb0f7511078f1be","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"osman-gazi-bridge-capstone.md","mimeType":"text/markdown","bytes":3672,"sha256":"d6891d8af9dd21f85ea6c6bbfdf985f634c0fca28dd9c3214f6d365b1b7b4fb7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","caption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2016-07-07","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":113,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157021,"sourceCount":4,"url":"/cases/osman-gazi-bridge"},{"id":"eastern-scheldt-barrier","title":"Eastern Scheldt Barrier — foundation mats and scour resilience","summary":"The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.","topics":["coastal-offshore","shallow-foundations","scour-erosion","ground-improvement","monitoring","delivery"],"country":"Netherlands","region":"Zeeland","owner":"Rijkswaterstaat","year":1986,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Graded foundation mats","Marine scour protection","Filter compatibility","Hydraulic–geotechnical interaction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Rijkswaterstaat documents the barrier arrangement and construction period. USACE guidance describes the Eastern Scheldt graded foundation-mat approach, while recent Deltares work reassesses hydraulic loads for renewal. Hydraulic model results must be translated into geotechnical limit states.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Rijkswaterstaat dates construction to 1976–1986. Deltares describes later 2024–2025 testing for renewal, a separate phase of the asset lifecycle.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner provides an operating history; the recent research supports maintenance decisions, not a new claim that every original foundation detail is verified under future loads.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a study section of a barrier foundation and protection apron, linking hydraulic demand to filter stability, bearing and erosion-resistant details.","inputs":["Use the owner source for the barrier configuration and the technical guidance for the mat/filter concept.","Define study bed-material gradations, hydraulic loading and foundation parameters; record what is measured and what is assumed."],"deliverables":["Check filter retention/permeability and sensitivity to edge scour and loss of support near the protection apron.","Prepare construction placement tolerances, underwater inspection criteria and a renewal plan under changed hydraulic loads.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a stable surface armour layer still permit undermining through an incompatible filter or an exposed apron edge?","Which results from a hydraulic scale model can directly inform foundation checks, and which require a separate soil-response model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eastern Scheldt Barrier — owner project record","url":"https://www.rijkswaterstaat.nl/en/projects/iconic-structures/eastern-scheldt-barrier","publisher":"Rijkswaterstaat","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"ETL 1110-2-565 — scour-protection and foundation-mat discussion","url":"https://www.publications.usace.army.mil/Portals/76/Publications/EngineerTechnicalLetters/ETL_1110-2-565.pdf","publisher":"U.S. Army Corps of Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Barrier renewal scale-model tests, 2024–2025","url":"https://www.deltares.nl/en/news/mini-eastern-scheldt-barrier-passes-extreme-storm-tests","publisher":"Deltares","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Oosterscheldekering.jpg","url":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","publisher":"Klankbeeld","year":2025,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eastern-scheldt-barrier.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eastern-scheldt-barrier-reference-values.csv","mimeType":"text/csv","bytes":644,"sha256":"e611fa5ed1abaf9bdc927b2b599be79f50f803e70bb4fdcf5b9df61e14162090","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eastern-scheldt-barrier/download/reference-values"},{"id":"project-image","title":"Eastern Scheldt Barrier — view from Westerschouwen","kind":"project-image","fileName":"eastern-scheldt-barrier.jpg","mimeType":"image/jpeg","bytes":225473,"sha256":"6be491da8741403f8266f67a77fc1e5e8b735b92cb7b2d27384dff4b3517a1e3","sourceId":"s4","license":"CC BY 4.0","width":1280,"height":720,"credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2025-01-28 15:00:00","evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e8/Oosterscheldekering.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eastern-scheldt-barrier/download/project-image","originalSha1":"b70e8701cc9305b1c2e1913069101ff01517625d","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eastern-scheldt-barrier-capstone.md","mimeType":"text/markdown","bytes":4598,"sha256":"7f3a6d20167aaefea6b90d8406ae9221540013fa07968034ca578ad67a99cc1e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","caption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":720,"imageDate":"2025-01-28 15:00:00","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","qualityNotes":["The USACE technical-letter PDF is linked at its official source; that host denied a local download during this review. The local project brief and photograph remain available."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":115,"referenceValues":[{"label":"Total barrier length","value":9,"unit":"km","scope":"Owner-reported overall barrier length, including fixed sections.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."},{"label":"Movable-section length","value":3,"unit":"km","scope":"Movable portion within the overall barrier; not a separate structure to add to the 9 km total.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":231922,"sourceCount":4,"url":"/cases/eastern-scheldt-barrier"},{"id":"venice-mose","title":"Venice MOSE — marine caisson placement and movement monitoring","summary":"The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.","topics":["coastal-offshore","shallow-foundations","settlement","ground-improvement","monitoring","delivery"],"country":"Italy","region":"Venice Lagoon","owner":"Italian Ministry of Infrastructure / MOSE project","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine caisson foundations","Ground–structure interaction","Precision grouting","GNSS/InSAR monitoring"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The designers explain caisson foundations, settlement assessment and watertight interfaces. The monitoring paper studies MOSE shoulder structures using GNSS and InSAR. Measurements of a shoulder cannot automatically be assigned to every gate caisson or inlet.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The locally available article provides component-specific deformation evidence. Its underlying MOSE GNSS observations have restricted access; open access to the article does not make those raw records downloadable. Complete construction acceptance records and final accounts were not provided.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a placement-and-monitoring design for a selected MOSE inlet caisson or shoulder, with explicit tolerances and a defensible spatial interpretation of movements.","inputs":["Select one inlet and one structure type; compile its geometry and support concept from the designer source.","Extract monitoring periods, reference frame, instrument precision and measured components from the published deformation study."],"deliverables":["Evaluate bearing and differential-settlement sensitivity for the selected foundation and define placement/grouting tolerances.","Design a combined survey/InSAR monitoring workflow that separates regional subsidence, structural movement and measurement noise.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would agreement between satellite line-of-sight and GNSS observations still require care before inferring a vertical settlement at a nearby gate?","How should a marine caisson placement sequence respond when the achieved support level differs from the alignment tolerance assumed by the gate designer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"MOSE — designer account of barrier and caisson foundations","url":"https://www.technital.net/projects/marine-and-coastal/special-marine-works/ingenieria-maritima-y-costera-mobile-surge-barriers-at-the-three-inlets-of-the-venice-lagoon-mose-italy","publisher":"Technital","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Integrated GNSS and InSAR analysis of MOSE shoulder structures","url":"https://www.mdpi.com/2072-4292/17/6/1059","publisher":"Project research authors / Remote Sensing","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"MOSE marine caisson foundation works","url":"https://proserveltd.co.uk/casestudies/venice/","publisher":"Proserve","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","url":"https://www.mdpi.com/2072-4292/17/6/1059/pdf","publisher":"Massimo Fabris and Mario Floris / Remote Sensing (MDPI)","year":2025,"access":"public-link","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","notes":"","checked":"2026-11-22","localAssetIds":["mose-monitoring-2025"]},{"id":"s5","title":"MOSE Project Venice.jpg","url":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","publisher":"Wikimedia Commons contributor","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"venice-mose.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/schematic"},{"id":"mose-monitoring-2025","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","kind":"report","fileName":"mose-monitoring-2025.pdf","mimeType":"application/pdf","bytes":7574597,"sha256":"4c89f5e78f6cd7fcbead8a0bebb6c7d5977141553ebb5a1c583a0827438270bf","sourceId":"s4","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","rightsUrl":"https://creativecommons.org/licenses/by/4.0/","rightsBasis":"The article first page and publisher page explicitly license this work under CC BY 4.0. The original PDF is redistributed unchanged, with author credit and DOI retained.","rightsEvidenceUrl":"https://www.mdpi.com/2072-4292/17/6/1059","pages":21,"downloadUrl":"/cases/venice-mose/download/mose-monitoring-2025"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"venice-mose-reference-values.csv","mimeType":"text/csv","bytes":611,"sha256":"71e6e7c4d13ce07281889fb2d4d103f8b1dc271e11b43c23d1c3378905ee0d3d","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/venice-mose/download/reference-values"},{"id":"project-image","title":"MOSE at the Lido inlet — construction in 2009","kind":"project-image","fileName":"venice-mose.jpg","mimeType":"image/jpeg","bytes":193898,"sha256":"ce7841b2d704bbc54e8005c5b4c7810008885b90c3caa31c55647589b3fc4d9f","sourceId":"s5","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-07-25 08:19:50","evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/27/MOSE_Project_Venice.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/venice-mose/download/project-image","originalSha1":"068a07bb2f08ce4ce810f1aeeb43e296ec7026dc","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"venice-mose-capstone.md","mimeType":"text/markdown","bytes":4928,"sha256":"087b1e2f4c7f9465eb18640c48853afe32fcd4bc0e4ca8168332f337007a53cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","caption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"2009-07-25 08:19:50","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","qualityNotes":["The locally downloadable monitoring article is CC BY 4.0. Its underlying MOSE GNSS observations are restricted by Consorzio Venezia Nuova; do not describe those raw observations as an open downloadable dataset."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":116,"referenceValues":[{"label":"MOSE continuous GNSS stations","value":36,"unit":"stations","scope":"32 stations on shoulder structures plus four local reference stations in the studied MOSE network.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."},{"label":"External reference-network stations","value":8,"unit":"stations","scope":"External stations used with the MOSE network; separate from its four local reference stations.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":7775241,"sourceCount":5,"url":"/cases/venice-mose"}]}