{"schemaVersion":1,"updated":"2026-11-22","total":12,"records":[{"id":"woodrow-wilson-foundations","title":"Woodrow Wilson Bridge — foundation selection and testing","summary":"Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.","topics":["deep-foundations","lateral-foundations","site-investigation","seismic","scour-erosion"],"country":"United States","region":"Potomac River, Virginia–Maryland","owner":"Virginia DOT / Maryland State Highway Administration","year":2008,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Pile foundations","Foundation alternatives","Soil–structure interaction","Scour allowance"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project papers document foundation optimization and constructed-foundation practice; verify the paper’s stage before treating an alternative as the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The 2008 paper provides a later construction-stage foundation account.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select and justify a bridge-pier foundation for a tidal river crossing using the project’s alternatives and investigation strategy.","inputs":["Extract boring profiles, selected pile geometry, load-test evidence and scour assumptions where published.","Record separately the design spectrum and the soil profile used in the foundation response study."],"deliverables":["Develop axial/group and lateral-response checks for a selected pier.","Compare two foundation alternatives with construction plant, testing and navigational constraints.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation optimization and design for replacement of the Woodrow Wilson Bridge","url":"https://scholarsmine.mst.edu/icchge/5icchge/session09/6/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2004,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"New I-95 Woodrow Wilson Bridge Foundations","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08/6/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Woodrow Wilson Bridge aerial 2012.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","publisher":"Wikimedia Commons / Doc Searls from Santa Barbara, USA","year":2012,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"woodrow-wilson-foundations.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/woodrow-wilson-foundations/download/schematic"},{"id":"project-image","title":"Woodrow Wilson Bridge aerial 2012.jpg","kind":"project-image","fileName":"woodrow-wilson-foundations.jpg","mimeType":"image/jpeg","bytes":247837,"sha256":"60e13516a959b10477debf6f01d67a1822be0c401b935c64eb09f3f83924f637","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":606,"credit":"Doc Searls from Santa Barbara, USA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2012-03-14 11:10","evidenceFile":"image-provenance/woodrow-wilson-foundations-commons.json","evidenceSha256":"f0b310a9f2468aa50476d768691bcc900e19a1771b989a996335547c471d2250","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/33/Woodrow_Wilson_Bridge_aerial_2012.jpg","downloadUrl":"/cases/woodrow-wilson-foundations/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"woodrow-wilson-foundations-capstone.md","mimeType":"text/markdown","bytes":3290,"sha256":"6afb567962ac563d089f9502685d44763d9e16214c58e0ec6573023f216cba28","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/woodrow-wilson-foundations/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012.","caption":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.","credit":"Doc Searls from Santa Barbara, USA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":606,"imageDate":"2012-03-14 11:10"},"figureCaption":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":5,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/woodrow-wilson-foundations-commons.json","evidenceSha256":"f0b310a9f2468aa50476d768691bcc900e19a1771b989a996335547c471d2250","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":252326,"sourceCount":3,"url":"/cases/woodrow-wilson-foundations"},{"id":"snake-river-micropiles","title":"US 26/89, Snake River Canyon — micropile slope stabilization","summary":"A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.","topics":["slopes","deep-foundations","lateral-foundations","retaining-walls","monitoring"],"country":"United States","region":"Wyoming","owner":"Wyoming Department of Transportation","year":1997,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Reticulated micropiles","Ground anchors","Residual shear strength"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The published case describes battered micropiles, anchor layout, soil-rock sliding interface and instrumentation.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Construction ran from April to September 1997; monitoring continued through June 1998.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Inclinometers, piezometers, strain gauges, load cells and survey measurements are described.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a stabilizing micropile/anchor system for a sliding block and compare it with unloading or road relocation.","inputs":["Extract the sliding interface and adopted residual strength.","Use the reported wall arrangement and identify how load transfers into stable ground."],"deliverables":["Prepare slope equilibrium and structural load-sharing calculations.","Specify anchor testing, pile checks and a deformation-trigger response plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"US Highway 26/89 slope stabilization, Wyoming","url":"https://www.geoinstitute.org/node/8359","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Wolosick, Turner and Hasenkamp (1998), Reticulated Minipile Walls for Landslide Stabilization.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"snake-river-micropiles.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/snake-river-micropiles/download/schematic"},{"id":"project-image","title":"Snake River Canyon — US 26/89 stabilization site","kind":"project-image","fileName":"snake-river-micropiles-r13.png","mimeType":"image/png","bytes":684301,"sha256":"0d7194dbae94485262504b5d595cda83c0c0500adb745aa79d412702c6cc9c45","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":679,"height":453,"credit":"Hayward Baker, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8359","licenseUrl":"https://www.geoinstitute.org/node/8359","imageDate":null,"evidenceFile":"image-provenance/snake-river-micropiles-r13-source.json","evidenceSha256":"e7ecfd47a0e5e7019bdb4e32a6dddba47c407db700196586e66cccee1d973f4f","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/Mp2.png","originalSha256":"0d7194dbae94485262504b5d595cda83c0c0500adb745aa79d412702c6cc9c45","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/snake-river-micropiles/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"snake-river-micropiles-capstone.md","mimeType":"text/markdown","bytes":2608,"sha256":"b8148f68e3eada63d34fa56f9c18b0076cc5505415a4860870633529c44779ab","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/snake-river-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","caption":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","credit":"Hayward Baker, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8359","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8359","width":679,"height":453,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":8,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/snake-river-micropiles-r13-source.json","evidenceSha256":"e7ecfd47a0e5e7019bdb4e32a6dddba47c407db700196586e66cccee1d973f4f","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3637,"sourceCount":1,"url":"/cases/snake-river-micropiles"},{"id":"block-island-wind","title":"Block Island Wind Farm — pile foundations and measured stiffness","summary":"The five-turbine offshore project has public foundation-installation observations and subsequent structural-monitoring studies.","topics":["coastal-offshore","deep-foundations","lateral-foundations","monitoring","seismic"],"country":"United States","region":"Offshore Rhode Island","owner":"Deepwater Wind / project partners","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Jacket piles","Foundation stiffness","Structural health monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The original geotechnical consultant describes interpreted profiles and pile-capacity work. BSEE publishes a foundation-stiffness study for one turbine.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The BSEE page lists a $608,722 monitoring-research award; this is not the wind-farm construction cost.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"partial","summary":"The Rhode Island owner/regulator record identifies commercial operation in December 2016.","sourceIds":["s3"]},"records":{"availability":"partial","summary":"The regulator records and BSEE technical attachments support construction/performance review.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare predicted and observed foundation stiffness for an offshore wind support, including how uncertain soil springs affect structural response.","inputs":["Extract pile/structure information from published monitoring and technical reports.","Distinguish one instrumented turbine from the full wind farm and retain marine ground-condition differences."],"deliverables":["Prepare an axial/lateral soil-spring sensitivity model and identify validation data.","Develop an installation and monitoring plan with offshore access and scour considerations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Block Island windfarm structural monitoring, TAP 806","url":"https://www.bsee.gov/research-records/tap-806-block-island-windfarm-structural-monitoring","publisher":"BSEE","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Block Island offshore wind farm — geotechnical engineering","url":"https://www.gza.com/projects/block-island-offshore-wind-farm","publisher":"GZA, project geotechnical consultant","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Block Island Wind Farm project records","url":"https://www.crmc.ri.gov/windenergy/blockislandwind.html","publisher":"Rhode Island Coastal Resources Management Council","year":2016,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Offshore Foundation Install 18.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","publisher":"Wikimedia Commons / BOEM-OPA","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"block-island-wind.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/block-island-wind/download/schematic"},{"id":"project-image","title":"Offshore Foundation Install 18.jpg","kind":"project-image","fileName":"block-island-wind.jpg","mimeType":"image/jpeg","bytes":226374,"sha256":"475bb6cc47f26f4dd77af72f39cee01b6c412a83262e3afd9ec312f36db9f2c2","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":941,"credit":"BOEM-OPA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-08-25 14:32:56","evidenceFile":"image-provenance/block-island-wind-commons.json","evidenceSha256":"6956e188a9bc1a7f8a6b86695ee9d106d4fba8a7f93b931a111c2cc68de31a23","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d0/Offshore_Foundation_Install_18.jpg","downloadUrl":"/cases/block-island-wind/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"block-island-wind-capstone.md","mimeType":"text/markdown","bytes":3287,"sha256":"c1cd6a9f8b988043bd356d43464ce3e47a76b4751e48fa08e57a40ffcaefdd0d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/block-island-wind/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015.","caption":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015. The jackets were built in Louisiana and transported to the offshore site.","credit":"BOEM-OPA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":941,"imageDate":"2015-08-25 14:32:56"},"figureCaption":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015. The jackets were built in Louisiana and transported to the offshore site.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":41,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/block-island-wind-commons.json","evidenceSha256":"6956e188a9bc1a7f8a6b86695ee9d106d4fba8a7f93b931a111c2cc68de31a23","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":230868,"sourceCount":4,"url":"/cases/block-island-wind"},{"id":"us231-landslide","title":"US 231, Lacey Springs — bridging a moving landslide","summary":"After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.","topics":["slopes","deep-foundations","lateral-foundations","monitoring","delivery"],"country":"United States","region":"Lacey Springs, Alabama","owner":"Alabama Department of Transportation","year":2020,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Landslide avoidance","Drilled shafts","Instrumentation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"FHWA documents alternative selection, drilled-shaft monitoring and construction delivery. It does not supply the full bridge/shaft design set.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $27.4 million for the repair/betterment and describes comparison with more expensive alternatives.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The bridges opened on 28 September 2020; the case describes incentives and advance purchase of casings and girders.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case discusses post-opening performance and ongoing instrumentation.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare slope stabilization with a bridge solution that transfers loads through unstable ground while preserving the road alignment.","inputs":["Extract the evaluated alternatives, slope geometry constraints and monitored quantities.","Identify the shear surface and pile-soil relative movement needed for a study shaft design."],"deliverables":["Prepare an alternatives decision matrix and a lateral soil-loading sensitivity study.","Develop an instrument layout with action levels and an accelerated procurement schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-028 — US 231 landslide repair","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","publisher":"FHWA / ALDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us231-landslide-repair","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us231-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us231-landslide/download/schematic"},{"id":"us231-landslide-repair","title":"FHWA-HIF-23-028, US231 landslide repair","kind":"report","fileName":"us231-landslide-repair.pdf","mimeType":"application/pdf","bytes":383622,"sha256":"0a5b9919d751adb355239d412946675bfefd4a7f291651073059edcb7b1114d8","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship; original state-agency photograph credits retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/72760","pages":2,"downloadUrl":"/cases/us231-landslide/download/us231-landslide-repair"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us231-landslide-reference-values.csv","mimeType":"text/csv","bytes":604,"sha256":"d55a19765753cfb5c1130dc843fd71aa0c087da6a9453cea9d72b6ce51778005","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us231-landslide/download/reference-values"},{"id":"project-image","title":"US 231 — completed bridges over the slide area","kind":"project-image","fileName":"us231-landslide-r13.jpeg","mimeType":"image/jpeg","bytes":67649,"sha256":"b728910614d015886a43573f82e0d8105eefbf36625f378c9b767c67aa34be08","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":778,"height":401,"credit":"Alabama Department of Transportation (ALDOT), published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","imageDate":null,"evidenceFile":"image-provenance/us231-landslide-r13-source.json","evidenceSha256":"073254ab95646ec6e74219206613cae5e26f89adfb9b853f3e9b026882a6f1fc","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","originalSha256":"0a5b9919d751adb355239d412946675bfefd4a7f291651073059edcb7b1114d8","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/us231-landslide/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us231-landslide-capstone.md","mimeType":"text/markdown","bytes":3543,"sha256":"5d0783dcad1f51544fac4c829e19d66bc6ed984bd1285c1d76c61c3f57350ea0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us231-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","caption":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","credit":"Alabama Department of Transportation (ALDOT), published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","width":778,"height":401,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":43,"referenceValues":[{"label":"Repair/betterment cost","value":27400000,"unit":"USD","scope":"Two-bridge resilience solution; FHWA-reported package.","sourceId":"s1","locator":"Project Snapshot and page 2","basis":"As reported; no escalation or inflation adjustment."},{"label":"Contract opening incentive","value":2490000,"unit":"USD","scope":"Incentive described for opening by 2 November 2020; not an extra cost assumed to have been paid.","sourceId":"s1","locator":"Challenges and Lessons Learned","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us231-landslide-r13-source.json","evidenceSha256":"073254ab95646ec6e74219206613cae5e26f89adfb9b853f3e9b026882a6f1fc","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":388798,"sourceCount":1,"url":"/cases/us231-landslide"},{"id":"rion-antirion","title":"Rion–Antirion Bridge — seismic caissons on improved seabed","summary":"The bridge foundations combine large caissons, a gravel interface and steel inclusions in weak seabed deposits. The designer distinguishes this system from piles structurally connected to a raft.","topics":["shallow-foundations","ground-improvement","seismic","coastal-offshore","lateral-foundations"],"country":"Greece","region":"Gulf of Corinth","owner":"Gefyra","year":2004,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seabed inclusions","Caisson sliding","Seismic capacity design"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Designer accounts explain the seismic load-transfer concept, alternative selection and verification studies. Their inclusion terminology is retained because the caisson is not fixed to the inclusions.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The designer account describes an approximately €800 million overall project. It is not a foundation-package bill or a certified final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The designer account reports completion in summer 2004 ahead of the contractual deadline.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate a gravity caisson on reinforced seabed with controlled sliding and uplift under earthquake loading.","inputs":["Extract the published soil layering, caisson geometry and reinforcement concept.","Use separate interface and reinforced-ground strengths; do not model the inclusions as connected piles."],"deliverables":["Check bearing, sliding and uplift for a defined seismic load envelope.","Compare alternative foundation concepts and propose validation by model tests and monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which load path is lost if the gravel layer is incorrectly modeled as a fixed connection?","How can controlled foundation movement reduce structural force while requiring displacement checks?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of Rion Antirion Bridge","url":"https://www.ice.org.uk/areas-of-interest/buildings-and-structures/design-and-construction-of-rion-antirion","publisher":"Bridge design team / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation design paper","url":"https://ascelibrary.org/doi/10.1061/40744%28154%297","publisher":"Alain Pecker / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","publisher":"Wikimedia Commons / Julien Seguinot from Lille, France","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rion-antirion.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/schematic"},{"id":"project-image","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg","kind":"project-image","fileName":"rion-antirion.jpg","mimeType":"image/jpeg","bytes":393534,"sha256":"a3d2e41eaadeb905afedcc04ba5700e30410d24dbf4cd468265faa4b86936bc9","sourceId":"s3","license":"CC BY-SA 2.0","width":1280,"height":853,"credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-09-30 15:33","evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/9f/Rio-Antirrio_bridge_from_Peloponnese_%2850451233726%29.jpg","downloadUrl":"/cases/rion-antirion/download/project-image","originalSha1":"e79018f5e06ee63197783330d3fe440d7aa3cebb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rion-antirion-capstone.md","mimeType":"text/markdown","bytes":3295,"sha256":"e769c46de36c7f364d44c5e2ab1ce02b58a85a6298e8ea0522acc1691d78bc0c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Rion–Antirion Bridge viewed from the Peloponnese.","caption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":853,"imageDate":"2020-09-30 15:33","imageDownloadAllowed":true},"figureCaption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":53,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":397715,"sourceCount":3,"url":"/cases/rion-antirion"},{"id":"lake-borgne-barrier","title":"Lake Borgne surge barrier — pile-supported flood protection","summary":"The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.","topics":["deep-foundations","lateral-foundations","coastal-offshore","seepage","monitoring"],"country":"United States","region":"New Orleans, Louisiana","owner":"Flood Protection Authority East / USACE","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven piles","Lateral pile response","Global stability","Floodwall transitions"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner and consultant sources explain the built system and geotechnical scope. Published summaries use differing pile counts and stages; no single count is inferred across them.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The operator describes an approximately $1.3 billion whole-barrier project, not a geotechnical-package final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator records transfer of operating and maintenance responsibilities following construction in 2013.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a representative barrier-wall foundation and its transition into an earthen levee.","inputs":["Extract the wall, gate and levee interface functions from the owner material.","Define study water levels, wave actions and soft-soil strength profiles with explicit source limits."],"deliverables":["Check axial/lateral pile response, group behavior and global stability.","Design transition details and instrumentation to compare storm response with predictions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a locally adequate pile group still sit within an unstable soil mass?","Why do differential movement and seepage deserve special attention at levee transitions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Barrier operations and system description","url":"https://www.floodauthority.org/the-system/lake-borgne-surge-barrier/","publisher":"Flood Protection Authority East","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geotechnical engineering account","url":"https://ardaman.com/ihnc-lake-borgne-barrier-giww-to-mrgo-st-bernard-parish-louisiana-usace-new-orleans-district/","publisher":"Ardaman & Associates","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"IHNC Surge Barrier Construction from Air.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","publisher":"Wikimedia Commons / Ray Devlin","year":2010,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lake-borgne-barrier.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/schematic"},{"id":"project-image","title":"IHNC Surge Barrier Construction from Air.jpg","kind":"project-image","fileName":"lake-borgne-barrier.jpg","mimeType":"image/jpeg","bytes":101254,"sha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","sourceId":"s3","license":"CC BY 2.0","width":800,"height":533,"credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2010-01-11 16:26:30","evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/42/IHNC_Surge_Barrier_Construction_from_Air.jpg","downloadUrl":"/cases/lake-borgne-barrier/download/project-image","originalSha1":"ec096cf2cb2f46b2508af820b50bbfcb78c8a3d3","originalSha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lake-borgne-barrier-capstone.md","mimeType":"text/markdown","bytes":3192,"sha256":"3d36487e28f0ac12f46bdcec3ecfa9d5a263ed5a4ad8e7455a843d1d326bbdf0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans.","caption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":800,"height":533,"imageDate":"2010-01-11 16:26:30","imageDownloadAllowed":true},"figureCaption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":72,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":105645,"sourceCount":3,"url":"/cases/lake-borgne-barrier"},{"id":"northern-line-extension","title":"Northern Line Extension — settlement assessment and station-box interfaces","summary":"The extension combines bored tunnels with deep station boxes and nearby developments. Owner settlement commitments and designer accounts link prediction, condition surveys and construction monitoring.","topics":["tunnels","excavation","monitoring","lateral-foundations"],"country":"United Kingdom","region":"Kennington to Battersea, London","owner":"Transport for London","year":2021,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Settlement troughs","Building damage assessment","Diaphragm walls"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The environmental assessment is a design-stage screening document, while the designer reports built features and opening. Predicted settlement values must not be presented as measured outcomes.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The designer records passenger opening in September 2021; the settlement-assessment documents predate construction.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a staged settlement assessment for a tunnel approaching a station box beneath a dense urban neighborhood.","inputs":["Extract the screening assumptions and distinguish greenfield analysis from building interaction.","Identify the owner’s survey and monitoring commitments for affected properties."],"deliverables":["Calculate overlapping tunnel/box settlement envelopes with volume-loss sensitivity.","Propose building-specific follow-up analyses and monitoring/compensation arrangements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a conservative greenfield prediction be unsuitable as a direct building-damage estimate?","How should deep foundations crossing the tunnel influence the screening process?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground movement assessment","url":"https://content.tfl.gov.uk/nle-twa-environmental-statement-volume-iic-appendix-i-part-4-a17-4d.pdf","publisher":"Buro Happold / Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Settlement commitments","url":"https://tfl.gov.uk/cdn/static/cms/documents/commitment-1-settlement.pdf","publisher":"Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Designer project account","url":"https://www.mottmac.com/en/projects/northern-line-extension/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Northern line extension construction site, SW8.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","publisher":"Wikimedia Commons / sludgegulper","year":2016,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"northern-line-extension.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/schematic"},{"id":"project-image","title":"Northern line extension construction site, SW8.jpg","kind":"project-image","fileName":"northern-line-extension.jpg","mimeType":"image/jpeg","bytes":422345,"sha256":"f4462889444ce02b4c781ef4bbf522a5573244ce74ff062bf476cfbd50c698fd","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":1707,"credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2016-03-11 12:38:22","evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/3c/Northern_line_extension_construction_site%2C_SW8.jpg","downloadUrl":"/cases/northern-line-extension/download/project-image","originalSha1":"3806f56827ba3cb38637a262dcd624ef348b915e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"northern-line-extension-capstone.md","mimeType":"text/markdown","bytes":3319,"sha256":"cb2697c5975600fbf469eabdf4cd496ff91056b5d2ddf37e77b93a4e903f748f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Battersea station construction site for the Northern Line Extension.","caption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":1707,"imageDate":"2016-03-11 12:38:22","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":99,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":426789,"sourceCount":4,"url":"/cases/northern-line-extension"},{"id":"port-of-anchorage","title":"Port of Alaska — test piles and seismic waterfront foundations","summary":"Modernization studies used offshore investigation and a test-pile programme to examine drivability, capacity and underwater noise. The petroleum/cement terminal team also characterized cyclic behavior and soil–structure interaction.","topics":["deep-foundations","lateral-foundations","laboratory-testing","seismic","coastal-offshore"],"country":"United States","region":"Anchorage, Alaska","owner":"Don Young Port of Alaska","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven pipe piles","Cyclic soil testing","Site response","Noise attenuation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner provides a test-pile report and the geotechnical consultant explains terminal investigation gaps. The programme-wide trial and terminal design are distinguished in the study brief.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a waterfront pile-test programme that answers structural, geotechnical and marine-environmental questions together.","inputs":["Extract the trial-pile purpose and installation/test sequence from the owner report.","Identify tidal-silt cyclic behavior, offshore strengths and shear-wave velocity gaps described by the designer."],"deliverables":["Compare pile capacity and drivability interpretations for a study wharf bent.","Plan static/dynamic testing, cyclic material tests and underwater-noise verification.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can changing the installation method satisfy noise limits yet affect pile capacity?","Why does an essential waterfront facility need deformation checks beyond ordinary axial resistance?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modernization test-pile programme and report","url":"https://www.portofalaska.com/modernization-project/test-pile-program-summary/","publisher":"Don Young Port of Alaska","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Petroleum Cement Terminal geotechnical investigation","url":"https://www.rmconsult.com/projects/port-of-alaska-petroleum-cement-terminal-geotechnical/","publisher":"R&M Consultants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Terminal engineering project account","url":"https://www.rmconsult.com/projects/port-of-alaska-petroleum-cement-terminal/","publisher":"R&M Consultants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Anchorage Alaska aerial view.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers, photographer not specified or unknown","year":1999,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"port-of-anchorage.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-of-anchorage/download/schematic"},{"id":"project-image","title":"Anchorage Alaska aerial view.jpg","kind":"project-image","fileName":"port-of-anchorage.jpg","mimeType":"image/jpeg","bytes":384244,"sha256":"c2bd6a0bb19c2276a49b485f47e1072f250b9b1767b9227f8b7514dea12d6634","sourceId":"s4","license":"Public domain","width":1280,"height":769,"credit":"U.S. Army Corps of Engineers, photographer not specified or unknown","sourceUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg#Licensing","imageDate":"1999-02-20","evidenceFile":"image-provenance/port-of-anchorage-commons.json","evidenceSha256":"ff2e3e8fe1f994820c8639a1ee26eaf5db81a5ebfda8ab8220368093c6e2207a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/67/Anchorage_Alaska_aerial_view.jpg","downloadUrl":"/cases/port-of-anchorage/download/project-image","originalSha1":"11a58562274dd12774ff3b6e9641cb7583a04c59","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"port-of-anchorage-capstone.md","mimeType":"text/markdown","bytes":3590,"sha256":"723fcf83c2e8348839d3b7975f57ee3ab426108ba4d1b423a77fcd9f6efb101a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-of-anchorage/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska.","caption":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska. This is port context; the photograph is not represented as a record of the later test-pile or petroleum/cement-terminal construction stage.","credit":"U.S. Army Corps of Engineers, photographer not specified or unknown","sourceUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Anchorage_Alaska_aerial_view.jpg#Licensing","width":1280,"height":769,"imageDate":"1999-02-20","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Port of Anchorage, now the Don Young Port of Alaska. This is port context; the photograph is not represented as a record of the later test-pile or petroleum/cement-terminal construction stage.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":100,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/port-of-anchorage-commons.json","evidenceSha256":"ff2e3e8fe1f994820c8639a1ee26eaf5db81a5ebfda8ab8220368093c6e2207a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":389033,"sourceCount":4,"url":"/cases/port-of-anchorage"},{"id":"london-bank-station","title":"Bank station upgrade — tunnelling through existing pile zones","summary":"The capacity upgrade required new tunnels beside operating infrastructure and existing building piles. The designer describes staged building-impact assessment and a load-transfer solution that retained foundation reuse options.","topics":["tunnels","deep-foundations","lateral-foundations","monitoring"],"country":"United Kingdom","region":"City of London","owner":"London Underground","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Tunnel–pile interaction","Load transfer","Three-dimensional assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The impact-assessment engineer describes the pile interactions and modeling approach; the contractor records completion. Public summaries do not include every building-specific check.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The contractor records project completion in February 2023; the designer’s earlier timeframe refers to its own service scope.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess a new tunnel intersecting the influence zone of existing piled foundations without assuming the building can be demolished.","inputs":["Extract the reported pile types and identify which are directly intercepted.","Separate empirical screening from the later three-dimensional assessment."],"deliverables":["Compare pile load redistribution and building movement for alternative tunnel sequences.","Design a conceptual load-transfer structure with monitoring and verification hold points.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When is a greenfield settlement trough insufficient for a piled building?","How can a retrofit preserve future foundation reuse while controlling present construction risk?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Building impact assessment for Bank station","url":"https://www.dr-sauer.com/projects/bank-station-capacity-upgrade-building-impact-assessment","publisher":"Dr. Sauer & Partners","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Completed station upgrade","url":"https://www.dragados.com/en/our-experience/our-projects/bank-station-capacity-upgrade","publisher":"Dragados","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"BSCU - Bank Station Cannon Street Entrance - Cannon Street, February 2023 44.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","publisher":"Wikimedia Commons / TheFrog001","year":2023,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"london-bank-station.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/london-bank-station/download/schematic"},{"id":"project-image","title":"BSCU - Bank Station Cannon Street Entrance - Cannon Street, February 2023 44.jpg","kind":"project-image","fileName":"london-bank-station.jpg","mimeType":"image/jpeg","bytes":288002,"sha256":"210ae3c5517a74552a2a317efa775f15a1f01c5798ac06246add01986e509bad","sourceId":"s3","license":"CC0","width":1280,"height":960,"credit":"TheFrog001","sourceUrl":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2023-02-28 17:58:12","evidenceFile":"image-provenance/london-bank-station-commons.json","evidenceSha256":"e9420ca11e7ffb2e72446888c3e2ff14821e3f56f03075e35c0a3794e59297f7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f5/BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street%2C_February_2023_44.jpg","downloadUrl":"/cases/london-bank-station/download/project-image","originalSha1":"ee0124a274c02d78077408d5ddfe9242f19638bc","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"london-bank-station-capstone.md","mimeType":"text/markdown","bytes":3302,"sha256":"7481286fea1cc7b54d484a2ad7211302e6236d1c1ecf4f59f7f4b0c2a949b9fa","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/london-bank-station/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The new Cannon Street entrance to Bank station in February 2023.","caption":"The new Cannon Street entrance to Bank station in February 2023. The photograph shows the actual capacity-upgrade project after completion of the new entrance.","credit":"TheFrog001","sourceUrl":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":960,"imageDate":"2023-02-28 17:58:12","imageDownloadAllowed":true},"figureCaption":"The new Cannon Street entrance to Bank station in February 2023. The photograph shows the actual capacity-upgrade project after completion of the new entrance.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":102,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/london-bank-station-commons.json","evidenceSha256":"e9420ca11e7ffb2e72446888c3e2ff14821e3f56f03075e35c0a3794e59297f7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":292429,"sourceCount":3,"url":"/cases/london-bank-station"},{"id":"sutong-bridge","title":"Sutong Bridge — deep pile groups and riverbed scour protection","summary":"The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.","topics":["deep-foundations","lateral-foundations","scour-erosion","site-investigation","monitoring","coastal-offshore"],"country":"China","region":"Yangtze River, Jiangsu","owner":"Sutong Bridge project authorities","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Large drilled-shaft groups","Post-grouting","Group interaction","Scour protection","Cofferdams"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The foundation papers describe 131 shafts beneath each main pylon, project-specific test/model evidence and construction methods. Published pile dimensions and group coefficients apply to the stated foundation and cannot be adopted as universal design factors.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The source papers include pile testing, model studies and field-monitoring comparisons, while a complete current inspection and as-built record set was not established.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coupled foundation-and-scour assessment for one Sutong main pylon, preserving the distinction between individual-pile testing and group response.","inputs":["Select the north or south foundation and retain its own shaft geometry, stratigraphy, load tests and pile-cap configuration.","Extract the design scour/protection assumptions and identify temporary construction conditions separately from permanent conditions."],"deliverables":["Compare single-shaft and group axial/lateral response using transparent assumptions and documented calibration evidence.","Prepare a scour-monitoring and protection-maintenance concept with a construction-stage cofferdam risk register.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would a tip post-grouting result on a single shaft not directly establish the settlement of the full pylon pile group?","How could local bed erosion change lateral foundation response even before the calculated axial resistance becomes critical?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of the Sutong Bridge foundations","url":"https://www.xcdsystem.com/dfi/journal/?abstractid=2007010101","publisher":"Project designers and constructors / DFI Journal","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Super-large bridge pile foundation in soft soil — testing and monitoring","url":"https://scholarsmine.mst.edu/icchge/7icchge/session08/1/","publisher":"Yang, Dai and Gong / Missouri S&T","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Scour protection for deep-water pylon foundations","url":"https://www.engineering.org.cn/sscae/EN/1160099698767880365","publisher":"Project authors / Strategic Study of CAE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Sutong Bridge in construction2.jpg","url":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","publisher":"Trevor and Joce","year":2007,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sutong-bridge.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"sutong-bridge-reference-values.csv","mimeType":"text/csv","bytes":964,"sha256":"54b76bad46f0abfe39229fdb6dfc70c2341fb243dea6db60699071418a1032b2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/sutong-bridge/download/reference-values"},{"id":"project-image","title":"Sutong Bridge — construction over the Yangtze","kind":"project-image","fileName":"sutong-bridge.jpg","mimeType":"image/jpeg","bytes":216713,"sha256":"cde90ed38819bb57406e5fc776e0ca7aa7dc3eb74adc203bb315a6aa21b51804","sourceId":"s4","license":"CC BY-SA 2.0","width":386,"height":588,"credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2007-08-23 12:57","evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d2/Sutong_Bridge_in_construction2.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/sutong-bridge/download/project-image","originalSha1":"0068ceeba8bd5efef4ff854c6ad6f377810c71aa","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sutong-bridge-capstone.md","mimeType":"text/markdown","bytes":4785,"sha256":"5f940d78551b92642633723f99f53ef00b6175da520c7ec011354b245973f91c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","caption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":386,"height":588,"imageDate":"2007-08-23 12:57","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":112,"referenceValues":[{"label":"Bored piles per main pylon foundation","value":131,"unit":"piles","scope":"Large main-pylon group described in the DFI foundation paper; not the whole-bridge pile total.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — shorter group","value":114,"unit":"m","scope":"One of the two reported main-pylon pile lengths; verify group location in the source before modelling.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — longer group","value":117,"unit":"m","scope":"Other reported main-pylon pile length; not an uncertainty range for every pile.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":223661,"sourceCount":4,"url":"/cases/sutong-bridge"},{"id":"osman-gazi-bridge","title":"Osman Gazi Bridge — seismic caissons on gravel beds","summary":"The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.","topics":["lateral-foundations","seismic","ground-improvement","coastal-offshore","site-investigation","delivery"],"country":"Türkiye","region":"Izmit Bay","owner":"Gebze–Orhangazi–Izmir motorway project","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seismic soil–structure interaction","Caisson foundations","Ground improvement","Interface sliding"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The design paper models gravel-bed and reinforced-subsoil response using nonlinear foundation elements. Contractor records explain floating and sinking the caissons onto prepared crushed rock. A controlled-sliding concept needs both displacement and residual-performance checks.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"IHI describes a 42-month construction period. Treat that as the contractor’s overall project account, not a detailed foundation activity schedule.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The construction accounts document the built crossing; the design-stage soil–structure model is not a substitute for measured earthquake performance.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare fixed-base and nonlinear-foundation representations for a bridge tower supported on a prepared gravel interface.","inputs":["Extract foundation arrangement, soil improvement and the interface behaviour from the design-stage paper.","Identify the earthquake performance objectives and distinguish assumptions in the analysis from measured field response."],"deliverables":["Construct a reduced nonlinear spring/interface model and compare sliding, rocking and residual displacement under selected study motions.","Prepare seabed preparation, caisson placement, survey-tolerance and post-earthquake inspection requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When can intentional foundation sliding reduce structural demand while increasing permanent displacement and service-restoration work?","Which installation tolerances and seabed observations are needed to make the assumed gravel-interface behaviour credible?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modelling of soil–structure interaction for seismic analyses of the Izmit Bay Bridge","url":"https://www.cfms-sols.org/sites/default/files/Actes/763-768.pdf","publisher":"Project design authors / CFMS conference proceedings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Osman Gazi Bridge construction sequence","url":"https://www.ihi.co.jp/iis/en/gallery/movie/izmit_movie.html","publisher":"IHI Infra-square","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Osman Gazi Bridge project account","url":"https://www.webuildgroup.com/en/projects/bridges-viaducts/osman-gazi-bridge/","publisher":"Webuild","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Osman-Gazi-Bridge-620x410.jpg","url":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","publisher":"Erdmkiliic","year":2016,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"osman-gazi-bridge.svg","mimeType":"image/svg+xml","bytes":1201,"sha256":"0f34c5a583e4d9e8427d0110ef6d716d217e38ffb3b4ade758e04d51b5451084","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/schematic"},{"id":"project-image","title":"Osman Gazi Bridge — suspension crossing","kind":"project-image","fileName":"osman-gazi-bridge.jpg","mimeType":"image/jpeg","bytes":152148,"sha256":"0c746b33551461f356d58e95fe70fe4588a48903a60efef88a9c49d11e78123b","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2016-07-07","evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/Osman-Gazi-Bridge-620x410.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/osman-gazi-bridge/download/project-image","originalSha1":"1ec066ac577efd9795f0ed8a5eb0f7511078f1be","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"osman-gazi-bridge-capstone.md","mimeType":"text/markdown","bytes":3672,"sha256":"d6891d8af9dd21f85ea6c6bbfdf985f634c0fca28dd9c3214f6d365b1b7b4fb7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","caption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2016-07-07","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":113,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157021,"sourceCount":4,"url":"/cases/osman-gazi-bridge"},{"id":"hywind-scotland","title":"Hywind Scotland — suction anchors for floating wind","summary":"Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.","topics":["coastal-offshore","lateral-foundations","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"Buchan Deep, offshore Peterhead","owner":"Equinor / Masdar","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Suction anchors","Inclined cyclic loading","Mooring–soil interaction","Installation and decommissioning"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Project sources describe the spar, mooring lines and suction anchors; the 2022 decommissioning programme gives asset-specific arrangements. Distinguish the floating turbine substructure from its seabed anchor foundation and do not transfer onshore monopile checks directly.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The operator records commissioning in 2017. The 2022 decommissioning document is a programme, not evidence that removal has occurred.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The published field study reports subsea observations from 2018 and 2020. These observations show asset inspection opportunities and are not a complete geotechnical acceptance certificate.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a suction-anchor concept and inspection strategy for one mooring line, including cyclic demand and removal feasibility.","inputs":["Trace the three-point mooring arrangement and identify the anchor information actually supplied by the project.","Develop explicit study soil profiles and load envelopes when borehole/CPT data or proprietary design loads are unavailable."],"deliverables":["Compare installation suction, holding capacity and cyclic degradation scenarios, retaining the distinction between drained and undrained assumptions.","Prepare an ROV inspection plan, cable/mooring interaction review and a decommissioning sequence with geotechnical risks.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can an anchor meet a monotonic holding-capacity check yet remain unsuitable under repeated inclined mooring loads?","How would the preferred removal method change if the as-installed suction anchor has tilted or developed significant internal soil plugging?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Hywind Scotland — operator project information","url":"https://www.equinor.com/energy/hywind-scotland","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pilot Park decommissioning programme, May 2022","url":"https://cdn.equinor.com/files/h61q9gi9/global/1b585f93025b2cf77ece1bb597520ff325454abc.pdf?hywind-scotland-pilot-park-decommissioning-programme-submission-may-2022-equinor.pdf=","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Artificial hard-substrate colonisation — field inspection of structures, moorings and anchors","url":"https://wes.copernicus.org/articles/7/801/2022/","publisher":"Karlsson et al. / Wind Energy Science","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Hywind Wind Farm, off Peterhead - geograph.org.uk - 7226685.jpg","url":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","publisher":"Mike Pennington","year":2022,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hywind-scotland.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/schematic"},{"id":"project-image","title":"Hywind Scotland — floating turbines offshore Peterhead","kind":"project-image","fileName":"hywind-scotland.jpg","mimeType":"image/jpeg","bytes":184836,"sha256":"69d6f91c41a64fb6d8b73f64d25fc5e470c5c2dbaa26c9e97b497bcbef3d07e8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":854,"credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2022-06-22","evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/65/Hywind_Wind_Farm%2C_off_Peterhead_-_geograph.org.uk_-_7226685.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/hywind-scotland/download/project-image","originalSha1":"73679c0939c31070d5973600125fa5b98e70746c","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hywind-scotland-capstone.md","mimeType":"text/markdown","bytes":3976,"sha256":"85e5f997085ffbc3896b28ac27ae3e0c519a862847311a508ef90f2414b41c54","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","caption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":854,"imageDate":"2022-06-22","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":114,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":190019,"sourceCount":4,"url":"/cases/hywind-scotland"}]}