{"schemaVersion":1,"updated":"2026-11-22","total":60,"records":[{"id":"founders-meadows","title":"Founders/Meadows Bridge — footings on reinforced soil","summary":"The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.","topics":["reinforced-soil","shallow-foundations","laboratory-testing","monitoring"],"country":"United States","region":"Castle Rock, Colorado","owner":"Colorado Department of Transportation","year":1999,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Footings on MSE","Geosynthetic reinforcement","Measured deformation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"CDOT Report 1 covers design, materials, construction and instruments; Report 2 evaluates wall performance.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT reports completion in July 1999.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The two reports contain construction observations and instrumented performance results.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate the load path from bridge footing through reinforced soil and compare calculated wall movements with the reported observations.","inputs":["Extract the front-wall geometry, footing loads and reinforcement properties.","Tabulate measured displacement/stress locations and distinguish construction stages."],"deliverables":["Develop bearing, sliding, internal stability and deformation checks for the reference section.","Prepare an instrumentation layout and explain which measurements can test each design assumption.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Founders/Meadows Bridge — Report 1","url":"https://rosap.ntl.bts.gov/view/dot/93454","publisher":"CDOT / FHWA","year":2000,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s2","title":"Founders/Meadows Bridge — Report 2","url":"https://rosap.ntl.bts.gov/view/dot/93418","publisher":"CDOT / FHWA","year":2001,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"founders-meadows.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/founders-meadows/download/schematic"},{"id":"project-image","title":"Founders/Meadows Bridge — completed reinforced-soil approaches","kind":"project-image","fileName":"founders-meadows-r13.jpeg","mimeType":"image/jpeg","bytes":153856,"sha256":"eab161baabb50bab8ad8fbabd87e30265ce580748743fa6841d132e6b722019e","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1024,"height":768,"credit":"CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/93454","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/93454","imageDate":"2000","evidenceFile":"image-provenance/founders-meadows-r13-source.json","evidenceSha256":"448c5095d4b3dae7640c6b858a7052727d7113bce0d2b321ab909ffbfe33e328","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://rosap.ntl.bts.gov/view/dot/93454/dot_93454_DS1.pdf","originalSha256":"8dc6a24810c88a96b1eaa7f05c3eef4d4ef221ad38cb2b4cd3a9223ae3ee98de","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/founders-meadows/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"founders-meadows-capstone.md","mimeType":"text/markdown","bytes":2817,"sha256":"39abf337de186a2f27bd8426784e781403fda0be815e01e9e8cd82cb69a4200c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/founders-meadows/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","caption":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","credit":"CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/93454","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/93454","width":1024,"height":768,"imageDate":"2000","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":2,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/founders-meadows-r13-source.json","evidenceSha256":"448c5095d4b3dae7640c6b858a7052727d7113bce0d2b321ab909ffbfe33e328","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3938,"sourceCount":2,"url":"/cases/founders-meadows"},{"id":"i15-salt-lake","title":"I-15 reconstruction — soft-ground embankments and geofoam","summary":"Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.","topics":["settlement","ground-improvement","reinforced-soil","monitoring","delivery"],"country":"United States","region":"Salt Lake City, Utah","owner":"Utah Department of Transportation","year":2001,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Vertical drains and surcharge","Two-stage MSE","Consolidation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"The reports document alternative embankment systems and monitored geofoam sections, including the 100 South crossing.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The monitoring reports cover reconstruction and the following decade; extract dates for the chosen section rather than using a corridor-wide programme.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Long-term settlement and numerical-model comparisons are available in the research reports.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Choose an embankment solution above sensitive buried utilities and soft clay, then reconcile the design prediction with the long-term monitoring record.","inputs":["Extract stratigraphy, groundwater and construction loading from the selected instrumented section.","Digitize a clearly identified settlement series with units and dates."],"deliverables":["Compare earth fill, preload/drains and geofoam for settlement, time and buoyancy.","Prepare a staged-load calculation, utility protection detail and monitoring acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"I-15 reconstruction long-term embankment monitoring study","url":"https://rosap.ntl.bts.gov/view/dot/31963","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Design and evaluation of EPS geofoam embankments","url":"https://rosap.ntl.bts.gov/view/dot/31962","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Use of Geofoam for I-15 Reconstruction in Salt Lake City, UT","url":"https://geofoam.syr.edu/utah.html","publisher":"Syracuse University Geofoam Research Center","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Original published image file copied unchanged; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"i15-salt-lake.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/schematic"},{"id":"project-image","title":"I-15 geofoam embankment at 100 South","kind":"project-image","fileName":"i15-salt-lake-r13.jpg","mimeType":"image/jpeg","bytes":35444,"sha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":305,"credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","licenseUrl":"https://geofoam.syr.edu/utah.html","imageDate":null,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://geofoam.syr.edu/I15/fig2.jpg","originalSha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/i15-salt-lake/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"i15-salt-lake-capstone.md","mimeType":"text/markdown","bytes":3144,"sha256":"2f5d23d456cf891b53e2856f43a44d2aa142b9eb42e4bd26cf2ba3cbb33ffe33","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","caption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://geofoam.syr.edu/utah.html","width":400,"height":305,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":3,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4322,"sourceCount":3,"url":"/cases/i15-salt-lake"},{"id":"virginia-route288","title":"Virginia Route 288 — drilled-shaft quality evaluation","summary":"This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.","topics":["deep-foundations","site-investigation","monitoring","delivery"],"country":"United States","region":"Richmond region, Virginia","owner":"Virginia Department of Transportation","year":2004,"yearLabel":"Case reference year","projectType":"Construction quality and testing","methods":["Drilled shafts","Crosshole sonic logging","Pile integrity testing"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper addresses foundation evaluation and test interpretation; it is not the complete bridge design package.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published test and anomaly discussions support a quality-control exercise; the complete acceptance register is not included.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an inspection and acceptance plan for drilled shafts, including how to investigate an anomalous test result before deciding on remediation.","inputs":["Identify the shaft construction method, test types and reported anomalies.","Separate an instrument anomaly from an independently confirmed physical defect."],"deliverables":["Prepare a shaft inspection checklist and evidence-based test decision tree.","Design a supplemental investigation and a repair-verification programme for a selected anomaly.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case history: Foundation evaluation for the Virginia Highway 288 project","url":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2004,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"virginia-route288.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/virginia-route288/download/schematic"},{"id":"project-image","title":"Virginia Route 288 — drilled-shaft microcamera inspection","kind":"project-image","fileName":"virginia-route288-r13.png","mimeType":"image/png","bytes":456787,"sha256":"0e633fcb38fe2e682fcd020e9f07729175f71d1d5dab2fe370d72a0e407d32b2","sourceId":"s1","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":527,"height":395,"credit":"Emad Farouz, Paul Landers and Scott Webster (2004)","sourceUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2001-12-03","evidenceFile":"image-provenance/virginia-route288-r13-source.json","evidenceSha256":"33377d6ce9ec887fbd81fc654caa1a31cbfeab71987daed3c688f9b0b68a8d4a","transformations":"The source PDF stores the photograph as three overlapping strips. Rendered the complete original Figure 9 image rectangle without retouching, annotations, or loss of the embedded timestamp. Surrounding page text was excluded.","originalUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","originalSha256":"66f2fafdab1063fc379bef39de6061d2314de6c969a97b611a5bdb21a7661300","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-inspection-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/virginia-route288/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"virginia-route288-capstone.md","mimeType":"text/markdown","bytes":2920,"sha256":"2932362755e4b7365bb1e297f4cf3595cf28358867724afc354b70d5405cf7ea","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/virginia-route288/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","caption":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","credit":"Emad Farouz, Paul Landers and Scott Webster (2004)","sourceUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":527,"height":395,"imageDate":"2001-12-03","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-inspection-photograph"},"figureCaption":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":6,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/virginia-route288-r13-source.json","evidenceSha256":"33377d6ce9ec887fbd81fc654caa1a31cbfeab71987daed3c688f9b0b68a8d4a","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":460906,"sourceCount":1,"url":"/cases/virginia-route288"},{"id":"nj-turnpike-micropiles","title":"New Jersey Turnpike bridges — micropile underpinning","summary":"Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.","topics":["deep-foundations","scour-erosion","monitoring","delivery"],"country":"United States","region":"New Jersey","owner":"New Jersey highway agencies; see source","year":2008,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Hollow-bar micropiles","Underpinning","Verification/proof testing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case reports an 80-kip design load per micropile, cased exposure to scour level and different bond lengths at the four bridges.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports production proof tests and sacrificial verification tests.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan underpinning of an operating bridge with limited access and a temporary cofferdam.","inputs":["Select one of the four bridges and retain its soil profile, bond length and grout diameter.","Extract verification and production proof-test criteria."],"deliverables":["Check grout-ground bond, steel capacity and corrosion/scour exposure.","Prepare a load-transfer sequence and a test-and-acceptance schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Existing bridge retrofits, Turnpike, New Jersey","url":"https://www.geoinstitute.org/node/8358","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Gómez et al. (2008), Hollow Core Bar Micropile—Design Parameters Interpreted from 404 Load Tests.","checked":"2026-11-22"},{"id":"s2","title":"Bond Strength of Hollow-Core Bar Micropiles","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","notes":"Project image source. Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nj-turnpike-micropiles.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/schematic"},{"id":"project-image","title":"New Jersey Turnpike — micropile installation beneath a bridge","kind":"project-image","fileName":"nj-turnpike-micropiles-r13.jpeg","mimeType":"image/jpeg","bytes":28249,"sha256":"4678f47c6011a4c3fa0d2d05bb71100f88236b51368c43788e87e1e54853f8cd","sourceId":"s2","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":426,"height":374,"credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2008","evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://scholarsmine.mst.edu/cgi/viewcontent.cgi?article=2920&context=icchge","originalSha256":"a179eebce7ffb4e8e8313d962d90c9afe1486157038f57824499780f01df1b8e","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/nj-turnpike-micropiles/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nj-turnpike-micropiles-capstone.md","mimeType":"text/markdown","bytes":2919,"sha256":"2f89cefca8d0332f0acc0a04130440eb9e506f61c8d196d4ad95ebc36da9c74d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","caption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":426,"height":374,"imageDate":"2008","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph"},"figureCaption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":7,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":32367,"sourceCount":2,"url":"/cases/nj-turnpike-micropiles"},{"id":"snake-river-micropiles","title":"US 26/89, Snake River Canyon — micropile slope stabilization","summary":"A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.","topics":["slopes","deep-foundations","lateral-foundations","retaining-walls","monitoring"],"country":"United States","region":"Wyoming","owner":"Wyoming Department of Transportation","year":1997,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Reticulated micropiles","Ground anchors","Residual shear strength"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The published case describes battered micropiles, anchor layout, soil-rock sliding interface and instrumentation.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Construction ran from April to September 1997; monitoring continued through June 1998.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Inclinometers, piezometers, strain gauges, load cells and survey measurements are described.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a stabilizing micropile/anchor system for a sliding block and compare it with unloading or road relocation.","inputs":["Extract the sliding interface and adopted residual strength.","Use the reported wall arrangement and identify how load transfers into stable ground."],"deliverables":["Prepare slope equilibrium and structural load-sharing calculations.","Specify anchor testing, pile checks and a deformation-trigger response plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"US Highway 26/89 slope stabilization, Wyoming","url":"https://www.geoinstitute.org/node/8359","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Wolosick, Turner and Hasenkamp (1998), Reticulated Minipile Walls for Landslide Stabilization.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"snake-river-micropiles.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/snake-river-micropiles/download/schematic"},{"id":"project-image","title":"Snake River Canyon — US 26/89 stabilization site","kind":"project-image","fileName":"snake-river-micropiles-r13.png","mimeType":"image/png","bytes":684301,"sha256":"0d7194dbae94485262504b5d595cda83c0c0500adb745aa79d412702c6cc9c45","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":679,"height":453,"credit":"Hayward Baker, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8359","licenseUrl":"https://www.geoinstitute.org/node/8359","imageDate":null,"evidenceFile":"image-provenance/snake-river-micropiles-r13-source.json","evidenceSha256":"e7ecfd47a0e5e7019bdb4e32a6dddba47c407db700196586e66cccee1d973f4f","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/Mp2.png","originalSha256":"0d7194dbae94485262504b5d595cda83c0c0500adb745aa79d412702c6cc9c45","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/snake-river-micropiles/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"snake-river-micropiles-capstone.md","mimeType":"text/markdown","bytes":2608,"sha256":"b8148f68e3eada63d34fa56f9c18b0076cc5505415a4860870633529c44779ab","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/snake-river-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","caption":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","credit":"Hayward Baker, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8359","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8359","width":679,"height":453,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":8,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/snake-river-micropiles-r13-source.json","evidenceSha256":"e7ecfd47a0e5e7019bdb4e32a6dddba47c407db700196586e66cccee1d973f4f","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3637,"sourceCount":1,"url":"/cases/snake-river-micropiles"},{"id":"river-road-soil-nails","title":"River Road, Tucson — tall soil-nailed cuts","summary":"Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.","topics":["retaining-walls","excavation","site-investigation","monitoring"],"country":"United States","region":"Pima County, Arizona","owner":"Pima County Department of Transportation","year":2004,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Soil nailing","Top-down excavation","Face stability"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case describes hollow-bar nails, wall geometry, drainage, facing checks and a loose-seam treatment during excavation.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports wall and adjacent-structure monitoring; complete construction drawings are not provided.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a soil-nailed cut design that protects nearby buildings and includes a response to unexpected ravelling material.","inputs":["Extract wall sections, adopted strength, nail rows and drilling restrictions.","Identify what the limited original investigation could not resolve."],"deliverables":["Check global stability, nail pullout, nail tensile resistance and facing demand.","Prepare lift sequencing, temporary-face support, drainage and monitoring details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"River Road widening and realigning, Pima County","url":"https://www.geoinstitute.org/node/8324","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Nowatzki and Samtani (2004), Design, Construction, and Performance of an 18-meter Soil Nail Wall.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"river-road-soil-nails.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/river-road-soil-nails/download/schematic"},{"id":"project-image","title":"River Road, Tucson — aerial photograph of the completed soil-nailed walls","kind":"project-image","fileName":"river-road-soil-nails-r13.png","mimeType":"image/png","bytes":707435,"sha256":"a5544ab2ed10f27ba121c94a3f85409559aede2a1ab1e0fde5607b93a7f9d425","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":630,"height":463,"credit":"© 2011 Google; image reproduced in the ASCE Geo-Institute case history","sourceUrl":"https://www.geoinstitute.org/node/8324","licenseUrl":"https://www.geoinstitute.org/node/8324","imageDate":"2011","evidenceFile":"image-provenance/river-road-soil-nails-r13-source.json","evidenceSha256":"aa28a499ffc7d675c6ed4baa2d32891f10127b351edf5339935edcfd27ab07ac","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/DGHB1.png","originalSha256":"a5544ab2ed10f27ba121c94a3f85409559aede2a1ab1e0fde5607b93a7f9d425","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"aerial-project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/river-road-soil-nails/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"river-road-soil-nails-capstone.md","mimeType":"text/markdown","bytes":2731,"sha256":"026237657dd16c5343f449d7ff39374b1c1a7491481203eff4d07ff89e138da9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/river-road-soil-nails/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","caption":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","credit":"© 2011 Google; image reproduced in the ASCE Geo-Institute case history","sourceUrl":"https://www.geoinstitute.org/node/8324","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8324","width":630,"height":463,"imageDate":"2011","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"aerial-project-photograph"},"figureCaption":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":9,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/river-road-soil-nails-r13-source.json","evidenceSha256":"aa28a499ffc7d675c6ed4baa2d32891f10127b351edf5339935edcfd27ab07ac","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3862,"sourceCount":1,"url":"/cases/river-road-soil-nails"},{"id":"us14-nicollet","title":"US 14 near Nicollet — preload and vertical drains","summary":"A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.","topics":["settlement","ground-improvement","problem-soils","monitoring","delivery"],"country":"United States","region":"Nicollet, Minnesota","owner":"Minnesota Department of Transportation","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Prefabricated vertical drains","Staged surcharge","Observational consolidation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors describe drain spacing, surcharge, staged lifts, waiting periods and primary/post-surcharge secondary settlement.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source lists estimated alternatives from $0.3 million for surcharge-only to $1.8 million for a land bridge; these are comparison estimates, not audited final costs.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The documented drain/surcharge design targeted a five-month waiting period after staged filling.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The submitted case describes automated settlement, piezometric and earth-pressure monitoring.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a preload programme that meets a highway opening deadline while controlling stability and residual settlement.","inputs":["Extract layer thicknesses, compression parameters and drain layout from the cited papers.","Use measured settlement and pore-pressure stages to define the observation period."],"deliverables":["Compare untreated waiting time with vertical/radial drainage and secondary compression.","Set stage-release criteria and a contingency for slow pore-pressure dissipation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"PVD and fill preloading — US Highway 14","url":"https://www.geoinstitute.org/node/16159","publisher":"ASCE Geo-Institute / named case-history author","year":2024,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case submitted by the project manager and MnDOT foundations engineer; technical papers by Lamb/Chow/Bentler (2018, 2019).","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us14-nicollet.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us14-nicollet/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us14-nicollet-reference-values.csv","mimeType":"text/csv","bytes":1496,"sha256":"007a382e255f2ad4f1b9b13dceb0a7669748d03a85a1b7e11acb980d9a7ba8f7","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us14-nicollet/download/reference-values"},{"id":"project-image","title":"US 14, Nicollet — prefabricated vertical drains","kind":"project-image","fileName":"us14-nicollet-r13.jpg","mimeType":"image/jpeg","bytes":256005,"sha256":"def13de472acda2ba590bff1ac10ad55ee8c048ab95c68ddc8dc39dce688635d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1920,"height":1080,"credit":"Project photograph published by ASCE Geo-Institute; case submitted by Liang Chern Chow and Rich Lamb","sourceUrl":"https://www.geoinstitute.org/node/16159","licenseUrl":"https://www.geoinstitute.org/node/16159","imageDate":null,"evidenceFile":"image-provenance/us14-nicollet-r13-source.json","evidenceSha256":"d1426baf3baf7a5516e7c258c631b742342f5d3434b36c023779179195338e5b","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/casehistory1.jpg","originalSha256":"def13de472acda2ba590bff1ac10ad55ee8c048ab95c68ddc8dc39dce688635d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/us14-nicollet/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us14-nicollet-capstone.md","mimeType":"text/markdown","bytes":4241,"sha256":"e99fc8e22bb8ef2a80b680d8678aed4180f17eb7ba1a1d4ae67d4f03094675f0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us14-nicollet/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","caption":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","credit":"Project photograph published by ASCE Geo-Institute; case submitted by Liang Chern Chow and Rich Lamb","sourceUrl":"https://www.geoinstitute.org/node/16159","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16159","width":1920,"height":1080,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":11,"referenceValues":[{"label":"Organic-soil thickness","value":34,"unit":"ft","scope":"Reported soft to very soft organic deposit above glacial till.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Reported investigation interpretation."},{"label":"Typical drain spacing","value":6,"unit":"ft","scope":"Triangular drain pattern over 80% of the embankment length.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Reported design geometry."},{"label":"Surcharge-only estimate","value":300000,"unit":"USD","scope":"Alternative with extended waiting period.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Drains and surcharge estimate","value":500000,"unit":"USD","scope":"Alternative including extended wait and geotechnical monitoring.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Geofoam estimate","value":800000,"unit":"USD","scope":"Lightweight-fill alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Column-supported estimate","value":1200000,"unit":"USD","scope":"Column-supported embankment alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Land-bridge estimate","value":1800000,"unit":"USD","scope":"Land-bridge alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us14-nicollet-r13-source.json","evidenceSha256":"d1426baf3baf7a5516e7c258c631b742342f5d3434b36c023779179195338e5b","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":6915,"sourceCount":1,"url":"/cases/us14-nicollet"},{"id":"charleston-hlt-drains","title":"Hugh K. Leatherman Terminal — vertical-drain installation control","summary":"Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.","topics":["settlement","ground-improvement","coastal-offshore","monitoring"],"country":"United States","region":"Charleston, South Carolina","owner":"South Carolina State Ports Authority","year":2018,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Vertical drains","Surcharge","As-installed monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The submitted case describes variable drain depths and as-installed data acquisition during surcharge-ground improvement.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The source reports delivery of the drain programme on schedule but does not supply the complete programme.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"As-installed depth/location data are described; the underlying installation register is not locally supplied.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan drain installation and acceptance for a reclaimed port platform with spatially variable compressible deposits.","inputs":["Extract drain-depth ranges and the documented installation-control workflow.","Map the missing ground profile and design settlement inputs before sizing drain spacing."],"deliverables":["Develop zone-specific consolidation calculations and installation tolerances.","Prepare a spatial acceptance register and a response to short or misplaced drains.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Port of Charleston HLT wall remediation — PVD case","url":"https://www.geoinstitute.org/node/15986","publisher":"ASCE Geo-Institute / named case-history author","year":2020,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Source budget refers to the described package; it must not be interpreted as the entire terminal cost.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"charleston-hlt-drains.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/charleston-hlt-drains/download/schematic"},{"id":"project-image","title":"Hugh K. Leatherman Terminal — vertical-drain installation","kind":"project-image","fileName":"charleston-hlt-drains-r13.png","mimeType":"image/png","bytes":345339,"sha256":"2b3c4d924e04dd99a7742029b8a6d757fd230f1a87104579ccf746338f164813","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":413,"height":306,"credit":"Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history","sourceUrl":"https://www.geoinstitute.org/node/15986","licenseUrl":"https://www.geoinstitute.org/node/15986","imageDate":null,"evidenceFile":"image-provenance/charleston-hlt-drains-r13-source.json","evidenceSha256":"25eb76e4ff6e80a492861b0bc96ebabe9040069368342729cd8273c879ace608","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/Port%20of%20Charleston%20Picture1.png","originalSha256":"2b3c4d924e04dd99a7742029b8a6d757fd230f1a87104579ccf746338f164813","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/charleston-hlt-drains/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"charleston-hlt-drains-capstone.md","mimeType":"text/markdown","bytes":2752,"sha256":"81f1f270e586fe4a0953132af5d87be94da0333d6cfd15b52bf8670292d27182","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/charleston-hlt-drains/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","caption":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","credit":"Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history","sourceUrl":"https://www.geoinstitute.org/node/15986","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/15986","width":413,"height":306,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":12,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/charleston-hlt-drains-r13-source.json","evidenceSha256":"25eb76e4ff6e80a492861b0bc96ebabe9040069368342729cd8273c879ace608","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3930,"sourceCount":1,"url":"/cases/charleston-hlt-drains"},{"id":"tempe-landfill","title":"Tempe Marketplace — foundations over former landfill","summary":"The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.","topics":["ground-improvement","shallow-foundations","geoenvironmental","monitoring"],"country":"United States","region":"Tempe, Arizona","owner":"Owner not stated in reviewed case","year":2015,"yearLabel":"Case reference year","projectType":"Redevelopment","methods":["Dynamic compaction","Shallow foundations","Vibration control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case gives separate treatment passes for general areas and building zones and describes plate-load verification.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"Reported compaction rates were approximately $1.00/ft² for initial passes plus $1.25/ft² for additional building passes; supporting earthwork is excluded.","sourceIds":["s1"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Plate-load and vibration monitoring are described; raw test datasets are not supplied.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a redevelopment foundation strategy that addresses both geotechnical settlement and environmental constraints of former landfill ground.","inputs":["Extract the source’s treatment energy, grid and verification approach.","Identify gas, contamination and decomposable-waste data absent from the geotechnical summary."],"deliverables":["Compare foundations on treated ground with an alternative deep-foundation option.","Prepare a trial-pad programme, vibration limits and residual-settlement allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Tempe Marketplace, Tempe, AZ","url":"https://www.geoinstitute.org/node/16274","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper Woods, Shaffer and Drumheller (2023). The source’s 2015 case date is retained without equating it with opening of the entire retail centre.","checked":"2026-11-22"},{"id":"s2","title":"Tempe Marketplace - 2008-04-17 - Image1.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","publisher":"Wikimedia Commons / Cygnusloop99","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tempe-landfill.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tempe-landfill/download/schematic"},{"id":"project-image","title":"Tempe Marketplace - 2008-04-17 - Image1.JPG","kind":"project-image","fileName":"tempe-landfill.jpg","mimeType":"image/jpeg","bytes":309826,"sha256":"1560b21832ab7c98fa55efb7be6044ca924367f3340cdf77bb7c3cf9282d77d7","sourceId":"s2","license":"CC BY-SA 3.0","width":1280,"height":853,"credit":"Cygnusloop99","sourceUrl":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-04-17","evidenceFile":"image-provenance/tempe-landfill-commons.json","evidenceSha256":"a45cb5b1e75e9c2628f52e3a6cb5899a90bdafe2aadcdc163fe79a85135d487b","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/23/Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","downloadUrl":"/cases/tempe-landfill/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tempe-landfill-capstone.md","mimeType":"text/markdown","bytes":2951,"sha256":"2820f23d69644226442f02bb4d45826cd449c4ec74f941dfd807f6ad3ab035f9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tempe-landfill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Tempe Marketplace after construction, April 2008.","caption":"Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.","credit":"Cygnusloop99","sourceUrl":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":853,"imageDate":"2008-04-17"},"figureCaption":"Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":14,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tempe-landfill-commons.json","evidenceSha256":"a45cb5b1e75e9c2628f52e3a6cb5899a90bdafe2aadcdc163fe79a85135d487b","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":313965,"sourceCount":2,"url":"/cases/tempe-landfill"},{"id":"jfk-hangar","title":"JFK hangar expansion — liquefaction mitigation by compaction","summary":"A hangar expansion used dynamic compaction to reduce liquefaction susceptibility in sandy fill and outwash, with vibration controls beside operating airport facilities.","topics":["ground-improvement","seismic","shallow-foundations","monitoring"],"country":"United States","region":"Queens, New York","owner":"Airport project owner not stated in reviewed case","year":1999,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Dynamic compaction","Liquefaction assessment","Vibration isolation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project case describes compaction passes, grid spacing, groundwater and post-treatment penetration testing.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The submitted case identifies 1998–1999 as the project period.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case reports improvement depth inferred from post-treatment SPTs.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Specify improvement and verification for an airport foundation site while maintaining service of nearby utilities and structures.","inputs":["Extract pre/post-treatment penetration-test evidence and groundwater depth.","Establish the design earthquake and appropriate corrections independently; the summary alone is not a complete liquefaction input set."],"deliverables":["Compare triggering and settlement checks before and after treatment.","Set field acceptance, vibration monitoring and stop-work criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"JFK Airport, Queens, NY","url":"https://www.geoinstitute.org/node/16275","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Meyer et al. (2001), Liquefaction Mitigation at JFK Airport Using Dynamic Compaction.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"jfk-hangar.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/jfk-hangar/download/schematic"},{"id":"project-image","title":"JFK hangar expansion — dynamic compaction","kind":"project-image","fileName":"jfk-hangar-r13.png","mimeType":"image/png","bytes":1687455,"sha256":"85f72cbdde8a47d0f8c8e73b4cd3965fb4dfcf2ec32d1f2467e0f60f0ac3ea5d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1011,"height":1280,"credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16275","licenseUrl":"https://www.geoinstitute.org/node/16275","imageDate":null,"evidenceFile":"image-provenance/jfk-hangar-r13-source.json","evidenceSha256":"de48924e56741ae6177849fc79762d2aed8c54398996f286b15d5417d57a1933","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/jfk.png","originalSha256":"85f72cbdde8a47d0f8c8e73b4cd3965fb4dfcf2ec32d1f2467e0f60f0ac3ea5d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/jfk-hangar/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"jfk-hangar-capstone.md","mimeType":"text/markdown","bytes":2611,"sha256":"295a20b1e182cfb1a7d1ae4d10af7ffc5ba10f958ca9ee54a2f13ba245066f64","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/jfk-hangar/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","caption":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16275","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16275","width":1011,"height":1280,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":15,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/jfk-hangar-r13-source.json","evidenceSha256":"de48924e56741ae6177849fc79762d2aed8c54398996f286b15d5417d57a1933","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3799,"sourceCount":1,"url":"/cases/jfk-hangar"},{"id":"boston-central-artery","title":"Boston Central Artery/Tunnel — deep mixing and ground movement","summary":"Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.","topics":["excavation","ground-improvement","tunnels","monitoring","delivery"],"country":"United States","region":"Boston, Massachusetts","owner":"Massachusetts highway agencies","year":2006,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Deep mixing","Excavation movement","Observational control"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper covers soil properties, mixing characteristics and measured response. FHWA separately documents project financial-management lessons.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"FHWA discusses major-project contingency management; it is not a priced geotechnical work breakdown.","sourceIds":["s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published research compares construction-induced ground movements and stabilization behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a ground-treatment and monitoring concept for a deep urban cut in soft clay, with construction risks included in the estimate.","inputs":["Extract the selected site section and treatment properties from the project paper.","Define movements tolerated by nearby structures and utilities as a study requirement."],"deliverables":["Compare untreated and treated basal stability and movement mechanisms.","Prepare a monitoring-trigger plan and a geotechnical contingency allowance.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lessons learned for ground movements and soil stabilization from the Boston Central Artery","url":"https://doi.org/10.1061/(ASCE)1090-0241(2006)132:8(966)","publisher":"O’Rourke and McGinn / ASCE","year":2006,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Full technical article may require subscription.","checked":"2026-11-22"},{"id":"s2","title":"Contingency fund management — lessons learned","url":"https://www.fhwa.dot.gov/majorprojects/financial_plans/lessons_learned.cfm","publisher":"FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Big Dig construction 589.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":1989,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"boston-central-artery.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/schematic"},{"id":"project-image","title":"Big Dig construction 589.agr.jpg","kind":"project-image","fileName":"boston-central-artery.jpg","mimeType":"image/jpeg","bytes":339680,"sha256":"01902e3f96aad17c3cb58875d0a7591633c218d8dabbe0755b42916933825fe4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"1989-05","evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/46/Big_Dig_construction_589.agr.jpg","downloadUrl":"/cases/boston-central-artery/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"boston-central-artery-capstone.md","mimeType":"text/markdown","bytes":3134,"sha256":"f3d0712edf16c7e0d9920a6b8a1af90de9cdaed03a9c5eade371264e7933c719","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction for Boston’s Central Artery/Tunnel project in May 1989.","caption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"1989-05"},"figureCaption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":17,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":343945,"sourceCount":3,"url":"/cases/boston-central-artery"},{"id":"seattle-sr99","title":"Seattle SR 99 tunnel — soft-ground tunnelling and settlement","summary":"The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.","topics":["tunnels","excavation","dewatering","monitoring","delivery"],"country":"United States","region":"Seattle, Washington","owner":"Washington State Department of Transportation","year":2019,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Earth-pressure-balance tunnelling","Settlement","Groundwater control"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The environmental geology/soils appendix and design-build procurement records establish ground risks and contract context, not a complete as-built tunnel design.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSDOT identifies February 2019 completion; procurement and construction milestones are available on the owner pages.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner’s completed-project page records the outcome and links supporting material.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-risk and monitoring plan for an urban bored tunnel, including shaft construction and dewatering interactions.","inputs":["Extract route geology, groundwater and protected assets from Appendix P.","Separate environmental alternatives from the subsequently selected design-build solution."],"deliverables":["Estimate surface settlement for documented or explicitly assumed loss scenarios.","Prepare shaft/uplift checks and a response plan for unexpected settlement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SR 99 tunnel — completed February 2019","url":"https://apps.wsdot.wa.gov/construction-planning/search-projects/sr-99-tunnel","publisher":"WSDOT","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Alaskan Way Viaduct FEIS Appendix P — geology and soils","url":"https://data.wsdot.wa.gov/publications/Viaduct/AWVFEIS-AppendixP.pdf","publisher":"WSDOT","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"SR 99 bored tunnel design-build procurement","url":"https://wsdot.wa.gov/business-wsdot/contracting-opportunities/sr-99-alaskan-way-viaduct-sr-99-bored-tunnel-design-build-project","publisher":"WSDOT","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Bertha TBM retrieval site.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","publisher":"Wikimedia Commons / SounderBruce from Seattle, United States","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"seattle-sr99.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/schematic"},{"id":"project-image","title":"Bertha TBM retrieval site.jpg","kind":"project-image","fileName":"seattle-sr99.jpg","mimeType":"image/jpeg","bytes":152931,"sha256":"4fa4ed3313fbe70109c8c909325c418043dd5c73592739c5fb1ad31a1a870385","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":406,"credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-07-15 12:27","evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/82/Bertha_TBM_retrieval_site.jpg","downloadUrl":"/cases/seattle-sr99/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"seattle-sr99-capstone.md","mimeType":"text/markdown","bytes":3334,"sha256":"c959a6fd7180face32361696df394f5ca309f8ad094b3f5b8ff41fe7dd4ed30e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015.","caption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":406,"imageDate":"2015-07-15 12:27"},"figureCaption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":18,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157390,"sourceCount":4,"url":"/cases/seattle-sr99"},{"id":"crossrail-farringdon","title":"Crossrail Farringdon — compensation grouting near existing assets","summary":"Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.","topics":["tunnels","ground-improvement","monitoring","excavation"],"country":"United Kingdom","region":"London, England","owner":"Crossrail","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Compensation grouting","Asset protection","Observational tunnelling"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project papers document local asset constraints, grouting and a structural mitigation solution; they do not constitute the entire station design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The learning-legacy papers report implementation and measured behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan mitigation for a sensitive structure above station tunnelling and decide when grouting alone is insufficient.","inputs":["Extract asset geometry, movement triggers and the documented construction sequence.","Distinguish monitoring observations from predicted ground movement."],"deliverables":["Prepare an asset damage assessment and mitigation alternatives.","Design monitoring review stages, trigger actions and verification of movement recovery.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lindsey Street Bridge — a structural solution to settlement mitigation","url":"https://learninglegacy.crossrail.co.uk/documents/lindsey-street-bridge-structural-solution-settlement-mitigation/","publisher":"Crossrail Learning Legacy / project authors","year":2016,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Data management, analysis and visualisation on Drive X","url":"https://learninglegacy.crossrail.co.uk/documents/data-management-analysis-and-visualisation-on-crossrail-drive-x-western-tunnels/index.html","publisher":"Crossrail Learning Legacy / project authors","year":2014,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Crossrail construction site, Farringdon - geograph.org.uk - 2259281.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","publisher":"Wikimedia Commons / Robin Webster","year":2011,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"crossrail-farringdon.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/crossrail-farringdon/download/schematic"},{"id":"project-image","title":"Crossrail construction site, Farringdon - geograph.org.uk - 2259281.jpg","kind":"project-image","fileName":"crossrail-farringdon.jpg","mimeType":"image/jpeg","bytes":135906,"sha256":"1e3b65e2566983c683fe4504c5ba077cc460e02e69371e8bbfc9b3bc55379987","sourceId":"s3","license":"CC BY-SA 2.0","width":640,"height":480,"credit":"Robin Webster","sourceUrl":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2011-02-05","evidenceFile":"image-provenance/crossrail-farringdon-commons.json","evidenceSha256":"c294f4b8021c7d8438edc8ab746650f06bb15707370570c92ff491e623289a26","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/96/Crossrail_construction_site%2C_Farringdon_-_geograph.org.uk_-_2259281.jpg","downloadUrl":"/cases/crossrail-farringdon/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"crossrail-farringdon-capstone.md","mimeType":"text/markdown","bytes":3376,"sha256":"3517728f9e88964f9f1290a79106101005b9cc1a4f5a51adc183182f4d16870c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/crossrail-farringdon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site.","caption":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site. This is a site photograph; the Lindsey Street Bridge settlement-mitigation details are in the linked project account.","credit":"Robin Webster","sourceUrl":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":640,"height":480,"imageDate":"2011-02-05"},"figureCaption":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site. This is a site photograph; the Lindsey Street Bridge settlement-mitigation details are in the linked project account.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":19,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/crossrail-farringdon-commons.json","evidenceSha256":"c294f4b8021c7d8438edc8ab746650f06bb15707370570c92ff491e623289a26","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":140407,"sourceCount":3,"url":"/cases/crossrail-farringdon"},{"id":"herbert-hoover","title":"Herbert Hoover Dike — seepage barriers and structure replacement","summary":"The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.","topics":["dams-levees","seepage","ground-improvement","monitoring","delivery"],"country":"United States","region":"Lake Okeechobee, Florida","owner":"US Army Corps of Engineers","year":2023,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Cutoff walls","Internal erosion","Embankment armoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE documents more than 56 miles of cutoff wall and replacement of 28 water-control structures, alongside other risk-reduction work.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The January 2023 announcement reports $1.5 billion invested; the later Fall 2023 update reports over $1.6 billion since 2001. Preserve the different dates and scopes.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE celebrated construction completion in January 2023 after a programme begun in 2005.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The completion release and later update describe completed risk-reduction features.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a reach-prioritization and treatment plan for a long embankment system with penetrations and heterogeneous seepage risk.","inputs":["Extract the completed work types and distinguish dike length from treated cutoff length.","Select one study reach and record what local borings, heads and structure details remain necessary."],"deliverables":["Compare seepage-control alternatives at a typical reach and at a culvert penetration.","Build a work-package schedule and QA plan for interfaces between walls and structures.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Herbert Hoover Dike rehabilitation completion","url":"https://www.saj.usace.army.mil/Media/News-Releases/Article/3276863/usace-marks-herbert-hoover-dike-rehabilitation-project-completion-with-ribbon-c/","publisher":"USACE","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Herbert Hoover Dike — Fall 2023 project update","url":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","publisher":"USACE","year":2023,"access":"public-link","license":"USACE public information; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["herbert-hoover-update","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"herbert-hoover.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/herbert-hoover/download/schematic"},{"id":"herbert-hoover-update","title":"Herbert Hoover Dike project update, Fall 2023","kind":"report","fileName":"herbert-hoover-update.pdf","mimeType":"application/pdf","bytes":1823491,"sha256":"01202f04ff137dff3893984e220dba8cc131287ee65070944b1b0c4dea9d6e69","sourceId":"s2","license":"USACE public information; original credits retained","rightsUrl":"https://www.usace.army.mil/Privacy-and-Security/","rightsBasis":"USACE public-information policy permits copying and distribution unless otherwise indicated.","rightsEvidenceUrl":"https://www.usace.army.mil/Privacy-and-Security/","pages":2,"downloadUrl":"/cases/herbert-hoover/download/herbert-hoover-update"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"herbert-hoover-reference-values.csv","mimeType":"text/csv","bytes":767,"sha256":"03152f87e5ef980f6f0c4ca7440c17766655c72932e645aa4edb92b3a26c9f9e","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/herbert-hoover/download/reference-values"},{"id":"project-image","title":"Herbert Hoover Dike cutoff-wall construction","kind":"project-image","fileName":"herbert-hoover.jpeg","mimeType":"image/jpeg","bytes":1250146,"sha256":"901a3bac7b402ad688e24f2fe77941a34e7cd9d3602d4edc5ac331ccd350cf6a","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1200,"height":800,"credit":"U.S. Army Corps of Engineers, Jacksonville District","sourceUrl":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","licenseUrl":"https://www.usace.army.mil/Privacy-and-Security/","imageDate":null,"evidenceFile":"image-provenance/herbert-hoover-source.json","evidenceSha256":"0bf437e163401247f8725180dba9abdf6f6aa5a4234808386c3f48ac5f91252e","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/herbert-hoover/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"herbert-hoover-capstone.md","mimeType":"text/markdown","bytes":4026,"sha256":"ee6a2a35f3d9cab06c07dbb0f25fb69ea7cc757392cba4fbaaf9563b9c91d87d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/herbert-hoover/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee.","caption":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee. Original USACE photograph from the Fall 2023 project update.","credit":"U.S. Army Corps of Engineers, Jacksonville District","sourceUrl":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.usace.army.mil/Privacy-and-Security/","width":1200,"height":800,"imageDate":null},"figureCaption":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee. Original USACE photograph from the Fall 2023 project update.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":22,"referenceValues":[{"label":"Completed cutoff-wall length","value":56.2,"unit":"mile","scope":"Partial-penetration wall described in the Fall 2023 update.","sourceId":"s2","locator":"Embankment cutoff wall","basis":"Reported completed length."},{"label":"Replaced water-control structures","value":28,"unit":"count","scope":"Replacement work within the rehabilitation programme.","sourceId":"s2","locator":"Water control structures","basis":"Reported completed quantity."},{"label":"Removed or abandoned structures","value":4,"unit":"count","scope":"Structures no longer required.","sourceId":"s2","locator":"Water control structures","basis":"Reported completed quantity."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/herbert-hoover-source.json","evidenceSha256":"0bf437e163401247f8725180dba9abdf6f6aa5a4234808386c3f48ac5f91252e","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":3079415,"sourceCount":2,"url":"/cases/herbert-hoover"},{"id":"oso-landslide","title":"Oso SR 530 landslide — investigation and mitigation planning","summary":"USGS reports characterize the deposits and soils associated with the 2014 landslide, providing a basis for ground-model and hazard-assessment exercises.","topics":["slopes","laboratory-testing","site-investigation","monitoring"],"country":"United States","region":"Snohomish County, Washington","owner":"USGS investigation with university and state partners","year":2014,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Ground model","Strength interpretation","Runout and exposure"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The available records are investigation reports, not a final stabilization design or an approval to rebuild within the affected area.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The event occurred on 22 March 2014; the linked investigations were published in 2014 and 2015.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Laboratory/field characterization and deposit mapping are available.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a defensible investigation and risk-reduction study for a populated valley below an unstable glacial-deposit slope.","inputs":["Use the soil characterization report and mapped older deposits.","Document sampling disturbance and distinguish intact samples from mobilized debris."],"deliverables":["Build geological sections and a parameter-selection register with uncertainties.","Compare avoidance, monitoring and feasible engineering measures without claiming that a simple stability factor predicts runout.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"USGS OFR 2015-1089 — geotechnical soil characterization","url":"https://pubs.usgs.gov/of/2015/1089/","publisher":"USGS","year":2015,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"USGS OFR 2014-1065 — pre-2014 deposits","url":"https://pubs.usgs.gov/of/2014/1065/","publisher":"USGS","year":2014,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Oso Landslide aerial.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg","publisher":"Wikimedia Commons / Mark Reid, USGS","year":2014,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"oso-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oso-landslide/download/schematic"},{"id":"project-image","title":"Oso Landslide aerial.jpg","kind":"project-image","fileName":"oso-landslide.jpg","mimeType":"image/jpeg","bytes":497563,"sha256":"48e7926cf1f6bce1479240efb6aae4a28b377b3839f4d2b036cb4bb76dae0b5b","sourceId":"s3","license":"Public domain","width":1280,"height":834,"credit":"Mark Reid, USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg#Licensing","imageDate":"2014-05-15 10:13:33","evidenceFile":"image-provenance/oso-landslide-commons.json","evidenceSha256":"692925ac897d9a4634b014e033e5a845b0b9672da0fe17762a668791bc570b22","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a7/Oso_Landslide_aerial.jpg","downloadUrl":"/cases/oso-landslide/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"oso-landslide-capstone.md","mimeType":"text/markdown","bytes":2904,"sha256":"634b87f1af44d2d23bceb653a0a6b9e8153244745261c93ae9847b982e68b0f2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oso-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial photograph of the March 22, 2014 Oso landslide and its runout across the Stillaguamish River valley..","caption":"Aerial photograph of the March 22, 2014 Oso landslide and its runout across the Stillaguamish River valley.","credit":"Mark Reid, USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg#Licensing","width":1280,"height":834,"imageDate":"2014-05-15 10:13:33"},"figureCaption":"Aerial photograph of the March 22, 2014 Oso landslide and its runout across the Stillaguamish River valley.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":27,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/oso-landslide-commons.json","evidenceSha256":"692925ac897d9a4634b014e033e5a845b0b9672da0fe17762a668791bc570b22","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":501496,"sourceCount":3,"url":"/cases/oso-landslide"},{"id":"mud-creek","title":"Mud Creek, Highway 1 — landslide mapping and road recovery","summary":"Repeat topographic and radar observations document the coastal landslide that destroyed part of Highway 1 in May 2017 and the continuing changes around its margins.","topics":["slopes","coastal-offshore","monitoring","earthworks"],"country":"United States","region":"Big Sur, California","owner":"Caltrans / USGS and NASA investigation partners","year":2017,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Change detection","Coastal slope behaviour","Road-alignment alternatives"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"USGS provides the investigation and monitoring context; the linked science page is not the final road-reconstruction design.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"NASA’s 2019 account cites $54 million in road repairs; a detailed final estimate is not attached.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"The failure occurred on 20 May 2017; source publications document pre/post-event observations.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Research observations are linked; final road as-built documents were not established.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a road-recovery alternatives study using mapped change and a clearly defined stability/erosion investigation plan.","inputs":["Identify the source surveys, coordinate reference, acquisition dates and remaining moving areas.","Keep differing published volume estimates tied to their methods and dates."],"deliverables":["Create a change-map interpretation and preliminary geotechnical ground model.","Compare realignment and reconstruction concepts with residual movement and coastal erosion risks.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"The Mud Creek Landslide, May 20, 2017","url":"https://www.usgs.gov/special-topics/big-sur-landslides/science/mud-creek-landslide-may-20-2017","publisher":"USGS","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Drought, deluge turned stable landslide into disaster","url":"https://www.jpl.nasa.gov/news/drought-deluge-turned-stable-landslide-into-disaster/","publisher":"NASA JPL","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Big Sur Mud Creek Slide May 2017.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","publisher":"Wikimedia Commons / Pacific Coastal and Marine Science Center","year":2017,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"mud-creek.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mud-creek/download/schematic"},{"id":"project-image","title":"Big Sur Mud Creek Slide May 2017.jpg","kind":"project-image","fileName":"mud-creek.jpg","mimeType":"image/jpeg","bytes":357896,"sha256":"bf6c766da30a2ff6c07c80c56f6d0062a06e92f7ef3a2dce0b2a3bf6e997b3ce","sourceId":"s3","license":"Public domain","width":1280,"height":847,"credit":"Pacific Coastal and Marine Science Center","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg#Licensing","imageDate":"2017-05-27","evidenceFile":"image-provenance/mud-creek-commons.json","evidenceSha256":"5d22a8ea6622f52ea2221f5311d6ff3b31bad54960946b8901258e7f09ecc441","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a5/Big_Sur_Mud_Creek_Slide_May_2017.jpg","downloadUrl":"/cases/mud-creek/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"mud-creek-capstone.md","mimeType":"text/markdown","bytes":3138,"sha256":"8abafd73397f4b1cada679751451832c1ce649b1605fd0f570bc16c0aad99c37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mud-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Mud Creek landslide on California’s Big Sur coast in May 2017.","caption":"The Mud Creek landslide on California’s Big Sur coast in May 2017. The slide buried Highway 1 and extended the shoreline. USGS photograph.","credit":"Pacific Coastal and Marine Science Center","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Big_Sur_Mud_Creek_Slide_May_2017.jpg#Licensing","width":1280,"height":847,"imageDate":"2017-05-27"},"figureCaption":"The Mud Creek landslide on California’s Big Sur coast in May 2017. The slide buried Highway 1 and extended the shoreline. USGS photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":28,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/mud-creek-commons.json","evidenceSha256":"5d22a8ea6622f52ea2221f5311d6ff3b31bad54960946b8901258e7f09ecc441","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":362063,"sourceCount":3,"url":"/cases/mud-creek"},{"id":"milltown-dam-removal","title":"Milltown Reservoir — dam removal and contaminated sediment remediation","summary":"Reservoir drawdown, dam removal and sediment excavation/capping were coordinated with river restoration and replacement of affected water-supply wells.","topics":["geoenvironmental","dewatering","earthworks","dams-levees","monitoring"],"country":"United States","region":"Missoula County, Montana","owner":"US EPA / Montana and responsible-party partners","year":2009,"yearLabel":"Case reference year","projectType":"Remediation and restoration","methods":["Sediment dewatering","Excavation and capping","Groundwater response"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"EPA’s five-year review describes the implemented remedy and site components. Different operable units have different completion status.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The 2021 review records remedial work beginning in 2006 and final dam removal in March 2009; later site restoration and monitoring followed.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The five-year review evaluates remedy performance; it does not state that every Clark Fork operable unit is complete.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased contaminated-sediment removal plan while maintaining downstream water quality and protecting nearby wells.","inputs":["Extract the remedy scope for the reservoir operable unit, not the entire Clark Fork site.","Identify sediment handling, groundwater and restored-channel monitoring information."],"deliverables":["Prepare a dewatering/well-impact assessment and sediment handling sequence.","Compare excavation, onsite containment and capping with monitoring/closure criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Third five-year review — Milltown Reservoir/Clark Fork","url":"https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P101GPHY.TXT","publisher":"US EPA","year":2021,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Milltown Reservoir Sediments cleanup profile","url":"https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0800445","publisher":"US EPA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Excavation.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","publisher":"Wikimedia Commons / M Kustudia","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"milltown-dam-removal.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/milltown-dam-removal/download/schematic"},{"id":"project-image","title":"Excavation.jpg","kind":"project-image","fileName":"milltown-dam-removal.jpg","mimeType":"image/jpeg","bytes":92446,"sha256":"c89444bbdf35eaa35ede26e64248eef43c17962bdb52b85aa8b7ea6a94ab395b","sourceId":"s3","license":"CC BY-SA 3.0","width":640,"height":473,"credit":"M Kustudia","sourceUrl":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-10-14","evidenceFile":"image-provenance/milltown-dam-removal-commons.json","evidenceSha256":"b542555b3a16fa6c34d99f848043d15ea64dc6789961e70910b6bfc421dd6895","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/8f/Excavation.jpg","downloadUrl":"/cases/milltown-dam-removal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"milltown-dam-removal-capstone.md","mimeType":"text/markdown","bytes":3054,"sha256":"7aee3520ebde422ce33cc80a110f0ed5313bdaa02a3ba95536fc18e40182447a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/milltown-dam-removal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Remediation work at the Milltown Reservoir Superfund site in Montana.","caption":"Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.","credit":"M Kustudia","sourceUrl":"https://commons.wikimedia.org/wiki/File:Excavation.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":640,"height":473,"imageDate":"2008-10-14"},"figureCaption":"Remediation work at the Milltown Reservoir Superfund site in Montana. The photograph shows excavation at the actual cleanup and dam-removal project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":34,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/milltown-dam-removal-commons.json","evidenceSha256":"b542555b3a16fa6c34d99f848043d15ea64dc6789961e70910b6bfc421dd6895","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":96491,"sourceCount":3,"url":"/cases/milltown-dam-removal"},{"id":"hanford-barrier","title":"Prototype Hanford Barrier — long-term infiltration control","summary":"Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.","topics":["geoenvironmental","seepage","monitoring","earthworks"],"country":"United States","region":"Hanford Site, Washington","owner":"US Department of Energy / PNNL","year":2024,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Evapotranspiration cover","Unsaturated flow","Water balance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The FY 2024 report presents barrier sections, instrumentation and water-balance observations; it is a performance report, not a universal cover design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The report covers July 2023–June 2024 observations and was published in 2025.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Annual measured-performance results and instrument maintenance are documented.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a cover-design and monitoring study that accounts for both central capillary storage and lateral edge drainage.","inputs":["Extract layer geometry, climate observations and the stated drainage criterion.","Distinguish central-cover performance from gravel/riprap side-slope behaviour."],"deliverables":["Prepare a seasonal water-storage calculation and a sensitivity study for precipitation and vegetation.","Design a monitoring layout that can detect edge effects and instrument failure.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Prototype Hanford Barrier performance monitoring — FY 2024","url":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","publisher":"PNNL / US DOE","year":2025,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"The report is openly downloadable at the publisher; PNNL reuse terms require separate consideration, so it is linked rather than mirrored.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hanford-barrier.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hanford-barrier/download/schematic"},{"id":"project-image","title":"Prototype Hanford Barrier — original annotated aerial photograph","kind":"project-image","fileName":"hanford-barrier.jpeg","mimeType":"image/jpeg","bytes":459599,"sha256":"63cb16ca1395d7d5ff0fde51b014a0d920e143cf1127e6bd90d4abdf56479bc1","sourceId":"s1","license":"PNNL permission for noncommercial scientific and educational use","width":1449,"height":1177,"credit":"Pacific Northwest National Laboratory / U.S. Department of Energy; Figure 1 in Thomle and Linneman (2025), modified in that report from DOE-RL (2016)","sourceUrl":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","licenseUrl":"https://www.pnnl.gov/important-notices","imageDate":"1994-08-09","evidenceFile":"image-provenance/hanford-barrier-source.json","evidenceSha256":"d2328302fe4d206a8b7ebc2cef155b3bc29e55e057a951732eb7e5fdfc0306d1","transformations":"Unchanged complete original embedded image extracted from the identified PDF. Original labels retained; no crop, retouching, or newly added annotation.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/hanford-barrier/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hanford-barrier-capstone.md","mimeType":"text/markdown","bytes":3018,"sha256":"3674df64a7230934309cfd38e9079fda91df6bba4d8bcecbdddb3652ef3cf96d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hanford-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Annotated aerial photograph of the completed Prototype Hanford Barrier in August 1994.","caption":"Annotated aerial photograph of the completed Prototype Hanford Barrier on August 9, 1994, reproduced as Figure 1 in PNNL-36586 (2025). The labels and outlines are part of the original published figure.","credit":"Pacific Northwest National Laboratory / U.S. Department of Energy; Figure 1 in Thomle and Linneman (2025), modified in that report from DOE-RL (2016)","sourceUrl":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","license":"PNNL permission for noncommercial scientific and educational use","licenseUrl":"https://www.pnnl.gov/important-notices","width":1449,"height":1177,"imageDate":"1994-08-09","preserveWholeImage":true},"figureCaption":"Annotated aerial photograph of the completed Prototype Hanford Barrier on August 9, 1994, reproduced as Figure 1 in PNNL-36586 (2025). The labels and outlines are part of the original published figure.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":35,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hanford-barrier-source.json","evidenceSha256":"d2328302fe4d206a8b7ebc2cef155b3bc29e55e057a951732eb7e5fdfc0306d1","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":463608,"sourceCount":1,"url":"/cases/hanford-barrier"},{"id":"inuvik-tuktoyaktuk","title":"Inuvik–Tuktoyaktuk Highway — embankment over permafrost","summary":"The highway used fill placement and separation geotextile to protect permafrost, with much construction undertaken in winter.","topics":["cold-regions","earthworks","problem-soils","monitoring"],"country":"Canada","region":"Northwest Territories","owner":"Government of the Northwest Territories","year":2017,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Permafrost preservation","Fill-only construction","Thermal monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The owner describes the construction strategy; a Canadian geological report documents regional ground temperatures before and after construction.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner project page documents opening and winter construction strategy; use source milestones rather than an assumed year-round programme.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The owner page and regional ground-temperature report support performance review.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an embankment concept for ice-rich permafrost and compare seasonal construction and thaw-settlement risk.","inputs":["Extract the owner’s construction constraints and select a monitored ground-temperature location.","Record how ground-ice and soil-property information differ along the alignment."],"deliverables":["Prepare a thermal/thaw-settlement screening model and sensitivity to warming and drainage.","Plan borrow, winter hauling, geotextile placement and long-term temperature monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Inuvik Tuktoyaktuk Highway project","url":"https://www.inf.gov.nt.ca/en/ITH","publisher":"Government of the Northwest Territories","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Permafrost ground-temperature synthesis 2013–2019, GSC OF 8656","url":"https://publications.gc.ca/collections/collection_2021/rncan-nrcan/m183-2/M183-2-8656-eng.pdf","publisher":"Geological Survey of Canada / NWT Geological Survey","year":2020,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ITH Caribou Hills.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","publisher":"Wikimedia Commons / Samuell","year":2021,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"inuvik-tuktoyaktuk.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/schematic"},{"id":"project-image","title":"ITH Caribou Hills.jpg","kind":"project-image","fileName":"inuvik-tuktoyaktuk.jpg","mimeType":"image/jpeg","bytes":291929,"sha256":"55ee8cf3a180f741ff152d7c513710111400d26fa703c4819812f989a97ae89b","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":853,"credit":"Samuell","sourceUrl":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2021-02-13 17:33:04","evidenceFile":"image-provenance/inuvik-tuktoyaktuk-commons.json","evidenceSha256":"4c6669c299ecf13f73a372be900e2dffe1f4f769b807e13b8c03bd847a5d6646","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/85/ITH_Caribou_Hills.jpg","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"inuvik-tuktoyaktuk-capstone.md","mimeType":"text/markdown","bytes":3026,"sha256":"30173d5e66902d254c9880b2330409a9eda5a055399b3e40289fe7f9edbe9560","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/inuvik-tuktoyaktuk/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik.","caption":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik. Photograph of the actual permafrost-road project corridor.","credit":"Samuell","sourceUrl":"https://commons.wikimedia.org/wiki/File:ITH_Caribou_Hills.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":853,"imageDate":"2021-02-13 17:33:04"},"figureCaption":"The Inuvik–Tuktoyaktuk Highway through the Caribou Hills north of Inuvik. Photograph of the actual permafrost-road project corridor.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":37,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/inuvik-tuktoyaktuk-commons.json","evidenceSha256":"4c6669c299ecf13f73a372be900e2dffe1f4f769b807e13b8c03bd847a5d6646","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":295923,"sourceCount":3,"url":"/cases/inuvik-tuktoyaktuk"},{"id":"dalton-air-convection","title":"Dalton Highway MP 209–222 — air-convection embankment trial","summary":"Twelve embankment test sections compared air-convection shoulder geometry and rock classes over thaw-unstable permafrost near milepost 219.","topics":["cold-regions","earthworks","monitoring","delivery"],"country":"United States","region":"Alaska","owner":"Alaska Department of Transportation and Public Facilities","year":2022,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Air-convection embankment","Insulation","Thermal monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The final report documents sections installed in 2017–2018 and three years of monitoring; it evaluates thermal performance rather than a complete climate-life prediction.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Test sections were installed in 2017–2018 and monitored for three years.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The 2022 final report presents the trial performance evaluation.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select an embankment shoulder treatment using measured thermal response and construction quantity comparisons.","inputs":["Extract section dimensions, rock class and ground-temperature records.","Separate effects of embankment height, rock size and shoulder width."],"deliverables":["Compare thermal performance and rock quantities for the test configurations.","Specify monitoring and maintenance needed to retain open pore spaces and drainage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Air Convection Embankment experimental feature — final report","url":"https://rosap.ntl.bts.gov/view/dot/65788","publisher":"Alaska DOT&PF","year":2022,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"dalton-air-convection.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/dalton-air-convection/download/schematic"},{"id":"project-image","title":"Dalton Highway — air-convection embankment placement","kind":"project-image","fileName":"dalton-air-convection-r13.jpeg","mimeType":"image/jpeg","bytes":266437,"sha256":"41cd81354e831ab47d34011a8f272506fbc40a1cf387a967fe8e943ae878971d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1472,"height":1103,"credit":"Alaska DOT&PF; report by Matt Billings and Michael Berggren (2022)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/65788","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/65788","imageDate":null,"evidenceFile":"image-provenance/dalton-air-convection-r13-source.json","evidenceSha256":"1b5ef9ae1e3e062b9b5e227cc5c3cbb23389ce29fda155dc9bf4906d670eef2c","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://rosap.ntl.bts.gov/view/dot/65788/dot_65788_DS1.pdf","originalSha256":"f6f2a75551ad504c4d381a1170961c89e6da7a9201e2a5498a3340cbd863068c","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/dalton-air-convection/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"dalton-air-convection-capstone.md","mimeType":"text/markdown","bytes":2644,"sha256":"e683517c5d3198347da8f1c967c583b58f2e6093f00c2cc29af1a274f241b638","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/dalton-air-convection/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","caption":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","credit":"Alaska DOT&PF; report by Matt Billings and Michael Berggren (2022)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/65788","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/65788","width":1472,"height":1103,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Placement of the coarse rock shoulder for the Dalton Highway air-convection embankment experiment. Original Figure 2 in the final report.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":38,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/dalton-air-convection-r13-source.json","evidenceSha256":"1b5ef9ae1e3e062b9b5e227cc5c3cbb23389ce29fda155dc9bf4906d670eef2c","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3612,"sourceCount":1,"url":"/cases/dalton-air-convection"},{"id":"block-island-wind","title":"Block Island Wind Farm — pile foundations and measured stiffness","summary":"The five-turbine offshore project has public foundation-installation observations and subsequent structural-monitoring studies.","topics":["coastal-offshore","deep-foundations","lateral-foundations","monitoring","seismic"],"country":"United States","region":"Offshore Rhode Island","owner":"Deepwater Wind / project partners","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Jacket piles","Foundation stiffness","Structural health monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The original geotechnical consultant describes interpreted profiles and pile-capacity work. BSEE publishes a foundation-stiffness study for one turbine.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The BSEE page lists a $608,722 monitoring-research award; this is not the wind-farm construction cost.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"partial","summary":"The Rhode Island owner/regulator record identifies commercial operation in December 2016.","sourceIds":["s3"]},"records":{"availability":"partial","summary":"The regulator records and BSEE technical attachments support construction/performance review.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare predicted and observed foundation stiffness for an offshore wind support, including how uncertain soil springs affect structural response.","inputs":["Extract pile/structure information from published monitoring and technical reports.","Distinguish one instrumented turbine from the full wind farm and retain marine ground-condition differences."],"deliverables":["Prepare an axial/lateral soil-spring sensitivity model and identify validation data.","Develop an installation and monitoring plan with offshore access and scour considerations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Block Island windfarm structural monitoring, TAP 806","url":"https://www.bsee.gov/research-records/tap-806-block-island-windfarm-structural-monitoring","publisher":"BSEE","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Block Island offshore wind farm — geotechnical engineering","url":"https://www.gza.com/projects/block-island-offshore-wind-farm","publisher":"GZA, project geotechnical consultant","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Block Island Wind Farm project records","url":"https://www.crmc.ri.gov/windenergy/blockislandwind.html","publisher":"Rhode Island Coastal Resources Management Council","year":2016,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Offshore Foundation Install 18.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","publisher":"Wikimedia Commons / BOEM-OPA","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"block-island-wind.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/block-island-wind/download/schematic"},{"id":"project-image","title":"Offshore Foundation Install 18.jpg","kind":"project-image","fileName":"block-island-wind.jpg","mimeType":"image/jpeg","bytes":226374,"sha256":"475bb6cc47f26f4dd77af72f39cee01b6c412a83262e3afd9ec312f36db9f2c2","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":941,"credit":"BOEM-OPA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-08-25 14:32:56","evidenceFile":"image-provenance/block-island-wind-commons.json","evidenceSha256":"6956e188a9bc1a7f8a6b86695ee9d106d4fba8a7f93b931a111c2cc68de31a23","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d0/Offshore_Foundation_Install_18.jpg","downloadUrl":"/cases/block-island-wind/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"block-island-wind-capstone.md","mimeType":"text/markdown","bytes":3287,"sha256":"c1cd6a9f8b988043bd356d43464ce3e47a76b4751e48fa08e57a40ffcaefdd0d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/block-island-wind/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015.","caption":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015. The jackets were built in Louisiana and transported to the offshore site.","credit":"BOEM-OPA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Offshore_Foundation_Install_18.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":941,"imageDate":"2015-08-25 14:32:56"},"figureCaption":"Installation of Block Island Wind Farm jacket foundations in Rhode Island waters in 2015. The jackets were built in Louisiana and transported to the offshore site.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":41,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/block-island-wind-commons.json","evidenceSha256":"6956e188a9bc1a7f8a6b86695ee9d106d4fba8a7f93b931a111c2cc68de31a23","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":230868,"sourceCount":4,"url":"/cases/block-island-wind"},{"id":"schoharie-creek","title":"Schoharie Creek Bridge — scour and foundation inspection","summary":"The NTSB investigation documents the bridge collapse after scour undermined spread-footing support, including construction, protection and inspection issues.","topics":["scour-erosion","shallow-foundations","site-investigation","monitoring"],"country":"United States","region":"Near Amsterdam, New York","owner":"New York State Thruway Authority","year":1987,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Scour assessment","Spread footings","Inspection and maintenance"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The investigation reconstructs the original foundation and scour-protection evidence; it is a forensic record rather than a replacement-bridge design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Collapse occurred on 5 April 1987; the NTSB report was published in 1988.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The report supplies the investigation record and recommendations, not replacement as-built plans.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a scour-risk assessment and protection/inspection strategy that remains effective throughout the bridge life.","inputs":["Extract original footing elevations, bed conditions and riprap/inspection evidence.","Distinguish foundation erosion from structural redundancy and emergency response questions."],"deliverables":["Compare predicted scour levels with available bearing support and foundation depth.","Prepare a protection detail, inspection triggers and a maintenance quantity schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"NTSB HAR-88/02 — Schoharie Creek Bridge collapse","url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/HAR8802.pdf","publisher":"National Transportation Safety Board","year":1988,"access":"public-link","license":"US federal investigation report; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["schoharie-investigation"]},{"id":"s2","title":"Interstate 90 Schoharie Creek Bridge collapsed.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","publisher":"Wikimedia Commons / USGS","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"schoharie-creek.svg","mimeType":"image/svg+xml","bytes":1056,"sha256":"ca50c03b28c61244d08ee83702433916e462ad2ee363e42240a9f0377b8c9c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/schoharie-creek/download/schematic"},{"id":"schoharie-investigation","title":"NTSB HAR-88/02, Schoharie Creek investigation","kind":"report","fileName":"schoharie-investigation.pdf","mimeType":"application/pdf","bytes":12310933,"sha256":"d28240fdf577aa1b231f09493181927478ae46a078f186c5a980909f6c6be14d","sourceId":"s1","license":"US federal investigation report; original credits retained","rightsUrl":"https://www.ntsb.gov/about/Policies/Pages/Policies.aspx","rightsBasis":"NTSB staff reports and graphics are public domain except specifically credited copyright material; report retained unmodified.","rightsEvidenceUrl":"https://www.ntsb.gov/about/Policies/Pages/Policies.aspx","pages":172,"downloadUrl":"/cases/schoharie-creek/download/schoharie-investigation"},{"id":"project-image","title":"Interstate 90 Schoharie Creek Bridge collapsed.jpg","kind":"project-image","fileName":"schoharie-creek.jpg","mimeType":"image/jpeg","bytes":57965,"sha256":"ba1a8e908b89c2890aa64f154a516bd9fd741d15f483c3c47027362ff2bf3022","sourceId":"s2","license":"Public domain","width":483,"height":320,"credit":"USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg#Licensing","imageDate":null,"evidenceFile":"image-provenance/schoharie-creek-commons.json","evidenceSha256":"66eb93aea3e6dcdba8e09808b6a0faab92d41bd4e46b5b5a7093623dcc4458a0","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fc/Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","downloadUrl":"/cases/schoharie-creek/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"schoharie-creek-capstone.md","mimeType":"text/markdown","bytes":2973,"sha256":"b118fc06966d2c43b2489147762bcbdfe8abc441fcc5e12b5a2016f263da0e47","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/schoharie-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse.","caption":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse. Historical USGS project photograph.","credit":"USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg#Licensing","width":483,"height":320,"imageDate":null},"figureCaption":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse. Historical USGS project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":42,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/schoharie-creek-commons.json","evidenceSha256":"66eb93aea3e6dcdba8e09808b6a0faab92d41bd4e46b5b5a7093623dcc4458a0","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":12372927,"sourceCount":2,"url":"/cases/schoharie-creek"},{"id":"us231-landslide","title":"US 231, Lacey Springs — bridging a moving landslide","summary":"After a rainfall-triggered slide, ALDOT selected two bridges across the unstable area rather than reconstructing the road on the moving embankment.","topics":["slopes","deep-foundations","lateral-foundations","monitoring","delivery"],"country":"United States","region":"Lacey Springs, Alabama","owner":"Alabama Department of Transportation","year":2020,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Landslide avoidance","Drilled shafts","Instrumentation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"FHWA documents alternative selection, drilled-shaft monitoring and construction delivery. It does not supply the full bridge/shaft design set.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $27.4 million for the repair/betterment and describes comparison with more expensive alternatives.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The bridges opened on 28 September 2020; the case describes incentives and advance purchase of casings and girders.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case discusses post-opening performance and ongoing instrumentation.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare slope stabilization with a bridge solution that transfers loads through unstable ground while preserving the road alignment.","inputs":["Extract the evaluated alternatives, slope geometry constraints and monitored quantities.","Identify the shear surface and pile-soil relative movement needed for a study shaft design."],"deliverables":["Prepare an alternatives decision matrix and a lateral soil-loading sensitivity study.","Develop an instrument layout with action levels and an accelerated procurement schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-028 — US 231 landslide repair","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","publisher":"FHWA / ALDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us231-landslide-repair","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us231-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us231-landslide/download/schematic"},{"id":"us231-landslide-repair","title":"FHWA-HIF-23-028, US231 landslide repair","kind":"report","fileName":"us231-landslide-repair.pdf","mimeType":"application/pdf","bytes":383622,"sha256":"0a5b9919d751adb355239d412946675bfefd4a7f291651073059edcb7b1114d8","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship; original state-agency photograph credits retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/72760","pages":2,"downloadUrl":"/cases/us231-landslide/download/us231-landslide-repair"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us231-landslide-reference-values.csv","mimeType":"text/csv","bytes":604,"sha256":"d55a19765753cfb5c1130dc843fd71aa0c087da6a9453cea9d72b6ce51778005","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us231-landslide/download/reference-values"},{"id":"project-image","title":"US 231 — completed bridges over the slide area","kind":"project-image","fileName":"us231-landslide-r13.jpeg","mimeType":"image/jpeg","bytes":67649,"sha256":"b728910614d015886a43573f82e0d8105eefbf36625f378c9b767c67aa34be08","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":778,"height":401,"credit":"Alabama Department of Transportation (ALDOT), published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","imageDate":null,"evidenceFile":"image-provenance/us231-landslide-r13-source.json","evidenceSha256":"073254ab95646ec6e74219206613cae5e26f89adfb9b853f3e9b026882a6f1fc","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","originalSha256":"0a5b9919d751adb355239d412946675bfefd4a7f291651073059edcb7b1114d8","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/us231-landslide/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us231-landslide-capstone.md","mimeType":"text/markdown","bytes":3543,"sha256":"5d0783dcad1f51544fac4c829e19d66bc6ed984bd1285c1d76c61c3f57350ea0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us231-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","caption":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","credit":"Alabama Department of Transportation (ALDOT), published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_alabama_us231.pdf","width":778,"height":401,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The completed US 231 bridges at Lacey Springs span the unstable slope, shown in the FHWA case study’s Figure 3.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":43,"referenceValues":[{"label":"Repair/betterment cost","value":27400000,"unit":"USD","scope":"Two-bridge resilience solution; FHWA-reported package.","sourceId":"s1","locator":"Project Snapshot and page 2","basis":"As reported; no escalation or inflation adjustment."},{"label":"Contract opening incentive","value":2490000,"unit":"USD","scope":"Incentive described for opening by 2 November 2020; not an extra cost assumed to have been paid.","sourceId":"s1","locator":"Challenges and Lessons Learned","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us231-landslide-r13-source.json","evidenceSha256":"073254ab95646ec6e74219206613cae5e26f89adfb9b853f3e9b026882a6f1fc","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":388798,"sourceCount":1,"url":"/cases/us231-landslide"},{"id":"pisa-stabilization","title":"Leaning Tower of Pisa — controlled underexcavation","summary":"A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.","topics":["shallow-foundations","settlement","dewatering","monitoring"],"country":"Italy","region":"Pisa","owner":"Italian Government / Opera della Primaziale Pisana","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underexcavation","Differential settlement","Piezometric control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors describe the stabilization mechanism and subsequent instrument readings. The case supports an observational-method study rather than copying a universal underpinning detail.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The author paper reports post-stabilization monitoring; it is not a current inspection certificate.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a staged underexcavation trial for an eccentric masonry-tower footing, using Pisa to define observations and stop criteria.","inputs":["Extract the foundation geometry, rotation history and monitored groundwater response from the author paper.","Distinguish the temporary stabilization operations from the permanent soil-removal and drainage measures."],"deliverables":["Calculate the direction and sensitivity of foundation rotation for small asymmetric volume removals.","Specify incremental excavation stages, survey precision, trigger values and contingency actions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can removing support on the higher side improve stability without simply increasing bearing resistance?","How would a seasonal groundwater rise change the interpretation of the measured tilt?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Behaviour after stabilization operations","url":"https://www.geocasehistoriesjournal.org/issues/volume-1-3/leaning-tower-of-pisa-behaviour-after-stabilization-operations","publisher":"Burland, Jamiolkowski and Viggiani / International Journal of Geoengineering Case Histories","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Restoration works contractor account","url":"https://trevispa.com/en/progetti/the-restoration-of-the-leaning-tower-of-pisa/","publisher":"Trevi","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Exterior of the Leaning Tower (Pisa) in April 2024.1.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","publisher":"Wikimedia Commons / PaestumPaestum","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"pisa-stabilization.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pisa-stabilization/download/schematic"},{"id":"project-image","title":"Exterior of the Leaning Tower (Pisa) in April 2024.1.jpg","kind":"project-image","fileName":"pisa-stabilization.jpg","mimeType":"image/jpeg","bytes":750557,"sha256":"4fe52d89c0578296c480ba671b8cd8d23bf1447b768d11a5661f9fb513ab7de9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":2490,"credit":"PaestumPaestum","sourceUrl":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-05-24 10:50:55","evidenceFile":"image-provenance/pisa-stabilization-commons.json","evidenceSha256":"27d6f137275dbf0bc47e7965477a8700394301d62fe5df53dcebb2fbbdff28d3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fb/Exterior_of_the_Leaning_Tower_%28Pisa%29_in_April_2024.1.jpg","downloadUrl":"/cases/pisa-stabilization/download/project-image","originalSha1":"d9e3fbde3af929fa625c4a633098fac6402952c4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"pisa-stabilization-capstone.md","mimeType":"text/markdown","bytes":3389,"sha256":"e8e53ea3c4f4a2019e709e9ffbf8d8406576dd631ea06e16190cb69970eb28c4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pisa-stabilization/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Leaning Tower of Pisa after the stabilization works.","caption":"The Leaning Tower of Pisa after the stabilization works. The photograph identifies the actual monument; the soil-removal operations are documented in the linked engineering accounts.","credit":"PaestumPaestum","sourceUrl":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":2490,"imageDate":"2023-05-24 10:50:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Leaning Tower of Pisa after the stabilization works. The photograph identifies the actual monument; the soil-removal operations are documented in the linked engineering accounts.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":47,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/pisa-stabilization-commons.json","evidenceSha256":"27d6f137275dbf0bc47e7965477a8700394301d62fe5df53dcebb2fbbdff28d3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":754832,"sourceCount":3,"url":"/cases/pisa-stabilization"},{"id":"kansai-airport","title":"Kansai International Airport — reclamation and long-term settlement","summary":"An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.","topics":["settlement","ground-improvement","problem-soils","monitoring","coastal-offshore"],"country":"Japan","region":"Osaka Bay","owner":"Kansai Airports","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sand drains","Consolidation","Differential settlement","Jacking"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The operator explains sand drains, reclaimed-fill compaction and jacking of individual columns. Published settlement histories allow comparison of shallow and deeper clay contributions.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator supplies monitoring updates and explains continuing adjustment; the airport is an operating asset, not a concluded settlement experiment.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-management plan for a reclaimed airport platform whose terminal and utility connections must remain serviceable.","inputs":["Separate pre-opening settlement from post-opening movement in the owner data.","Define a study clay profile and drainage lengths; clearly label parameters not provided by the owner."],"deliverables":["Fit a consolidation trend and test sensitivity to deep-clay compressibility.","Detail adjustable supports and flexible utility interfaces with a survey-and-maintenance programme.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does accelerating upper-layer consolidation not eliminate deeper-layer settlement?","Which measurements should trigger a building adjustment rather than a change in the ground model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Subsidence countermeasures and monitored status","url":"https://www.kansai-airports.co.jp/en/sustainability/society/tech-subsidence-countermeasures/","publisher":"Kansai Airports","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Uneven settlement and jacking-up","url":"https://www.kansai-airports.co.jp/en/sustainability/society/tech-jacking-up/","publisher":"Kansai Airports","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Kansai closeup.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","publisher":"Wikimedia Commons / NASA Earth Observatory","year":2003,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"kansai-airport.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kansai-airport/download/schematic"},{"id":"project-image","title":"Kansai closeup.jpg","kind":"project-image","fileName":"kansai-airport.jpg","mimeType":"image/jpeg","bytes":67326,"sha256":"820c6c19f570694e31a5f52cb274dc257136eb7470b63062a15935302651c7f1","sourceId":"s3","license":"Public domain","width":800,"height":600,"credit":"NASA Earth Observatory","sourceUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg#Licensing","imageDate":"2003-09-19","evidenceFile":"image-provenance/kansai-airport-commons.json","evidenceSha256":"2496b2e3dbfa9199043b8545d26458c7bcdda034ed833e65f0801d1ca420d53a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Kansai_closeup.jpg","downloadUrl":"/cases/kansai-airport/download/project-image","originalSha1":"55c3ecb6fd4c95b23d3591a32493baddcdb45f4f","originalSha256":"820c6c19f570694e31a5f52cb274dc257136eb7470b63062a15935302651c7f1","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"kansai-airport-capstone.md","mimeType":"text/markdown","bytes":3282,"sha256":"ca2f810824f14286d8f604345aa661f6abeadb02f3c83425fedd0f5254b0087d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kansai-airport/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Satellite view of Kansai International Airport and its reclaimed offshore island works.","caption":"Satellite view of Kansai International Airport and its reclaimed offshore island works. The image provides project context for the owner’s settlement and foundation-adjustment records.","credit":"NASA Earth Observatory","sourceUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg#Licensing","width":800,"height":600,"imageDate":"2003-09-19","imageDownloadAllowed":true},"figureCaption":"Satellite view of Kansai International Airport and its reclaimed offshore island works. The image provides project context for the owner’s settlement and foundation-adjustment records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":48,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/kansai-airport-commons.json","evidenceSha256":"2496b2e3dbfa9199043b8545d26458c7bcdda034ed833e65f0801d1ca420d53a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":71786,"sourceCount":3,"url":"/cases/kansai-airport"},{"id":"shanghai-tower","title":"Shanghai Tower — excavation compensation and pile–raft interaction","summary":"Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.","topics":["deep-foundations","settlement","excavation","monitoring"],"country":"China","region":"Shanghai","owner":"Shanghai Tower Construction and Development","year":2015,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Piled raft","Excavation compensation","Variable stiffness"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The cited studies include a design optimization and a re-analysis. The latter is an author’s model of the project, not an assertion that its proposed alternative was constructed.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconcile excavation relief and subsequent structural loading in a settlement model for a tower founded in deep urban deposits.","inputs":["Extract the construction-stage loads and compressible layers described in the papers.","Maintain separate ledgers for excavation unloading, dead load, live load and sustained loading."],"deliverables":["Compare a compensated-foundation calculation with a simplified interacting pile–raft model.","Propose a pile-stiffness distribution and explain its effect on raft curvature.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can apparent compensation of total stress justify ignoring differential settlement?","Which measured response would reveal an overly stiff pile-group assumption?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation re-analysis using compensated pile foundation theory","url":"https://onlinelibrary.wiley.com/doi/10.1002/tal.1087","publisher":"Project researchers / The Structural Design of Tall and Special Buildings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pile-raft foundation optimization analysis of Shanghai Tower","url":"https://tgjc.whrsm.ac.cn/EN/Y2018/V32/I3/243","publisher":"Zeng Chaojie / Soil Engineering and Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Shanghai - Shanghai Tower - 0001.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","publisher":"Wikimedia Commons / Stefan Fussan","year":2016,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"shanghai-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/schematic"},{"id":"project-image","title":"Shanghai - Shanghai Tower - 0001.jpg","kind":"project-image","fileName":"shanghai-tower.jpg","mimeType":"image/jpeg","bytes":714199,"sha256":"a540e70593ff3ea46a5baca90d32d4970546a3250d424431e2b792b02e6b7495","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":2114,"credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2016-09-18","evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e0/Shanghai_-_Shanghai_Tower_-_0001.jpg","downloadUrl":"/cases/shanghai-tower/download/project-image","originalSha1":"fbf6b991ef2d29b0baf093451432884e609fef5a","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"shanghai-tower-capstone.md","mimeType":"text/markdown","bytes":3209,"sha256":"7ddd952b24548584f1328900dafc4c9f5aedfac7b7cc92766795ff25ac33f2d7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Shanghai Tower in Shanghai.","caption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":2114,"imageDate":"2016-09-18","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":50,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":718607,"sourceCount":3,"url":"/cases/shanghai-tower"},{"id":"millau-viaduct","title":"Millau Viaduct — rock foundations and observational control","summary":"Very tall bridge piers transfer load through large shaft-and-raft foundations in limestone and marl. The geotechnical authors report measured foundation movement and the observational design strategy.","topics":["rock","deep-foundations","settlement","monitoring"],"country":"France","region":"Tarn Valley","owner":"Compagnie Eiffage du Viaduc de Millau","year":2004,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock sockets","Foundation rotation","Observational method"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"An open research paper describes investigation, foundation geometry and monitoring. The consultant account distinguishes pier geology and a local abutment adaptation.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Eiffage records construction during 2001–2004 and inauguration in December 2004; this is a milestone history, not the full contractor programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The geotechnical paper reports the monitored foundation behavior after construction.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Check a tall-pier foundation on contrasting rock units, with rotation limits governing the design.","inputs":["Extract published shaft, raft and rock-unit descriptions for one selected pier.","Separate measured translations from rotations and identify the construction stages."],"deliverables":["Compare bearing, sliding and rotational stiffness for limestone and marl assumptions.","Draft an instrumentation plan and pre-agreed foundation intervention sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can small differential movements matter more than total bearing capacity for this bridge?","How should an unexpected weak zone change the verification and contingency plan?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Millau viaduct geotechnical studies and foundations","url":"https://www.sciencedirect.com/science/article/pii/S167477551300036X","publisher":"Geotechnical project authors / Journal of Rock Mechanics and Geotechnical Engineering","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation engineering project account","url":"https://www.terrasol.fr/wp-content/uploads/2017/12/oa07_845_millau_viaduct_eng.pdf","publisher":"Terrasol","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Construction milestones","url":"https://www.eiffagegeniecivil.com/milau-viaduct","publisher":"Eiffage Génie Civil","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Viaduc millau 1.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","publisher":"Wikimedia Commons / Emeraude","year":2004,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"millau-viaduct.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millau-viaduct/download/schematic"},{"id":"project-image","title":"Viaduc millau 1.JPG","kind":"project-image","fileName":"millau-viaduct.jpg","mimeType":"image/jpeg","bytes":51310,"sha256":"9467ba872ccc50d998b9cc2bfb5188db5146d84c983f005b7d3b9847e693a6b9","sourceId":"s4","license":"Public domain","width":480,"height":640,"credit":"Emeraude","sourceUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG#Licensing","imageDate":"2004-03-14","evidenceFile":"image-provenance/millau-viaduct-commons.json","evidenceSha256":"e7a265ad5c20e75ffa310179ed68178f1fb3cf4910a87d8e54fabfba3627795e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/9c/Viaduc_millau_1.JPG","downloadUrl":"/cases/millau-viaduct/download/project-image","originalSha1":"cfe891bbedddcb693b57292d9abae9380c489b21","originalSha256":"9467ba872ccc50d998b9cc2bfb5188db5146d84c983f005b7d3b9847e693a6b9","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"millau-viaduct-capstone.md","mimeType":"text/markdown","bytes":3222,"sha256":"694e38240fd87fccdac897252bff729b43efe470995f39c65b3c150cb2d6baca","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millau-viaduct/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Millau Viaduct during construction.","caption":"The Millau Viaduct during construction. The tall piers and valley setting provide context for the published rock-foundation and monitoring case.","credit":"Emeraude","sourceUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG#Licensing","width":480,"height":640,"imageDate":"2004-03-14","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Millau Viaduct during construction. The tall piers and valley setting provide context for the published rock-foundation and monitoring case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":52,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/millau-viaduct-commons.json","evidenceSha256":"e7a265ad5c20e75ffa310179ed68178f1fb3cf4910a87d8e54fabfba3627795e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":55549,"sourceCount":4,"url":"/cases/millau-viaduct"},{"id":"transbay-transit","title":"Transbay Transit Center — deep excavation beside existing foundations","summary":"The transit-center excavation required a stiff, low-permeability perimeter and protection of nearby foundations. Public authority records explain proposed test shafts, soil improvement and groundwater concerns during design.","topics":["excavation","dewatering","ground-improvement","monitoring"],"country":"United States","region":"San Francisco","owner":"Transbay Joint Powers Authority","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Braced excavation","Soil improvement trials","Groundwater cutoff"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The public testing scope and meeting records describe design-stage reasoning. They are not the final as-built shoring design or a finding about responsibility for neighboring building movement.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The testing-scope record discusses a reduced test programme within a $5 million request. This is a proposed testing allocation, not the transit center’s final foundation cost.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a deep-excavation risk assessment for a transit box bordered by loaded foundations in compressible urban deposits.","inputs":["Extract the authority’s proposed testing objectives and soil profile descriptions.","Identify neighboring foundation levels and the movement paths that excavation could influence."],"deliverables":["Compare wall stiffness, brace staging and groundwater control using an explicit study section.","Write a trial-shaft verification plan and a monitoring-trigger matrix for adjacent properties.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which test result could change the proposed soil-improvement method before production?","How do drawdown settlement and wall-deflection settlement require different monitoring?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geotechnical shoring wall testing scope","url":"https://www.tjpa.org/media/30638/download?inline=","publisher":"Transbay Joint Powers Authority / Arup","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Shoring and excavation presentation record","url":"https://www.tjpa.org/media/36745/download?inline=","publisher":"Transbay Joint Powers Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Transbay Transit Center under construction, Spring 2013.png — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","publisher":"Wikimedia Commons / Jdelx","year":2013,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"transbay-transit.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/transbay-transit/download/schematic"},{"id":"project-image","title":"Transbay Transit Center under construction, Spring 2013.png","kind":"project-image","fileName":"transbay-transit.png","mimeType":"image/png","bytes":519266,"sha256":"c04ab6b0f8323c972cf506cdbd118dc783408a3ad20d3e0dc32c90d9c120edcd","sourceId":"s3","license":"CC BY-SA 3.0","width":657,"height":485,"credit":"Jdelx","sourceUrl":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2013-10-05 02:27:07","evidenceFile":"image-provenance/transbay-transit-commons.json","evidenceSha256":"97a2ded657ba021a83ec7d0f0c66e35ff4137b24a1d3a142f5ce9f6130ea35cb","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bc/Transbay_Transit_Center_under_construction%2C_Spring_2013.png","downloadUrl":"/cases/transbay-transit/download/project-image","originalSha1":"45ddeb57f1fa0a8bcc6dabbdd6c5976b9922bcfe","originalSha256":"c04ab6b0f8323c972cf506cdbd118dc783408a3ad20d3e0dc32c90d9c120edcd","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"transbay-transit-capstone.md","mimeType":"text/markdown","bytes":3287,"sha256":"af827fc3762380e4e65f15d9e88f68b50574dab5ae5e6feff893e6cbfc4a9430","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/transbay-transit/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Transbay Transit Center construction site in 2013.","caption":"The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.","credit":"Jdelx","sourceUrl":"https://commons.wikimedia.org/wiki/File:Transbay_Transit_Center_under_construction,_Spring_2013.png","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":657,"height":485,"imageDate":"2013-10-05 02:27:07","imageDownloadAllowed":true},"figureCaption":"The Transbay Transit Center construction site in 2013. The excavation and nearby urban setting belong to the actual project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":59,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/transbay-transit-commons.json","evidenceSha256":"97a2ded657ba021a83ec7d0f0c66e35ff4137b24a1d3a142f5ce9f6130ea35cb","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":523684,"sourceCount":3,"url":"/cases/transbay-transit"},{"id":"millennium-tower","title":"Millennium Tower — perimeter-pile underpinning and monitored load transfer","summary":"The remedial designer describes transferring part of the building load to new perimeter piles founded in rock. Installation-induced movement required changes to both pile construction and the final pile arrangement.","topics":["deep-foundations","settlement","monitoring","delivery"],"country":"United States","region":"San Francisco","owner":"Millennium Tower Homeowners Association","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underpinning","Rock-founded piles","Jacked load transfer"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The designer distinguishes the earlier 52-pile proposal from the implemented 18-pile solution. The city’s earlier environmental sheet is retained as proposal-stage evidence, not the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The remedial designer reports completion in September 2023 with occupancy maintained during the work.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The designer reports initial post-work behavior and a ten-year monitoring requirement; long-term performance is still a monitoring question.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a monitored perimeter underpinning concept while keeping an occupied building in service.","inputs":["Compare the original proposal and later constructed solution without mixing their quantities.","Extract the load-transfer concept and identify the pile-installation effects that prompted revision."],"deliverables":["Balance imposed pile load, existing-foundation capacity and differential movement.","Prepare installation trials, staged jacking steps and ten-year monitoring objectives.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can installing a settlement remedy initially increase settlement?","How should load-transfer fuses protect the original foundation if future differential movement occurs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Perimeter-pile upgrade and observed outcome","url":"https://www.sgh.com/project-story/millennium-tower/","publisher":"Simpson Gumpertz & Heger, remedial designer","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"2019 proposed upgrade information sheet","url":"https://media.api.sf.gov/documents/301_Mission_Information_Sheet_CEQA_Notice.pdf","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Millennium Tower adding pile section 2.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"millennium-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/schematic"},{"id":"project-image","title":"Millennium Tower adding pile section 2.agr.jpg","kind":"project-image","fileName":"millennium-tower.jpg","mimeType":"image/jpeg","bytes":858661,"sha256":"351acb58a3af5bd4bd050a171a013934d81a3c8d9e2085f72a092435946fb878","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1707,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-02-22 16:17:55","evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/07/Millennium_Tower_adding_pile_section_2.agr.jpg","downloadUrl":"/cases/millennium-tower/download/project-image","originalSha1":"d4e2c44c3246b245231a17a0d012fb7bd9790ff5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"millennium-tower-capstone.md","mimeType":"text/markdown","bytes":3232,"sha256":"25bd5057fc007e9cb063539a06b2a2495726a31f43bf1ebbbd69ecd1f5cba045","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco.","caption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1707,"imageDate":"2022-02-22 16:17:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":61,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":863092,"sourceCount":3,"url":"/cases/millennium-tower"},{"id":"east-branch-dam","title":"East Branch Dam — cutoff-wall construction and verification","summary":"A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.","topics":["dams-levees","seepage","ground-improvement","monitoring"],"country":"United States","region":"Elk County, Pennsylvania","owner":"US Army Corps of Engineers","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seepage cutoff","Wall continuity","Verification drilling"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner releases establish the rehabilitation scope and outcome. The cited verification reference is an abstract, so complete verification datasets are not claimed locally.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The owner reports a $132.5 million cutoff-wall rehabilitation contract awarded in 2014, not a certified final expenditure.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The owner’s 2020 releases describe repair completion and reservoir-operating changes.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a cutoff-wall quality-assurance programme that can demonstrate continuity without damaging the finished barrier.","inputs":["Extract the owner’s treatment objective and the technical abstract’s verification problem.","Specify study foundation permeability zones and their uncertainty before comparing barrier options."],"deliverables":["Estimate seepage reduction for intact and defective wall scenarios.","Develop test-panel, drilling, permeability-testing and reservoir-response acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can a low-permeability test core establish continuity between adjacent panels?","What monitoring evidence is needed before relaxing an operating restriction?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Repair-project conclusion","url":"https://www.usace.army.mil/Media/News/Article/2453263/thats-a-wrap-corps-concludes-east-branch-dam-repair-project/","publisher":"USACE Pittsburgh District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Return to normal operations announcement","url":"https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2386554/east-branch-dam-safety-modification-project-returning-to-normal-operations-weat/","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Lessons during cutoff-wall verification drilling","url":"https://damsafety.org/reference/east-branch-dam-lessons-learned-during-cutoff-wall-verification-drilling","publisher":"USACE authors / ASDSO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"USACE East Branch Clarion River Lake and Dam.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","publisher":"Wikimedia Commons / Margaret Luzier, U.S. Army Corps of Engineers","year":1985,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"east-branch-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-branch-dam/download/schematic"},{"id":"project-image","title":"USACE East Branch Clarion River Lake and Dam.jpg","kind":"project-image","fileName":"east-branch-dam.jpg","mimeType":"image/jpeg","bytes":295707,"sha256":"3a7264103efa49f7a3c6af162e3c91518990dbc92b306642e9d07fe5b08de9d8","sourceId":"s4","license":"Public domain","width":1280,"height":854,"credit":"Margaret Luzier, U.S. Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing","imageDate":"1985-09-01","evidenceFile":"image-provenance/east-branch-dam-commons.json","evidenceSha256":"c1163c137e1710737ad46d4a734fa7fc01a733a7ca0c14b7a83b70471c24912a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b5/USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","downloadUrl":"/cases/east-branch-dam/download/project-image","originalSha1":"b4e50869d539b41ada751c645b44bb0bc14f6900","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"east-branch-dam-capstone.md","mimeType":"text/markdown","bytes":3598,"sha256":"0424302e3006289b5f388519b956d139f36356bd9b7283fd3dc7b8a8a3076f4c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-branch-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania.","caption":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.","credit":"Margaret Luzier, U.S. Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing","width":1280,"height":854,"imageDate":"1985-09-01","imageDownloadAllowed":true},"figureCaption":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":65,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/east-branch-dam-commons.json","evidenceSha256":"c1163c137e1710737ad46d4a734fa7fc01a733a7ca0c14b7a83b70471c24912a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":300290,"sourceCount":4,"url":"/cases/east-branch-dam"},{"id":"mosul-dam","title":"Mosul Dam — maintenance grouting in soluble foundations","summary":"The dam overlies soluble limestone and gypsum. A rehabilitation programme strengthened maintenance grouting, equipment and instrumentation; continuing operation depends on sustained foundation management.","topics":["dams-levees","seepage","rock","monitoring","delivery"],"country":"Iraq","region":"Tigris River, northern Iraq","owner":"Iraq Ministry of Water Resources","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Maintenance grouting","Karst dissolution","Instrumented surveillance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE’s project history explains the grouting-gallery purpose and the 2016–2019 rehabilitation. It does not portray dissolution as permanently eliminated.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The history documents the 2016–2019 task force; operation and maintenance remained the responsibility of Iraq’s Ministry of Water Resources.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The source records equipment, workforce and instrumentation improvements, with continued grouting required.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an operations-linked grouting and surveillance plan for a dam on a dissolving foundation.","inputs":["Identify the soluble strata, access-gallery function and monitoring system described by the project team.","Define study groundwater chemistry and hydraulic gradients, marking them as assumptions where unpublished."],"deliverables":["Compare targeted and blanket grouting using permeability and grout-take scenarios.","Create inspection, drilling, instrumentation and response schedules that remain workable during outages.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is completion of a rehabilitation contract different from ending maintenance grouting?","How can changing grout take indicate either successful closure or a new flow path?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Mosul Dam Task Force project history","url":"https://www.tad.usace.army.mil/About/History/","publisher":"USACE Transatlantic Division","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Mosul Dam seepage.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","publisher":"Wikimedia Commons / This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","year":2007,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"mosul-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mosul-dam/download/schematic"},{"id":"project-image","title":"Mosul Dam seepage.jpg","kind":"project-image","fileName":"mosul-dam.jpg","mimeType":"image/jpeg","bytes":36400,"sha256":"5ed3cd442242ea44ce7714f6406861853e493e1e3c9f7ff7bfd283766ce3331c","sourceId":"s2","license":"Public domain","width":652,"height":390,"credit":"This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","sourceUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg#Licensing","imageDate":"2007","evidenceFile":"image-provenance/mosul-dam-commons.json","evidenceSha256":"24cc7f7e6d87e0313bf07045244006791851a33a996e3b1856e722d1eb96c160","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/ef/Mosul_Dam_seepage.jpg","downloadUrl":"/cases/mosul-dam/download/project-image","originalSha1":"aa0bd6259fd94c99184966d5b6f57b00092cb239","originalSha256":"5ed3cd442242ea44ce7714f6406861853e493e1e3c9f7ff7bfd283766ce3331c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"mosul-dam-capstone.md","mimeType":"text/markdown","bytes":3389,"sha256":"d6549148f14ee3077870d6d17abbffd5fefc264b92192bbca050323f1979172b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mosul-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Seepage east of and below the Mosul Dam spillway.","caption":"Seepage east of and below the Mosul Dam spillway. The source photograph documents the actual dam setting relevant to the foundation-management case.","credit":"This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","sourceUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg#Licensing","width":652,"height":390,"imageDate":"2007","imageDownloadAllowed":true},"figureCaption":"Seepage east of and below the Mosul Dam spillway. The source photograph documents the actual dam setting relevant to the foundation-management case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":68,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/mosul-dam-commons.json","evidenceSha256":"24cc7f7e6d87e0313bf07045244006791851a33a996e3b1856e722d1eb96c160","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":40774,"sourceCount":2,"url":"/cases/mosul-dam"},{"id":"bolivar-dam","title":"Bolivar Dam — seepage barriers in outwash and fractured abutment rock","summary":"Rehabilitation combined a partial-depth barrier, blanket improvements, relief wells and an abutment grout curtain. The project authors explain construction problems in thin limestone units with open flow paths.","topics":["dams-levees","seepage","rock","monitoring"],"country":"United States","region":"Tuscarawas County, Ohio","owner":"US Army Corps of Engineers","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Partial-depth cutoff","Relief wells","Abutment grouting","Piping control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The USACE completion account identifies the combined risk-reduction measures. A technical paper details the abutment grouting and downstage treatment decisions.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports rehabilitation completion in October 2017.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The completion account describes post-implementation evaluation and the resulting dam-safety classification.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare seepage-control combinations for an embankment on permeable outwash beside fractured rock.","inputs":["Separate foundation flow, rock-contact erosion and gate-system issues in the owner record.","Extract the grout-curtain arrangement and treatment response to circulation losses."],"deliverables":["Draw a seepage model with wall, blanket and relief-well alternatives.","Specify drilling/grouting decisions and post-treatment piezometric performance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a partial-depth barrier still reduce internal-erosion risk?","Where could seepage concentrate if the wall-to-rock transition is poorly treated?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Completion and post-implementation review","url":"https://www.army.mil/article/200670/bolivar_receives_best_dam_safety_rating","publisher":"US Army / USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Grout-curtain construction at Bolivar Dam","url":"https://pubs.geoscienceworld.org/aeg/eeg/article-abstract/24/1/121/522957/Grout-Curtain-Construction-At-Bolivar-Dam-Ohio","publisher":"USACE project authors / Environmental & Engineering Geoscience","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Bolivar Dam (Ohio) upstream.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","publisher":"Wikimedia Commons / Roseohioresident","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bolivar-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bolivar-dam/download/schematic"},{"id":"project-image","title":"Bolivar Dam (Ohio) upstream.jpg","kind":"project-image","fileName":"bolivar-dam.jpg","mimeType":"image/jpeg","bytes":395437,"sha256":"d20de43c4b633adfc2bdb10b723118662052fad325fe034c3b54fee87c8cd5c5","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"Roseohioresident","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg#Licensing","imageDate":"Taken on 18 August 2010","evidenceFile":"image-provenance/bolivar-dam-commons.json","evidenceSha256":"06d3cfbcd6025097e520fe62ad8bbd6609f2d0557a1751445d3a1c76c9f28fc3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/6e/Bolivar_Dam_%28Ohio%29_upstream.jpg","downloadUrl":"/cases/bolivar-dam/download/project-image","originalSha1":"9be59df03889845bff4d1c545c9fce0bc1a6693e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bolivar-dam-capstone.md","mimeType":"text/markdown","bytes":3151,"sha256":"15bf2f4194d6edcc19efb7438c2a05798f6806f3933f4462c59513b14abee9db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bolivar-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Upstream view of Bolivar Dam in Ohio.","caption":"Upstream view of Bolivar Dam in Ohio. The actual embankment is shown; the later seepage barrier and grout curtain are largely below ground.","credit":"Roseohioresident","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg#Licensing","width":1280,"height":960,"imageDate":"Taken on 18 August 2010","imageDownloadAllowed":true},"figureCaption":"Upstream view of Bolivar Dam in Ohio. The actual embankment is shown; the later seepage barrier and grout curtain are largely below ground.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":71,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bolivar-dam-commons.json","evidenceSha256":"06d3cfbcd6025097e520fe62ad8bbd6609f2d0557a1751445d3a1c76c9f28fc3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":399573,"sourceCount":3,"url":"/cases/bolivar-dam"},{"id":"lake-borgne-barrier","title":"Lake Borgne surge barrier — pile-supported flood protection","summary":"The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.","topics":["deep-foundations","lateral-foundations","coastal-offshore","seepage","monitoring"],"country":"United States","region":"New Orleans, Louisiana","owner":"Flood Protection Authority East / USACE","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven piles","Lateral pile response","Global stability","Floodwall transitions"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner and consultant sources explain the built system and geotechnical scope. Published summaries use differing pile counts and stages; no single count is inferred across them.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The operator describes an approximately $1.3 billion whole-barrier project, not a geotechnical-package final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator records transfer of operating and maintenance responsibilities following construction in 2013.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a representative barrier-wall foundation and its transition into an earthen levee.","inputs":["Extract the wall, gate and levee interface functions from the owner material.","Define study water levels, wave actions and soft-soil strength profiles with explicit source limits."],"deliverables":["Check axial/lateral pile response, group behavior and global stability.","Design transition details and instrumentation to compare storm response with predictions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a locally adequate pile group still sit within an unstable soil mass?","Why do differential movement and seepage deserve special attention at levee transitions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Barrier operations and system description","url":"https://www.floodauthority.org/the-system/lake-borgne-surge-barrier/","publisher":"Flood Protection Authority East","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geotechnical engineering account","url":"https://ardaman.com/ihnc-lake-borgne-barrier-giww-to-mrgo-st-bernard-parish-louisiana-usace-new-orleans-district/","publisher":"Ardaman & Associates","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"IHNC Surge Barrier Construction from Air.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","publisher":"Wikimedia Commons / Ray Devlin","year":2010,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lake-borgne-barrier.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/schematic"},{"id":"project-image","title":"IHNC Surge Barrier Construction from Air.jpg","kind":"project-image","fileName":"lake-borgne-barrier.jpg","mimeType":"image/jpeg","bytes":101254,"sha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","sourceId":"s3","license":"CC BY 2.0","width":800,"height":533,"credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2010-01-11 16:26:30","evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/42/IHNC_Surge_Barrier_Construction_from_Air.jpg","downloadUrl":"/cases/lake-borgne-barrier/download/project-image","originalSha1":"ec096cf2cb2f46b2508af820b50bbfcb78c8a3d3","originalSha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lake-borgne-barrier-capstone.md","mimeType":"text/markdown","bytes":3192,"sha256":"3d36487e28f0ac12f46bdcec3ecfa9d5a263ed5a4ad8e7455a843d1d326bbdf0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans.","caption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":800,"height":533,"imageDate":"2010-01-11 16:26:30","imageDownloadAllowed":true},"figureCaption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":72,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":105645,"sourceCount":3,"url":"/cases/lake-borgne-barrier"},{"id":"gotthard-base-tunnel","title":"Gotthard Base Tunnel — squeezing rock and adaptive support","summary":"Deep tunnel sections encountered squeezing rock and strongly variable geological behavior. The Swiss geotechnical society’s project history explains both anticipated and unexpected support challenges at Sedrun and Faido.","topics":["tunnels","rock","site-investigation","monitoring","delivery"],"country":"Switzerland","region":"Swiss Alps","owner":"AlpTransit Gotthard","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Squeezing-ground support","Convergence monitoring","Geological prediction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The heritage case includes geology and support-system discussions from project records. It supports assessment of alternatives and field observations rather than transfer of one support class to all rock.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The engineering overview records opening in June 2016 after a long multi-heading construction programme.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select and revise a tunnel support scheme when measured convergence exceeds the original forecast.","inputs":["Choose one published squeezing section and extract its geology and support sequence.","Distinguish forecast ground conditions from observations obtained during excavation."],"deliverables":["Compare yielding and stiff support with a convergence–confinement study.","Prepare an observational trigger plan and construction-time implications for revised support.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can stronger initial support fail to stop continuing squeezing?","Which measurements indicate that a support change is needed before the next excavation round?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Gotthard Base Tunnel engineering heritage case","url":"https://htc.issmge.org/virtual-time-capsule/member-societies/swiss-geotechnical-society-geotechnik-schweiz/gotthard-base-tunnel","publisher":"Swiss Geotechnical Society / ISSMGE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Project engineering overview","url":"https://www.satw.ch/en/gotthard-base-tunnel-1","publisher":"Swiss Academy of Engineering Sciences","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"20141120 gotthard-basistunnel05-wiki.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","publisher":"Wikimedia Commons / Hannes Ortlieb ( Diskussion )","year":2014,"access":"public-link","license":"CC BY-SA 3.0 de","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"gotthard-base-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/gotthard-base-tunnel/download/schematic"},{"id":"project-image","title":"20141120 gotthard-basistunnel05-wiki.jpg","kind":"project-image","fileName":"gotthard-base-tunnel.jpg","mimeType":"image/jpeg","bytes":270024,"sha256":"c34e7149142543a6d7467bab8777410c8eda3fd5bea95792762d9de0b49230d5","sourceId":"s3","license":"CC BY-SA 3.0 de","width":1280,"height":853,"credit":"Hannes Ortlieb ( Diskussion )","sourceUrl":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/de/deed.en","imageDate":"2014-11-20","evidenceFile":"image-provenance/gotthard-base-tunnel-commons.json","evidenceSha256":"b0b8e93d8f2238bc07cd984600507c4e88264e3ece95c7661871510ceae09f35","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/69/20141120_gotthard-basistunnel05-wiki.jpg","downloadUrl":"/cases/gotthard-base-tunnel/download/project-image","originalSha1":"e74de4bfce9b76c9c98d216f3edbb245cb2a7ec5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"gotthard-base-tunnel-capstone.md","mimeType":"text/markdown","bytes":3256,"sha256":"76ba7c8ccd685844c7f7ec46648cb4988358b8db5be5d2a9269651d4d408168b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/gotthard-base-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014.","caption":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.","credit":"Hannes Ortlieb ( Diskussion )","sourceUrl":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","license":"CC BY-SA 3.0 de","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/de/deed.en","width":1280,"height":853,"imageDate":"2014-11-20","imageDownloadAllowed":true},"figureCaption":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":74,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/gotthard-base-tunnel-commons.json","evidenceSha256":"b0b8e93d8f2238bc07cd984600507c4e88264e3ece95c7661871510ceae09f35","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":274405,"sourceCount":3,"url":"/cases/gotthard-base-tunnel"},{"id":"tideway-tunnel","title":"Thames Tideway Tunnel — variable geology and deep shafts","summary":"The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.","topics":["tunnels","dewatering","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"London","owner":"Tideway","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry tunnelling","Deep shafts","Ground model refinement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project geologist’s technical lecture and designer account provide ground-model and machine-selection reasoning. Completion of tunnelling in a contract area is not the same as completion of the whole sewer system.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare tunnelling and shaft-construction risks across clay, sand and chalk reaches of an urban sewer alignment.","inputs":["Extract the geological units and identify where face pressure is governed by water rather than soil strength.","Choose one contract reach and preserve the distinction between main and connection tunnels."],"deliverables":["Prepare an excavation-method selection matrix and groundwater-control concepts.","Develop a monitoring and geological-reporting plan for updating production forecasts.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What does an intact sample fail to reveal about in-situ chalk permeability?","How should a changed ground model alter contingency time and intervention planning?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Engineering geology and construction performance","url":"https://ice.org.uk/events/recorded-lectures/engineering-geology-of-the-thames-tideway-tunnel","publisher":"Tim Newman / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Engineering the Thames Tideway sewer","url":"https://www.mottmac.com/en-gb/projects/how-londons-thames-tideway-super-sewer-was-engineered/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Thames Tideway Tunnel construction, Nine Elms.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","publisher":"Wikimedia Commons / AndyScott","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tideway-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/schematic"},{"id":"project-image","title":"Thames Tideway Tunnel construction, Nine Elms.jpg","kind":"project-image","fileName":"tideway-tunnel.jpg","mimeType":"image/jpeg","bytes":574175,"sha256":"407b83af897291400982623e5865b9a4baefbb086e090062f79b6911b9d9e3f4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1925,"credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-03-23 14:14:14","evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/4f/Thames_Tideway_Tunnel_construction%2C_Nine_Elms.jpg","downloadUrl":"/cases/tideway-tunnel/download/project-image","originalSha1":"a8e1f4ec3dc41e3101fff83dea35e08e296a2037","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tideway-tunnel-capstone.md","mimeType":"text/markdown","bytes":3265,"sha256":"ba22b9318da7099b0a5527de83a4cf0224651f9706d87d28d94497b3cc7bfb99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Thames Tideway Tunnel construction at Nine Elms, London.","caption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1925,"imageDate":"2022-03-23 14:14:14","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":78,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":578565,"sourceCount":3,"url":"/cases/tideway-tunnel"},{"id":"second-avenue-subway","title":"Second Avenue Subway Phase 1 — ground freezing at a TBM launch","summary":"Unexpected poor ground near the east running-tunnel launch required a revised sequence. The construction manager describes soil freezing while the TBM first advanced through the western alignment.","topics":["tunnels","ground-improvement","monitoring","delivery"],"country":"United States","region":"Manhattan, New York","owner":"Metropolitan Transportation Authority","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","TBM launch support","Settlement control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The construction-manager account identifies the actual temporary treatment and sequencing response. It does not imply that the entire subway alignment was frozen.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSP records west and east running-tunnel completion in 2011 and Phase 1 opening in January 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Recover a tunnelling programme when a localized launch zone cannot support the planned hard-rock TBM excavation.","inputs":["Extract the reported launch problem and revised east/west drive sequence.","Define a study freezing geometry and groundwater flow scenario for the local weak zone."],"deliverables":["Estimate freeze formation time and identify verification boreholes and temperature targets.","Plan thawing and lining load transfer with utilities and adjacent building monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can closely spaced borings still miss a localized poor-ground pocket?","How does moving the TBM to a different drive reduce schedule risk without removing ground risk?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Opening and construction challenges","url":"https://www.wsp.com/en-us/insights/new-york-opens-its-second-avenue-subway","publisher":"WSP, construction manager","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Phase 1 project methods","url":"https://www.wsp.com/en-gb/projects/second-avenue-subway","publisher":"WSP","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Second Avenue Subway November 2013 (11344196583) (2).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","publisher":"Wikimedia Commons / Metropolitan Transportation Authority of the State of New York","year":2013,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"second-avenue-subway.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/second-avenue-subway/download/schematic"},{"id":"project-image","title":"Second Avenue Subway November 2013 (11344196583) (2).jpg","kind":"project-image","fileName":"second-avenue-subway.jpg","mimeType":"image/jpeg","bytes":544351,"sha256":"6683f5afad3af69a041d3b73709795ba2cb397ef47ff446be5e6577b1be71970","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":852,"credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2013-11-23 13:26","evidenceFile":"image-provenance/second-avenue-subway-commons.json","evidenceSha256":"ad23a21be5fd939864d642accfbf5f27829c9a31abdd0977487f66394614ac4b","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Second_Avenue_Subway_November_2013_%2811344196583%29_%282%29.jpg","downloadUrl":"/cases/second-avenue-subway/download/project-image","originalSha1":"0cae68c05f3f00662ab2261e99e53be5714184e8","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"second-avenue-subway-capstone.md","mimeType":"text/markdown","bytes":3216,"sha256":"b90c172254070205460219585cba13957e4c0b6c883c5b18b7e41dee3f25896a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/second-avenue-subway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the future 86th Street station in November 2013.","caption":"Construction of the future 86th Street station in November 2013. MTA photograph from Second Avenue Subway Phase 1; the localized launch-freezing operation occurred elsewhere on the same phase.","credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":852,"imageDate":"2013-11-23 13:26","imageDownloadAllowed":true},"figureCaption":"Construction of the future 86th Street station in November 2013. MTA photograph from Second Avenue Subway Phase 1; the localized launch-freezing operation occurred elsewhere on the same phase.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":80,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/second-avenue-subway-commons.json","evidenceSha256":"ad23a21be5fd939864d642accfbf5f27829c9a31abdd0977487f66394614ac4b","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":548692,"sourceCount":3,"url":"/cases/second-avenue-subway"},{"id":"east-side-access","title":"East Side Access — frozen support beneath Northern Boulevard","summary":"A short mined connection beneath active transport infrastructure used a frozen soil arch for temporary support and groundwater cutoff. The project sources distinguish local freezing from the wider East Side Access tunnel programme.","topics":["tunnels","ground-improvement","dewatering","monitoring"],"country":"United States","region":"Queens, New York","owner":"Metropolitan Transportation Authority","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Sequential excavation","Heave and settlement control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The contractor case and design-team account describe the Northern Boulevard crossing and movement control. Photographs of the wider project are identified as context unless the crossing itself is shown.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a short mined crossing beneath an operating subway box where drawdown and ground movement are tightly constrained.","inputs":["Extract the access-shaft arrangement, groundwater setting and supported transport structures.","Distinguish freeze-induced heave from excavation-induced settlement in the monitoring plan."],"deliverables":["Develop staged thermal and stability checks for a frozen arch.","Coordinate compensation grouting, lining installation and controlled thaw with operating railway limits.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which monitoring trends would indicate that freezing is protecting the face but damaging the asset above?","Why must the temporary frozen ground remain effective until lining load transfer is complete?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Northern Boulevard crossing case","url":"https://www.geoinstitute.org/node/16177","publisher":"Project case author / ASCE Geo-Institute","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"East Side Access design and construction account","url":"https://www.mottmac.com/en-us/projects/transforming-rail-on-manhattans-east-side/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ESA 0968 (8311751208).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","publisher":"Wikimedia Commons / Metropolitan Transportation Authority of the State of New York","year":2012,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"east-side-access.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-side-access/download/schematic"},{"id":"project-image","title":"ESA 0968 (8311751208).jpg","kind":"project-image","fileName":"east-side-access.jpg","mimeType":"image/jpeg","bytes":368730,"sha256":"b28bf3330220485b79647239eaf8a823d8cd8a8f655976d19808683423d66f38","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":852,"credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2012-12-20 10:55","evidenceFile":"image-provenance/east-side-access-commons.json","evidenceSha256":"3b73a5b980a975dc875f8b13a25fae5c42e9eaeca85f68dbd88dfe46f47b2bb2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e4/ESA_0968_%288311751208%29.jpg","downloadUrl":"/cases/east-side-access/download/project-image","originalSha1":"bed1ed4d21b8d615f8d47b1c8e599c6f7e8358a6","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"east-side-access-capstone.md","mimeType":"text/markdown","bytes":3336,"sha256":"dc67afd8eb763990e864f661eb9dbdfc1820f32ec6b4f975be6fad9154e02a62","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-side-access/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Excavation beneath Northern Boulevard in Queens in December 2012.","caption":"Excavation beneath Northern Boulevard in Queens in December 2012. The MTA photograph shows the actual East Side Access crossing where frozen ground and temporary supports protected the roadway and subway structures above.","credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":852,"imageDate":"2012-12-20 10:55","imageDownloadAllowed":true},"figureCaption":"Excavation beneath Northern Boulevard in Queens in December 2012. The MTA photograph shows the actual East Side Access crossing where frozen ground and temporary supports protected the roadway and subway structures above.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":81,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/east-side-access-commons.json","evidenceSha256":"3b73a5b980a975dc875f8b13a25fae5c42e9eaeca85f68dbd88dfe46f47b2bb2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":373191,"sourceCount":3,"url":"/cases/east-side-access"},{"id":"auckland-city-rail","title":"Auckland City Rail Link — ground models and settlement baselines","summary":"The urban rail link traverses weak rock, younger sediments, volcanic material and reclamation. Project engineers describe how phased investigations and a shared three-dimensional ground model informed procurement and risk allocation.","topics":["tunnels","site-investigation","monitoring","delivery"],"country":"New Zealand","region":"Central Auckland","owner":"City Rail Link Limited","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geotechnical baseline reports","EPB tunnelling","Settlement assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The geotechnical paper explains the baseline-report process, while owner pages link settlement assessments and TBM information. Those records support a procurement study without inventing a final asset-acceptance status.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a defensible ground baseline and investigation plan for an urban railway with several geological transitions.","inputs":["Extract the geological units and trace how investigation priorities changed through design.","Choose one alignment section and identify factual data separately from interpretation."],"deliverables":["Create a baseline table of expected conditions and measurable exceedance criteria.","Develop a building settlement screening and instrumentation strategy linked to tunnel operations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which uncertainties should remain explicit in a baseline rather than being hidden in an average profile?","How can a shared geological model improve procurement while still requiring independent interpretation?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Managing ground risk from concept to procurement","url":"https://www.nzgs.org/libraries/managing-ground-risk-for-aucklands-city-rail-link-project-concept-design-to-procurement/","publisher":"Project engineers / New Zealand Geotechnical Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"TBM technical facts","url":"https://www.cityraillink.co.nz/tunnel-boring-machine-key-facts","publisher":"City Rail Link Limited","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Consents and settlement assessments","url":"https://www.cityraillink.co.nz/consents-in-your-area","publisher":"City Rail Link Limited","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"CRL Albert Street 2452.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","publisher":"Wikimedia Commons / Schwede66","year":2018,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"auckland-city-rail.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/auckland-city-rail/download/schematic"},{"id":"project-image","title":"CRL Albert Street 2452.jpg","kind":"project-image","fileName":"auckland-city-rail.jpg","mimeType":"image/jpeg","bytes":335829,"sha256":"9f57ec9525f4422ccf4aab9a56c5d8b30f5836b5eb79c2fd3d9fa0bbe507bcd6","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Schwede66","sourceUrl":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2018-03-06 07:48:51","evidenceFile":"image-provenance/auckland-city-rail-commons.json","evidenceSha256":"798247ba9b24a81b1bbb676d213e54e192861dc5f1566b0513fc29a0de4de7e7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0a/CRL_Albert_Street_2452.jpg","downloadUrl":"/cases/auckland-city-rail/download/project-image","originalSha1":"12611ec2058caffaa71507bb9e901326c9b29c39","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"auckland-city-rail-capstone.md","mimeType":"text/markdown","bytes":3369,"sha256":"aa8cd7d0034de7bd80af2853144a3ab04107a646cfef16d40bf7000246a3d3bb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/auckland-city-rail/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"City Rail Link construction on Albert Street in Auckland.","caption":"City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.","credit":"Schwede66","sourceUrl":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2018-03-06 07:48:51","imageDownloadAllowed":true},"figureCaption":"City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":84,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/auckland-city-rail-commons.json","evidenceSha256":"798247ba9b24a81b1bbb676d213e54e192861dc5f1566b0513fc29a0de4de7e7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":340323,"sourceCount":4,"url":"/cases/auckland-city-rail"},{"id":"trans-alaska-pipeline","title":"Trans-Alaska Pipeline — thermally stabilized supports in permafrost","summary":"The pipeline uses elevated supports where thaw-sensitive permafrost would be disturbed by warm oil. Operator and state-geology sources describe thermal support members, heat-pipe monitoring and maintenance.","topics":["cold-regions","deep-foundations","monitoring","problem-soils"],"country":"United States","region":"Alaska","owner":"Alyeska Pipeline Service Company","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Thermosyphons","Thaw settlement","Thermal piles","Infrared surveillance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources explain design modes and thermal monitoring. They do not justify assuming that every support experiences the same ground temperature or ice content.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The sources describe an operating maintenance system and ongoing observations, not a once-only completed cooling treatment.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design an elevated pipe support whose foundation must remain stable as the seasonal thermal regime changes.","inputs":["Distinguish thaw-stable and thaw-unstable ground and identify the operator’s design modes.","Define a study soil-ice profile, climate series and support load using clearly stated assumptions."],"deliverables":["Compare thaw-settlement risk for untreated and passively cooled supports.","Prepare heat-pipe inspection, performance assessment and repair priorities.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is a foundation’s thermal condition as important as its initial bearing capacity?","Which observations distinguish a failed heat pipe from a change in regional ground temperature?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Permafrost and pipeline design modes","url":"https://alyeska-pipe.com/environmental-protection/","publisher":"Alyeska Pipeline Service Company","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Guide to permafrost and pipeline thermal supports","url":"https://dggs.alaska.gov/webpubs/dggs/gb/text/gb011.pdf","publisher":"Alaska Division of Geological & Geophysical Surveys","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Pipeline vertical support member.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","publisher":"Wikimedia Commons / JKBrooks85","year":2009,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"trans-alaska-pipeline.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/trans-alaska-pipeline/download/schematic"},{"id":"project-image","title":"Pipeline vertical support member.jpg","kind":"project-image","fileName":"trans-alaska-pipeline.jpg","mimeType":"image/jpeg","bytes":276864,"sha256":"95af32a5a9e743df4620352815794b8e849ecacf42f144afd7539bfb960faf59","sourceId":"s3","license":"Public domain","width":1280,"height":1786,"credit":"JKBrooks85","sourceUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg#Licensing","imageDate":"2009-07-15","evidenceFile":"image-provenance/trans-alaska-pipeline-commons.json","evidenceSha256":"35ae4095e2d748ed8f40f58a36da1e011fc8623305a2e9c5960b497c63202f7a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/7/7c/Pipeline_vertical_support_member.jpg","downloadUrl":"/cases/trans-alaska-pipeline/download/project-image","originalSha1":"d00ccb10f81ff141b64657c56034afc9de8df237","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"trans-alaska-pipeline-capstone.md","mimeType":"text/markdown","bytes":3223,"sha256":"ec3686dad92cdeee5d12b99ad4f7a2c3957dd463a9f24f58d97ff6e6ea2535eb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/trans-alaska-pipeline/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators.","caption":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators. The photograph shows the actual foundation-cooling detail used to protect frozen ground around supports.","credit":"JKBrooks85","sourceUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Pipeline_vertical_support_member.jpg#Licensing","width":1280,"height":1786,"imageDate":"2009-07-15","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"A vertical support member of the Trans-Alaska Pipeline topped by two heat-pipe radiators. The photograph shows the actual foundation-cooling detail used to protect frozen ground around supports.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":85,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/trans-alaska-pipeline-commons.json","evidenceSha256":"35ae4095e2d748ed8f40f58a36da1e011fc8623305a2e9c5960b497c63202f7a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":281055,"sourceCount":3,"url":"/cases/trans-alaska-pipeline"},{"id":"qinghai-tibet-railway","title":"Qinghai–Tibet Railway — crushed-rock embankments over warming permafrost","summary":"Instrumented railway embankments provide evidence on the cooling and deformation of crushed-rock configurations. Researchers compare thermal performance, sunny/shady slope effects and continuing permafrost change.","topics":["cold-regions","earthworks","monitoring","problem-soils"],"country":"China","region":"Qinghai–Tibet Plateau","owner":"Qinghai–Tibet Railway","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Air-convection embankments","Thermal monitoring","Thaw deformation"],"documentationLevel":"monitoring-study","design":{"availability":"partial","summary":"The monitoring paper reports several embankment configurations. Later proposed reinforcement is research, not proof that every monitored section was reconstructed with that measure.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select an embankment cross-section for warm permafrost using both thermal and deformation performance.","inputs":["Extract the monitoring period and distinguish the compared crushed-rock arrangements.","Define climate, aspect and rock-layer permeability sensitivities for the study section."],"deliverables":["Compare seasonal cooling and thaw-depth trends under alternative geometries.","Develop maintenance checks for clogging, slope asymmetry and track-level movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a rock layer lose cooling effectiveness even when its thickness is unchanged?","Why should the warmest year and cumulative thermal trend both inform maintenance decisions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Cooling performance and deformation of railway embankments","url":"https://www.sciencedirect.com/science/article/pii/S0013795219312098","publisher":"Tai and coauthors / Engineering Geology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Performance and reinforcement study","url":"https://pmc.ncbi.nlm.nih.gov/articles/PMC11471204/","publisher":"Research authors / open journal article","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Lhassa-Xining railway.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","publisher":"Wikimedia Commons / This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","year":2012,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"qinghai-tibet-railway.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/qinghai-tibet-railway/download/schematic"},{"id":"project-image","title":"Lhassa-Xining railway.JPG","kind":"project-image","fileName":"qinghai-tibet-railway.jpg","mimeType":"image/jpeg","bytes":577578,"sha256":"e3bdb64f0cac308615d1017bb64abcec0d6a428ad400ccf8d23332aaaef94bc0","sourceId":"s3","license":"CC0","width":1280,"height":961,"credit":"This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","sourceUrl":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2012-05-14","evidenceFile":"image-provenance/qinghai-tibet-railway-commons.json","evidenceSha256":"570452a99f700b14e881a3d7d43b31edcc6795fb8a69c2b1e322e281bafca47d","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/90/Lhassa-Xining_railway.JPG","downloadUrl":"/cases/qinghai-tibet-railway/download/project-image","originalSha1":"e561258d5e03d572416a91865a11a4421aca973f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"qinghai-tibet-railway-capstone.md","mimeType":"text/markdown","bytes":3908,"sha256":"9fd34b9e382fbf6d1d0107977d066f9ff370d3eb2ecab7364cad29b308c04651","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/qinghai-tibet-railway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Qinghai–Tibet railway route beyond Golmud.","caption":"The Qinghai–Tibet railway route beyond Golmud. This is corridor context; it is not labeled as one of the instrumented cross-sections in the cited monitoring papers.","credit":"This illustration was made by ( User:Royonx ) and released under the license(s) stated above. You are free to use it for any purpose as long as you credit me and follow the terms of the license. Example : © Michel Royon / Wikimedia Commons If you use this image outside of the Wikimedia projects, I would be happy to hear from you par courriel ( royonx gmail.com). Thanks ! Ce message en français","sourceUrl":"https://commons.wikimedia.org/wiki/File:Lhassa-Xining_railway.JPG","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":961,"imageDate":"2012-05-14","imageDownloadAllowed":true},"figureCaption":"The Qinghai–Tibet railway route beyond Golmud. This is corridor context; it is not labeled as one of the instrumented cross-sections in the cited monitoring papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":86,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/qinghai-tibet-railway-commons.json","evidenceSha256":"570452a99f700b14e881a3d7d43b31edcc6795fb8a69c2b1e322e281bafca47d","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":582454,"sourceCount":3,"url":"/cases/qinghai-tibet-railway"},{"id":"vajont-landslide","title":"Vajont reservoir — rockslide, groundwater and observational decisions","summary":"The reservoir disaster involved a large pre-existing rockslide and rapid displacement of reservoir water. Geological researchers emphasize the complex shear zone and the influence of groundwater and reservoir operations.","topics":["slopes","rock","dams-levees","seepage","monitoring"],"country":"Italy","region":"Vajont Valley","owner":"Historic reservoir project / Italian public investigation","year":1963,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Rockslide back-analysis","Reservoir drawdown","Shear-zone strength"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"This is a forensic case, not a completed slope-remediation design. Competing geological interpretations remain relevant when selecting assumptions for back-analysis.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconstruct how alternative geological models change slope-stability decisions during reservoir filling.","inputs":["Compare published interpretations of the old slide mass and basal shear zone.","Compile a source-based sequence of reservoir levels, observations and movement."],"deliverables":["Perform coupled seepage/stability sensitivity studies for the competing models.","Write an observational decision plan with limits on reservoir operations and explicitly conservative triggers.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a good fit to one displacement episode fail to validate a unique failure mechanism?","What monitoring evidence would justify stopping filling before a deterministic factor of safety reaches one?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Vajont geological heritage and research context","url":"https://iugs-geoheritage.org/geoheritage_sites/vajont-landslide/","publisher":"International Union of Geological Sciences / case scientists","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Updated geological model of the prehistoric rockslide","url":"https://www.sciencedirect.com/science/article/pii/S0169555X12002048","publisher":"Paronuzzi and Bolla / Geomorphology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Vajont Dam landslide.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg","publisher":"Wikimedia Commons / US Army","year":1963,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"vajont-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/vajont-landslide/download/schematic"},{"id":"project-image","title":"Vajont Dam landslide.jpg","kind":"project-image","fileName":"vajont-landslide.jpg","mimeType":"image/jpeg","bytes":115238,"sha256":"101bf55fce288261b9be5350624ada515293ee27254dc4ea441259aa489fcb16","sourceId":"s3","license":"Public domain","width":800,"height":550,"credit":"US Army","sourceUrl":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg#Licensing","imageDate":"1963","evidenceFile":"image-provenance/vajont-landslide-commons.json","evidenceSha256":"5c02ae2fe38b9b323a7f6211233de9232d9a3ef4bd2bf62b925e09b40fcb24d2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f4/Vajont_Dam_landslide.jpg","downloadUrl":"/cases/vajont-landslide/download/project-image","originalSha1":"fdceebd3956b8ae854e0327568b91a20d76834f8","originalSha256":"101bf55fce288261b9be5350624ada515293ee27254dc4ea441259aa489fcb16","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"vajont-landslide-capstone.md","mimeType":"text/markdown","bytes":3153,"sha256":"def386340f1865b5b949a68cec0b779fa5789e9497ca974f589aa46aeb58ad98","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/vajont-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Vajont landslide in 1963.","caption":"The Vajont landslide in 1963. Historical US Army photograph showing the actual landslide and reservoir-dam setting.","credit":"US Army","sourceUrl":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg#Licensing","width":800,"height":550,"imageDate":"1963","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Vajont landslide in 1963. Historical US Army photograph showing the actual landslide and reservoir-dam setting.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":87,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/vajont-landslide-commons.json","evidenceSha256":"5c02ae2fe38b9b323a7f6211233de9232d9a3ef4bd2bf62b925e09b40fcb24d2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":119420,"sourceCount":3,"url":"/cases/vajont-landslide"},{"id":"love-canal","title":"Love Canal — containment cap and barrier drainage","summary":"The remedy contains waste beneath a cap and intercepts contaminated groundwater for treatment. EPA records describe the expanded synthetic cover, barrier drains and continuing inspection programme.","topics":["geoenvironmental","seepage","dewatering","monitoring"],"country":"United States","region":"Niagara Falls, New York","owner":"US EPA / New York State Department of Environmental Conservation","year":1985,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Composite cap","Barrier drains","Hydraulic containment"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The EPA site record and technical report describe constructed containment and operating components. Removal from a regulatory list does not mean the buried waste or maintenance requirements disappeared.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"EPA describes continuing operations, inspection and maintenance of the containment system.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate whether a containment remedy can maintain inward groundwater gradients under changing infiltration and pump performance.","inputs":["Extract the cap, trench and pumping arrangement from EPA’s report.","Distinguish site boundaries, capped footprint and the actual waste-disposal area."],"deliverables":["Prepare a water balance and capture-zone sensitivity study.","Design inspection priorities and failure-response actions for cap damage or pumping interruption.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What monitoring evidence would reveal a bypass around the barrier-drain system?","Why is a clean-looking surface not sufficient evidence of remedy performance?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Site cleanup and continuing operation","url":"https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0201290","publisher":"US Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Technical containment-system report","url":"https://semspub.epa.gov/work/02/534007.pdf","publisher":"US Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Looking into Love Canal.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","publisher":"Wikimedia Commons / Buffalutheran","year":2012,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"love-canal.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/love-canal/download/schematic"},{"id":"project-image","title":"Looking into Love Canal.jpg","kind":"project-image","fileName":"love-canal.jpg","mimeType":"image/jpeg","bytes":269116,"sha256":"96a2bf4eab0121fa484bdcd20caba1e9984c522c62cd60399ea71de5b086b32d","sourceId":"s3","license":"CC0","width":1280,"height":857,"credit":"Buffalutheran","sourceUrl":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2012-06-15","evidenceFile":"image-provenance/love-canal-commons.json","evidenceSha256":"d4d3d8a037738385c27b7d752567521ce0c0f66f401d7abb350d853fc3e8517e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/5e/Looking_into_Love_Canal.jpg","downloadUrl":"/cases/love-canal/download/project-image","originalSha1":"06e5138c9746943f5e099648990419918b5a1f5e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"love-canal-capstone.md","mimeType":"text/markdown","bytes":3097,"sha256":"9eafc46a13cafa86303fecdba9599259b4e8f1e29833f65a946bebc5ef4d8983","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/love-canal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"View into the Love Canal containment area in 2012.","caption":"View into the Love Canal containment area in 2012. This is the actual remediated site, where the buried waste and collection systems require continuing management.","credit":"Buffalutheran","sourceUrl":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":857,"imageDate":"2012-06-15","imageDownloadAllowed":true},"figureCaption":"View into the Love Canal containment area in 2012. This is the actual remediated site, where the buried waste and collection systems require continuing management.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":95,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/love-canal-commons.json","evidenceSha256":"d4d3d8a037738385c27b7d752567521ce0c0f66f401d7abb350d853fc3e8517e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":273204,"sourceCount":3,"url":"/cases/love-canal"},{"id":"sydney-olympic-remediation","title":"Sydney Olympic Park — engineered waste mounds and leachate management","summary":"Rehabilitated waste areas form parkland above engineered containment. The authority describes the continuing management of landfills and a wetland-based system for treating collected leachate.","topics":["geoenvironmental","seepage","earthworks","monitoring"],"country":"Australia","region":"Homebush Bay, New South Wales","owner":"Sydney Olympic Park Authority","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Waste containment","Leachate collection","Water balance","Post-closure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner explains the treatment strategy and the regulator specifies ongoing management obligations. Parkland use does not remove containment and monitoring duties.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The authority and regulator describe ongoing containment management rather than an unrestricted clean-soil site.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a post-remediation management plan that keeps recreational land use compatible with waste containment.","inputs":["Map the relationship between waste mounds, drainage and treatment from the owner description.","Identify obligations in the regulator’s ongoing maintenance order."],"deliverables":["Prepare a leachate water balance with wet and dry season scenarios.","Specify cap inspections, settlement surveys and action limits at public-use interfaces.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can changing irrigation practice affect both vegetation and leachate generation?","Which engineering responsibilities persist after a site opens as a public park?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Landfill leachate treatment","url":"https://www.sydneyolympicpark.nsw.gov.au/parklands/sustainability/innovative-landfill-waste-water-treatment","publisher":"Sydney Olympic Park Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Ongoing maintenance order amendment","url":"https://app.epa.nsw.gov.au/resources/clm/docs/html/n20224440.htm","publisher":"NSW Environment Protection Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Sydney Olympic Park, New South Wales (aerial view, 2010).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","publisher":"Wikimedia Commons / YellowMonkey","year":2010,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sydney-olympic-remediation.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sydney-olympic-remediation/download/schematic"},{"id":"project-image","title":"Sydney Olympic Park, New South Wales (aerial view, 2010).jpg","kind":"project-image","fileName":"sydney-olympic-remediation.jpg","mimeType":"image/jpeg","bytes":351233,"sha256":"a4369361c1b211df204b80c3292789fc5ea9a54345749b0befae6ac299d70882","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":889,"credit":"YellowMonkey","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2010-01-01","evidenceFile":"image-provenance/sydney-olympic-remediation-commons.json","evidenceSha256":"cdab9d43e8077cf22f651fc63274c75be0763dc1ba041684fa59ead7b5100639","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/c1/Sydney_Olympic_Park%2C_New_South_Wales_%28aerial_view%2C_2010%29.jpg","downloadUrl":"/cases/sydney-olympic-remediation/download/project-image","originalSha1":"e881304a765e0c1c4d5397317cab6c75eb67fb1e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sydney-olympic-remediation-capstone.md","mimeType":"text/markdown","bytes":3230,"sha256":"a6c0372ecc5957e69050d7a4744dcff5e6adc3be3c5a8d343ed4ef429a2157cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sydney-olympic-remediation/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Sydney Olympic Park in 2010.","caption":"Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.","credit":"YellowMonkey","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":889,"imageDate":"2010-01-01","imageDownloadAllowed":true},"figureCaption":"Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":96,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sydney-olympic-remediation-commons.json","evidenceSha256":"cdab9d43e8077cf22f651fc63274c75be0763dc1ba041684fa59ead7b5100639","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":355454,"sourceCount":3,"url":"/cases/sydney-olympic-remediation"},{"id":"one-new-change","title":"One New Change — basement effects on St Paul’s groundwater","summary":"Redevelopment beside St Paul’s Cathedral required assessment of groundwater changes in shallow deposits supporting the historic structure. The designer describes conceptual and numerical groundwater modeling followed by construction monitoring.","topics":["excavation","dewatering","shallow-foundations","monitoring"],"country":"United Kingdom","region":"City of London","owner":"Land Securities","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Groundwater modeling","Basement cutoff effects","Heritage monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Arup explains the groundwater model and observed construction response. The public account does not provide the full calibrated model or authorize unrestricted basement work near the cathedral.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The designer reports groundwater and structural monitoring during construction with negligible observed effect on the cathedral.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess whether a new basement diverts shallow groundwater enough to affect a neighboring heritage foundation.","inputs":["Extract the reported aquifer, foundation and basement relationships.","Identify man-made drainage and historic excavations that may change natural flow paths."],"deliverables":["Compare preconstruction and basement scenarios with recharge and permeability sensitivities.","Specify piezometers and structural surveys capable of distinguishing seasonal changes from construction effects.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can a watertight basement cause damaging groundwater change without active dewatering?","Which calibration observations are needed before trusting a model’s small predicted effect?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground engineering and groundwater protection at One New Change","url":"https://www.arup.com/en-us/projects/one-new-change/","publisher":"Arup","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"London - New Change - One New Change 2010 by Jean Nouvel - View West on St Paul's Cathedral 1697 by Sir Christopher Wren III.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","publisher":"Wikimedia Commons / Txllxt TxllxT","year":2011,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"one-new-change.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/one-new-change/download/schematic"},{"id":"project-image","title":"London - New Change - One New Change 2010 by Jean Nouvel - View West on St Paul's Cathedral 1697 by Sir Christopher Wren III.jpg","kind":"project-image","fileName":"one-new-change.jpg","mimeType":"image/jpeg","bytes":247667,"sha256":"9a6679e879bd9eb087a955a9593eea26025ed3624038d8b664b67ba27ee88c45","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Txllxt TxllxT","sourceUrl":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2011-06-20 14:27:18","evidenceFile":"image-provenance/one-new-change-commons.json","evidenceSha256":"6b3c5058ed26b68bc8857ee718d90dc0816f85f95f68c713496d1cdb57cb101d","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/38/London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","downloadUrl":"/cases/one-new-change/download/project-image","originalSha1":"241c5d5b01283a7a875ec9b5aa600bf482fccca1","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"one-new-change-capstone.md","mimeType":"text/markdown","bytes":3362,"sha256":"dfdc5008d7df14d8e08879a051b14fcd5dee3a5bb724e23de542d930e7f416e6","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/one-new-change/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"View from One New Change toward St Paul’s Cathedral.","caption":"View from One New Change toward St Paul’s Cathedral. The photograph shows the adjacent development and heritage structure whose groundwater interaction was assessed.","credit":"Txllxt TxllxT","sourceUrl":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2011-06-20 14:27:18","imageDownloadAllowed":true},"figureCaption":"View from One New Change toward St Paul’s Cathedral. The photograph shows the adjacent development and heritage structure whose groundwater interaction was assessed.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":98,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/one-new-change-commons.json","evidenceSha256":"6b3c5058ed26b68bc8857ee718d90dc0816f85f95f68c713496d1cdb57cb101d","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":252160,"sourceCount":2,"url":"/cases/one-new-change"},{"id":"northern-line-extension","title":"Northern Line Extension — settlement assessment and station-box interfaces","summary":"The extension combines bored tunnels with deep station boxes and nearby developments. Owner settlement commitments and designer accounts link prediction, condition surveys and construction monitoring.","topics":["tunnels","excavation","monitoring","lateral-foundations"],"country":"United Kingdom","region":"Kennington to Battersea, London","owner":"Transport for London","year":2021,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Settlement troughs","Building damage assessment","Diaphragm walls"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The environmental assessment is a design-stage screening document, while the designer reports built features and opening. Predicted settlement values must not be presented as measured outcomes.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The designer records passenger opening in September 2021; the settlement-assessment documents predate construction.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a staged settlement assessment for a tunnel approaching a station box beneath a dense urban neighborhood.","inputs":["Extract the screening assumptions and distinguish greenfield analysis from building interaction.","Identify the owner’s survey and monitoring commitments for affected properties."],"deliverables":["Calculate overlapping tunnel/box settlement envelopes with volume-loss sensitivity.","Propose building-specific follow-up analyses and monitoring/compensation arrangements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a conservative greenfield prediction be unsuitable as a direct building-damage estimate?","How should deep foundations crossing the tunnel influence the screening process?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground movement assessment","url":"https://content.tfl.gov.uk/nle-twa-environmental-statement-volume-iic-appendix-i-part-4-a17-4d.pdf","publisher":"Buro Happold / Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Settlement commitments","url":"https://tfl.gov.uk/cdn/static/cms/documents/commitment-1-settlement.pdf","publisher":"Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Designer project account","url":"https://www.mottmac.com/en/projects/northern-line-extension/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Northern line extension construction site, SW8.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","publisher":"Wikimedia Commons / sludgegulper","year":2016,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"northern-line-extension.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/schematic"},{"id":"project-image","title":"Northern line extension construction site, SW8.jpg","kind":"project-image","fileName":"northern-line-extension.jpg","mimeType":"image/jpeg","bytes":422345,"sha256":"f4462889444ce02b4c781ef4bbf522a5573244ce74ff062bf476cfbd50c698fd","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":1707,"credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2016-03-11 12:38:22","evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/3c/Northern_line_extension_construction_site%2C_SW8.jpg","downloadUrl":"/cases/northern-line-extension/download/project-image","originalSha1":"3806f56827ba3cb38637a262dcd624ef348b915e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"northern-line-extension-capstone.md","mimeType":"text/markdown","bytes":3319,"sha256":"cb2697c5975600fbf469eabdf4cd496ff91056b5d2ddf37e77b93a4e903f748f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Battersea station construction site for the Northern Line Extension.","caption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":1707,"imageDate":"2016-03-11 12:38:22","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":99,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":426789,"sourceCount":4,"url":"/cases/northern-line-extension"},{"id":"nicoll-highway","title":"Nicoll Highway collapse — excavation design and monitoring decisions","summary":"The official inquiry identified errors in retaining-wall and strut-connection design and failures to respond adequately to warning signs. The case joins ground-model selection, temporary-structure detailing and construction governance.","topics":["excavation","retaining-walls","monitoring","delivery"],"country":"Singapore","region":"Singapore","owner":"Singapore Land Transport Authority / Committee of Inquiry","year":2004,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Braced excavation","Undrained analysis","Strut connections","Trigger response"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The government executive summary supplies findings from the inquiry. It is not a complete finite-element input file or a basis for reproducing all trial evidence.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Audit a deep-excavation design and its monitoring response before allowing the next excavation stage.","inputs":["Separate wall-system assumptions from structural connection capacity in the inquiry findings.","Build a timeline of reported warnings and the decisions that followed."],"deliverables":["Compare appropriate undrained modeling assumptions and perform an independent brace-load check.","Write stop-work criteria and an escalation chain with accountable technical review.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can matching measured wall movement with a flawed back-analysis increase risk?","What should happen when instrumentation review levels are repeatedly exceeded?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Final Committee of Inquiry executive summary","url":"https://www.nas.gov.sg/archivesonline/data/pdfdoc/20050513987.pdf","publisher":"Singapore Ministry of Manpower / Committee of Inquiry","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Nicoll Highway collapse site 20240420 084318.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","publisher":"Wikimedia Commons / ZKang123","year":2024,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nicoll-highway.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nicoll-highway/download/schematic"},{"id":"project-image","title":"Nicoll Highway collapse site 20240420 084318.jpg","kind":"project-image","fileName":"nicoll-highway.jpg","mimeType":"image/jpeg","bytes":413344,"sha256":"01166dcd29cd06c988ce62bd23006a1e3c32242081861387a420c628f3da0c12","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ZKang123","sourceUrl":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2024-04-20 08:43:18","evidenceFile":"image-provenance/nicoll-highway-commons.json","evidenceSha256":"f602ded2258765be6bc19708d0174afcae8ed2a6c3f3ffb780c9a55f494a3199","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/30/Nicoll_Highway_collapse_site_20240420_084318.jpg","downloadUrl":"/cases/nicoll-highway/download/project-image","originalSha1":"25a928d56919a1390026c07139abffea22a64a07","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nicoll-highway-capstone.md","mimeType":"text/markdown","bytes":3033,"sha256":"86db0bc61b262d41febb7bd4f24e7935905a9c1323d16a6a05644e1c95c4ac99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nicoll-highway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Nicoll Highway collapse site photographed in April 2024.","caption":"The Nicoll Highway collapse site photographed in April 2024. The image identifies the location twenty years after the event and is not a photograph taken during the collapse.","credit":"ZKang123","sourceUrl":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2024-04-20 08:43:18","imageDownloadAllowed":true},"figureCaption":"The Nicoll Highway collapse site photographed in April 2024. The image identifies the location twenty years after the event and is not a photograph taken during the collapse.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":101,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nicoll-highway-commons.json","evidenceSha256":"f602ded2258765be6bc19708d0174afcae8ed2a6c3f3ffb780c9a55f494a3199","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":417508,"sourceCount":2,"url":"/cases/nicoll-highway"},{"id":"london-bank-station","title":"Bank station upgrade — tunnelling through existing pile zones","summary":"The capacity upgrade required new tunnels beside operating infrastructure and existing building piles. The designer describes staged building-impact assessment and a load-transfer solution that retained foundation reuse options.","topics":["tunnels","deep-foundations","lateral-foundations","monitoring"],"country":"United Kingdom","region":"City of London","owner":"London Underground","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Tunnel–pile interaction","Load transfer","Three-dimensional assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The impact-assessment engineer describes the pile interactions and modeling approach; the contractor records completion. Public summaries do not include every building-specific check.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The contractor records project completion in February 2023; the designer’s earlier timeframe refers to its own service scope.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess a new tunnel intersecting the influence zone of existing piled foundations without assuming the building can be demolished.","inputs":["Extract the reported pile types and identify which are directly intercepted.","Separate empirical screening from the later three-dimensional assessment."],"deliverables":["Compare pile load redistribution and building movement for alternative tunnel sequences.","Design a conceptual load-transfer structure with monitoring and verification hold points.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When is a greenfield settlement trough insufficient for a piled building?","How can a retrofit preserve future foundation reuse while controlling present construction risk?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Building impact assessment for Bank station","url":"https://www.dr-sauer.com/projects/bank-station-capacity-upgrade-building-impact-assessment","publisher":"Dr. Sauer & Partners","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Completed station upgrade","url":"https://www.dragados.com/en/our-experience/our-projects/bank-station-capacity-upgrade","publisher":"Dragados","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"BSCU - Bank Station Cannon Street Entrance - Cannon Street, February 2023 44.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","publisher":"Wikimedia Commons / TheFrog001","year":2023,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"london-bank-station.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/london-bank-station/download/schematic"},{"id":"project-image","title":"BSCU - Bank Station Cannon Street Entrance - Cannon Street, February 2023 44.jpg","kind":"project-image","fileName":"london-bank-station.jpg","mimeType":"image/jpeg","bytes":288002,"sha256":"210ae3c5517a74552a2a317efa775f15a1f01c5798ac06246add01986e509bad","sourceId":"s3","license":"CC0","width":1280,"height":960,"credit":"TheFrog001","sourceUrl":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2023-02-28 17:58:12","evidenceFile":"image-provenance/london-bank-station-commons.json","evidenceSha256":"e9420ca11e7ffb2e72446888c3e2ff14821e3f56f03075e35c0a3794e59297f7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f5/BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street%2C_February_2023_44.jpg","downloadUrl":"/cases/london-bank-station/download/project-image","originalSha1":"ee0124a274c02d78077408d5ddfe9242f19638bc","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"london-bank-station-capstone.md","mimeType":"text/markdown","bytes":3302,"sha256":"7481286fea1cc7b54d484a2ad7211302e6236d1c1ecf4f59f7f4b0c2a949b9fa","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/london-bank-station/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The new Cannon Street entrance to Bank station in February 2023.","caption":"The new Cannon Street entrance to Bank station in February 2023. The photograph shows the actual capacity-upgrade project after completion of the new entrance.","credit":"TheFrog001","sourceUrl":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":960,"imageDate":"2023-02-28 17:58:12","imageDownloadAllowed":true},"figureCaption":"The new Cannon Street entrance to Bank station in February 2023. The photograph shows the actual capacity-upgrade project after completion of the new entrance.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":102,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/london-bank-station-commons.json","evidenceSha256":"e9420ca11e7ffb2e72446888c3e2ff14821e3f56f03075e35c0a3794e59297f7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":292429,"sourceCount":3,"url":"/cases/london-bank-station"},{"id":"eth-honggerberg","title":"ETH Hönggerberg — seasonal borehole heat storage","summary":"The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.","topics":["geothermal","site-investigation","dewatering","monitoring","delivery"],"country":"Switzerland","region":"Zurich","owner":"ETH Zurich","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Borehole heat exchangers","Seasonal thermal storage","Thermal interference","Construction staging"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"ETH documents 160 additional probes at 200 m depth on a 5 m grid, beside an existing field of 126 probes. The published project description supports layout and heat-balance studies; it does not supply a complete thermal-response test dataset.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner dates HC4 expansion drilling to October 2024–May 2025 and operational handover to July 2025. Later proposed fields are outside this completed expansion.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The owner confirms connection of the enlarged HC4 field to the campus network; continuous raw operating data and final drilling records were not provided on the reviewed pages.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased borehole-field expansion for an operating campus and test whether spacing, ground properties and annual heat imbalance control the design.","inputs":["Use the published HC4 depth, spacing and probe counts; assemble an explicitly labelled study load series for heating and cooling.","Identify borehole logs, groundwater flow, thermal conductivity and borehole-resistance measurements still needed before design."],"deliverables":["Compare a line-source screening calculation with a multi-borehole response model under balanced and unbalanced annual loads.","Lay out drilling access, buried services, grouting verification, commissioning tests and long-term temperature monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would persistent net heat injection change performance even if the first operating year meets the heating and cooling demand?","What additional thermal-response or groundwater observations would justify reducing uncertainty at the 5 m borehole spacing?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"HC4 geothermal probe-field expansion and commissioning","url":"https://ethz.ch/staffnet/en/news-and-events/internal-news/archive/2025/08/hoenggerberg-campus-becomes-more-sustainable-above-and-below-ground.html","publisher":"ETH Zurich Real Estate Management","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Energy supply and the campus anergy grid","url":"https://ethz.ch/en/the-eth-zurich/organisation/departments/engineering-and-systems/energie.html","publisher":"ETH Zurich","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ETH Hönggerberg campus, seen from Hönggerbergstrasse.jpg","url":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","publisher":"Balise42","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eth-honggerberg.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eth-honggerberg-reference-values.csv","mimeType":"text/csv","bytes":1393,"sha256":"0746df014858f90951177b8dd60717dcd4fd0c62a7496d26412f00d0525e7c28","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eth-honggerberg/download/reference-values"},{"id":"project-image","title":"ETH Hönggerberg campus — setting of the anergy grid","kind":"project-image","fileName":"eth-honggerberg.jpg","mimeType":"image/jpeg","bytes":299237,"sha256":"3bfed12bb7a9484ceb0020eb752234d62054091b0f07478ee2a2b3a9b01c5ce9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":854,"credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-09-16 10:13:12","evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/94/ETH_H%C3%B6nggerberg_campus%2C_seen_from_H%C3%B6nggerbergstrasse.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eth-honggerberg/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eth-honggerberg-capstone.md","mimeType":"text/markdown","bytes":5102,"sha256":"e859f8b70fe4a7e15e0b6156c663fbf6c8ef78fcddde30913231a93546dc88b4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","caption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":854,"imageDate":"2023-09-16 10:13:12","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":103,"referenceValues":[{"label":"Added HC4 probes","value":160,"unit":"probes","scope":"HC4 expansion drilled October 2024–May 2025.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported probe depth","value":200,"unit":"m","scope":"New HC4 geothermal probes; do not infer the full site stratigraphy.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported grid spacing","value":5,"unit":"m","scope":"Spacing stated for the HC4 expansion.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Existing HC4 probes","value":126,"unit":"probes","scope":"Pre-expansion field, distinct from the 160 additional probes.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":306789,"sourceCount":3,"url":"/cases/eth-honggerberg"},{"id":"arlanda-aquifer","title":"Stockholm Arlanda — aquifer thermal energy storage","summary":"The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.","topics":["geothermal","dewatering","site-investigation","monitoring"],"country":"Sweden","region":"Stockholm Arlanda Airport","owner":"Swedavia","year":2009,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Aquifer thermal energy storage","Pumping and reinjection","Thermal plume transport","Water balance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Swedavia describes seasonal circulation through the Brunkebergsåsen aquifer, reinjection of the extracted volume and uses for recovered heat. Detailed well construction, transmissivity and monitoring time series must be obtained separately.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports that the aquifer system began operation in summer 2009.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The owner describes the operating principle and an annual energy-reduction estimate. Treat that estimate as an owner-reported system value, not an independently reproduced geotechnical result.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Size a conceptual paired-well seasonal storage system for an airport, keeping hydraulic interference, heat migration and groundwater protection visible in the design.","inputs":["Establish an assumed stratigraphic section and transmissivity range, clearly separated from the owner’s published system description.","Build seasonal heating/cooling loads and identify water-quality limits, abstraction permissions and nearby receptors."],"deliverables":["Calculate pumping drawdown, reinjection mounding and a first thermal travel-time estimate, then test sensitivity to groundwater flow.","Prepare a well spacing concept, mass/energy balance, monitoring network and recovery-efficiency evaluation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How could returning the same volume of groundwater still change temperatures or groundwater quality outside the intended storage zone?","Which combination of pumping tests and thermal tracers would best distinguish inadequate transmissivity from early thermal breakthrough?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"The aquifer — owner explanation of airport seasonal storage","url":"https://www.swedavia.com/about-swedavia/the-aquifer/","publisher":"Swedavia","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Stockholm-Arlanda Airport aerial view.JPG","url":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","publisher":"Nemracc","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"arlanda-aquifer.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/arlanda-aquifer/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"arlanda-aquifer-reference-values.csv","mimeType":"text/csv","bytes":375,"sha256":"8a4f1706bee52daf9c8d4a97180a76295841b01271e437878d6c32986279c518","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/arlanda-aquifer/download/reference-values"},{"id":"project-image","title":"Stockholm Arlanda Airport — aerial site view","kind":"project-image","fileName":"arlanda-aquifer.jpg","mimeType":"image/jpeg","bytes":268995,"sha256":"a4465724499f43a3e188c68f6d065eb106cf5d3e7abddf0469b56d0789048f8a","sourceId":"s2","license":"CC BY-SA 3.0","width":1269,"height":650,"credit":"Nemracc / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-01-11 08:37:35","evidenceFile":"image-provenance/arlanda-aquifer-r14-source.json","evidenceSha256":"fbacca4ee162dee050c65db5b09456023adf2f565c6392f39bea524e93cbd441","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f2/Stockholm-Arlanda_Airport_aerial_view.JPG?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/arlanda-aquifer/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"arlanda-aquifer-capstone.md","mimeType":"text/markdown","bytes":3872,"sha256":"f9b0bd622d058575a97b9b95083312cd054f93e88a524a051a0178d17246b6ff","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/arlanda-aquifer/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","caption":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","credit":"Nemracc / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1269,"height":650,"imageDate":"2008-01-11 08:37:35","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":104,"referenceValues":[{"label":"Owner-reported annual energy reduction","value":19,"unit":"GWh/year","scope":"Airport system estimate from the owner description; not a measured heat-pump COP.","sourceId":"s1","locator":"Annual energy reduction","basis":"Owner-reported estimate; no independent performance reconstruction or guarantee implied."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/arlanda-aquifer-r14-source.json","evidenceSha256":"fbacca4ee162dee050c65db5b09456023adf2f565c6392f39bea524e93cbd441","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":274299,"sourceCount":2,"url":"/cases/arlanda-aquifer"},{"id":"heerlen-minewater","title":"Heerlen — heat recovery and storage in flooded mines","summary":"Flooded coal-mine workings provide thermal resources and storage for a district network. Published project accounts explain the transition from extracting mine heat to exchanging and regenerating it through building clusters.","topics":["geothermal","rock","dewatering","geoenvironmental","monitoring"],"country":"Netherlands","region":"Heerlen, Limburg","owner":"Mijnwater / Municipality of Heerlen","year":2014,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Mine-water heat recovery","Coupled groundwater and heat transport","Thermal regeneration","Mine-void risk assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project paper describes Minewater 2.0 and the STORM demonstrator documents hot, cold and reinjection wells. Mine connectivity, well condition, water chemistry and pressure limits remain site-specific inputs for any new scheme.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The project paper identifies pilot operation from October 2008 and the first Minewater 2.0 phase from June 2013.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The STORM project records staged controller deployment and monitoring at the Heerlen demonstration site; it is not a complete mine-closure or well-acceptance dossier.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a hydrothermal operating concept for a flooded-mine network, with explicit mine-stability, water-quality and seasonal heat-recovery constraints.","inputs":["Trace the reported hot/cold-well arrangement and distinguish the original pilot from the later cluster network.","Assemble mine plans, hydraulic connections, pumping response and chemistry data; document gaps instead of assuming a uniform porous aquifer."],"deliverables":["Construct a reduced network water/heat balance and test thermal short-circuiting and seasonal regeneration scenarios.","Prepare well-integrity, mine-stability and water-quality monitoring plans with operating limits and contingency actions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a system that initially supplies heat become unsustainable if recharge and heat exchange are ignored?","How would a poorly mapped mine connection alter pumping response, thermal breakthrough and the choice of observation wells?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Minewater 2.0 — project authors’ account","url":"https://www.sciencedirect.com/science/article/pii/S187661021400174X","publisher":"Verhoeven et al. / Energy Procedia","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Heerlen demonstration site and well/network configuration","url":"https://storm-dhc.eu/en/mijnwater-bv-site","publisher":"STORM project / VITO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Heerlerheide Schacht ONIII (1).jpg","url":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","publisher":"Hans Erren","year":2012,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"heerlen-minewater.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/heerlen-minewater/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"heerlen-minewater-reference-values.csv","mimeType":"text/csv","bytes":532,"sha256":"a2efc312f0bbcd2b120f9231b984aff1643b05c6e92016837cfe49dfb2cbceb2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/heerlen-minewater/download/reference-values"},{"id":"project-image","title":"Heerlerheide — former Oranje-Nassau III mine shaft","kind":"project-image","fileName":"heerlen-minewater.jpg","mimeType":"image/jpeg","bytes":333440,"sha256":"baa063d001e8d1878b3fcb4bc810e00f26ce5b5768ff10ffafb48b0cde985468","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":648,"credit":"Hans Erren / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2012-08-01 18:48:42","evidenceFile":"image-provenance/heerlen-minewater-r14-source.json","evidenceSha256":"ead9774990be9695ae89799195ff0a7032b9f83c5146cdf65c8ff6331c92f048","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Heerlerheide_Schacht_ONIII_%281%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/heerlen-minewater/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"heerlen-minewater-capstone.md","mimeType":"text/markdown","bytes":4155,"sha256":"3757cab5372b656f41e48fd4cc3e273c7a8e68bc26af1ec2053b87ecd31e0fde","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/heerlen-minewater/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","caption":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","credit":"Hans Erren / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Heerlerheide_Schacht_ONIII_(1).jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":648,"imageDate":"2012-08-01 18:48:42","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The marked former Oranje-Nassau III shaft in Heerlerheide, part of the mining legacy underlying the Heerlen minewater project. This is a historic mine-site feature, not a photograph of an operational heat-extraction well.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":105,"referenceValues":[{"label":"Hot-well temperature","value":28,"unit":"°C","scope":"Two hot wells in the documented STORM demonstration configuration.","sourceId":"s2","locator":"Site description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Cold-well temperature","value":16,"unit":"°C","scope":"Two cold wells in the documented STORM demonstration configuration.","sourceId":"s2","locator":"Site description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/heerlen-minewater-r14-source.json","evidenceSha256":"ead9774990be9695ae89799195ff0a7032b9f83c5146cdf65c8ff6331c92f048","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":339184,"sourceCount":3,"url":"/cases/heerlen-minewater"},{"id":"halley-vi","title":"Halley VI — relocatable foundations on accumulating snow","summary":"The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.","topics":["cold-regions","shallow-foundations","settlement","monitoring","delivery"],"country":"Antarctica","region":"Brunt Ice Shelf, Antarctica","owner":"British Antarctic Survey","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow bearing and creep","Jackable foundations","Differential movement","Relocation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"BAS documents the hydraulic-leg concept, seasonal raising procedure and 2016/17 relocation. Ground support is deformable snow/ice, so a conventional soil bearing-capacity calculation alone does not represent the governing behaviour.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"BAS records relocation to a new site during the 2016/17 Antarctic season.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"BAS publishes operational descriptions of raising and maintaining the station. A complete calibrated snow-foundation model and support-load register are not supplied.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an operating and lifting plan for a modular station on snow, explicitly separating creep settlement, drifting accumulation and large-scale ice-shelf movement.","inputs":["Extract the actual support arrangement and raising sequence from BAS material.","Define a labelled study range for snow density, creep response, wind/drift loading and allowable module distortion."],"deliverables":["Compare support pressure and time-dependent movement for alternative ski contact areas and raising intervals.","Prepare a one-leg-at-a-time lifting sequence, temporary support checks, survey tolerances and relocation triggers.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can increasing foundation contact area reduce bearing pressure yet leave annual raising and relocation necessary?","How would uneven snow placement beneath one leg appear in level surveys, and how could it be distinguished from a drifting snow-surface change?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Halley VI Research Station — facility and support system","url":"https://www.bas.ac.uk/polar-operations/sites-and-facilities/facility/halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Halley Research Station relocation","url":"https://www.bas.ac.uk/project/moving-halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Preparing Halley VI for winter — annual raising operations","url":"https://www.bas.ac.uk/blogpost/seasons-end-hibernating-halley-vi-for-the-winter/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Halley VI Antarctic Research Station - view from North East.jpg","url":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","publisher":"Hugh Broughton Architects","year":2012,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"halley-vi.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/schematic"},{"id":"project-image","title":"Halley VI — raised modular research station","kind":"project-image","fileName":"halley-vi.jpg","mimeType":"image/jpeg","bytes":118311,"sha256":"daf2edd100b8853181848248a42315aa652f50e61d8c92c94f7b17560bc5e234","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2012-02-23 23:15:19","evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b1/Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/halley-vi/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"halley-vi-capstone.md","mimeType":"text/markdown","bytes":3692,"sha256":"9819e7bcf0b22239b8d6f67c7382c97ac1900cc0daccdb36464ab15043bcb185","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","caption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2012-02-23 23:15:19","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":107,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":122971,"sourceCount":4,"url":"/cases/halley-vi"},{"id":"south-pole-station","title":"South Pole Station — snow-foundation settlement and levelling","summary":"The elevated station experiences nonuniform support-column settlement in deep permanent snow. USACE reports analyze surveys, floor levelness and maintenance decisions, making a useful observational-design case.","topics":["cold-regions","settlement","shallow-foundations","monitoring","laboratory-testing"],"country":"Antarctica","region":"Geographic South Pole","owner":"National Science Foundation / U.S. Antarctic Program","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow creep settlement","Survey adjustment","Differential settlement","Maintenance prediction"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The 2019 CRREL study evaluates column surveys and shimming, while the 2025 master plan describes continued monitoring and future lifting needs. These dated records should remain distinct from a new design assumption or a claim that a planned major lift has occurred.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The 2019 report provides support-column analysis. The 2025 plan describes 32 supporting columns, recurring surveys and future lifting requirements; it does not certify that a lift has already been completed.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Use the public support-column study to develop a forecast-and-levelling workflow for an elevated structure on compressible snow.","inputs":["Extract column identifiers, survey dates, reference levels and documented shimming events from the CRREL report.","Separate snow-surface accumulation from foundation movement and account for staged construction and unequal column loads."],"deliverables":["Fit a transparent settlement forecast with residual and extrapolation checks; compare the prediction with withheld survey dates if available.","Produce a floor-levelness map, column-priority list and maintenance decision rule with survey uncertainty.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How could a survey reference that moves with the snowpack distort a long-term foundation settlement assessment?","Which evidence would justify a major building lift instead of continued local shimming, and what data would a planner need to schedule it?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Analysis of recent support-column survey results — ERDC/CRREL SR-19-3","url":"https://www.erdc.usace.army.mil/Media/Publication-Notices/Article/1897499/publication-notice-analysis-of-recent-support-column-survey-results-for-the-ele/","publisher":"Blaisdell, Weale and Barna / USACE CRREL","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"South Pole Station Master Plan, 2025","url":"https://www.usap.gov/news/documents/SouthPoleMasterPlan.pdf","publisher":"U.S. Antarctic Program / National Science Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Amundsen-scott-south pole station 2007.jpg","url":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","publisher":"Bill Spindler, U.S. Antarctic Program, National Science Foundation","year":2008,"access":"public-link","license":"Public domain","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"south-pole-station.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/south-pole-station/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"south-pole-station-reference-values.csv","mimeType":"text/csv","bytes":388,"sha256":"32fad7f12be05aeb15f9c891c912b2289a32149d761d154bf07f70b1e4af4db0","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/south-pole-station/download/reference-values"},{"id":"project-image","title":"Amundsen–Scott South Pole Station — elevated facility","kind":"project-image","fileName":"south-pole-station.jpg","mimeType":"image/jpeg","bytes":293744,"sha256":"75b10c9ceee46be2a59db22cfabcbd129f5fa6431f92863bde15db9d21a27517","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"Bill Spindler, U.S. Antarctic Program, National Science Foundation / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","imageDate":"2008-02","evidenceFile":"image-provenance/south-pole-station-r14-source.json","evidenceSha256":"3538e99d4ef6c9ac2e03bda2557ab5de9b5f0a17ddf1f11ca501b96202e5c8c1","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/91/Amundsen-scott-south_pole_station_2007.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/south-pole-station/download/project-image","imageDownloadAllowed":true,"rightsStatus":"public-domain","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"south-pole-station-capstone.md","mimeType":"text/markdown","bytes":4423,"sha256":"987067e31bfc68faa4f9f4165f8cd5ebfce8a2b5425dda599cdedee3eac08a35","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/south-pole-station/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","caption":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","credit":"Bill Spindler, U.S. Antarctic Program, National Science Foundation / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","width":1280,"height":960,"imageDate":"2008-02","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"public-domain"},"figureCaption":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","qualityNotes":["The 2019 CRREL support-column report is indexed at the official publication notice, but its download host denied access during this review. The station master plan is a separate linked source."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":108,"referenceValues":[{"label":"Elevated-station support columns","value":32,"unit":"columns","scope":"Support-column count in the 2025 master plan; this does not specify a uniform load distribution.","sourceId":"s2","locator":"Elevated Station / foundation levelling","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/south-pole-station-r14-source.json","evidenceSha256":"3538e99d4ef6c9ac2e03bda2557ab5de9b5f0a17ddf1f11ca501b96202e5c8c1","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":299523,"sourceCount":3,"url":"/cases/south-pole-station"},{"id":"glenwood-canyon","title":"Glenwood Canyon — reinforced walls on compressible foundations","summary":"Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.","topics":["reinforced-soil","retaining-walls","settlement","monitoring","earthworks","delivery"],"country":"United States","region":"I-70, Colorado","owner":"Colorado Department of Transportation","year":1992,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geosynthetic-reinforced soil","Foundation consolidation","Staged facing","Instrumented performance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The CDOT research synthesis describes the instrumented Glenwood Canyon GRS test wall and long-term differential settlement. A separate 1988 wall study addresses staged facing installation. These are distinct wall experiments within the corridor and should not be combined into one fictitious section.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT dates final-corridor construction to 1980–1992. The selected experimental wall has its own earlier construction and monitoring dates.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The technical report gives measured reinforced-wall performance; the owner history records completion of the broader corridor.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select one documented Glenwood Canyon reinforced-wall section and reconcile its reinforcement response with foundation settlement and facing movements.","inputs":["Identify the chosen test section, reinforcement, fill and underlying compressible profile in the technical report.","Compile displacement and settlement observations with dates; keep results from other wall systems in a separate comparison."],"deliverables":["Check reinforcement/internal stability separately from foundation settlement and global stability.","Compare single-stage construction with delayed permanent facing, including drainage and survey control.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a reinforced-soil mass remain stable while differential foundation settlement still creates unacceptable facing movement?","Which measured response would distinguish reinforcement stretching from compression of the underlying lacustrine deposits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of reinforced-soil structures — Glenwood Canyon case section","url":"https://rosap.ntl.bts.gov/view/dot/42215/dot_42215_DS1.pdf","publisher":"Colorado Department of Transportation / FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Embankment settlement in Glenwood Canyon — CDOH-DTD-R-88-8","url":"https://trid.trb.org/View/286942","publisher":"Colorado Department of Highways / FHWA; TRB record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"I-70 Glenwood Canyon project history","url":"https://www.codot.gov/about/CDOTHistory/50th-anniversary/glenwood-canyon","publisher":"Colorado Department of Transportation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"I-70 Glenwood Canyon-terabass.jpg","url":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","publisher":"Terabass","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glenwood-canyon.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/schematic"},{"id":"project-image","title":"I-70 in Glenwood Canyon — constrained highway corridor","kind":"project-image","fileName":"glenwood-canyon.jpg","mimeType":"image/jpeg","bytes":369614,"sha256":"363c30effe911ccd3b235683fa83b24984de39d8dd378c8e8921a3d3603a11d1","sourceId":"s4","license":"CC BY-SA 3.0","width":1280,"height":854,"credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-09-09","evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/62/I-70_Glenwood_Canyon-terabass.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/glenwood-canyon/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glenwood-canyon-capstone.md","mimeType":"text/markdown","bytes":3767,"sha256":"ab9a0c2f868a5433e8f7ca3687d87cab146c6924c87f98c0e922a89e18ea1cc5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","caption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":854,"imageDate":"2009-09-09","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","qualityNotes":["The corridor photograph is site context; the buried conditions and reinforcement are established by the selected report section, not by the photograph."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":109,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":374502,"sourceCount":4,"url":"/cases/glenwood-canyon"},{"id":"rocky-flats","title":"Rocky Flats — engineered covers and long-term groundwater care","summary":"The remediated site retains engineered landfill covers, groundwater collection/treatment systems and long-term inspections. Public surveillance records support a capstone on containment performance after closure.","topics":["geoenvironmental","seepage","slopes","earthworks","monitoring"],"country":"United States","region":"Colorado Front Range","owner":"U.S. Department of Energy, Office of Legacy Management","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Landfill-cover water balance","Infiltration control","Cover-slope stability","Groundwater monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"DOE records distinguish the Original and Present Landfills and the associated water-management systems. Select a specific unit before evaluating infiltration, cover stability or treatment performance; site-wide cleanup is not evidence that all residual hazards were removed.","sourceIds":["s1","s2","s3","s4"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The May 2026 DOE fact sheet separates the 2005 physical closure from continuing cover maintenance, groundwater treatment and monitoring. The owner also lists a new five-year remedy review due in 2027; that future review is not a completed record.","sourceIds":["s1","s2","s3","s4"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess one documented cover or groundwater-control unit and design an inspection-and-maintenance programme that can identify declining performance.","inputs":["Select a dated DOE cover inspection, groundwater record and corresponding remedy description.","Assemble precipitation, runoff pathways, cover stratigraphy and measured movements where public; label any substituted parameters."],"deliverables":["Evaluate cover infiltration and stability under normal operation, blocked drainage and a severe precipitation scenario.","Prepare a monitoring dashboard specification, repair triggers and a long-term maintenance cost model using current study rates.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a vegetated cover appear healthy while preferential seepage or a slope movement is degrading its containment function?","Which measurements would reveal whether a groundwater change originates at the cover, the collection system or regional recharge?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Rocky Flats Site — remedy and stewardship responsibilities","url":"https://www.energy.gov/lm/rocky-flats-site-colorado","publisher":"U.S. Department of Energy","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Rocky Flats key document archive — monitoring and inspections","url":"https://www.energy.gov/lm/rocky-flats-site-colorado-key-document-archive","publisher":"U.S. Department of Energy","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Original Landfill inspection-frequency contact record, 2025-03","url":"https://lmpublicsearch.lm.doe.gov/LMSites/RFLMA%20CR%202025-03.pdf","publisher":"U.S. Department of Energy / Rocky Flats regulators","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Rocky Flats Site fact sheet, May 2026","url":"https://www.energy.gov/documents/rocky-flats-site-colorado-fact-sheet","publisher":"U.S. Department of Energy, Office of Legacy Management","year":null,"access":"public-link","license":"US Department of Energy public-domain publication; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["rocky-flats-factsheet-2026"]},{"id":"s5","title":"Aerial View of Rocky Flats in 2007 (14597931675).jpg","url":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","publisher":"USEPA Environmental-Protection-Agency","year":2014,"access":"public-link","license":"Public domain","notes":"Project image source. Publisher-native 300 × 210 JPEG retained unchanged; no local upscaling, crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rocky-flats.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rocky-flats/download/schematic"},{"id":"rocky-flats-factsheet-2026","title":"Rocky Flats Site, Colorado — DOE fact sheet, May 2026","kind":"report","fileName":"rocky-flats-factsheet-2026.pdf","mimeType":"application/pdf","bytes":4278537,"sha256":"fa3fa6e60923be177cdc512bb53099361d20a3b2441ffa0f3507cb9e85b93121","sourceId":"s4","license":"US Department of Energy public-domain publication; original credits retained","rightsUrl":"https://www.energy.gov/web-policies","rightsBasis":"DOE-authored site fact sheet; DOE web policy permits distribution of government information. The four-page original has no separate third-party copyright notice and is retained unchanged with all credits.","rightsEvidenceUrl":"https://www.energy.gov/web-policies","pages":4,"downloadUrl":"/cases/rocky-flats/download/rocky-flats-factsheet-2026"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"rocky-flats-reference-values.csv","mimeType":"text/csv","bytes":1032,"sha256":"f58cae5cc633707ae1377b8d404c0a00e3a111a42ea49d3940b22d5e32a1c361","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/rocky-flats/download/reference-values"},{"id":"project-image","title":"Rocky Flats — site after building removal","kind":"project-image","fileName":"rocky-flats.jpg","mimeType":"image/jpeg","bytes":26010,"sha256":"8437d2bc32ef137793a3f53dca6f25f0fa81eaf9f810bdce49c02f5612c24dd1","sourceId":"s5","license":"Public domain","width":300,"height":210,"credit":"USEPA Environmental-Protection-Agency / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","imageDate":"2014-07-07 13:46","evidenceFile":"image-provenance/rocky-flats-r14-source.json","evidenceSha256":"9f571755569d1dbcea1f0b130b2d172dac5094df7de004c5c58c4c33c1adb3f5","transformations":"Publisher-native 300 × 210 JPEG retained unchanged; no local upscaling, crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/45/Aerial_View_of_Rocky_Flats_in_2007_%2814597931675%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/rocky-flats/download/project-image","imageDownloadAllowed":true,"rightsStatus":"public-domain","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rocky-flats-capstone.md","mimeType":"text/markdown","bytes":5243,"sha256":"e18c9ea27f777db1cc3f999ea5b03b616ef943c524086271527cb86314ec28c3","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rocky-flats/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","caption":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","credit":"USEPA Environmental-Protection-Agency / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","width":300,"height":210,"imageDate":"2014-07-07 13:46","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"public-domain"},"figureCaption":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","qualityNotes":["The local DOE fact sheet describes the remedy and ongoing responsibilities. Final cover cross-sections and monitoring time series remain in the linked site archive."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":110,"referenceValues":[{"label":"Closed landfills under continuing care","value":2,"unit":"landfills","scope":"DOE Office of Legacy Management responsibilities as described in May 2026.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."},{"label":"Groundwater collection systems","value":4,"unit":"systems","scope":"Continuing collection-system responsibilities, separate from treatment-system count.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."},{"label":"Groundwater treatment systems","value":3,"unit":"systems","scope":"Continuing treatment-system responsibilities; not four because collection and treatment are different systems.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rocky-flats-r14-source.json","evidenceSha256":"9f571755569d1dbcea1f0b130b2d172dac5094df7de004c5c58c4c33c1adb3f5","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":4311813,"sourceCount":5,"url":"/cases/rocky-flats"},{"id":"berkeley-pit","title":"Berkeley Pit — mine flooding and hydraulic containment","summary":"The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.","topics":["geoenvironmental","dewatering","rock","seepage","monitoring"],"country":"United States","region":"Butte, Montana","owner":"EPA oversight / responsible mining parties","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Mine-water balance","Hydraulic containment","Pumping and treatment","Monitoring interpretation"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"EPA identifies the Butte Mine Flooding operable unit and continuing treatment. The official monitoring archive provides dated discharge reports; pit water, connected mine water and surrounding aquifers must be represented as a connected system.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Public discharge reports and EPA status material document continuing treatment and monitoring. They are dated operational records, not evidence that treatment can be discontinued.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a water-balance and containment assessment for the flooded mine, with sensitivity to uncertain inflow and temporary treatment interruption.","inputs":["Use a dated monthly monitoring report for observed discharge and compliance data.","Identify pit and mine-water levels, the relevant control elevation and its datum, and unmeasured groundwater exchanges."],"deliverables":["Build a time-dependent storage/pumping model that distinguishes observations, calibrated flows and conservative assumptions.","Develop outage scenarios, monitoring triggers and a recovery pumping strategy with treatment-capacity constraints.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would a stable pit level conceal a change in groundwater capture or treatment demand?","What evidence is needed before comparing a reported control elevation with survey data recorded in a different vertical datum?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Current site status — Butte Mine Flooding OU3","url":"https://www.epa.gov/butte/current-site-status","publisher":"U.S. Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"January 2025 monthly discharge monitoring report","url":"https://digitalcommons.mtech.edu/superfund_silverbowbutte/1282/","publisher":"Thompson and Griffis / Montana Technological University archive","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Berkeley Pit water-treatment explanation","url":"https://pitwatch.org/learn/water-treatment/","publisher":"PitWatch / Butte Mine Flooding information programme","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"2013 Berkeley Pit, Butte, Montana (1).jpg","url":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","publisher":"Chris06","year":2013,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"berkeley-pit.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/berkeley-pit/download/schematic"},{"id":"project-image","title":"Berkeley Pit — flooded mine excavation","kind":"project-image","fileName":"berkeley-pit.jpg","mimeType":"image/jpeg","bytes":297779,"sha256":"27b5d65db09c4b1d2ba719119c2740d3cb439ae5250b4e5c9ace6f2032d4f473","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":903,"credit":"Chris06 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2013-08-03","evidenceFile":"image-provenance/berkeley-pit-r14-source.json","evidenceSha256":"8258faad4b0bffb33e50f379f8fc7e4acf937b5946609c3dc163c7733f9ca2b8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a8/2013_Berkeley_Pit%2C_Butte%2C_Montana_%281%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/berkeley-pit/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"berkeley-pit-capstone.md","mimeType":"text/markdown","bytes":3653,"sha256":"a8e1cd9696e424949050088262199d4660028a778e7daa8a242dd143c1df072d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/berkeley-pit/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","caption":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","credit":"Chris06 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":903,"imageDate":"2013-08-03","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":111,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/berkeley-pit-r14-source.json","evidenceSha256":"8258faad4b0bffb33e50f379f8fc7e4acf937b5946609c3dc163c7733f9ca2b8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":302423,"sourceCount":4,"url":"/cases/berkeley-pit"},{"id":"sutong-bridge","title":"Sutong Bridge — deep pile groups and riverbed scour protection","summary":"The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.","topics":["deep-foundations","lateral-foundations","scour-erosion","site-investigation","monitoring","coastal-offshore"],"country":"China","region":"Yangtze River, Jiangsu","owner":"Sutong Bridge project authorities","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Large drilled-shaft groups","Post-grouting","Group interaction","Scour protection","Cofferdams"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The foundation papers describe 131 shafts beneath each main pylon, project-specific test/model evidence and construction methods. Published pile dimensions and group coefficients apply to the stated foundation and cannot be adopted as universal design factors.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The source papers include pile testing, model studies and field-monitoring comparisons, while a complete current inspection and as-built record set was not established.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coupled foundation-and-scour assessment for one Sutong main pylon, preserving the distinction between individual-pile testing and group response.","inputs":["Select the north or south foundation and retain its own shaft geometry, stratigraphy, load tests and pile-cap configuration.","Extract the design scour/protection assumptions and identify temporary construction conditions separately from permanent conditions."],"deliverables":["Compare single-shaft and group axial/lateral response using transparent assumptions and documented calibration evidence.","Prepare a scour-monitoring and protection-maintenance concept with a construction-stage cofferdam risk register.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would a tip post-grouting result on a single shaft not directly establish the settlement of the full pylon pile group?","How could local bed erosion change lateral foundation response even before the calculated axial resistance becomes critical?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of the Sutong Bridge foundations","url":"https://www.xcdsystem.com/dfi/journal/?abstractid=2007010101","publisher":"Project designers and constructors / DFI Journal","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Super-large bridge pile foundation in soft soil — testing and monitoring","url":"https://scholarsmine.mst.edu/icchge/7icchge/session08/1/","publisher":"Yang, Dai and Gong / Missouri S&T","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Scour protection for deep-water pylon foundations","url":"https://www.engineering.org.cn/sscae/EN/1160099698767880365","publisher":"Project authors / Strategic Study of CAE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Sutong Bridge in construction2.jpg","url":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","publisher":"Trevor and Joce","year":2007,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sutong-bridge.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"sutong-bridge-reference-values.csv","mimeType":"text/csv","bytes":964,"sha256":"54b76bad46f0abfe39229fdb6dfc70c2341fb243dea6db60699071418a1032b2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/sutong-bridge/download/reference-values"},{"id":"project-image","title":"Sutong Bridge — construction over the Yangtze","kind":"project-image","fileName":"sutong-bridge.jpg","mimeType":"image/jpeg","bytes":216713,"sha256":"cde90ed38819bb57406e5fc776e0ca7aa7dc3eb74adc203bb315a6aa21b51804","sourceId":"s4","license":"CC BY-SA 2.0","width":386,"height":588,"credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2007-08-23 12:57","evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d2/Sutong_Bridge_in_construction2.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/sutong-bridge/download/project-image","originalSha1":"0068ceeba8bd5efef4ff854c6ad6f377810c71aa","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sutong-bridge-capstone.md","mimeType":"text/markdown","bytes":4785,"sha256":"5f940d78551b92642633723f99f53ef00b6175da520c7ec011354b245973f91c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","caption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":386,"height":588,"imageDate":"2007-08-23 12:57","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":112,"referenceValues":[{"label":"Bored piles per main pylon foundation","value":131,"unit":"piles","scope":"Large main-pylon group described in the DFI foundation paper; not the whole-bridge pile total.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — shorter group","value":114,"unit":"m","scope":"One of the two reported main-pylon pile lengths; verify group location in the source before modelling.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — longer group","value":117,"unit":"m","scope":"Other reported main-pylon pile length; not an uncertainty range for every pile.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":223661,"sourceCount":4,"url":"/cases/sutong-bridge"},{"id":"hywind-scotland","title":"Hywind Scotland — suction anchors for floating wind","summary":"Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.","topics":["coastal-offshore","lateral-foundations","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"Buchan Deep, offshore Peterhead","owner":"Equinor / Masdar","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Suction anchors","Inclined cyclic loading","Mooring–soil interaction","Installation and decommissioning"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Project sources describe the spar, mooring lines and suction anchors; the 2022 decommissioning programme gives asset-specific arrangements. Distinguish the floating turbine substructure from its seabed anchor foundation and do not transfer onshore monopile checks directly.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The operator records commissioning in 2017. The 2022 decommissioning document is a programme, not evidence that removal has occurred.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The published field study reports subsea observations from 2018 and 2020. These observations show asset inspection opportunities and are not a complete geotechnical acceptance certificate.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a suction-anchor concept and inspection strategy for one mooring line, including cyclic demand and removal feasibility.","inputs":["Trace the three-point mooring arrangement and identify the anchor information actually supplied by the project.","Develop explicit study soil profiles and load envelopes when borehole/CPT data or proprietary design loads are unavailable."],"deliverables":["Compare installation suction, holding capacity and cyclic degradation scenarios, retaining the distinction between drained and undrained assumptions.","Prepare an ROV inspection plan, cable/mooring interaction review and a decommissioning sequence with geotechnical risks.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can an anchor meet a monotonic holding-capacity check yet remain unsuitable under repeated inclined mooring loads?","How would the preferred removal method change if the as-installed suction anchor has tilted or developed significant internal soil plugging?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Hywind Scotland — operator project information","url":"https://www.equinor.com/energy/hywind-scotland","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pilot Park decommissioning programme, May 2022","url":"https://cdn.equinor.com/files/h61q9gi9/global/1b585f93025b2cf77ece1bb597520ff325454abc.pdf?hywind-scotland-pilot-park-decommissioning-programme-submission-may-2022-equinor.pdf=","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Artificial hard-substrate colonisation — field inspection of structures, moorings and anchors","url":"https://wes.copernicus.org/articles/7/801/2022/","publisher":"Karlsson et al. / Wind Energy Science","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Hywind Wind Farm, off Peterhead - geograph.org.uk - 7226685.jpg","url":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","publisher":"Mike Pennington","year":2022,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hywind-scotland.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/schematic"},{"id":"project-image","title":"Hywind Scotland — floating turbines offshore Peterhead","kind":"project-image","fileName":"hywind-scotland.jpg","mimeType":"image/jpeg","bytes":184836,"sha256":"69d6f91c41a64fb6d8b73f64d25fc5e470c5c2dbaa26c9e97b497bcbef3d07e8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":854,"credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2022-06-22","evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/65/Hywind_Wind_Farm%2C_off_Peterhead_-_geograph.org.uk_-_7226685.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/hywind-scotland/download/project-image","originalSha1":"73679c0939c31070d5973600125fa5b98e70746c","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hywind-scotland-capstone.md","mimeType":"text/markdown","bytes":3976,"sha256":"85e5f997085ffbc3896b28ac27ae3e0c519a862847311a508ef90f2414b41c54","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","caption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":854,"imageDate":"2022-06-22","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":114,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":190019,"sourceCount":4,"url":"/cases/hywind-scotland"},{"id":"eastern-scheldt-barrier","title":"Eastern Scheldt Barrier — foundation mats and scour resilience","summary":"The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.","topics":["coastal-offshore","shallow-foundations","scour-erosion","ground-improvement","monitoring","delivery"],"country":"Netherlands","region":"Zeeland","owner":"Rijkswaterstaat","year":1986,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Graded foundation mats","Marine scour protection","Filter compatibility","Hydraulic–geotechnical interaction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Rijkswaterstaat documents the barrier arrangement and construction period. USACE guidance describes the Eastern Scheldt graded foundation-mat approach, while recent Deltares work reassesses hydraulic loads for renewal. Hydraulic model results must be translated into geotechnical limit states.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Rijkswaterstaat dates construction to 1976–1986. Deltares describes later 2024–2025 testing for renewal, a separate phase of the asset lifecycle.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner provides an operating history; the recent research supports maintenance decisions, not a new claim that every original foundation detail is verified under future loads.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a study section of a barrier foundation and protection apron, linking hydraulic demand to filter stability, bearing and erosion-resistant details.","inputs":["Use the owner source for the barrier configuration and the technical guidance for the mat/filter concept.","Define study bed-material gradations, hydraulic loading and foundation parameters; record what is measured and what is assumed."],"deliverables":["Check filter retention/permeability and sensitivity to edge scour and loss of support near the protection apron.","Prepare construction placement tolerances, underwater inspection criteria and a renewal plan under changed hydraulic loads.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a stable surface armour layer still permit undermining through an incompatible filter or an exposed apron edge?","Which results from a hydraulic scale model can directly inform foundation checks, and which require a separate soil-response model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eastern Scheldt Barrier — owner project record","url":"https://www.rijkswaterstaat.nl/en/projects/iconic-structures/eastern-scheldt-barrier","publisher":"Rijkswaterstaat","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"ETL 1110-2-565 — scour-protection and foundation-mat discussion","url":"https://www.publications.usace.army.mil/Portals/76/Publications/EngineerTechnicalLetters/ETL_1110-2-565.pdf","publisher":"U.S. Army Corps of Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Barrier renewal scale-model tests, 2024–2025","url":"https://www.deltares.nl/en/news/mini-eastern-scheldt-barrier-passes-extreme-storm-tests","publisher":"Deltares","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Oosterscheldekering.jpg","url":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","publisher":"Klankbeeld","year":2025,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eastern-scheldt-barrier.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eastern-scheldt-barrier-reference-values.csv","mimeType":"text/csv","bytes":644,"sha256":"e611fa5ed1abaf9bdc927b2b599be79f50f803e70bb4fdcf5b9df61e14162090","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eastern-scheldt-barrier/download/reference-values"},{"id":"project-image","title":"Eastern Scheldt Barrier — view from Westerschouwen","kind":"project-image","fileName":"eastern-scheldt-barrier.jpg","mimeType":"image/jpeg","bytes":225473,"sha256":"6be491da8741403f8266f67a77fc1e5e8b735b92cb7b2d27384dff4b3517a1e3","sourceId":"s4","license":"CC BY 4.0","width":1280,"height":720,"credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2025-01-28 15:00:00","evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e8/Oosterscheldekering.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eastern-scheldt-barrier/download/project-image","originalSha1":"b70e8701cc9305b1c2e1913069101ff01517625d","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eastern-scheldt-barrier-capstone.md","mimeType":"text/markdown","bytes":4598,"sha256":"7f3a6d20167aaefea6b90d8406ae9221540013fa07968034ca578ad67a99cc1e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","caption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":720,"imageDate":"2025-01-28 15:00:00","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","qualityNotes":["The USACE technical-letter PDF is linked at its official source; that host denied a local download during this review. The local project brief and photograph remain available."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":115,"referenceValues":[{"label":"Total barrier length","value":9,"unit":"km","scope":"Owner-reported overall barrier length, including fixed sections.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."},{"label":"Movable-section length","value":3,"unit":"km","scope":"Movable portion within the overall barrier; not a separate structure to add to the 9 km total.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":231922,"sourceCount":4,"url":"/cases/eastern-scheldt-barrier"},{"id":"venice-mose","title":"Venice MOSE — marine caisson placement and movement monitoring","summary":"The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.","topics":["coastal-offshore","shallow-foundations","settlement","ground-improvement","monitoring","delivery"],"country":"Italy","region":"Venice Lagoon","owner":"Italian Ministry of Infrastructure / MOSE project","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine caisson foundations","Ground–structure interaction","Precision grouting","GNSS/InSAR monitoring"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The designers explain caisson foundations, settlement assessment and watertight interfaces. The monitoring paper studies MOSE shoulder structures using GNSS and InSAR. Measurements of a shoulder cannot automatically be assigned to every gate caisson or inlet.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The locally available article provides component-specific deformation evidence. Its underlying MOSE GNSS observations have restricted access; open access to the article does not make those raw records downloadable. Complete construction acceptance records and final accounts were not provided.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a placement-and-monitoring design for a selected MOSE inlet caisson or shoulder, with explicit tolerances and a defensible spatial interpretation of movements.","inputs":["Select one inlet and one structure type; compile its geometry and support concept from the designer source.","Extract monitoring periods, reference frame, instrument precision and measured components from the published deformation study."],"deliverables":["Evaluate bearing and differential-settlement sensitivity for the selected foundation and define placement/grouting tolerances.","Design a combined survey/InSAR monitoring workflow that separates regional subsidence, structural movement and measurement noise.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would agreement between satellite line-of-sight and GNSS observations still require care before inferring a vertical settlement at a nearby gate?","How should a marine caisson placement sequence respond when the achieved support level differs from the alignment tolerance assumed by the gate designer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"MOSE — designer account of barrier and caisson foundations","url":"https://www.technital.net/projects/marine-and-coastal/special-marine-works/ingenieria-maritima-y-costera-mobile-surge-barriers-at-the-three-inlets-of-the-venice-lagoon-mose-italy","publisher":"Technital","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Integrated GNSS and InSAR analysis of MOSE shoulder structures","url":"https://www.mdpi.com/2072-4292/17/6/1059","publisher":"Project research authors / Remote Sensing","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"MOSE marine caisson foundation works","url":"https://proserveltd.co.uk/casestudies/venice/","publisher":"Proserve","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","url":"https://www.mdpi.com/2072-4292/17/6/1059/pdf","publisher":"Massimo Fabris and Mario Floris / Remote Sensing (MDPI)","year":2025,"access":"public-link","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","notes":"","checked":"2026-11-22","localAssetIds":["mose-monitoring-2025"]},{"id":"s5","title":"MOSE Project Venice.jpg","url":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","publisher":"Wikimedia Commons contributor","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"venice-mose.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/schematic"},{"id":"mose-monitoring-2025","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","kind":"report","fileName":"mose-monitoring-2025.pdf","mimeType":"application/pdf","bytes":7574597,"sha256":"4c89f5e78f6cd7fcbead8a0bebb6c7d5977141553ebb5a1c583a0827438270bf","sourceId":"s4","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","rightsUrl":"https://creativecommons.org/licenses/by/4.0/","rightsBasis":"The article first page and publisher page explicitly license this work under CC BY 4.0. The original PDF is redistributed unchanged, with author credit and DOI retained.","rightsEvidenceUrl":"https://www.mdpi.com/2072-4292/17/6/1059","pages":21,"downloadUrl":"/cases/venice-mose/download/mose-monitoring-2025"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"venice-mose-reference-values.csv","mimeType":"text/csv","bytes":611,"sha256":"71e6e7c4d13ce07281889fb2d4d103f8b1dc271e11b43c23d1c3378905ee0d3d","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/venice-mose/download/reference-values"},{"id":"project-image","title":"MOSE at the Lido inlet — construction in 2009","kind":"project-image","fileName":"venice-mose.jpg","mimeType":"image/jpeg","bytes":193898,"sha256":"ce7841b2d704bbc54e8005c5b4c7810008885b90c3caa31c55647589b3fc4d9f","sourceId":"s5","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-07-25 08:19:50","evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/27/MOSE_Project_Venice.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/venice-mose/download/project-image","originalSha1":"068a07bb2f08ce4ce810f1aeeb43e296ec7026dc","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"venice-mose-capstone.md","mimeType":"text/markdown","bytes":4928,"sha256":"087b1e2f4c7f9465eb18640c48853afe32fcd4bc0e4ca8168332f337007a53cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","caption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"2009-07-25 08:19:50","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","qualityNotes":["The locally downloadable monitoring article is CC BY 4.0. Its underlying MOSE GNSS observations are restricted by Consorzio Venezia Nuova; do not describe those raw observations as an open downloadable dataset."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":116,"referenceValues":[{"label":"MOSE continuous GNSS stations","value":36,"unit":"stations","scope":"32 stations on shoulder structures plus four local reference stations in the studied MOSE network.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."},{"label":"External reference-network stations","value":8,"unit":"stations","scope":"External stations used with the MOSE network; separate from its four local reference stations.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":7775241,"sourceCount":5,"url":"/cases/venice-mose"},{"id":"yeager-airport","title":"Yeager Airport — reinforced-slope failure and degraded rock","summary":"The reinforced slope supporting a runway extension failed in 2015. Published investigations examine the fill–rock interface, material strength selection and global failure mechanisms, offering a strong forensic capstone.","topics":["reinforced-soil","slopes","rock","laboratory-testing","site-investigation","monitoring"],"country":"United States","region":"Charleston, West Virginia","owner":"Central West Virginia Regional Airport Authority","year":2015,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Reinforced-slope stability","Fully softened and residual strength","Degraded sedimentary rock","Inverse analysis"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"The author studies discuss construction, performance and post-failure testing. The reinforced-slope height is reported differently across papers; retain the geometry and datum of the particular section being analysed instead of merging those values.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The failure occurred on 12 March 2015 after several years of service. The published papers separately describe construction and the observed pre-failure movements.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"Post-failure investigation and analyses are documented; these sources are not a complete record of the later repair and acceptance programme.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconstruct a documented failure section and compare competing strength and groundwater assumptions against the observed failure geometry.","inputs":["Extract one internally consistent cross-section, foundation preparation detail and chronology from the selected author paper.","Separate coarse reinforced-fill test results from softened or residual strengths at the fill–rock interface, recording drainage and sample scale."],"deliverables":["Compare internal, compound and global mechanisms with sensitivity to interface strength and pore pressure.","Prepare an improved investigation, construction-observation and movement-trigger plan, clearly distinguished from the actual historical design.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can strong geogrid and competent reinforced fill fail to prevent a mechanism controlled by the underlying weathered-rock interface?","What would make a back-calculated strength plausible as a material property, rather than merely compensating for an incorrect geometry or groundwater model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case history: failure of the reinforced soil slope at Yeager Airport","url":"https://ascelibrary.org/doi/10.1061/%28ASCE%29GT.1943-5606.0002430","publisher":"VandenBerge, Valentine, Brandon and Wright / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Case history on failure of a 67 m tall reinforced soil slope","url":"https://www.sciencedirect.com/science/article/pii/S0266114420300686","publisher":"Collin and coauthors / Geotextiles and Geomembranes","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Stability and stress-deformation analyses — author-hosted paper","url":"https://www.thecollingroup.com/wp-content/uploads/2021/01/Collin-Yeager-Failure-JGGE-ASCE-GT.1943-5606.0002454.pdf","publisher":"Investigation authors / The Collin Group","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"KCRW airport aerial 20261020.jpg","url":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","publisher":"Designism","year":2026,"access":"public-link","license":"CC0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"yeager-airport.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/yeager-airport/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"yeager-airport-reference-values.csv","mimeType":"text/csv","bytes":794,"sha256":"743239327bd7a5bc43922859fa94090a2465f88f69d96df2d76f0f2ff4fc22f7","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/yeager-airport/download/reference-values"},{"id":"project-image","title":"Yeager Airport — aerial site context in 2026","kind":"project-image","fileName":"yeager-airport.jpg","mimeType":"image/jpeg","bytes":192611,"sha256":"e81b78a1347994e6c2a868aa8ab7749e6e273bdd01e3b9cdf73809b3c388a605","sourceId":"s4","license":"CC0","width":1280,"height":867,"credit":"Designism / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2026-10-20 13:24:53","evidenceFile":"image-provenance/yeager-airport-r14-source.json","evidenceSha256":"11ad0740552021430cbcd470ca63fca0b86f43ac87d9d6aba8b379f3dc393172","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/cd/KCRW_airport_aerial_20261020.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/yeager-airport/download/project-image","originalSha1":"f179194a5d2d62c05b3a6400727fc85453c6caaf","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"yeager-airport-capstone.md","mimeType":"text/markdown","bytes":4809,"sha256":"f2ee34dc662632c6f866232936ea9c60202f43c4e59d54196c0d3d15c610fa5d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/yeager-airport/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","caption":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","credit":"Designism / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":867,"imageDate":"2026-10-20 13:24:53","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","qualityNotes":["The 2026 aerial photograph is a later view of the actual airport, not a photograph of the 2015 collapse.","Published heights differ by section/definition. The study must cite its selected source geometry."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":117,"referenceValues":[{"label":"Slope height stated by Collin et al.","value":67,"unit":"m","scope":"Reinforced-soil slope height in the Geotextiles and Geomembranes case-history title; retain that paper’s definition.","sourceId":"s2","locator":"Article title and case description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Slope height stated by VandenBerge et al.","value":73,"unit":"m","scope":"Height used in the ASCE case-history description; consult geometry and reference elevations before comparing with 67 m.","sourceId":"s1","locator":"Case-history description","basis":"Source-specific geometry definition. The two published heights are not averaged or silently treated as interchangeable."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/yeager-airport-r14-source.json","evidenceSha256":"11ad0740552021430cbcd470ca63fca0b86f43ac87d9d6aba8b379f3dc393172","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":199335,"sourceCount":4,"url":"/cases/yeager-airport"}]}