{"schemaVersion":1,"updated":"2026-11-22","total":8,"records":[{"id":"bowman-road-grs","title":"Bowman Road Bridge — reinforced-soil abutments","summary":"The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.","topics":["reinforced-soil","shallow-foundations","settlement","delivery"],"country":"United States","region":"Defiance County, Ohio","owner":"Defiance County","year":2005,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["GRS-IBS","Bearing and settlement","Reinforcement demand"],"documentationLevel":"worked-design","design":{"availability":"available","summary":"The archived FHWA worked example supplies bridge geometry, bearing loads, abutment sizing and internal/external checks. Use current guidance for a new design.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"FHWA reports $266,000 for the Bowman Road abutment, beams and waterproofing, compared with a $338,000 independent estimate for the conventional alternative. This historical comparison is not a certified final account.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"Production construction occurred in 2005; the reviewed sources discuss accelerated construction rather than a complete contractor programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"FHWA reports settlement and approach performance after opening.","sourceIds":["s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a replacement rural bridge abutment using the Bowman Road example as the reference project; compare reinforced soil with a conventional abutment.","inputs":["Extract span, reactions, abutment dimensions and reinforcement assumptions from the worked example.","Identify scour, drainage and foundation information that the example assumes."],"deliverables":["Reproduce the reference checks and document any difference caused by a current design basis.","Prepare an abutment section, reinforcement schedule, drainage detail and bridge-approach settlement check.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"GRS-IBS Interim Implementation Guide — Bowman Road design example","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"GRS-IBS bid-price analysis and cost comparisons","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm","publisher":"FHWA","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GRS-IBS synthesis — field case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s4","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/11026.pdf","publisher":"FHWA","year":2012,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["bowman-grs-guide"]},{"id":"s5","title":"FHWA-HRT-11-027, case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/11027.pdf","publisher":"FHWA","year":2011,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-synthesis"]},{"id":"s6","title":"FHWA-HRT-19-024, bid price analysis","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/19024.pdf","publisher":"FHWA","year":2019,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-bid-comparison"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bowman-road-grs.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/schematic"},{"id":"bowman-grs-guide","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","kind":"report","fileName":"bowman-grs-guide.pdf","mimeType":"application/pdf","bytes":9102045,"sha256":"fcc4772db9661f4ced0e7bf1d8c7cc47edcfac470f89a9869df71844c39a0807","sourceId":"s4","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; publication attribution and errata retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/39209","pages":176,"downloadUrl":"/cases/bowman-road-grs/download/bowman-grs-guide"},{"id":"grs-synthesis","title":"FHWA-HRT-11-027, case histories","kind":"report","fileName":"grs-synthesis.pdf","mimeType":"application/pdf","bytes":1733657,"sha256":"f81f37d091959f40e56e560052d16fd6d1235a836af77c99bbb267d9010daf59","sourceId":"s5","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; original publication retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/34474","pages":68,"downloadUrl":"/cases/bowman-road-grs/download/grs-synthesis"},{"id":"grs-bid-comparison","title":"FHWA-HRT-19-024, bid price analysis","kind":"report","fileName":"grs-bid-comparison.pdf","mimeType":"application/pdf","bytes":2719769,"sha256":"aa9e358d09b308d2131d1175a307b0f7fe66797d606a89015bed7f33a3bba3cc","sourceId":"s6","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship recorded by the National Transportation Library.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/40086","pages":16,"downloadUrl":"/cases/bowman-road-grs/download/grs-bid-comparison"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"bowman-road-grs-reference-values.csv","mimeType":"text/csv","bytes":1138,"sha256":"ded6368d90b3ccf2ad594fbefa7f56f0df2128d370be3afed39fbacf6277a527","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/bowman-road-grs/download/reference-values"},{"id":"project-image","title":"Bowman Road Bridge — FHWA Figure 23","kind":"project-image","fileName":"bowman-road-grs.jpeg","mimeType":"image/jpeg","bytes":13695,"sha256":"4d6c07c0f10c365be283b508151090886d0d43d6043e22e1fa50d652c37eaebb","sourceId":"s3","license":"Public domain — U.S. federal government work","width":401,"height":301,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/bowman-road-grs/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bowman-road-grs-capstone.md","mimeType":"text/markdown","bytes":5028,"sha256":"9b84946c504990c8bdb70c4aecd0bccb2c4e927c1cc7195c2794593bfa798a94","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23).","caption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":401,"height":301,"imageDate":null},"figureCaption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":1,"referenceValues":[{"label":"GRS abutment cost","value":95000,"unit":"USD","scope":"Bowman Road GRS-IBS abutment; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"GRS beams and waterproofing","value":171000,"unit":"USD","scope":"Bowman Road beams and waterproofing; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reported GRS total","value":266000,"unit":"USD","scope":"Combined abutment, beams and waterproofing in Table 1; not a certified final account.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Conventional alternative estimate","value":338000,"unit":"USD","scope":"Independent cost estimate for the alternative in Table 1; not an awarded contract.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":3,"downloadBytes":13576453,"sourceCount":6,"url":"/cases/bowman-road-grs"},{"id":"founders-meadows","title":"Founders/Meadows Bridge — footings on reinforced soil","summary":"The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.","topics":["reinforced-soil","shallow-foundations","laboratory-testing","monitoring"],"country":"United States","region":"Castle Rock, Colorado","owner":"Colorado Department of Transportation","year":1999,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Footings on MSE","Geosynthetic reinforcement","Measured deformation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"CDOT Report 1 covers design, materials, construction and instruments; Report 2 evaluates wall performance.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT reports completion in July 1999.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The two reports contain construction observations and instrumented performance results.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate the load path from bridge footing through reinforced soil and compare calculated wall movements with the reported observations.","inputs":["Extract the front-wall geometry, footing loads and reinforcement properties.","Tabulate measured displacement/stress locations and distinguish construction stages."],"deliverables":["Develop bearing, sliding, internal stability and deformation checks for the reference section.","Prepare an instrumentation layout and explain which measurements can test each design assumption.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Founders/Meadows Bridge — Report 1","url":"https://rosap.ntl.bts.gov/view/dot/93454","publisher":"CDOT / FHWA","year":2000,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s2","title":"Founders/Meadows Bridge — Report 2","url":"https://rosap.ntl.bts.gov/view/dot/93418","publisher":"CDOT / FHWA","year":2001,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"founders-meadows.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/founders-meadows/download/schematic"},{"id":"project-image","title":"Founders/Meadows Bridge — completed reinforced-soil approaches","kind":"project-image","fileName":"founders-meadows-r13.jpeg","mimeType":"image/jpeg","bytes":153856,"sha256":"eab161baabb50bab8ad8fbabd87e30265ce580748743fa6841d132e6b722019e","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1024,"height":768,"credit":"CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/93454","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/93454","imageDate":"2000","evidenceFile":"image-provenance/founders-meadows-r13-source.json","evidenceSha256":"448c5095d4b3dae7640c6b858a7052727d7113bce0d2b321ab909ffbfe33e328","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://rosap.ntl.bts.gov/view/dot/93454/dot_93454_DS1.pdf","originalSha256":"8dc6a24810c88a96b1eaa7f05c3eef4d4ef221ad38cb2b4cd3a9223ae3ee98de","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/founders-meadows/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"founders-meadows-capstone.md","mimeType":"text/markdown","bytes":2817,"sha256":"39abf337de186a2f27bd8426784e781403fda0be815e01e9e8cd82cb69a4200c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/founders-meadows/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","caption":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","credit":"CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/93454","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/93454","width":1024,"height":768,"imageDate":"2000","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":2,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/founders-meadows-r13-source.json","evidenceSha256":"448c5095d4b3dae7640c6b858a7052727d7113bce0d2b321ab909ffbfe33e328","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3938,"sourceCount":2,"url":"/cases/founders-meadows"},{"id":"i15-salt-lake","title":"I-15 reconstruction — soft-ground embankments and geofoam","summary":"Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.","topics":["settlement","ground-improvement","reinforced-soil","monitoring","delivery"],"country":"United States","region":"Salt Lake City, Utah","owner":"Utah Department of Transportation","year":2001,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Vertical drains and surcharge","Two-stage MSE","Consolidation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"The reports document alternative embankment systems and monitored geofoam sections, including the 100 South crossing.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The monitoring reports cover reconstruction and the following decade; extract dates for the chosen section rather than using a corridor-wide programme.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Long-term settlement and numerical-model comparisons are available in the research reports.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Choose an embankment solution above sensitive buried utilities and soft clay, then reconcile the design prediction with the long-term monitoring record.","inputs":["Extract stratigraphy, groundwater and construction loading from the selected instrumented section.","Digitize a clearly identified settlement series with units and dates."],"deliverables":["Compare earth fill, preload/drains and geofoam for settlement, time and buoyancy.","Prepare a staged-load calculation, utility protection detail and monitoring acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"I-15 reconstruction long-term embankment monitoring study","url":"https://rosap.ntl.bts.gov/view/dot/31963","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Design and evaluation of EPS geofoam embankments","url":"https://rosap.ntl.bts.gov/view/dot/31962","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Use of Geofoam for I-15 Reconstruction in Salt Lake City, UT","url":"https://geofoam.syr.edu/utah.html","publisher":"Syracuse University Geofoam Research Center","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Original published image file copied unchanged; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"i15-salt-lake.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/schematic"},{"id":"project-image","title":"I-15 geofoam embankment at 100 South","kind":"project-image","fileName":"i15-salt-lake-r13.jpg","mimeType":"image/jpeg","bytes":35444,"sha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":305,"credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","licenseUrl":"https://geofoam.syr.edu/utah.html","imageDate":null,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://geofoam.syr.edu/I15/fig2.jpg","originalSha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/i15-salt-lake/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"i15-salt-lake-capstone.md","mimeType":"text/markdown","bytes":3144,"sha256":"2f5d23d456cf891b53e2856f43a44d2aa142b9eb42e4bd26cf2ba3cbb33ffe33","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","caption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://geofoam.syr.edu/utah.html","width":400,"height":305,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":3,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4322,"sourceCount":3,"url":"/cases/i15-salt-lake"},{"id":"us98-revetment","title":"US 98, Florida — coastal roadway revetment","summary":"Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.","topics":["scour-erosion","coastal-offshore","reinforced-soil","earthworks","delivery"],"country":"United States","region":"Florida Panhandle","owner":"Florida Department of Transportation","year":2018,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Articulated concrete blocks","Filters","Coastal erosion"],"documentationLevel":"technical-case","design":{"availability":"available","summary":"The FHWA case includes an as-built shoulder section, construction details and comparison with retaining-wall protection.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $5.25 million for resilience improvements and a separate 1,000-ft comparison: $490,000 protection versus $724,000 reconstruction.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The study concerns recovery after the October 2018 hurricane; it also compares performance of protection installed after an earlier storm.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"An as-built shoulder detail and observed performance comparisons appear in the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a roadway-embankment protection concept with particular attention to drains and interfaces where protection can be discontinuous.","inputs":["Extract the published shoulder section and treatment layers.","Establish wave/current demands and filtration requirements from appropriate site data."],"deliverables":["Check filter compatibility, toe/interface stability and treatment limits.","Reproduce the stated cost comparison and test sensitivity to storm recurrence and residual damage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-025 — Hurricane Michael US 98 revetment","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","publisher":"FHWA / FDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us98-revetment","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us98-revetment.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/schematic"},{"id":"us98-revetment","title":"FHWA-HIF-23-025, US98 revetment","kind":"report","fileName":"us98-revetment.pdf","mimeType":"application/pdf","bytes":523326,"sha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/us98-revetment/download/us98-revetment"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us98-revetment-reference-values.csv","mimeType":"text/csv","bytes":875,"sha256":"ebdcd5f5ffad1d2b5e9513da41212acf5e40f818570234f82356c2bf7ff5a976","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us98-revetment/download/reference-values"},{"id":"project-image","title":"US 98 — concrete-block coastal revetment","kind":"project-image","fileName":"us98-revetment-r13.jpeg","mimeType":"image/jpeg","bytes":50907,"sha256":"2c0e7866aa35ba362b4dfdcda8d9076ca7eba3715ccab0e01743150f686e3760","sourceId":"s1","license":"U.S. government photograph — credited to FHWA in the source","width":513,"height":385,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","imageDate":null,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","originalSha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us98-revetment/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us98-revetment-capstone.md","mimeType":"text/markdown","bytes":3797,"sha256":"7b8952f37ce686120c8c8bfddac5f073549d9d12f5da1ebf66a55dc89a96e6ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","caption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","license":"U.S. government photograph — credited to FHWA in the source","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","width":513,"height":385,"imageDate":null,"imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph"},"figureCaption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":45,"referenceValues":[{"label":"Resilience-improvement cost","value":5250000,"unit":"USD","scope":"Reported project resilience improvements.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Protection comparison cost","value":490000,"unit":"USD per 1,000 ft","scope":"Articulated-concrete-block protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reconstruction comparison cost","value":724000,"unit":"USD per 1,000 ft","scope":"Road reconstruction without equivalent protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":580308,"sourceCount":1,"url":"/cases/us98-revetment"},{"id":"us34-erosion","title":"US 34, Iowa — flood-resistant embankment matting","summary":"After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.","topics":["scour-erosion","earthworks","reinforced-soil","delivery"],"country":"United States","region":"Mills County, Iowa","owner":"Iowa Department of Transportation","year":2021,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Erosion-resistant matting","Embankment protection","Life-cycle comparison"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents flexible matting, economic assumptions and the treated extent; full construction drawings are not attached.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The case separates $6.8 million emergency restoration from $2.3 million resilience improvements and reports a benefit-cost ratio of 1.07.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Emergency restoration was completed in May 2019; the matting installation followed approval in 2021.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case describes installed protection along 2.25 miles and the economic review.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a flood-resistant embankment protection scheme that explicitly includes residual damage in its economic assessment.","inputs":["Extract the damaged/treatment extents and recurrence assumptions.","Identify geotechnical filter, anchorage and subgrade conditions needed beyond the case summary."],"deliverables":["Prepare a typical treatment section and interface/filter checks.","Reproduce the benefit-cost calculation and vary residual repair costs and flood frequency.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-027 — US 34 erosion control","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","publisher":"FHWA / Iowa DOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us34-erosion","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us34-erosion.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us34-erosion/download/schematic"},{"id":"us34-erosion","title":"FHWA-HIF-23-027, US34 erosion control","kind":"report","fileName":"us34-erosion.pdf","mimeType":"application/pdf","bytes":366024,"sha256":"7942f01369a05652a64ffb9fff38fbdf367db6975c699bcb2de9e6920e2b9cf6","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":2,"downloadUrl":"/cases/us34-erosion/download/us34-erosion"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us34-erosion-reference-values.csv","mimeType":"text/csv","bytes":953,"sha256":"39a03e8e7b91c4f7c1241dd2ede1cb6d0f02a09e905ce7bc52576222b171f78e","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us34-erosion/download/reference-values"},{"id":"project-image","title":"US 34 flood damage — FHWA Figure 2","kind":"project-image","fileName":"us34-erosion.jpeg","mimeType":"image/jpeg","bytes":120095,"sha256":"a7b471f0ab8cb533098c5e0129b471c60b2cb76e148c205314b7e9c13737259f","sourceId":"s1","license":"Public domain — U.S. federal government work","width":791,"height":505,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/us34-erosion-source.json","evidenceSha256":"4fd46c5561bab26a65674c90334464d50d19f44de1eb5bd69693ee64d7c631e9","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us34-erosion/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us34-erosion-capstone.md","mimeType":"text/markdown","bytes":3808,"sha256":"739db4e27ca57483140774286d65b7273782d3f9cd4796652900b372f1e10d17","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us34-erosion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding.","caption":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding. FHWA photograph of the Iowa project documented in the erosion-protection case.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":791,"height":505,"imageDate":null},"figureCaption":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding. FHWA photograph of the Iowa project documented in the erosion-protection case.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":46,"referenceValues":[{"label":"Emergency restoration cost","value":6800000,"unit":"USD","scope":"Emergency restoration following the 2019 event.","sourceId":"s1","locator":"Page 1, emergency restoration","basis":"As reported; no escalation or inflation adjustment."},{"label":"Resilience-improvement cost","value":2300000,"unit":"USD","scope":"Concrete-block matting resilience treatment.","sourceId":"s1","locator":"Page 1, Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Treatment extent","value":2.25,"unit":"mile","scope":"Reported embankment protection extent.","sourceId":"s1","locator":"Resilience Features","basis":"Reported project length."},{"label":"Reported benefit-cost ratio","value":1.07,"unit":"dimensionless","scope":"Source economic evaluation; reproduce its assumptions before comparison.","sourceId":"s1","locator":"Resilience Features","basis":"Source calculation result."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us34-erosion-source.json","evidenceSha256":"4fd46c5561bab26a65674c90334464d50d19f44de1eb5bd69693ee64d7c631e9","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":492283,"sourceCount":1,"url":"/cases/us34-erosion"},{"id":"freshkills-landfill","title":"Freshkills Park — landfill cap, drainage and long-term integrity","summary":"Former waste mounds are being converted to parkland above engineered cover and gas/leachate systems. The project explains how cover layers limit infiltration, protect barriers and drain slopes.","topics":["geoenvironmental","reinforced-soil","settlement","slopes"],"country":"United States","region":"Staten Island, New York","owner":"New York City","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Composite cover","Interface stability","Leachate control","Waste settlement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project’s landfill-engineering descriptions identify layer functions and monitoring needs. Published expectations for later park phases are not treated as final completion records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a park-compatible cover section that remains functional as underlying waste settles.","inputs":["Extract the barrier, drainage, protection and vegetation functions from the project account.","Define study waste-settlement and rainfall conditions without treating landscaping as structural cover."],"deliverables":["Check interface sliding and drainage capacity for the selected slope.","Detail utility penetrations, gas collection interfaces and a settlement/erosion maintenance plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can differential settlement damage a low-permeability cover without visible surface cracking?","Why must planting and visitor access be coordinated with gas and leachate infrastructure?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Landfill engineering systems","url":"https://freshkillspark.org/the-park/landfill-engineering","publisher":"Freshkills Park / New York City project","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Covering, stabilizing and maintaining","url":"https://freshkillspark.org/landfill-engineering/covering-stabilizing-maintaining","publisher":"Freshkills Park","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","publisher":"Wikimedia Commons / Master Sgt. Mark Olsen","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"freshkills-landfill.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/freshkills-landfill/download/schematic"},{"id":"project-image","title":"Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg","kind":"project-image","fileName":"freshkills-landfill.jpg","mimeType":"image/jpeg","bytes":450785,"sha256":"5251a14d60d70cdf43e8b1f9d40fa2414fcc37c14d14cb6a0da53fca4fcd1bc0","sourceId":"s3","license":"Public domain","width":1280,"height":816,"credit":"Master Sgt. Mark Olsen","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing","imageDate":"Taken on 3 October 2001","evidenceFile":"image-provenance/freshkills-landfill-commons.json","evidenceSha256":"d4019d87a4f791f31f0117545d4c2fe381f92a396a324526924c135ac6f47c3e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/08/Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","downloadUrl":"/cases/freshkills-landfill/download/project-image","originalSha1":"b72773f0a41399c197eae4d74b920815b06bcb86","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"freshkills-landfill-capstone.md","mimeType":"text/markdown","bytes":3372,"sha256":"c49404fa89808b5b9fe490e5b9952afbe7e4bf7418806ef6a1726affa36a8094","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/freshkills-landfill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Fresh Kills Landfill in October 2001.","caption":"Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.","credit":"Master Sgt. Mark Olsen","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing","width":1280,"height":816,"imageDate":"Taken on 3 October 2001","imageDownloadAllowed":true},"figureCaption":"Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":94,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/freshkills-landfill-commons.json","evidenceSha256":"d4019d87a4f791f31f0117545d4c2fe381f92a396a324526924c135ac6f47c3e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":455148,"sourceCount":3,"url":"/cases/freshkills-landfill"},{"id":"glenwood-canyon","title":"Glenwood Canyon — reinforced walls on compressible foundations","summary":"Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.","topics":["reinforced-soil","retaining-walls","settlement","monitoring","earthworks","delivery"],"country":"United States","region":"I-70, Colorado","owner":"Colorado Department of Transportation","year":1992,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geosynthetic-reinforced soil","Foundation consolidation","Staged facing","Instrumented performance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The CDOT research synthesis describes the instrumented Glenwood Canyon GRS test wall and long-term differential settlement. A separate 1988 wall study addresses staged facing installation. These are distinct wall experiments within the corridor and should not be combined into one fictitious section.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT dates final-corridor construction to 1980–1992. The selected experimental wall has its own earlier construction and monitoring dates.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The technical report gives measured reinforced-wall performance; the owner history records completion of the broader corridor.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select one documented Glenwood Canyon reinforced-wall section and reconcile its reinforcement response with foundation settlement and facing movements.","inputs":["Identify the chosen test section, reinforcement, fill and underlying compressible profile in the technical report.","Compile displacement and settlement observations with dates; keep results from other wall systems in a separate comparison."],"deliverables":["Check reinforcement/internal stability separately from foundation settlement and global stability.","Compare single-stage construction with delayed permanent facing, including drainage and survey control.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a reinforced-soil mass remain stable while differential foundation settlement still creates unacceptable facing movement?","Which measured response would distinguish reinforcement stretching from compression of the underlying lacustrine deposits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of reinforced-soil structures — Glenwood Canyon case section","url":"https://rosap.ntl.bts.gov/view/dot/42215/dot_42215_DS1.pdf","publisher":"Colorado Department of Transportation / FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Embankment settlement in Glenwood Canyon — CDOH-DTD-R-88-8","url":"https://trid.trb.org/View/286942","publisher":"Colorado Department of Highways / FHWA; TRB record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"I-70 Glenwood Canyon project history","url":"https://www.codot.gov/about/CDOTHistory/50th-anniversary/glenwood-canyon","publisher":"Colorado Department of Transportation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"I-70 Glenwood Canyon-terabass.jpg","url":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","publisher":"Terabass","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glenwood-canyon.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/schematic"},{"id":"project-image","title":"I-70 in Glenwood Canyon — constrained highway corridor","kind":"project-image","fileName":"glenwood-canyon.jpg","mimeType":"image/jpeg","bytes":369614,"sha256":"363c30effe911ccd3b235683fa83b24984de39d8dd378c8e8921a3d3603a11d1","sourceId":"s4","license":"CC BY-SA 3.0","width":1280,"height":854,"credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-09-09","evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/62/I-70_Glenwood_Canyon-terabass.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/glenwood-canyon/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glenwood-canyon-capstone.md","mimeType":"text/markdown","bytes":3767,"sha256":"ab9a0c2f868a5433e8f7ca3687d87cab146c6924c87f98c0e922a89e18ea1cc5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","caption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":854,"imageDate":"2009-09-09","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","qualityNotes":["The corridor photograph is site context; the buried conditions and reinforcement are established by the selected report section, not by the photograph."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":109,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":374502,"sourceCount":4,"url":"/cases/glenwood-canyon"},{"id":"yeager-airport","title":"Yeager Airport — reinforced-slope failure and degraded rock","summary":"The reinforced slope supporting a runway extension failed in 2015. Published investigations examine the fill–rock interface, material strength selection and global failure mechanisms, offering a strong forensic capstone.","topics":["reinforced-soil","slopes","rock","laboratory-testing","site-investigation","monitoring"],"country":"United States","region":"Charleston, West Virginia","owner":"Central West Virginia Regional Airport Authority","year":2015,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Reinforced-slope stability","Fully softened and residual strength","Degraded sedimentary rock","Inverse analysis"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"The author studies discuss construction, performance and post-failure testing. The reinforced-slope height is reported differently across papers; retain the geometry and datum of the particular section being analysed instead of merging those values.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The failure occurred on 12 March 2015 after several years of service. The published papers separately describe construction and the observed pre-failure movements.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"Post-failure investigation and analyses are documented; these sources are not a complete record of the later repair and acceptance programme.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconstruct a documented failure section and compare competing strength and groundwater assumptions against the observed failure geometry.","inputs":["Extract one internally consistent cross-section, foundation preparation detail and chronology from the selected author paper.","Separate coarse reinforced-fill test results from softened or residual strengths at the fill–rock interface, recording drainage and sample scale."],"deliverables":["Compare internal, compound and global mechanisms with sensitivity to interface strength and pore pressure.","Prepare an improved investigation, construction-observation and movement-trigger plan, clearly distinguished from the actual historical design.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can strong geogrid and competent reinforced fill fail to prevent a mechanism controlled by the underlying weathered-rock interface?","What would make a back-calculated strength plausible as a material property, rather than merely compensating for an incorrect geometry or groundwater model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case history: failure of the reinforced soil slope at Yeager Airport","url":"https://ascelibrary.org/doi/10.1061/%28ASCE%29GT.1943-5606.0002430","publisher":"VandenBerge, Valentine, Brandon and Wright / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Case history on failure of a 67 m tall reinforced soil slope","url":"https://www.sciencedirect.com/science/article/pii/S0266114420300686","publisher":"Collin and coauthors / Geotextiles and Geomembranes","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Stability and stress-deformation analyses — author-hosted paper","url":"https://www.thecollingroup.com/wp-content/uploads/2021/01/Collin-Yeager-Failure-JGGE-ASCE-GT.1943-5606.0002454.pdf","publisher":"Investigation authors / The Collin Group","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"KCRW airport aerial 20261020.jpg","url":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","publisher":"Designism","year":2026,"access":"public-link","license":"CC0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"yeager-airport.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/yeager-airport/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"yeager-airport-reference-values.csv","mimeType":"text/csv","bytes":794,"sha256":"743239327bd7a5bc43922859fa94090a2465f88f69d96df2d76f0f2ff4fc22f7","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/yeager-airport/download/reference-values"},{"id":"project-image","title":"Yeager Airport — aerial site context in 2026","kind":"project-image","fileName":"yeager-airport.jpg","mimeType":"image/jpeg","bytes":192611,"sha256":"e81b78a1347994e6c2a868aa8ab7749e6e273bdd01e3b9cdf73809b3c388a605","sourceId":"s4","license":"CC0","width":1280,"height":867,"credit":"Designism / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2026-10-20 13:24:53","evidenceFile":"image-provenance/yeager-airport-r14-source.json","evidenceSha256":"11ad0740552021430cbcd470ca63fca0b86f43ac87d9d6aba8b379f3dc393172","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/cd/KCRW_airport_aerial_20261020.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/yeager-airport/download/project-image","originalSha1":"f179194a5d2d62c05b3a6400727fc85453c6caaf","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"yeager-airport-capstone.md","mimeType":"text/markdown","bytes":4809,"sha256":"f2ee34dc662632c6f866232936ea9c60202f43c4e59d54196c0d3d15c610fa5d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/yeager-airport/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","caption":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","credit":"Designism / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":867,"imageDate":"2026-10-20 13:24:53","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","qualityNotes":["The 2026 aerial photograph is a later view of the actual airport, not a photograph of the 2015 collapse.","Published heights differ by section/definition. The study must cite its selected source geometry."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":117,"referenceValues":[{"label":"Slope height stated by Collin et al.","value":67,"unit":"m","scope":"Reinforced-soil slope height in the Geotextiles and Geomembranes case-history title; retain that paper’s definition.","sourceId":"s2","locator":"Article title and case description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Slope height stated by VandenBerge et al.","value":73,"unit":"m","scope":"Height used in the ASCE case-history description; consult geometry and reference elevations before comparing with 67 m.","sourceId":"s1","locator":"Case-history description","basis":"Source-specific geometry definition. The two published heights are not averaged or silently treated as interchangeable."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/yeager-airport-r14-source.json","evidenceSha256":"11ad0740552021430cbcd470ca63fca0b86f43ac87d9d6aba8b379f3dc393172","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":199335,"sourceCount":4,"url":"/cases/yeager-airport"}]}