{"schemaVersion":1,"updated":"2026-11-22","total":11,"records":[{"id":"snake-river-micropiles","title":"US 26/89, Snake River Canyon — micropile slope stabilization","summary":"A moving highway slope was stabilized using three reticulated micropile walls and ground anchors, allowing work under restricted access while maintaining traffic.","topics":["slopes","deep-foundations","lateral-foundations","retaining-walls","monitoring"],"country":"United States","region":"Wyoming","owner":"Wyoming Department of Transportation","year":1997,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Reticulated micropiles","Ground anchors","Residual shear strength"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The published case describes battered micropiles, anchor layout, soil-rock sliding interface and instrumentation.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Construction ran from April to September 1997; monitoring continued through June 1998.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Inclinometers, piezometers, strain gauges, load cells and survey measurements are described.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a stabilizing micropile/anchor system for a sliding block and compare it with unloading or road relocation.","inputs":["Extract the sliding interface and adopted residual strength.","Use the reported wall arrangement and identify how load transfers into stable ground."],"deliverables":["Prepare slope equilibrium and structural load-sharing calculations.","Specify anchor testing, pile checks and a deformation-trigger response plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"US Highway 26/89 slope stabilization, Wyoming","url":"https://www.geoinstitute.org/node/8359","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Wolosick, Turner and Hasenkamp (1998), Reticulated Minipile Walls for Landslide Stabilization.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"snake-river-micropiles.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/snake-river-micropiles/download/schematic"},{"id":"project-image","title":"Snake River Canyon — US 26/89 stabilization site","kind":"project-image","fileName":"snake-river-micropiles-r13.png","mimeType":"image/png","bytes":684301,"sha256":"0d7194dbae94485262504b5d595cda83c0c0500adb745aa79d412702c6cc9c45","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":679,"height":453,"credit":"Hayward Baker, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8359","licenseUrl":"https://www.geoinstitute.org/node/8359","imageDate":null,"evidenceFile":"image-provenance/snake-river-micropiles-r13-source.json","evidenceSha256":"e7ecfd47a0e5e7019bdb4e32a6dddba47c407db700196586e66cccee1d973f4f","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/Mp2.png","originalSha256":"0d7194dbae94485262504b5d595cda83c0c0500adb745aa79d412702c6cc9c45","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/snake-river-micropiles/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"snake-river-micropiles-capstone.md","mimeType":"text/markdown","bytes":2608,"sha256":"b8148f68e3eada63d34fa56f9c18b0076cc5505415a4860870633529c44779ab","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/snake-river-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","caption":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","credit":"Hayward Baker, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8359","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8359","width":679,"height":453,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The constrained US 26/89 slope above the Snake River, before the micropile and anchor stabilization works.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":8,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/snake-river-micropiles-r13-source.json","evidenceSha256":"e7ecfd47a0e5e7019bdb4e32a6dddba47c407db700196586e66cccee1d973f4f","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3637,"sourceCount":1,"url":"/cases/snake-river-micropiles"},{"id":"river-road-soil-nails","title":"River Road, Tucson — tall soil-nailed cuts","summary":"Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.","topics":["retaining-walls","excavation","site-investigation","monitoring"],"country":"United States","region":"Pima County, Arizona","owner":"Pima County Department of Transportation","year":2004,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Soil nailing","Top-down excavation","Face stability"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case describes hollow-bar nails, wall geometry, drainage, facing checks and a loose-seam treatment during excavation.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports wall and adjacent-structure monitoring; complete construction drawings are not provided.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a soil-nailed cut design that protects nearby buildings and includes a response to unexpected ravelling material.","inputs":["Extract wall sections, adopted strength, nail rows and drilling restrictions.","Identify what the limited original investigation could not resolve."],"deliverables":["Check global stability, nail pullout, nail tensile resistance and facing demand.","Prepare lift sequencing, temporary-face support, drainage and monitoring details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"River Road widening and realigning, Pima County","url":"https://www.geoinstitute.org/node/8324","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Nowatzki and Samtani (2004), Design, Construction, and Performance of an 18-meter Soil Nail Wall.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"river-road-soil-nails.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/river-road-soil-nails/download/schematic"},{"id":"project-image","title":"River Road, Tucson — aerial photograph of the completed soil-nailed walls","kind":"project-image","fileName":"river-road-soil-nails-r13.png","mimeType":"image/png","bytes":707435,"sha256":"a5544ab2ed10f27ba121c94a3f85409559aede2a1ab1e0fde5607b93a7f9d425","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":630,"height":463,"credit":"© 2011 Google; image reproduced in the ASCE Geo-Institute case history","sourceUrl":"https://www.geoinstitute.org/node/8324","licenseUrl":"https://www.geoinstitute.org/node/8324","imageDate":"2011","evidenceFile":"image-provenance/river-road-soil-nails-r13-source.json","evidenceSha256":"aa28a499ffc7d675c6ed4baa2d32891f10127b351edf5339935edcfd27ab07ac","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/DGHB1.png","originalSha256":"a5544ab2ed10f27ba121c94a3f85409559aede2a1ab1e0fde5607b93a7f9d425","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"aerial-project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/river-road-soil-nails/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"river-road-soil-nails-capstone.md","mimeType":"text/markdown","bytes":2731,"sha256":"026237657dd16c5343f449d7ff39374b1c1a7491481203eff4d07ff89e138da9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/river-road-soil-nails/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","caption":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","credit":"© 2011 Google; image reproduced in the ASCE Geo-Institute case history","sourceUrl":"https://www.geoinstitute.org/node/8324","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8324","width":630,"height":463,"imageDate":"2011","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"aerial-project-photograph"},"figureCaption":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":9,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/river-road-soil-nails-r13-source.json","evidenceSha256":"aa28a499ffc7d675c6ed4baa2d32891f10127b351edf5339935edcfd27ab07ac","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3862,"sourceCount":1,"url":"/cases/river-road-soil-nails"},{"id":"pebble-beach-bluff","title":"Pebble Beach Drive — coastal bluff stabilization","summary":"An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.","topics":["slopes","retaining-walls","coastal-offshore","seepage"],"country":"United States","region":"Crescent City, California","owner":"Del Norte County","year":2009,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Launched soil nails","Coastal slope drainage","Restricted-access construction"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The case describes nail arrangement, drainage galleries and installation adjustments. Its specialty nail system needs method-specific verification.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The case records a five-week construction period spanning December 2008 and January 2009.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Construction observations and photographs are linked at the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare drainage and reinforcement alternatives for a coastal bluff supporting a road, including corrosion and erosion exposure.","inputs":["Extract the exploration description and installation constraints.","Identify shoreline loading and future erosion information needed beyond the case."],"deliverables":["Develop a stability/drainage concept and distinguish launched nails from drilled-and-grouted nails.","Specify a trial installation, acceptance testing and long-term inspection plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Pebble Beach Drive slope stabilization","url":"https://www.geoinstitute.org/node/8373","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"pebble-beach-bluff.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pebble-beach-bluff/download/schematic"},{"id":"project-image","title":"Pebble Beach Drive — coastal stabilization works","kind":"project-image","fileName":"pebble-beach-bluff-r13.jpg","mimeType":"image/jpeg","bytes":134722,"sha256":"1274fb57f1619d2782a1b20c4e3c8883fd91f6a26c999a11455bec7372e8dd67","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":600,"height":450,"credit":"Del Norte County, via Soil Nail Launcher, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8373","licenseUrl":"https://www.geoinstitute.org/node/8373","imageDate":null,"evidenceFile":"image-provenance/pebble-beach-bluff-r13-source.json","evidenceSha256":"edab8ab0264051c065195fa974b31a0d414f32dbc778a367a0a38469618d34a9","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/SI1.jpg","originalSha256":"1274fb57f1619d2782a1b20c4e3c8883fd91f6a26c999a11455bec7372e8dd67","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/pebble-beach-bluff/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"pebble-beach-bluff-capstone.md","mimeType":"text/markdown","bytes":2696,"sha256":"3028e28553e93107e7a38993c995c67905c02bd14803be5a31eab41763f1ab69","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pebble-beach-bluff/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","caption":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","credit":"Del Norte County, via Soil Nail Launcher, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8373","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8373","width":600,"height":450,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":10,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/pebble-beach-bluff-r13-source.json","evidenceSha256":"edab8ab0264051c065195fa974b31a0d414f32dbc778a367a0a38469618d34a9","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3725,"sourceCount":1,"url":"/cases/pebble-beach-bluff"},{"id":"ocoee-us64","title":"US 64 Ocoee Gorge — emergency rockslide stabilization","summary":"Rockslides near Ocoee Dam 2 required rock removal, bolting and stabilization while weather and difficult access affected the reopening programme.","topics":["rock","slopes","retaining-walls","delivery"],"country":"United States","region":"Polk County, Tennessee","owner":"Tennessee Department of Transportation","year":2010,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Rock bolting","Scaling and controlled removal","Weather-constrained work"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner update documents stabilization quantities and sequencing. The technical conference account describes geological failure mechanisms.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The March 2010 owner update revised the expected reopening date to April 16 after weather delays; this was a forecast at publication.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Progress quantities and a technical case paper are linked; a final account was not found.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a temporary and permanent rock-slope repair plan with worker exclusion zones and weather allowances.","inputs":["Extract the documented failures, access limitations and installed treatment quantities.","Identify discontinuity mapping and block geometry required for a study design."],"deliverables":["Prepare a kinematic stability assessment and concept bolt/fence layout.","Build a weather-sensitive schedule and quantity-based estimate.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"US 64 to reopen April 16 — project update","url":"https://comptroller.extglb.tn.gov/news/2010/3/19/u.s.-64-to-reopen-april-16.html","publisher":"Tennessee DOT","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Emergency rockslide mitigation in the Ocoee River Gorge","url":"https://www.researchgate.net/publication/335319508_Emergency_Rockslide_Mitigation_in_Eastern_Tennessee_US_64_Through_the_Ocoee_River_Gorge_2009-2010","publisher":"Jay Smerekanicz / project conference paper","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"US 64, Polk County, Tennessee — Emergency Rock Slope Stabilization in the Ocoee Gorge","url":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","publisher":"American Society of Highway Engineers / TDOT project author","year":2009,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"ocoee-us64.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ocoee-us64/download/schematic"},{"id":"project-image","title":"US 64 Ocoee Gorge — rockslide stabilization site","kind":"project-image","fileName":"ocoee-us64-r13.jpeg","mimeType":"image/jpeg","bytes":170821,"sha256":"579ec113a100e26fc42fe511826fd4fcbad9af811273131115dc3a92a1c3dd55","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":542,"height":267,"credit":"Photograph published with Vanessa Bateman’s TDOT project article in ASHE SCANNER, Spring 2011","sourceUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","licenseUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","imageDate":"2009-11-20","evidenceFile":"image-provenance/ocoee-us64-r13-source.json","evidenceSha256":"bab1cbd782e3171d399080740ebd1e88dcb69f166a7781eb8ea937fb6af56334","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","originalSha256":"885dab5a39ccf863a025149d6649977f4694a858081971d527ec2be4babee623","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/ocoee-us64/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"ocoee-us64-capstone.md","mimeType":"text/markdown","bytes":3238,"sha256":"8a31f23ebaecfdf9f45b2a3cef4498b5fdf7b17eb249476bed62871221313169","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ocoee-us64/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.","caption":"The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.","credit":"Photograph published with Vanessa Bateman’s TDOT project article in ASHE SCANNER, Spring 2011","sourceUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://ashe.pro/documents/archives/scanner/2011-2.pdf","width":542,"height":267,"imageDate":"2009-11-20","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Ocoee Gorge rockslide site on 20 November 2009, with the source author’s marked instability zones retained.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":30,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/ocoee-us64-r13-source.json","evidenceSha256":"bab1cbd782e3171d399080740ebd1e88dcb69f166a7781eb8ea937fb6af56334","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4255,"sourceCount":3,"url":"/cases/ocoee-us64"},{"id":"17th-street-canal","title":"17th Street Canal — floodwall failure and reevaluation","summary":"Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.","topics":["dams-levees","seepage","retaining-walls","laboratory-testing","site-investigation"],"country":"United States","region":"New Orleans, Louisiana","owner":"US Army Corps of Engineers","year":2005,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Floodwall stability","Undrained strength","Water-filled gap","Seepage"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"USACE publishes reevaluation material and later remediation decisions. The record distinguishes the original I-wall problem from subsequent protection measures.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The reevaluation and remediation decisions are linked; complete as-built records for all later works are not included.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconcile competing ground-model and wall-loading assumptions, then propose a monitored remediation concept.","inputs":["Extract a published cross section and the laboratory/field-test evidence for foundation strength.","Identify canal water levels, wall embedment and alternative assumptions for a water-filled gap."],"deliverables":["Compare effective-stress/undrained equilibrium cases and sensitivity to weak layers.","Develop a remediation alternatives assessment and a verification investigation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"17th Street Canal reevaluation","url":"https://www.mvn.usace.army.mil/portals/56/docs/hsdrrs/MOWL-17th-St-Canal.pdf","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Decision record for outfall-canal remediation","url":"https://www.mvn.usace.army.mil/Media/News-Releases/Article/474147/district-commander-signs-decision-record-for-remediation-work-at-outfall-canals/","publisher":"USACE","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"NOAA Katrina NOLA 17th Street breach Aug 31 2005.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","publisher":"Wikimedia Commons / NOAA","year":2005,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"17th-street-canal.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/17th-street-canal/download/schematic"},{"id":"project-image","title":"NOAA Katrina NOLA 17th Street breach Aug 31 2005.jpg","kind":"project-image","fileName":"17th-street-canal.jpg","mimeType":"image/jpeg","bytes":977324,"sha256":"4639a5baf2a1b834fae4f2b53ab79923419920b8f3b16a2e77e8ce7edb2cba2d","sourceId":"s3","license":"Public domain","width":1082,"height":1323,"credit":"NOAA","sourceUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg#Licensing","imageDate":"2005-08","evidenceFile":"image-provenance/17th-street-canal-commons.json","evidenceSha256":"cab42e822a4adb6db090593124612f985014194d864bb832d291240d96c01aef","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/cb/NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","downloadUrl":"/cases/17th-street-canal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"17th-street-canal-capstone.md","mimeType":"text/markdown","bytes":3240,"sha256":"f25f19a3fb10fabdc8a6c29c1359ee75db4fa42a4cef7977c4f8ec0b967ef236","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/17th-street-canal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina.","caption":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina in August 2005. NOAA photograph.","credit":"NOAA","sourceUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg#Licensing","width":1082,"height":1323,"imageDate":"2005-08"},"figureCaption":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina in August 2005. NOAA photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":31,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/17th-street-canal-commons.json","evidenceSha256":"cab42e822a4adb6db090593124612f985014194d864bb832d291240d96c01aef","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":981549,"sourceCount":3,"url":"/cases/17th-street-canal"},{"id":"salesforce-tower","title":"Salesforce Tower — staged excavation and artesian-pressure control","summary":"The excavation engineer describes a staged support system using deep soil-mixed soldier walls, internal bracing, jet-grouted shafts, a secant-pile ring and tiebacks. Artesian pressure and nearby structures governed key design checks.","topics":["excavation","dewatering","ground-improvement","retaining-walls"],"country":"United States","region":"San Francisco","owner":"Salesforce Tower development team","year":2018,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Secant pile ring","Deep soil mixing","Basal stability","Bracing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The engineer-of-record account identifies installed systems and construction stages. It does not publish the full calculation package or groundwater time series.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Coordinate nested excavation stages where the deepest core excavation extends below the surrounding basement.","inputs":["Extract the reported support components and their excavation-stage relationships.","Define study water pressures and soil strengths and identify which require field confirmation."],"deliverables":["Check basal uplift/heave and wall movements at each excavation stage.","Draw load-transfer interfaces between the braced perimeter, circular ring and plaza support.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which stage creates the most adverse hydraulic gradient below the excavation?","What happens to support loads when a local deeper excavation is opened inside a braced box?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Salesforce Tower excavation support","url":"https://www.sgh.com/project/salesforce-tower-excavation-support/","publisher":"Simpson Gumpertz & Heger, excavation engineer of record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Salesforce Tower Construction, San Francisco.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","publisher":"Wikimedia Commons / Dllu","year":2017,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"salesforce-tower.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/salesforce-tower/download/schematic"},{"id":"project-image","title":"Salesforce Tower Construction, San Francisco.jpg","kind":"project-image","fileName":"salesforce-tower.jpg","mimeType":"image/jpeg","bytes":662808,"sha256":"5630df54a1978429dd7eb555cad00b9e05fb8e9eba4371296acee8730134033b","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":1976,"credit":"Dllu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2017-02-16 13:41:48","evidenceFile":"image-provenance/salesforce-tower-commons.json","evidenceSha256":"161950b9f4e2d949725b84432afcc1da5e41df9c96b3af5e704fa7e158fbe44a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/2c/Salesforce_Tower_Construction%2C_San_Francisco.jpg","downloadUrl":"/cases/salesforce-tower/download/project-image","originalSha1":"32e98d418758e271623698b321c477b96dfebc6f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"salesforce-tower-capstone.md","mimeType":"text/markdown","bytes":3035,"sha256":"84e87c2b3acdd462bd4d53a1ebf4e55b3f4229c74e69044637af024eea66a624","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/salesforce-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Salesforce Tower during construction in San Francisco.","caption":"Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.","credit":"Dllu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Salesforce_Tower_Construction,_San_Francisco.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1976,"imageDate":"2017-02-16 13:41:48","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Salesforce Tower during construction in San Francisco. The photograph identifies the tower site; its staged underground excavation support is explained by the engineer of record.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":60,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/salesforce-tower-commons.json","evidenceSha256":"161950b9f4e2d949725b84432afcc1da5e41df9c96b3af5e704fa7e158fbe44a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":666974,"sourceCount":2,"url":"/cases/salesforce-tower"},{"id":"lee-tunnel","title":"Lee Tunnel — diaphragm-wall shafts in water-bearing chalk","summary":"Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.","topics":["tunnels","excavation","dewatering","retaining-walls"],"country":"United Kingdom","region":"East London","owner":"Thames Water","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Diaphragm-wall shafts","Hoop action","Curtain grouting","Slurry TBM"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The contractor account describes geology and shaft systems; the contract case supplies delivery context. Its later Tideway forecasts are historical and are not treated as current milestones.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The contract case describes a £675 million overall project. It is not a shaft-only cost or an independently audited final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The contract case reports operation beginning in 2016 and overall completion in 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a circular access shaft with large openings through mixed superficial deposits and chalk.","inputs":["Extract the reported shaft geometry range and rock description.","Identify openings and non-axisymmetric actions that violate a simple uniform hoop model."],"deliverables":["Check wall forces, basal water pressure and the staged excavation sequence.","Specify verticality, panel-joint and grouting acceptance checks before deep excavation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How do large shaft openings alter the advantages of circular wall action?","Which checks become most sensitive when chalk fractures connect to overlying sands?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lee Tunnel foundations and shafts","url":"https://www.bacsol.co.uk/project/lee-tunnel-london","publisher":"Bachy Soletanche","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s2","title":"Lee Tunnel delivery case","url":"https://www.neccontract.com/projects/lee-sewage-tunnel-uk","publisher":"NEC Contracts / project participants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lee-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lee-tunnel/download/schematic"},{"id":"project-image","title":"Lee Tunnel — diaphragm-wall shaft","kind":"project-image","fileName":"lee-tunnel-r13.jpg","mimeType":"image/jpeg","bytes":228064,"sha256":"fc396c5f49b66dd83e44ab6a653056fe8d94c89b90f8994e87f69391358eef32","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":600,"height":400,"credit":"Bachy Soletanche","sourceUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","licenseUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","imageDate":null,"evidenceFile":"image-provenance/lee-tunnel-r13-source.json","evidenceSha256":"5cc7371182aedd09643f171ed244c2357082c4601da5804250e5e0010cf8673a","transformations":"Copied the publisher’s 600 × 400 JPEG derivative unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://www.bacsol.co.uk/wp-content/uploads/2020/08/Retaining-Wall-Solution-Lee-Tunnel-Diaphragm-Wall-Shaft-7-600x400.jpg","originalSha256":"fc396c5f49b66dd83e44ab6a653056fe8d94c89b90f8994e87f69391358eef32","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/lee-tunnel/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lee-tunnel-capstone.md","mimeType":"text/markdown","bytes":2910,"sha256":"a2d8ea7378ad7a5316b4aff6b33df06977e908282baab4aa1e0a4f0859b388cc","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lee-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction photograph looking down into a circular Lee Tunnel diaphragm-wall shaft.","caption":"Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.","credit":"Bachy Soletanche","sourceUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","width":600,"height":400,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":79,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lee-tunnel-r13-source.json","evidenceSha256":"5cc7371182aedd09643f171ed244c2357082c4601da5804250e5e0010cf8673a","visualReview":"Inspected the entire published 600 × 400 photograph. It shows the full visible circular shaft lining, suspended construction lines and equipment below. No generative or unrelated replacement was used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4035,"sourceCount":2,"url":"/cases/lee-tunnel"},{"id":"kobe-port-island","title":"Kobe Port — quay-wall displacement during liquefaction","summary":"Many caisson quay walls moved seaward during the 1995 earthquake. Port researchers studied the combined contributions of inertia and excess pore pressure beneath and behind the walls.","topics":["seismic","retaining-walls","coastal-offshore","ground-improvement"],"country":"Japan","region":"Kobe","owner":"Port of Kobe / Japanese port researchers","year":1995,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Caisson quay walls","Effective-stress analysis","Lateral spreading"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The primary papers report observed damage and effective-stress analyses. The detailed modeled example is on Rokko Island; a general Kobe photograph is not mislabeled as that precise section.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare quay-wall retrofit options that address both foundation liquefaction and inertial sliding.","inputs":["Select one documented wall section and extract its foundation/backfill geometry.","Separate observed displacements from values reproduced by the numerical model."],"deliverables":["Check sliding and bearing before and after pore-pressure increase.","Compare ground treatment, drainage and geometry changes for controlling permanent displacement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a wall remain upright while losing operational serviceability?","Which deformation component would a simple static sliding check miss?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of caisson-type quay walls at Kobe Port","url":"https://www.jstage.jst.go.jp/article/sandf1995/36/Special/36_119/_article/-char/en","publisher":"Inagaki and port-research coauthors / Soils and Foundations","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Effective-stress analysis of a Kobe quay wall","url":"https://www.pari.go.jp/PDF/no0813-07.pdf","publisher":"Port and Harbour Research Institute","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Minatojimanakamachi c184.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","publisher":"Wikimedia Commons / 神戸市","year":null,"access":"public-link","license":"CC BY 2.1 jp","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"kobe-port-island.svg","mimeType":"image/svg+xml","bytes":989,"sha256":"7ed6562b41c1ef6286cc62d81928348d9f071653ee41e073ab8e6a4e68cf4e34","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kobe-port-island/download/schematic"},{"id":"project-image","title":"Minatojimanakamachi c184.jpg","kind":"project-image","fileName":"kobe-port-island.jpg","mimeType":"image/jpeg","bytes":476339,"sha256":"a63966b46b6f031e47094ed34cf561ab7b5ea124d02dbebcc0ed0c8a87f7b0df","sourceId":"s3","license":"CC BY 2.1 jp","width":998,"height":595,"credit":"神戸市","sourceUrl":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.1/jp/deed.en","imageDate":"Taken on 17 January 1995","evidenceFile":"image-provenance/kobe-port-island-commons.json","evidenceSha256":"8ab22636f60ccd60c3c506d526e8109d4bda8c91483f197686de20f24a74c874","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/67/Minatojimanakamachi_c184.jpg","downloadUrl":"/cases/kobe-port-island/download/project-image","originalSha1":"000dc3efb2977bd78da58b6b4ddf2fbf5e28edc6","originalSha256":"a63966b46b6f031e47094ed34cf561ab7b5ea124d02dbebcc0ed0c8a87f7b0df","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"kobe-port-island-capstone.md","mimeType":"text/markdown","bytes":3123,"sha256":"4ec6c5e445fffd1b61f806f0455d306e48f28f911efd5a2358b0504085057248","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kobe-port-island/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995.","caption":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995. The photograph documents the port-area earthquake; the detailed quay-wall model cited in the case is a separate Rokko Island section.","credit":"神戸市","sourceUrl":"https://commons.wikimedia.org/wiki/File:Minatojimanakamachi_c184.jpg","license":"CC BY 2.1 jp","licenseUrl":"https://creativecommons.org/licenses/by/2.1/jp/deed.en","width":998,"height":595,"imageDate":"Taken on 17 January 1995","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Liquefaction damage in Minatojima-Nakamachi on Kobe’s Port Island on 17 January 1995. The photograph documents the port-area earthquake; the detailed quay-wall model cited in the case is a separate Rokko Island section.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":93,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/kobe-port-island-commons.json","evidenceSha256":"8ab22636f60ccd60c3c506d526e8109d4bda8c91483f197686de20f24a74c874","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":480451,"sourceCount":3,"url":"/cases/kobe-port-island"},{"id":"randle-reef","title":"Randle Reef — harbour sediment containment and final capping","summary":"Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.","topics":["geoenvironmental","coastal-offshore","retaining-walls","settlement"],"country":"Canada","region":"Hamilton Harbour, Ontario","owner":"Canada Water Agency and project partners","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sediment containment","Steel walls","Consolidation","Environmental capping"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The official project record identifies the staged remedy. The final cap is not labeled complete: the reviewed owner update schedules that phase for 2027.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The reviewed owner update schedules Stage 3 completion for 2027, subject to the additional structural work described there.","sourceIds":["s1"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a staged containment-cell concept that can receive dredged sediment and later support a capped working surface.","inputs":["Extract the containment, dredging and cap-stage functions from the owner record.","Define sediment compressibility, drainage and future surface loads as explicit study inputs."],"deliverables":["Compare wall stability and fill settlement during successive dredging stages.","Develop cap tolerances, consolidation monitoring and handover criteria for long-term operation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does sediment settlement affect cap grading and surface drainage?","Why is completion of contaminant placement different from completion of the containment facility?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Randle Reef remediation stages and status","url":"https://www.canada.ca/en/canada-water-agency/freshwater-ecosystem-initiatives/great-lakes/great-lakes-protection/areas-concern/hamilton-harbour/randle-reef.html","publisher":"Canada Water Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Randle Reef — project milestones and photographs","url":"https://randlereef.ca/","publisher":"Randle Reef project / Bay Area Restoration Council","year":2024,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"randle-reef.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/schematic"},{"id":"project-image","title":"Randle Reef — July 2024 project aerial","kind":"project-image","fileName":"randle-reef-r13.jpg","mimeType":"image/jpeg","bytes":148502,"sha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","sourceId":"s2","license":"No open reuse license verified; original copyright retained","width":410,"height":230,"credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","licenseUrl":"https://randlereef.ca/","imageDate":"2024-07","evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","transformations":"Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://randlereef.ca/images/Milestones/2024-07-01-RR-1.jpg","originalSha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/randle-reef/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"randle-reef-capstone.md","mimeType":"text/markdown","bytes":3111,"sha256":"4357e7687177934b826133161deabfbee508806634260af74dd729247c2ea234","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"July 2024 aerial photograph of the Randle Reef sediment containment facility in Hamilton Harbour.","caption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://randlereef.ca/","width":410,"height":230,"imageDate":"2024-07","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":97,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","visualReview":"Inspected the complete published 410 × 230 image. It shows the actual containment cell with surrounding water, retaining perimeter and construction-stage fill. The image is not relabeled as a final-completion record.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4102,"sourceCount":2,"url":"/cases/randle-reef"},{"id":"nicoll-highway","title":"Nicoll Highway collapse — excavation design and monitoring decisions","summary":"The official inquiry identified errors in retaining-wall and strut-connection design and failures to respond adequately to warning signs. The case joins ground-model selection, temporary-structure detailing and construction governance.","topics":["excavation","retaining-walls","monitoring","delivery"],"country":"Singapore","region":"Singapore","owner":"Singapore Land Transport Authority / Committee of Inquiry","year":2004,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Braced excavation","Undrained analysis","Strut connections","Trigger response"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The government executive summary supplies findings from the inquiry. It is not a complete finite-element input file or a basis for reproducing all trial evidence.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Audit a deep-excavation design and its monitoring response before allowing the next excavation stage.","inputs":["Separate wall-system assumptions from structural connection capacity in the inquiry findings.","Build a timeline of reported warnings and the decisions that followed."],"deliverables":["Compare appropriate undrained modeling assumptions and perform an independent brace-load check.","Write stop-work criteria and an escalation chain with accountable technical review.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can matching measured wall movement with a flawed back-analysis increase risk?","What should happen when instrumentation review levels are repeatedly exceeded?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Final Committee of Inquiry executive summary","url":"https://www.nas.gov.sg/archivesonline/data/pdfdoc/20050513987.pdf","publisher":"Singapore Ministry of Manpower / Committee of Inquiry","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Nicoll Highway collapse site 20240420 084318.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","publisher":"Wikimedia Commons / ZKang123","year":2024,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nicoll-highway.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nicoll-highway/download/schematic"},{"id":"project-image","title":"Nicoll Highway collapse site 20240420 084318.jpg","kind":"project-image","fileName":"nicoll-highway.jpg","mimeType":"image/jpeg","bytes":413344,"sha256":"01166dcd29cd06c988ce62bd23006a1e3c32242081861387a420c628f3da0c12","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ZKang123","sourceUrl":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2024-04-20 08:43:18","evidenceFile":"image-provenance/nicoll-highway-commons.json","evidenceSha256":"f602ded2258765be6bc19708d0174afcae8ed2a6c3f3ffb780c9a55f494a3199","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/30/Nicoll_Highway_collapse_site_20240420_084318.jpg","downloadUrl":"/cases/nicoll-highway/download/project-image","originalSha1":"25a928d56919a1390026c07139abffea22a64a07","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nicoll-highway-capstone.md","mimeType":"text/markdown","bytes":3033,"sha256":"86db0bc61b262d41febb7bd4f24e7935905a9c1323d16a6a05644e1c95c4ac99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nicoll-highway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Nicoll Highway collapse site photographed in April 2024.","caption":"The Nicoll Highway collapse site photographed in April 2024. The image identifies the location twenty years after the event and is not a photograph taken during the collapse.","credit":"ZKang123","sourceUrl":"https://commons.wikimedia.org/wiki/File:Nicoll_Highway_collapse_site_20240420_084318.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2024-04-20 08:43:18","imageDownloadAllowed":true},"figureCaption":"The Nicoll Highway collapse site photographed in April 2024. The image identifies the location twenty years after the event and is not a photograph taken during the collapse.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":101,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nicoll-highway-commons.json","evidenceSha256":"f602ded2258765be6bc19708d0174afcae8ed2a6c3f3ffb780c9a55f494a3199","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":417508,"sourceCount":2,"url":"/cases/nicoll-highway"},{"id":"glenwood-canyon","title":"Glenwood Canyon — reinforced walls on compressible foundations","summary":"Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.","topics":["reinforced-soil","retaining-walls","settlement","monitoring","earthworks","delivery"],"country":"United States","region":"I-70, Colorado","owner":"Colorado Department of Transportation","year":1992,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geosynthetic-reinforced soil","Foundation consolidation","Staged facing","Instrumented performance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The CDOT research synthesis describes the instrumented Glenwood Canyon GRS test wall and long-term differential settlement. A separate 1988 wall study addresses staged facing installation. These are distinct wall experiments within the corridor and should not be combined into one fictitious section.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT dates final-corridor construction to 1980–1992. The selected experimental wall has its own earlier construction and monitoring dates.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The technical report gives measured reinforced-wall performance; the owner history records completion of the broader corridor.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select one documented Glenwood Canyon reinforced-wall section and reconcile its reinforcement response with foundation settlement and facing movements.","inputs":["Identify the chosen test section, reinforcement, fill and underlying compressible profile in the technical report.","Compile displacement and settlement observations with dates; keep results from other wall systems in a separate comparison."],"deliverables":["Check reinforcement/internal stability separately from foundation settlement and global stability.","Compare single-stage construction with delayed permanent facing, including drainage and survey control.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a reinforced-soil mass remain stable while differential foundation settlement still creates unacceptable facing movement?","Which measured response would distinguish reinforcement stretching from compression of the underlying lacustrine deposits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of reinforced-soil structures — Glenwood Canyon case section","url":"https://rosap.ntl.bts.gov/view/dot/42215/dot_42215_DS1.pdf","publisher":"Colorado Department of Transportation / FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Embankment settlement in Glenwood Canyon — CDOH-DTD-R-88-8","url":"https://trid.trb.org/View/286942","publisher":"Colorado Department of Highways / FHWA; TRB record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"I-70 Glenwood Canyon project history","url":"https://www.codot.gov/about/CDOTHistory/50th-anniversary/glenwood-canyon","publisher":"Colorado Department of Transportation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"I-70 Glenwood Canyon-terabass.jpg","url":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","publisher":"Terabass","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glenwood-canyon.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/schematic"},{"id":"project-image","title":"I-70 in Glenwood Canyon — constrained highway corridor","kind":"project-image","fileName":"glenwood-canyon.jpg","mimeType":"image/jpeg","bytes":369614,"sha256":"363c30effe911ccd3b235683fa83b24984de39d8dd378c8e8921a3d3603a11d1","sourceId":"s4","license":"CC BY-SA 3.0","width":1280,"height":854,"credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-09-09","evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/62/I-70_Glenwood_Canyon-terabass.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/glenwood-canyon/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glenwood-canyon-capstone.md","mimeType":"text/markdown","bytes":3767,"sha256":"ab9a0c2f868a5433e8f7ca3687d87cab146c6924c87f98c0e922a89e18ea1cc5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","caption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":854,"imageDate":"2009-09-09","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","qualityNotes":["The corridor photograph is site context; the buried conditions and reinforcement are established by the selected report section, not by the photograph."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":109,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":374502,"sourceCount":4,"url":"/cases/glenwood-canyon"}]}