{"schemaVersion":1,"updated":"2026-11-22","total":11,"records":[{"id":"woodrow-wilson-foundations","title":"Woodrow Wilson Bridge — foundation selection and testing","summary":"Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.","topics":["deep-foundations","lateral-foundations","site-investigation","seismic","scour-erosion"],"country":"United States","region":"Potomac River, Virginia–Maryland","owner":"Virginia DOT / Maryland State Highway Administration","year":2008,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Pile foundations","Foundation alternatives","Soil–structure interaction","Scour allowance"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project papers document foundation optimization and constructed-foundation practice; verify the paper’s stage before treating an alternative as the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The 2008 paper provides a later construction-stage foundation account.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select and justify a bridge-pier foundation for a tidal river crossing using the project’s alternatives and investigation strategy.","inputs":["Extract boring profiles, selected pile geometry, load-test evidence and scour assumptions where published.","Record separately the design spectrum and the soil profile used in the foundation response study."],"deliverables":["Develop axial/group and lateral-response checks for a selected pier.","Compare two foundation alternatives with construction plant, testing and navigational constraints.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation optimization and design for replacement of the Woodrow Wilson Bridge","url":"https://scholarsmine.mst.edu/icchge/5icchge/session09/6/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2004,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"New I-95 Woodrow Wilson Bridge Foundations","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08/6/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Woodrow Wilson Bridge aerial 2012.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","publisher":"Wikimedia Commons / Doc Searls from Santa Barbara, USA","year":2012,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"woodrow-wilson-foundations.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/woodrow-wilson-foundations/download/schematic"},{"id":"project-image","title":"Woodrow Wilson Bridge aerial 2012.jpg","kind":"project-image","fileName":"woodrow-wilson-foundations.jpg","mimeType":"image/jpeg","bytes":247837,"sha256":"60e13516a959b10477debf6f01d67a1822be0c401b935c64eb09f3f83924f637","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":606,"credit":"Doc Searls from Santa Barbara, USA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2012-03-14 11:10","evidenceFile":"image-provenance/woodrow-wilson-foundations-commons.json","evidenceSha256":"f0b310a9f2468aa50476d768691bcc900e19a1771b989a996335547c471d2250","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/33/Woodrow_Wilson_Bridge_aerial_2012.jpg","downloadUrl":"/cases/woodrow-wilson-foundations/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"woodrow-wilson-foundations-capstone.md","mimeType":"text/markdown","bytes":3290,"sha256":"6afb567962ac563d089f9502685d44763d9e16214c58e0ec6573023f216cba28","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/woodrow-wilson-foundations/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012.","caption":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.","credit":"Doc Searls from Santa Barbara, USA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":606,"imageDate":"2012-03-14 11:10"},"figureCaption":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":5,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/woodrow-wilson-foundations-commons.json","evidenceSha256":"f0b310a9f2468aa50476d768691bcc900e19a1771b989a996335547c471d2250","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":252326,"sourceCount":3,"url":"/cases/woodrow-wilson-foundations"},{"id":"nj-turnpike-micropiles","title":"New Jersey Turnpike bridges — micropile underpinning","summary":"Four bridge retrofits used hollow-core bar micropiles under limited headroom after deterioration of exposed precast piles. The submitted case includes proof and verification tests.","topics":["deep-foundations","scour-erosion","monitoring","delivery"],"country":"United States","region":"New Jersey","owner":"New Jersey highway agencies; see source","year":2008,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Hollow-bar micropiles","Underpinning","Verification/proof testing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case reports an 80-kip design load per micropile, cased exposure to scour level and different bond lengths at the four bridges.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports production proof tests and sacrificial verification tests.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan underpinning of an operating bridge with limited access and a temporary cofferdam.","inputs":["Select one of the four bridges and retain its soil profile, bond length and grout diameter.","Extract verification and production proof-test criteria."],"deliverables":["Check grout-ground bond, steel capacity and corrosion/scour exposure.","Prepare a load-transfer sequence and a test-and-acceptance schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Existing bridge retrofits, Turnpike, New Jersey","url":"https://www.geoinstitute.org/node/8358","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Gómez et al. (2008), Hollow Core Bar Micropile—Design Parameters Interpreted from 404 Load Tests.","checked":"2026-11-22"},{"id":"s2","title":"Bond Strength of Hollow-Core Bar Micropiles","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","notes":"Project image source. Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"nj-turnpike-micropiles.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/schematic"},{"id":"project-image","title":"New Jersey Turnpike — micropile installation beneath a bridge","kind":"project-image","fileName":"nj-turnpike-micropiles-r13.jpeg","mimeType":"image/jpeg","bytes":28249,"sha256":"4678f47c6011a4c3fa0d2d05bb71100f88236b51368c43788e87e1e54853f8cd","sourceId":"s2","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":426,"height":374,"credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2008","evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://scholarsmine.mst.edu/cgi/viewcontent.cgi?article=2920&context=icchge","originalSha256":"a179eebce7ffb4e8e8313d962d90c9afe1486157038f57824499780f01df1b8e","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/nj-turnpike-micropiles/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"nj-turnpike-micropiles-capstone.md","mimeType":"text/markdown","bytes":2919,"sha256":"2f89cefca8d0332f0acc0a04130440eb9e506f61c8d196d4ad95ebc36da9c74d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/nj-turnpike-micropiles/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","caption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","credit":"Jesús E. Gómez, Carlos J. Rodriguez, Helen D. Robinson, Johanna Mikitka and Larry Keough (2008)","sourceUrl":"https://scholarsmine.mst.edu/icchge/6icchge/session08c/3/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":426,"height":374,"imageDate":"2008","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-photograph"},"figureCaption":"Production micropiles installed under limited headroom at one of the New Jersey Turnpike bridge retrofits. Original Figure 3 from the project authors’ 2008 paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":7,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/nj-turnpike-micropiles-r13-source.json","evidenceSha256":"0f14f45505b35c62a1e34501223045a1bfa69230a22eaccb20bb494d3718a34e","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":32367,"sourceCount":2,"url":"/cases/nj-turnpike-micropiles"},{"id":"oroville-spillways","title":"Oroville spillway recovery — erosion-resistant foundation reconstruction","summary":"Recovery rebuilt the main spillway and added a secant pile wall, splashpad and buttress at the emergency spillway after the 2017 incident.","topics":["rock","scour-erosion","dams-levees","seepage","delivery"],"country":"United States","region":"Oroville, California","owner":"California Department of Water Resources","year":2018,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Erosion control","Secant pile wall","Rock foundation drainage"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"DWR’s recovery page links investigations and describes the final-design reconstruction; the project update distinguishes initial mobilization from the completed design.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The September 2018 update estimated $940 million recovery through 2019, plus $160 million emergency response; these are dated estimates, not a final account.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"Temporary main-spillway readiness was targeted for November 2017; final-design reconstruction was completed in 2018.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"DWR links consultant, inspection and forensic records from the recovery page.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an emergency-to-permanent reconstruction plan that addresses erosion, uplift and uncertain rock quality.","inputs":["Review the forensic findings and identify the selected failure mechanisms.","Extract the repair cross sections and distinguish temporary from permanent work."],"deliverables":["Prepare a foundation-drainage and erosion-protection concept with construction hold points.","Reconcile changing estimate scopes and show how geological uncertainty enters contingency.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Oroville Spillways Recovery","url":"https://water.ca.gov/Programs/State-Water-Project/SWP-Facilities/Oroville/Oroville-Spillways","publisher":"California DWR","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"September 2018 construction and cost estimate update","url":"https://water.ca.gov/News/News-Releases/2018/Sept-18/Oroville-Spillways-Construction-and-Cost-Estimate-Update","publisher":"California DWR","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Oroville Dam weir and emergency spillway erosion.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","publisher":"Wikimedia Commons / California Department of Water Resources","year":2017,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"oroville-spillways.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oroville-spillways/download/schematic"},{"id":"project-image","title":"Oroville Dam weir and emergency spillway erosion.jpg","kind":"project-image","fileName":"oroville-spillways.jpg","mimeType":"image/jpeg","bytes":320332,"sha256":"f4bd13af9ead3b5be6c9e4a05f99af18dd1c77f2fec0b5b3abc0cde34b401542","sourceId":"s3","license":"Public domain","width":1200,"height":900,"credit":"California Department of Water Resources","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg#Licensing","imageDate":"2017-02-13","evidenceFile":"image-provenance/oroville-spillways-commons.json","evidenceSha256":"e0d98727520124a4f3f46bcb4cef896752cbd9e8edd6e0aa990b908411566689","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bc/Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","downloadUrl":"/cases/oroville-spillways/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"oroville-spillways-capstone.md","mimeType":"text/markdown","bytes":3348,"sha256":"56fa6675b828b6b1cd30cec6dd7461afa664e2b2ba051586c8e6dce28299e59a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oroville-spillways/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident.","caption":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident. California Department of Water Resources project photograph.","credit":"California Department of Water Resources","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg#Licensing","width":1200,"height":900,"imageDate":"2017-02-13"},"figureCaption":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident. California Department of Water Resources project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":24,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/oroville-spillways-commons.json","evidenceSha256":"e0d98727520124a4f3f46bcb4cef896752cbd9e8edd6e0aa990b908411566689","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":324697,"sourceCount":3,"url":"/cases/oroville-spillways"},{"id":"grizzly-creek","title":"I-70 Grizzly Creek — post-fire rockfall risk and betterment","summary":"After the 2020 fire, CDOT compared rockfall mitigation using risk and benefit-cost analysis. Subsequent debris flows exceeded some installed protection capacities.","topics":["rock","slopes","scour-erosion","delivery"],"country":"United States","region":"Glenwood Canyon, Colorado","owner":"Colorado Department of Transportation","year":2021,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Rockfall protection","Risk-based selection","Benefit-cost analysis"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents selected fence treatments, cost assumptions and the importance of distinguishing routine rockfall from larger debris-flow events.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The report lists a $2.692 million fence estimate and benefit-cost ratios for one- and five-year periods; other summary totals have different scopes.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Fences were installed in spring 2021; intense rainfall caused damaging debris flows in July 2021.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case records both reduced minor-rockfall disruption and damage during larger subsequent events.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select a rockfall-protection strategy under changing post-fire hazard and explicitly describe the residual risk from events beyond its capacity.","inputs":["Extract the source cost table, hazard categories and analysis periods.","Verify energy units and fence specifications against design documents before using them; the summary’s unit labels require confirmation."],"deliverables":["Recalculate the published benefit-cost comparison with transparent assumptions.","Develop a fence layout concept, inspection triggers and a response to debris-flow exceedance.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-029 — reducing risk through rockfall mitigation","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_colorado_grizzlycreek.pdf","publisher":"FHWA / CDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["grizzly-creek-rockfall","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"grizzly-creek.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/grizzly-creek/download/schematic"},{"id":"grizzly-creek-rockfall","title":"FHWA-HIF-23-029, Grizzly Creek rockfall","kind":"report","fileName":"grizzly-creek-rockfall.pdf","mimeType":"application/pdf","bytes":719478,"sha256":"8051f0614203a8cb8749182bd5ffbe8c56bb3b094e9d4fdd341be3757026c733","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/grizzly-creek/download/grizzly-creek-rockfall"},{"id":"project-image","title":"Grizzly Creek burn scar beside I-70 — FHWA Figure 1","kind":"project-image","fileName":"grizzly-creek.jpeg","mimeType":"image/jpeg","bytes":208925,"sha256":"6b408b3327d7bf2f33726e93280cc2b73c473ddac3ef901ef911ea3b9543c23b","sourceId":"s1","license":"Public domain — U.S. federal government work","width":1175,"height":661,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_colorado_grizzlycreek.pdf","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/grizzly-creek-source.json","evidenceSha256":"0e4132c03c8e5e5e14d66e6ac6d452de1ae48d1bc5c08bed5213881269447cf2","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/grizzly-creek/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"grizzly-creek-capstone.md","mimeType":"text/markdown","bytes":2956,"sha256":"b5d9d9eff8777971cac43f025eb24699e0f66497d7e1e95007d6bb13ea3718f0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/grizzly-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Burn scars from the Grizzly Creek fire above I-70 in Glenwood Canyon, Colorado.","caption":"Burn scars from the Grizzly Creek fire above I-70 in Glenwood Canyon, Colorado. FHWA photograph from its rockfall and debris-flow mitigation case study.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_colorado_grizzlycreek.pdf","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":1175,"height":661,"imageDate":null},"figureCaption":"Burn scars from the Grizzly Creek fire above I-70 in Glenwood Canyon, Colorado. FHWA photograph from its rockfall and debris-flow mitigation case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":29,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/grizzly-creek-source.json","evidenceSha256":"0e4132c03c8e5e5e14d66e6ac6d452de1ae48d1bc5c08bed5213881269447cf2","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":932376,"sourceCount":1,"url":"/cases/grizzly-creek"},{"id":"schoharie-creek","title":"Schoharie Creek Bridge — scour and foundation inspection","summary":"The NTSB investigation documents the bridge collapse after scour undermined spread-footing support, including construction, protection and inspection issues.","topics":["scour-erosion","shallow-foundations","site-investigation","monitoring"],"country":"United States","region":"Near Amsterdam, New York","owner":"New York State Thruway Authority","year":1987,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Scour assessment","Spread footings","Inspection and maintenance"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The investigation reconstructs the original foundation and scour-protection evidence; it is a forensic record rather than a replacement-bridge design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Collapse occurred on 5 April 1987; the NTSB report was published in 1988.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The report supplies the investigation record and recommendations, not replacement as-built plans.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a scour-risk assessment and protection/inspection strategy that remains effective throughout the bridge life.","inputs":["Extract original footing elevations, bed conditions and riprap/inspection evidence.","Distinguish foundation erosion from structural redundancy and emergency response questions."],"deliverables":["Compare predicted scour levels with available bearing support and foundation depth.","Prepare a protection detail, inspection triggers and a maintenance quantity schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"NTSB HAR-88/02 — Schoharie Creek Bridge collapse","url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/HAR8802.pdf","publisher":"National Transportation Safety Board","year":1988,"access":"public-link","license":"US federal investigation report; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["schoharie-investigation"]},{"id":"s2","title":"Interstate 90 Schoharie Creek Bridge collapsed.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","publisher":"Wikimedia Commons / USGS","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"schoharie-creek.svg","mimeType":"image/svg+xml","bytes":1056,"sha256":"ca50c03b28c61244d08ee83702433916e462ad2ee363e42240a9f0377b8c9c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/schoharie-creek/download/schematic"},{"id":"schoharie-investigation","title":"NTSB HAR-88/02, Schoharie Creek investigation","kind":"report","fileName":"schoharie-investigation.pdf","mimeType":"application/pdf","bytes":12310933,"sha256":"d28240fdf577aa1b231f09493181927478ae46a078f186c5a980909f6c6be14d","sourceId":"s1","license":"US federal investigation report; original credits retained","rightsUrl":"https://www.ntsb.gov/about/Policies/Pages/Policies.aspx","rightsBasis":"NTSB staff reports and graphics are public domain except specifically credited copyright material; report retained unmodified.","rightsEvidenceUrl":"https://www.ntsb.gov/about/Policies/Pages/Policies.aspx","pages":172,"downloadUrl":"/cases/schoharie-creek/download/schoharie-investigation"},{"id":"project-image","title":"Interstate 90 Schoharie Creek Bridge collapsed.jpg","kind":"project-image","fileName":"schoharie-creek.jpg","mimeType":"image/jpeg","bytes":57965,"sha256":"ba1a8e908b89c2890aa64f154a516bd9fd741d15f483c3c47027362ff2bf3022","sourceId":"s2","license":"Public domain","width":483,"height":320,"credit":"USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg#Licensing","imageDate":null,"evidenceFile":"image-provenance/schoharie-creek-commons.json","evidenceSha256":"66eb93aea3e6dcdba8e09808b6a0faab92d41bd4e46b5b5a7093623dcc4458a0","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fc/Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","downloadUrl":"/cases/schoharie-creek/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"schoharie-creek-capstone.md","mimeType":"text/markdown","bytes":2973,"sha256":"b118fc06966d2c43b2489147762bcbdfe8abc441fcc5e12b5a2016f263da0e47","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/schoharie-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse.","caption":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse. Historical USGS project photograph.","credit":"USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg#Licensing","width":483,"height":320,"imageDate":null},"figureCaption":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse. Historical USGS project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":42,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/schoharie-creek-commons.json","evidenceSha256":"66eb93aea3e6dcdba8e09808b6a0faab92d41bd4e46b5b5a7093623dcc4458a0","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":12372927,"sourceCount":2,"url":"/cases/schoharie-creek"},{"id":"beaver-dam-wash","title":"Beaver Dam Wash Bridge — scour-resistant replacement","summary":"Flood damage and channel migration prompted comparison of replacement spans and erosion protection at the County Road 91 crossing.","topics":["scour-erosion","deep-foundations","coastal-offshore","delivery"],"country":"United States","region":"Mohave County, Arizona","owner":"Mohave County Public Works","year":2005,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Channel migration","Scour protection","Bridge alternatives"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents the selected longer bridge and gabion training-dike approach, with alternatives and economic justification.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $6.5 million for resilience improvements; use its stated scope when comparing alternatives.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The damaging event occurred in 2005; the case describes emergency access followed by replacement planning.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case records the selected resilience solution and lessons learned.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a crossing concept that addresses both local foundation scour and movement of the channel approaching the bridge.","inputs":["Extract the replacement alternatives, channel-change observations and protection measures.","Identify missing hydraulic and geotechnical inputs for a detailed design."],"deliverables":["Compare foundation depth and protection footprints for the alternatives.","Prepare a training-dike concept and a life-cycle maintenance/inspection plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-023 — Beaver Dam Wash bridge","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","publisher":"FHWA / Mohave County","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["beaver-dam-wash","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"beaver-dam-wash.svg","mimeType":"image/svg+xml","bytes":1056,"sha256":"ca50c03b28c61244d08ee83702433916e462ad2ee363e42240a9f0377b8c9c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/beaver-dam-wash/download/schematic"},{"id":"beaver-dam-wash","title":"FHWA-HIF-23-023, Beaver Dam Wash bridge","kind":"report","fileName":"beaver-dam-wash.pdf","mimeType":"application/pdf","bytes":702064,"sha256":"b6eb1c0c1b14505816aec4a0976b5eefafe6792d573bf1f92815ace9144f222f","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/beaver-dam-wash/download/beaver-dam-wash"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"beaver-dam-wash-reference-values.csv","mimeType":"text/csv","bytes":316,"sha256":"59cd33750e4d9acacdef6fb1d3d64718afdd918c65a6b95e1810b9711a6ea2c5","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/beaver-dam-wash/download/reference-values"},{"id":"project-image","title":"Beaver Dam Wash — replacement bridge","kind":"project-image","fileName":"beaver-dam-wash-r13.jpeg","mimeType":"image/jpeg","bytes":65879,"sha256":"1a0c97ba212bac01a7c42e6f0a083b4726a2eb395d317612fef735777e2e8dad","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":592,"height":442,"credit":"Mohave County, published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","imageDate":null,"evidenceFile":"image-provenance/beaver-dam-wash-r13-source.json","evidenceSha256":"462593532e8e6601c25d49cc8fe98590898d6af49b74f0cba439405d59cde406","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","originalSha256":"b6eb1c0c1b14505816aec4a0976b5eefafe6792d573bf1f92815ace9144f222f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/beaver-dam-wash/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"beaver-dam-wash-capstone.md","mimeType":"text/markdown","bytes":3165,"sha256":"766648b23e2c30c1c194e868dfb83cbe7cd8b45f1e1660d9947127c91ff5a14c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/beaver-dam-wash/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","caption":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","credit":"Mohave County, published by FHWA","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_arizona_beaverdam.pdf","width":592,"height":442,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The replacement Beaver Dam Wash Bridge, shown in Figure 4 of the FHWA resilience case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":44,"referenceValues":[{"label":"Resilience-improvement cost","value":6500000,"unit":"USD","scope":"Bridge-replacement resilience measures in the case summary.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/beaver-dam-wash-r13-source.json","evidenceSha256":"462593532e8e6601c25d49cc8fe98590898d6af49b74f0cba439405d59cde406","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":706601,"sourceCount":1,"url":"/cases/beaver-dam-wash"},{"id":"us98-revetment","title":"US 98, Florida — coastal roadway revetment","summary":"Following Hurricane Michael, roadway reconstruction incorporated articulated concrete blocks over filter fabric and bedding to reduce recurring embankment erosion.","topics":["scour-erosion","coastal-offshore","reinforced-soil","earthworks","delivery"],"country":"United States","region":"Florida Panhandle","owner":"Florida Department of Transportation","year":2018,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Articulated concrete blocks","Filters","Coastal erosion"],"documentationLevel":"technical-case","design":{"availability":"available","summary":"The FHWA case includes an as-built shoulder section, construction details and comparison with retaining-wall protection.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports $5.25 million for resilience improvements and a separate 1,000-ft comparison: $490,000 protection versus $724,000 reconstruction.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The study concerns recovery after the October 2018 hurricane; it also compares performance of protection installed after an earlier storm.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"An as-built shoulder detail and observed performance comparisons appear in the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a roadway-embankment protection concept with particular attention to drains and interfaces where protection can be discontinuous.","inputs":["Extract the published shoulder section and treatment layers.","Establish wave/current demands and filtration requirements from appropriate site data."],"deliverables":["Check filter compatibility, toe/interface stability and treatment limits.","Reproduce the stated cost comparison and test sensitivity to storm recurrence and residual damage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-025 — Hurricane Michael US 98 revetment","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","publisher":"FHWA / FDOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us98-revetment","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us98-revetment.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/schematic"},{"id":"us98-revetment","title":"FHWA-HIF-23-025, US98 revetment","kind":"report","fileName":"us98-revetment.pdf","mimeType":"application/pdf","bytes":523326,"sha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":3,"downloadUrl":"/cases/us98-revetment/download/us98-revetment"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us98-revetment-reference-values.csv","mimeType":"text/csv","bytes":875,"sha256":"ebdcd5f5ffad1d2b5e9513da41212acf5e40f818570234f82356c2bf7ff5a976","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us98-revetment/download/reference-values"},{"id":"project-image","title":"US 98 — concrete-block coastal revetment","kind":"project-image","fileName":"us98-revetment-r13.jpeg","mimeType":"image/jpeg","bytes":50907,"sha256":"2c0e7866aa35ba362b4dfdcda8d9076ca7eba3715ccab0e01743150f686e3760","sourceId":"s1","license":"U.S. government photograph — credited to FHWA in the source","width":513,"height":385,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","imageDate":null,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","originalSha256":"eca776d0c83bed760130b9c7a2bc43a50267203a994a34dc13b3df7863bd36b2","imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us98-revetment/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us98-revetment-capstone.md","mimeType":"text/markdown","bytes":3797,"sha256":"7b8952f37ce686120c8c8bfddac5f073549d9d12f5da1ebf66a55dc89a96e6ce","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us98-revetment/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","caption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","license":"U.S. government photograph — credited to FHWA in the source","licenseUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_florida_hurricanemichael.pdf","width":513,"height":385,"imageDate":null,"imageDownloadAllowed":true,"rightsStatus":"federal-agency-credited","permissionStatus":"Credited to the U.S. federal agency in the original publication","rightsNote":"The selected figure is credited to FHWA itself; different state-agency images in the same report retain their separate credits.","imageUsage":"project-photograph"},"figureCaption":"The articulating concrete-block revetment beside US 98 in Florida, shown in Figure 3 of the FHWA case study.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":45,"referenceValues":[{"label":"Resilience-improvement cost","value":5250000,"unit":"USD","scope":"Reported project resilience improvements.","sourceId":"s1","locator":"Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Protection comparison cost","value":490000,"unit":"USD per 1,000 ft","scope":"Articulated-concrete-block protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reconstruction comparison cost","value":724000,"unit":"USD per 1,000 ft","scope":"Road reconstruction without equivalent protection in the stated comparison.","sourceId":"s1","locator":"Page 2, cost comparison","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us98-revetment-r13-source.json","evidenceSha256":"1b4f4aecc75c5c592b0aa06c26fdb166b6107c3be0f7a116fb3ff84f24e6bbb3","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":580308,"sourceCount":1,"url":"/cases/us98-revetment"},{"id":"us34-erosion","title":"US 34, Iowa — flood-resistant embankment matting","summary":"After the 2019 flood damaged the road embankment, Iowa DOT selected anchored concrete-block matting and evaluated recurring-damage economics.","topics":["scour-erosion","earthworks","reinforced-soil","delivery"],"country":"United States","region":"Mills County, Iowa","owner":"Iowa Department of Transportation","year":2021,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Erosion-resistant matting","Embankment protection","Life-cycle comparison"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The FHWA case documents flexible matting, economic assumptions and the treated extent; full construction drawings are not attached.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The case separates $6.8 million emergency restoration from $2.3 million resilience improvements and reports a benefit-cost ratio of 1.07.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Emergency restoration was completed in May 2019; the matting installation followed approval in 2021.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case describes installed protection along 2.25 miles and the economic review.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a flood-resistant embankment protection scheme that explicitly includes residual damage in its economic assessment.","inputs":["Extract the damaged/treatment extents and recurrence assumptions.","Identify geotechnical filter, anchorage and subgrade conditions needed beyond the case summary."],"deliverables":["Prepare a typical treatment section and interface/filter checks.","Reproduce the benefit-cost calculation and vary residual repair costs and flood frequency.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"FHWA-HIF-23-027 — US 34 erosion control","url":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","publisher":"FHWA / Iowa DOT","year":2023,"access":"public-link","license":"US federal agency case study; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["us34-erosion","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us34-erosion.svg","mimeType":"image/svg+xml","bytes":1403,"sha256":"0d7537f342ec8b3bb99cf43cc07e1876dfeac674179e21cef16691ae4bfecee2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us34-erosion/download/schematic"},{"id":"us34-erosion","title":"FHWA-HIF-23-027, US34 erosion control","kind":"report","fileName":"us34-erosion.pdf","mimeType":"application/pdf","bytes":366024,"sha256":"7942f01369a05652a64ffb9fff38fbdf367db6975c699bcb2de9e6920e2b9cf6","sourceId":"s1","license":"US federal agency case study; original credits retained","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency case publication; original agency photograph credits retained.","rightsEvidenceUrl":"https://www.fhwa.dot.gov/programadmin/er/","pages":2,"downloadUrl":"/cases/us34-erosion/download/us34-erosion"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us34-erosion-reference-values.csv","mimeType":"text/csv","bytes":953,"sha256":"39a03e8e7b91c4f7c1241dd2ede1cb6d0f02a09e905ce7bc52576222b171f78e","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us34-erosion/download/reference-values"},{"id":"project-image","title":"US 34 flood damage — FHWA Figure 2","kind":"project-image","fileName":"us34-erosion.jpeg","mimeType":"image/jpeg","bytes":120095,"sha256":"a7b471f0ab8cb533098c5e0129b471c60b2cb76e148c205314b7e9c13737259f","sourceId":"s1","license":"Public domain — U.S. federal government work","width":791,"height":505,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/us34-erosion-source.json","evidenceSha256":"4fd46c5561bab26a65674c90334464d50d19f44de1eb5bd69693ee64d7c631e9","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/us34-erosion/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us34-erosion-capstone.md","mimeType":"text/markdown","bytes":3808,"sha256":"739db4e27ca57483140774286d65b7273782d3f9cd4796652900b372f1e10d17","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us34-erosion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding.","caption":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding. FHWA photograph of the Iowa project documented in the erosion-protection case.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/programadmin/er/er_case_iowa_us34.pdf","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":791,"height":505,"imageDate":null},"figureCaption":"Cracked pavement, washed-out embankment and displaced roadway on US 34 after flooding. FHWA photograph of the Iowa project documented in the erosion-protection case.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":46,"referenceValues":[{"label":"Emergency restoration cost","value":6800000,"unit":"USD","scope":"Emergency restoration following the 2019 event.","sourceId":"s1","locator":"Page 1, emergency restoration","basis":"As reported; no escalation or inflation adjustment."},{"label":"Resilience-improvement cost","value":2300000,"unit":"USD","scope":"Concrete-block matting resilience treatment.","sourceId":"s1","locator":"Page 1, Project Snapshot","basis":"As reported; no escalation or inflation adjustment."},{"label":"Treatment extent","value":2.25,"unit":"mile","scope":"Reported embankment protection extent.","sourceId":"s1","locator":"Resilience Features","basis":"Reported project length."},{"label":"Reported benefit-cost ratio","value":1.07,"unit":"dimensionless","scope":"Source economic evaluation; reproduce its assumptions before comparison.","sourceId":"s1","locator":"Resilience Features","basis":"Source calculation result."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us34-erosion-source.json","evidenceSha256":"4fd46c5561bab26a65674c90334464d50d19f44de1eb5bd69693ee64d7c631e9","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":492283,"sourceCount":1,"url":"/cases/us34-erosion"},{"id":"bluestone-dam","title":"Bluestone Dam — rock anchors and spillway-foundation protection","summary":"The safety programme combines anchoring, drainage and armor over the bedrock stilling basin. Construction must be staged while the spillway remains an active river-release route.","topics":["dams-levees","rock","scour-erosion","dewatering","delivery"],"country":"United States","region":"Hinton, West Virginia","owner":"US Army Corps of Engineers","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock anchors","Uplift drainage","Stilling-basin armor","Cofferdams"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE describes completed earlier phases and the ongoing stilling-basin work. The project is not labeled fully complete; the owner’s 2026 programme forecasts completion in 2030.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The 2020 notice identifies a $319.6 million Phase 5 contract. It is not a final cost for all phases.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The 2026 owner update reports one half complete and forecasts overall completion in 2030; this supersedes the older 2020 contract forecast.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Stage foundation anchoring and armor placement in half of an operating stilling basin.","inputs":["Extract the owner’s phase boundaries, diversion concept and uplift-control components.","Define a study flood window and rock discontinuity model for temporary and permanent checks."],"deliverables":["Check anchor demand and drain effectiveness for intact and blocked-drain scenarios.","Prepare a cofferdam sequence and flood-response plan with excavation hold points.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does temporary river diversion alter uplift beneath the work area?","Which inspection or proof-test result should delay concreting over an anchor zone?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Safety assurance project and 2026 progress","url":"https://www.lrd.usace.army.mil/Missions/Projects/Article/3631104/bluestone-dam-dam-safety-assurance-mega-project/","publisher":"USACE Great Lakes and Ohio River Division","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Phase 5 contract milestone","url":"https://www.usace.army.mil/Media/News/Article/2126116/bluestone-pdt-achieves-milestone/","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Bluestone Dam 2022a.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","publisher":"Wikimedia Commons / Antony-22","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bluestone-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bluestone-dam/download/schematic"},{"id":"project-image","title":"Bluestone Dam 2022a.jpg","kind":"project-image","fileName":"bluestone-dam.jpg","mimeType":"image/jpeg","bytes":346957,"sha256":"1956f06dd42d585fa5868ce36388d01e769be3f4e1558d874872a4fa7143082e","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Antony-22","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-04-02 13:13:58","evidenceFile":"image-provenance/bluestone-dam-commons.json","evidenceSha256":"55a381e13ba93c79b945faaf64fc9910ada6981407ff3b529abc3e1d4a12faa5","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/90/Bluestone_Dam_2022a.jpg","downloadUrl":"/cases/bluestone-dam/download/project-image","originalSha1":"7a54bc8e6d12bb134ada88de7744b4def9c86426","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bluestone-dam-capstone.md","mimeType":"text/markdown","bytes":3056,"sha256":"db4860c066a5468d0b6af254a88a791ef3657652ddccc228ec5e7352a5e98892","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bluestone-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bluestone Dam in 2022, showing work in the spillway area.","caption":"Bluestone Dam in 2022, showing work in the spillway area. The photograph corresponds to the ongoing dam-safety programme.","credit":"Antony-22","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bluestone_Dam_2022a.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2022-04-02 13:13:58","imageDownloadAllowed":true},"figureCaption":"Bluestone Dam in 2022, showing work in the spillway area. The photograph corresponds to the ongoing dam-safety programme.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":67,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bluestone-dam-commons.json","evidenceSha256":"55a381e13ba93c79b945faaf64fc9910ada6981407ff3b529abc3e1d4a12faa5","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350998,"sourceCount":3,"url":"/cases/bluestone-dam"},{"id":"sutong-bridge","title":"Sutong Bridge — deep pile groups and riverbed scour protection","summary":"The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.","topics":["deep-foundations","lateral-foundations","scour-erosion","site-investigation","monitoring","coastal-offshore"],"country":"China","region":"Yangtze River, Jiangsu","owner":"Sutong Bridge project authorities","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Large drilled-shaft groups","Post-grouting","Group interaction","Scour protection","Cofferdams"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The foundation papers describe 131 shafts beneath each main pylon, project-specific test/model evidence and construction methods. Published pile dimensions and group coefficients apply to the stated foundation and cannot be adopted as universal design factors.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The source papers include pile testing, model studies and field-monitoring comparisons, while a complete current inspection and as-built record set was not established.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coupled foundation-and-scour assessment for one Sutong main pylon, preserving the distinction between individual-pile testing and group response.","inputs":["Select the north or south foundation and retain its own shaft geometry, stratigraphy, load tests and pile-cap configuration.","Extract the design scour/protection assumptions and identify temporary construction conditions separately from permanent conditions."],"deliverables":["Compare single-shaft and group axial/lateral response using transparent assumptions and documented calibration evidence.","Prepare a scour-monitoring and protection-maintenance concept with a construction-stage cofferdam risk register.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would a tip post-grouting result on a single shaft not directly establish the settlement of the full pylon pile group?","How could local bed erosion change lateral foundation response even before the calculated axial resistance becomes critical?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of the Sutong Bridge foundations","url":"https://www.xcdsystem.com/dfi/journal/?abstractid=2007010101","publisher":"Project designers and constructors / DFI Journal","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Super-large bridge pile foundation in soft soil — testing and monitoring","url":"https://scholarsmine.mst.edu/icchge/7icchge/session08/1/","publisher":"Yang, Dai and Gong / Missouri S&T","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Scour protection for deep-water pylon foundations","url":"https://www.engineering.org.cn/sscae/EN/1160099698767880365","publisher":"Project authors / Strategic Study of CAE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Sutong Bridge in construction2.jpg","url":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","publisher":"Trevor and Joce","year":2007,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sutong-bridge.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"sutong-bridge-reference-values.csv","mimeType":"text/csv","bytes":964,"sha256":"54b76bad46f0abfe39229fdb6dfc70c2341fb243dea6db60699071418a1032b2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/sutong-bridge/download/reference-values"},{"id":"project-image","title":"Sutong Bridge — construction over the Yangtze","kind":"project-image","fileName":"sutong-bridge.jpg","mimeType":"image/jpeg","bytes":216713,"sha256":"cde90ed38819bb57406e5fc776e0ca7aa7dc3eb74adc203bb315a6aa21b51804","sourceId":"s4","license":"CC BY-SA 2.0","width":386,"height":588,"credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2007-08-23 12:57","evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d2/Sutong_Bridge_in_construction2.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/sutong-bridge/download/project-image","originalSha1":"0068ceeba8bd5efef4ff854c6ad6f377810c71aa","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sutong-bridge-capstone.md","mimeType":"text/markdown","bytes":4785,"sha256":"5f940d78551b92642633723f99f53ef00b6175da520c7ec011354b245973f91c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","caption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":386,"height":588,"imageDate":"2007-08-23 12:57","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":112,"referenceValues":[{"label":"Bored piles per main pylon foundation","value":131,"unit":"piles","scope":"Large main-pylon group described in the DFI foundation paper; not the whole-bridge pile total.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — shorter group","value":114,"unit":"m","scope":"One of the two reported main-pylon pile lengths; verify group location in the source before modelling.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — longer group","value":117,"unit":"m","scope":"Other reported main-pylon pile length; not an uncertainty range for every pile.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":223661,"sourceCount":4,"url":"/cases/sutong-bridge"},{"id":"eastern-scheldt-barrier","title":"Eastern Scheldt Barrier — foundation mats and scour resilience","summary":"The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.","topics":["coastal-offshore","shallow-foundations","scour-erosion","ground-improvement","monitoring","delivery"],"country":"Netherlands","region":"Zeeland","owner":"Rijkswaterstaat","year":1986,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Graded foundation mats","Marine scour protection","Filter compatibility","Hydraulic–geotechnical interaction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Rijkswaterstaat documents the barrier arrangement and construction period. USACE guidance describes the Eastern Scheldt graded foundation-mat approach, while recent Deltares work reassesses hydraulic loads for renewal. Hydraulic model results must be translated into geotechnical limit states.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Rijkswaterstaat dates construction to 1976–1986. Deltares describes later 2024–2025 testing for renewal, a separate phase of the asset lifecycle.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner provides an operating history; the recent research supports maintenance decisions, not a new claim that every original foundation detail is verified under future loads.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a study section of a barrier foundation and protection apron, linking hydraulic demand to filter stability, bearing and erosion-resistant details.","inputs":["Use the owner source for the barrier configuration and the technical guidance for the mat/filter concept.","Define study bed-material gradations, hydraulic loading and foundation parameters; record what is measured and what is assumed."],"deliverables":["Check filter retention/permeability and sensitivity to edge scour and loss of support near the protection apron.","Prepare construction placement tolerances, underwater inspection criteria and a renewal plan under changed hydraulic loads.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a stable surface armour layer still permit undermining through an incompatible filter or an exposed apron edge?","Which results from a hydraulic scale model can directly inform foundation checks, and which require a separate soil-response model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eastern Scheldt Barrier — owner project record","url":"https://www.rijkswaterstaat.nl/en/projects/iconic-structures/eastern-scheldt-barrier","publisher":"Rijkswaterstaat","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"ETL 1110-2-565 — scour-protection and foundation-mat discussion","url":"https://www.publications.usace.army.mil/Portals/76/Publications/EngineerTechnicalLetters/ETL_1110-2-565.pdf","publisher":"U.S. Army Corps of Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Barrier renewal scale-model tests, 2024–2025","url":"https://www.deltares.nl/en/news/mini-eastern-scheldt-barrier-passes-extreme-storm-tests","publisher":"Deltares","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Oosterscheldekering.jpg","url":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","publisher":"Klankbeeld","year":2025,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eastern-scheldt-barrier.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eastern-scheldt-barrier-reference-values.csv","mimeType":"text/csv","bytes":644,"sha256":"e611fa5ed1abaf9bdc927b2b599be79f50f803e70bb4fdcf5b9df61e14162090","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eastern-scheldt-barrier/download/reference-values"},{"id":"project-image","title":"Eastern Scheldt Barrier — view from Westerschouwen","kind":"project-image","fileName":"eastern-scheldt-barrier.jpg","mimeType":"image/jpeg","bytes":225473,"sha256":"6be491da8741403f8266f67a77fc1e5e8b735b92cb7b2d27384dff4b3517a1e3","sourceId":"s4","license":"CC BY 4.0","width":1280,"height":720,"credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2025-01-28 15:00:00","evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e8/Oosterscheldekering.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eastern-scheldt-barrier/download/project-image","originalSha1":"b70e8701cc9305b1c2e1913069101ff01517625d","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eastern-scheldt-barrier-capstone.md","mimeType":"text/markdown","bytes":4598,"sha256":"7f3a6d20167aaefea6b90d8406ae9221540013fa07968034ca578ad67a99cc1e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","caption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":720,"imageDate":"2025-01-28 15:00:00","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","qualityNotes":["The USACE technical-letter PDF is linked at its official source; that host denied a local download during this review. The local project brief and photograph remain available."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":115,"referenceValues":[{"label":"Total barrier length","value":9,"unit":"km","scope":"Owner-reported overall barrier length, including fixed sections.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."},{"label":"Movable-section length","value":3,"unit":"km","scope":"Movable portion within the overall barrier; not a separate structure to add to the 9 km total.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":231922,"sourceCount":4,"url":"/cases/eastern-scheldt-barrier"}]}