{"schemaVersion":1,"updated":"2026-11-22","total":25,"records":[{"id":"pebble-beach-bluff","title":"Pebble Beach Drive — coastal bluff stabilization","summary":"An eroding coastal bluff was treated using launched fiberglass soil nails, facing and drainage under restricted site access.","topics":["slopes","retaining-walls","coastal-offshore","seepage"],"country":"United States","region":"Crescent City, California","owner":"Del Norte County","year":2009,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Launched soil nails","Coastal slope drainage","Restricted-access construction"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The case describes nail arrangement, drainage galleries and installation adjustments. Its specialty nail system needs method-specific verification.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The case records a five-week construction period spanning December 2008 and January 2009.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Construction observations and photographs are linked at the source.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare drainage and reinforcement alternatives for a coastal bluff supporting a road, including corrosion and erosion exposure.","inputs":["Extract the exploration description and installation constraints.","Identify shoreline loading and future erosion information needed beyond the case."],"deliverables":["Develop a stability/drainage concept and distinguish launched nails from drilled-and-grouted nails.","Specify a trial installation, acceptance testing and long-term inspection plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Pebble Beach Drive slope stabilization","url":"https://www.geoinstitute.org/node/8373","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"pebble-beach-bluff.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pebble-beach-bluff/download/schematic"},{"id":"project-image","title":"Pebble Beach Drive — coastal stabilization works","kind":"project-image","fileName":"pebble-beach-bluff-r13.jpg","mimeType":"image/jpeg","bytes":134722,"sha256":"1274fb57f1619d2782a1b20c4e3c8883fd91f6a26c999a11455bec7372e8dd67","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":600,"height":450,"credit":"Del Norte County, via Soil Nail Launcher, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8373","licenseUrl":"https://www.geoinstitute.org/node/8373","imageDate":null,"evidenceFile":"image-provenance/pebble-beach-bluff-r13-source.json","evidenceSha256":"edab8ab0264051c065195fa974b31a0d414f32dbc778a367a0a38469618d34a9","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/SI1.jpg","originalSha256":"1274fb57f1619d2782a1b20c4e3c8883fd91f6a26c999a11455bec7372e8dd67","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/pebble-beach-bluff/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"pebble-beach-bluff-capstone.md","mimeType":"text/markdown","bytes":2696,"sha256":"3028e28553e93107e7a38993c995c67905c02bd14803be5a31eab41763f1ab69","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pebble-beach-bluff/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","caption":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","credit":"Del Norte County, via Soil Nail Launcher, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/8373","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8373","width":600,"height":450,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The finished bluff facing at the Pebble Beach Drive stabilization project near Crescent City, California, with its sculpted and stained surface.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":10,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/pebble-beach-bluff-r13-source.json","evidenceSha256":"edab8ab0264051c065195fa974b31a0d414f32dbc778a367a0a38469618d34a9","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3725,"sourceCount":1,"url":"/cases/pebble-beach-bluff"},{"id":"wolf-creek","title":"Wolf Creek Dam — karst-foundation cutoff wall","summary":"A deep concrete barrier and associated grouting addressed seepage through the dam’s karst foundation. USACE documents completion and project scope.","topics":["dams-levees","seepage","rock","ground-improvement","delivery"],"country":"United States","region":"Jamestown, Kentucky","owner":"US Army Corps of Engineers","year":2013,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Cutoff wall","Karst grouting","Dam seepage control"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The completion account describes approximately 1,197 overlapping piles forming a 4,000-foot barrier. It does not provide a complete issued-for-construction package.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The March 2013 USACE account identifies a $594 million rehabilitation project; this is programme scope, not the wall’s final unit-price account.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Last pile placement was reported on 6 March 2013, nine months ahead of the then-planned December completion.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"USACE records barrier completion and the subsequent reservoir review.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare a cutoff wall and grouting strategy for an operating dam over soluble rock, including continuity verification and reservoir constraints.","inputs":["Extract the documented barrier dimensions and geological problem.","Define an explicitly sourced or assumed permeability model for the study seepage calculation."],"deliverables":["Develop a seepage/uplift comparison and a wall-continuity QA plan.","Prepare a construction platform section and a reservoir/instrumentation hold-point sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Nashville District completes Wolf Creek Dam barrier wall","url":"https://www.dvidshub.net/news/103103/nashville-district-completes-wolf-creek-dam-barrier-wall","publisher":"USACE / DVIDS","year":2013,"access":"public-link","license":"US government public information; original credits retained","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Wolf Creek Dam barrier-wall construction — published image and source","url":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","publisher":"DVIDS / U.S. Army Corps of Engineers","year":2012,"access":"public-link","license":"Public domain — U.S. federal government work","notes":"Project image source. Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"wolf-creek.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/wolf-creek/download/schematic"},{"id":"project-image","title":"Wolf Creek Dam barrier-wall construction","kind":"project-image","fileName":"wolf-creek.jpg","mimeType":"image/jpeg","bytes":360915,"sha256":"3b361e7407fd987273b67296a8243d56d96b8acaacef0a11a35bbbf016ef58cc","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1000,"height":664,"credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","licenseUrl":"https://www.dvidshub.net/about/copyright","imageDate":"2012-05-02","evidenceFile":"image-provenance/wolf-creek-source.json","evidenceSha256":"7c60540ea61fdb963e680eb0e27ef54375564f419bba957c0086c51479fca3e5","transformations":"Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/wolf-creek/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"wolf-creek-capstone.md","mimeType":"text/markdown","bytes":3149,"sha256":"a6a8f5863cc2de9de547b3be3d54e50e32e3a1475422a83b73f24b26ce485245","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/wolf-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012.","caption":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012. U.S. Army Corps of Engineers photograph by Leon Roberts.","credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/1965076/nashville-district-highlights-its-notable-projects-leading-into-national-dam-safety-awareness-day","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.dvidshub.net/about/copyright","width":1000,"height":664,"imageDate":"2012-05-02"},"figureCaption":"Concrete barrier-wall construction in the Wolf Creek Dam embankment on May 2, 2012. U.S. Army Corps of Engineers photograph by Leon Roberts.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":20,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/wolf-creek-source.json","evidenceSha256":"7c60540ea61fdb963e680eb0e27ef54375564f419bba957c0086c51479fca3e5","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":365049,"sourceCount":2,"url":"/cases/wolf-creek"},{"id":"center-hill","title":"Center Hill Dam — grouting, cutoff wall and stabilizing berm","summary":"A staged rehabilitation treated foundation seepage and auxiliary-dam risks using grouting, a deep cutoff wall and a roller-compacted-concrete berm.","topics":["dams-levees","seepage","rock","ground-improvement","delivery"],"country":"United States","region":"DeKalb County, Tennessee","owner":"US Army Corps of Engineers","year":2020,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Foundation grouting","Cutoff wall","Stabilizing berm"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"USACE describes three major repair phases and their completed components; detailed construction plans are not attached to the completion release.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The completion release reports $353 million overall, with $107 million grouting, $122 million cutoff and $50 million berm contracts; scopes differ from the programme total.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Reported phases were grouting in 2008–2010, cutoff in 2012–2015 and final berm completion celebrated in July 2020.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The USACE release documents the final repair phase and constructed features.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a risk-based sequence of dam repairs in which initial grouting also informs the later cutoff design.","inputs":["Extract phase scope, wall depth and published contract-period information.","Identify the piezometric and geological evidence needed to assess each repaired failure mode."],"deliverables":["Prepare a seepage/stability failure-mode map and an investigation-to-construction decision process.","Compare a single-stage programme with the documented phased strategy.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Berm construction completes last repair phase for dam rehabilitation","url":"https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2261687/berm-construction-completes-last-repair-phase-for-dam-rehabilitation/","publisher":"USACE","year":2020,"access":"public-link","license":"USACE public information; original credits retained","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Center Hill auxiliary-dam RCC berm — published image and source","url":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","publisher":"DVIDS / U.S. Army Corps of Engineers","year":2020,"access":"public-link","license":"Public domain — U.S. federal government work","notes":"Project image source. Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"center-hill.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/center-hill/download/schematic"},{"id":"project-image","title":"Center Hill auxiliary-dam RCC berm","kind":"project-image","fileName":"center-hill.jpg","mimeType":"image/jpeg","bytes":293503,"sha256":"a0d33fc9f80d78aecd1af015fbcb8573ffccfdd3639abf05c4993f77dfefa73c","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1000,"height":667,"credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","licenseUrl":"https://www.dvidshub.net/about/copyright","imageDate":"2020","evidenceFile":"image-provenance/center-hill-source.json","evidenceSha256":"7491f54c4d276ee87d196bb5ab594f571734776ba54d95bb86336014027cecf1","transformations":"Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/center-hill/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"center-hill-capstone.md","mimeType":"text/markdown","bytes":3178,"sha256":"fd3962a5077f1d6636c34b684c2ab4f19da43c9623771422cb63d524eb0013d6","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/center-hill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020..","caption":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020.","credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.dvidshub.net/about/copyright","width":1000,"height":667,"imageDate":"2020"},"figureCaption":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":21,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/center-hill-source.json","evidenceSha256":"7491f54c4d276ee87d196bb5ab594f571734776ba54d95bb86336014027cecf1","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":297666,"sourceCount":2,"url":"/cases/center-hill"},{"id":"herbert-hoover","title":"Herbert Hoover Dike — seepage barriers and structure replacement","summary":"The rehabilitation combined cutoff walls, culvert replacements and embankment armoring around Lake Okeechobee. USACE provides a completion summary and project update.","topics":["dams-levees","seepage","ground-improvement","monitoring","delivery"],"country":"United States","region":"Lake Okeechobee, Florida","owner":"US Army Corps of Engineers","year":2023,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Cutoff walls","Internal erosion","Embankment armoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE documents more than 56 miles of cutoff wall and replacement of 28 water-control structures, alongside other risk-reduction work.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The January 2023 announcement reports $1.5 billion invested; the later Fall 2023 update reports over $1.6 billion since 2001. Preserve the different dates and scopes.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE celebrated construction completion in January 2023 after a programme begun in 2005.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The completion release and later update describe completed risk-reduction features.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a reach-prioritization and treatment plan for a long embankment system with penetrations and heterogeneous seepage risk.","inputs":["Extract the completed work types and distinguish dike length from treated cutoff length.","Select one study reach and record what local borings, heads and structure details remain necessary."],"deliverables":["Compare seepage-control alternatives at a typical reach and at a culvert penetration.","Build a work-package schedule and QA plan for interfaces between walls and structures.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Herbert Hoover Dike rehabilitation completion","url":"https://www.saj.usace.army.mil/Media/News-Releases/Article/3276863/usace-marks-herbert-hoover-dike-rehabilitation-project-completion-with-ribbon-c/","publisher":"USACE","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Herbert Hoover Dike — Fall 2023 project update","url":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","publisher":"USACE","year":2023,"access":"public-link","license":"USACE public information; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["herbert-hoover-update","project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"herbert-hoover.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/herbert-hoover/download/schematic"},{"id":"herbert-hoover-update","title":"Herbert Hoover Dike project update, Fall 2023","kind":"report","fileName":"herbert-hoover-update.pdf","mimeType":"application/pdf","bytes":1823491,"sha256":"01202f04ff137dff3893984e220dba8cc131287ee65070944b1b0c4dea9d6e69","sourceId":"s2","license":"USACE public information; original credits retained","rightsUrl":"https://www.usace.army.mil/Privacy-and-Security/","rightsBasis":"USACE public-information policy permits copying and distribution unless otherwise indicated.","rightsEvidenceUrl":"https://www.usace.army.mil/Privacy-and-Security/","pages":2,"downloadUrl":"/cases/herbert-hoover/download/herbert-hoover-update"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"herbert-hoover-reference-values.csv","mimeType":"text/csv","bytes":767,"sha256":"03152f87e5ef980f6f0c4ca7440c17766655c72932e645aa4edb92b3a26c9f9e","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/herbert-hoover/download/reference-values"},{"id":"project-image","title":"Herbert Hoover Dike cutoff-wall construction","kind":"project-image","fileName":"herbert-hoover.jpeg","mimeType":"image/jpeg","bytes":1250146,"sha256":"901a3bac7b402ad688e24f2fe77941a34e7cd9d3602d4edc5ac331ccd350cf6a","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1200,"height":800,"credit":"U.S. Army Corps of Engineers, Jacksonville District","sourceUrl":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","licenseUrl":"https://www.usace.army.mil/Privacy-and-Security/","imageDate":null,"evidenceFile":"image-provenance/herbert-hoover-source.json","evidenceSha256":"0bf437e163401247f8725180dba9abdf6f6aa5a4234808386c3f48ac5f91252e","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/herbert-hoover/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"herbert-hoover-capstone.md","mimeType":"text/markdown","bytes":4026,"sha256":"ee6a2a35f3d9cab06c07dbb0f25fb69ea7cc757392cba4fbaaf9563b9c91d87d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/herbert-hoover/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee.","caption":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee. Original USACE photograph from the Fall 2023 project update.","credit":"U.S. Army Corps of Engineers, Jacksonville District","sourceUrl":"https://usace.contentdm.oclc.org/digital/api/collection/p16021coll11/id/6735/download","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.usace.army.mil/Privacy-and-Security/","width":1200,"height":800,"imageDate":null},"figureCaption":"Construction equipment working along the Herbert Hoover Dike at Lake Okeechobee. Original USACE photograph from the Fall 2023 project update.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":22,"referenceValues":[{"label":"Completed cutoff-wall length","value":56.2,"unit":"mile","scope":"Partial-penetration wall described in the Fall 2023 update.","sourceId":"s2","locator":"Embankment cutoff wall","basis":"Reported completed length."},{"label":"Replaced water-control structures","value":28,"unit":"count","scope":"Replacement work within the rehabilitation programme.","sourceId":"s2","locator":"Water control structures","basis":"Reported completed quantity."},{"label":"Removed or abandoned structures","value":4,"unit":"count","scope":"Structures no longer required.","sourceId":"s2","locator":"Water control structures","basis":"Reported completed quantity."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/herbert-hoover-source.json","evidenceSha256":"0bf437e163401247f8725180dba9abdf6f6aa5a4234808386c3f48ac5f91252e","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":3079415,"sourceCount":2,"url":"/cases/herbert-hoover"},{"id":"oroville-spillways","title":"Oroville spillway recovery — erosion-resistant foundation reconstruction","summary":"Recovery rebuilt the main spillway and added a secant pile wall, splashpad and buttress at the emergency spillway after the 2017 incident.","topics":["rock","scour-erosion","dams-levees","seepage","delivery"],"country":"United States","region":"Oroville, California","owner":"California Department of Water Resources","year":2018,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Erosion control","Secant pile wall","Rock foundation drainage"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"DWR’s recovery page links investigations and describes the final-design reconstruction; the project update distinguishes initial mobilization from the completed design.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The September 2018 update estimated $940 million recovery through 2019, plus $160 million emergency response; these are dated estimates, not a final account.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"Temporary main-spillway readiness was targeted for November 2017; final-design reconstruction was completed in 2018.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"DWR links consultant, inspection and forensic records from the recovery page.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an emergency-to-permanent reconstruction plan that addresses erosion, uplift and uncertain rock quality.","inputs":["Review the forensic findings and identify the selected failure mechanisms.","Extract the repair cross sections and distinguish temporary from permanent work."],"deliverables":["Prepare a foundation-drainage and erosion-protection concept with construction hold points.","Reconcile changing estimate scopes and show how geological uncertainty enters contingency.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Oroville Spillways Recovery","url":"https://water.ca.gov/Programs/State-Water-Project/SWP-Facilities/Oroville/Oroville-Spillways","publisher":"California DWR","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"September 2018 construction and cost estimate update","url":"https://water.ca.gov/News/News-Releases/2018/Sept-18/Oroville-Spillways-Construction-and-Cost-Estimate-Update","publisher":"California DWR","year":2018,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Oroville Dam weir and emergency spillway erosion.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","publisher":"Wikimedia Commons / California Department of Water Resources","year":2017,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"oroville-spillways.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oroville-spillways/download/schematic"},{"id":"project-image","title":"Oroville Dam weir and emergency spillway erosion.jpg","kind":"project-image","fileName":"oroville-spillways.jpg","mimeType":"image/jpeg","bytes":320332,"sha256":"f4bd13af9ead3b5be6c9e4a05f99af18dd1c77f2fec0b5b3abc0cde34b401542","sourceId":"s3","license":"Public domain","width":1200,"height":900,"credit":"California Department of Water Resources","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg#Licensing","imageDate":"2017-02-13","evidenceFile":"image-provenance/oroville-spillways-commons.json","evidenceSha256":"e0d98727520124a4f3f46bcb4cef896752cbd9e8edd6e0aa990b908411566689","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bc/Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","downloadUrl":"/cases/oroville-spillways/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"oroville-spillways-capstone.md","mimeType":"text/markdown","bytes":3348,"sha256":"56fa6675b828b6b1cd30cec6dd7461afa664e2b2ba051586c8e6dce28299e59a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oroville-spillways/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident.","caption":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident. California Department of Water Resources project photograph.","credit":"California Department of Water Resources","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oroville_Dam_weir_and_emergency_spillway_erosion.jpg#Licensing","width":1200,"height":900,"imageDate":"2017-02-13"},"figureCaption":"Oroville Dam’s emergency spillway and the erosion below its weir during the February 2017 spillway incident. California Department of Water Resources project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":24,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/oroville-spillways-commons.json","evidenceSha256":"e0d98727520124a4f3f46bcb4cef896752cbd9e8edd6e0aa990b908411566689","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":324697,"sourceCount":3,"url":"/cases/oroville-spillways"},{"id":"teton-dam","title":"Teton Dam — internal erosion and first-filling investigation","summary":"The first-filling failure is documented through the Bureau of Reclamation’s history and the independent investigation report.","topics":["dams-levees","seepage","rock","site-investigation"],"country":"United States","region":"Eastern Idaho","owner":"US Bureau of Reclamation","year":1976,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Internal erosion","Filters and contacts","First-filling surveillance"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The official archive provides the original design/foundation investigation context and the 1976 failure report; the dam was not rebuilt.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Failure occurred on 5 June 1976; the independent panel report was submitted in December 1976.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The official archive links the investigation and contemporary photographs; there is no completed replacement-dam record.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate alternative core/filter and foundation-treatment concepts using the investigation as a forensic reference, without treating a classroom redesign as an approved remedy.","inputs":["Extract foundation geology, core/filter arrangement and reservoir-filling observations.","Separate contemporary records from later interpretations of the failure mechanism."],"deliverables":["Prepare a potential-failure-mode analysis and a filtered-contact concept.","Design a first-filling monitoring and escalation plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Teton Dam history and investigation archive","url":"https://www.usbr.gov/pn/snakeriver/dams/uppersnake/teton/","publisher":"Bureau of Reclamation","year":1976,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Breach of Teton Dam - DPLA - 657b673aa7b01ea982116a68bef069b4.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","publisher":"Wikimedia Commons / Department of the Interior. Bureau of Reclamation. Denver Office. 3/4/1988","year":1976,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"teton-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/teton-dam/download/schematic"},{"id":"project-image","title":"Breach of Teton Dam - DPLA - 657b673aa7b01ea982116a68bef069b4.jpg","kind":"project-image","fileName":"teton-dam.jpg","mimeType":"image/jpeg","bytes":343519,"sha256":"ee45a14882d8e40ef7cdb8d2ece02d9b5374b2d05f99d4b1b102ea2a0eeda844","sourceId":"s2","license":"Public domain","width":1280,"height":1343,"credit":"U.S. Bureau of Reclamation / U.S. National Archives at Denver","sourceUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg#Licensing","imageDate":"1976-06-05","evidenceFile":"image-provenance/teton-dam-commons.json","evidenceSha256":"37ed6c24f2101c2bca27da33b67333e9b1d6149cc3a7f12fc66d13eb389b47b9","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0c/Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","downloadUrl":"/cases/teton-dam/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"teton-dam-capstone.md","mimeType":"text/markdown","bytes":3122,"sha256":"b5d2ac5ede4ca9a488bd21b78156a925a2c65879cecce063d5ca5c2181a91114","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/teton-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The breach of Teton Dam, June 5, 1976.","caption":"The breach of Teton Dam, June 5, 1976. Historical project photograph from the U.S. Bureau of Reclamation collection.","credit":"U.S. Bureau of Reclamation / U.S. National Archives at Denver","sourceUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg#Licensing","width":1280,"height":1343,"imageDate":"1976-06-05"},"figureCaption":"The breach of Teton Dam, June 5, 1976. Historical project photograph from the U.S. Bureau of Reclamation collection.","qualityNotes":["This is a failure-analysis case, not a successfully completed design example."],"checked":"2026-11-22","curatedOrder":25,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/teton-dam-commons.json","evidenceSha256":"37ed6c24f2101c2bca27da33b67333e9b1d6149cc3a7f12fc66d13eb389b47b9","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":347626,"sourceCount":2,"url":"/cases/teton-dam"},{"id":"17th-street-canal","title":"17th Street Canal — floodwall failure and reevaluation","summary":"Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.","topics":["dams-levees","seepage","retaining-walls","laboratory-testing","site-investigation"],"country":"United States","region":"New Orleans, Louisiana","owner":"US Army Corps of Engineers","year":2005,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Floodwall stability","Undrained strength","Water-filled gap","Seepage"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"USACE publishes reevaluation material and later remediation decisions. The record distinguishes the original I-wall problem from subsequent protection measures.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The reevaluation and remediation decisions are linked; complete as-built records for all later works are not included.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconcile competing ground-model and wall-loading assumptions, then propose a monitored remediation concept.","inputs":["Extract a published cross section and the laboratory/field-test evidence for foundation strength.","Identify canal water levels, wall embedment and alternative assumptions for a water-filled gap."],"deliverables":["Compare effective-stress/undrained equilibrium cases and sensitivity to weak layers.","Develop a remediation alternatives assessment and a verification investigation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"17th Street Canal reevaluation","url":"https://www.mvn.usace.army.mil/portals/56/docs/hsdrrs/MOWL-17th-St-Canal.pdf","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Decision record for outfall-canal remediation","url":"https://www.mvn.usace.army.mil/Media/News-Releases/Article/474147/district-commander-signs-decision-record-for-remediation-work-at-outfall-canals/","publisher":"USACE","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"NOAA Katrina NOLA 17th Street breach Aug 31 2005.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","publisher":"Wikimedia Commons / NOAA","year":2005,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"17th-street-canal.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/17th-street-canal/download/schematic"},{"id":"project-image","title":"NOAA Katrina NOLA 17th Street breach Aug 31 2005.jpg","kind":"project-image","fileName":"17th-street-canal.jpg","mimeType":"image/jpeg","bytes":977324,"sha256":"4639a5baf2a1b834fae4f2b53ab79923419920b8f3b16a2e77e8ce7edb2cba2d","sourceId":"s3","license":"Public domain","width":1082,"height":1323,"credit":"NOAA","sourceUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg#Licensing","imageDate":"2005-08","evidenceFile":"image-provenance/17th-street-canal-commons.json","evidenceSha256":"cab42e822a4adb6db090593124612f985014194d864bb832d291240d96c01aef","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/cb/NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","downloadUrl":"/cases/17th-street-canal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"17th-street-canal-capstone.md","mimeType":"text/markdown","bytes":3240,"sha256":"f25f19a3fb10fabdc8a6c29c1359ee75db4fa42a4cef7977c4f8ec0b967ef236","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/17th-street-canal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina.","caption":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina in August 2005. NOAA photograph.","credit":"NOAA","sourceUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg#Licensing","width":1082,"height":1323,"imageDate":"2005-08"},"figureCaption":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina in August 2005. NOAA photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":31,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/17th-street-canal-commons.json","evidenceSha256":"cab42e822a4adb6db090593124612f985014194d864bb832d291240d96c01aef","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":981549,"sourceCount":3,"url":"/cases/17th-street-canal"},{"id":"hanford-barrier","title":"Prototype Hanford Barrier — long-term infiltration control","summary":"Long-term monitoring examines an evapotranspiration-capillary barrier intended to limit infiltration into waste. The annual report also discusses side-slope edge effects.","topics":["geoenvironmental","seepage","monitoring","earthworks"],"country":"United States","region":"Hanford Site, Washington","owner":"US Department of Energy / PNNL","year":2024,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Evapotranspiration cover","Unsaturated flow","Water balance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The FY 2024 report presents barrier sections, instrumentation and water-balance observations; it is a performance report, not a universal cover design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The report covers July 2023–June 2024 observations and was published in 2025.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Annual measured-performance results and instrument maintenance are documented.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a cover-design and monitoring study that accounts for both central capillary storage and lateral edge drainage.","inputs":["Extract layer geometry, climate observations and the stated drainage criterion.","Distinguish central-cover performance from gravel/riprap side-slope behaviour."],"deliverables":["Prepare a seasonal water-storage calculation and a sensitivity study for precipitation and vegetation.","Design a monitoring layout that can detect edge effects and instrument failure.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Prototype Hanford Barrier performance monitoring — FY 2024","url":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","publisher":"PNNL / US DOE","year":2025,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"The report is openly downloadable at the publisher; PNNL reuse terms require separate consideration, so it is linked rather than mirrored.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hanford-barrier.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hanford-barrier/download/schematic"},{"id":"project-image","title":"Prototype Hanford Barrier — original annotated aerial photograph","kind":"project-image","fileName":"hanford-barrier.jpeg","mimeType":"image/jpeg","bytes":459599,"sha256":"63cb16ca1395d7d5ff0fde51b014a0d920e143cf1127e6bd90d4abdf56479bc1","sourceId":"s1","license":"PNNL permission for noncommercial scientific and educational use","width":1449,"height":1177,"credit":"Pacific Northwest National Laboratory / U.S. Department of Energy; Figure 1 in Thomle and Linneman (2025), modified in that report from DOE-RL (2016)","sourceUrl":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","licenseUrl":"https://www.pnnl.gov/important-notices","imageDate":"1994-08-09","evidenceFile":"image-provenance/hanford-barrier-source.json","evidenceSha256":"d2328302fe4d206a8b7ebc2cef155b3bc29e55e057a951732eb7e5fdfc0306d1","transformations":"Unchanged complete original embedded image extracted from the identified PDF. Original labels retained; no crop, retouching, or newly added annotation.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/hanford-barrier/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hanford-barrier-capstone.md","mimeType":"text/markdown","bytes":3018,"sha256":"3674df64a7230934309cfd38e9079fda91df6bba4d8bcecbdddb3652ef3cf96d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hanford-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Annotated aerial photograph of the completed Prototype Hanford Barrier in August 1994.","caption":"Annotated aerial photograph of the completed Prototype Hanford Barrier on August 9, 1994, reproduced as Figure 1 in PNNL-36586 (2025). The labels and outlines are part of the original published figure.","credit":"Pacific Northwest National Laboratory / U.S. Department of Energy; Figure 1 in Thomle and Linneman (2025), modified in that report from DOE-RL (2016)","sourceUrl":"https://www.pnnl.gov/publications/prototype-hanford-barrier-performance-monitoring-report-fiscal-year-2024","license":"PNNL permission for noncommercial scientific and educational use","licenseUrl":"https://www.pnnl.gov/important-notices","width":1449,"height":1177,"imageDate":"1994-08-09","preserveWholeImage":true},"figureCaption":"Annotated aerial photograph of the completed Prototype Hanford Barrier on August 9, 1994, reproduced as Figure 1 in PNNL-36586 (2025). The labels and outlines are part of the original published figure.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":35,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hanford-barrier-source.json","evidenceSha256":"d2328302fe4d206a8b7ebc2cef155b3bc29e55e057a951732eb7e5fdfc0306d1","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":463608,"sourceCount":1,"url":"/cases/hanford-barrier"},{"id":"port-brisbane","title":"Port of Brisbane — vacuum consolidation beside a marine park","summary":"A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.","topics":["ground-improvement","settlement","seepage","problem-soils","coastal-offshore"],"country":"Australia","region":"Fisherman Islands, Queensland","owner":"Port of Brisbane","year":2009,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vacuum preloading","Vertical drains","Cutoff isolation","Lateral movement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner, contractor and consultant paper records the trial design objectives, instrumentation and interpreted performance. Its successful trial does not establish identical behavior in every reclamation cell.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare vacuum-assisted and fill-only preloading for an environmentally constrained soft-ground boundary.","inputs":["Extract the trial profile, drainage arrangement and cutoff function.","List the settlement, pore-pressure and lateral-displacement observations needed to separate mechanisms."],"deliverables":["Compare consolidation time and stability for vacuum-plus-fill versus higher surcharge.","Specify vacuum-loss response, cutoff continuity tests and a monitoring plan at the sensitive boundary.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would an undetected sand connection reduce the effective vacuum in the clay?","Why must improved consolidation time be assessed alongside lateral movement?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Successful application of vacuum consolidation","url":"https://rpsonline.com.sg/proceedings/9789810831240/html/GI125.php","publisher":"Port of Brisbane, Menard and Coffey project authors","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Performance and prediction of vacuum combined surcharge consolidation","url":"https://ascelibrary.com/doi/10.1061/%28ASCE%29GT.1943-5606.0000519","publisher":"Indraratna and project coauthors / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Port of Brisbane and Brisbane Airport June 2015.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","publisher":"Wikimedia Commons / Nick-D","year":2015,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"port-brisbane.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-brisbane/download/schematic"},{"id":"project-image","title":"Port of Brisbane and Brisbane Airport June 2015.jpg","kind":"project-image","fileName":"port-brisbane.jpg","mimeType":"image/jpeg","bytes":144392,"sha256":"64dc5639a068a195aeddfa35450009393fb02813c20b5a6d70334cd8a822135f","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":959,"credit":"Nick-D","sourceUrl":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2015-06-30 11:56:37","evidenceFile":"image-provenance/port-brisbane-commons.json","evidenceSha256":"a5d5469a7028e7ab4d41f10074f724774726a497f48327df25bc2effa337a475","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/69/Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","downloadUrl":"/cases/port-brisbane/download/project-image","originalSha1":"3412db9547a125dd74c90c8c2c9006240612c154","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"port-brisbane-capstone.md","mimeType":"text/markdown","bytes":3302,"sha256":"fee1d5cbb729910937eee63cc5be6be0cefc54d4bf4492c6c67611e85d30f71b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-brisbane/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Port of Brisbane and adjoining airport in 2015.","caption":"Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.","credit":"Nick-D","sourceUrl":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":959,"imageDate":"2015-06-30 11:56:37","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":56,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/port-brisbane-commons.json","evidenceSha256":"a5d5469a7028e7ab4d41f10074f724774726a497f48327df25bc2effa337a475","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":148882,"sourceCount":3,"url":"/cases/port-brisbane"},{"id":"san-vicente-dam","title":"San Vicente Dam raise — rock preparation and RCC interface","summary":"The existing concrete dam was raised using roller-compacted concrete. Owner documents connect excavation to competent rock, treatment of localized poor material and seepage control with the enlarged structure.","topics":["rock","dams-levees","seepage","excavation","delivery"],"country":"United States","region":"San Diego County, California","owner":"San Diego County Water Authority","year":2014,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock excavation","Dental concrete","Consolidation grouting","RCC"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The environmental design commitments describe proposed foundation measures; the completion account establishes the constructed dam raise. Detailed final foundation treatment records are not included.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports foundation preparation beginning in June 2009 and construction ending in June 2014.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan foundation preparation and construction of an RCC enlargement beside an existing gravity dam.","inputs":["Extract the owner’s foundation-treatment commitments and construction milestones.","Identify rock defects, existing-dam support and old/new concrete interfaces needing detailed verification."],"deliverables":["Prepare excavation acceptance criteria, dental-concrete details and grout/drain layouts.","Check a representative enlarged section for sliding and uplift, with treatment effectiveness sensitivities.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does excavating beside the original dam change temporary stability requirements?","Which field observations should decide whether a weak rock pocket is removed or treated?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geology and soils design commitments","url":"https://www.sdcwa.org/sites/default/files/files/environmental-docs/csp/Section%2003_08%2C%20Alt%201%20Geology%20%2008%2024%2007.pdf","publisher":"San Diego County Water Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Completion of the dam raise","url":"https://www.sdcwa.org/historic-san-vicente-dam-raise-project-completed/","publisher":"San Diego County Water Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Drone Photography San Vicente Reservoir and Dam San Diego.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","publisher":"Wikimedia Commons / Redideo","year":2024,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"san-vicente-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/san-vicente-dam/download/schematic"},{"id":"project-image","title":"Drone Photography San Vicente Reservoir and Dam San Diego.jpg","kind":"project-image","fileName":"san-vicente-dam.jpg","mimeType":"image/jpeg","bytes":169202,"sha256":"13b8f0c81856c9a03fefd07c981f6913f52c9e46eb2ba83a8706c2f6db0b55e2","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":715,"credit":"Redideo","sourceUrl":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2024-04-21","evidenceFile":"image-provenance/san-vicente-dam-commons.json","evidenceSha256":"e1a6c813b0c557b0253bdb3b0e6764fe4402a1e58f2a6282e512b67dd9e29779","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","downloadUrl":"/cases/san-vicente-dam/download/project-image","originalSha1":"a17feb3503b42dbb142e24edfd3a3f2663af8f7b","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"san-vicente-dam-capstone.md","mimeType":"text/markdown","bytes":3308,"sha256":"f5024109cac1cebbe29b76af2538e1c2ea9fba72955662e777a3a827ca7baefa","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/san-vicente-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County.","caption":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County. The photograph shows the actual completed dam, not a rendering of the proposed raise.","credit":"Redideo","sourceUrl":"https://commons.wikimedia.org/wiki/File:Drone_Photography_San_Vicente_Reservoir_and_Dam_San_Diego.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":715,"imageDate":"2024-04-21","imageDownloadAllowed":true},"figureCaption":"Aerial view of the raised San Vicente Dam and reservoir in San Diego County. The photograph shows the actual completed dam, not a rendering of the proposed raise.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":62,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/san-vicente-dam-commons.json","evidenceSha256":"e1a6c813b0c557b0253bdb3b0e6764fe4402a1e58f2a6282e512b67dd9e29779","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":173527,"sourceCount":3,"url":"/cases/san-vicente-dam"},{"id":"isabella-dam","title":"Isabella Dam modifications — seismic, seepage and spillway risk","summary":"The main and auxiliary dams were modified to address combined seismic, seepage and flood-passage concerns. Owner records describe dam raises, downstream buttress work, filters, drainage and major spillway excavation.","topics":["dams-levees","seepage","seismic","rock","earthworks"],"country":"United States","region":"Kern County, California","owner":"US Army Corps of Engineers","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Embankment buttress","Filter compatibility","Rock excavation","Dam raise"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE publishes the programme scope and completion milestones. A study should keep the different failure modes separate before combining their risk-reduction measures.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The owner identifies a $204 million Phase II construction contract awarded in 2017. This amount is contract scope, not the whole programme’s final cost.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE reports substantial completion of the Phase II dam and spillway work in 2022; related facilities are separate phases.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"USACE documents a reduced dam-risk classification and lifting of operating restrictions in 2023.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coordinated rehabilitation concept for an embankment dam with both seepage and seismic deficiencies.","inputs":["Extract the owner’s modification components and their targeted failure modes.","Build study sections for the embankment, filter/drain system and spillway excavation."],"deliverables":["Compare stability and seepage checks before and after buttressing and drainage improvements.","Sequence the work to preserve flood passage and define filter-placement quality controls.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which risk remains if a dam raise is designed without checking seepage gradients?","How should rock excavation and embankment placement share temporary drainage and access?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Isabella Dam safety modification project","url":"https://www.spk.usace.army.mil/Missions/Civil-Works/Isabella-Dam-Safety-Modification-Project/show/all/","publisher":"USACE Sacramento District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Operating restrictions lifted after improvements","url":"https://www.spk.usace.army.mil/Media/News-Releases/Article/3465598/usace-lowers-isabella-dam-risk-rating-lifts-operating-restrictions/","publisher":"USACE Sacramento District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Aerial view of the Isabella Dam Safety Modification Project.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers, Sacramento District","year":2022,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"isabella-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/isabella-dam/download/schematic"},{"id":"project-image","title":"Aerial view of the Isabella Dam Safety Modification Project.jpg","kind":"project-image","fileName":"isabella-dam.jpg","mimeType":"image/jpeg","bytes":575748,"sha256":"f66ddb737d1275d09742d361d46183bcf320b45382a1625ec3e4af5f0f9d5750","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"U.S. Army Corps of Engineers, Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg#Licensing","imageDate":"2022-09-13 20:00:00","evidenceFile":"image-provenance/isabella-dam-commons.json","evidenceSha256":"585cadac20100e6a89c699ae881d201bb11fd0a8f347cfe93812aaa5a2d07c09","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bd/Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","downloadUrl":"/cases/isabella-dam/download/project-image","originalSha1":"bb9ba911a669570736c2b7ca7f7f5b5e1079e431","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"isabella-dam-capstone.md","mimeType":"text/markdown","bytes":3526,"sha256":"4abb6ee3c8ffc12bed66ea962c61321ddb882f4d54ec0ee44678422325316d28","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/isabella-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022.","caption":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022. USACE construction photograph of the actual dams and spillway works.","credit":"U.S. Army Corps of Engineers, Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg#Licensing","width":1280,"height":960,"imageDate":"2022-09-13 20:00:00","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022. USACE construction photograph of the actual dams and spillway works.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":64,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/isabella-dam-commons.json","evidenceSha256":"585cadac20100e6a89c699ae881d201bb11fd0a8f347cfe93812aaa5a2d07c09","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":580259,"sourceCount":3,"url":"/cases/isabella-dam"},{"id":"east-branch-dam","title":"East Branch Dam — cutoff-wall construction and verification","summary":"A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.","topics":["dams-levees","seepage","ground-improvement","monitoring"],"country":"United States","region":"Elk County, Pennsylvania","owner":"US Army Corps of Engineers","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seepage cutoff","Wall continuity","Verification drilling"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner releases establish the rehabilitation scope and outcome. The cited verification reference is an abstract, so complete verification datasets are not claimed locally.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The owner reports a $132.5 million cutoff-wall rehabilitation contract awarded in 2014, not a certified final expenditure.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The owner’s 2020 releases describe repair completion and reservoir-operating changes.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a cutoff-wall quality-assurance programme that can demonstrate continuity without damaging the finished barrier.","inputs":["Extract the owner’s treatment objective and the technical abstract’s verification problem.","Specify study foundation permeability zones and their uncertainty before comparing barrier options."],"deliverables":["Estimate seepage reduction for intact and defective wall scenarios.","Develop test-panel, drilling, permeability-testing and reservoir-response acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can a low-permeability test core establish continuity between adjacent panels?","What monitoring evidence is needed before relaxing an operating restriction?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Repair-project conclusion","url":"https://www.usace.army.mil/Media/News/Article/2453263/thats-a-wrap-corps-concludes-east-branch-dam-repair-project/","publisher":"USACE Pittsburgh District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Return to normal operations announcement","url":"https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2386554/east-branch-dam-safety-modification-project-returning-to-normal-operations-weat/","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Lessons during cutoff-wall verification drilling","url":"https://damsafety.org/reference/east-branch-dam-lessons-learned-during-cutoff-wall-verification-drilling","publisher":"USACE authors / ASDSO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"USACE East Branch Clarion River Lake and Dam.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","publisher":"Wikimedia Commons / Margaret Luzier, U.S. Army Corps of Engineers","year":1985,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"east-branch-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-branch-dam/download/schematic"},{"id":"project-image","title":"USACE East Branch Clarion River Lake and Dam.jpg","kind":"project-image","fileName":"east-branch-dam.jpg","mimeType":"image/jpeg","bytes":295707,"sha256":"3a7264103efa49f7a3c6af162e3c91518990dbc92b306642e9d07fe5b08de9d8","sourceId":"s4","license":"Public domain","width":1280,"height":854,"credit":"Margaret Luzier, U.S. Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing","imageDate":"1985-09-01","evidenceFile":"image-provenance/east-branch-dam-commons.json","evidenceSha256":"c1163c137e1710737ad46d4a734fa7fc01a733a7ca0c14b7a83b70471c24912a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b5/USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","downloadUrl":"/cases/east-branch-dam/download/project-image","originalSha1":"b4e50869d539b41ada751c645b44bb0bc14f6900","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"east-branch-dam-capstone.md","mimeType":"text/markdown","bytes":3598,"sha256":"0424302e3006289b5f388519b956d139f36356bd9b7283fd3dc7b8a8a3076f4c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-branch-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania.","caption":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.","credit":"Margaret Luzier, U.S. Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing","width":1280,"height":854,"imageDate":"1985-09-01","imageDownloadAllowed":true},"figureCaption":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":65,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/east-branch-dam-commons.json","evidenceSha256":"c1163c137e1710737ad46d4a734fa7fc01a733a7ca0c14b7a83b70471c24912a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":300290,"sourceCount":4,"url":"/cases/east-branch-dam"},{"id":"clearwater-dam","title":"Clearwater Dam — karst pretreatment and a hanging cutoff","summary":"A sinkhole prompted foundation exploration and grouting before construction of a deep seepage cutoff. The owner explains why treating solution-enlarged fractures was necessary for slurry-supported excavation.","topics":["dams-levees","seepage","rock","ground-improvement"],"country":"United States","region":"Wayne and Reynolds counties, Missouri","owner":"US Army Corps of Engineers","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Karst grouting","Hydromill cutoff","Slurry loss control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE’s rehabilitation account describes the grouting sequence, epikarst treatment and cutoff construction. Its forecast of later completion is retained as a forecast rather than a final-account statement.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The owner page forecast approximately $240 million for the overall rehabilitation. It is not presented here as a verified final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE records placement of the final cutoff panel on 6 December 2011; the page’s remaining-work milestones were forecasts.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a pretreatment and cutoff-wall sequence for a dam with connected karst features.","inputs":["Extract the reported seepage problem and the relationship between pretreatment and panel excavation.","Define a study range for rock permeability and connected-void sizes."],"deliverables":["Compare seepage paths around a hanging cutoff and through a locally defective panel.","Specify staged grouting, slurry-loss response and test-panel acceptance requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can grouting be necessary even when a cutoff wall is the main permanent barrier?","How should treatment change when drilling loses circulation in a solution feature?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Clearwater major rehabilitation","url":"https://www.swl.usace.army.mil/Missions/Civil-Works/Program-and-Project-Management/Clearwater-Major-Rehab/","publisher":"USACE Little Rock District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Cutoff-wall construction account","url":"https://www.keller-na.com/projects/clearwater-lake-dam","publisher":"Keller","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"clearwater-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/clearwater-dam/download/schematic"},{"id":"project-image","title":"Clearwater Lake Dam — rehabilitation works in Missouri","kind":"project-image","fileName":"clearwater-dam-r13.jpg","mimeType":"image/jpeg","bytes":157363,"sha256":"6ba4f3f9f46427acca852befd6cbcf86ed02208a0029c7b3d592a2bc62707bea","sourceId":"s2","license":"No open reuse license verified; original copyright retained","width":900,"height":561,"credit":"Keller / Keller Management Services, LLC","sourceUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","licenseUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","imageDate":null,"evidenceFile":"image-provenance/clearwater-dam-r13-source.json","evidenceSha256":"c4e83124dafe5ca3ef277b3db6f7ac973e45d1e9d7dd7b6067175829993234e6","transformations":"Resized the full 2500 × 1559 source photograph proportionally to 900 × 561 pixels, JPEG quality 90; no cropping, added labels, or retouching.","originalUrl":"https://www.keller-na.com/sites/keller-na/files/2019-11/Clearwater-Lake-Dam-aerial.jpg","originalSha256":"a42680ec532691b4140cd8daf9878188de455cc941f6b4b7c9dd8eb695ee1575","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/clearwater-dam/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"clearwater-dam-capstone.md","mimeType":"text/markdown","bytes":3059,"sha256":"784e54f18432f07f72ef06f300e14058dcca60705b6602c74041dc9056c09cb9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/clearwater-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction equipment along the crest of Clearwater Lake Dam in Missouri.","caption":"Aerial view of Clearwater Lake Dam in Missouri during the rehabilitation works, from Keller’s project account. The photograph shows construction along the dam crest.","credit":"Keller / Keller Management Services, LLC","sourceUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","width":900,"height":561,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Aerial view of Clearwater Lake Dam in Missouri during the rehabilitation works, from Keller’s project account. The photograph shows construction along the dam crest.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":66,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/clearwater-dam-r13-source.json","evidenceSha256":"c4e83124dafe5ca3ef277b3db6f7ac973e45d1e9d7dd7b6067175829993234e6","visualReview":"Inspected the full uncropped photograph and its 900 pixel derivative. It shows a reservoir, the Missouri dam embankment, and construction equipment on the crest. No embedded credit or other edge content was removed.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4044,"sourceCount":2,"url":"/cases/clearwater-dam"},{"id":"mosul-dam","title":"Mosul Dam — maintenance grouting in soluble foundations","summary":"The dam overlies soluble limestone and gypsum. A rehabilitation programme strengthened maintenance grouting, equipment and instrumentation; continuing operation depends on sustained foundation management.","topics":["dams-levees","seepage","rock","monitoring","delivery"],"country":"Iraq","region":"Tigris River, northern Iraq","owner":"Iraq Ministry of Water Resources","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Maintenance grouting","Karst dissolution","Instrumented surveillance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE’s project history explains the grouting-gallery purpose and the 2016–2019 rehabilitation. It does not portray dissolution as permanently eliminated.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The history documents the 2016–2019 task force; operation and maintenance remained the responsibility of Iraq’s Ministry of Water Resources.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The source records equipment, workforce and instrumentation improvements, with continued grouting required.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an operations-linked grouting and surveillance plan for a dam on a dissolving foundation.","inputs":["Identify the soluble strata, access-gallery function and monitoring system described by the project team.","Define study groundwater chemistry and hydraulic gradients, marking them as assumptions where unpublished."],"deliverables":["Compare targeted and blanket grouting using permeability and grout-take scenarios.","Create inspection, drilling, instrumentation and response schedules that remain workable during outages.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is completion of a rehabilitation contract different from ending maintenance grouting?","How can changing grout take indicate either successful closure or a new flow path?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Mosul Dam Task Force project history","url":"https://www.tad.usace.army.mil/About/History/","publisher":"USACE Transatlantic Division","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Mosul Dam seepage.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","publisher":"Wikimedia Commons / This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","year":2007,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"mosul-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mosul-dam/download/schematic"},{"id":"project-image","title":"Mosul Dam seepage.jpg","kind":"project-image","fileName":"mosul-dam.jpg","mimeType":"image/jpeg","bytes":36400,"sha256":"5ed3cd442242ea44ce7714f6406861853e493e1e3c9f7ff7bfd283766ce3331c","sourceId":"s2","license":"Public domain","width":652,"height":390,"credit":"This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","sourceUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg#Licensing","imageDate":"2007","evidenceFile":"image-provenance/mosul-dam-commons.json","evidenceSha256":"24cc7f7e6d87e0313bf07045244006791851a33a996e3b1856e722d1eb96c160","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/ef/Mosul_Dam_seepage.jpg","downloadUrl":"/cases/mosul-dam/download/project-image","originalSha1":"aa0bd6259fd94c99184966d5b6f57b00092cb239","originalSha256":"5ed3cd442242ea44ce7714f6406861853e493e1e3c9f7ff7bfd283766ce3331c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"mosul-dam-capstone.md","mimeType":"text/markdown","bytes":3389,"sha256":"d6549148f14ee3077870d6d17abbffd5fefc264b92192bbca050323f1979172b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/mosul-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Seepage east of and below the Mosul Dam spillway.","caption":"Seepage east of and below the Mosul Dam spillway. The source photograph documents the actual dam setting relevant to the foundation-management case.","credit":"This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government , the image is in the public domain .","sourceUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Mosul_Dam_seepage.jpg#Licensing","width":652,"height":390,"imageDate":"2007","imageDownloadAllowed":true},"figureCaption":"Seepage east of and below the Mosul Dam spillway. The source photograph documents the actual dam setting relevant to the foundation-management case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":68,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/mosul-dam-commons.json","evidenceSha256":"24cc7f7e6d87e0313bf07045244006791851a33a996e3b1856e722d1eb96c160","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":40774,"sourceCount":2,"url":"/cases/mosul-dam"},{"id":"hoover-dam","title":"Hoover Dam — rock-foundation preparation and remedial grouting","summary":"Construction removed river deposits to competent rock and treated the foundation and abutments. Later drainage and remedial grouting addressed uplift and leakage observed during initial reservoir filling.","topics":["rock","dams-levees","seepage","excavation","delivery"],"country":"United States","region":"Colorado River, Nevada–Arizona","owner":"US Bureau of Reclamation","year":1947,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock excavation","Grout curtain","Drainage galleries","Uplift"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"Reclamation’s construction history and foundation-grouting standard explain original preparation and the later remedial programme. Concrete contraction-joint grouting must not be confused with rock-foundation grouting.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The design standard records effectiveness of remedial work and later observations; it is not a present-day dam-safety evaluation.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reassess foundation seepage after reservoir filling reveals pressures above the original design expectation.","inputs":["Separate original grout holes, later remedial work and concrete-joint treatment in the source record.","Extract the reported rationale for changed grout mixes and additional drainage."],"deliverables":["Calculate uplift distributions for alternative drain and curtain effectiveness assumptions.","Design a trial grouting plan with staged pressure limits and monitoring of adjacent drainage.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why might a deeper curtain and additional drains be complementary rather than competing remedies?","What observations would show that apparent grout refusal is caused by premature setting?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Hoover Dam construction history","url":"https://www.usbr.gov/history/hoover.html","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation grouting design standard, Hoover case","url":"https://www.usbr.gov/tsc/techreferences/designstandards-datacollectionguides/finalds-pdfs/DS13-15.pdf","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Hoover Dam, Nevada (Arizona-Nevada, USA) -- 2012 -- 6099.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","publisher":"Wikimedia Commons / Dietmar Rabich","year":null,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hoover-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hoover-dam/download/schematic"},{"id":"project-image","title":"Hoover Dam, Nevada (Arizona-Nevada, USA) -- 2012 -- 6099.jpg","kind":"project-image","fileName":"hoover-dam.jpg","mimeType":"image/jpeg","bytes":465705,"sha256":"85015660314ac149a4557cb3f98fe7fb03d50be0ec1b734ca92b8a807c6b734e","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Dietmar Rabich","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"Taken on 26 July 2012, 13:37","evidenceFile":"image-provenance/hoover-dam-commons.json","evidenceSha256":"ec32fc3ca7a4a63c78fa79cebdf26ae9a3b975af6c12b7c48725cb839261eca2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f6/Hoover_Dam%2C_Nevada_%28Arizona-Nevada%2C_USA%29_--_2012_--_6099.jpg","downloadUrl":"/cases/hoover-dam/download/project-image","originalSha1":"4d420802cfaaf32abceb2ae2056cfe87dbc710f9","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hoover-dam-capstone.md","mimeType":"text/markdown","bytes":3357,"sha256":"9454c025e84aa35fa0a13d2587b628d4c439ff0309ef32c508d072347e950f19","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hoover-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hoover Dam and its canyon setting.","caption":"Hoover Dam and its canyon setting. The photograph identifies the completed project; original and remedial foundation grouting are described in Reclamation’s records.","credit":"Dietmar Rabich","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hoover_Dam,_Nevada_(Arizona-Nevada,_USA)_--_2012_--_6099.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"Taken on 26 July 2012, 13:37","imageDownloadAllowed":true},"figureCaption":"Hoover Dam and its canyon setting. The photograph identifies the completed project; original and remedial foundation grouting are described in Reclamation’s records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":69,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hoover-dam-commons.json","evidenceSha256":"ec32fc3ca7a4a63c78fa79cebdf26ae9a3b975af6c12b7c48725cb839261eca2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":470079,"sourceCount":3,"url":"/cases/hoover-dam"},{"id":"glen-canyon-dam","title":"Glen Canyon Dam — sandstone abutments and controlled seepage","summary":"The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.","topics":["rock","dams-levees","seepage","dewatering","site-investigation"],"country":"United States","region":"Page, Arizona","owner":"US Bureau of Reclamation","year":1966,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock bolting","Abutment stability","Seepage measurement","River diversion"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner history explains the construction systems; the USGS regional map supports geological context. Regional mapping does not replace discontinuity surveys at individual abutments.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Reclamation records major construction milestones and dedication in 1966; detailed daily excavation records are not included.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop rock-abutment support and seepage-monitoring concepts for a dam in fractured sandstone.","inputs":["Use the regional map and owner account to distinguish formation-scale geology from local joints.","Identify the temporary diversion and excavation stages that precede concrete placement."],"deliverables":["Perform a study wedge-stability check with bolt and groundwater sensitivities.","Design a drainage and weir-monitoring layout that distinguishes changing seepage paths from reservoir-level effects.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is measurable seepage not by itself evidence of dam failure?","What site mapping is required before using a regional joint orientation in a support design?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Glen Canyon construction, geology and monitoring","url":"https://www.usbr.gov/uc/rm/crsp/gc/","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geologic map of the Glen Canyon Dam quadrangle","url":"https://pubs.usgs.gov/publication/sim3268","publisher":"US Geological Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Glen Canyon Dam 1962.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","publisher":"Wikimedia Commons / U.S. Bureau of Reclamation","year":1962,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glen-canyon-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glen-canyon-dam/download/schematic"},{"id":"project-image","title":"Glen Canyon Dam 1962.jpg","kind":"project-image","fileName":"glen-canyon-dam.jpg","mimeType":"image/jpeg","bytes":417488,"sha256":"9d600d85f07d11d5b66cab14776d263c4e47c5e81665b6b2d1137d1ced913cef","sourceId":"s3","license":"Public domain","width":439,"height":550,"credit":"U.S. Bureau of Reclamation","sourceUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg#Licensing","imageDate":"1962","evidenceFile":"image-provenance/glen-canyon-dam-commons.json","evidenceSha256":"c1a950a228699d14eebae0da50d05260e7eae33821540a6ef62b5fba484d0bc4","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/ae/Glen_Canyon_Dam_1962.jpg","downloadUrl":"/cases/glen-canyon-dam/download/project-image","originalSha1":"b6a0eb9c6a8100448477e78cd35499d7c07e7d28","originalSha256":"9d600d85f07d11d5b66cab14776d263c4e47c5e81665b6b2d1137d1ced913cef","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glen-canyon-dam-capstone.md","mimeType":"text/markdown","bytes":3082,"sha256":"7812eb24234b655ed2da8b5f24604a3588ab0a135414f74e6e24bd7b9db2dd95","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glen-canyon-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Glen Canyon Dam under construction in 1962.","caption":"Glen Canyon Dam under construction in 1962. The historical photograph shows the actual dam and sandstone canyon abutments.","credit":"U.S. Bureau of Reclamation","sourceUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg#Licensing","width":439,"height":550,"imageDate":"1962","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Glen Canyon Dam under construction in 1962. The historical photograph shows the actual dam and sandstone canyon abutments.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":70,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glen-canyon-dam-commons.json","evidenceSha256":"c1a950a228699d14eebae0da50d05260e7eae33821540a6ef62b5fba484d0bc4","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":421587,"sourceCount":3,"url":"/cases/glen-canyon-dam"},{"id":"bolivar-dam","title":"Bolivar Dam — seepage barriers in outwash and fractured abutment rock","summary":"Rehabilitation combined a partial-depth barrier, blanket improvements, relief wells and an abutment grout curtain. The project authors explain construction problems in thin limestone units with open flow paths.","topics":["dams-levees","seepage","rock","monitoring"],"country":"United States","region":"Tuscarawas County, Ohio","owner":"US Army Corps of Engineers","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Partial-depth cutoff","Relief wells","Abutment grouting","Piping control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The USACE completion account identifies the combined risk-reduction measures. A technical paper details the abutment grouting and downstage treatment decisions.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports rehabilitation completion in October 2017.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The completion account describes post-implementation evaluation and the resulting dam-safety classification.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare seepage-control combinations for an embankment on permeable outwash beside fractured rock.","inputs":["Separate foundation flow, rock-contact erosion and gate-system issues in the owner record.","Extract the grout-curtain arrangement and treatment response to circulation losses."],"deliverables":["Draw a seepage model with wall, blanket and relief-well alternatives.","Specify drilling/grouting decisions and post-treatment piezometric performance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a partial-depth barrier still reduce internal-erosion risk?","Where could seepage concentrate if the wall-to-rock transition is poorly treated?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Completion and post-implementation review","url":"https://www.army.mil/article/200670/bolivar_receives_best_dam_safety_rating","publisher":"US Army / USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Grout-curtain construction at Bolivar Dam","url":"https://pubs.geoscienceworld.org/aeg/eeg/article-abstract/24/1/121/522957/Grout-Curtain-Construction-At-Bolivar-Dam-Ohio","publisher":"USACE project authors / Environmental & Engineering Geoscience","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Bolivar Dam (Ohio) upstream.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","publisher":"Wikimedia Commons / Roseohioresident","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bolivar-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bolivar-dam/download/schematic"},{"id":"project-image","title":"Bolivar Dam (Ohio) upstream.jpg","kind":"project-image","fileName":"bolivar-dam.jpg","mimeType":"image/jpeg","bytes":395437,"sha256":"d20de43c4b633adfc2bdb10b723118662052fad325fe034c3b54fee87c8cd5c5","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"Roseohioresident","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg#Licensing","imageDate":"Taken on 18 August 2010","evidenceFile":"image-provenance/bolivar-dam-commons.json","evidenceSha256":"06d3cfbcd6025097e520fe62ad8bbd6609f2d0557a1751445d3a1c76c9f28fc3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/6e/Bolivar_Dam_%28Ohio%29_upstream.jpg","downloadUrl":"/cases/bolivar-dam/download/project-image","originalSha1":"9be59df03889845bff4d1c545c9fce0bc1a6693e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bolivar-dam-capstone.md","mimeType":"text/markdown","bytes":3151,"sha256":"15bf2f4194d6edcc19efb7438c2a05798f6806f3933f4462c59513b14abee9db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bolivar-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Upstream view of Bolivar Dam in Ohio.","caption":"Upstream view of Bolivar Dam in Ohio. The actual embankment is shown; the later seepage barrier and grout curtain are largely below ground.","credit":"Roseohioresident","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Bolivar_Dam_(Ohio)_upstream.jpg#Licensing","width":1280,"height":960,"imageDate":"Taken on 18 August 2010","imageDownloadAllowed":true},"figureCaption":"Upstream view of Bolivar Dam in Ohio. The actual embankment is shown; the later seepage barrier and grout curtain are largely below ground.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":71,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bolivar-dam-commons.json","evidenceSha256":"06d3cfbcd6025097e520fe62ad8bbd6609f2d0557a1751445d3a1c76c9f28fc3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":399573,"sourceCount":3,"url":"/cases/bolivar-dam"},{"id":"lake-borgne-barrier","title":"Lake Borgne surge barrier — pile-supported flood protection","summary":"The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.","topics":["deep-foundations","lateral-foundations","coastal-offshore","seepage","monitoring"],"country":"United States","region":"New Orleans, Louisiana","owner":"Flood Protection Authority East / USACE","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven piles","Lateral pile response","Global stability","Floodwall transitions"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner and consultant sources explain the built system and geotechnical scope. Published summaries use differing pile counts and stages; no single count is inferred across them.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The operator describes an approximately $1.3 billion whole-barrier project, not a geotechnical-package final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator records transfer of operating and maintenance responsibilities following construction in 2013.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a representative barrier-wall foundation and its transition into an earthen levee.","inputs":["Extract the wall, gate and levee interface functions from the owner material.","Define study water levels, wave actions and soft-soil strength profiles with explicit source limits."],"deliverables":["Check axial/lateral pile response, group behavior and global stability.","Design transition details and instrumentation to compare storm response with predictions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a locally adequate pile group still sit within an unstable soil mass?","Why do differential movement and seepage deserve special attention at levee transitions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Barrier operations and system description","url":"https://www.floodauthority.org/the-system/lake-borgne-surge-barrier/","publisher":"Flood Protection Authority East","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geotechnical engineering account","url":"https://ardaman.com/ihnc-lake-borgne-barrier-giww-to-mrgo-st-bernard-parish-louisiana-usace-new-orleans-district/","publisher":"Ardaman & Associates","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"IHNC Surge Barrier Construction from Air.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","publisher":"Wikimedia Commons / Ray Devlin","year":2010,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lake-borgne-barrier.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/schematic"},{"id":"project-image","title":"IHNC Surge Barrier Construction from Air.jpg","kind":"project-image","fileName":"lake-borgne-barrier.jpg","mimeType":"image/jpeg","bytes":101254,"sha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","sourceId":"s3","license":"CC BY 2.0","width":800,"height":533,"credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2010-01-11 16:26:30","evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/42/IHNC_Surge_Barrier_Construction_from_Air.jpg","downloadUrl":"/cases/lake-borgne-barrier/download/project-image","originalSha1":"ec096cf2cb2f46b2508af820b50bbfcb78c8a3d3","originalSha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lake-borgne-barrier-capstone.md","mimeType":"text/markdown","bytes":3192,"sha256":"3d36487e28f0ac12f46bdcec3ecfa9d5a263ed5a4ad8e7455a843d1d326bbdf0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans.","caption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":800,"height":533,"imageDate":"2010-01-11 16:26:30","imageDownloadAllowed":true},"figureCaption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":72,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":105645,"sourceCount":3,"url":"/cases/lake-borgne-barrier"},{"id":"vajont-landslide","title":"Vajont reservoir — rockslide, groundwater and observational decisions","summary":"The reservoir disaster involved a large pre-existing rockslide and rapid displacement of reservoir water. Geological researchers emphasize the complex shear zone and the influence of groundwater and reservoir operations.","topics":["slopes","rock","dams-levees","seepage","monitoring"],"country":"Italy","region":"Vajont Valley","owner":"Historic reservoir project / Italian public investigation","year":1963,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Rockslide back-analysis","Reservoir drawdown","Shear-zone strength"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"This is a forensic case, not a completed slope-remediation design. Competing geological interpretations remain relevant when selecting assumptions for back-analysis.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconstruct how alternative geological models change slope-stability decisions during reservoir filling.","inputs":["Compare published interpretations of the old slide mass and basal shear zone.","Compile a source-based sequence of reservoir levels, observations and movement."],"deliverables":["Perform coupled seepage/stability sensitivity studies for the competing models.","Write an observational decision plan with limits on reservoir operations and explicitly conservative triggers.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a good fit to one displacement episode fail to validate a unique failure mechanism?","What monitoring evidence would justify stopping filling before a deterministic factor of safety reaches one?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Vajont geological heritage and research context","url":"https://iugs-geoheritage.org/geoheritage_sites/vajont-landslide/","publisher":"International Union of Geological Sciences / case scientists","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Updated geological model of the prehistoric rockslide","url":"https://www.sciencedirect.com/science/article/pii/S0169555X12002048","publisher":"Paronuzzi and Bolla / Geomorphology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Vajont Dam landslide.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg","publisher":"Wikimedia Commons / US Army","year":1963,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"vajont-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/vajont-landslide/download/schematic"},{"id":"project-image","title":"Vajont Dam landslide.jpg","kind":"project-image","fileName":"vajont-landslide.jpg","mimeType":"image/jpeg","bytes":115238,"sha256":"101bf55fce288261b9be5350624ada515293ee27254dc4ea441259aa489fcb16","sourceId":"s3","license":"Public domain","width":800,"height":550,"credit":"US Army","sourceUrl":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg#Licensing","imageDate":"1963","evidenceFile":"image-provenance/vajont-landslide-commons.json","evidenceSha256":"5c02ae2fe38b9b323a7f6211233de9232d9a3ef4bd2bf62b925e09b40fcb24d2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f4/Vajont_Dam_landslide.jpg","downloadUrl":"/cases/vajont-landslide/download/project-image","originalSha1":"fdceebd3956b8ae854e0327568b91a20d76834f8","originalSha256":"101bf55fce288261b9be5350624ada515293ee27254dc4ea441259aa489fcb16","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"vajont-landslide-capstone.md","mimeType":"text/markdown","bytes":3153,"sha256":"def386340f1865b5b949a68cec0b779fa5789e9497ca974f589aa46aeb58ad98","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/vajont-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Vajont landslide in 1963.","caption":"The Vajont landslide in 1963. Historical US Army photograph showing the actual landslide and reservoir-dam setting.","credit":"US Army","sourceUrl":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Vajont_Dam_landslide.jpg#Licensing","width":800,"height":550,"imageDate":"1963","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Vajont landslide in 1963. Historical US Army photograph showing the actual landslide and reservoir-dam setting.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":87,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/vajont-landslide-commons.json","evidenceSha256":"5c02ae2fe38b9b323a7f6211233de9232d9a3ef4bd2bf62b925e09b40fcb24d2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":119420,"sourceCount":3,"url":"/cases/vajont-landslide"},{"id":"malpasset-dam","title":"Malpasset Dam — abutment wedge failure and uplift","summary":"The arch dam failed after instability developed in its rock foundation. The French dam committee and government accident record describe the role of discontinuity geometry, uplift and stress-dependent drainage.","topics":["rock","dams-levees","seepage","site-investigation"],"country":"France","region":"Fréjus","owner":"Historic Malpasset water-supply project","year":1959,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Rock-wedge stability","Uplift pressure","Stress-dependent permeability"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"The English technical material supports a forensic rock-wedge study. It is not an as-built remediation proposal for the ruined dam.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate an arch-dam abutment where intersecting discontinuities create a potentially unstable rock wedge.","inputs":["Extract the reported fault, foliation and abutment-force relationships.","Separate known observations from later interpretations of permeability changes."],"deliverables":["Calculate wedge stability for several groundwater-pressure distributions.","Specify investigation and drainage verification that could discriminate between the competing assumptions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can increased compressive stress reduce drainage yet raise destabilizing uplift?","Why may strong intact rock still provide an inadequate dam abutment?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Government accident review","url":"https://www.aria.developpement-durable.gouv.fr/fiche_detaillee/29490_en/?lang=en","publisher":"French Ministry environmental accident database","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Arch-dam guidance and Malpasset foundation case","url":"https://www.barrages-cfbr.eu/IMG/pdf/gtvoute_vienne2018.pdf","publisher":"French Committee on Dams and Reservoirs","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Barrage Malpasset 2007.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg","publisher":"Wikimedia Commons / Bonho1962","year":2007,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"malpasset-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/malpasset-dam/download/schematic"},{"id":"project-image","title":"Barrage Malpasset 2007.jpg","kind":"project-image","fileName":"malpasset-dam.jpg","mimeType":"image/jpeg","bytes":168986,"sha256":"039a3c531fb72c3b49904ea6e1f9da2bea8acdddbc138a8643e5ba023bab74e5","sourceId":"s3","license":"Public domain","width":1280,"height":453,"credit":"Bonho1962","sourceUrl":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg#Licensing","imageDate":"2007-06-08","evidenceFile":"image-provenance/malpasset-dam-commons.json","evidenceSha256":"04369b2ef16501c643e1aea885269ffa0c83d1f6cd2aae2c207a48b564d30a04","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/64/Barrage_Malpasset_2007.jpg","downloadUrl":"/cases/malpasset-dam/download/project-image","originalSha1":"30bd87cf637b57e5f5502beeba47afb24b14f92f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"malpasset-dam-capstone.md","mimeType":"text/markdown","bytes":3016,"sha256":"ed57709c549dd09a23398800a53df70f4909ccb6252c938df716172917eaf451","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/malpasset-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Ruins of Malpasset Dam photographed in 2007.","caption":"Ruins of Malpasset Dam photographed in 2007. The remaining concrete and rock setting belong to the actual 1959 failure site.","credit":"Bonho1962","sourceUrl":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg#Licensing","width":1280,"height":453,"imageDate":"2007-06-08","imageDownloadAllowed":true},"figureCaption":"Ruins of Malpasset Dam photographed in 2007. The remaining concrete and rock setting belong to the actual 1959 failure site.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":88,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/malpasset-dam-commons.json","evidenceSha256":"04369b2ef16501c643e1aea885269ffa0c83d1f6cd2aae2c207a48b564d30a04","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":173019,"sourceCount":3,"url":"/cases/malpasset-dam"},{"id":"love-canal","title":"Love Canal — containment cap and barrier drainage","summary":"The remedy contains waste beneath a cap and intercepts contaminated groundwater for treatment. EPA records describe the expanded synthetic cover, barrier drains and continuing inspection programme.","topics":["geoenvironmental","seepage","dewatering","monitoring"],"country":"United States","region":"Niagara Falls, New York","owner":"US EPA / New York State Department of Environmental Conservation","year":1985,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Composite cap","Barrier drains","Hydraulic containment"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The EPA site record and technical report describe constructed containment and operating components. Removal from a regulatory list does not mean the buried waste or maintenance requirements disappeared.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"EPA describes continuing operations, inspection and maintenance of the containment system.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate whether a containment remedy can maintain inward groundwater gradients under changing infiltration and pump performance.","inputs":["Extract the cap, trench and pumping arrangement from EPA’s report.","Distinguish site boundaries, capped footprint and the actual waste-disposal area."],"deliverables":["Prepare a water balance and capture-zone sensitivity study.","Design inspection priorities and failure-response actions for cap damage or pumping interruption.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What monitoring evidence would reveal a bypass around the barrier-drain system?","Why is a clean-looking surface not sufficient evidence of remedy performance?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Site cleanup and continuing operation","url":"https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.cleanup&id=0201290","publisher":"US Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Technical containment-system report","url":"https://semspub.epa.gov/work/02/534007.pdf","publisher":"US Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Looking into Love Canal.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","publisher":"Wikimedia Commons / Buffalutheran","year":2012,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"love-canal.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/love-canal/download/schematic"},{"id":"project-image","title":"Looking into Love Canal.jpg","kind":"project-image","fileName":"love-canal.jpg","mimeType":"image/jpeg","bytes":269116,"sha256":"96a2bf4eab0121fa484bdcd20caba1e9984c522c62cd60399ea71de5b086b32d","sourceId":"s3","license":"CC0","width":1280,"height":857,"credit":"Buffalutheran","sourceUrl":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2012-06-15","evidenceFile":"image-provenance/love-canal-commons.json","evidenceSha256":"d4d3d8a037738385c27b7d752567521ce0c0f66f401d7abb350d853fc3e8517e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/5e/Looking_into_Love_Canal.jpg","downloadUrl":"/cases/love-canal/download/project-image","originalSha1":"06e5138c9746943f5e099648990419918b5a1f5e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"love-canal-capstone.md","mimeType":"text/markdown","bytes":3097,"sha256":"9eafc46a13cafa86303fecdba9599259b4e8f1e29833f65a946bebc5ef4d8983","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/love-canal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"View into the Love Canal containment area in 2012.","caption":"View into the Love Canal containment area in 2012. This is the actual remediated site, where the buried waste and collection systems require continuing management.","credit":"Buffalutheran","sourceUrl":"https://commons.wikimedia.org/wiki/File:Looking_into_Love_Canal.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":857,"imageDate":"2012-06-15","imageDownloadAllowed":true},"figureCaption":"View into the Love Canal containment area in 2012. This is the actual remediated site, where the buried waste and collection systems require continuing management.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":95,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/love-canal-commons.json","evidenceSha256":"d4d3d8a037738385c27b7d752567521ce0c0f66f401d7abb350d853fc3e8517e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":273204,"sourceCount":3,"url":"/cases/love-canal"},{"id":"sydney-olympic-remediation","title":"Sydney Olympic Park — engineered waste mounds and leachate management","summary":"Rehabilitated waste areas form parkland above engineered containment. The authority describes the continuing management of landfills and a wetland-based system for treating collected leachate.","topics":["geoenvironmental","seepage","earthworks","monitoring"],"country":"Australia","region":"Homebush Bay, New South Wales","owner":"Sydney Olympic Park Authority","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Waste containment","Leachate collection","Water balance","Post-closure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner explains the treatment strategy and the regulator specifies ongoing management obligations. Parkland use does not remove containment and monitoring duties.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The authority and regulator describe ongoing containment management rather than an unrestricted clean-soil site.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a post-remediation management plan that keeps recreational land use compatible with waste containment.","inputs":["Map the relationship between waste mounds, drainage and treatment from the owner description.","Identify obligations in the regulator’s ongoing maintenance order."],"deliverables":["Prepare a leachate water balance with wet and dry season scenarios.","Specify cap inspections, settlement surveys and action limits at public-use interfaces.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can changing irrigation practice affect both vegetation and leachate generation?","Which engineering responsibilities persist after a site opens as a public park?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Landfill leachate treatment","url":"https://www.sydneyolympicpark.nsw.gov.au/parklands/sustainability/innovative-landfill-waste-water-treatment","publisher":"Sydney Olympic Park Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Ongoing maintenance order amendment","url":"https://app.epa.nsw.gov.au/resources/clm/docs/html/n20224440.htm","publisher":"NSW Environment Protection Authority","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Sydney Olympic Park, New South Wales (aerial view, 2010).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","publisher":"Wikimedia Commons / YellowMonkey","year":2010,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sydney-olympic-remediation.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sydney-olympic-remediation/download/schematic"},{"id":"project-image","title":"Sydney Olympic Park, New South Wales (aerial view, 2010).jpg","kind":"project-image","fileName":"sydney-olympic-remediation.jpg","mimeType":"image/jpeg","bytes":351233,"sha256":"a4369361c1b211df204b80c3292789fc5ea9a54345749b0befae6ac299d70882","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":889,"credit":"YellowMonkey","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2010-01-01","evidenceFile":"image-provenance/sydney-olympic-remediation-commons.json","evidenceSha256":"cdab9d43e8077cf22f651fc63274c75be0763dc1ba041684fa59ead7b5100639","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/c1/Sydney_Olympic_Park%2C_New_South_Wales_%28aerial_view%2C_2010%29.jpg","downloadUrl":"/cases/sydney-olympic-remediation/download/project-image","originalSha1":"e881304a765e0c1c4d5397317cab6c75eb67fb1e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sydney-olympic-remediation-capstone.md","mimeType":"text/markdown","bytes":3230,"sha256":"a6c0372ecc5957e69050d7a4744dcff5e6adc3be3c5a8d343ed4ef429a2157cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sydney-olympic-remediation/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Sydney Olympic Park in 2010.","caption":"Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.","credit":"YellowMonkey","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sydney_Olympic_Park,_New_South_Wales_(aerial_view,_2010).jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":889,"imageDate":"2010-01-01","imageDownloadAllowed":true},"figureCaption":"Aerial view of Sydney Olympic Park in 2010. The photograph shows the redeveloped precinct; waste-containment areas must be located using the cited owner and regulatory documents.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":96,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sydney-olympic-remediation-commons.json","evidenceSha256":"cdab9d43e8077cf22f651fc63274c75be0763dc1ba041684fa59ead7b5100639","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":355454,"sourceCount":3,"url":"/cases/sydney-olympic-remediation"},{"id":"svalbard-seed-vault","title":"Svalbard Seed Vault — tunnel waterproofing and frozen ground","summary":"The Seed Vault upgrade replaced its access tunnel with a watertight concrete structure and moved heat-producing services. The construction account includes artificial ground freezing to support the replacement works.","topics":["cold-regions","tunnels","ground-improvement","seepage","rock","delivery"],"country":"Norway","region":"Longyearbyen, Svalbard","owner":"Norwegian Ministry of Agriculture and Food / Statsbygg","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Tunnel waterproofing","Thermal disturbance","Groundwater exclusion"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner sources describe the 2016–2019 upgrade and freezing used during tunnel construction. The seed-storage chambers and the entrance tunnel have different thermal and groundwater functions; do not treat the entire facility as one homogeneous frozen-ground boundary.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner identifies the main upgrade period as 2016–2019; the 2018 construction update describes the work while it was in progress.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner reports a waterproofed entrance tunnel and upgraded cooling. Published descriptions do not provide the full freeze-pipe commissioning records or as-built waterproofing details.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a watertight tunnel replacement in warming permafrost, combining temporary frozen-ground support with a permanent drainage, waterproofing and thermal strategy.","inputs":["Map the access tunnel, rock chambers, service heat sources and surface-water pathways from the owner descriptions.","Define study values for unfrozen permeability, ice content, thermal properties and freezing-system temperature, flagging them as assumptions."],"deliverables":["Estimate freeze-wall development and thaw sensitivity around the excavation, then assess leakage and uplift for the permanent tunnel.","Prepare freezing verification holes, temperature monitoring, excavation hold points and a seasonal surface-water diversion plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does removing internal heat generation help even when the final tunnel lining is designed to be watertight?","What measurements would establish adequate frozen-ground continuity before excavation without confusing cold air with frozen soil?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Construction improvements and temporary ground freezing","url":"https://www.seedvault.no/2018/09/04/seed-vault-construction-improvements-proceed-as-planned/","publisher":"Svalbard Global Seed Vault / Norwegian Ministry of Agriculture and Food","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Purpose, operations and 2016–2019 upgrade","url":"https://www.seedvault.no/about/purpose-operations-and-organisation/","publisher":"Svalbard Global Seed Vault","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Facility operation and tunnel arrangement","url":"https://www.nordgen.org/our-work/svalbard-global-seed-vault/frequently-asked-questions/","publisher":"NordGen","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Svalbard Global Seed Vault Exterior 2020.jpg","url":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","publisher":"Cierra Martin for Crop Trust","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"svalbard-seed-vault.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/schematic"},{"id":"project-image","title":"Svalbard Global Seed Vault — exterior in 2020","kind":"project-image","fileName":"svalbard-seed-vault.jpg","mimeType":"image/jpeg","bytes":345849,"sha256":"3514d4606ff689bef0b68899a77237a3b3cf4225b33b29b32b01f7ab01657dc8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":913,"credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-02-25","evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e3/Svalbard_Global_Seed_Vault_Exterior_2020.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/svalbard-seed-vault/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"svalbard-seed-vault-capstone.md","mimeType":"text/markdown","bytes":3964,"sha256":"7be9dac2dda47c60c428fcb9c412c0a4663488f05b6fa991da6346122ad9c1cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","caption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":913,"imageDate":"2020-02-25","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":106,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350781,"sourceCount":4,"url":"/cases/svalbard-seed-vault"},{"id":"rocky-flats","title":"Rocky Flats — engineered covers and long-term groundwater care","summary":"The remediated site retains engineered landfill covers, groundwater collection/treatment systems and long-term inspections. Public surveillance records support a capstone on containment performance after closure.","topics":["geoenvironmental","seepage","slopes","earthworks","monitoring"],"country":"United States","region":"Colorado Front Range","owner":"U.S. Department of Energy, Office of Legacy Management","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Landfill-cover water balance","Infiltration control","Cover-slope stability","Groundwater monitoring"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"DOE records distinguish the Original and Present Landfills and the associated water-management systems. Select a specific unit before evaluating infiltration, cover stability or treatment performance; site-wide cleanup is not evidence that all residual hazards were removed.","sourceIds":["s1","s2","s3","s4"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The May 2026 DOE fact sheet separates the 2005 physical closure from continuing cover maintenance, groundwater treatment and monitoring. The owner also lists a new five-year remedy review due in 2027; that future review is not a completed record.","sourceIds":["s1","s2","s3","s4"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess one documented cover or groundwater-control unit and design an inspection-and-maintenance programme that can identify declining performance.","inputs":["Select a dated DOE cover inspection, groundwater record and corresponding remedy description.","Assemble precipitation, runoff pathways, cover stratigraphy and measured movements where public; label any substituted parameters."],"deliverables":["Evaluate cover infiltration and stability under normal operation, blocked drainage and a severe precipitation scenario.","Prepare a monitoring dashboard specification, repair triggers and a long-term maintenance cost model using current study rates.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a vegetated cover appear healthy while preferential seepage or a slope movement is degrading its containment function?","Which measurements would reveal whether a groundwater change originates at the cover, the collection system or regional recharge?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Rocky Flats Site — remedy and stewardship responsibilities","url":"https://www.energy.gov/lm/rocky-flats-site-colorado","publisher":"U.S. Department of Energy","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Rocky Flats key document archive — monitoring and inspections","url":"https://www.energy.gov/lm/rocky-flats-site-colorado-key-document-archive","publisher":"U.S. Department of Energy","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Original Landfill inspection-frequency contact record, 2025-03","url":"https://lmpublicsearch.lm.doe.gov/LMSites/RFLMA%20CR%202025-03.pdf","publisher":"U.S. Department of Energy / Rocky Flats regulators","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Rocky Flats Site fact sheet, May 2026","url":"https://www.energy.gov/documents/rocky-flats-site-colorado-fact-sheet","publisher":"U.S. Department of Energy, Office of Legacy Management","year":null,"access":"public-link","license":"US Department of Energy public-domain publication; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["rocky-flats-factsheet-2026"]},{"id":"s5","title":"Aerial View of Rocky Flats in 2007 (14597931675).jpg","url":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","publisher":"USEPA Environmental-Protection-Agency","year":2014,"access":"public-link","license":"Public domain","notes":"Project image source. Publisher-native 300 × 210 JPEG retained unchanged; no local upscaling, crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rocky-flats.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rocky-flats/download/schematic"},{"id":"rocky-flats-factsheet-2026","title":"Rocky Flats Site, Colorado — DOE fact sheet, May 2026","kind":"report","fileName":"rocky-flats-factsheet-2026.pdf","mimeType":"application/pdf","bytes":4278537,"sha256":"fa3fa6e60923be177cdc512bb53099361d20a3b2441ffa0f3507cb9e85b93121","sourceId":"s4","license":"US Department of Energy public-domain publication; original credits retained","rightsUrl":"https://www.energy.gov/web-policies","rightsBasis":"DOE-authored site fact sheet; DOE web policy permits distribution of government information. The four-page original has no separate third-party copyright notice and is retained unchanged with all credits.","rightsEvidenceUrl":"https://www.energy.gov/web-policies","pages":4,"downloadUrl":"/cases/rocky-flats/download/rocky-flats-factsheet-2026"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"rocky-flats-reference-values.csv","mimeType":"text/csv","bytes":1032,"sha256":"f58cae5cc633707ae1377b8d404c0a00e3a111a42ea49d3940b22d5e32a1c361","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/rocky-flats/download/reference-values"},{"id":"project-image","title":"Rocky Flats — site after building removal","kind":"project-image","fileName":"rocky-flats.jpg","mimeType":"image/jpeg","bytes":26010,"sha256":"8437d2bc32ef137793a3f53dca6f25f0fa81eaf9f810bdce49c02f5612c24dd1","sourceId":"s5","license":"Public domain","width":300,"height":210,"credit":"USEPA Environmental-Protection-Agency / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","imageDate":"2014-07-07 13:46","evidenceFile":"image-provenance/rocky-flats-r14-source.json","evidenceSha256":"9f571755569d1dbcea1f0b130b2d172dac5094df7de004c5c58c4c33c1adb3f5","transformations":"Publisher-native 300 × 210 JPEG retained unchanged; no local upscaling, crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/45/Aerial_View_of_Rocky_Flats_in_2007_%2814597931675%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/rocky-flats/download/project-image","imageDownloadAllowed":true,"rightsStatus":"public-domain","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rocky-flats-capstone.md","mimeType":"text/markdown","bytes":5243,"sha256":"e18c9ea27f777db1cc3f999ea5b03b616ef943c524086271527cb86314ec28c3","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rocky-flats/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","caption":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","credit":"USEPA Environmental-Protection-Agency / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_View_of_Rocky_Flats_in_2007_(14597931675).jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","width":300,"height":210,"imageDate":"2014-07-07 13:46","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"public-domain"},"figureCaption":"Rocky Flats in 2007 after removal of the former industrial buildings. The broad site view does not establish the location or condition of individual landfill-cover layers or groundwater treatment cells.","qualityNotes":["The local DOE fact sheet describes the remedy and ongoing responsibilities. Final cover cross-sections and monitoring time series remain in the linked site archive."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":110,"referenceValues":[{"label":"Closed landfills under continuing care","value":2,"unit":"landfills","scope":"DOE Office of Legacy Management responsibilities as described in May 2026.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."},{"label":"Groundwater collection systems","value":4,"unit":"systems","scope":"Continuing collection-system responsibilities, separate from treatment-system count.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."},{"label":"Groundwater treatment systems","value":3,"unit":"systems","scope":"Continuing treatment-system responsibilities; not four because collection and treatment are different systems.","sourceId":"s4","locator":"Page 4 — Legacy Management Activities","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rocky-flats-r14-source.json","evidenceSha256":"9f571755569d1dbcea1f0b130b2d172dac5094df7de004c5c58c4c33c1adb3f5","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":4311813,"sourceCount":5,"url":"/cases/rocky-flats"},{"id":"berkeley-pit","title":"Berkeley Pit — mine flooding and hydraulic containment","summary":"The flooded open pit and connected underground mine workings require water-level management and treatment. Public monitoring records link hydraulic containment with an ongoing remediation operation.","topics":["geoenvironmental","dewatering","rock","seepage","monitoring"],"country":"United States","region":"Butte, Montana","owner":"EPA oversight / responsible mining parties","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Mine-water balance","Hydraulic containment","Pumping and treatment","Monitoring interpretation"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"EPA identifies the Butte Mine Flooding operable unit and continuing treatment. The official monitoring archive provides dated discharge reports; pit water, connected mine water and surrounding aquifers must be represented as a connected system.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Public discharge reports and EPA status material document continuing treatment and monitoring. They are dated operational records, not evidence that treatment can be discontinued.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a water-balance and containment assessment for the flooded mine, with sensitivity to uncertain inflow and temporary treatment interruption.","inputs":["Use a dated monthly monitoring report for observed discharge and compliance data.","Identify pit and mine-water levels, the relevant control elevation and its datum, and unmeasured groundwater exchanges."],"deliverables":["Build a time-dependent storage/pumping model that distinguishes observations, calibrated flows and conservative assumptions.","Develop outage scenarios, monitoring triggers and a recovery pumping strategy with treatment-capacity constraints.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would a stable pit level conceal a change in groundwater capture or treatment demand?","What evidence is needed before comparing a reported control elevation with survey data recorded in a different vertical datum?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Current site status — Butte Mine Flooding OU3","url":"https://www.epa.gov/butte/current-site-status","publisher":"U.S. Environmental Protection Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"January 2025 monthly discharge monitoring report","url":"https://digitalcommons.mtech.edu/superfund_silverbowbutte/1282/","publisher":"Thompson and Griffis / Montana Technological University archive","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Berkeley Pit water-treatment explanation","url":"https://pitwatch.org/learn/water-treatment/","publisher":"PitWatch / Butte Mine Flooding information programme","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"2013 Berkeley Pit, Butte, Montana (1).jpg","url":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","publisher":"Chris06","year":2013,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"berkeley-pit.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/berkeley-pit/download/schematic"},{"id":"project-image","title":"Berkeley Pit — flooded mine excavation","kind":"project-image","fileName":"berkeley-pit.jpg","mimeType":"image/jpeg","bytes":297779,"sha256":"27b5d65db09c4b1d2ba719119c2740d3cb439ae5250b4e5c9ace6f2032d4f473","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":903,"credit":"Chris06 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2013-08-03","evidenceFile":"image-provenance/berkeley-pit-r14-source.json","evidenceSha256":"8258faad4b0bffb33e50f379f8fc7e4acf937b5946609c3dc163c7733f9ca2b8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a8/2013_Berkeley_Pit%2C_Butte%2C_Montana_%281%29.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/berkeley-pit/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"berkeley-pit-capstone.md","mimeType":"text/markdown","bytes":3653,"sha256":"a8e1cd9696e424949050088262199d4660028a778e7daa8a242dd143c1df072d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/berkeley-pit/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","caption":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","credit":"Chris06 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:2013_Berkeley_Pit,_Butte,_Montana_(1).jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":903,"imageDate":"2013-08-03","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Berkeley Pit in Butte, Montana, photographed in 2013. The image shows the actual flooded pit; water-level controls and treatment performance should be read from the dated monitoring records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":111,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/berkeley-pit-r14-source.json","evidenceSha256":"8258faad4b0bffb33e50f379f8fc7e4acf937b5946609c3dc163c7733f9ca2b8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":302423,"sourceCount":4,"url":"/cases/berkeley-pit"}]}