{"schemaVersion":1,"updated":"2026-11-22","total":22,"records":[{"id":"bowman-road-grs","title":"Bowman Road Bridge — reinforced-soil abutments","summary":"The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.","topics":["reinforced-soil","shallow-foundations","settlement","delivery"],"country":"United States","region":"Defiance County, Ohio","owner":"Defiance County","year":2005,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["GRS-IBS","Bearing and settlement","Reinforcement demand"],"documentationLevel":"worked-design","design":{"availability":"available","summary":"The archived FHWA worked example supplies bridge geometry, bearing loads, abutment sizing and internal/external checks. Use current guidance for a new design.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"FHWA reports $266,000 for the Bowman Road abutment, beams and waterproofing, compared with a $338,000 independent estimate for the conventional alternative. This historical comparison is not a certified final account.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"Production construction occurred in 2005; the reviewed sources discuss accelerated construction rather than a complete contractor programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"FHWA reports settlement and approach performance after opening.","sourceIds":["s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a replacement rural bridge abutment using the Bowman Road example as the reference project; compare reinforced soil with a conventional abutment.","inputs":["Extract span, reactions, abutment dimensions and reinforcement assumptions from the worked example.","Identify scour, drainage and foundation information that the example assumes."],"deliverables":["Reproduce the reference checks and document any difference caused by a current design basis.","Prepare an abutment section, reinforcement schedule, drainage detail and bridge-approach settlement check.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"GRS-IBS Interim Implementation Guide — Bowman Road design example","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"GRS-IBS bid-price analysis and cost comparisons","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm","publisher":"FHWA","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GRS-IBS synthesis — field case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s4","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/11026.pdf","publisher":"FHWA","year":2012,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["bowman-grs-guide"]},{"id":"s5","title":"FHWA-HRT-11-027, case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/11027.pdf","publisher":"FHWA","year":2011,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-synthesis"]},{"id":"s6","title":"FHWA-HRT-19-024, bid price analysis","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/19024.pdf","publisher":"FHWA","year":2019,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-bid-comparison"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bowman-road-grs.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/schematic"},{"id":"bowman-grs-guide","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","kind":"report","fileName":"bowman-grs-guide.pdf","mimeType":"application/pdf","bytes":9102045,"sha256":"fcc4772db9661f4ced0e7bf1d8c7cc47edcfac470f89a9869df71844c39a0807","sourceId":"s4","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; publication attribution and errata retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/39209","pages":176,"downloadUrl":"/cases/bowman-road-grs/download/bowman-grs-guide"},{"id":"grs-synthesis","title":"FHWA-HRT-11-027, case histories","kind":"report","fileName":"grs-synthesis.pdf","mimeType":"application/pdf","bytes":1733657,"sha256":"f81f37d091959f40e56e560052d16fd6d1235a836af77c99bbb267d9010daf59","sourceId":"s5","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; original publication retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/34474","pages":68,"downloadUrl":"/cases/bowman-road-grs/download/grs-synthesis"},{"id":"grs-bid-comparison","title":"FHWA-HRT-19-024, bid price analysis","kind":"report","fileName":"grs-bid-comparison.pdf","mimeType":"application/pdf","bytes":2719769,"sha256":"aa9e358d09b308d2131d1175a307b0f7fe66797d606a89015bed7f33a3bba3cc","sourceId":"s6","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship recorded by the National Transportation Library.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/40086","pages":16,"downloadUrl":"/cases/bowman-road-grs/download/grs-bid-comparison"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"bowman-road-grs-reference-values.csv","mimeType":"text/csv","bytes":1138,"sha256":"ded6368d90b3ccf2ad594fbefa7f56f0df2128d370be3afed39fbacf6277a527","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/bowman-road-grs/download/reference-values"},{"id":"project-image","title":"Bowman Road Bridge — FHWA Figure 23","kind":"project-image","fileName":"bowman-road-grs.jpeg","mimeType":"image/jpeg","bytes":13695,"sha256":"4d6c07c0f10c365be283b508151090886d0d43d6043e22e1fa50d652c37eaebb","sourceId":"s3","license":"Public domain — U.S. federal government work","width":401,"height":301,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/bowman-road-grs/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bowman-road-grs-capstone.md","mimeType":"text/markdown","bytes":5028,"sha256":"9b84946c504990c8bdb70c4aecd0bccb2c4e927c1cc7195c2794593bfa798a94","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23).","caption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":401,"height":301,"imageDate":null},"figureCaption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":1,"referenceValues":[{"label":"GRS abutment cost","value":95000,"unit":"USD","scope":"Bowman Road GRS-IBS abutment; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"GRS beams and waterproofing","value":171000,"unit":"USD","scope":"Bowman Road beams and waterproofing; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reported GRS total","value":266000,"unit":"USD","scope":"Combined abutment, beams and waterproofing in Table 1; not a certified final account.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Conventional alternative estimate","value":338000,"unit":"USD","scope":"Independent cost estimate for the alternative in Table 1; not an awarded contract.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":3,"downloadBytes":13576453,"sourceCount":6,"url":"/cases/bowman-road-grs"},{"id":"i15-salt-lake","title":"I-15 reconstruction — soft-ground embankments and geofoam","summary":"Rapid highway reconstruction over soft lacustrine soils used geofoam, lime-cement columns, vertical drains, surcharge and staged MSE construction. UDOT reports ten-year performance.","topics":["settlement","ground-improvement","reinforced-soil","monitoring","delivery"],"country":"United States","region":"Salt Lake City, Utah","owner":"Utah Department of Transportation","year":2001,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Vertical drains and surcharge","Two-stage MSE","Consolidation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"The reports document alternative embankment systems and monitored geofoam sections, including the 100 South crossing.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The monitoring reports cover reconstruction and the following decade; extract dates for the chosen section rather than using a corridor-wide programme.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Long-term settlement and numerical-model comparisons are available in the research reports.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Choose an embankment solution above sensitive buried utilities and soft clay, then reconcile the design prediction with the long-term monitoring record.","inputs":["Extract stratigraphy, groundwater and construction loading from the selected instrumented section.","Digitize a clearly identified settlement series with units and dates."],"deliverables":["Compare earth fill, preload/drains and geofoam for settlement, time and buoyancy.","Prepare a staged-load calculation, utility protection detail and monitoring acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"I-15 reconstruction long-term embankment monitoring study","url":"https://rosap.ntl.bts.gov/view/dot/31963","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Design and evaluation of EPS geofoam embankments","url":"https://rosap.ntl.bts.gov/view/dot/31962","publisher":"UDOT / University of Utah","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Use of Geofoam for I-15 Reconstruction in Salt Lake City, UT","url":"https://geofoam.syr.edu/utah.html","publisher":"Syracuse University Geofoam Research Center","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Original published image file copied unchanged; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"i15-salt-lake.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/schematic"},{"id":"project-image","title":"I-15 geofoam embankment at 100 South","kind":"project-image","fileName":"i15-salt-lake-r13.jpg","mimeType":"image/jpeg","bytes":35444,"sha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":305,"credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","licenseUrl":"https://geofoam.syr.edu/utah.html","imageDate":null,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://geofoam.syr.edu/I15/fig2.jpg","originalSha256":"de589f4da01bbb45e9796dfb0d8838da02f1673387716070f99af9411fc0e32e","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/i15-salt-lake/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"i15-salt-lake-capstone.md","mimeType":"text/markdown","bytes":3144,"sha256":"2f5d23d456cf891b53e2856f43a44d2aa142b9eb42e4bd26cf2ba3cbb33ffe33","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/i15-salt-lake/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","caption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","credit":"Steven Bartlett, Dawit Negussey, Mark Kimble and Michael Sheeley; published by Syracuse Geofoam Research Center","sourceUrl":"https://geofoam.syr.edu/utah.html","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://geofoam.syr.edu/utah.html","width":400,"height":305,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The 100 South utility corridor during the Salt Lake City I-15 reconstruction, shown in the project authors’ Figure 2.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":3,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/i15-salt-lake-r13-source.json","evidenceSha256":"ae26ea3dbd21d97cfa6cbc2da56d0487a62da060248534355d224f1d3d2db3c8","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4322,"sourceCount":3,"url":"/cases/i15-salt-lake"},{"id":"west-davis-geofoam","title":"West Davis Highway ramp — lightweight fill beside live transport","summary":"UDOT used geofoam blocks for the ramp connecting West Davis Highway to southbound I-15, with existing transport infrastructure constraining allowable settlement.","topics":["ground-improvement","settlement","earthworks","delivery"],"country":"United States","region":"Farmington, Utah","owner":"Utah Department of Transportation","year":2023,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["EPS geofoam","Settlement control","Construction access"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"The owner describes the lightweight-fill choice and construction; detailed geotechnical design calculations are not supplied on the news page.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner update documents ramp construction in August 2023.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The source includes construction photographs; complete as-built drawings were not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a lightweight ramp concept while preserving adjacent road and rail service.","inputs":["Use the owner’s site description and identify missing foundation-soil data.","Set an explicit study profile, load case and allowable movement with instructor approval."],"deliverables":["Check foundation stress, settlement, block compression and groundwater uplift.","Draw block arrangement, pavement separation and lateral protection details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"UDOT uses Styrofoam blocks to build freeway ramp in Davis County","url":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","publisher":"UDOT","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"west-davis-geofoam.svg","mimeType":"image/svg+xml","bytes":1799,"sha256":"e23761dbae30acfd1a743186545c5dcb2378a1245850347956435a393d209bfe","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/schematic"},{"id":"project-image","title":"West Davis Highway geofoam ramp — UDOT aerial photograph","kind":"project-image","fileName":"west-davis-geofoam.jpg","mimeType":"image/jpeg","bytes":410515,"sha256":"ab0b77da1950e4c96176524133fdba24a8ba723c6ae986fac408e5789d53dd3f","sourceId":"s1","license":"UDOT public reuse with attribution — social-media policy","width":1536,"height":1152,"credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","imageDate":null,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","transformations":"Unmodified image bytes from UDOT’s 1536-pixel file; responsive display sizing only.","downloadUrl":"/cases/west-davis-geofoam/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"west-davis-geofoam-capstone.md","mimeType":"text/markdown","bytes":2842,"sha256":"b5fb2c304589779ef896527dbaa582a8964ff846f3a2fbf5fcc79dbbaf04c8e9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-davis-geofoam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the West Davis Highway geofoam ramp under construction beside live transport routes.","caption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","credit":"Utah Department of Transportation (UDOT)","sourceUrl":"https://connect.udot.utah.gov/2023/08/08/udot-uses-styrofoam-blocks-to-build-freeway-ramp-in-davis-county/","license":"UDOT public reuse with attribution — social-media policy","licenseUrl":"https://hebervalleyeis.udot.utah.gov/wp-content/uploads/2025/03/Social-Media-Guidelines.pdf","width":1536,"height":1152,"imageDate":null},"figureCaption":"Aerial view of geofoam ramp construction on the West Davis Highway connection to southbound I-15, Farmington, Utah. UDOT published this project photograph in August 2023.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":4,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/west-davis-geofoam-source.json","evidenceSha256":"c6758ccebd7d5d5958d79f0886035870f55d59a65dc5a68cfe403ac4fc4a7714","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":415156,"sourceCount":1,"url":"/cases/west-davis-geofoam"},{"id":"us14-nicollet","title":"US 14 near Nicollet — preload and vertical drains","summary":"A highway embankment over organic clay used vertical drains, surcharge and staged filling, with remote monitoring of pore pressure and settlement.","topics":["settlement","ground-improvement","problem-soils","monitoring","delivery"],"country":"United States","region":"Nicollet, Minnesota","owner":"Minnesota Department of Transportation","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Prefabricated vertical drains","Staged surcharge","Observational consolidation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors describe drain spacing, surcharge, staged lifts, waiting periods and primary/post-surcharge secondary settlement.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source lists estimated alternatives from $0.3 million for surcharge-only to $1.8 million for a land bridge; these are comparison estimates, not audited final costs.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The documented drain/surcharge design targeted a five-month waiting period after staged filling.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The submitted case describes automated settlement, piezometric and earth-pressure monitoring.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a preload programme that meets a highway opening deadline while controlling stability and residual settlement.","inputs":["Extract layer thicknesses, compression parameters and drain layout from the cited papers.","Use measured settlement and pore-pressure stages to define the observation period."],"deliverables":["Compare untreated waiting time with vertical/radial drainage and secondary compression.","Set stage-release criteria and a contingency for slow pore-pressure dissipation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"PVD and fill preloading — US Highway 14","url":"https://www.geoinstitute.org/node/16159","publisher":"ASCE Geo-Institute / named case-history author","year":2024,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case submitted by the project manager and MnDOT foundations engineer; technical papers by Lamb/Chow/Bentler (2018, 2019).","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"us14-nicollet.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us14-nicollet/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"us14-nicollet-reference-values.csv","mimeType":"text/csv","bytes":1496,"sha256":"007a382e255f2ad4f1b9b13dceb0a7669748d03a85a1b7e11acb980d9a7ba8f7","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/us14-nicollet/download/reference-values"},{"id":"project-image","title":"US 14, Nicollet — prefabricated vertical drains","kind":"project-image","fileName":"us14-nicollet-r13.jpg","mimeType":"image/jpeg","bytes":256005,"sha256":"def13de472acda2ba590bff1ac10ad55ee8c048ab95c68ddc8dc39dce688635d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1920,"height":1080,"credit":"Project photograph published by ASCE Geo-Institute; case submitted by Liang Chern Chow and Rich Lamb","sourceUrl":"https://www.geoinstitute.org/node/16159","licenseUrl":"https://www.geoinstitute.org/node/16159","imageDate":null,"evidenceFile":"image-provenance/us14-nicollet-r13-source.json","evidenceSha256":"d1426baf3baf7a5516e7c258c631b742342f5d3434b36c023779179195338e5b","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/casehistory1.jpg","originalSha256":"def13de472acda2ba590bff1ac10ad55ee8c048ab95c68ddc8dc39dce688635d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/us14-nicollet/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"us14-nicollet-capstone.md","mimeType":"text/markdown","bytes":4241,"sha256":"e99fc8e22bb8ef2a80b680d8678aed4180f17eb7ba1a1d4ae67d4f03094675f0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/us14-nicollet/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","caption":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","credit":"Project photograph published by ASCE Geo-Institute; case submitted by Liang Chern Chow and Rich Lamb","sourceUrl":"https://www.geoinstitute.org/node/16159","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16159","width":1920,"height":1080,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Vertical-drain construction on the US 14 embankment project near Nicollet, Minnesota.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":11,"referenceValues":[{"label":"Organic-soil thickness","value":34,"unit":"ft","scope":"Reported soft to very soft organic deposit above glacial till.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Reported investigation interpretation."},{"label":"Typical drain spacing","value":6,"unit":"ft","scope":"Triangular drain pattern over 80% of the embankment length.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Reported design geometry."},{"label":"Surcharge-only estimate","value":300000,"unit":"USD","scope":"Alternative with extended waiting period.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Drains and surcharge estimate","value":500000,"unit":"USD","scope":"Alternative including extended wait and geotechnical monitoring.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Geofoam estimate","value":800000,"unit":"USD","scope":"Lightweight-fill alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Column-supported estimate","value":1200000,"unit":"USD","scope":"Column-supported embankment alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."},{"label":"Land-bridge estimate","value":1800000,"unit":"USD","scope":"Land-bridge alternative.","sourceId":"s1","locator":"Estimated Costs of Considered Options","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/us14-nicollet-r13-source.json","evidenceSha256":"d1426baf3baf7a5516e7c258c631b742342f5d3434b36c023779179195338e5b","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":6915,"sourceCount":1,"url":"/cases/us14-nicollet"},{"id":"charleston-hlt-drains","title":"Hugh K. Leatherman Terminal — vertical-drain installation control","summary":"Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.","topics":["settlement","ground-improvement","coastal-offshore","monitoring"],"country":"United States","region":"Charleston, South Carolina","owner":"South Carolina State Ports Authority","year":2018,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Vertical drains","Surcharge","As-installed monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The submitted case describes variable drain depths and as-installed data acquisition during surcharge-ground improvement.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The source reports delivery of the drain programme on schedule but does not supply the complete programme.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"As-installed depth/location data are described; the underlying installation register is not locally supplied.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan drain installation and acceptance for a reclaimed port platform with spatially variable compressible deposits.","inputs":["Extract drain-depth ranges and the documented installation-control workflow.","Map the missing ground profile and design settlement inputs before sizing drain spacing."],"deliverables":["Develop zone-specific consolidation calculations and installation tolerances.","Prepare a spatial acceptance register and a response to short or misplaced drains.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Port of Charleston HLT wall remediation — PVD case","url":"https://www.geoinstitute.org/node/15986","publisher":"ASCE Geo-Institute / named case-history author","year":2020,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Source budget refers to the described package; it must not be interpreted as the entire terminal cost.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"charleston-hlt-drains.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/charleston-hlt-drains/download/schematic"},{"id":"project-image","title":"Hugh K. Leatherman Terminal — vertical-drain installation","kind":"project-image","fileName":"charleston-hlt-drains-r13.png","mimeType":"image/png","bytes":345339,"sha256":"2b3c4d924e04dd99a7742029b8a6d757fd230f1a87104579ccf746338f164813","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":413,"height":306,"credit":"Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history","sourceUrl":"https://www.geoinstitute.org/node/15986","licenseUrl":"https://www.geoinstitute.org/node/15986","imageDate":null,"evidenceFile":"image-provenance/charleston-hlt-drains-r13-source.json","evidenceSha256":"25eb76e4ff6e80a492861b0bc96ebabe9040069368342729cd8273c879ace608","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/Port%20of%20Charleston%20Picture1.png","originalSha256":"2b3c4d924e04dd99a7742029b8a6d757fd230f1a87104579ccf746338f164813","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/charleston-hlt-drains/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"charleston-hlt-drains-capstone.md","mimeType":"text/markdown","bytes":2752,"sha256":"81f1f270e586fe4a0953132af5d87be94da0333d6cfd15b52bf8670292d27182","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/charleston-hlt-drains/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","caption":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","credit":"Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history","sourceUrl":"https://www.geoinstitute.org/node/15986","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/15986","width":413,"height":306,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":12,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/charleston-hlt-drains-r13-source.json","evidenceSha256":"25eb76e4ff6e80a492861b0bc96ebabe9040069368342729cd8273c879ace608","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3930,"sourceCount":1,"url":"/cases/charleston-hlt-drains"},{"id":"pisa-stabilization","title":"Leaning Tower of Pisa — controlled underexcavation","summary":"A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.","topics":["shallow-foundations","settlement","dewatering","monitoring"],"country":"Italy","region":"Pisa","owner":"Italian Government / Opera della Primaziale Pisana","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underexcavation","Differential settlement","Piezometric control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors describe the stabilization mechanism and subsequent instrument readings. The case supports an observational-method study rather than copying a universal underpinning detail.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The author paper reports post-stabilization monitoring; it is not a current inspection certificate.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a staged underexcavation trial for an eccentric masonry-tower footing, using Pisa to define observations and stop criteria.","inputs":["Extract the foundation geometry, rotation history and monitored groundwater response from the author paper.","Distinguish the temporary stabilization operations from the permanent soil-removal and drainage measures."],"deliverables":["Calculate the direction and sensitivity of foundation rotation for small asymmetric volume removals.","Specify incremental excavation stages, survey precision, trigger values and contingency actions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can removing support on the higher side improve stability without simply increasing bearing resistance?","How would a seasonal groundwater rise change the interpretation of the measured tilt?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Behaviour after stabilization operations","url":"https://www.geocasehistoriesjournal.org/issues/volume-1-3/leaning-tower-of-pisa-behaviour-after-stabilization-operations","publisher":"Burland, Jamiolkowski and Viggiani / International Journal of Geoengineering Case Histories","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Restoration works contractor account","url":"https://trevispa.com/en/progetti/the-restoration-of-the-leaning-tower-of-pisa/","publisher":"Trevi","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Exterior of the Leaning Tower (Pisa) in April 2024.1.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","publisher":"Wikimedia Commons / PaestumPaestum","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"pisa-stabilization.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pisa-stabilization/download/schematic"},{"id":"project-image","title":"Exterior of the Leaning Tower (Pisa) in April 2024.1.jpg","kind":"project-image","fileName":"pisa-stabilization.jpg","mimeType":"image/jpeg","bytes":750557,"sha256":"4fe52d89c0578296c480ba671b8cd8d23bf1447b768d11a5661f9fb513ab7de9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":2490,"credit":"PaestumPaestum","sourceUrl":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-05-24 10:50:55","evidenceFile":"image-provenance/pisa-stabilization-commons.json","evidenceSha256":"27d6f137275dbf0bc47e7965477a8700394301d62fe5df53dcebb2fbbdff28d3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fb/Exterior_of_the_Leaning_Tower_%28Pisa%29_in_April_2024.1.jpg","downloadUrl":"/cases/pisa-stabilization/download/project-image","originalSha1":"d9e3fbde3af929fa625c4a633098fac6402952c4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"pisa-stabilization-capstone.md","mimeType":"text/markdown","bytes":3389,"sha256":"e8e53ea3c4f4a2019e709e9ffbf8d8406576dd631ea06e16190cb69970eb28c4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pisa-stabilization/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Leaning Tower of Pisa after the stabilization works.","caption":"The Leaning Tower of Pisa after the stabilization works. The photograph identifies the actual monument; the soil-removal operations are documented in the linked engineering accounts.","credit":"PaestumPaestum","sourceUrl":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":2490,"imageDate":"2023-05-24 10:50:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Leaning Tower of Pisa after the stabilization works. The photograph identifies the actual monument; the soil-removal operations are documented in the linked engineering accounts.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":47,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/pisa-stabilization-commons.json","evidenceSha256":"27d6f137275dbf0bc47e7965477a8700394301d62fe5df53dcebb2fbbdff28d3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":754832,"sourceCount":3,"url":"/cases/pisa-stabilization"},{"id":"kansai-airport","title":"Kansai International Airport — reclamation and long-term settlement","summary":"An offshore airport on deep marine deposits combines accelerated consolidation with ongoing settlement observation and adjustable building supports. The operator publishes measured island subsidence and its mitigation approach.","topics":["settlement","ground-improvement","problem-soils","monitoring","coastal-offshore"],"country":"Japan","region":"Osaka Bay","owner":"Kansai Airports","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sand drains","Consolidation","Differential settlement","Jacking"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The operator explains sand drains, reclaimed-fill compaction and jacking of individual columns. Published settlement histories allow comparison of shallow and deeper clay contributions.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator supplies monitoring updates and explains continuing adjustment; the airport is an operating asset, not a concluded settlement experiment.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-management plan for a reclaimed airport platform whose terminal and utility connections must remain serviceable.","inputs":["Separate pre-opening settlement from post-opening movement in the owner data.","Define a study clay profile and drainage lengths; clearly label parameters not provided by the owner."],"deliverables":["Fit a consolidation trend and test sensitivity to deep-clay compressibility.","Detail adjustable supports and flexible utility interfaces with a survey-and-maintenance programme.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does accelerating upper-layer consolidation not eliminate deeper-layer settlement?","Which measurements should trigger a building adjustment rather than a change in the ground model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Subsidence countermeasures and monitored status","url":"https://www.kansai-airports.co.jp/en/sustainability/society/tech-subsidence-countermeasures/","publisher":"Kansai Airports","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Uneven settlement and jacking-up","url":"https://www.kansai-airports.co.jp/en/sustainability/society/tech-jacking-up/","publisher":"Kansai Airports","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Kansai closeup.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","publisher":"Wikimedia Commons / NASA Earth Observatory","year":2003,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"kansai-airport.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kansai-airport/download/schematic"},{"id":"project-image","title":"Kansai closeup.jpg","kind":"project-image","fileName":"kansai-airport.jpg","mimeType":"image/jpeg","bytes":67326,"sha256":"820c6c19f570694e31a5f52cb274dc257136eb7470b63062a15935302651c7f1","sourceId":"s3","license":"Public domain","width":800,"height":600,"credit":"NASA Earth Observatory","sourceUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg#Licensing","imageDate":"2003-09-19","evidenceFile":"image-provenance/kansai-airport-commons.json","evidenceSha256":"2496b2e3dbfa9199043b8545d26458c7bcdda034ed833e65f0801d1ca420d53a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Kansai_closeup.jpg","downloadUrl":"/cases/kansai-airport/download/project-image","originalSha1":"55c3ecb6fd4c95b23d3591a32493baddcdb45f4f","originalSha256":"820c6c19f570694e31a5f52cb274dc257136eb7470b63062a15935302651c7f1","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"kansai-airport-capstone.md","mimeType":"text/markdown","bytes":3282,"sha256":"ca2f810824f14286d8f604345aa661f6abeadb02f3c83425fedd0f5254b0087d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/kansai-airport/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Satellite view of Kansai International Airport and its reclaimed offshore island works.","caption":"Satellite view of Kansai International Airport and its reclaimed offshore island works. The image provides project context for the owner’s settlement and foundation-adjustment records.","credit":"NASA Earth Observatory","sourceUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Kansai_closeup.jpg#Licensing","width":800,"height":600,"imageDate":"2003-09-19","imageDownloadAllowed":true},"figureCaption":"Satellite view of Kansai International Airport and its reclaimed offshore island works. The image provides project context for the owner’s settlement and foundation-adjustment records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":48,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/kansai-airport-commons.json","evidenceSha256":"2496b2e3dbfa9199043b8545d26458c7bcdda034ed833e65f0801d1ca420d53a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":71786,"sourceCount":3,"url":"/cases/kansai-airport"},{"id":"burj-khalifa","title":"Burj Khalifa — piled-raft settlement design","summary":"The tower uses a piled raft in weak sedimentary rock. The foundation designer publishes an analysis process linking ground characterization, trial pile testing and settlement predictions for super-tall towers.","topics":["deep-foundations","shallow-foundations","settlement","laboratory-testing"],"country":"United Arab Emirates","region":"Dubai","owner":"Emaar Properties","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Piled raft","Load sharing","Pile load tests"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The designer paper provides a foundation-design case and discusses piled-raft interaction. Access to a publication does not establish availability of the complete issued-for-construction package.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare a conventional pile-group design with a settlement-led piled-raft concept for a heavily loaded tower on weak rock.","inputs":["Extract the published stratigraphy, raft geometry and pile test interpretation.","Set an explicit study loading envelope instead of inferring column loads from building height."],"deliverables":["Assess pile–raft load sharing and differential settlement under gravity and overturning actions.","Prepare a trial-pile programme and a monitoring layout that can distinguish group interaction from single-pile behavior.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When does an acceptable single-pile capacity still produce unacceptable raft settlement?","How sensitive is load sharing to the stiffness assigned to weathered rock?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geotechnical foundation design for some of the world’s tallest buildings","url":"https://www.jstage.jst.go.jp/article/jgssp/2/2/2_ESD-KL-2/_article/-char/en","publisher":"Frances Badelow and Harry G. Poulos / Japanese Geotechnical Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Tower raft construction","url":"https://www.multiplex.global/projects/burj-khalifa-tower-raft/","publisher":"Multiplex","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Burj Khalifa (16260269606).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","publisher":"Wikimedia Commons / Laika ac","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"burj-khalifa.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/burj-khalifa/download/schematic"},{"id":"project-image","title":"Burj Khalifa (16260269606).jpg","kind":"project-image","fileName":"burj-khalifa.jpg","mimeType":"image/jpeg","bytes":182077,"sha256":"8076b1a767a9e03b29c96f35dd1453a58e86e4b2edf03fbe14b93b18b3c41bb7","sourceId":"s3","license":"CC BY-SA 2.0","width":1280,"height":853,"credit":"Laika ac","sourceUrl":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-01-02 02:34","evidenceFile":"image-provenance/burj-khalifa-commons.json","evidenceSha256":"4d1264dcd302baee5b9cb830b9c828715714cae0cd06cb5e42a2e4f6340c02bc","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a6/Burj_Khalifa_%2816260269606%29.jpg","downloadUrl":"/cases/burj-khalifa/download/project-image","originalSha1":"95070e3053de0d9a27330f7ab02fe3ea714e68d5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"burj-khalifa-capstone.md","mimeType":"text/markdown","bytes":3189,"sha256":"402a9cf33e6b720a84554a80b913297eb995eeecc398abea894bef0643a1329a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/burj-khalifa/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Burj Khalifa in Dubai.","caption":"Burj Khalifa in Dubai. The tower photograph identifies the project; its piled raft lies below ground and is described in the foundation-design paper.","credit":"Laika ac","sourceUrl":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":853,"imageDate":"2015-01-02 02:34","imageDownloadAllowed":true},"figureCaption":"Burj Khalifa in Dubai. The tower photograph identifies the project; its piled raft lies below ground and is described in the foundation-design paper.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":49,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/burj-khalifa-commons.json","evidenceSha256":"4d1264dcd302baee5b9cb830b9c828715714cae0cd06cb5e42a2e4f6340c02bc","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":186465,"sourceCount":3,"url":"/cases/burj-khalifa"},{"id":"shanghai-tower","title":"Shanghai Tower — excavation compensation and pile–raft interaction","summary":"Published studies of the tower foundation examine excavation heave, reloading and pile–raft interaction. They offer a useful comparison between simplified foundation springs and coupled settlement analyses.","topics":["deep-foundations","settlement","excavation","monitoring"],"country":"China","region":"Shanghai","owner":"Shanghai Tower Construction and Development","year":2015,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Piled raft","Excavation compensation","Variable stiffness"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The cited studies include a design optimization and a re-analysis. The latter is an author’s model of the project, not an assertion that its proposed alternative was constructed.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconcile excavation relief and subsequent structural loading in a settlement model for a tower founded in deep urban deposits.","inputs":["Extract the construction-stage loads and compressible layers described in the papers.","Maintain separate ledgers for excavation unloading, dead load, live load and sustained loading."],"deliverables":["Compare a compensated-foundation calculation with a simplified interacting pile–raft model.","Propose a pile-stiffness distribution and explain its effect on raft curvature.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can apparent compensation of total stress justify ignoring differential settlement?","Which measured response would reveal an overly stiff pile-group assumption?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation re-analysis using compensated pile foundation theory","url":"https://onlinelibrary.wiley.com/doi/10.1002/tal.1087","publisher":"Project researchers / The Structural Design of Tall and Special Buildings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pile-raft foundation optimization analysis of Shanghai Tower","url":"https://tgjc.whrsm.ac.cn/EN/Y2018/V32/I3/243","publisher":"Zeng Chaojie / Soil Engineering and Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Shanghai - Shanghai Tower - 0001.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","publisher":"Wikimedia Commons / Stefan Fussan","year":2016,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"shanghai-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/schematic"},{"id":"project-image","title":"Shanghai - Shanghai Tower - 0001.jpg","kind":"project-image","fileName":"shanghai-tower.jpg","mimeType":"image/jpeg","bytes":714199,"sha256":"a540e70593ff3ea46a5baca90d32d4970546a3250d424431e2b792b02e6b7495","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":2114,"credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2016-09-18","evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e0/Shanghai_-_Shanghai_Tower_-_0001.jpg","downloadUrl":"/cases/shanghai-tower/download/project-image","originalSha1":"fbf6b991ef2d29b0baf093451432884e609fef5a","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"shanghai-tower-capstone.md","mimeType":"text/markdown","bytes":3209,"sha256":"7ddd952b24548584f1328900dafc4c9f5aedfac7b7cc92766795ff25ac33f2d7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/shanghai-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Shanghai Tower in Shanghai.","caption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","credit":"Stefan Fussan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Shanghai_-_Shanghai_Tower_-_0001.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":2114,"imageDate":"2016-09-18","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Shanghai Tower in Shanghai. The photograph identifies the building discussed in the piled-raft studies; underground pile and raft details are not visible.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":50,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/shanghai-tower-commons.json","evidenceSha256":"ddedb473817fee68656727019780350d465c9d2a69cbfd3598d8165268623a6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":718607,"sourceCount":3,"url":"/cases/shanghai-tower"},{"id":"millau-viaduct","title":"Millau Viaduct — rock foundations and observational control","summary":"Very tall bridge piers transfer load through large shaft-and-raft foundations in limestone and marl. The geotechnical authors report measured foundation movement and the observational design strategy.","topics":["rock","deep-foundations","settlement","monitoring"],"country":"France","region":"Tarn Valley","owner":"Compagnie Eiffage du Viaduc de Millau","year":2004,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock sockets","Foundation rotation","Observational method"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"An open research paper describes investigation, foundation geometry and monitoring. The consultant account distinguishes pier geology and a local abutment adaptation.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Eiffage records construction during 2001–2004 and inauguration in December 2004; this is a milestone history, not the full contractor programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The geotechnical paper reports the monitored foundation behavior after construction.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Check a tall-pier foundation on contrasting rock units, with rotation limits governing the design.","inputs":["Extract published shaft, raft and rock-unit descriptions for one selected pier.","Separate measured translations from rotations and identify the construction stages."],"deliverables":["Compare bearing, sliding and rotational stiffness for limestone and marl assumptions.","Draft an instrumentation plan and pre-agreed foundation intervention sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can small differential movements matter more than total bearing capacity for this bridge?","How should an unexpected weak zone change the verification and contingency plan?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Millau viaduct geotechnical studies and foundations","url":"https://www.sciencedirect.com/science/article/pii/S167477551300036X","publisher":"Geotechnical project authors / Journal of Rock Mechanics and Geotechnical Engineering","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation engineering project account","url":"https://www.terrasol.fr/wp-content/uploads/2017/12/oa07_845_millau_viaduct_eng.pdf","publisher":"Terrasol","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Construction milestones","url":"https://www.eiffagegeniecivil.com/milau-viaduct","publisher":"Eiffage Génie Civil","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Viaduc millau 1.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","publisher":"Wikimedia Commons / Emeraude","year":2004,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"millau-viaduct.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millau-viaduct/download/schematic"},{"id":"project-image","title":"Viaduc millau 1.JPG","kind":"project-image","fileName":"millau-viaduct.jpg","mimeType":"image/jpeg","bytes":51310,"sha256":"9467ba872ccc50d998b9cc2bfb5188db5146d84c983f005b7d3b9847e693a6b9","sourceId":"s4","license":"Public domain","width":480,"height":640,"credit":"Emeraude","sourceUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG#Licensing","imageDate":"2004-03-14","evidenceFile":"image-provenance/millau-viaduct-commons.json","evidenceSha256":"e7a265ad5c20e75ffa310179ed68178f1fb3cf4910a87d8e54fabfba3627795e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/9c/Viaduc_millau_1.JPG","downloadUrl":"/cases/millau-viaduct/download/project-image","originalSha1":"cfe891bbedddcb693b57292d9abae9380c489b21","originalSha256":"9467ba872ccc50d998b9cc2bfb5188db5146d84c983f005b7d3b9847e693a6b9","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"millau-viaduct-capstone.md","mimeType":"text/markdown","bytes":3222,"sha256":"694e38240fd87fccdac897252bff729b43efe470995f39c65b3c150cb2d6baca","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millau-viaduct/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Millau Viaduct during construction.","caption":"The Millau Viaduct during construction. The tall piers and valley setting provide context for the published rock-foundation and monitoring case.","credit":"Emeraude","sourceUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Viaduc_millau_1.JPG#Licensing","width":480,"height":640,"imageDate":"2004-03-14","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Millau Viaduct during construction. The tall piers and valley setting provide context for the published rock-foundation and monitoring case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":52,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/millau-viaduct-commons.json","evidenceSha256":"e7a265ad5c20e75ffa310179ed68178f1fb3cf4910a87d8e54fabfba3627795e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":55549,"sourceCount":4,"url":"/cases/millau-viaduct"},{"id":"chek-lap-kok","title":"Hong Kong International Airport — foundations across rock and reclamation","summary":"The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.","topics":["site-investigation","deep-foundations","shallow-foundations","ground-improvement","settlement"],"country":"China","region":"Chek Lap Kok","owner":"Airport Authority Hong Kong","year":1998,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","CPT verification","Mixed foundation systems"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources describe actual foundation choices and field characterization. They do not provide a single uniform soil profile for the whole airport.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design the transition between a shallow foundation on rock and a piled concourse on reclaimed deposits.","inputs":["Distinguish original rock, weathered zones and reclaimed sand in a project ground model.","Extract the reported investigation and density-verification approach from the vibrocompaction paper."],"deliverables":["Compare settlement and construction risk for two terminal foundation zones.","Define CPT acceptance criteria and an interface detail for differential movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which discontinuity is more important: the former shoreline or the top of competent rock?","How can improvement verification avoid hiding local loose pockets behind an average density?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Airport design and construction history","url":"https://www.mottmac.com/en/projects/hong-kong-international-the-airport-that-changed-the-world/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Review of vibrocompaction at Hong Kong’s new airport","url":"https://www.tandfonline.com/doi/abs/10.1080/1023697X.1998.10667731","publisher":"Petra Berner, Airport Authority / HKIE Transactions","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","publisher":"Wikimedia Commons / PSnyan","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"chek-lap-kok.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"fc361c835a99c48885fcadacff7f4f786820aca6f6b5404b5974cf6cce064489","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/schematic"},{"id":"project-image","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg","kind":"project-image","fileName":"chek-lap-kok.jpg","mimeType":"image/jpeg","bytes":179932,"sha256":"c87c0cdcf9398738ded1b460f6b9732fe4d96156b32027b16c219767feb56c88","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 17 October 2008","evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Hong_Kong_Internatinal_Airport_from_Air%28Chek_Lap_Kok%2C%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF%29_-_panoramio.jpg","downloadUrl":"/cases/chek-lap-kok/download/project-image","originalSha1":"cea44a0793016f2db57daf5f9cfda0023fdfba2d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"chek-lap-kok-capstone.md","mimeType":"text/markdown","bytes":3461,"sha256":"45bad050968b234d820c46685e9c15826621090d33708b2cdeff712cf44cc2a1","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hong Kong International Airport at Chek Lap Kok viewed from the air.","caption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 17 October 2008","imageDownloadAllowed":true},"figureCaption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":54,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":184279,"sourceCount":3,"url":"/cases/chek-lap-kok"},{"id":"changi-east","title":"Changi East reclamation — instrumented vertical-drain design","summary":"The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.","topics":["settlement","ground-improvement","laboratory-testing","site-investigation","coastal-offshore"],"country":"Singapore","region":"Eastern Singapore","owner":"Singapore reclamation authorities","year":2005,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vertical drains","Radial consolidation","Pore-pressure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The papers provide field and laboratory characterization and consolidation-monitoring methods for the historic reclamation phases. They should not be mistaken for current Terminal 5 construction records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The research account covers the historic reclamation phases completed by 2005, not the schedule of present airport expansion.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select drain spacing and surcharge duration for a reclamation cell using both settlement and pore-pressure acceptance measures.","inputs":["Extract a single pilot-cell stratigraphy, drain spacing and loading history from the papers.","Identify horizontal consolidation coefficients and laboratory versus field scale differences."],"deliverables":["Calculate consolidation time with drain smear and well resistance sensitivities.","Create a surcharge-removal decision that reconciles settlement and piezometer observations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can settlement-based and pore-pressure-based degrees of consolidation disagree?","What evidence would justify changing drain spacing after a pilot trial?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Soil improvement works for an offshore land reclamation","url":"https://doi.org/10.1680/geng.2009.162.1.21","publisher":"Project investigators / ICE Geotechnical Engineering","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Research-oriented ground investigation at Changi","url":"https://www.sciencedirect.com/org/science/article/pii/S205261561700014X","publisher":"Project investigators / ICE Geotechnical Research","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Reclamation of a slurry pond in Singapore","url":"https://doi.org/10.1680/geng.2009.162.1.13","publisher":"Institution of Civil Engineers","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"changi-east.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/schematic"},{"id":"project-image","title":"Changi East reclamation — historical slurry pond","kind":"project-image","fileName":"changi-east-r13.png","mimeType":"image/png","bytes":62386,"sha256":"4f62cd73fd4d72c53798f8a5ac698776331144b757d2814d6ad4c0cbf4599d37","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":248,"credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","imageDate":null,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","transformations":"Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","originalUrl":"https://pdfs.semanticscholar.org/b85d/a748e31f6ee68e6b2d2076def3513f3cb316.pdf","originalSha256":"7a40c8913a894c9fef0283fae1eb9bcd280f828c5054512d20515287d3286e26","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/changi-east/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"changi-east-capstone.md","mimeType":"text/markdown","bytes":3304,"sha256":"8e246b3753d44e7c2626bb72152377dffbf29f9f2be0c1f274cc61f2ec018be8","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.","caption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","width":400,"height":248,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":55,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","visualReview":"Inspected the complete first paper page, its Figure 2 caption, and the extracted 400 by 248 pixel photograph. The image shows the enclosed slurry pond and surrounding reclamation land; it is not the adjacent site-plan diagram or an author portrait.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4482,"sourceCount":3,"url":"/cases/changi-east"},{"id":"port-brisbane","title":"Port of Brisbane — vacuum consolidation beside a marine park","summary":"A reclamation trial combined vacuum preloading and vertical drainage in soft dredged mud and underlying clay. A cutoff isolated permeable layers, while stability at the adjacent marine park constrained surcharge filling.","topics":["ground-improvement","settlement","seepage","problem-soils","coastal-offshore"],"country":"Australia","region":"Fisherman Islands, Queensland","owner":"Port of Brisbane","year":2009,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vacuum preloading","Vertical drains","Cutoff isolation","Lateral movement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner, contractor and consultant paper records the trial design objectives, instrumentation and interpreted performance. Its successful trial does not establish identical behavior in every reclamation cell.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare vacuum-assisted and fill-only preloading for an environmentally constrained soft-ground boundary.","inputs":["Extract the trial profile, drainage arrangement and cutoff function.","List the settlement, pore-pressure and lateral-displacement observations needed to separate mechanisms."],"deliverables":["Compare consolidation time and stability for vacuum-plus-fill versus higher surcharge.","Specify vacuum-loss response, cutoff continuity tests and a monitoring plan at the sensitive boundary.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would an undetected sand connection reduce the effective vacuum in the clay?","Why must improved consolidation time be assessed alongside lateral movement?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Successful application of vacuum consolidation","url":"https://rpsonline.com.sg/proceedings/9789810831240/html/GI125.php","publisher":"Port of Brisbane, Menard and Coffey project authors","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Performance and prediction of vacuum combined surcharge consolidation","url":"https://ascelibrary.com/doi/10.1061/%28ASCE%29GT.1943-5606.0000519","publisher":"Indraratna and project coauthors / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Port of Brisbane and Brisbane Airport June 2015.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","publisher":"Wikimedia Commons / Nick-D","year":2015,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"port-brisbane.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-brisbane/download/schematic"},{"id":"project-image","title":"Port of Brisbane and Brisbane Airport June 2015.jpg","kind":"project-image","fileName":"port-brisbane.jpg","mimeType":"image/jpeg","bytes":144392,"sha256":"64dc5639a068a195aeddfa35450009393fb02813c20b5a6d70334cd8a822135f","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":959,"credit":"Nick-D","sourceUrl":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2015-06-30 11:56:37","evidenceFile":"image-provenance/port-brisbane-commons.json","evidenceSha256":"a5d5469a7028e7ab4d41f10074f724774726a497f48327df25bc2effa337a475","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/69/Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","downloadUrl":"/cases/port-brisbane/download/project-image","originalSha1":"3412db9547a125dd74c90c8c2c9006240612c154","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"port-brisbane-capstone.md","mimeType":"text/markdown","bytes":3302,"sha256":"fee1d5cbb729910937eee63cc5be6be0cefc54d4bf4492c6c67611e85d30f71b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/port-brisbane/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Port of Brisbane and adjoining airport in 2015.","caption":"Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.","credit":"Nick-D","sourceUrl":"https://commons.wikimedia.org/wiki/File:Port_of_Brisbane_and_Brisbane_Airport_June_2015.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":959,"imageDate":"2015-06-30 11:56:37","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Port of Brisbane and adjoining airport in 2015. This is the port setting; the precise vacuum-consolidation trial cell is defined in the cited project papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":56,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/port-brisbane-commons.json","evidenceSha256":"a5d5469a7028e7ab4d41f10074f724774726a497f48327df25bc2effa337a475","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":148882,"sourceCount":3,"url":"/cases/port-brisbane"},{"id":"treasure-island","title":"Treasure Island redevelopment — liquefaction, settlement and shoreline stability","summary":"Redevelopment of the former naval station must address liquefiable fill, compressible bay mud and perimeter stability. City documents connect geotechnical work with groundwater, contaminated-soil management and phased infrastructure delivery.","topics":["ground-improvement","seismic","settlement","geoenvironmental","coastal-offshore"],"country":"United States","region":"San Francisco Bay","owner":"Treasure Island Development Authority / TICD","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Liquefaction mitigation","Bay-mud consolidation","Shoreline stabilization"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The city’s management plan identifies ground risks and candidate mitigation measures. It is a programme-level source; a measure mentioned there is not automatically the final design for every parcel.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The planning authority describes multiple major phases and phased approvals. Use the selected phase’s current documents for a detailed programme.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a staged redevelopment concept that coordinates ground improvement with contaminated-soil handling and future flood levels.","inputs":["Separate dredged sand, young bay mud and shoreline fills in a study ground model.","Select one development phase and identify which remediation and infrastructure works precede buildings."],"deliverables":["Compare densification, drainage and soil mixing for the selected ground risks.","Prepare a compatible earthworks, groundwater and monitoring plan with defined parcel interfaces.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Could improving liquefaction resistance leave long-term bay-mud settlement unresolved?","How would an improvement method alter the contaminated-water management needs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Revised soil and groundwater management plan","url":"https://www.sf.gov/sites/default/files/2023-12/SGMP_0004-007-005%20Treasure%20Island_Rev%2003-17-23-compressed.pdf","publisher":"City and County of San Francisco","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Adopted development plans and environmental review","url":"https://sfplanning.org/project/treasure-island-yerba-buena-island","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Treasure Island Causeway reconstruction, August 2021.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","publisher":"Wikimedia Commons / Pi.1415926535","year":null,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"treasure-island.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/treasure-island/download/schematic"},{"id":"project-image","title":"Treasure Island Causeway reconstruction, August 2021.jpg","kind":"project-image","fileName":"treasure-island.jpg","mimeType":"image/jpeg","bytes":384762,"sha256":"ab06e2607cce980b060c769b65dedc04cc6f58aedb8a3f6f9e0a633aaaf4d210","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":875,"credit":"Pi.1415926535","sourceUrl":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"Taken on 7 August 2021","evidenceFile":"image-provenance/treasure-island-commons.json","evidenceSha256":"b3087047b946aa578f559ea9164f8b3af9921eb3ea276b6fcbf2645aec9835f2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/21/Treasure_Island_Causeway_reconstruction%2C_August_2021.jpg","downloadUrl":"/cases/treasure-island/download/project-image","originalSha1":"963a01ab4c3fafe7def018b05bd960bc5dc07be2","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"treasure-island-capstone.md","mimeType":"text/markdown","bytes":3420,"sha256":"1aaa50d130048eb8cc82973857ff9d6ceedc527db7ff8de88eef85412d11832e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/treasure-island/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Reconstruction of the Treasure Island Causeway in August 2021.","caption":"Reconstruction of the Treasure Island Causeway in August 2021. This is a real redevelopment work area at the island connection, not a diagram of every ground-improvement method.","credit":"Pi.1415926535","sourceUrl":"https://commons.wikimedia.org/wiki/File:Treasure_Island_Causeway_reconstruction,_August_2021.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":875,"imageDate":"Taken on 7 August 2021","imageDownloadAllowed":true},"figureCaption":"Reconstruction of the Treasure Island Causeway in August 2021. This is a real redevelopment work area at the island connection, not a diagram of every ground-improvement method.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":58,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/treasure-island-commons.json","evidenceSha256":"b3087047b946aa578f559ea9164f8b3af9921eb3ea276b6fcbf2645aec9835f2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":389370,"sourceCount":3,"url":"/cases/treasure-island"},{"id":"millennium-tower","title":"Millennium Tower — perimeter-pile underpinning and monitored load transfer","summary":"The remedial designer describes transferring part of the building load to new perimeter piles founded in rock. Installation-induced movement required changes to both pile construction and the final pile arrangement.","topics":["deep-foundations","settlement","monitoring","delivery"],"country":"United States","region":"San Francisco","owner":"Millennium Tower Homeowners Association","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underpinning","Rock-founded piles","Jacked load transfer"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The designer distinguishes the earlier 52-pile proposal from the implemented 18-pile solution. The city’s earlier environmental sheet is retained as proposal-stage evidence, not the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The remedial designer reports completion in September 2023 with occupancy maintained during the work.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The designer reports initial post-work behavior and a ten-year monitoring requirement; long-term performance is still a monitoring question.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a monitored perimeter underpinning concept while keeping an occupied building in service.","inputs":["Compare the original proposal and later constructed solution without mixing their quantities.","Extract the load-transfer concept and identify the pile-installation effects that prompted revision."],"deliverables":["Balance imposed pile load, existing-foundation capacity and differential movement.","Prepare installation trials, staged jacking steps and ten-year monitoring objectives.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can installing a settlement remedy initially increase settlement?","How should load-transfer fuses protect the original foundation if future differential movement occurs?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Perimeter-pile upgrade and observed outcome","url":"https://www.sgh.com/project-story/millennium-tower/","publisher":"Simpson Gumpertz & Heger, remedial designer","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"2019 proposed upgrade information sheet","url":"https://media.api.sf.gov/documents/301_Mission_Information_Sheet_CEQA_Notice.pdf","publisher":"San Francisco Planning","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Millennium Tower adding pile section 2.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"millennium-tower.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/schematic"},{"id":"project-image","title":"Millennium Tower adding pile section 2.agr.jpg","kind":"project-image","fileName":"millennium-tower.jpg","mimeType":"image/jpeg","bytes":858661,"sha256":"351acb58a3af5bd4bd050a171a013934d81a3c8d9e2085f72a092435946fb878","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1707,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-02-22 16:17:55","evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/07/Millennium_Tower_adding_pile_section_2.agr.jpg","downloadUrl":"/cases/millennium-tower/download/project-image","originalSha1":"d4e2c44c3246b245231a17a0d012fb7bd9790ff5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"millennium-tower-capstone.md","mimeType":"text/markdown","bytes":3232,"sha256":"25bd5057fc007e9cb063539a06b2a2495726a31f43bf1ebbbd69ecd1f5cba045","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/millennium-tower/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco.","caption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Millennium_Tower_adding_pile_section_2.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1707,"imageDate":"2022-02-22 16:17:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Workers adding a pile section during the Millennium Tower foundation upgrade in San Francisco. The photograph shows actual underpinning work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":61,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/millennium-tower-commons.json","evidenceSha256":"5dbcda3a39fe317fc83ca99e692b99cde924212d0eacfd4a858d2f64dccfb66e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":863092,"sourceCount":3,"url":"/cases/millennium-tower"},{"id":"hongkong-zhuhai-macao","title":"Hong Kong–Zhuhai–Macao crossing — immersed-tunnel settlement transitions","summary":"Artificial islands connect a long immersed crossing founded above variable soft deposits. Project papers describe composite foundation treatment, island formation and full-scale testing near transition zones.","topics":["tunnels","coastal-offshore","ground-improvement","settlement"],"country":"China","region":"Pearl River estuary","owner":"Hong Kong–Zhuhai–Macao Bridge Authority","year":2018,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Immersed-tunnel bedding","Jet grouting","Preloading","Transition settlement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors document implemented island/tunnel concepts; a separate test study evaluates preload and jet-grout treatment. A test section is not assumed to represent the full crossing.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The project paper describes island/tunnel work beginning in 2011 and handover in 2018; these milestones do not cover every contract in the full bridge system.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a settlement transition between an artificial island and an immersed-tunnel approach.","inputs":["Extract the transition geometry and distinguish soft seabed from later backfill.","Identify the test conditions and measured response used to judge treatment effectiveness."],"deliverables":["Compare composite-ground and untreated-ground settlement profiles.","Prepare treatment verification, dredging tolerance and immersion sequence requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is differential settlement at an island transition more consequential than uniform tunnel settlement?","How could sediment accumulation undermine a correctly designed bedding layer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Novelties in the islands and tunnel project","url":"https://www.sciencedirect.com/science/article/pii/S0886779821004788","publisher":"Project authors / Tunnelling and Underground Space Technology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Full-scale jet-grouting loading test","url":"https://ascelibrary.org/doi/10.1061/%28ASCE%29GM.1943-5622.0002625","publisher":"Project researchers / ASCE International Journal of Geomechanics","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","publisher":"Wikimedia Commons / Tksteven","year":2013,"access":"public-link","license":"CC BY 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hongkong-zhuhai-macao.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hongkong-zhuhai-macao/download/schematic"},{"id":"project-image","title":"Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG","kind":"project-image","fileName":"hongkong-zhuhai-macao.jpg","mimeType":"image/jpeg","bytes":252028,"sha256":"d7563419a811f7da36efb6afb13d22b3c9bdc67b63a65c0d79bd8ba53adcd21c","sourceId":"s3","license":"CC BY 3.0","width":1024,"height":768,"credit":"Tksteven","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","licenseUrl":"https://creativecommons.org/licenses/by/3.0","imageDate":"2013-02-11 15:19:38","evidenceFile":"image-provenance/hongkong-zhuhai-macao-commons.json","evidenceSha256":"e5d16295088c059e0cb1ffc80e0738fc71a6b60b7ce3f31ca3831aceec427f6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/7/78/Eastern_artificial_island_for_the_tunnel_section%2C_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","downloadUrl":"/cases/hongkong-zhuhai-macao/download/project-image","originalSha1":"6ec561ebc1adfc53a5867ac30ff2729cd80c458d","originalSha256":"d7563419a811f7da36efb6afb13d22b3c9bdc67b63a65c0d79bd8ba53adcd21c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hongkong-zhuhai-macao-capstone.md","mimeType":"text/markdown","bytes":3373,"sha256":"d3990d19ae12ff46c5c5c8650b34676fdad3037a61c38dba8bc5319e2623d603","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hongkong-zhuhai-macao/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section.","caption":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.","credit":"Tksteven","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","license":"CC BY 3.0","licenseUrl":"https://creativecommons.org/licenses/by/3.0","width":1024,"height":768,"imageDate":"2013-02-11 15:19:38","imageDownloadAllowed":true},"figureCaption":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":82,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hongkong-zhuhai-macao-commons.json","evidenceSha256":"e5d16295088c059e0cb1ffc80e0738fc71a6b60b7ce3f31ca3831aceec427f6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":256526,"sourceCount":3,"url":"/cases/hongkong-zhuhai-macao"},{"id":"freshkills-landfill","title":"Freshkills Park — landfill cap, drainage and long-term integrity","summary":"Former waste mounds are being converted to parkland above engineered cover and gas/leachate systems. The project explains how cover layers limit infiltration, protect barriers and drain slopes.","topics":["geoenvironmental","reinforced-soil","settlement","slopes"],"country":"United States","region":"Staten Island, New York","owner":"New York City","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Composite cover","Interface stability","Leachate control","Waste settlement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project’s landfill-engineering descriptions identify layer functions and monitoring needs. Published expectations for later park phases are not treated as final completion records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a park-compatible cover section that remains functional as underlying waste settles.","inputs":["Extract the barrier, drainage, protection and vegetation functions from the project account.","Define study waste-settlement and rainfall conditions without treating landscaping as structural cover."],"deliverables":["Check interface sliding and drainage capacity for the selected slope.","Detail utility penetrations, gas collection interfaces and a settlement/erosion maintenance plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can differential settlement damage a low-permeability cover without visible surface cracking?","Why must planting and visitor access be coordinated with gas and leachate infrastructure?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Landfill engineering systems","url":"https://freshkillspark.org/the-park/landfill-engineering","publisher":"Freshkills Park / New York City project","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Covering, stabilizing and maintaining","url":"https://freshkillspark.org/landfill-engineering/covering-stabilizing-maintaining","publisher":"Freshkills Park","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","publisher":"Wikimedia Commons / Master Sgt. Mark Olsen","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"freshkills-landfill.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/freshkills-landfill/download/schematic"},{"id":"project-image","title":"Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg","kind":"project-image","fileName":"freshkills-landfill.jpg","mimeType":"image/jpeg","bytes":450785,"sha256":"5251a14d60d70cdf43e8b1f9d40fa2414fcc37c14d14cb6a0da53fca4fcd1bc0","sourceId":"s3","license":"Public domain","width":1280,"height":816,"credit":"Master Sgt. Mark Olsen","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing","imageDate":"Taken on 3 October 2001","evidenceFile":"image-provenance/freshkills-landfill-commons.json","evidenceSha256":"d4019d87a4f791f31f0117545d4c2fe381f92a396a324526924c135ac6f47c3e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/08/Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","downloadUrl":"/cases/freshkills-landfill/download/project-image","originalSha1":"b72773f0a41399c197eae4d74b920815b06bcb86","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"freshkills-landfill-capstone.md","mimeType":"text/markdown","bytes":3372,"sha256":"c49404fa89808b5b9fe490e5b9952afbe7e4bf7418806ef6a1726affa36a8094","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/freshkills-landfill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Fresh Kills Landfill in October 2001.","caption":"Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.","credit":"Master Sgt. Mark Olsen","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing","width":1280,"height":816,"imageDate":"Taken on 3 October 2001","imageDownloadAllowed":true},"figureCaption":"Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":94,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/freshkills-landfill-commons.json","evidenceSha256":"d4019d87a4f791f31f0117545d4c2fe381f92a396a324526924c135ac6f47c3e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":455148,"sourceCount":3,"url":"/cases/freshkills-landfill"},{"id":"randle-reef","title":"Randle Reef — harbour sediment containment and final capping","summary":"Contaminated harbour sediment is managed within a double-walled engineered containment facility. The owner separates wall construction, dredging and the later environmental cap and structural works.","topics":["geoenvironmental","coastal-offshore","retaining-walls","settlement"],"country":"Canada","region":"Hamilton Harbour, Ontario","owner":"Canada Water Agency and project partners","year":2026,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Sediment containment","Steel walls","Consolidation","Environmental capping"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The official project record identifies the staged remedy. The final cap is not labeled complete: the reviewed owner update schedules that phase for 2027.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The reviewed owner update schedules Stage 3 completion for 2027, subject to the additional structural work described there.","sourceIds":["s1"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a staged containment-cell concept that can receive dredged sediment and later support a capped working surface.","inputs":["Extract the containment, dredging and cap-stage functions from the owner record.","Define sediment compressibility, drainage and future surface loads as explicit study inputs."],"deliverables":["Compare wall stability and fill settlement during successive dredging stages.","Develop cap tolerances, consolidation monitoring and handover criteria for long-term operation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How does sediment settlement affect cap grading and surface drainage?","Why is completion of contaminant placement different from completion of the containment facility?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Randle Reef remediation stages and status","url":"https://www.canada.ca/en/canada-water-agency/freshwater-ecosystem-initiatives/great-lakes/great-lakes-protection/areas-concern/hamilton-harbour/randle-reef.html","publisher":"Canada Water Agency","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Randle Reef — project milestones and photographs","url":"https://randlereef.ca/","publisher":"Randle Reef project / Bay Area Restoration Council","year":2024,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"randle-reef.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/schematic"},{"id":"project-image","title":"Randle Reef — July 2024 project aerial","kind":"project-image","fileName":"randle-reef-r13.jpg","mimeType":"image/jpeg","bytes":148502,"sha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","sourceId":"s2","license":"No open reuse license verified; original copyright retained","width":410,"height":230,"credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","licenseUrl":"https://randlereef.ca/","imageDate":"2024-07","evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","transformations":"Copied the publisher’s 410 × 230 JPEG unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://randlereef.ca/images/Milestones/2024-07-01-RR-1.jpg","originalSha256":"0ede19702e323b3a8692c35437e3fc4af8cf00c742ce6d66f19d1797b806a97f","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/randle-reef/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"randle-reef-capstone.md","mimeType":"text/markdown","bytes":3111,"sha256":"4357e7687177934b826133161deabfbee508806634260af74dd729247c2ea234","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/randle-reef/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"July 2024 aerial photograph of the Randle Reef sediment containment facility in Hamilton Harbour.","caption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","credit":"Randle Reef project gallery / Bay Area Restoration Council; project-partner photo credits are recorded in the source evidence","sourceUrl":"https://randlereef.ca/","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://randlereef.ca/","width":410,"height":230,"imageDate":"2024-07","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Randle Reef containment facility in Hamilton Harbour in July 2024, as shown in the project’s dated milestone gallery. This construction-stage image does not establish completion of the final cap.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":97,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/randle-reef-r13-source.json","evidenceSha256":"6568f2c1d3ca4db60e6d23d5996ed232c102303c217265f80dc073035eef1de3","visualReview":"Inspected the complete published 410 × 230 image. It shows the actual containment cell with surrounding water, retaining perimeter and construction-stage fill. The image is not relabeled as a final-completion record.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4102,"sourceCount":2,"url":"/cases/randle-reef"},{"id":"halley-vi","title":"Halley VI — relocatable foundations on accumulating snow","summary":"The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.","topics":["cold-regions","shallow-foundations","settlement","monitoring","delivery"],"country":"Antarctica","region":"Brunt Ice Shelf, Antarctica","owner":"British Antarctic Survey","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow bearing and creep","Jackable foundations","Differential movement","Relocation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"BAS documents the hydraulic-leg concept, seasonal raising procedure and 2016/17 relocation. Ground support is deformable snow/ice, so a conventional soil bearing-capacity calculation alone does not represent the governing behaviour.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"BAS records relocation to a new site during the 2016/17 Antarctic season.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"BAS publishes operational descriptions of raising and maintaining the station. A complete calibrated snow-foundation model and support-load register are not supplied.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an operating and lifting plan for a modular station on snow, explicitly separating creep settlement, drifting accumulation and large-scale ice-shelf movement.","inputs":["Extract the actual support arrangement and raising sequence from BAS material.","Define a labelled study range for snow density, creep response, wind/drift loading and allowable module distortion."],"deliverables":["Compare support pressure and time-dependent movement for alternative ski contact areas and raising intervals.","Prepare a one-leg-at-a-time lifting sequence, temporary support checks, survey tolerances and relocation triggers.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can increasing foundation contact area reduce bearing pressure yet leave annual raising and relocation necessary?","How would uneven snow placement beneath one leg appear in level surveys, and how could it be distinguished from a drifting snow-surface change?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Halley VI Research Station — facility and support system","url":"https://www.bas.ac.uk/polar-operations/sites-and-facilities/facility/halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Halley Research Station relocation","url":"https://www.bas.ac.uk/project/moving-halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Preparing Halley VI for winter — annual raising operations","url":"https://www.bas.ac.uk/blogpost/seasons-end-hibernating-halley-vi-for-the-winter/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Halley VI Antarctic Research Station - view from North East.jpg","url":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","publisher":"Hugh Broughton Architects","year":2012,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"halley-vi.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/schematic"},{"id":"project-image","title":"Halley VI — raised modular research station","kind":"project-image","fileName":"halley-vi.jpg","mimeType":"image/jpeg","bytes":118311,"sha256":"daf2edd100b8853181848248a42315aa652f50e61d8c92c94f7b17560bc5e234","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2012-02-23 23:15:19","evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b1/Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/halley-vi/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"halley-vi-capstone.md","mimeType":"text/markdown","bytes":3692,"sha256":"9819e7bcf0b22239b8d6f67c7382c97ac1900cc0daccdb36464ab15043bcb185","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","caption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2012-02-23 23:15:19","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":107,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":122971,"sourceCount":4,"url":"/cases/halley-vi"},{"id":"south-pole-station","title":"South Pole Station — snow-foundation settlement and levelling","summary":"The elevated station experiences nonuniform support-column settlement in deep permanent snow. USACE reports analyze surveys, floor levelness and maintenance decisions, making a useful observational-design case.","topics":["cold-regions","settlement","shallow-foundations","monitoring","laboratory-testing"],"country":"Antarctica","region":"Geographic South Pole","owner":"National Science Foundation / U.S. Antarctic Program","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow creep settlement","Survey adjustment","Differential settlement","Maintenance prediction"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The 2019 CRREL study evaluates column surveys and shimming, while the 2025 master plan describes continued monitoring and future lifting needs. These dated records should remain distinct from a new design assumption or a claim that a planned major lift has occurred.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The 2019 report provides support-column analysis. The 2025 plan describes 32 supporting columns, recurring surveys and future lifting requirements; it does not certify that a lift has already been completed.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Use the public support-column study to develop a forecast-and-levelling workflow for an elevated structure on compressible snow.","inputs":["Extract column identifiers, survey dates, reference levels and documented shimming events from the CRREL report.","Separate snow-surface accumulation from foundation movement and account for staged construction and unequal column loads."],"deliverables":["Fit a transparent settlement forecast with residual and extrapolation checks; compare the prediction with withheld survey dates if available.","Produce a floor-levelness map, column-priority list and maintenance decision rule with survey uncertainty.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How could a survey reference that moves with the snowpack distort a long-term foundation settlement assessment?","Which evidence would justify a major building lift instead of continued local shimming, and what data would a planner need to schedule it?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Analysis of recent support-column survey results — ERDC/CRREL SR-19-3","url":"https://www.erdc.usace.army.mil/Media/Publication-Notices/Article/1897499/publication-notice-analysis-of-recent-support-column-survey-results-for-the-ele/","publisher":"Blaisdell, Weale and Barna / USACE CRREL","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"South Pole Station Master Plan, 2025","url":"https://www.usap.gov/news/documents/SouthPoleMasterPlan.pdf","publisher":"U.S. Antarctic Program / National Science Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Amundsen-scott-south pole station 2007.jpg","url":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","publisher":"Bill Spindler, U.S. Antarctic Program, National Science Foundation","year":2008,"access":"public-link","license":"Public domain","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"south-pole-station.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/south-pole-station/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"south-pole-station-reference-values.csv","mimeType":"text/csv","bytes":388,"sha256":"32fad7f12be05aeb15f9c891c912b2289a32149d761d154bf07f70b1e4af4db0","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/south-pole-station/download/reference-values"},{"id":"project-image","title":"Amundsen–Scott South Pole Station — elevated facility","kind":"project-image","fileName":"south-pole-station.jpg","mimeType":"image/jpeg","bytes":293744,"sha256":"75b10c9ceee46be2a59db22cfabcbd129f5fa6431f92863bde15db9d21a27517","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"Bill Spindler, U.S. Antarctic Program, National Science Foundation / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","imageDate":"2008-02","evidenceFile":"image-provenance/south-pole-station-r14-source.json","evidenceSha256":"3538e99d4ef6c9ac2e03bda2557ab5de9b5f0a17ddf1f11ca501b96202e5c8c1","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/91/Amundsen-scott-south_pole_station_2007.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/south-pole-station/download/project-image","imageDownloadAllowed":true,"rightsStatus":"public-domain","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"south-pole-station-capstone.md","mimeType":"text/markdown","bytes":4423,"sha256":"987067e31bfc68faa4f9f4165f8cd5ebfce8a2b5425dda599cdedee3eac08a35","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/south-pole-station/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","caption":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","credit":"Bill Spindler, U.S. Antarctic Program, National Science Foundation / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","width":1280,"height":960,"imageDate":"2008-02","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"public-domain"},"figureCaption":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","qualityNotes":["The 2019 CRREL support-column report is indexed at the official publication notice, but its download host denied access during this review. The station master plan is a separate linked source."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":108,"referenceValues":[{"label":"Elevated-station support columns","value":32,"unit":"columns","scope":"Support-column count in the 2025 master plan; this does not specify a uniform load distribution.","sourceId":"s2","locator":"Elevated Station / foundation levelling","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/south-pole-station-r14-source.json","evidenceSha256":"3538e99d4ef6c9ac2e03bda2557ab5de9b5f0a17ddf1f11ca501b96202e5c8c1","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":299523,"sourceCount":3,"url":"/cases/south-pole-station"},{"id":"glenwood-canyon","title":"Glenwood Canyon — reinforced walls on compressible foundations","summary":"Constrained highway construction used retaining structures in a river canyon. The reinforced-wall studies examine movement over compressible deposits and the importance of separating reinforced-fill performance from foundation settlement.","topics":["reinforced-soil","retaining-walls","settlement","monitoring","earthworks","delivery"],"country":"United States","region":"I-70, Colorado","owner":"Colorado Department of Transportation","year":1992,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geosynthetic-reinforced soil","Foundation consolidation","Staged facing","Instrumented performance"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The CDOT research synthesis describes the instrumented Glenwood Canyon GRS test wall and long-term differential settlement. A separate 1988 wall study addresses staged facing installation. These are distinct wall experiments within the corridor and should not be combined into one fictitious section.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT dates final-corridor construction to 1980–1992. The selected experimental wall has its own earlier construction and monitoring dates.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The technical report gives measured reinforced-wall performance; the owner history records completion of the broader corridor.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select one documented Glenwood Canyon reinforced-wall section and reconcile its reinforcement response with foundation settlement and facing movements.","inputs":["Identify the chosen test section, reinforcement, fill and underlying compressible profile in the technical report.","Compile displacement and settlement observations with dates; keep results from other wall systems in a separate comparison."],"deliverables":["Check reinforcement/internal stability separately from foundation settlement and global stability.","Compare single-stage construction with delayed permanent facing, including drainage and survey control.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a reinforced-soil mass remain stable while differential foundation settlement still creates unacceptable facing movement?","Which measured response would distinguish reinforcement stretching from compression of the underlying lacustrine deposits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Performance of reinforced-soil structures — Glenwood Canyon case section","url":"https://rosap.ntl.bts.gov/view/dot/42215/dot_42215_DS1.pdf","publisher":"Colorado Department of Transportation / FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Embankment settlement in Glenwood Canyon — CDOH-DTD-R-88-8","url":"https://trid.trb.org/View/286942","publisher":"Colorado Department of Highways / FHWA; TRB record","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"I-70 Glenwood Canyon project history","url":"https://www.codot.gov/about/CDOTHistory/50th-anniversary/glenwood-canyon","publisher":"Colorado Department of Transportation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"I-70 Glenwood Canyon-terabass.jpg","url":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","publisher":"Terabass","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glenwood-canyon.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/schematic"},{"id":"project-image","title":"I-70 in Glenwood Canyon — constrained highway corridor","kind":"project-image","fileName":"glenwood-canyon.jpg","mimeType":"image/jpeg","bytes":369614,"sha256":"363c30effe911ccd3b235683fa83b24984de39d8dd378c8e8921a3d3603a11d1","sourceId":"s4","license":"CC BY-SA 3.0","width":1280,"height":854,"credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-09-09","evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/62/I-70_Glenwood_Canyon-terabass.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/glenwood-canyon/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glenwood-canyon-capstone.md","mimeType":"text/markdown","bytes":3767,"sha256":"ab9a0c2f868a5433e8f7ca3687d87cab146c6924c87f98c0e922a89e18ea1cc5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glenwood-canyon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","caption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","credit":"Terabass / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:I-70_Glenwood_Canyon-terabass.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":854,"imageDate":"2009-09-09","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"I-70 in Glenwood Canyon, showing the constrained highway setting. The linked engineering sources distinguish particular reinforced-soil wall test sections from the broader corridor shown here.","qualityNotes":["The corridor photograph is site context; the buried conditions and reinforcement are established by the selected report section, not by the photograph."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":109,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glenwood-canyon-r14-source.json","evidenceSha256":"dff04a283818ed395a07a2b371cea79b56871fc18507dda69265485f1db27fda","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":374502,"sourceCount":4,"url":"/cases/glenwood-canyon"},{"id":"venice-mose","title":"Venice MOSE — marine caisson placement and movement monitoring","summary":"The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.","topics":["coastal-offshore","shallow-foundations","settlement","ground-improvement","monitoring","delivery"],"country":"Italy","region":"Venice Lagoon","owner":"Italian Ministry of Infrastructure / MOSE project","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine caisson foundations","Ground–structure interaction","Precision grouting","GNSS/InSAR monitoring"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The designers explain caisson foundations, settlement assessment and watertight interfaces. The monitoring paper studies MOSE shoulder structures using GNSS and InSAR. Measurements of a shoulder cannot automatically be assigned to every gate caisson or inlet.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The locally available article provides component-specific deformation evidence. Its underlying MOSE GNSS observations have restricted access; open access to the article does not make those raw records downloadable. Complete construction acceptance records and final accounts were not provided.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a placement-and-monitoring design for a selected MOSE inlet caisson or shoulder, with explicit tolerances and a defensible spatial interpretation of movements.","inputs":["Select one inlet and one structure type; compile its geometry and support concept from the designer source.","Extract monitoring periods, reference frame, instrument precision and measured components from the published deformation study."],"deliverables":["Evaluate bearing and differential-settlement sensitivity for the selected foundation and define placement/grouting tolerances.","Design a combined survey/InSAR monitoring workflow that separates regional subsidence, structural movement and measurement noise.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would agreement between satellite line-of-sight and GNSS observations still require care before inferring a vertical settlement at a nearby gate?","How should a marine caisson placement sequence respond when the achieved support level differs from the alignment tolerance assumed by the gate designer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"MOSE — designer account of barrier and caisson foundations","url":"https://www.technital.net/projects/marine-and-coastal/special-marine-works/ingenieria-maritima-y-costera-mobile-surge-barriers-at-the-three-inlets-of-the-venice-lagoon-mose-italy","publisher":"Technital","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Integrated GNSS and InSAR analysis of MOSE shoulder structures","url":"https://www.mdpi.com/2072-4292/17/6/1059","publisher":"Project research authors / Remote Sensing","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"MOSE marine caisson foundation works","url":"https://proserveltd.co.uk/casestudies/venice/","publisher":"Proserve","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","url":"https://www.mdpi.com/2072-4292/17/6/1059/pdf","publisher":"Massimo Fabris and Mario Floris / Remote Sensing (MDPI)","year":2025,"access":"public-link","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","notes":"","checked":"2026-11-22","localAssetIds":["mose-monitoring-2025"]},{"id":"s5","title":"MOSE Project Venice.jpg","url":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","publisher":"Wikimedia Commons contributor","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"venice-mose.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/schematic"},{"id":"mose-monitoring-2025","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","kind":"report","fileName":"mose-monitoring-2025.pdf","mimeType":"application/pdf","bytes":7574597,"sha256":"4c89f5e78f6cd7fcbead8a0bebb6c7d5977141553ebb5a1c583a0827438270bf","sourceId":"s4","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","rightsUrl":"https://creativecommons.org/licenses/by/4.0/","rightsBasis":"The article first page and publisher page explicitly license this work under CC BY 4.0. The original PDF is redistributed unchanged, with author credit and DOI retained.","rightsEvidenceUrl":"https://www.mdpi.com/2072-4292/17/6/1059","pages":21,"downloadUrl":"/cases/venice-mose/download/mose-monitoring-2025"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"venice-mose-reference-values.csv","mimeType":"text/csv","bytes":611,"sha256":"71e6e7c4d13ce07281889fb2d4d103f8b1dc271e11b43c23d1c3378905ee0d3d","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/venice-mose/download/reference-values"},{"id":"project-image","title":"MOSE at the Lido inlet — construction in 2009","kind":"project-image","fileName":"venice-mose.jpg","mimeType":"image/jpeg","bytes":193898,"sha256":"ce7841b2d704bbc54e8005c5b4c7810008885b90c3caa31c55647589b3fc4d9f","sourceId":"s5","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-07-25 08:19:50","evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/27/MOSE_Project_Venice.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/venice-mose/download/project-image","originalSha1":"068a07bb2f08ce4ce810f1aeeb43e296ec7026dc","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"venice-mose-capstone.md","mimeType":"text/markdown","bytes":4928,"sha256":"087b1e2f4c7f9465eb18640c48853afe32fcd4bc0e4ca8168332f337007a53cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","caption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"2009-07-25 08:19:50","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","qualityNotes":["The locally downloadable monitoring article is CC BY 4.0. Its underlying MOSE GNSS observations are restricted by Consorzio Venezia Nuova; do not describe those raw observations as an open downloadable dataset."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":116,"referenceValues":[{"label":"MOSE continuous GNSS stations","value":36,"unit":"stations","scope":"32 stations on shoulder structures plus four local reference stations in the studied MOSE network.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."},{"label":"External reference-network stations","value":8,"unit":"stations","scope":"External stations used with the MOSE network; separate from its four local reference stations.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":7775241,"sourceCount":5,"url":"/cases/venice-mose"}]}