{"schemaVersion":1,"updated":"2026-11-22","total":18,"records":[{"id":"bowman-road-grs","title":"Bowman Road Bridge — reinforced-soil abutments","summary":"The first production GRS integrated bridge system used reinforced-soil abutments. FHWA publishes a worked Bowman Road design and subsequent performance discussion.","topics":["reinforced-soil","shallow-foundations","settlement","delivery"],"country":"United States","region":"Defiance County, Ohio","owner":"Defiance County","year":2005,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["GRS-IBS","Bearing and settlement","Reinforcement demand"],"documentationLevel":"worked-design","design":{"availability":"available","summary":"The archived FHWA worked example supplies bridge geometry, bearing loads, abutment sizing and internal/external checks. Use current guidance for a new design.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"FHWA reports $266,000 for the Bowman Road abutment, beams and waterproofing, compared with a $338,000 independent estimate for the conventional alternative. This historical comparison is not a certified final account.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"Production construction occurred in 2005; the reviewed sources discuss accelerated construction rather than a complete contractor programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"FHWA reports settlement and approach performance after opening.","sourceIds":["s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a replacement rural bridge abutment using the Bowman Road example as the reference project; compare reinforced soil with a conventional abutment.","inputs":["Extract span, reactions, abutment dimensions and reinforcement assumptions from the worked example.","Identify scour, drainage and foundation information that the example assumes."],"deliverables":["Reproduce the reference checks and document any difference caused by a current design basis.","Prepare an abutment section, reinforcement schedule, drainage detail and bridge-approach settlement check.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"GRS-IBS Interim Implementation Guide — Bowman Road design example","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"GRS-IBS bid-price analysis and cost comparisons","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/index.cfm","publisher":"FHWA","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GRS-IBS synthesis — field case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","publisher":"FHWA","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s4","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11026/11026.pdf","publisher":"FHWA","year":2012,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["bowman-grs-guide"]},{"id":"s5","title":"FHWA-HRT-11-027, case histories","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/11027.pdf","publisher":"FHWA","year":2011,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-synthesis"]},{"id":"s6","title":"FHWA-HRT-19-024, bid price analysis","url":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/bridge/19024/19024.pdf","publisher":"FHWA","year":2019,"access":"public-link","license":"US federal publication; preserve original credits","notes":"","checked":"2026-11-22","localAssetIds":["grs-bid-comparison"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"bowman-road-grs.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/schematic"},{"id":"bowman-grs-guide","title":"FHWA-HRT-11-026, archived worked design (2012 errata included)","kind":"report","fileName":"bowman-grs-guide.pdf","mimeType":"application/pdf","bytes":9102045,"sha256":"fcc4772db9661f4ced0e7bf1d8c7cc47edcfac470f89a9869df71844c39a0807","sourceId":"s4","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; publication attribution and errata retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/39209","pages":176,"downloadUrl":"/cases/bowman-road-grs/download/bowman-grs-guide"},{"id":"grs-synthesis","title":"FHWA-HRT-11-027, case histories","kind":"report","fileName":"grs-synthesis.pdf","mimeType":"application/pdf","bytes":1733657,"sha256":"f81f37d091959f40e56e560052d16fd6d1235a836af77c99bbb267d9010daf59","sourceId":"s5","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA agency-authored report; original publication retained.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/34474","pages":68,"downloadUrl":"/cases/bowman-road-grs/download/grs-synthesis"},{"id":"grs-bid-comparison","title":"FHWA-HRT-19-024, bid price analysis","kind":"report","fileName":"grs-bid-comparison.pdf","mimeType":"application/pdf","bytes":2719769,"sha256":"aa9e358d09b308d2131d1175a307b0f7fe66797d606a89015bed7f33a3bba3cc","sourceId":"s6","license":"US federal publication; preserve original credits","rightsUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","rightsBasis":"FHWA corporate authorship recorded by the National Transportation Library.","rightsEvidenceUrl":"https://rosap.ntl.bts.gov/view/dot/40086","pages":16,"downloadUrl":"/cases/bowman-road-grs/download/grs-bid-comparison"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"bowman-road-grs-reference-values.csv","mimeType":"text/csv","bytes":1138,"sha256":"ded6368d90b3ccf2ad594fbefa7f56f0df2128d370be3afed39fbacf6277a527","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/bowman-road-grs/download/reference-values"},{"id":"project-image","title":"Bowman Road Bridge — FHWA Figure 23","kind":"project-image","fileName":"bowman-road-grs.jpeg","mimeType":"image/jpeg","bytes":13695,"sha256":"4d6c07c0f10c365be283b508151090886d0d43d6043e22e1fa50d652c37eaebb","sourceId":"s3","license":"Public domain — U.S. federal government work","width":401,"height":301,"credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","imageDate":null,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","transformations":"Unchanged original embedded image extracted from the identified PDF; no new marks, labels, retouching, or crop.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/bowman-road-grs/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"bowman-road-grs-capstone.md","mimeType":"text/markdown","bytes":5028,"sha256":"9b84946c504990c8bdb70c4aecd0bccb2c4e927c1cc7195c2794593bfa798a94","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/bowman-road-grs/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23).","caption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","credit":"Federal Highway Administration (FHWA)","sourceUrl":"https://www.fhwa.dot.gov/publications/research/infrastructure/structures/11027/004.cfm","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.fhwa.dot.gov/publications/research/general/15058/024.cfm","width":401,"height":301,"imageDate":null},"figureCaption":"Bowman Road Bridge approximately 4.5 years after construction, as published in FHWA’s GRS-IBS synthesis (Figure 23). The bridge and reinforced-soil abutments are the actual project.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":1,"referenceValues":[{"label":"GRS abutment cost","value":95000,"unit":"USD","scope":"Bowman Road GRS-IBS abutment; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"GRS beams and waterproofing","value":171000,"unit":"USD","scope":"Bowman Road beams and waterproofing; historical comparison.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Reported GRS total","value":266000,"unit":"USD","scope":"Combined abutment, beams and waterproofing in Table 1; not a certified final account.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."},{"label":"Conventional alternative estimate","value":338000,"unit":"USD","scope":"Independent cost estimate for the alternative in Table 1; not an awarded contract.","sourceId":"s2","locator":"Table 1","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/bowman-road-grs-source.json","evidenceSha256":"d480d00b2c58615ce1d9d63609af44dd2229e9af956dcb5d514185d2c251c195","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":3,"downloadBytes":13576453,"sourceCount":6,"url":"/cases/bowman-road-grs"},{"id":"founders-meadows","title":"Founders/Meadows Bridge — footings on reinforced soil","summary":"The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.","topics":["reinforced-soil","shallow-foundations","laboratory-testing","monitoring"],"country":"United States","region":"Castle Rock, Colorado","owner":"Colorado Department of Transportation","year":1999,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Footings on MSE","Geosynthetic reinforcement","Measured deformation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"CDOT Report 1 covers design, materials, construction and instruments; Report 2 evaluates wall performance.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT reports completion in July 1999.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The two reports contain construction observations and instrumented performance results.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate the load path from bridge footing through reinforced soil and compare calculated wall movements with the reported observations.","inputs":["Extract the front-wall geometry, footing loads and reinforcement properties.","Tabulate measured displacement/stress locations and distinguish construction stages."],"deliverables":["Develop bearing, sliding, internal stability and deformation checks for the reference section.","Prepare an instrumentation layout and explain which measurements can test each design assumption.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Founders/Meadows Bridge — Report 1","url":"https://rosap.ntl.bts.gov/view/dot/93454","publisher":"CDOT / FHWA","year":2000,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s2","title":"Founders/Meadows Bridge — Report 2","url":"https://rosap.ntl.bts.gov/view/dot/93418","publisher":"CDOT / FHWA","year":2001,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"founders-meadows.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/founders-meadows/download/schematic"},{"id":"project-image","title":"Founders/Meadows Bridge — completed reinforced-soil approaches","kind":"project-image","fileName":"founders-meadows-r13.jpeg","mimeType":"image/jpeg","bytes":153856,"sha256":"eab161baabb50bab8ad8fbabd87e30265ce580748743fa6841d132e6b722019e","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1024,"height":768,"credit":"CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/93454","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/93454","imageDate":"2000","evidenceFile":"image-provenance/founders-meadows-r13-source.json","evidenceSha256":"448c5095d4b3dae7640c6b858a7052727d7113bce0d2b321ab909ffbfe33e328","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://rosap.ntl.bts.gov/view/dot/93454/dot_93454_DS1.pdf","originalSha256":"8dc6a24810c88a96b1eaa7f05c3eef4d4ef221ad38cb2b4cd3a9223ae3ee98de","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/founders-meadows/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"founders-meadows-capstone.md","mimeType":"text/markdown","bytes":2817,"sha256":"39abf337de186a2f27bd8426784e781403fda0be815e01e9e8cd82cb69a4200c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/founders-meadows/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","caption":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","credit":"CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/93454","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/93454","width":1024,"height":768,"imageDate":"2000","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":2,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/founders-meadows-r13-source.json","evidenceSha256":"448c5095d4b3dae7640c6b858a7052727d7113bce0d2b321ab909ffbfe33e328","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3938,"sourceCount":2,"url":"/cases/founders-meadows"},{"id":"olyphant-distribution","title":"Olyphant distribution centre — variable mine-spoil improvement","summary":"A distribution-centre site on former strip-mine ground combined dynamic compaction with aggregate piers where wet, weak areas did not respond adequately.","topics":["ground-improvement","shallow-foundations","problem-soils","earthworks"],"country":"United States","region":"Olyphant, Pennsylvania","owner":"D&L Realty","year":2022,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Dynamic compaction","Aggregate piers","Performance verification"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project engineer’s case describes the change in treatment, post-improvement SPT checks and aggregate-pier modulus tests.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The source reports about $950,000 for dynamic compaction only; earthwork and aggregate-pier costs are unavailable.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The documented project period is 2021–2022.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case includes post-improvement SPT and pier-modulus verification.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a ground-improvement design with an explicit decision rule for changing treatment in saturated or poorly responding zones.","inputs":["Extract fill depths, initial/post-treatment tests and observed crater response.","Separate warehouse foundation requirements from yard pavement requirements."],"deliverables":["Develop treatment zoning and a field trial with measurable acceptance criteria.","Compare additional compaction, aggregate piers and excavation/replacement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Distribution Center Site, Olyphant, PA","url":"https://www.geoinstitute.org/node/16272","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper by Woods et al., 2023 DFI conference.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"olyphant-distribution.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olyphant-distribution/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"olyphant-distribution-reference-values.csv","mimeType":"text/csv","bytes":303,"sha256":"d8e12ade8ad0afe7e13e24904df73ef410ab81246c1bad7429660474dab67db5","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/olyphant-distribution/download/reference-values"},{"id":"project-image","title":"Olyphant distribution centre — ground-improvement site","kind":"project-image","fileName":"olyphant-distribution-r13.jpg","mimeType":"image/jpeg","bytes":221097,"sha256":"3150a03207445e707145f91b89198c78b9e39ad4825baae9e4f25854c5b70ba9","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1024,"height":683,"credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16272","licenseUrl":"https://www.geoinstitute.org/node/16272","imageDate":null,"evidenceFile":"image-provenance/olyphant-distribution-r13-source.json","evidenceSha256":"26c7c3c9e1ec0483ce092180cb01289e8ec92ded9ea4a33d4423e2547b5ec3d1","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/olyphant_center.jpg","originalSha256":"3150a03207445e707145f91b89198c78b9e39ad4825baae9e4f25854c5b70ba9","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/olyphant-distribution/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"olyphant-distribution-capstone.md","mimeType":"text/markdown","bytes":3085,"sha256":"045c75f6403a1a2cc930baac411103cf2ddb62188ab04145e021984c45afbc77","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/olyphant-distribution/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","caption":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16272","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16272","width":1024,"height":683,"imageDate":null,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Olyphant, Pennsylvania distribution-centre site during its mine-spoil ground-improvement programme.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":13,"referenceValues":[{"label":"Dynamic-compaction package","value":950000,"unit":"USD","scope":"Approximate dynamic-compaction cost; earthworks and aggregate columns excluded.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/olyphant-distribution-r13-source.json","evidenceSha256":"26c7c3c9e1ec0483ce092180cb01289e8ec92ded9ea4a33d4423e2547b5ec3d1","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4576,"sourceCount":1,"url":"/cases/olyphant-distribution"},{"id":"tempe-landfill","title":"Tempe Marketplace — foundations over former landfill","summary":"The submitted case describes dynamic compaction of variable former landfill material before shallow foundations and slabs were constructed.","topics":["ground-improvement","shallow-foundations","geoenvironmental","monitoring"],"country":"United States","region":"Tempe, Arizona","owner":"Owner not stated in reviewed case","year":2015,"yearLabel":"Case reference year","projectType":"Redevelopment","methods":["Dynamic compaction","Shallow foundations","Vibration control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case gives separate treatment passes for general areas and building zones and describes plate-load verification.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"Reported compaction rates were approximately $1.00/ft² for initial passes plus $1.25/ft² for additional building passes; supporting earthwork is excluded.","sourceIds":["s1"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Plate-load and vibration monitoring are described; raw test datasets are not supplied.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a redevelopment foundation strategy that addresses both geotechnical settlement and environmental constraints of former landfill ground.","inputs":["Extract the source’s treatment energy, grid and verification approach.","Identify gas, contamination and decomposable-waste data absent from the geotechnical summary."],"deliverables":["Compare foundations on treated ground with an alternative deep-foundation option.","Prepare a trial-pad programme, vibration limits and residual-settlement allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Tempe Marketplace, Tempe, AZ","url":"https://www.geoinstitute.org/node/16274","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper Woods, Shaffer and Drumheller (2023). The source’s 2015 case date is retained without equating it with opening of the entire retail centre.","checked":"2026-11-22"},{"id":"s2","title":"Tempe Marketplace - 2008-04-17 - Image1.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","publisher":"Wikimedia Commons / Cygnusloop99","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tempe-landfill.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tempe-landfill/download/schematic"},{"id":"project-image","title":"Tempe Marketplace - 2008-04-17 - Image1.JPG","kind":"project-image","fileName":"tempe-landfill.jpg","mimeType":"image/jpeg","bytes":309826,"sha256":"1560b21832ab7c98fa55efb7be6044ca924367f3340cdf77bb7c3cf9282d77d7","sourceId":"s2","license":"CC BY-SA 3.0","width":1280,"height":853,"credit":"Cygnusloop99","sourceUrl":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-04-17","evidenceFile":"image-provenance/tempe-landfill-commons.json","evidenceSha256":"a45cb5b1e75e9c2628f52e3a6cb5899a90bdafe2aadcdc163fe79a85135d487b","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/23/Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","downloadUrl":"/cases/tempe-landfill/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tempe-landfill-capstone.md","mimeType":"text/markdown","bytes":2951,"sha256":"2820f23d69644226442f02bb4d45826cd449c4ec74f941dfd807f6ad3ab035f9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tempe-landfill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Tempe Marketplace after construction, April 2008.","caption":"Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.","credit":"Cygnusloop99","sourceUrl":"https://commons.wikimedia.org/wiki/File:Tempe_Marketplace_-_2008-04-17_-_Image1.JPG","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":853,"imageDate":"2008-04-17"},"figureCaption":"Tempe Marketplace after construction, April 2008. This is the completed development on the remediated landfill site, not a photograph of the ground-improvement work.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":14,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tempe-landfill-commons.json","evidenceSha256":"a45cb5b1e75e9c2628f52e3a6cb5899a90bdafe2aadcdc163fe79a85135d487b","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":313965,"sourceCount":2,"url":"/cases/tempe-landfill"},{"id":"jfk-hangar","title":"JFK hangar expansion — liquefaction mitigation by compaction","summary":"A hangar expansion used dynamic compaction to reduce liquefaction susceptibility in sandy fill and outwash, with vibration controls beside operating airport facilities.","topics":["ground-improvement","seismic","shallow-foundations","monitoring"],"country":"United States","region":"Queens, New York","owner":"Airport project owner not stated in reviewed case","year":1999,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Dynamic compaction","Liquefaction assessment","Vibration isolation"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project case describes compaction passes, grid spacing, groundwater and post-treatment penetration testing.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The submitted case identifies 1998–1999 as the project period.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The case reports improvement depth inferred from post-treatment SPTs.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Specify improvement and verification for an airport foundation site while maintaining service of nearby utilities and structures.","inputs":["Extract pre/post-treatment penetration-test evidence and groundwater depth.","Establish the design earthquake and appropriate corrections independently; the summary alone is not a complete liquefaction input set."],"deliverables":["Compare triggering and settlement checks before and after treatment.","Set field acceptance, vibration monitoring and stop-work criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"JFK Airport, Queens, NY","url":"https://www.geoinstitute.org/node/16275","publisher":"ASCE Geo-Institute / named case-history author","year":2023,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Meyer et al. (2001), Liquefaction Mitigation at JFK Airport Using Dynamic Compaction.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"jfk-hangar.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/jfk-hangar/download/schematic"},{"id":"project-image","title":"JFK hangar expansion — dynamic compaction","kind":"project-image","fileName":"jfk-hangar-r13.png","mimeType":"image/png","bytes":1687455,"sha256":"85f72cbdde8a47d0f8c8e73b4cd3965fb4dfcf2ec32d1f2467e0f60f0ac3ea5d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1011,"height":1280,"credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16275","licenseUrl":"https://www.geoinstitute.org/node/16275","imageDate":null,"evidenceFile":"image-provenance/jfk-hangar-r13-source.json","evidenceSha256":"de48924e56741ae6177849fc79762d2aed8c54398996f286b15d5417d57a1933","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/inline-images/jfk.png","originalSha256":"85f72cbdde8a47d0f8c8e73b4cd3965fb4dfcf2ec32d1f2467e0f60f0ac3ea5d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/jfk-hangar/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"jfk-hangar-capstone.md","mimeType":"text/markdown","bytes":2611,"sha256":"295a20b1e182cfb1a7d1ae4d10af7ffc5ba10f958ca9ee54a2f13ba245066f64","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/jfk-hangar/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","caption":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","credit":"Densification, Inc.; published by ASCE Geo-Institute","sourceUrl":"https://www.geoinstitute.org/node/16275","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/16275","width":1011,"height":1280,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Dynamic compaction beside an aircraft at the JFK hangar-expansion ground-improvement site.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":15,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/jfk-hangar-r13-source.json","evidenceSha256":"de48924e56741ae6177849fc79762d2aed8c54398996f286b15d5417d57a1933","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3799,"sourceCount":1,"url":"/cases/jfk-hangar"},{"id":"prudential-centre","title":"Prudential Center — shallow foundations after improvement","summary":"The arena foundation study compared deep foundations with spread footings on improved ground. Test sections supported the selected compaction and replacement approach.","topics":["shallow-foundations","ground-improvement","site-investigation","delivery"],"country":"United States","region":"Newark, New Jersey","owner":"New Jersey Devils","year":2006,"yearLabel":"Case reference year","projectType":"Redevelopment","methods":["Foundation alternatives","Dynamic compaction","Trial sections"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case describes trial treatment, foundation selection and protection of adjacent historic development.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The case reports roughly $1.5 million for improvement plus shallow foundations versus an estimated $3 million driven-pile alternative.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The case connects foundation selection to readiness for the 2007–2008 hockey season; a full contractor schedule is not supplied.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Test-section and post-improvement field checks are discussed.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Perform a value-engineering comparison for a large building on heterogeneous urban fill while protecting neighbouring structures.","inputs":["Extract the trial-section results and stated allowable-bearing assumptions.","Separate measured treatment response from the original designers’ interpreted bearing values."],"deliverables":["Check bearing, differential settlement and vibration-sensitive construction zones.","Prepare an alternatives matrix with cost scope and construction-risk allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Prudential Center, Newark, New Jersey","url":"https://www.geoinstitute.org/node/16271","publisher":"ASCE Geo-Institute / named case-history author","year":2013,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper Woods, Drumheller and Huber (2013).","checked":"2026-11-22"},{"id":"s2","title":"New Jersey - Newark - Prudential Center IMG 2295 - National Newark Building - Leecourt-Newark Building - Penn Station.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","publisher":"Wikimedia Commons / Bjoertvedt","year":2018,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"prudential-centre.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/prudential-centre/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"prudential-centre-reference-values.csv","mimeType":"text/csv","bytes":742,"sha256":"9543f67494a4bf3029bd31ac796b2b285ee15d0e9c2721e0657bb8f8392b6d68","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/prudential-centre/download/reference-values"},{"id":"project-image","title":"New Jersey - Newark - Prudential Center IMG 2295 - National Newark Building - Leecourt-Newark Building - Penn Station.jpg","kind":"project-image","fileName":"prudential-centre.jpg","mimeType":"image/jpeg","bytes":229002,"sha256":"fd961e3f456289c12b8e9851c5d3d52e6f742c388195fa6d6df5e8377526366b","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":556,"credit":"Bjoertvedt","sourceUrl":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2018-06-30 14:40:28","evidenceFile":"image-provenance/prudential-centre-commons.json","evidenceSha256":"1befa45140ee1090a128a92a838148a1c778e95268f262855b15321a82d424a5","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","downloadUrl":"/cases/prudential-centre/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"prudential-centre-capstone.md","mimeType":"text/markdown","bytes":4036,"sha256":"5c29b435d4dfd10f8273c13b5a15b7c7b92a108255546ee544c862a6fcada1b5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/prudential-centre/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed Prudential Center arena in Newark, New Jersey.","caption":"The completed Prudential Center arena in Newark, New Jersey. The photograph identifies the project discussed in the ground-improvement case history; the subsurface work is not visible.","credit":"Bjoertvedt","sourceUrl":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":556,"imageDate":"2018-06-30 14:40:28"},"figureCaption":"The completed Prudential Center arena in Newark, New Jersey. The photograph identifies the project discussed in the ground-improvement case history; the subsurface work is not visible.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":16,"referenceValues":[{"label":"Improvement plus shallow foundations","value":1500000,"unit":"USD","scope":"Approximate reported cost; not the arena total.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."},{"label":"Driven-pile alternative","value":3000000,"unit":"USD","scope":"Order-of-magnitude estimated alternative; not an executed pile contract.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."},{"label":"Trial-supported bearing pressure","value":3,"unit":"tsf","scope":"Reported allowable bearing pressure after trial assessment; not a transferable design value.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Site-specific reported allowable value."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/prudential-centre-commons.json","evidenceSha256":"1befa45140ee1090a128a92a838148a1c778e95268f262855b15321a82d424a5","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":234666,"sourceCount":2,"url":"/cases/prudential-centre"},{"id":"canterbury-trials","title":"Canterbury residential ground-improvement trials","summary":"The 2012 trials compared shallow rafts, mixing columns, a perimeter curtain and densification approaches to support residential foundation repair and rebuilding.","topics":["ground-improvement","seismic","shallow-foundations","laboratory-testing"],"country":"New Zealand","region":"Christchurch, Canterbury","owner":"New Zealand building ministry and trial partners","year":2012,"yearLabel":"Case reference year","projectType":"Field demonstration","methods":["Liquefaction mitigation","Ground-treatment trials","Residential foundations"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"MBIE publishes the trial report and method descriptions. Trial configurations must not be treated as a site-independent residential design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The official page links the trial report and its findings.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a comparative field-trial and foundation-selection study for liquefiable residential ground.","inputs":["Extract trial geometry, ground conditions, loading and measured response from the 2012 report.","Keep the 2012 programme distinct from the separate 2013 EQC science trials."],"deliverables":["Create a treatment-selection matrix and testable acceptance criteria.","Prepare a study foundation detail and a plan to verify performance beyond the trial footprint.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Christchurch ground improvement trials","url":"https://www.building.govt.nz/building-code-compliance/canterbury-rebuild/supplementary-guidance/christchurch-ground-improvement-trials","publisher":"MBIE","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Queen Elizabeth Park — Murray Kennedy earthquake collection","url":"https://www.canterburystories.nz/collections/community/murray-kennedy/ccl-cs-13063","publisher":"Christchurch City Libraries — Canterbury Stories","year":2011,"access":"public-link","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","notes":"Project image source. Original published image file copied unchanged; no crop, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"canterbury-trials.svg","mimeType":"image/svg+xml","bytes":1188,"sha256":"1920205333b391315a1a8dc51c3ceea9b1d38258e470b3cd92fd907a2a396e7a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/canterbury-trials/download/schematic"},{"id":"project-image","title":"QEII Park — liquefaction at the Canterbury trial site","kind":"project-image","fileName":"canterbury-trials-r13.jpg","mimeType":"image/jpeg","bytes":344886,"sha256":"f6adc5f101e5d8a9bd75c44f89e831d5b16a95ba16f83219fabeb30eec655b6f","sourceId":"s2","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":1440,"height":1080,"credit":"Murray Kennedy; Christchurch City Libraries, CCL-DW-74261 / CCL-MuKe-P3110219","sourceUrl":"https://www.canterburystories.nz/collections/community/murray-kennedy/ccl-cs-13063","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2011-03-11","evidenceFile":"image-provenance/canterbury-trials-r13-source.json","evidenceSha256":"fdbad02509140c2afe2393db0241818a10a4e720a1d8786c5ef50559689c82f1","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.canterburystories.nz/sites/default/files/2020-08/13063-Service%20File.jpg","originalSha256":"f6adc5f101e5d8a9bd75c44f89e831d5b16a95ba16f83219fabeb30eec655b6f","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"pre-trial-site-context-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/canterbury-trials/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"canterbury-trials-capstone.md","mimeType":"text/markdown","bytes":3076,"sha256":"446a28a3aec317c5647b377613b087e81be41ba1b2a67b990618aee808f588be","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/canterbury-trials/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial photograph of liquefaction at QEII Park and its surroundings on 11 March 2011. This records the site context before the later ground-improvement trials, not the trial construction.","caption":"Aerial photograph of liquefaction at QEII Park and its surroundings on 11 March 2011. This records the site context before the later ground-improvement trials, not the trial construction.","credit":"Murray Kennedy; Christchurch City Libraries, CCL-DW-74261 / CCL-MuKe-P3110219","sourceUrl":"https://www.canterburystories.nz/collections/community/murray-kennedy/ccl-cs-13063","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":1440,"height":1080,"imageDate":"2011-03-11","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"pre-trial-site-context-photograph"},"figureCaption":"Aerial photograph of liquefaction at QEII Park and its surroundings on 11 March 2011. This records the site context before the later ground-improvement trials, not the trial construction.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":33,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/canterbury-trials-r13-source.json","evidenceSha256":"fdbad02509140c2afe2393db0241818a10a4e720a1d8786c5ef50559689c82f1","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":349150,"sourceCount":2,"url":"/cases/canterbury-trials"},{"id":"schoharie-creek","title":"Schoharie Creek Bridge — scour and foundation inspection","summary":"The NTSB investigation documents the bridge collapse after scour undermined spread-footing support, including construction, protection and inspection issues.","topics":["scour-erosion","shallow-foundations","site-investigation","monitoring"],"country":"United States","region":"Near Amsterdam, New York","owner":"New York State Thruway Authority","year":1987,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Scour assessment","Spread footings","Inspection and maintenance"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The investigation reconstructs the original foundation and scour-protection evidence; it is a forensic record rather than a replacement-bridge design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Collapse occurred on 5 April 1987; the NTSB report was published in 1988.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The report supplies the investigation record and recommendations, not replacement as-built plans.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a scour-risk assessment and protection/inspection strategy that remains effective throughout the bridge life.","inputs":["Extract original footing elevations, bed conditions and riprap/inspection evidence.","Distinguish foundation erosion from structural redundancy and emergency response questions."],"deliverables":["Compare predicted scour levels with available bearing support and foundation depth.","Prepare a protection detail, inspection triggers and a maintenance quantity schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"NTSB HAR-88/02 — Schoharie Creek Bridge collapse","url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/HAR8802.pdf","publisher":"National Transportation Safety Board","year":1988,"access":"public-link","license":"US federal investigation report; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["schoharie-investigation"]},{"id":"s2","title":"Interstate 90 Schoharie Creek Bridge collapsed.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","publisher":"Wikimedia Commons / USGS","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"schoharie-creek.svg","mimeType":"image/svg+xml","bytes":1056,"sha256":"ca50c03b28c61244d08ee83702433916e462ad2ee363e42240a9f0377b8c9c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/schoharie-creek/download/schematic"},{"id":"schoharie-investigation","title":"NTSB HAR-88/02, Schoharie Creek investigation","kind":"report","fileName":"schoharie-investigation.pdf","mimeType":"application/pdf","bytes":12310933,"sha256":"d28240fdf577aa1b231f09493181927478ae46a078f186c5a980909f6c6be14d","sourceId":"s1","license":"US federal investigation report; original credits retained","rightsUrl":"https://www.ntsb.gov/about/Policies/Pages/Policies.aspx","rightsBasis":"NTSB staff reports and graphics are public domain except specifically credited copyright material; report retained unmodified.","rightsEvidenceUrl":"https://www.ntsb.gov/about/Policies/Pages/Policies.aspx","pages":172,"downloadUrl":"/cases/schoharie-creek/download/schoharie-investigation"},{"id":"project-image","title":"Interstate 90 Schoharie Creek Bridge collapsed.jpg","kind":"project-image","fileName":"schoharie-creek.jpg","mimeType":"image/jpeg","bytes":57965,"sha256":"ba1a8e908b89c2890aa64f154a516bd9fd741d15f483c3c47027362ff2bf3022","sourceId":"s2","license":"Public domain","width":483,"height":320,"credit":"USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg#Licensing","imageDate":null,"evidenceFile":"image-provenance/schoharie-creek-commons.json","evidenceSha256":"66eb93aea3e6dcdba8e09808b6a0faab92d41bd4e46b5b5a7093623dcc4458a0","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fc/Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","downloadUrl":"/cases/schoharie-creek/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"schoharie-creek-capstone.md","mimeType":"text/markdown","bytes":2973,"sha256":"b118fc06966d2c43b2489147762bcbdfe8abc441fcc5e12b5a2016f263da0e47","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/schoharie-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse.","caption":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse. Historical USGS project photograph.","credit":"USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg#Licensing","width":483,"height":320,"imageDate":null},"figureCaption":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse. Historical USGS project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":42,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/schoharie-creek-commons.json","evidenceSha256":"66eb93aea3e6dcdba8e09808b6a0faab92d41bd4e46b5b5a7093623dcc4458a0","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":12372927,"sourceCount":2,"url":"/cases/schoharie-creek"},{"id":"pisa-stabilization","title":"Leaning Tower of Pisa — controlled underexcavation","summary":"A heritage foundation was stabilized by carefully removing soil beneath its north side. Published post-intervention observations connect rotation, settlement and groundwater control.","topics":["shallow-foundations","settlement","dewatering","monitoring"],"country":"Italy","region":"Pisa","owner":"Italian Government / Opera della Primaziale Pisana","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Underexcavation","Differential settlement","Piezometric control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors describe the stabilization mechanism and subsequent instrument readings. The case supports an observational-method study rather than copying a universal underpinning detail.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The author paper reports post-stabilization monitoring; it is not a current inspection certificate.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a staged underexcavation trial for an eccentric masonry-tower footing, using Pisa to define observations and stop criteria.","inputs":["Extract the foundation geometry, rotation history and monitored groundwater response from the author paper.","Distinguish the temporary stabilization operations from the permanent soil-removal and drainage measures."],"deliverables":["Calculate the direction and sensitivity of foundation rotation for small asymmetric volume removals.","Specify incremental excavation stages, survey precision, trigger values and contingency actions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can removing support on the higher side improve stability without simply increasing bearing resistance?","How would a seasonal groundwater rise change the interpretation of the measured tilt?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Behaviour after stabilization operations","url":"https://www.geocasehistoriesjournal.org/issues/volume-1-3/leaning-tower-of-pisa-behaviour-after-stabilization-operations","publisher":"Burland, Jamiolkowski and Viggiani / International Journal of Geoengineering Case Histories","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Restoration works contractor account","url":"https://trevispa.com/en/progetti/the-restoration-of-the-leaning-tower-of-pisa/","publisher":"Trevi","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Exterior of the Leaning Tower (Pisa) in April 2024.1.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","publisher":"Wikimedia Commons / PaestumPaestum","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"pisa-stabilization.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pisa-stabilization/download/schematic"},{"id":"project-image","title":"Exterior of the Leaning Tower (Pisa) in April 2024.1.jpg","kind":"project-image","fileName":"pisa-stabilization.jpg","mimeType":"image/jpeg","bytes":750557,"sha256":"4fe52d89c0578296c480ba671b8cd8d23bf1447b768d11a5661f9fb513ab7de9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":2490,"credit":"PaestumPaestum","sourceUrl":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-05-24 10:50:55","evidenceFile":"image-provenance/pisa-stabilization-commons.json","evidenceSha256":"27d6f137275dbf0bc47e7965477a8700394301d62fe5df53dcebb2fbbdff28d3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fb/Exterior_of_the_Leaning_Tower_%28Pisa%29_in_April_2024.1.jpg","downloadUrl":"/cases/pisa-stabilization/download/project-image","originalSha1":"d9e3fbde3af929fa625c4a633098fac6402952c4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"pisa-stabilization-capstone.md","mimeType":"text/markdown","bytes":3389,"sha256":"e8e53ea3c4f4a2019e709e9ffbf8d8406576dd631ea06e16190cb69970eb28c4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/pisa-stabilization/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Leaning Tower of Pisa after the stabilization works.","caption":"The Leaning Tower of Pisa after the stabilization works. The photograph identifies the actual monument; the soil-removal operations are documented in the linked engineering accounts.","credit":"PaestumPaestum","sourceUrl":"https://commons.wikimedia.org/wiki/File:Exterior_of_the_Leaning_Tower_(Pisa)_in_April_2024.1.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":2490,"imageDate":"2023-05-24 10:50:55","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Leaning Tower of Pisa after the stabilization works. The photograph identifies the actual monument; the soil-removal operations are documented in the linked engineering accounts.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":47,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/pisa-stabilization-commons.json","evidenceSha256":"27d6f137275dbf0bc47e7965477a8700394301d62fe5df53dcebb2fbbdff28d3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":754832,"sourceCount":3,"url":"/cases/pisa-stabilization"},{"id":"burj-khalifa","title":"Burj Khalifa — piled-raft settlement design","summary":"The tower uses a piled raft in weak sedimentary rock. The foundation designer publishes an analysis process linking ground characterization, trial pile testing and settlement predictions for super-tall towers.","topics":["deep-foundations","shallow-foundations","settlement","laboratory-testing"],"country":"United Arab Emirates","region":"Dubai","owner":"Emaar Properties","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Piled raft","Load sharing","Pile load tests"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The designer paper provides a foundation-design case and discusses piled-raft interaction. Access to a publication does not establish availability of the complete issued-for-construction package.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare a conventional pile-group design with a settlement-led piled-raft concept for a heavily loaded tower on weak rock.","inputs":["Extract the published stratigraphy, raft geometry and pile test interpretation.","Set an explicit study loading envelope instead of inferring column loads from building height."],"deliverables":["Assess pile–raft load sharing and differential settlement under gravity and overturning actions.","Prepare a trial-pile programme and a monitoring layout that can distinguish group interaction from single-pile behavior.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When does an acceptable single-pile capacity still produce unacceptable raft settlement?","How sensitive is load sharing to the stiffness assigned to weathered rock?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geotechnical foundation design for some of the world’s tallest buildings","url":"https://www.jstage.jst.go.jp/article/jgssp/2/2/2_ESD-KL-2/_article/-char/en","publisher":"Frances Badelow and Harry G. Poulos / Japanese Geotechnical Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Tower raft construction","url":"https://www.multiplex.global/projects/burj-khalifa-tower-raft/","publisher":"Multiplex","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Burj Khalifa (16260269606).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","publisher":"Wikimedia Commons / Laika ac","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"burj-khalifa.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/burj-khalifa/download/schematic"},{"id":"project-image","title":"Burj Khalifa (16260269606).jpg","kind":"project-image","fileName":"burj-khalifa.jpg","mimeType":"image/jpeg","bytes":182077,"sha256":"8076b1a767a9e03b29c96f35dd1453a58e86e4b2edf03fbe14b93b18b3c41bb7","sourceId":"s3","license":"CC BY-SA 2.0","width":1280,"height":853,"credit":"Laika ac","sourceUrl":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-01-02 02:34","evidenceFile":"image-provenance/burj-khalifa-commons.json","evidenceSha256":"4d1264dcd302baee5b9cb830b9c828715714cae0cd06cb5e42a2e4f6340c02bc","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a6/Burj_Khalifa_%2816260269606%29.jpg","downloadUrl":"/cases/burj-khalifa/download/project-image","originalSha1":"95070e3053de0d9a27330f7ab02fe3ea714e68d5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"burj-khalifa-capstone.md","mimeType":"text/markdown","bytes":3189,"sha256":"402a9cf33e6b720a84554a80b913297eb995eeecc398abea894bef0643a1329a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/burj-khalifa/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Burj Khalifa in Dubai.","caption":"Burj Khalifa in Dubai. The tower photograph identifies the project; its piled raft lies below ground and is described in the foundation-design paper.","credit":"Laika ac","sourceUrl":"https://commons.wikimedia.org/wiki/File:Burj_Khalifa_(16260269606).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":853,"imageDate":"2015-01-02 02:34","imageDownloadAllowed":true},"figureCaption":"Burj Khalifa in Dubai. The tower photograph identifies the project; its piled raft lies below ground and is described in the foundation-design paper.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":49,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/burj-khalifa-commons.json","evidenceSha256":"4d1264dcd302baee5b9cb830b9c828715714cae0cd06cb5e42a2e4f6340c02bc","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":186465,"sourceCount":3,"url":"/cases/burj-khalifa"},{"id":"rion-antirion","title":"Rion–Antirion Bridge — seismic caissons on improved seabed","summary":"The bridge foundations combine large caissons, a gravel interface and steel inclusions in weak seabed deposits. The designer distinguishes this system from piles structurally connected to a raft.","topics":["shallow-foundations","ground-improvement","seismic","coastal-offshore","lateral-foundations"],"country":"Greece","region":"Gulf of Corinth","owner":"Gefyra","year":2004,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seabed inclusions","Caisson sliding","Seismic capacity design"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Designer accounts explain the seismic load-transfer concept, alternative selection and verification studies. Their inclusion terminology is retained because the caisson is not fixed to the inclusions.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The designer account describes an approximately €800 million overall project. It is not a foundation-package bill or a certified final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The designer account reports completion in summer 2004 ahead of the contractual deadline.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate a gravity caisson on reinforced seabed with controlled sliding and uplift under earthquake loading.","inputs":["Extract the published soil layering, caisson geometry and reinforcement concept.","Use separate interface and reinforced-ground strengths; do not model the inclusions as connected piles."],"deliverables":["Check bearing, sliding and uplift for a defined seismic load envelope.","Compare alternative foundation concepts and propose validation by model tests and monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which load path is lost if the gravel layer is incorrectly modeled as a fixed connection?","How can controlled foundation movement reduce structural force while requiring displacement checks?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of Rion Antirion Bridge","url":"https://www.ice.org.uk/areas-of-interest/buildings-and-structures/design-and-construction-of-rion-antirion","publisher":"Bridge design team / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Foundation design paper","url":"https://ascelibrary.org/doi/10.1061/40744%28154%297","publisher":"Alain Pecker / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","publisher":"Wikimedia Commons / Julien Seguinot from Lille, France","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rion-antirion.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/schematic"},{"id":"project-image","title":"Rio-Antirrio bridge from Peloponnese (50451233726).jpg","kind":"project-image","fileName":"rion-antirion.jpg","mimeType":"image/jpeg","bytes":393534,"sha256":"a3d2e41eaadeb905afedcc04ba5700e30410d24dbf4cd468265faa4b86936bc9","sourceId":"s3","license":"CC BY-SA 2.0","width":1280,"height":853,"credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-09-30 15:33","evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/9f/Rio-Antirrio_bridge_from_Peloponnese_%2850451233726%29.jpg","downloadUrl":"/cases/rion-antirion/download/project-image","originalSha1":"e79018f5e06ee63197783330d3fe440d7aa3cebb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rion-antirion-capstone.md","mimeType":"text/markdown","bytes":3295,"sha256":"e769c46de36c7f364d44c5e2ab1ce02b58a85a6298e8ea0522acc1691d78bc0c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rion-antirion/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Rion–Antirion Bridge viewed from the Peloponnese.","caption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","credit":"Julien Seguinot from Lille, France","sourceUrl":"https://commons.wikimedia.org/wiki/File:Rio-Antirrio_bridge_from_Peloponnese_(50451233726).jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":853,"imageDate":"2020-09-30 15:33","imageDownloadAllowed":true},"figureCaption":"The Rion–Antirion Bridge viewed from the Peloponnese. This is the actual crossing whose caissons and improved seabed are described in the engineering case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":53,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rion-antirion-commons.json","evidenceSha256":"9a593649675916533d461ddfc9cc366b73d76664cd0530f4dfe5cf4a31f1abf6","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":397715,"sourceCount":3,"url":"/cases/rion-antirion"},{"id":"chek-lap-kok","title":"Hong Kong International Airport — foundations across rock and reclamation","summary":"The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.","topics":["site-investigation","deep-foundations","shallow-foundations","ground-improvement","settlement"],"country":"China","region":"Chek Lap Kok","owner":"Airport Authority Hong Kong","year":1998,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","CPT verification","Mixed foundation systems"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources describe actual foundation choices and field characterization. They do not provide a single uniform soil profile for the whole airport.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design the transition between a shallow foundation on rock and a piled concourse on reclaimed deposits.","inputs":["Distinguish original rock, weathered zones and reclaimed sand in a project ground model.","Extract the reported investigation and density-verification approach from the vibrocompaction paper."],"deliverables":["Compare settlement and construction risk for two terminal foundation zones.","Define CPT acceptance criteria and an interface detail for differential movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which discontinuity is more important: the former shoreline or the top of competent rock?","How can improvement verification avoid hiding local loose pockets behind an average density?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Airport design and construction history","url":"https://www.mottmac.com/en/projects/hong-kong-international-the-airport-that-changed-the-world/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Review of vibrocompaction at Hong Kong’s new airport","url":"https://www.tandfonline.com/doi/abs/10.1080/1023697X.1998.10667731","publisher":"Petra Berner, Airport Authority / HKIE Transactions","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","publisher":"Wikimedia Commons / PSnyan","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"chek-lap-kok.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"fc361c835a99c48885fcadacff7f4f786820aca6f6b5404b5974cf6cce064489","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/schematic"},{"id":"project-image","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg","kind":"project-image","fileName":"chek-lap-kok.jpg","mimeType":"image/jpeg","bytes":179932,"sha256":"c87c0cdcf9398738ded1b460f6b9732fe4d96156b32027b16c219767feb56c88","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 17 October 2008","evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Hong_Kong_Internatinal_Airport_from_Air%28Chek_Lap_Kok%2C%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF%29_-_panoramio.jpg","downloadUrl":"/cases/chek-lap-kok/download/project-image","originalSha1":"cea44a0793016f2db57daf5f9cfda0023fdfba2d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"chek-lap-kok-capstone.md","mimeType":"text/markdown","bytes":3461,"sha256":"45bad050968b234d820c46685e9c15826621090d33708b2cdeff712cf44cc2a1","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hong Kong International Airport at Chek Lap Kok viewed from the air.","caption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 17 October 2008","imageDownloadAllowed":true},"figureCaption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":54,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":184279,"sourceCount":3,"url":"/cases/chek-lap-kok"},{"id":"niigata-liquefaction","title":"Niigata earthquake — contrasting liquefied and non-liquefied sites","summary":"Published investigations compare sites that did and did not liquefy, linking penetration tests, recovered sand samples and cyclic strength. Building tilting demonstrates the importance of ground response even when the superstructure remains comparatively intact.","topics":["seismic","laboratory-testing","site-investigation","shallow-foundations"],"country":"Japan","region":"Niigata","owner":"Japanese earthquake investigators","year":1964,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["SPT and CPT","Cyclic triaxial testing","Liquefaction triggering"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The primary studies provide observed performance and analytical comparisons. Historical correlations should be reassessed using current procedures for a new design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Test a liquefaction assessment against both failure and non-failure sites from the same earthquake.","inputs":["Extract the paired site profiles and distinguish measured penetration resistance from inferred density.","Record the motion and groundwater assumptions used in the historical analysis."],"deliverables":["Compare cyclic demand and resistance across the two profiles with sensitivity bounds.","Develop a ground-improvement or foundation concept for an affected building plot.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is matching only the failed site an incomplete validation of a liquefaction method?","How could groundwater depth reverse the predicted outcome without changing the soil classification?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case studies of liquefaction in the 1964 earthquake","url":"https://www.jstage.jst.go.jp/article/sandf1972/21/3/21_3_35/_article","publisher":"Ishihara and Koga / Soils and Foundations","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Analysis of soil liquefaction: Niigata earthquake","url":"https://ascelibrary.org/doi/10.1061/JSFEAQ.0000981","publisher":"Seed and Idriss / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Liquefaction at Niigata.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG","publisher":"Wikimedia Commons / The original uploader was Ungtss at English Wikipedia .","year":1964,"access":"public-link","license":"Editorial reference; Commons claims U.S. public domain, wider reuse rights unverified","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"niigata-liquefaction.svg","mimeType":"image/svg+xml","bytes":989,"sha256":"7ed6562b41c1ef6286cc62d81928348d9f071653ee41e073ab8e6a4e68cf4e34","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/niigata-liquefaction/download/schematic"},{"id":"project-image","title":"Liquefaction at Niigata.JPG","kind":"project-image","fileName":"niigata-liquefaction.jpg","mimeType":"image/jpeg","bytes":36601,"sha256":"f0e87b68c38b11c43e8dd096702960839749ce38f0ea6993d18cbbcf47a3c2b8","sourceId":"s3","license":"Editorial reference; Commons claims U.S. public domain, wider reuse rights unverified","width":500,"height":297,"credit":"Japan National Committee on Earthquake Engineering / UC Berkeley EERC Library; individual photographer not identified in the Commons source record","sourceUrl":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG#Licensing","imageDate":"1964-06-16","evidenceFile":"image-provenance/niigata-liquefaction-commons.json","evidenceSha256":"cd555190bff77af422f10520beb09222ac92a18b26b1f5ced8f4c82cbb06d815","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/42/Liquefaction_at_Niigata.JPG","originalSha1":"0e5c70e48641447e47a0c826e3d9440d1a3f7ce0","originalSha256":"f0e87b68c38b11c43e8dd096702960839749ce38f0ea6993d18cbbcf47a3c2b8","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No worldwide open image license verified","rightsNote":"The Commons page uses a U.S. publication-without-notice designation and records the historical EERC Library source. That claim is not treated as a worldwide open license. The source-linked preview is not offered as a reusable download.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/niigata-liquefaction/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"niigata-liquefaction-capstone.md","mimeType":"text/markdown","bytes":3491,"sha256":"0c390c31b7c20f0ea6292f190223304f229eaf98087e09af79518d2c5085bef0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/niigata-liquefaction/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Buildings affected by soil liquefaction during the 1964 Niigata earthquake.","caption":"Buildings affected by soil liquefaction during the 1964 Niigata earthquake. This historical photograph illustrates the event; it is not a location marker for both detailed comparison sites in the research paper.","credit":"Japan National Committee on Earthquake Engineering / UC Berkeley EERC Library; individual photographer not identified in the Commons source record","sourceUrl":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG","license":"Editorial reference; Commons claims U.S. public domain, wider reuse rights unverified","licenseUrl":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG#Licensing","width":500,"height":297,"imageDate":"1964-06-16","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No worldwide open image license verified","rightsNote":"The Commons page uses a U.S. publication-without-notice designation and records the historical EERC Library source. That claim is not treated as a worldwide open license. The source-linked preview is not offered as a reusable download."},"figureCaption":"Buildings affected by soil liquefaction during the 1964 Niigata earthquake. This historical photograph illustrates the event; it is not a location marker for both detailed comparison sites in the research paper.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":92,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/niigata-liquefaction-commons.json","evidenceSha256":"cd555190bff77af422f10520beb09222ac92a18b26b1f5ced8f4c82cbb06d815","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4480,"sourceCount":3,"url":"/cases/niigata-liquefaction"},{"id":"one-new-change","title":"One New Change — basement effects on St Paul’s groundwater","summary":"Redevelopment beside St Paul’s Cathedral required assessment of groundwater changes in shallow deposits supporting the historic structure. The designer describes conceptual and numerical groundwater modeling followed by construction monitoring.","topics":["excavation","dewatering","shallow-foundations","monitoring"],"country":"United Kingdom","region":"City of London","owner":"Land Securities","year":2010,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Groundwater modeling","Basement cutoff effects","Heritage monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Arup explains the groundwater model and observed construction response. The public account does not provide the full calibrated model or authorize unrestricted basement work near the cathedral.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The designer reports groundwater and structural monitoring during construction with negligible observed effect on the cathedral.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess whether a new basement diverts shallow groundwater enough to affect a neighboring heritage foundation.","inputs":["Extract the reported aquifer, foundation and basement relationships.","Identify man-made drainage and historic excavations that may change natural flow paths."],"deliverables":["Compare preconstruction and basement scenarios with recharge and permeability sensitivities.","Specify piezometers and structural surveys capable of distinguishing seasonal changes from construction effects.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can a watertight basement cause damaging groundwater change without active dewatering?","Which calibration observations are needed before trusting a model’s small predicted effect?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground engineering and groundwater protection at One New Change","url":"https://www.arup.com/en-us/projects/one-new-change/","publisher":"Arup","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"London - New Change - One New Change 2010 by Jean Nouvel - View West on St Paul's Cathedral 1697 by Sir Christopher Wren III.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","publisher":"Wikimedia Commons / Txllxt TxllxT","year":2011,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"one-new-change.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/one-new-change/download/schematic"},{"id":"project-image","title":"London - New Change - One New Change 2010 by Jean Nouvel - View West on St Paul's Cathedral 1697 by Sir Christopher Wren III.jpg","kind":"project-image","fileName":"one-new-change.jpg","mimeType":"image/jpeg","bytes":247667,"sha256":"9a6679e879bd9eb087a955a9593eea26025ed3624038d8b664b67ba27ee88c45","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Txllxt TxllxT","sourceUrl":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2011-06-20 14:27:18","evidenceFile":"image-provenance/one-new-change-commons.json","evidenceSha256":"6b3c5058ed26b68bc8857ee718d90dc0816f85f95f68c713496d1cdb57cb101d","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/38/London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","downloadUrl":"/cases/one-new-change/download/project-image","originalSha1":"241c5d5b01283a7a875ec9b5aa600bf482fccca1","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"one-new-change-capstone.md","mimeType":"text/markdown","bytes":3362,"sha256":"dfdc5008d7df14d8e08879a051b14fcd5dee3a5bb724e23de542d930e7f416e6","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/one-new-change/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"View from One New Change toward St Paul’s Cathedral.","caption":"View from One New Change toward St Paul’s Cathedral. The photograph shows the adjacent development and heritage structure whose groundwater interaction was assessed.","credit":"Txllxt TxllxT","sourceUrl":"https://commons.wikimedia.org/wiki/File:London_-_New_Change_-_One_New_Change_2010_by_Jean_Nouvel_-_View_West_on_St_Paul%27s_Cathedral_1697_by_Sir_Christopher_Wren_III.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2011-06-20 14:27:18","imageDownloadAllowed":true},"figureCaption":"View from One New Change toward St Paul’s Cathedral. The photograph shows the adjacent development and heritage structure whose groundwater interaction was assessed.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":98,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/one-new-change-commons.json","evidenceSha256":"6b3c5058ed26b68bc8857ee718d90dc0816f85f95f68c713496d1cdb57cb101d","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":252160,"sourceCount":2,"url":"/cases/one-new-change"},{"id":"halley-vi","title":"Halley VI — relocatable foundations on accumulating snow","summary":"The Antarctic station sits on ski-supported hydraulic legs that allow annual raising and relocation. This is a foundation-maintenance and construction-logistics case on moving, accumulating snow and ice.","topics":["cold-regions","shallow-foundations","settlement","monitoring","delivery"],"country":"Antarctica","region":"Brunt Ice Shelf, Antarctica","owner":"British Antarctic Survey","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow bearing and creep","Jackable foundations","Differential movement","Relocation sequencing"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"BAS documents the hydraulic-leg concept, seasonal raising procedure and 2016/17 relocation. Ground support is deformable snow/ice, so a conventional soil bearing-capacity calculation alone does not represent the governing behaviour.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"BAS records relocation to a new site during the 2016/17 Antarctic season.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"BAS publishes operational descriptions of raising and maintaining the station. A complete calibrated snow-foundation model and support-load register are not supplied.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an operating and lifting plan for a modular station on snow, explicitly separating creep settlement, drifting accumulation and large-scale ice-shelf movement.","inputs":["Extract the actual support arrangement and raising sequence from BAS material.","Define a labelled study range for snow density, creep response, wind/drift loading and allowable module distortion."],"deliverables":["Compare support pressure and time-dependent movement for alternative ski contact areas and raising intervals.","Prepare a one-leg-at-a-time lifting sequence, temporary support checks, survey tolerances and relocation triggers.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can increasing foundation contact area reduce bearing pressure yet leave annual raising and relocation necessary?","How would uneven snow placement beneath one leg appear in level surveys, and how could it be distinguished from a drifting snow-surface change?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Halley VI Research Station — facility and support system","url":"https://www.bas.ac.uk/polar-operations/sites-and-facilities/facility/halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Halley Research Station relocation","url":"https://www.bas.ac.uk/project/moving-halley/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Preparing Halley VI for winter — annual raising operations","url":"https://www.bas.ac.uk/blogpost/seasons-end-hibernating-halley-vi-for-the-winter/","publisher":"British Antarctic Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Halley VI Antarctic Research Station - view from North East.jpg","url":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","publisher":"Hugh Broughton Architects","year":2012,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"halley-vi.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/schematic"},{"id":"project-image","title":"Halley VI — raised modular research station","kind":"project-image","fileName":"halley-vi.jpg","mimeType":"image/jpeg","bytes":118311,"sha256":"daf2edd100b8853181848248a42315aa652f50e61d8c92c94f7b17560bc5e234","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2012-02-23 23:15:19","evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b1/Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/halley-vi/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"halley-vi-capstone.md","mimeType":"text/markdown","bytes":3692,"sha256":"9819e7bcf0b22239b8d6f67c7382c97ac1900cc0daccdb36464ab15043bcb185","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/halley-vi/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","caption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","credit":"Hugh Broughton Architects / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Halley_VI_Antarctic_Research_Station_-_view_from_North_East.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2012-02-23 23:15:19","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Halley VI Research Station, with its modules elevated on hydraulic legs above the snow surface. The ski-supported arrangement allows lifting and relocation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":107,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/halley-vi-r14-source.json","evidenceSha256":"0569d1f8c0be9094fb3f62806b3ee0cb8bf915ebb3410e1a2d17d0c7791f3dcc","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":122971,"sourceCount":4,"url":"/cases/halley-vi"},{"id":"south-pole-station","title":"South Pole Station — snow-foundation settlement and levelling","summary":"The elevated station experiences nonuniform support-column settlement in deep permanent snow. USACE reports analyze surveys, floor levelness and maintenance decisions, making a useful observational-design case.","topics":["cold-regions","settlement","shallow-foundations","monitoring","laboratory-testing"],"country":"Antarctica","region":"Geographic South Pole","owner":"National Science Foundation / U.S. Antarctic Program","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Snow creep settlement","Survey adjustment","Differential settlement","Maintenance prediction"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The 2019 CRREL study evaluates column surveys and shimming, while the 2025 master plan describes continued monitoring and future lifting needs. These dated records should remain distinct from a new design assumption or a claim that a planned major lift has occurred.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The 2019 report provides support-column analysis. The 2025 plan describes 32 supporting columns, recurring surveys and future lifting requirements; it does not certify that a lift has already been completed.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Use the public support-column study to develop a forecast-and-levelling workflow for an elevated structure on compressible snow.","inputs":["Extract column identifiers, survey dates, reference levels and documented shimming events from the CRREL report.","Separate snow-surface accumulation from foundation movement and account for staged construction and unequal column loads."],"deliverables":["Fit a transparent settlement forecast with residual and extrapolation checks; compare the prediction with withheld survey dates if available.","Produce a floor-levelness map, column-priority list and maintenance decision rule with survey uncertainty.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How could a survey reference that moves with the snowpack distort a long-term foundation settlement assessment?","Which evidence would justify a major building lift instead of continued local shimming, and what data would a planner need to schedule it?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Analysis of recent support-column survey results — ERDC/CRREL SR-19-3","url":"https://www.erdc.usace.army.mil/Media/Publication-Notices/Article/1897499/publication-notice-analysis-of-recent-support-column-survey-results-for-the-ele/","publisher":"Blaisdell, Weale and Barna / USACE CRREL","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"South Pole Station Master Plan, 2025","url":"https://www.usap.gov/news/documents/SouthPoleMasterPlan.pdf","publisher":"U.S. Antarctic Program / National Science Foundation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Amundsen-scott-south pole station 2007.jpg","url":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","publisher":"Bill Spindler, U.S. Antarctic Program, National Science Foundation","year":2008,"access":"public-link","license":"Public domain","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"south-pole-station.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/south-pole-station/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"south-pole-station-reference-values.csv","mimeType":"text/csv","bytes":388,"sha256":"32fad7f12be05aeb15f9c891c912b2289a32149d761d154bf07f70b1e4af4db0","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/south-pole-station/download/reference-values"},{"id":"project-image","title":"Amundsen–Scott South Pole Station — elevated facility","kind":"project-image","fileName":"south-pole-station.jpg","mimeType":"image/jpeg","bytes":293744,"sha256":"75b10c9ceee46be2a59db22cfabcbd129f5fa6431f92863bde15db9d21a27517","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"Bill Spindler, U.S. Antarctic Program, National Science Foundation / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","imageDate":"2008-02","evidenceFile":"image-provenance/south-pole-station-r14-source.json","evidenceSha256":"3538e99d4ef6c9ac2e03bda2557ab5de9b5f0a17ddf1f11ca501b96202e5c8c1","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/91/Amundsen-scott-south_pole_station_2007.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/south-pole-station/download/project-image","imageDownloadAllowed":true,"rightsStatus":"public-domain","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"south-pole-station-capstone.md","mimeType":"text/markdown","bytes":4423,"sha256":"987067e31bfc68faa4f9f4165f8cd5ebfce8a2b5425dda599cdedee3eac08a35","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/south-pole-station/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","caption":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","credit":"Bill Spindler, U.S. Antarctic Program, National Science Foundation / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Amundsen-scott-south_pole_station_2007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/Commons:Licensing","width":1280,"height":960,"imageDate":"2008-02","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"public-domain"},"figureCaption":"The completed elevated Amundsen–Scott South Pole Station in the 2007–2008 summer season. The site photograph provides context for the support-column settlement surveys; it is not a current condition inspection.","qualityNotes":["The 2019 CRREL support-column report is indexed at the official publication notice, but its download host denied access during this review. The station master plan is a separate linked source."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":108,"referenceValues":[{"label":"Elevated-station support columns","value":32,"unit":"columns","scope":"Support-column count in the 2025 master plan; this does not specify a uniform load distribution.","sourceId":"s2","locator":"Elevated Station / foundation levelling","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/south-pole-station-r14-source.json","evidenceSha256":"3538e99d4ef6c9ac2e03bda2557ab5de9b5f0a17ddf1f11ca501b96202e5c8c1","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":299523,"sourceCount":3,"url":"/cases/south-pole-station"},{"id":"eastern-scheldt-barrier","title":"Eastern Scheldt Barrier — foundation mats and scour resilience","summary":"The movable barrier retains tidal exchange while closing during severe water levels. Its foundation and bed-protection concepts provide a case on erosion resistance, interface stability and long-term renewal of marine structures.","topics":["coastal-offshore","shallow-foundations","scour-erosion","ground-improvement","monitoring","delivery"],"country":"Netherlands","region":"Zeeland","owner":"Rijkswaterstaat","year":1986,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Graded foundation mats","Marine scour protection","Filter compatibility","Hydraulic–geotechnical interaction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Rijkswaterstaat documents the barrier arrangement and construction period. USACE guidance describes the Eastern Scheldt graded foundation-mat approach, while recent Deltares work reassesses hydraulic loads for renewal. Hydraulic model results must be translated into geotechnical limit states.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Rijkswaterstaat dates construction to 1976–1986. Deltares describes later 2024–2025 testing for renewal, a separate phase of the asset lifecycle.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner provides an operating history; the recent research supports maintenance decisions, not a new claim that every original foundation detail is verified under future loads.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a study section of a barrier foundation and protection apron, linking hydraulic demand to filter stability, bearing and erosion-resistant details.","inputs":["Use the owner source for the barrier configuration and the technical guidance for the mat/filter concept.","Define study bed-material gradations, hydraulic loading and foundation parameters; record what is measured and what is assumed."],"deliverables":["Check filter retention/permeability and sensitivity to edge scour and loss of support near the protection apron.","Prepare construction placement tolerances, underwater inspection criteria and a renewal plan under changed hydraulic loads.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a stable surface armour layer still permit undermining through an incompatible filter or an exposed apron edge?","Which results from a hydraulic scale model can directly inform foundation checks, and which require a separate soil-response model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eastern Scheldt Barrier — owner project record","url":"https://www.rijkswaterstaat.nl/en/projects/iconic-structures/eastern-scheldt-barrier","publisher":"Rijkswaterstaat","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"ETL 1110-2-565 — scour-protection and foundation-mat discussion","url":"https://www.publications.usace.army.mil/Portals/76/Publications/EngineerTechnicalLetters/ETL_1110-2-565.pdf","publisher":"U.S. Army Corps of Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Barrier renewal scale-model tests, 2024–2025","url":"https://www.deltares.nl/en/news/mini-eastern-scheldt-barrier-passes-extreme-storm-tests","publisher":"Deltares","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Oosterscheldekering.jpg","url":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","publisher":"Klankbeeld","year":2025,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eastern-scheldt-barrier.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eastern-scheldt-barrier-reference-values.csv","mimeType":"text/csv","bytes":644,"sha256":"e611fa5ed1abaf9bdc927b2b599be79f50f803e70bb4fdcf5b9df61e14162090","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eastern-scheldt-barrier/download/reference-values"},{"id":"project-image","title":"Eastern Scheldt Barrier — view from Westerschouwen","kind":"project-image","fileName":"eastern-scheldt-barrier.jpg","mimeType":"image/jpeg","bytes":225473,"sha256":"6be491da8741403f8266f67a77fc1e5e8b735b92cb7b2d27384dff4b3517a1e3","sourceId":"s4","license":"CC BY 4.0","width":1280,"height":720,"credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2025-01-28 15:00:00","evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e8/Oosterscheldekering.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eastern-scheldt-barrier/download/project-image","originalSha1":"b70e8701cc9305b1c2e1913069101ff01517625d","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eastern-scheldt-barrier-capstone.md","mimeType":"text/markdown","bytes":4598,"sha256":"7f3a6d20167aaefea6b90d8406ae9221540013fa07968034ca578ad67a99cc1e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eastern-scheldt-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","caption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","credit":"Klankbeeld / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oosterscheldekering.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":720,"imageDate":"2025-01-28 15:00:00","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Eastern Scheldt storm-surge barrier viewed from Westerschouwen in January 2025. Its submerged foundation mats and scour-protection layers are explained in the engineering sources, rather than inferred from this surface view.","qualityNotes":["The USACE technical-letter PDF is linked at its official source; that host denied a local download during this review. The local project brief and photograph remain available."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":115,"referenceValues":[{"label":"Total barrier length","value":9,"unit":"km","scope":"Owner-reported overall barrier length, including fixed sections.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."},{"label":"Movable-section length","value":3,"unit":"km","scope":"Movable portion within the overall barrier; not a separate structure to add to the 9 km total.","sourceId":"s1","locator":"Facts and figures","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eastern-scheldt-barrier-r14-source.json","evidenceSha256":"d3bc1d5802fd83d3746a38824431560eff8fa26f12315173fc3ba6a24c279ff9","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":231922,"sourceCount":4,"url":"/cases/eastern-scheldt-barrier"},{"id":"venice-mose","title":"Venice MOSE — marine caisson placement and movement monitoring","summary":"The movable lagoon barriers rely on accurately positioned marine caissons and controlled differential movement. Designer accounts and published deformation surveys connect foundation construction with operational alignment requirements.","topics":["coastal-offshore","shallow-foundations","settlement","ground-improvement","monitoring","delivery"],"country":"Italy","region":"Venice Lagoon","owner":"Italian Ministry of Infrastructure / MOSE project","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine caisson foundations","Ground–structure interaction","Precision grouting","GNSS/InSAR monitoring"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The designers explain caisson foundations, settlement assessment and watertight interfaces. The monitoring paper studies MOSE shoulder structures using GNSS and InSAR. Measurements of a shoulder cannot automatically be assigned to every gate caisson or inlet.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The locally available article provides component-specific deformation evidence. Its underlying MOSE GNSS observations have restricted access; open access to the article does not make those raw records downloadable. Complete construction acceptance records and final accounts were not provided.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a placement-and-monitoring design for a selected MOSE inlet caisson or shoulder, with explicit tolerances and a defensible spatial interpretation of movements.","inputs":["Select one inlet and one structure type; compile its geometry and support concept from the designer source.","Extract monitoring periods, reference frame, instrument precision and measured components from the published deformation study."],"deliverables":["Evaluate bearing and differential-settlement sensitivity for the selected foundation and define placement/grouting tolerances.","Design a combined survey/InSAR monitoring workflow that separates regional subsidence, structural movement and measurement noise.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would agreement between satellite line-of-sight and GNSS observations still require care before inferring a vertical settlement at a nearby gate?","How should a marine caisson placement sequence respond when the achieved support level differs from the alignment tolerance assumed by the gate designer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"MOSE — designer account of barrier and caisson foundations","url":"https://www.technital.net/projects/marine-and-coastal/special-marine-works/ingenieria-maritima-y-costera-mobile-surge-barriers-at-the-three-inlets-of-the-venice-lagoon-mose-italy","publisher":"Technital","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Integrated GNSS and InSAR analysis of MOSE shoulder structures","url":"https://www.mdpi.com/2072-4292/17/6/1059","publisher":"Project research authors / Remote Sensing","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"MOSE marine caisson foundation works","url":"https://proserveltd.co.uk/casestudies/venice/","publisher":"Proserve","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","url":"https://www.mdpi.com/2072-4292/17/6/1059/pdf","publisher":"Massimo Fabris and Mario Floris / Remote Sensing (MDPI)","year":2025,"access":"public-link","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","notes":"","checked":"2026-11-22","localAssetIds":["mose-monitoring-2025"]},{"id":"s5","title":"MOSE Project Venice.jpg","url":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","publisher":"Wikimedia Commons contributor","year":2009,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"venice-mose.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/schematic"},{"id":"mose-monitoring-2025","title":"MOSE shoulder-structure GNSS and InSAR monitoring — Fabris and Floris, 2025","kind":"report","fileName":"mose-monitoring-2025.pdf","mimeType":"application/pdf","bytes":7574597,"sha256":"4c89f5e78f6cd7fcbead8a0bebb6c7d5977141553ebb5a1c583a0827438270bf","sourceId":"s4","license":"CC BY 4.0 — Massimo Fabris and Mario Floris; original article retained","rightsUrl":"https://creativecommons.org/licenses/by/4.0/","rightsBasis":"The article first page and publisher page explicitly license this work under CC BY 4.0. The original PDF is redistributed unchanged, with author credit and DOI retained.","rightsEvidenceUrl":"https://www.mdpi.com/2072-4292/17/6/1059","pages":21,"downloadUrl":"/cases/venice-mose/download/mose-monitoring-2025"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"venice-mose-reference-values.csv","mimeType":"text/csv","bytes":611,"sha256":"71e6e7c4d13ce07281889fb2d4d103f8b1dc271e11b43c23d1c3378905ee0d3d","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/venice-mose/download/reference-values"},{"id":"project-image","title":"MOSE at the Lido inlet — construction in 2009","kind":"project-image","fileName":"venice-mose.jpg","mimeType":"image/jpeg","bytes":193898,"sha256":"ce7841b2d704bbc54e8005c5b4c7810008885b90c3caa31c55647589b3fc4d9f","sourceId":"s5","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2009-07-25 08:19:50","evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/27/MOSE_Project_Venice.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/venice-mose/download/project-image","originalSha1":"068a07bb2f08ce4ce810f1aeeb43e296ec7026dc","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"venice-mose-capstone.md","mimeType":"text/markdown","bytes":4928,"sha256":"087b1e2f4c7f9465eb18640c48853afe32fcd4bc0e4ca8168332f337007a53cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/venice-mose/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","caption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","credit":"Chris 73 / Wikimedia Commons (CC BY-SA 3.0; Wikimedia attribution retained)","sourceUrl":"https://commons.wikimedia.org/wiki/File:MOSE_Project_Venice.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"2009-07-25 08:19:50","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Construction of the MOSE project at the Lido inlet, Venice, in mid-2009. This is a construction-stage photograph; the later operational barrier and monitoring results are described separately.","qualityNotes":["The locally downloadable monitoring article is CC BY 4.0. Its underlying MOSE GNSS observations are restricted by Consorzio Venezia Nuova; do not describe those raw observations as an open downloadable dataset."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":116,"referenceValues":[{"label":"MOSE continuous GNSS stations","value":36,"unit":"stations","scope":"32 stations on shoulder structures plus four local reference stations in the studied MOSE network.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."},{"label":"External reference-network stations","value":8,"unit":"stations","scope":"External stations used with the MOSE network; separate from its four local reference stations.","sourceId":"s2","locator":"Section 2.2","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/venice-mose-r14-source.json","evidenceSha256":"4082afc70911de24fd1e36faba754c9d94b21a8a029e2a891a8ee408d6d6c19b","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":7775241,"sourceCount":5,"url":"/cases/venice-mose"}]}