{"schemaVersion":1,"updated":"2026-11-22","total":32,"records":[{"id":"woodrow-wilson-foundations","title":"Woodrow Wilson Bridge — foundation selection and testing","summary":"Technical project papers describe foundation alternatives and the new bridge foundations, including seismic soil–structure interaction and scour considerations.","topics":["deep-foundations","lateral-foundations","site-investigation","seismic","scour-erosion"],"country":"United States","region":"Potomac River, Virginia–Maryland","owner":"Virginia DOT / Maryland State Highway Administration","year":2008,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Pile foundations","Foundation alternatives","Soil–structure interaction","Scour allowance"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project papers document foundation optimization and constructed-foundation practice; verify the paper’s stage before treating an alternative as the final design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The 2008 paper provides a later construction-stage foundation account.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select and justify a bridge-pier foundation for a tidal river crossing using the project’s alternatives and investigation strategy.","inputs":["Extract boring profiles, selected pile geometry, load-test evidence and scour assumptions where published.","Record separately the design spectrum and the soil profile used in the foundation response study."],"deliverables":["Develop axial/group and lateral-response checks for a selected pier.","Compare two foundation alternatives with construction plant, testing and navigational constraints.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Foundation optimization and design for replacement of the Woodrow Wilson Bridge","url":"https://scholarsmine.mst.edu/icchge/5icchge/session09/6/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2004,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"New I-95 Woodrow Wilson Bridge Foundations","url":"https://scholarsmine.mst.edu/icchge/6icchge/session08/6/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2008,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Woodrow Wilson Bridge aerial 2012.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","publisher":"Wikimedia Commons / Doc Searls from Santa Barbara, USA","year":2012,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"woodrow-wilson-foundations.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/woodrow-wilson-foundations/download/schematic"},{"id":"project-image","title":"Woodrow Wilson Bridge aerial 2012.jpg","kind":"project-image","fileName":"woodrow-wilson-foundations.jpg","mimeType":"image/jpeg","bytes":247837,"sha256":"60e13516a959b10477debf6f01d67a1822be0c401b935c64eb09f3f83924f637","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":606,"credit":"Doc Searls from Santa Barbara, USA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2012-03-14 11:10","evidenceFile":"image-provenance/woodrow-wilson-foundations-commons.json","evidenceSha256":"f0b310a9f2468aa50476d768691bcc900e19a1771b989a996335547c471d2250","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/33/Woodrow_Wilson_Bridge_aerial_2012.jpg","downloadUrl":"/cases/woodrow-wilson-foundations/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"woodrow-wilson-foundations-capstone.md","mimeType":"text/markdown","bytes":3290,"sha256":"6afb567962ac563d089f9502685d44763d9e16214c58e0ec6573023f216cba28","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/woodrow-wilson-foundations/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012.","caption":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.","credit":"Doc Searls from Santa Barbara, USA","sourceUrl":"https://commons.wikimedia.org/wiki/File:Woodrow_Wilson_Bridge_aerial_2012.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":606,"imageDate":"2012-03-14 11:10"},"figureCaption":"Aerial view of the completed Woodrow Wilson Memorial Bridge over the Potomac River, March 2012. The photograph shows the actual crossing; foundation testing is documented in the linked technical papers.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":5,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/woodrow-wilson-foundations-commons.json","evidenceSha256":"f0b310a9f2468aa50476d768691bcc900e19a1771b989a996335547c471d2250","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":252326,"sourceCount":3,"url":"/cases/woodrow-wilson-foundations"},{"id":"virginia-route288","title":"Virginia Route 288 — drilled-shaft quality evaluation","summary":"This design-build highway case documents drilled-shaft assessment using crosshole sonic logging and pile-integrity tests, including construction anomalies.","topics":["deep-foundations","site-investigation","monitoring","delivery"],"country":"United States","region":"Richmond region, Virginia","owner":"Virginia Department of Transportation","year":2004,"yearLabel":"Case reference year","projectType":"Construction quality and testing","methods":["Drilled shafts","Crosshole sonic logging","Pile integrity testing"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper addresses foundation evaluation and test interpretation; it is not the complete bridge design package.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published test and anomaly discussions support a quality-control exercise; the complete acceptance register is not included.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an inspection and acceptance plan for drilled shafts, including how to investigate an anomalous test result before deciding on remediation.","inputs":["Identify the shaft construction method, test types and reported anomalies.","Separate an instrument anomaly from an independently confirmed physical defect."],"deliverables":["Prepare a shaft inspection checklist and evidence-based test decision tree.","Design a supplemental investigation and a repair-verification programme for a selected anomaly.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case history: Foundation evaluation for the Virginia Highway 288 project","url":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","publisher":"Project authors / Missouri S&T Scholars’ Mine","year":2004,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"virginia-route288.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/virginia-route288/download/schematic"},{"id":"project-image","title":"Virginia Route 288 — drilled-shaft microcamera inspection","kind":"project-image","fileName":"virginia-route288-r13.png","mimeType":"image/png","bytes":456787,"sha256":"0e633fcb38fe2e682fcd020e9f07729175f71d1d5dab2fe370d72a0e407d32b2","sourceId":"s1","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","width":527,"height":395,"credit":"Emad Farouz, Paul Landers and Scott Webster (2004)","sourceUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","imageDate":"2001-12-03","evidenceFile":"image-provenance/virginia-route288-r13-source.json","evidenceSha256":"33377d6ce9ec887fbd81fc654caa1a31cbfeab71987daed3c688f9b0b68a8d4a","transformations":"The source PDF stores the photograph as three overlapping strips. Rendered the complete original Figure 9 image rectangle without retouching, annotations, or loss of the embedded timestamp. Surrounding page text was excluded.","originalUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","originalSha256":"66f2fafdab1063fc379bef39de6061d2314de6c969a97b611a5bdb21a7661300","imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-inspection-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/virginia-route288/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"virginia-route288-capstone.md","mimeType":"text/markdown","bytes":2920,"sha256":"2932362755e4b7365bb1e297f4cf3595cf28358867724afc354b70d5405cf7ea","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/virginia-route288/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","caption":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","credit":"Emad Farouz, Paul Landers and Scott Webster (2004)","sourceUrl":"https://scholarsmine.mst.edu/icchge/5icchge/session09/5/","license":"CC BY-NC-ND 4.0 — noncommercial, unchanged reproduction","licenseUrl":"https://creativecommons.org/licenses/by-nc-nd/4.0/","width":527,"height":395,"imageDate":"2001-12-03","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"licensed-restricted","permissionStatus":"CC BY-NC-ND 4.0 published by the source","rightsNote":"Noncommercial, unchanged reproduction with attribution. Commercial reuse requires separate permission; preserve the complete photograph.","imageUsage":"project-inspection-photograph"},"figureCaption":"Microcamera photograph of defective concrete inside a Route 288 drilled shaft, from the project evaluation paper’s Figure 9. This is the actual shaft inspection, rather than an exterior bridge view.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":6,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/virginia-route288-r13-source.json","evidenceSha256":"33377d6ce9ec887fbd81fc654caa1a31cbfeab71987daed3c688f9b0b68a8d4a","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":460906,"sourceCount":1,"url":"/cases/virginia-route288"},{"id":"river-road-soil-nails","title":"River Road, Tucson — tall soil-nailed cuts","summary":"Road widening beneath developed bluffs used tall soil-nailed walls. Loose seams and constrained investigation access required construction responses.","topics":["retaining-walls","excavation","site-investigation","monitoring"],"country":"United States","region":"Pima County, Arizona","owner":"Pima County Department of Transportation","year":2004,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Soil nailing","Top-down excavation","Face stability"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case describes hollow-bar nails, wall geometry, drainage, facing checks and a loose-seam treatment during excavation.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The case reports wall and adjacent-structure monitoring; complete construction drawings are not provided.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a soil-nailed cut design that protects nearby buildings and includes a response to unexpected ravelling material.","inputs":["Extract wall sections, adopted strength, nail rows and drilling restrictions.","Identify what the limited original investigation could not resolve."],"deliverables":["Check global stability, nail pullout, nail tensile resistance and facing demand.","Prepare lift sequencing, temporary-face support, drainage and monitoring details.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"River Road widening and realigning, Pima County","url":"https://www.geoinstitute.org/node/8324","publisher":"ASCE Geo-Institute / named case-history author","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Technical source: Nowatzki and Samtani (2004), Design, Construction, and Performance of an 18-meter Soil Nail Wall.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"river-road-soil-nails.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/river-road-soil-nails/download/schematic"},{"id":"project-image","title":"River Road, Tucson — aerial photograph of the completed soil-nailed walls","kind":"project-image","fileName":"river-road-soil-nails-r13.png","mimeType":"image/png","bytes":707435,"sha256":"a5544ab2ed10f27ba121c94a3f85409559aede2a1ab1e0fde5607b93a7f9d425","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":630,"height":463,"credit":"© 2011 Google; image reproduced in the ASCE Geo-Institute case history","sourceUrl":"https://www.geoinstitute.org/node/8324","licenseUrl":"https://www.geoinstitute.org/node/8324","imageDate":"2011","evidenceFile":"image-provenance/river-road-soil-nails-r13-source.json","evidenceSha256":"aa28a499ffc7d675c6ed4baa2d32891f10127b351edf5339935edcfd27ab07ac","transformations":"Original published image file copied unchanged; no crop, added labels, or retouching.","originalUrl":"https://www.geoinstitute.org/sites/default/files/geotech-tools-uploads/DGHB1.png","originalSha256":"a5544ab2ed10f27ba121c94a3f85409559aede2a1ab1e0fde5607b93a7f9d425","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"aerial-project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/river-road-soil-nails/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"river-road-soil-nails-capstone.md","mimeType":"text/markdown","bytes":2731,"sha256":"026237657dd16c5343f449d7ff39374b1c1a7491481203eff4d07ff89e138da9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/river-road-soil-nails/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","caption":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","credit":"© 2011 Google; image reproduced in the ASCE Geo-Institute case history","sourceUrl":"https://www.geoinstitute.org/node/8324","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.geoinstitute.org/node/8324","width":630,"height":463,"imageDate":"2011","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"aerial-project-photograph"},"figureCaption":"Aerial photograph of the completed soil-nailed walls along River Road in Pima County, Arizona. The original Google attribution remains in the image.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":9,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/river-road-soil-nails-r13-source.json","evidenceSha256":"aa28a499ffc7d675c6ed4baa2d32891f10127b351edf5339935edcfd27ab07ac","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3862,"sourceCount":1,"url":"/cases/river-road-soil-nails"},{"id":"prudential-centre","title":"Prudential Center — shallow foundations after improvement","summary":"The arena foundation study compared deep foundations with spread footings on improved ground. Test sections supported the selected compaction and replacement approach.","topics":["shallow-foundations","ground-improvement","site-investigation","delivery"],"country":"United States","region":"Newark, New Jersey","owner":"New Jersey Devils","year":2006,"yearLabel":"Case reference year","projectType":"Redevelopment","methods":["Foundation alternatives","Dynamic compaction","Trial sections"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The case describes trial treatment, foundation selection and protection of adjacent historic development.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The case reports roughly $1.5 million for improvement plus shallow foundations versus an estimated $3 million driven-pile alternative.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"The case connects foundation selection to readiness for the 2007–2008 hockey season; a full contractor schedule is not supplied.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"Test-section and post-improvement field checks are discussed.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Perform a value-engineering comparison for a large building on heterogeneous urban fill while protecting neighbouring structures.","inputs":["Extract the trial-section results and stated allowable-bearing assumptions.","Separate measured treatment response from the original designers’ interpreted bearing values."],"deliverables":["Check bearing, differential settlement and vibration-sensitive construction zones.","Prepare an alternatives matrix with cost scope and construction-risk allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Prudential Center, Newark, New Jersey","url":"https://www.geoinstitute.org/node/16271","publisher":"ASCE Geo-Institute / named case-history author","year":2013,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Case author Chris Woods; technical paper Woods, Drumheller and Huber (2013).","checked":"2026-11-22"},{"id":"s2","title":"New Jersey - Newark - Prudential Center IMG 2295 - National Newark Building - Leecourt-Newark Building - Penn Station.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","publisher":"Wikimedia Commons / Bjoertvedt","year":2018,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"prudential-centre.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"2107d19e1bd432d3c8fe2e5faae0e145ee5e06afcec20186a71654cc9c208c9b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/prudential-centre/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"prudential-centre-reference-values.csv","mimeType":"text/csv","bytes":742,"sha256":"9543f67494a4bf3029bd31ac796b2b285ee15d0e9c2721e0657bb8f8392b6d68","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/prudential-centre/download/reference-values"},{"id":"project-image","title":"New Jersey - Newark - Prudential Center IMG 2295 - National Newark Building - Leecourt-Newark Building - Penn Station.jpg","kind":"project-image","fileName":"prudential-centre.jpg","mimeType":"image/jpeg","bytes":229002,"sha256":"fd961e3f456289c12b8e9851c5d3d52e6f742c388195fa6d6df5e8377526366b","sourceId":"s2","license":"CC BY-SA 4.0","width":1280,"height":556,"credit":"Bjoertvedt","sourceUrl":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2018-06-30 14:40:28","evidenceFile":"image-provenance/prudential-centre-commons.json","evidenceSha256":"1befa45140ee1090a128a92a838148a1c778e95268f262855b15321a82d424a5","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","downloadUrl":"/cases/prudential-centre/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"prudential-centre-capstone.md","mimeType":"text/markdown","bytes":4036,"sha256":"5c29b435d4dfd10f8273c13b5a15b7c7b92a108255546ee544c862a6fcada1b5","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/prudential-centre/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed Prudential Center arena in Newark, New Jersey.","caption":"The completed Prudential Center arena in Newark, New Jersey. The photograph identifies the project discussed in the ground-improvement case history; the subsurface work is not visible.","credit":"Bjoertvedt","sourceUrl":"https://commons.wikimedia.org/wiki/File:New_Jersey_-_Newark_-_Prudential_Center_IMG_2295_-_National_Newark_Building_-_Leecourt-Newark_Building_-_Penn_Station.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":556,"imageDate":"2018-06-30 14:40:28"},"figureCaption":"The completed Prudential Center arena in Newark, New Jersey. The photograph identifies the project discussed in the ground-improvement case history; the subsurface work is not visible.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":16,"referenceValues":[{"label":"Improvement plus shallow foundations","value":1500000,"unit":"USD","scope":"Approximate reported cost; not the arena total.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."},{"label":"Driven-pile alternative","value":3000000,"unit":"USD","scope":"Order-of-magnitude estimated alternative; not an executed pile contract.","sourceId":"s1","locator":"Cost Information","basis":"As reported; no escalation or inflation adjustment."},{"label":"Trial-supported bearing pressure","value":3,"unit":"tsf","scope":"Reported allowable bearing pressure after trial assessment; not a transferable design value.","sourceId":"s1","locator":"Project Summary/Scope","basis":"Site-specific reported allowable value."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/prudential-centre-commons.json","evidenceSha256":"1befa45140ee1090a128a92a838148a1c778e95268f262855b15321a82d424a5","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":234666,"sourceCount":2,"url":"/cases/prudential-centre"},{"id":"teton-dam","title":"Teton Dam — internal erosion and first-filling investigation","summary":"The first-filling failure is documented through the Bureau of Reclamation’s history and the independent investigation report.","topics":["dams-levees","seepage","rock","site-investigation"],"country":"United States","region":"Eastern Idaho","owner":"US Bureau of Reclamation","year":1976,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Internal erosion","Filters and contacts","First-filling surveillance"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The official archive provides the original design/foundation investigation context and the 1976 failure report; the dam was not rebuilt.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Failure occurred on 5 June 1976; the independent panel report was submitted in December 1976.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The official archive links the investigation and contemporary photographs; there is no completed replacement-dam record.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate alternative core/filter and foundation-treatment concepts using the investigation as a forensic reference, without treating a classroom redesign as an approved remedy.","inputs":["Extract foundation geology, core/filter arrangement and reservoir-filling observations.","Separate contemporary records from later interpretations of the failure mechanism."],"deliverables":["Prepare a potential-failure-mode analysis and a filtered-contact concept.","Design a first-filling monitoring and escalation plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Teton Dam history and investigation archive","url":"https://www.usbr.gov/pn/snakeriver/dams/uppersnake/teton/","publisher":"Bureau of Reclamation","year":1976,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Breach of Teton Dam - DPLA - 657b673aa7b01ea982116a68bef069b4.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","publisher":"Wikimedia Commons / Department of the Interior. Bureau of Reclamation. Denver Office. 3/4/1988","year":1976,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"teton-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/teton-dam/download/schematic"},{"id":"project-image","title":"Breach of Teton Dam - DPLA - 657b673aa7b01ea982116a68bef069b4.jpg","kind":"project-image","fileName":"teton-dam.jpg","mimeType":"image/jpeg","bytes":343519,"sha256":"ee45a14882d8e40ef7cdb8d2ece02d9b5374b2d05f99d4b1b102ea2a0eeda844","sourceId":"s2","license":"Public domain","width":1280,"height":1343,"credit":"U.S. Bureau of Reclamation / U.S. National Archives at Denver","sourceUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg#Licensing","imageDate":"1976-06-05","evidenceFile":"image-provenance/teton-dam-commons.json","evidenceSha256":"37ed6c24f2101c2bca27da33b67333e9b1d6149cc3a7f12fc66d13eb389b47b9","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0c/Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","downloadUrl":"/cases/teton-dam/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"teton-dam-capstone.md","mimeType":"text/markdown","bytes":3122,"sha256":"b5d2ac5ede4ca9a488bd21b78156a925a2c65879cecce063d5ca5c2181a91114","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/teton-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The breach of Teton Dam, June 5, 1976.","caption":"The breach of Teton Dam, June 5, 1976. Historical project photograph from the U.S. Bureau of Reclamation collection.","credit":"U.S. Bureau of Reclamation / U.S. National Archives at Denver","sourceUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Breach_of_Teton_Dam_-_DPLA_-_657b673aa7b01ea982116a68bef069b4.jpg#Licensing","width":1280,"height":1343,"imageDate":"1976-06-05"},"figureCaption":"The breach of Teton Dam, June 5, 1976. Historical project photograph from the U.S. Bureau of Reclamation collection.","qualityNotes":["This is a failure-analysis case, not a successfully completed design example."],"checked":"2026-11-22","curatedOrder":25,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/teton-dam-commons.json","evidenceSha256":"37ed6c24f2101c2bca27da33b67333e9b1d6149cc3a7f12fc66d13eb389b47b9","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":347626,"sourceCount":2,"url":"/cases/teton-dam"},{"id":"oso-landslide","title":"Oso SR 530 landslide — investigation and mitigation planning","summary":"USGS reports characterize the deposits and soils associated with the 2014 landslide, providing a basis for ground-model and hazard-assessment exercises.","topics":["slopes","laboratory-testing","site-investigation","monitoring"],"country":"United States","region":"Snohomish County, Washington","owner":"USGS investigation with university and state partners","year":2014,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Ground model","Strength interpretation","Runout and exposure"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The available records are investigation reports, not a final stabilization design or an approval to rebuild within the affected area.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The event occurred on 22 March 2014; the linked investigations were published in 2014 and 2015.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Laboratory/field characterization and deposit mapping are available.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a defensible investigation and risk-reduction study for a populated valley below an unstable glacial-deposit slope.","inputs":["Use the soil characterization report and mapped older deposits.","Document sampling disturbance and distinguish intact samples from mobilized debris."],"deliverables":["Build geological sections and a parameter-selection register with uncertainties.","Compare avoidance, monitoring and feasible engineering measures without claiming that a simple stability factor predicts runout.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"USGS OFR 2015-1089 — geotechnical soil characterization","url":"https://pubs.usgs.gov/of/2015/1089/","publisher":"USGS","year":2015,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"USGS OFR 2014-1065 — pre-2014 deposits","url":"https://pubs.usgs.gov/of/2014/1065/","publisher":"USGS","year":2014,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Oso Landslide aerial.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg","publisher":"Wikimedia Commons / Mark Reid, USGS","year":2014,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"oso-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oso-landslide/download/schematic"},{"id":"project-image","title":"Oso Landslide aerial.jpg","kind":"project-image","fileName":"oso-landslide.jpg","mimeType":"image/jpeg","bytes":497563,"sha256":"48e7926cf1f6bce1479240efb6aae4a28b377b3839f4d2b036cb4bb76dae0b5b","sourceId":"s3","license":"Public domain","width":1280,"height":834,"credit":"Mark Reid, USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg#Licensing","imageDate":"2014-05-15 10:13:33","evidenceFile":"image-provenance/oso-landslide-commons.json","evidenceSha256":"692925ac897d9a4634b014e033e5a845b0b9672da0fe17762a668791bc570b22","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a7/Oso_Landslide_aerial.jpg","downloadUrl":"/cases/oso-landslide/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"oso-landslide-capstone.md","mimeType":"text/markdown","bytes":2904,"sha256":"634b87f1af44d2d23bceb653a0a6b9e8153244745261c93ae9847b982e68b0f2","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/oso-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial photograph of the March 22, 2014 Oso landslide and its runout across the Stillaguamish River valley..","caption":"Aerial photograph of the March 22, 2014 Oso landslide and its runout across the Stillaguamish River valley.","credit":"Mark Reid, USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Oso_Landslide_aerial.jpg#Licensing","width":1280,"height":834,"imageDate":"2014-05-15 10:13:33"},"figureCaption":"Aerial photograph of the March 22, 2014 Oso landslide and its runout across the Stillaguamish River valley.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":27,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/oso-landslide-commons.json","evidenceSha256":"692925ac897d9a4634b014e033e5a845b0b9672da0fe17762a668791bc570b22","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":501496,"sourceCount":3,"url":"/cases/oso-landslide"},{"id":"17th-street-canal","title":"17th Street Canal — floodwall failure and reevaluation","summary":"Post-Katrina investigations and reevaluation examine the canal floodwall/levee system, including the soil profile and interaction between the wall and foundation.","topics":["dams-levees","seepage","retaining-walls","laboratory-testing","site-investigation"],"country":"United States","region":"New Orleans, Louisiana","owner":"US Army Corps of Engineers","year":2005,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Floodwall stability","Undrained strength","Water-filled gap","Seepage"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"USACE publishes reevaluation material and later remediation decisions. The record distinguishes the original I-wall problem from subsequent protection measures.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The reevaluation and remediation decisions are linked; complete as-built records for all later works are not included.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconcile competing ground-model and wall-loading assumptions, then propose a monitored remediation concept.","inputs":["Extract a published cross section and the laboratory/field-test evidence for foundation strength.","Identify canal water levels, wall embedment and alternative assumptions for a water-filled gap."],"deliverables":["Compare effective-stress/undrained equilibrium cases and sensitivity to weak layers.","Develop a remediation alternatives assessment and a verification investigation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"17th Street Canal reevaluation","url":"https://www.mvn.usace.army.mil/portals/56/docs/hsdrrs/MOWL-17th-St-Canal.pdf","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Decision record for outfall-canal remediation","url":"https://www.mvn.usace.army.mil/Media/News-Releases/Article/474147/district-commander-signs-decision-record-for-remediation-work-at-outfall-canals/","publisher":"USACE","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"NOAA Katrina NOLA 17th Street breach Aug 31 2005.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","publisher":"Wikimedia Commons / NOAA","year":2005,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"17th-street-canal.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/17th-street-canal/download/schematic"},{"id":"project-image","title":"NOAA Katrina NOLA 17th Street breach Aug 31 2005.jpg","kind":"project-image","fileName":"17th-street-canal.jpg","mimeType":"image/jpeg","bytes":977324,"sha256":"4639a5baf2a1b834fae4f2b53ab79923419920b8f3b16a2e77e8ce7edb2cba2d","sourceId":"s3","license":"Public domain","width":1082,"height":1323,"credit":"NOAA","sourceUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg#Licensing","imageDate":"2005-08","evidenceFile":"image-provenance/17th-street-canal-commons.json","evidenceSha256":"cab42e822a4adb6db090593124612f985014194d864bb832d291240d96c01aef","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/cb/NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","downloadUrl":"/cases/17th-street-canal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"17th-street-canal-capstone.md","mimeType":"text/markdown","bytes":3240,"sha256":"f25f19a3fb10fabdc8a6c29c1359ee75db4fa42a4cef7977c4f8ec0b967ef236","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/17th-street-canal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina.","caption":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina in August 2005. NOAA photograph.","credit":"NOAA","sourceUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:NOAA_Katrina_NOLA_17th_Street_breach_Aug_31_2005.jpg#Licensing","width":1082,"height":1323,"imageDate":"2005-08"},"figureCaption":"Aerial view of the 17th Street Canal breach and surrounding flooding after Hurricane Katrina in August 2005. NOAA photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":31,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/17th-street-canal-commons.json","evidenceSha256":"cab42e822a4adb6db090593124612f985014194d864bb832d291240d96c01aef","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":981549,"sourceCount":3,"url":"/cases/17th-street-canal"},{"id":"ball-state-geothermal","title":"Ball State University — campus ground-source borefields","summary":"The campus system uses closed-loop borefields to exchange heat with the ground. University material describes the two-field arrangement and staged conversion.","topics":["geothermal","site-investigation","dewatering","delivery"],"country":"United States","region":"Muncie, Indiana","owner":"Ball State University","year":2012,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Borefield layout","Thermal ground response","Drilling logistics"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The university white paper describes approximately 3,600 boreholes, depths of 400–500ft and restored surface uses; these are closed loops, not pumping wells.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The first phase began operating in spring 2012; the later university paper describes the completed base project.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"Owner information and a system map are linked; detailed bore logs and final bills were not established.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a ground-source borefield feasibility study that integrates thermal properties, drilling constraints and protection of groundwater.","inputs":["Extract the owner’s borefield arrangement and distinguish heat demand from ground capacity.","Define site-specific thermal-response and groundwater information needed before sizing."],"deliverables":["Prepare a borehole/loop concept and thermal-interference sensitivity study.","Develop drilling, grouting, testing and surface-restoration work packages.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geothermal energy system","url":"https://bsu.edu/about/geothermal","publisher":"Ball State University","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geothermal white paper, January 2019","url":"https://www.bsu.edu/-/media/www/departmentalcontent/cap/cote/021419geothermalwhitepaperjanuary2019.pdf","publisher":"Ball State University","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"GeothermalConstruction073011.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","publisher":"Wikimedia Commons / Travisleehardin","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"ball-state-geothermal.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ball-state-geothermal/download/schematic"},{"id":"project-image","title":"GeothermalConstruction073011.jpg","kind":"project-image","fileName":"ball-state-geothermal.jpg","mimeType":"image/jpeg","bytes":391205,"sha256":"b868dba6d8cf0ee3d2c41c41e43b9d48cfbbba7f642ee47ad0551a976352bfc1","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"Travisleehardin","sourceUrl":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 30 July 2011","evidenceFile":"image-provenance/ball-state-geothermal-commons.json","evidenceSha256":"82e4b1e5c89994e49ef1a6440f2a443e78d523712954dffd40d297383c97b1fd","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d3/GeothermalConstruction073011.jpg","downloadUrl":"/cases/ball-state-geothermal/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"ball-state-geothermal-capstone.md","mimeType":"text/markdown","bytes":3087,"sha256":"3ade5cc33c34a3ba8e308b4fe8867dc99ded41e7bd1fabd5e4ec7c8868394008","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ball-state-geothermal/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Geothermal-loop construction at Ball State University, July 30, 2011.","caption":"Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.","credit":"Travisleehardin","sourceUrl":"https://commons.wikimedia.org/wiki/File:GeothermalConstruction073011.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 30 July 2011"},"figureCaption":"Geothermal-loop construction at Ball State University, July 30, 2011. The photograph shows installation for the university’s campus ground-source system.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":36,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/ball-state-geothermal-commons.json","evidenceSha256":"82e4b1e5c89994e49ef1a6440f2a443e78d523712954dffd40d297383c97b1fd","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":395349,"sourceCount":3,"url":"/cases/ball-state-geothermal"},{"id":"ky499-swelling","title":"KY 499, Estill County — pavement swelling investigation","summary":"Field and laboratory work investigated heave of a relatively young pavement over compacted clay shale and distinguished wetting expansion from a suspected sulfate reaction.","topics":["problem-soils","laboratory-testing","earthworks","site-investigation"],"country":"United States","region":"Estill County, Kentucky","owner":"Kentucky Transportation Cabinet / University of Kentucky","year":2005,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Swell testing","Moisture effects","Subgrade diagnosis"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The report tests the cause of distress and discusses the lime-treated subgrade; it does not establish a generic stabilization prescription.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The technical report contains field/laboratory findings; a later construction closeout record was not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a laboratory investigation that distinguishes alternative heave mechanisms before selecting pavement rehabilitation.","inputs":["Extract moisture, shale and swell-test results from the investigation.","Identify sampling depth, test stress and wetting conditions needed for a field-heave estimate."],"deliverables":["Develop a mechanism-based diagnosis and a layered heave sensitivity calculation.","Compare moisture control, removal/replacement and treatment using compatible test evidence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Swelling Pavement: KY 499 Estill County, KTC-05-01","url":"https://uknowledge.uky.edu/ktc_researchreports/150/","publisher":"Kentucky Transportation Center / project researchers","year":2005,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"ky499-swelling.svg","mimeType":"image/svg+xml","bytes":1074,"sha256":"f31305ba349170d998041ee804cfc6952d08a61de199d40088aca881bad4100f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ky499-swelling/download/schematic"},{"id":"project-image","title":"KY 499, Estill County — observed pavement swelling","kind":"project-image","fileName":"ky499-swelling-r13.jpeg","mimeType":"image/jpeg","bytes":14332,"sha256":"25b496c7f022b670a9288eba0f888ca9ee8acc5a142642e0c4c54bdf2609db34","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":346,"height":216,"credit":"Tony L. Beckham and Tommy C. Hopkins; Kentucky Transportation Center, University of Kentucky (2005)","sourceUrl":"https://uknowledge.uky.edu/ktc_researchreports/150/","licenseUrl":"https://uknowledge.uky.edu/ktc_researchreports/150/","imageDate":null,"evidenceFile":"image-provenance/ky499-swelling-r13-source.json","evidenceSha256":"f2514f82e5836ee60da40128ec81fe228f8d1c8c55402ad9585d6a22c4b056d6","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://uknowledge.uky.edu/cgi/viewcontent.cgi?article=1153&context=ktc_researchreports","originalSha256":"80004554769d719cae1616026c44940197d11fac6c367330df6a0f0d63ac1474","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/ky499-swelling/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"ky499-swelling-capstone.md","mimeType":"text/markdown","bytes":2872,"sha256":"581410bda52ce64a5f6f4e201c2afaaa755d7ed584e3d457ae6bef68a6c48c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/ky499-swelling/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Observed pavement distortion on KY 499 in Estill County, Kentucky, documented in the swelling investigation report.","caption":"Observed pavement distortion on KY 499 in Estill County, Kentucky, documented in the swelling investigation report.","credit":"Tony L. Beckham and Tommy C. Hopkins; Kentucky Transportation Center, University of Kentucky (2005)","sourceUrl":"https://uknowledge.uky.edu/ktc_researchreports/150/","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://uknowledge.uky.edu/ktc_researchreports/150/","width":346,"height":216,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Observed pavement distortion on KY 499 in Estill County, Kentucky, documented in the swelling investigation report.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":39,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/ky499-swelling-r13-source.json","evidenceSha256":"f2514f82e5836ee60da40128ec81fe228f8d1c8c55402ad9585d6a22c4b056d6","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3946,"sourceCount":1,"url":"/cases/ky499-swelling"},{"id":"texas-sh6-sh21","title":"Texas SH 6 and SH 21 — expansive-subgrade distress","summary":"A TxDOT-funded project investigated swelling clay beneath distressed pavement sections and evaluated characterization and stabilization alternatives.","topics":["problem-soils","laboratory-testing","earthworks","site-investigation"],"country":"United States","region":"Texas","owner":"Texas Department of Transportation / Texas A&M","year":1996,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Expansive subgrade","Moisture/strength characterization","Treatment selection"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The final research report covers site investigation, interpretation and treatment recommendations; the public catalog alone is not a rehabilitation plan set.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"A final research report is publicly indexed; complete construction records are not established.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a subgrade investigation and rehabilitation alternatives study for a selected documented pavement section.","inputs":["Extract one site’s profile, moisture and laboratory data from the final report.","Keep the two highway sections distinct when comparing properties and distress."],"deliverables":["Prepare a parameter register, moisture/heave mechanism assessment and test matrix.","Compare a moisture barrier, soil replacement and a verified stabilizer treatment.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Investigation of swelling clay soils in subgrades of SH 6 and SH 21","url":"https://rosap.ntl.bts.gov/view/dot/84762","publisher":"TxDOT / Texas A&M","year":1996,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"texas-sh6-sh21.svg","mimeType":"image/svg+xml","bytes":1074,"sha256":"f31305ba349170d998041ee804cfc6952d08a61de199d40088aca881bad4100f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/texas-sh6-sh21/download/schematic"},{"id":"project-image","title":"Texas SH 6 — pavement distress over swelling clay","kind":"project-image","fileName":"texas-sh6-sh21-r13.png","mimeType":"image/png","bytes":274228,"sha256":"0cd4b7b8af15bdf841f4bfb2310c699fd7a2209492d7e470b1dcec98ca4aa54d","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":701,"height":469,"credit":"Seong-wan Park, Robert L. Lytton and Joe W. Button; Texas Transportation Institute / Texas A&M (1996)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/84762","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/84762","imageDate":"1996","evidenceFile":"image-provenance/texas-sh6-sh21-r13-source.json","evidenceSha256":"0ba8ade57932edc72eae1aae2584a6aa62831778b5d368a0d5118747d782e11c","transformations":"Rendered the original Figure 6 photograph region from the scanned report page. Surrounding page margins and caption excluded; no alteration, reconstruction, or retouching within the photograph.","originalUrl":"https://static.tti.tamu.edu/tti.tamu.edu/documents/2965-1F.pdf","originalSha256":"8ca2867a7d79f743350f9ac93847c2c1cd02eec21a912b3b924cf8f25996008d","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/texas-sh6-sh21/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"texas-sh6-sh21-capstone.md","mimeType":"text/markdown","bytes":2803,"sha256":"6dc6b1867827ec8c1bb1abebd7ac50b29e8c78784634e9d27226dbdd57d3ef70","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/texas-sh6-sh21/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","caption":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","credit":"Seong-wan Park, Robert L. Lytton and Joe W. Button; Texas Transportation Institute / Texas A&M (1996)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/84762","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/84762","width":701,"height":469,"imageDate":"1996","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The SH 6 study section in the original expansive-subgrade investigation, reproduced from the scanned Figure 6 photograph. The source scan has limited image quality.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":40,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/texas-sh6-sh21-r13-source.json","evidenceSha256":"0ba8ade57932edc72eae1aae2584a6aa62831778b5d368a0d5118747d782e11c","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3877,"sourceCount":1,"url":"/cases/texas-sh6-sh21"},{"id":"schoharie-creek","title":"Schoharie Creek Bridge — scour and foundation inspection","summary":"The NTSB investigation documents the bridge collapse after scour undermined spread-footing support, including construction, protection and inspection issues.","topics":["scour-erosion","shallow-foundations","site-investigation","monitoring"],"country":"United States","region":"Near Amsterdam, New York","owner":"New York State Thruway Authority","year":1987,"yearLabel":"Case reference year","projectType":"Forensic investigation","methods":["Scour assessment","Spread footings","Inspection and maintenance"],"documentationLevel":"investigation-report","design":{"availability":"partial","summary":"The investigation reconstructs the original foundation and scour-protection evidence; it is a forensic record rather than a replacement-bridge design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Collapse occurred on 5 April 1987; the NTSB report was published in 1988.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The report supplies the investigation record and recommendations, not replacement as-built plans.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a scour-risk assessment and protection/inspection strategy that remains effective throughout the bridge life.","inputs":["Extract original footing elevations, bed conditions and riprap/inspection evidence.","Distinguish foundation erosion from structural redundancy and emergency response questions."],"deliverables":["Compare predicted scour levels with available bearing support and foundation depth.","Prepare a protection detail, inspection triggers and a maintenance quantity schedule.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"NTSB HAR-88/02 — Schoharie Creek Bridge collapse","url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/HAR8802.pdf","publisher":"National Transportation Safety Board","year":1988,"access":"public-link","license":"US federal investigation report; original credits retained","notes":"","checked":"2026-11-22","localAssetIds":["schoharie-investigation"]},{"id":"s2","title":"Interstate 90 Schoharie Creek Bridge collapsed.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","publisher":"Wikimedia Commons / USGS","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"schoharie-creek.svg","mimeType":"image/svg+xml","bytes":1056,"sha256":"ca50c03b28c61244d08ee83702433916e462ad2ee363e42240a9f0377b8c9c76","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/schoharie-creek/download/schematic"},{"id":"schoharie-investigation","title":"NTSB HAR-88/02, Schoharie Creek investigation","kind":"report","fileName":"schoharie-investigation.pdf","mimeType":"application/pdf","bytes":12310933,"sha256":"d28240fdf577aa1b231f09493181927478ae46a078f186c5a980909f6c6be14d","sourceId":"s1","license":"US federal investigation report; original credits retained","rightsUrl":"https://www.ntsb.gov/about/Policies/Pages/Policies.aspx","rightsBasis":"NTSB staff reports and graphics are public domain except specifically credited copyright material; report retained unmodified.","rightsEvidenceUrl":"https://www.ntsb.gov/about/Policies/Pages/Policies.aspx","pages":172,"downloadUrl":"/cases/schoharie-creek/download/schoharie-investigation"},{"id":"project-image","title":"Interstate 90 Schoharie Creek Bridge collapsed.jpg","kind":"project-image","fileName":"schoharie-creek.jpg","mimeType":"image/jpeg","bytes":57965,"sha256":"ba1a8e908b89c2890aa64f154a516bd9fd741d15f483c3c47027362ff2bf3022","sourceId":"s2","license":"Public domain","width":483,"height":320,"credit":"USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg#Licensing","imageDate":null,"evidenceFile":"image-provenance/schoharie-creek-commons.json","evidenceSha256":"66eb93aea3e6dcdba8e09808b6a0faab92d41bd4e46b5b5a7093623dcc4458a0","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fc/Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","downloadUrl":"/cases/schoharie-creek/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"schoharie-creek-capstone.md","mimeType":"text/markdown","bytes":2973,"sha256":"b118fc06966d2c43b2489147762bcbdfe8abc441fcc5e12b5a2016f263da0e47","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/schoharie-creek/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse.","caption":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse. Historical USGS project photograph.","credit":"USGS","sourceUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Interstate_90_Schoharie_Creek_Bridge_collapsed.jpg#Licensing","width":483,"height":320,"imageDate":null},"figureCaption":"The Interstate 90 bridge over Schoharie Creek after its April 1987 collapse. Historical USGS project photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":42,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/schoharie-creek-commons.json","evidenceSha256":"66eb93aea3e6dcdba8e09808b6a0faab92d41bd4e46b5b5a7093623dcc4458a0","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":1,"downloadBytes":12372927,"sourceCount":2,"url":"/cases/schoharie-creek"},{"id":"chek-lap-kok","title":"Hong Kong International Airport — foundations across rock and reclamation","summary":"The original airport terminal crosses former island rock and newly reclaimed ground. The designer describes a range of foundation types adapted to these contrasting conditions; a contemporaneous paper documents vibrocompaction of marine sand fill.","topics":["site-investigation","deep-foundations","shallow-foundations","ground-improvement","settlement"],"country":"China","region":"Chek Lap Kok","owner":"Airport Authority Hong Kong","year":1998,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vibrocompaction","CPT verification","Mixed foundation systems"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The sources describe actual foundation choices and field characterization. They do not provide a single uniform soil profile for the whole airport.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design the transition between a shallow foundation on rock and a piled concourse on reclaimed deposits.","inputs":["Distinguish original rock, weathered zones and reclaimed sand in a project ground model.","Extract the reported investigation and density-verification approach from the vibrocompaction paper."],"deliverables":["Compare settlement and construction risk for two terminal foundation zones.","Define CPT acceptance criteria and an interface detail for differential movement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which discontinuity is more important: the former shoreline or the top of competent rock?","How can improvement verification avoid hiding local loose pockets behind an average density?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Airport design and construction history","url":"https://www.mottmac.com/en/projects/hong-kong-international-the-airport-that-changed-the-world/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Review of vibrocompaction at Hong Kong’s new airport","url":"https://www.tandfonline.com/doi/abs/10.1080/1023697X.1998.10667731","publisher":"Petra Berner, Airport Authority / HKIE Transactions","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","publisher":"Wikimedia Commons / PSnyan","year":null,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"chek-lap-kok.svg","mimeType":"image/svg+xml","bytes":886,"sha256":"fc361c835a99c48885fcadacff7f4f786820aca6f6b5404b5974cf6cce064489","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/schematic"},{"id":"project-image","title":"Hong Kong Internatinal Airport from Air(Chek Lap Kok,香港國際空港) - panoramio.jpg","kind":"project-image","fileName":"chek-lap-kok.jpg","mimeType":"image/jpeg","bytes":179932,"sha256":"c87c0cdcf9398738ded1b460f6b9732fe4d96156b32027b16c219767feb56c88","sourceId":"s3","license":"CC BY-SA 3.0","width":1280,"height":960,"credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"Taken on 17 October 2008","evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/5/58/Hong_Kong_Internatinal_Airport_from_Air%28Chek_Lap_Kok%2C%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF%29_-_panoramio.jpg","downloadUrl":"/cases/chek-lap-kok/download/project-image","originalSha1":"cea44a0793016f2db57daf5f9cfda0023fdfba2d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"chek-lap-kok-capstone.md","mimeType":"text/markdown","bytes":3461,"sha256":"45bad050968b234d820c46685e9c15826621090d33708b2cdeff712cf44cc2a1","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/chek-lap-kok/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hong Kong International Airport at Chek Lap Kok viewed from the air.","caption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","credit":"PSnyan","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hong_Kong_Internatinal_Airport_from_Air(Chek_Lap_Kok,%E9%A6%99%E6%B8%AF%E5%9C%8B%E9%9A%9B%E7%A9%BA%E6%B8%AF)_-_panoramio.jpg","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1280,"height":960,"imageDate":"Taken on 17 October 2008","imageDownloadAllowed":true},"figureCaption":"Hong Kong International Airport at Chek Lap Kok viewed from the air. The photograph shows the actual airport platform; ground improvement and terminal foundation zones are documented separately.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":54,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/chek-lap-kok-commons.json","evidenceSha256":"dabf4151267d9a6889bb577d5ba7402a4d70e1a075273dfccfa60aa1a8183cbd","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":184279,"sourceCount":3,"url":"/cases/chek-lap-kok"},{"id":"changi-east","title":"Changi East reclamation — instrumented vertical-drain design","summary":"The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.","topics":["settlement","ground-improvement","laboratory-testing","site-investigation","coastal-offshore"],"country":"Singapore","region":"Eastern Singapore","owner":"Singapore reclamation authorities","year":2005,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vertical drains","Radial consolidation","Pore-pressure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The papers provide field and laboratory characterization and consolidation-monitoring methods for the historic reclamation phases. They should not be mistaken for current Terminal 5 construction records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The research account covers the historic reclamation phases completed by 2005, not the schedule of present airport expansion.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select drain spacing and surcharge duration for a reclamation cell using both settlement and pore-pressure acceptance measures.","inputs":["Extract a single pilot-cell stratigraphy, drain spacing and loading history from the papers.","Identify horizontal consolidation coefficients and laboratory versus field scale differences."],"deliverables":["Calculate consolidation time with drain smear and well resistance sensitivities.","Create a surcharge-removal decision that reconciles settlement and piezometer observations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can settlement-based and pore-pressure-based degrees of consolidation disagree?","What evidence would justify changing drain spacing after a pilot trial?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Soil improvement works for an offshore land reclamation","url":"https://doi.org/10.1680/geng.2009.162.1.21","publisher":"Project investigators / ICE Geotechnical Engineering","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Research-oriented ground investigation at Changi","url":"https://www.sciencedirect.com/org/science/article/pii/S205261561700014X","publisher":"Project investigators / ICE Geotechnical Research","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Reclamation of a slurry pond in Singapore","url":"https://doi.org/10.1680/geng.2009.162.1.13","publisher":"Institution of Civil Engineers","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"changi-east.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/schematic"},{"id":"project-image","title":"Changi East reclamation — historical slurry pond","kind":"project-image","fileName":"changi-east-r13.png","mimeType":"image/png","bytes":62386,"sha256":"4f62cd73fd4d72c53798f8a5ac698776331144b757d2814d6ad4c0cbf4599d37","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":248,"credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","imageDate":null,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","transformations":"Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","originalUrl":"https://pdfs.semanticscholar.org/b85d/a748e31f6ee68e6b2d2076def3513f3cb316.pdf","originalSha256":"7a40c8913a894c9fef0283fae1eb9bcd280f828c5054512d20515287d3286e26","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/changi-east/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"changi-east-capstone.md","mimeType":"text/markdown","bytes":3304,"sha256":"8e246b3753d44e7c2626bb72152377dffbf29f9f2be0c1f274cc61f2ec018be8","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.","caption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","width":400,"height":248,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":55,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","visualReview":"Inspected the complete first paper page, its Figure 2 caption, and the extracted 400 by 248 pixel photograph. The image shows the enclosed slurry pond and surrounding reclamation land; it is not the adjacent site-plan diagram or an author portrait.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4482,"sourceCount":3,"url":"/cases/changi-east"},{"id":"calaveras-dam","title":"Calaveras Dam replacement — seismic foundations and unexpected landslides","summary":"Replacement of a seismically vulnerable dam encountered an additional ancient landslide during abutment excavation. Public environmental and budget records document supplemental investigation, design revisions and delivery consequences.","topics":["dams-levees","seismic","slopes","rock","site-investigation","delivery"],"country":"United States","region":"Sunol Valley, California","owner":"San Francisco Public Utilities Commission","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Abutment excavation","Seismic embankment design","Landslide stabilization"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The environmental addendum explains the left-abutment investigation and revised slope treatment. The consultant describes final-design responsibilities, while city oversight records track budget changes.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The 2019 city analysis traces a budget change from $416 million to $823 million across successive revisions. These are programme budgets with multiple causes, not a foundation-only final account.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Revise a dam-abutment excavation after construction exposes an unrecognized landslide mass.","inputs":["Extract the mapped hazard, supplemental investigation and treatment objective from the addendum.","Separate original design assumptions, newly observed conditions and later access-road damage."],"deliverables":["Compare removal and retained-remnant stabilization with groundwater sensitivities.","Develop a revised excavation sequence, material handling plan and change-control estimate.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What observations would distinguish an ancient shear surface from ordinary weathered rock?","How should uncertainty in the residual landslide geometry affect contingency quantities?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Environmental addendum after left-abutment discoveries","url":"https://sfplanning.s3.amazonaws.com/sfmea/2005.0161E_Adm1.pdf","publisher":"San Francisco Planning / SFPUC","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Final design and geotechnical investigations","url":"https://aecom.com/projects/calaveras-dam-replacement-project/","publisher":"AECOM","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"2019 budget and legislative analysis","url":"https://sfgov.legistar.com/View.ashx?GUID=E44CE420-A2F2-4DE8-BA38-A16B402F5B23&ID=7102715&M=F","publisher":"San Francisco Budget and Legislative Analyst","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Aerial view of Calaveras Reservoir showing the reconstruction of the dam wall.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_Calaveras_Reservoir_showing_the_reconstruction_of_the_dam_wall.JPG","publisher":"Wikimedia Commons / Kyle Hawton","year":2015,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"calaveras-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/calaveras-dam/download/schematic"},{"id":"project-image","title":"Aerial view of Calaveras Reservoir showing the reconstruction of the dam wall.JPG","kind":"project-image","fileName":"calaveras-dam.jpg","mimeType":"image/jpeg","bytes":263048,"sha256":"4b2838d0f8faaf72aa29c476d993568f3533c88816ec281b3be550b2f7b06bba","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":720,"credit":"Kyle Hawton","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_Calaveras_Reservoir_showing_the_reconstruction_of_the_dam_wall.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2015-03-22 14:12:56","evidenceFile":"image-provenance/calaveras-dam-commons.json","evidenceSha256":"dfe8d170b97213af3fa3c4663da03310fe5fe662f0642aa16a8ccbb7d763b7b7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/67/Aerial_view_of_Calaveras_Reservoir_showing_the_reconstruction_of_the_dam_wall.JPG","downloadUrl":"/cases/calaveras-dam/download/project-image","originalSha1":"3c6bd773968322a17452887f8c6e484af5dc8bf4","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"calaveras-dam-capstone.md","mimeType":"text/markdown","bytes":3596,"sha256":"28570b7ef1084de40740abad204dfe5b3b1cf54b66164bb11fc8d3e016bd0939","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/calaveras-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Calaveras Reservoir during reconstruction of the dam.","caption":"Aerial view of Calaveras Reservoir during reconstruction of the dam. The image shows the actual replacement-project work area.","credit":"Kyle Hawton","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_Calaveras_Reservoir_showing_the_reconstruction_of_the_dam_wall.JPG","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":720,"imageDate":"2015-03-22 14:12:56","imageDownloadAllowed":true},"figureCaption":"Aerial view of Calaveras Reservoir during reconstruction of the dam. The image shows the actual replacement-project work area.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":63,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/calaveras-dam-commons.json","evidenceSha256":"dfe8d170b97213af3fa3c4663da03310fe5fe662f0642aa16a8ccbb7d763b7b7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":267629,"sourceCount":4,"url":"/cases/calaveras-dam"},{"id":"glen-canyon-dam","title":"Glen Canyon Dam — sandstone abutments and controlled seepage","summary":"The high concrete dam required canyon-wall stabilization, river diversion and excavation to sandstone bedrock. Reclamation describes rock bolts, seepage measurement and the geological basis of the site selection.","topics":["rock","dams-levees","seepage","dewatering","site-investigation"],"country":"United States","region":"Page, Arizona","owner":"US Bureau of Reclamation","year":1966,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Rock bolting","Abutment stability","Seepage measurement","River diversion"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The owner history explains the construction systems; the USGS regional map supports geological context. Regional mapping does not replace discontinuity surveys at individual abutments.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Reclamation records major construction milestones and dedication in 1966; detailed daily excavation records are not included.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop rock-abutment support and seepage-monitoring concepts for a dam in fractured sandstone.","inputs":["Use the regional map and owner account to distinguish formation-scale geology from local joints.","Identify the temporary diversion and excavation stages that precede concrete placement."],"deliverables":["Perform a study wedge-stability check with bolt and groundwater sensitivities.","Design a drainage and weir-monitoring layout that distinguishes changing seepage paths from reservoir-level effects.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is measurable seepage not by itself evidence of dam failure?","What site mapping is required before using a regional joint orientation in a support design?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Glen Canyon construction, geology and monitoring","url":"https://www.usbr.gov/uc/rm/crsp/gc/","publisher":"US Bureau of Reclamation","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geologic map of the Glen Canyon Dam quadrangle","url":"https://pubs.usgs.gov/publication/sim3268","publisher":"US Geological Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Glen Canyon Dam 1962.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","publisher":"Wikimedia Commons / U.S. Bureau of Reclamation","year":1962,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"glen-canyon-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glen-canyon-dam/download/schematic"},{"id":"project-image","title":"Glen Canyon Dam 1962.jpg","kind":"project-image","fileName":"glen-canyon-dam.jpg","mimeType":"image/jpeg","bytes":417488,"sha256":"9d600d85f07d11d5b66cab14776d263c4e47c5e81665b6b2d1137d1ced913cef","sourceId":"s3","license":"Public domain","width":439,"height":550,"credit":"U.S. Bureau of Reclamation","sourceUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg#Licensing","imageDate":"1962","evidenceFile":"image-provenance/glen-canyon-dam-commons.json","evidenceSha256":"c1a950a228699d14eebae0da50d05260e7eae33821540a6ef62b5fba484d0bc4","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/ae/Glen_Canyon_Dam_1962.jpg","downloadUrl":"/cases/glen-canyon-dam/download/project-image","originalSha1":"b6a0eb9c6a8100448477e78cd35499d7c07e7d28","originalSha256":"9d600d85f07d11d5b66cab14776d263c4e47c5e81665b6b2d1137d1ced913cef","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"glen-canyon-dam-capstone.md","mimeType":"text/markdown","bytes":3082,"sha256":"7812eb24234b655ed2da8b5f24604a3588ab0a135414f74e6e24bd7b9db2dd95","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/glen-canyon-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Glen Canyon Dam under construction in 1962.","caption":"Glen Canyon Dam under construction in 1962. The historical photograph shows the actual dam and sandstone canyon abutments.","credit":"U.S. Bureau of Reclamation","sourceUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Glen_Canyon_Dam_1962.jpg#Licensing","width":439,"height":550,"imageDate":"1962","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Glen Canyon Dam under construction in 1962. The historical photograph shows the actual dam and sandstone canyon abutments.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":70,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/glen-canyon-dam-commons.json","evidenceSha256":"c1a950a228699d14eebae0da50d05260e7eae33821540a6ef62b5fba484d0bc4","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":421587,"sourceCount":3,"url":"/cases/glen-canyon-dam"},{"id":"west-closure-complex","title":"West Closure Complex — foundations on soft deltaic deposits","summary":"The gate and pumping complex is founded in soft, compressible deltaic deposits. USACE authors describe exploration, laboratory characterization and pile testing used to develop design strength profiles.","topics":["deep-foundations","laboratory-testing","site-investigation","problem-soils","coastal-offshore"],"country":"United States","region":"New Orleans, Louisiana","owner":"US Army Corps of Engineers","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["CPT interpretation","Strength profiling","Static and dynamic pile tests"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical publication explains the characterization programme and foundation-selection evidence. A complete final calculation set and acceptance database are not supplied by the abstract.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design an investigation and test-pile programme for a critical coastal pumping structure on organic clay and silt.","inputs":["Identify the published depositional units and component-specific foundation requirements.","Specify the additional parameters needed for axial, lateral and settlement analyses."],"deliverables":["Develop characteristic strength profiles and compare test-pile interpretations.","Prepare component foundation alternatives with construction access and long-term subsidence allowances.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which laboratory sampling problems are most consequential in soft organic deltaic soils?","How can a test-pile programme distinguish drivability constraints from long-term capacity?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Geocharacterization for design and construction of West Closure Complex","url":"https://ascelibrary.org/doi/10.1061/9780784413272.039","publisher":"USACE project authors / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Indexed technical-paper details","url":"https://trid.trb.org/View/1303129","publisher":"Transportation Research Board","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"West Closure Complex testing, Louisiana 2023 - 01.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","publisher":"Wikimedia Commons / Team New Orleans, US Army Corps of Engineers","year":2023,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"west-closure-complex.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-closure-complex/download/schematic"},{"id":"project-image","title":"West Closure Complex testing, Louisiana 2023 - 01.jpg","kind":"project-image","fileName":"west-closure-complex.jpg","mimeType":"image/jpeg","bytes":151852,"sha256":"24ff3fd3f6dcdabc9dc258256e332c4cd04548f9398b99d6a9568ecf307d5697","sourceId":"s3","license":"Public domain","width":1280,"height":854,"credit":"Team New Orleans, US Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg#Licensing","imageDate":"2023-05-11 10:19:39","evidenceFile":"image-provenance/west-closure-complex-commons.json","evidenceSha256":"8d095d27d0a6bde356c186d31570a687b18cca899f9d4b359ceef56a389fc721","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/1/13/West_Closure_Complex_testing%2C_Louisiana_2023_-_01.jpg","downloadUrl":"/cases/west-closure-complex/download/project-image","originalSha1":"13204edda35ce31161453465ac85aa6fac1fe530","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"west-closure-complex-capstone.md","mimeType":"text/markdown","bytes":3328,"sha256":"fec13d74d145a189bb0a084cecd6f93a464bf18f7883a87b18e15f167b3f654e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/west-closure-complex/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The West Closure Complex during its 2023 annual operational testing.","caption":"The West Closure Complex during its 2023 annual operational testing. This is the completed gate and pumping project discussed in the foundation-characterization paper.","credit":"Team New Orleans, US Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:West_Closure_Complex_testing,_Louisiana_2023_-_01.jpg#Licensing","width":1280,"height":854,"imageDate":"2023-05-11 10:19:39","imageDownloadAllowed":true},"figureCaption":"The West Closure Complex during its 2023 annual operational testing. This is the completed gate and pumping project discussed in the foundation-characterization paper.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":73,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/west-closure-complex-commons.json","evidenceSha256":"8d095d27d0a6bde356c186d31570a687b18cca899f9d4b359ceef56a389fc721","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":156379,"sourceCount":3,"url":"/cases/west-closure-complex"},{"id":"gotthard-base-tunnel","title":"Gotthard Base Tunnel — squeezing rock and adaptive support","summary":"Deep tunnel sections encountered squeezing rock and strongly variable geological behavior. The Swiss geotechnical society’s project history explains both anticipated and unexpected support challenges at Sedrun and Faido.","topics":["tunnels","rock","site-investigation","monitoring","delivery"],"country":"Switzerland","region":"Swiss Alps","owner":"AlpTransit Gotthard","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Squeezing-ground support","Convergence monitoring","Geological prediction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The heritage case includes geology and support-system discussions from project records. It supports assessment of alternatives and field observations rather than transfer of one support class to all rock.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The engineering overview records opening in June 2016 after a long multi-heading construction programme.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select and revise a tunnel support scheme when measured convergence exceeds the original forecast.","inputs":["Choose one published squeezing section and extract its geology and support sequence.","Distinguish forecast ground conditions from observations obtained during excavation."],"deliverables":["Compare yielding and stiff support with a convergence–confinement study.","Prepare an observational trigger plan and construction-time implications for revised support.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can stronger initial support fail to stop continuing squeezing?","Which measurements indicate that a support change is needed before the next excavation round?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Gotthard Base Tunnel engineering heritage case","url":"https://htc.issmge.org/virtual-time-capsule/member-societies/swiss-geotechnical-society-geotechnik-schweiz/gotthard-base-tunnel","publisher":"Swiss Geotechnical Society / ISSMGE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Project engineering overview","url":"https://www.satw.ch/en/gotthard-base-tunnel-1","publisher":"Swiss Academy of Engineering Sciences","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"20141120 gotthard-basistunnel05-wiki.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","publisher":"Wikimedia Commons / Hannes Ortlieb ( Diskussion )","year":2014,"access":"public-link","license":"CC BY-SA 3.0 de","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"gotthard-base-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/gotthard-base-tunnel/download/schematic"},{"id":"project-image","title":"20141120 gotthard-basistunnel05-wiki.jpg","kind":"project-image","fileName":"gotthard-base-tunnel.jpg","mimeType":"image/jpeg","bytes":270024,"sha256":"c34e7149142543a6d7467bab8777410c8eda3fd5bea95792762d9de0b49230d5","sourceId":"s3","license":"CC BY-SA 3.0 de","width":1280,"height":853,"credit":"Hannes Ortlieb ( Diskussion )","sourceUrl":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/de/deed.en","imageDate":"2014-11-20","evidenceFile":"image-provenance/gotthard-base-tunnel-commons.json","evidenceSha256":"b0b8e93d8f2238bc07cd984600507c4e88264e3ece95c7661871510ceae09f35","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/69/20141120_gotthard-basistunnel05-wiki.jpg","downloadUrl":"/cases/gotthard-base-tunnel/download/project-image","originalSha1":"e74de4bfce9b76c9c98d216f3edbb245cb2a7ec5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"gotthard-base-tunnel-capstone.md","mimeType":"text/markdown","bytes":3256,"sha256":"76ba7c8ccd685844c7f7ec46648cb4988358b8db5be5d2a9269651d4d408168b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/gotthard-base-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014.","caption":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.","credit":"Hannes Ortlieb ( Diskussion )","sourceUrl":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","license":"CC BY-SA 3.0 de","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/de/deed.en","width":1280,"height":853,"imageDate":"2014-11-20","imageDownloadAllowed":true},"figureCaption":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":74,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/gotthard-base-tunnel-commons.json","evidenceSha256":"b0b8e93d8f2238bc07cd984600507c4e88264e3ece95c7661871510ceae09f35","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":274405,"sourceCount":3,"url":"/cases/gotthard-base-tunnel"},{"id":"channel-tunnel","title":"Channel Tunnel — geological alignment and water-pressure control","summary":"The alignment sought low-permeability marly chalk while accommodating more fractured ground on the French side. Project geologists describe how marine seismic surveys and boreholes informed route selection and machine requirements.","topics":["tunnels","rock","site-investigation","dewatering"],"country":"United Kingdom / France","region":"English Channel","owner":"Eurotunnel","year":1994,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine ground investigation","Geological alignment","Face-pressure control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The account is written by geologists involved in design and construction and includes the geological section. It does not provide all TBM operating logs.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select a sub-sea tunnel alignment that balances cover, geological continuity and water-inflow risk.","inputs":["Extract the main stratigraphic marker and the reported contrast between the two shores.","Identify where sparse boreholes require interpretation supported by seismic profiles."],"deliverables":["Prepare a route-risk section and specify investigation priorities.","Compare open and closed-face excavation assumptions with water-pressure and fault-zone scenarios.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is the shortest geometric route not necessarily the lowest ground-risk route?","What evidence should trigger closed-mode operation before a permeable zone is entered?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Channel Tunnel geology by project geologists","url":"https://www.geolsoc.org.uk/science-and-policy/100-great-geosites/industrial-and-economic-importance/channel-tunnel/","publisher":"Bill Rankin and Ron Williams / Geological Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Site of the Channel Tunnel Construction in May 1991.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","publisher":"Wikimedia Commons / The Basingstoker","year":null,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"channel-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/channel-tunnel/download/schematic"},{"id":"project-image","title":"Site of the Channel Tunnel Construction in May 1991.jpg","kind":"project-image","fileName":"channel-tunnel.jpg","mimeType":"image/jpeg","bytes":294751,"sha256":"f4aaa8dd8d642ab88dc0d9b42b5b4256db7db5a638caa32ec433aa1961dcde9e","sourceId":"s2","license":"CC BY-SA 2.0","width":1280,"height":821,"credit":"The Basingstoker","sourceUrl":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"Unknown date","evidenceFile":"image-provenance/channel-tunnel-commons.json","evidenceSha256":"9649b153db1a0137d64094b16abc794aca62ee229ecfa64ae4748d3f01da2f74","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a0/Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","downloadUrl":"/cases/channel-tunnel/download/project-image","originalSha1":"8ccf8054cb87766b63fdca45e2f2a8059e15029b","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"channel-tunnel-capstone.md","mimeType":"text/markdown","bytes":3106,"sha256":"12ad7d067a39fc330a07359b02e2fa40ea999e32678268d8ca45ee7002155e26","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/channel-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Channel Tunnel construction site in May 1991.","caption":"The Channel Tunnel construction site in May 1991. The historical project photograph provides context for the geological alignment and excavation study.","credit":"The Basingstoker","sourceUrl":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":821,"imageDate":"Unknown date","imageDownloadAllowed":true},"figureCaption":"The Channel Tunnel construction site in May 1991. The historical project photograph provides context for the geological alignment and excavation study.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":75,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/channel-tunnel-commons.json","evidenceSha256":"9649b153db1a0137d64094b16abc794aca62ee229ecfa64ae4748d3f01da2f74","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":298982,"sourceCount":2,"url":"/cases/channel-tunnel"},{"id":"eurasia-tunnel","title":"Eurasia Tunnel — high-pressure mixed-ground TBM crossing","summary":"The road tunnel passes through rock and marine sediments at high water pressure. The designers describe slurry-shield excavation, specialized lining details and seismic joints near changes in ground stiffness.","topics":["tunnels","seismic","dewatering","site-investigation"],"country":"Türkiye","region":"Bosphorus, Istanbul","owner":"Eurasia Tunnel concession / transport authority","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry shield","Mixed-face excavation","High-pressure lining","Seismic joints"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The design consultant and supervising engineer describe ground conditions, machine selection and the installed systems. They do not supply a complete downloadable design calculation set.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Italferr records TBM excavation during 2014–2015, opening to traffic in December 2016 and final acceptance in February 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Define a TBM operating envelope and segmental-lining checks for a deep water-bearing rock-to-soil transition.","inputs":["Map the reported stiffness transitions and separate water pressure from effective ground stress.","Identify the design-stage and construction-stage dates in the engineering accounts."],"deliverables":["Compare face-pressure limits for blowout, inflow and ground loss.","Prepare a lining/joint load summary and contingency measures for interventions under pressure.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why should seismic joints be linked to ground stiffness rather than regular spacing alone?","Which ground investigation would most reduce uncertainty at a mixed-face transition?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eurasia Tunnel design account","url":"https://www.wsp.com/en-us/projects/eurasia-tunnel-istanbul-strait-road-tube-crossing","publisher":"WSP","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Supervision and technical summary","url":"https://www.italferr.it/content/dam/italferr_nd/inglese/document/SCHEDA%20TECNICA%20EURASYA%20TUNNEL%20ENG1.pdf","publisher":"Italferr","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Eurasia tunnel Asia entrance 01.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","publisher":"Wikimedia Commons / Alessandro57","year":2026,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eurasia-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eurasia-tunnel/download/schematic"},{"id":"project-image","title":"Eurasia tunnel Asia entrance 01.jpg","kind":"project-image","fileName":"eurasia-tunnel.jpg","mimeType":"image/jpeg","bytes":311150,"sha256":"a70a83d8bcede2460dad6a00f50fbba6bc19afef5862ba33691ddfac8dee4ff9","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1705,"credit":"Alessandro57","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2026-07-24 15:29:41","evidenceFile":"image-provenance/eurasia-tunnel-commons.json","evidenceSha256":"4f618700c50021f9d429c13b5f18989c9579c0ad1b094084d10d5fbaeea320d5","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/8a/Eurasia_tunnel_Asia_entrance_01.jpg","downloadUrl":"/cases/eurasia-tunnel/download/project-image","originalSha1":"5a67caa8bf97490596743334a14bce0ff75c510c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eurasia-tunnel-capstone.md","mimeType":"text/markdown","bytes":3141,"sha256":"6a381930ec696f509d49754ffba8bc7339c8fe035c793a92086038fa0640bab3","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eurasia-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Asian entrance of the Eurasia Tunnel in Istanbul.","caption":"The Asian entrance of the Eurasia Tunnel in Istanbul. The photograph shows the completed road-tunnel project; the deep mixed-ground crossing is below the strait.","credit":"Alessandro57","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1705,"imageDate":"2026-07-24 15:29:41","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Asian entrance of the Eurasia Tunnel in Istanbul. The photograph shows the completed road-tunnel project; the deep mixed-ground crossing is below the strait.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":77,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eurasia-tunnel-commons.json","evidenceSha256":"4f618700c50021f9d429c13b5f18989c9579c0ad1b094084d10d5fbaeea320d5","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":315416,"sourceCount":3,"url":"/cases/eurasia-tunnel"},{"id":"tideway-tunnel","title":"Thames Tideway Tunnel — variable geology and deep shafts","summary":"The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.","topics":["tunnels","dewatering","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"London","owner":"Tideway","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry tunnelling","Deep shafts","Ground model refinement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project geologist’s technical lecture and designer account provide ground-model and machine-selection reasoning. Completion of tunnelling in a contract area is not the same as completion of the whole sewer system.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare tunnelling and shaft-construction risks across clay, sand and chalk reaches of an urban sewer alignment.","inputs":["Extract the geological units and identify where face pressure is governed by water rather than soil strength.","Choose one contract reach and preserve the distinction between main and connection tunnels."],"deliverables":["Prepare an excavation-method selection matrix and groundwater-control concepts.","Develop a monitoring and geological-reporting plan for updating production forecasts.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What does an intact sample fail to reveal about in-situ chalk permeability?","How should a changed ground model alter contingency time and intervention planning?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Engineering geology and construction performance","url":"https://ice.org.uk/events/recorded-lectures/engineering-geology-of-the-thames-tideway-tunnel","publisher":"Tim Newman / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Engineering the Thames Tideway sewer","url":"https://www.mottmac.com/en-gb/projects/how-londons-thames-tideway-super-sewer-was-engineered/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Thames Tideway Tunnel construction, Nine Elms.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","publisher":"Wikimedia Commons / AndyScott","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tideway-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/schematic"},{"id":"project-image","title":"Thames Tideway Tunnel construction, Nine Elms.jpg","kind":"project-image","fileName":"tideway-tunnel.jpg","mimeType":"image/jpeg","bytes":574175,"sha256":"407b83af897291400982623e5865b9a4baefbb086e090062f79b6911b9d9e3f4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1925,"credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-03-23 14:14:14","evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/4f/Thames_Tideway_Tunnel_construction%2C_Nine_Elms.jpg","downloadUrl":"/cases/tideway-tunnel/download/project-image","originalSha1":"a8e1f4ec3dc41e3101fff83dea35e08e296a2037","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tideway-tunnel-capstone.md","mimeType":"text/markdown","bytes":3265,"sha256":"ba22b9318da7099b0a5527de83a4cf0224651f9706d87d28d94497b3cc7bfb99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Thames Tideway Tunnel construction at Nine Elms, London.","caption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1925,"imageDate":"2022-03-23 14:14:14","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":78,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":578565,"sourceCount":3,"url":"/cases/tideway-tunnel"},{"id":"smart-tunnel","title":"SMART Tunnel — tunnelling through urban karst","summary":"The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.","topics":["tunnels","rock","dewatering","ground-improvement","site-investigation"],"country":"Malaysia","region":"Kuala Lumpur","owner":"Department of Irrigation and Drainage / Malaysian Highway Authority","year":2007,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Karst investigation","Slurry shield","Fissure and compaction grouting"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The primary construction accounts explain the selected methods and localized treatment purposes. They do not establish that karst uncertainty can be removed by one uniform grouting grid.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The builder identifies operation from 2007; the page is a project history rather than a detailed monthly programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan ground investigation and treatment for a tunnel encountering pinnacles, cavities and variable cover beneath a city.","inputs":["Extract the reported karst features and the purpose of each grouting method.","Specify investigation coverage at shafts, interventions and transitions rather than uniform spacing alone."],"deliverables":["Develop face-pressure and groundwater-control concepts for mixed ground.","Prepare a cavity/sinkhole response plan with survey triggers and treatment verification.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can groundwater drawdown cause a surface collapse away from the tunnel face?","Which evidence separates a treatable local void from a larger connected karst system?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SMART construction and geology","url":"https://www.smarttunnel.com.my/construction/print_project_construction.htm","publisher":"SMART project","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Ground-treatment contractor case","url":"https://www.kellerasean.com/projects/storm-water-management-and-road-tunnel","publisher":"Keller","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Builder project record","url":"https://gamuda.com/our-expertise/engineering-construction/stormwater-management-and-road-tunnel-smart/","publisher":"Gamuda","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"KL-SMARTtunnelentrance.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","publisher":"Wikimedia Commons / Azreey","year":2007,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"smart-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/smart-tunnel/download/schematic"},{"id":"project-image","title":"KL-SMARTtunnelentrance.JPG","kind":"project-image","fileName":"smart-tunnel.jpg","mimeType":"image/jpeg","bytes":577763,"sha256":"96788f96ef8b17d718aeb536a6282dc215767c1c9217e99d6a7999c55a4d275d","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Azreey","sourceUrl":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2007-12-27","evidenceFile":"image-provenance/smart-tunnel-commons.json","evidenceSha256":"d6654eb1d691f51c5618edc29c7f59f575cfe4d5c70ce3a39979b2a84f69a950","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/26/KL-SMARTtunnelentrance.JPG","downloadUrl":"/cases/smart-tunnel/download/project-image","originalSha1":"a5a0765e43e062f683adc413aa657655bbd67c36","originalSha256":"96788f96ef8b17d718aeb536a6282dc215767c1c9217e99d6a7999c55a4d275d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"smart-tunnel-capstone.md","mimeType":"text/markdown","bytes":3195,"sha256":"41d78160bf08853a679ec43e844ed00eefd919e2d2cb15461408fd68297d66db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/smart-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The northbound entrance to Kuala Lumpur’s SMART Tunnel.","caption":"The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.","credit":"Azreey","sourceUrl":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2007-12-27","imageDownloadAllowed":true},"figureCaption":"The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":83,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/smart-tunnel-commons.json","evidenceSha256":"d6654eb1d691f51c5618edc29c7f59f575cfe4d5c70ce3a39979b2a84f69a950","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":582083,"sourceCount":4,"url":"/cases/smart-tunnel"},{"id":"auckland-city-rail","title":"Auckland City Rail Link — ground models and settlement baselines","summary":"The urban rail link traverses weak rock, younger sediments, volcanic material and reclamation. Project engineers describe how phased investigations and a shared three-dimensional ground model informed procurement and risk allocation.","topics":["tunnels","site-investigation","monitoring","delivery"],"country":"New Zealand","region":"Central Auckland","owner":"City Rail Link Limited","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geotechnical baseline reports","EPB tunnelling","Settlement assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The geotechnical paper explains the baseline-report process, while owner pages link settlement assessments and TBM information. Those records support a procurement study without inventing a final asset-acceptance status.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a defensible ground baseline and investigation plan for an urban railway with several geological transitions.","inputs":["Extract the geological units and trace how investigation priorities changed through design.","Choose one alignment section and identify factual data separately from interpretation."],"deliverables":["Create a baseline table of expected conditions and measurable exceedance criteria.","Develop a building settlement screening and instrumentation strategy linked to tunnel operations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which uncertainties should remain explicit in a baseline rather than being hidden in an average profile?","How can a shared geological model improve procurement while still requiring independent interpretation?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Managing ground risk from concept to procurement","url":"https://www.nzgs.org/libraries/managing-ground-risk-for-aucklands-city-rail-link-project-concept-design-to-procurement/","publisher":"Project engineers / New Zealand Geotechnical Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"TBM technical facts","url":"https://www.cityraillink.co.nz/tunnel-boring-machine-key-facts","publisher":"City Rail Link Limited","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Consents and settlement assessments","url":"https://www.cityraillink.co.nz/consents-in-your-area","publisher":"City Rail Link Limited","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"CRL Albert Street 2452.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","publisher":"Wikimedia Commons / Schwede66","year":2018,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"auckland-city-rail.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/auckland-city-rail/download/schematic"},{"id":"project-image","title":"CRL Albert Street 2452.jpg","kind":"project-image","fileName":"auckland-city-rail.jpg","mimeType":"image/jpeg","bytes":335829,"sha256":"9f57ec9525f4422ccf4aab9a56c5d8b30f5836b5eb79c2fd3d9fa0bbe507bcd6","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Schwede66","sourceUrl":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2018-03-06 07:48:51","evidenceFile":"image-provenance/auckland-city-rail-commons.json","evidenceSha256":"798247ba9b24a81b1bbb676d213e54e192861dc5f1566b0513fc29a0de4de7e7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0a/CRL_Albert_Street_2452.jpg","downloadUrl":"/cases/auckland-city-rail/download/project-image","originalSha1":"12611ec2058caffaa71507bb9e901326c9b29c39","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"auckland-city-rail-capstone.md","mimeType":"text/markdown","bytes":3369,"sha256":"aa8cd7d0034de7bd80af2853144a3ab04107a646cfef16d40bf7000246a3d3bb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/auckland-city-rail/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"City Rail Link construction on Albert Street in Auckland.","caption":"City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.","credit":"Schwede66","sourceUrl":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2018-03-06 07:48:51","imageDownloadAllowed":true},"figureCaption":"City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":84,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/auckland-city-rail-commons.json","evidenceSha256":"798247ba9b24a81b1bbb676d213e54e192861dc5f1566b0513fc29a0de4de7e7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":340323,"sourceCount":4,"url":"/cases/auckland-city-rail"},{"id":"malpasset-dam","title":"Malpasset Dam — abutment wedge failure and uplift","summary":"The arch dam failed after instability developed in its rock foundation. The French dam committee and government accident record describe the role of discontinuity geometry, uplift and stress-dependent drainage.","topics":["rock","dams-levees","seepage","site-investigation"],"country":"France","region":"Fréjus","owner":"Historic Malpasset water-supply project","year":1959,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Rock-wedge stability","Uplift pressure","Stress-dependent permeability"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"The English technical material supports a forensic rock-wedge study. It is not an as-built remediation proposal for the ruined dam.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate an arch-dam abutment where intersecting discontinuities create a potentially unstable rock wedge.","inputs":["Extract the reported fault, foliation and abutment-force relationships.","Separate known observations from later interpretations of permeability changes."],"deliverables":["Calculate wedge stability for several groundwater-pressure distributions.","Specify investigation and drainage verification that could discriminate between the competing assumptions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can increased compressive stress reduce drainage yet raise destabilizing uplift?","Why may strong intact rock still provide an inadequate dam abutment?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Government accident review","url":"https://www.aria.developpement-durable.gouv.fr/fiche_detaillee/29490_en/?lang=en","publisher":"French Ministry environmental accident database","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Arch-dam guidance and Malpasset foundation case","url":"https://www.barrages-cfbr.eu/IMG/pdf/gtvoute_vienne2018.pdf","publisher":"French Committee on Dams and Reservoirs","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Barrage Malpasset 2007.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg","publisher":"Wikimedia Commons / Bonho1962","year":2007,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"malpasset-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/malpasset-dam/download/schematic"},{"id":"project-image","title":"Barrage Malpasset 2007.jpg","kind":"project-image","fileName":"malpasset-dam.jpg","mimeType":"image/jpeg","bytes":168986,"sha256":"039a3c531fb72c3b49904ea6e1f9da2bea8acdddbc138a8643e5ba023bab74e5","sourceId":"s3","license":"Public domain","width":1280,"height":453,"credit":"Bonho1962","sourceUrl":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg#Licensing","imageDate":"2007-06-08","evidenceFile":"image-provenance/malpasset-dam-commons.json","evidenceSha256":"04369b2ef16501c643e1aea885269ffa0c83d1f6cd2aae2c207a48b564d30a04","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/64/Barrage_Malpasset_2007.jpg","downloadUrl":"/cases/malpasset-dam/download/project-image","originalSha1":"30bd87cf637b57e5f5502beeba47afb24b14f92f","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"malpasset-dam-capstone.md","mimeType":"text/markdown","bytes":3016,"sha256":"ed57709c549dd09a23398800a53df70f4909ccb6252c938df716172917eaf451","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/malpasset-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Ruins of Malpasset Dam photographed in 2007.","caption":"Ruins of Malpasset Dam photographed in 2007. The remaining concrete and rock setting belong to the actual 1959 failure site.","credit":"Bonho1962","sourceUrl":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg#Licensing","width":1280,"height":453,"imageDate":"2007-06-08","imageDownloadAllowed":true},"figureCaption":"Ruins of Malpasset Dam photographed in 2007. The remaining concrete and rock setting belong to the actual 1959 failure site.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":88,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/malpasset-dam-commons.json","evidenceSha256":"04369b2ef16501c643e1aea885269ffa0c83d1f6cd2aae2c207a48b564d30a04","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":173019,"sourceCount":3,"url":"/cases/malpasset-dam"},{"id":"st-francis-dam","title":"St. Francis Dam — investigation evidence and foundation reassessment","summary":"The 1928 collapse prompted an official investigation and later reassessments of geology and foundation behavior. The records make a useful exercise in distinguishing contemporary findings from subsequent hypotheses.","topics":["rock","dams-levees","problem-soils","site-investigation"],"country":"United States","region":"San Francisquito Canyon, California","owner":"Historic Los Angeles water-supply project","year":1928,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Forensic ground model","Foundation saturation","Abutment stability"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"The commission report and later research represent different stages of interpretation. No single disputed mechanism is presented as conclusively established by this catalog.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare competing foundation-failure explanations and propose the investigation that would best distinguish them.","inputs":["Extract evidence from the original commission report separately from later interpretations.","Map the contrasting abutment materials and identify changes associated with reservoir filling."],"deliverables":["Prepare sensitivity checks for sliding, uplift and material degradation.","Build an evidence matrix showing which observations support or contradict each mechanism.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which conclusion depends most strongly on an assumed pre-failure groundwater condition?","How would modern investigation reduce uncertainty without claiming hindsight makes the outcome inevitable?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Original commission report record","url":"https://damsafety.org/content/causes-leading-failure-saint-francis-dam","publisher":"California investigation commission / ASDSO archive","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Later foundation reassessment","url":"https://damsafety.org/content/reassessment-st-francis-dam-failure-0","publisher":"J. David Rogers and David McMahon / ASDSO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"USGS historical overview","url":"https://www.usgs.gov/media/images/st-francis-dam-disaster","publisher":"US Geological Survey","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Saint Francis Dam Site 2012.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Saint_Francis_Dam_Site_2012.jpg","publisher":"Wikimedia Commons / Chevy111","year":2012,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"st-francis-dam.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/st-francis-dam/download/schematic"},{"id":"project-image","title":"Saint Francis Dam Site 2012.jpg","kind":"project-image","fileName":"st-francis-dam.jpg","mimeType":"image/jpeg","bytes":410499,"sha256":"615231c05357069092a774fa146cb08b7be245e4ef4479873474fa16986d23f3","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Chevy111","sourceUrl":"https://commons.wikimedia.org/wiki/File:Saint_Francis_Dam_Site_2012.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2012-08-05 09:47:38","evidenceFile":"image-provenance/st-francis-dam-commons.json","evidenceSha256":"53a2c42e8c9d7963c83e036424e0cf8fc84572d726d0e567074b0648702bb588","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a3/Saint_Francis_Dam_Site_2012.jpg","downloadUrl":"/cases/st-francis-dam/download/project-image","originalSha1":"9f6c998731ed25f57bb2d83749f0b6043c7ec96b","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"st-francis-dam-capstone.md","mimeType":"text/markdown","bytes":3301,"sha256":"5af44503b48f4b65d84af1c900f2f16e6943ff68d5b7e370826792c2a549f618","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/st-francis-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Concrete ruins at the St.","caption":"Concrete ruins at the St. Francis Dam site in San Francisquito Canyon, photographed in 2012. The image shows the actual historic failure site.","credit":"Chevy111","sourceUrl":"https://commons.wikimedia.org/wiki/File:Saint_Francis_Dam_Site_2012.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2012-08-05 09:47:38","imageDownloadAllowed":true},"figureCaption":"Concrete ruins at the St. Francis Dam site in San Francisquito Canyon, photographed in 2012. The image shows the actual historic failure site.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":89,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/st-francis-dam-commons.json","evidenceSha256":"53a2c42e8c9d7963c83e036424e0cf8fc84572d726d0e567074b0648702bb588","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":414817,"sourceCount":4,"url":"/cases/st-francis-dam"},{"id":"rissa-landslide","title":"Rissa landslide — sensitive clay and retrogressive failure","summary":"The quick-clay landslide was filmed during retrogressive movement. NGI explains the remoulding mechanism and publishes strength and geometry evidence used in stability interpretation.","topics":["slopes","problem-soils","laboratory-testing","site-investigation"],"country":"Norway","region":"Rissa, Trøndelag","owner":"Historic landslide investigation / Norwegian Geotechnical Institute","year":1978,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Quick-clay characterization","Undrained stability","Retrogression"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"The research supports analysis of sensitive-clay behavior and failure extent. A back-analysis is not a local development approval or a current hazard map.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop an investigation and stability assessment for a gentle slope underlain by sensitive marine clay.","inputs":["Extract the published intact and remoulded strength evidence and groundwater setting.","Separate initial triggering from subsequent retrogressive propagation."],"deliverables":["Compare intact-strength stability with a remoulding-sensitive scenario.","Specify sampling, sensitivity testing and a conservative exclusion-zone rationale.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can an initially small disturbance lead to failure far behind the original slope face?","Which laboratory sample disturbance would most distort the assessment of clay sensitivity?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Quick clay and the Rissa event","url":"https://www.ngi.no/en/research-and-consulting/natural-hazards-container/avalanches-and-slides/quick-clay-landslides/what-is-quick-clay/","publisher":"Norwegian Geotechnical Institute","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Stability of natural slopes in quick clay","url":"https://ngi.brage.unit.no/ngi-xmlui/bitstream/handle/11250/3031017/Aas_Lacasse%20%282022%29%205.pdf?sequence=1","publisher":"Aas and Lacasse / NGI repository","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Rissaraset i 1978 - Se videoen som gikk verden rundt","url":"https://www.ngu.no/en/node/183","publisher":"Geological Survey of Norway (NGU)","year":1978,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Resized the full 1440 × 947 NGU JPEG derivative proportionally to 900 × 592 pixels, JPEG quality 90; no cropping, added labels, or retouching.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"rissa-landslide.svg","mimeType":"image/svg+xml","bytes":1029,"sha256":"ccf2f027816a3de86d722599635826d3b3cadcf8867cf69fa1bf6fc1bdf2d3bf","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rissa-landslide/download/schematic"},{"id":"project-image","title":"Rissa landslide — the 1978 aftermath","kind":"project-image","fileName":"rissa-landslide-r13.jpg","mimeType":"image/jpeg","bytes":144975,"sha256":"feb55ed544ec8f298dd564198d08a00755dd292e80ddc81f192f55187577389b","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":900,"height":592,"credit":"Bjørn Bergstrøm / Geological Survey of Norway (NGU)","sourceUrl":"https://www.ngu.no/en/node/183","licenseUrl":"https://www.ngu.no/en/node/183","imageDate":"1978","evidenceFile":"image-provenance/rissa-landslide-r13-source.json","evidenceSha256":"c539032706b8042ad7776dcef3d3d44dc044c4b5729bc09c618e42e38c3a6d4e","transformations":"Resized the full 1440 × 947 NGU JPEG derivative proportionally to 900 × 592 pixels, JPEG quality 90; no cropping, added labels, or retouching.","originalUrl":"https://www.ngu.no/sites/default/files/styles/full_content_width/public/2023-03/Mann%20ser%20p%C3%A5%20skadene%20etter%20Rissaraset.%20Foto%20Bj%C3%B8rn%20Bergstr%C3%B8m%20NGU..jpg?itok=0SuzRFv9","originalSha256":"bcb5d813d802c6b165174d59b4a412ab0b9d5cedf95831466956c51c3c204960","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/rissa-landslide/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"rissa-landslide-capstone.md","mimeType":"text/markdown","bytes":3113,"sha256":"85e26a6127f09820a20adf40744fc933794b19146f55a747550aef80a132cd93","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/rissa-landslide/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"A person standing beside damaged buildings and the failed ground after the 1978 Rissa landslide.","caption":"A person examines the damage left by the 1978 Rissa landslide. NGU identifies the event and credits the original photograph to Bjørn Bergstrøm.","credit":"Bjørn Bergstrøm / Geological Survey of Norway (NGU)","sourceUrl":"https://www.ngu.no/en/node/183","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.ngu.no/en/node/183","width":900,"height":592,"imageDate":"1978","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"A person examines the damage left by the 1978 Rissa landslide. NGU identifies the event and credits the original photograph to Bjørn Bergstrøm.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":90,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/rissa-landslide-r13-source.json","evidenceSha256":"c539032706b8042ad7776dcef3d3d44dc044c4b5729bc09c618e42e38c3a6d4e","visualReview":"Inspected the full 1440 × 947 source and the proportional 900 pixel derivative. They show an observer, damaged red buildings and the landslide scarp/failed ground. The entire published scene is retained.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4142,"sourceCount":3,"url":"/cases/rissa-landslide"},{"id":"niigata-liquefaction","title":"Niigata earthquake — contrasting liquefied and non-liquefied sites","summary":"Published investigations compare sites that did and did not liquefy, linking penetration tests, recovered sand samples and cyclic strength. Building tilting demonstrates the importance of ground response even when the superstructure remains comparatively intact.","topics":["seismic","laboratory-testing","site-investigation","shallow-foundations"],"country":"Japan","region":"Niigata","owner":"Japanese earthquake investigators","year":1964,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["SPT and CPT","Cyclic triaxial testing","Liquefaction triggering"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The primary studies provide observed performance and analytical comparisons. Historical correlations should be reassessed using current procedures for a new design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Test a liquefaction assessment against both failure and non-failure sites from the same earthquake.","inputs":["Extract the paired site profiles and distinguish measured penetration resistance from inferred density.","Record the motion and groundwater assumptions used in the historical analysis."],"deliverables":["Compare cyclic demand and resistance across the two profiles with sensitivity bounds.","Develop a ground-improvement or foundation concept for an affected building plot.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is matching only the failed site an incomplete validation of a liquefaction method?","How could groundwater depth reverse the predicted outcome without changing the soil classification?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case studies of liquefaction in the 1964 earthquake","url":"https://www.jstage.jst.go.jp/article/sandf1972/21/3/21_3_35/_article","publisher":"Ishihara and Koga / Soils and Foundations","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Analysis of soil liquefaction: Niigata earthquake","url":"https://ascelibrary.org/doi/10.1061/JSFEAQ.0000981","publisher":"Seed and Idriss / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Liquefaction at Niigata.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG","publisher":"Wikimedia Commons / The original uploader was Ungtss at English Wikipedia .","year":1964,"access":"public-link","license":"Editorial reference; Commons claims U.S. public domain, wider reuse rights unverified","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"niigata-liquefaction.svg","mimeType":"image/svg+xml","bytes":989,"sha256":"7ed6562b41c1ef6286cc62d81928348d9f071653ee41e073ab8e6a4e68cf4e34","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/niigata-liquefaction/download/schematic"},{"id":"project-image","title":"Liquefaction at Niigata.JPG","kind":"project-image","fileName":"niigata-liquefaction.jpg","mimeType":"image/jpeg","bytes":36601,"sha256":"f0e87b68c38b11c43e8dd096702960839749ce38f0ea6993d18cbbcf47a3c2b8","sourceId":"s3","license":"Editorial reference; Commons claims U.S. public domain, wider reuse rights unverified","width":500,"height":297,"credit":"Japan National Committee on Earthquake Engineering / UC Berkeley EERC Library; individual photographer not identified in the Commons source record","sourceUrl":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG#Licensing","imageDate":"1964-06-16","evidenceFile":"image-provenance/niigata-liquefaction-commons.json","evidenceSha256":"cd555190bff77af422f10520beb09222ac92a18b26b1f5ced8f4c82cbb06d815","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/42/Liquefaction_at_Niigata.JPG","originalSha1":"0e5c70e48641447e47a0c826e3d9440d1a3f7ce0","originalSha256":"f0e87b68c38b11c43e8dd096702960839749ce38f0ea6993d18cbbcf47a3c2b8","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No worldwide open image license verified","rightsNote":"The Commons page uses a U.S. publication-without-notice designation and records the historical EERC Library source. That claim is not treated as a worldwide open license. The source-linked preview is not offered as a reusable download.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/niigata-liquefaction/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"niigata-liquefaction-capstone.md","mimeType":"text/markdown","bytes":3491,"sha256":"0c390c31b7c20f0ea6292f190223304f229eaf98087e09af79518d2c5085bef0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/niigata-liquefaction/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Buildings affected by soil liquefaction during the 1964 Niigata earthquake.","caption":"Buildings affected by soil liquefaction during the 1964 Niigata earthquake. This historical photograph illustrates the event; it is not a location marker for both detailed comparison sites in the research paper.","credit":"Japan National Committee on Earthquake Engineering / UC Berkeley EERC Library; individual photographer not identified in the Commons source record","sourceUrl":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG","license":"Editorial reference; Commons claims U.S. public domain, wider reuse rights unverified","licenseUrl":"https://commons.wikimedia.org/wiki/File:Liquefaction_at_Niigata.JPG#Licensing","width":500,"height":297,"imageDate":"1964-06-16","preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No worldwide open image license verified","rightsNote":"The Commons page uses a U.S. publication-without-notice designation and records the historical EERC Library source. That claim is not treated as a worldwide open license. The source-linked preview is not offered as a reusable download."},"figureCaption":"Buildings affected by soil liquefaction during the 1964 Niigata earthquake. This historical photograph illustrates the event; it is not a location marker for both detailed comparison sites in the research paper.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":92,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/niigata-liquefaction-commons.json","evidenceSha256":"cd555190bff77af422f10520beb09222ac92a18b26b1f5ced8f4c82cbb06d815","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4480,"sourceCount":3,"url":"/cases/niigata-liquefaction"},{"id":"eth-honggerberg","title":"ETH Hönggerberg — seasonal borehole heat storage","summary":"The campus anergy grid balances heating and cooling through buried borehole fields. Its documented HC4 expansion provides a practical study of thermal interference, drilling access and staged commissioning.","topics":["geothermal","site-investigation","dewatering","monitoring","delivery"],"country":"Switzerland","region":"Zurich","owner":"ETH Zurich","year":2025,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Borehole heat exchangers","Seasonal thermal storage","Thermal interference","Construction staging"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"ETH documents 160 additional probes at 200 m depth on a 5 m grid, beside an existing field of 126 probes. The published project description supports layout and heat-balance studies; it does not supply a complete thermal-response test dataset.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner dates HC4 expansion drilling to October 2024–May 2025 and operational handover to July 2025. Later proposed fields are outside this completed expansion.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The owner confirms connection of the enlarged HC4 field to the campus network; continuous raw operating data and final drilling records were not provided on the reviewed pages.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a phased borehole-field expansion for an operating campus and test whether spacing, ground properties and annual heat imbalance control the design.","inputs":["Use the published HC4 depth, spacing and probe counts; assemble an explicitly labelled study load series for heating and cooling.","Identify borehole logs, groundwater flow, thermal conductivity and borehole-resistance measurements still needed before design."],"deliverables":["Compare a line-source screening calculation with a multi-borehole response model under balanced and unbalanced annual loads.","Lay out drilling access, buried services, grouting verification, commissioning tests and long-term temperature monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How would persistent net heat injection change performance even if the first operating year meets the heating and cooling demand?","What additional thermal-response or groundwater observations would justify reducing uncertainty at the 5 m borehole spacing?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"HC4 geothermal probe-field expansion and commissioning","url":"https://ethz.ch/staffnet/en/news-and-events/internal-news/archive/2025/08/hoenggerberg-campus-becomes-more-sustainable-above-and-below-ground.html","publisher":"ETH Zurich Real Estate Management","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Energy supply and the campus anergy grid","url":"https://ethz.ch/en/the-eth-zurich/organisation/departments/engineering-and-systems/energie.html","publisher":"ETH Zurich","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ETH Hönggerberg campus, seen from Hönggerbergstrasse.jpg","url":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","publisher":"Balise42","year":2023,"access":"public-link","license":"CC BY 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eth-honggerberg.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"eth-honggerberg-reference-values.csv","mimeType":"text/csv","bytes":1393,"sha256":"0746df014858f90951177b8dd60717dcd4fd0c62a7496d26412f00d0525e7c28","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/eth-honggerberg/download/reference-values"},{"id":"project-image","title":"ETH Hönggerberg campus — setting of the anergy grid","kind":"project-image","fileName":"eth-honggerberg.jpg","mimeType":"image/jpeg","bytes":299237,"sha256":"3bfed12bb7a9484ceb0020eb752234d62054091b0f07478ee2a2b3a9b01c5ce9","sourceId":"s3","license":"CC BY 4.0","width":1280,"height":854,"credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","licenseUrl":"https://creativecommons.org/licenses/by/4.0","imageDate":"2023-09-16 10:13:12","evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/94/ETH_H%C3%B6nggerberg_campus%2C_seen_from_H%C3%B6nggerbergstrasse.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/eth-honggerberg/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eth-honggerberg-capstone.md","mimeType":"text/markdown","bytes":5102,"sha256":"e859f8b70fe4a7e15e0b6156c663fbf6c8ef78fcddde30913231a93546dc88b4","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eth-honggerberg/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","caption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","credit":"Balise42 / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:ETH_H%C3%B6nggerberg_campus,_seen_from_H%C3%B6nggerbergstrasse.jpg","license":"CC BY 4.0","licenseUrl":"https://creativecommons.org/licenses/by/4.0","width":1280,"height":854,"imageDate":"2023-09-16 10:13:12","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The ETH Hönggerberg campus, where the anergy grid exchanges heat with borehole fields. This site-context photograph does not show the buried HC4 boreholes.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":103,"referenceValues":[{"label":"Added HC4 probes","value":160,"unit":"probes","scope":"HC4 expansion drilled October 2024–May 2025.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported probe depth","value":200,"unit":"m","scope":"New HC4 geothermal probes; do not infer the full site stratigraphy.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported grid spacing","value":5,"unit":"m","scope":"Spacing stated for the HC4 expansion.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Existing HC4 probes","value":126,"unit":"probes","scope":"Pre-expansion field, distinct from the 160 additional probes.","sourceId":"s1","locator":"HC4 expansion description","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eth-honggerberg-r14-source.json","evidenceSha256":"e87c69e60081fe532f03aa9ebc54beffedb9911d962e6f33c11082515f413a9e","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":306789,"sourceCount":3,"url":"/cases/eth-honggerberg"},{"id":"arlanda-aquifer","title":"Stockholm Arlanda — aquifer thermal energy storage","summary":"The airport uses warm and cold groundwater zones within an esker aquifer for seasonal energy exchange. This case links well hydraulics and thermal transport with operational heating and cooling demand.","topics":["geothermal","dewatering","site-investigation","monitoring"],"country":"Sweden","region":"Stockholm Arlanda Airport","owner":"Swedavia","year":2009,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Aquifer thermal energy storage","Pumping and reinjection","Thermal plume transport","Water balance"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Swedavia describes seasonal circulation through the Brunkebergsåsen aquifer, reinjection of the extracted volume and uses for recovered heat. Detailed well construction, transmissivity and monitoring time series must be obtained separately.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner reports that the aquifer system began operation in summer 2009.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The owner describes the operating principle and an annual energy-reduction estimate. Treat that estimate as an owner-reported system value, not an independently reproduced geotechnical result.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Size a conceptual paired-well seasonal storage system for an airport, keeping hydraulic interference, heat migration and groundwater protection visible in the design.","inputs":["Establish an assumed stratigraphic section and transmissivity range, clearly separated from the owner’s published system description.","Build seasonal heating/cooling loads and identify water-quality limits, abstraction permissions and nearby receptors."],"deliverables":["Calculate pumping drawdown, reinjection mounding and a first thermal travel-time estimate, then test sensitivity to groundwater flow.","Prepare a well spacing concept, mass/energy balance, monitoring network and recovery-efficiency evaluation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How could returning the same volume of groundwater still change temperatures or groundwater quality outside the intended storage zone?","Which combination of pumping tests and thermal tracers would best distinguish inadequate transmissivity from early thermal breakthrough?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"The aquifer — owner explanation of airport seasonal storage","url":"https://www.swedavia.com/about-swedavia/the-aquifer/","publisher":"Swedavia","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Stockholm-Arlanda Airport aerial view.JPG","url":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","publisher":"Nemracc","year":2008,"access":"public-link","license":"CC BY-SA 3.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"arlanda-aquifer.svg","mimeType":"image/svg+xml","bytes":1057,"sha256":"6c0f3672578d66652bd772c30449ad7f24ff1dacdf6823a19f097a49f226c6ec","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/arlanda-aquifer/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"arlanda-aquifer-reference-values.csv","mimeType":"text/csv","bytes":375,"sha256":"8a4f1706bee52daf9c8d4a97180a76295841b01271e437878d6c32986279c518","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/arlanda-aquifer/download/reference-values"},{"id":"project-image","title":"Stockholm Arlanda Airport — aerial site view","kind":"project-image","fileName":"arlanda-aquifer.jpg","mimeType":"image/jpeg","bytes":268995,"sha256":"a4465724499f43a3e188c68f6d065eb106cf5d3e7abddf0469b56d0789048f8a","sourceId":"s2","license":"CC BY-SA 3.0","width":1269,"height":650,"credit":"Nemracc / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","imageDate":"2008-01-11 08:37:35","evidenceFile":"image-provenance/arlanda-aquifer-r14-source.json","evidenceSha256":"fbacca4ee162dee050c65db5b09456023adf2f565c6392f39bea524e93cbd441","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f2/Stockholm-Arlanda_Airport_aerial_view.JPG?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/arlanda-aquifer/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"arlanda-aquifer-capstone.md","mimeType":"text/markdown","bytes":3872,"sha256":"f9b0bd622d058575a97b9b95083312cd054f93e88a524a051a0178d17246b6ff","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/arlanda-aquifer/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","caption":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","credit":"Nemracc / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Stockholm-Arlanda_Airport_aerial_view.JPG","license":"CC BY-SA 3.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0","width":1269,"height":650,"imageDate":"2008-01-11 08:37:35","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Stockholm Arlanda Airport, the operating facility served by aquifer thermal energy storage. The subsurface wells and storage zones are not visible in this aerial photograph.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":104,"referenceValues":[{"label":"Owner-reported annual energy reduction","value":19,"unit":"GWh/year","scope":"Airport system estimate from the owner description; not a measured heat-pump COP.","sourceId":"s1","locator":"Annual energy reduction","basis":"Owner-reported estimate; no independent performance reconstruction or guarantee implied."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/arlanda-aquifer-r14-source.json","evidenceSha256":"fbacca4ee162dee050c65db5b09456023adf2f565c6392f39bea524e93cbd441","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":274299,"sourceCount":2,"url":"/cases/arlanda-aquifer"},{"id":"sutong-bridge","title":"Sutong Bridge — deep pile groups and riverbed scour protection","summary":"The main pylons use large groups of long drilled shafts in deep water and soft ground. Project papers connect testing, pile-group analysis, post-grouting, cofferdam construction and permanent scour protection.","topics":["deep-foundations","lateral-foundations","scour-erosion","site-investigation","monitoring","coastal-offshore"],"country":"China","region":"Yangtze River, Jiangsu","owner":"Sutong Bridge project authorities","year":2008,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Large drilled-shaft groups","Post-grouting","Group interaction","Scour protection","Cofferdams"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The foundation papers describe 131 shafts beneath each main pylon, project-specific test/model evidence and construction methods. Published pile dimensions and group coefficients apply to the stated foundation and cannot be adopted as universal design factors.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The source papers include pile testing, model studies and field-monitoring comparisons, while a complete current inspection and as-built record set was not established.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coupled foundation-and-scour assessment for one Sutong main pylon, preserving the distinction between individual-pile testing and group response.","inputs":["Select the north or south foundation and retain its own shaft geometry, stratigraphy, load tests and pile-cap configuration.","Extract the design scour/protection assumptions and identify temporary construction conditions separately from permanent conditions."],"deliverables":["Compare single-shaft and group axial/lateral response using transparent assumptions and documented calibration evidence.","Prepare a scour-monitoring and protection-maintenance concept with a construction-stage cofferdam risk register.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why would a tip post-grouting result on a single shaft not directly establish the settlement of the full pylon pile group?","How could local bed erosion change lateral foundation response even before the calculated axial resistance becomes critical?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Design and construction of the Sutong Bridge foundations","url":"https://www.xcdsystem.com/dfi/journal/?abstractid=2007010101","publisher":"Project designers and constructors / DFI Journal","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Super-large bridge pile foundation in soft soil — testing and monitoring","url":"https://scholarsmine.mst.edu/icchge/7icchge/session08/1/","publisher":"Yang, Dai and Gong / Missouri S&T","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Scour protection for deep-water pylon foundations","url":"https://www.engineering.org.cn/sscae/EN/1160099698767880365","publisher":"Project authors / Strategic Study of CAE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Sutong Bridge in construction2.jpg","url":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","publisher":"Trevor and Joce","year":2007,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"sutong-bridge.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"sutong-bridge-reference-values.csv","mimeType":"text/csv","bytes":964,"sha256":"54b76bad46f0abfe39229fdb6dfc70c2341fb243dea6db60699071418a1032b2","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/sutong-bridge/download/reference-values"},{"id":"project-image","title":"Sutong Bridge — construction over the Yangtze","kind":"project-image","fileName":"sutong-bridge.jpg","mimeType":"image/jpeg","bytes":216713,"sha256":"cde90ed38819bb57406e5fc776e0ca7aa7dc3eb74adc203bb315a6aa21b51804","sourceId":"s4","license":"CC BY-SA 2.0","width":386,"height":588,"credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2007-08-23 12:57","evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/d/d2/Sutong_Bridge_in_construction2.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/sutong-bridge/download/project-image","originalSha1":"0068ceeba8bd5efef4ff854c6ad6f377810c71aa","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"sutong-bridge-capstone.md","mimeType":"text/markdown","bytes":4785,"sha256":"5f940d78551b92642633723f99f53ef00b6175da520c7ec011354b245973f91c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/sutong-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","caption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","credit":"Trevor and Joce / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Sutong_Bridge_in_construction2.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":386,"height":588,"imageDate":"2007-08-23 12:57","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Sutong Bridge during construction. The image shows the actual crossing; detailed shaft groups, pile-cap geometry and scour protection are described in the project engineering papers.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":112,"referenceValues":[{"label":"Bored piles per main pylon foundation","value":131,"unit":"piles","scope":"Large main-pylon group described in the DFI foundation paper; not the whole-bridge pile total.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — shorter group","value":114,"unit":"m","scope":"One of the two reported main-pylon pile lengths; verify group location in the source before modelling.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."},{"label":"Reported pile length — longer group","value":117,"unit":"m","scope":"Other reported main-pylon pile length; not an uncertainty range for every pile.","sourceId":"s1","locator":"Foundation arrangement","basis":"As reported by the cited project source; not a universal design input."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/sutong-bridge-r14-source.json","evidenceSha256":"cd941ccb2b01c7f3e349131d656742ddafd27097d4fdbb692bb654af5f5d5b10","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":223661,"sourceCount":4,"url":"/cases/sutong-bridge"},{"id":"osman-gazi-bridge","title":"Osman Gazi Bridge — seismic caissons on gravel beds","summary":"The suspension bridge combines offshore caisson foundations with improved ground and a gravel interface intended to accommodate extreme seismic movement. Published accounts describe soil–structure interaction and marine installation.","topics":["lateral-foundations","seismic","ground-improvement","coastal-offshore","site-investigation","delivery"],"country":"Türkiye","region":"Izmit Bay","owner":"Gebze–Orhangazi–Izmir motorway project","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seismic soil–structure interaction","Caisson foundations","Ground improvement","Interface sliding"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The design paper models gravel-bed and reinforced-subsoil response using nonlinear foundation elements. Contractor records explain floating and sinking the caissons onto prepared crushed rock. A controlled-sliding concept needs both displacement and residual-performance checks.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"IHI describes a 42-month construction period. Treat that as the contractor’s overall project account, not a detailed foundation activity schedule.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The construction accounts document the built crossing; the design-stage soil–structure model is not a substitute for measured earthquake performance.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare fixed-base and nonlinear-foundation representations for a bridge tower supported on a prepared gravel interface.","inputs":["Extract foundation arrangement, soil improvement and the interface behaviour from the design-stage paper.","Identify the earthquake performance objectives and distinguish assumptions in the analysis from measured field response."],"deliverables":["Construct a reduced nonlinear spring/interface model and compare sliding, rocking and residual displacement under selected study motions.","Prepare seabed preparation, caisson placement, survey-tolerance and post-earthquake inspection requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When can intentional foundation sliding reduce structural demand while increasing permanent displacement and service-restoration work?","Which installation tolerances and seabed observations are needed to make the assumed gravel-interface behaviour credible?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Modelling of soil–structure interaction for seismic analyses of the Izmit Bay Bridge","url":"https://www.cfms-sols.org/sites/default/files/Actes/763-768.pdf","publisher":"Project design authors / CFMS conference proceedings","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Osman Gazi Bridge construction sequence","url":"https://www.ihi.co.jp/iis/en/gallery/movie/izmit_movie.html","publisher":"IHI Infra-square","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Osman Gazi Bridge project account","url":"https://www.webuildgroup.com/en/projects/bridges-viaducts/osman-gazi-bridge/","publisher":"Webuild","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Osman-Gazi-Bridge-620x410.jpg","url":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","publisher":"Erdmkiliic","year":2016,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"osman-gazi-bridge.svg","mimeType":"image/svg+xml","bytes":1201,"sha256":"0f34c5a583e4d9e8427d0110ef6d716d217e38ffb3b4ade758e04d51b5451084","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/schematic"},{"id":"project-image","title":"Osman Gazi Bridge — suspension crossing","kind":"project-image","fileName":"osman-gazi-bridge.jpg","mimeType":"image/jpeg","bytes":152148,"sha256":"0c746b33551461f356d58e95fe70fe4588a48903a60efef88a9c49d11e78123b","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2016-07-07","evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0b/Osman-Gazi-Bridge-620x410.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/osman-gazi-bridge/download/project-image","originalSha1":"1ec066ac577efd9795f0ed8a5eb0f7511078f1be","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"osman-gazi-bridge-capstone.md","mimeType":"text/markdown","bytes":3672,"sha256":"d6891d8af9dd21f85ea6c6bbfdf985f634c0fca28dd9c3214f6d365b1b7b4fb7","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/osman-gazi-bridge/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","caption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","credit":"Erdmkiliic / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Osman-Gazi-Bridge-620x410.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2016-07-07","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The Osman Gazi Bridge across Izmit Bay. The buried and submerged foundation details are documented in the linked design and construction sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":113,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/osman-gazi-bridge-r14-source.json","evidenceSha256":"d7e58e70726fded845c346cf8e30d08eaf8747ec04240d4337ddcfd1a498aee8","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157021,"sourceCount":4,"url":"/cases/osman-gazi-bridge"},{"id":"hywind-scotland","title":"Hywind Scotland — suction anchors for floating wind","summary":"Five floating turbines use mooring systems connected to seabed suction anchors. Project and decommissioning material support an integrated study of anchor capacity, installation, inspection and eventual removal.","topics":["coastal-offshore","lateral-foundations","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"Buchan Deep, offshore Peterhead","owner":"Equinor / Masdar","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Suction anchors","Inclined cyclic loading","Mooring–soil interaction","Installation and decommissioning"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Project sources describe the spar, mooring lines and suction anchors; the 2022 decommissioning programme gives asset-specific arrangements. Distinguish the floating turbine substructure from its seabed anchor foundation and do not transfer onshore monopile checks directly.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The operator records commissioning in 2017. The 2022 decommissioning document is a programme, not evidence that removal has occurred.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The published field study reports subsea observations from 2018 and 2020. These observations show asset inspection opportunities and are not a complete geotechnical acceptance certificate.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a suction-anchor concept and inspection strategy for one mooring line, including cyclic demand and removal feasibility.","inputs":["Trace the three-point mooring arrangement and identify the anchor information actually supplied by the project.","Develop explicit study soil profiles and load envelopes when borehole/CPT data or proprietary design loads are unavailable."],"deliverables":["Compare installation suction, holding capacity and cyclic degradation scenarios, retaining the distinction between drained and undrained assumptions.","Prepare an ROV inspection plan, cable/mooring interaction review and a decommissioning sequence with geotechnical risks.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can an anchor meet a monotonic holding-capacity check yet remain unsuitable under repeated inclined mooring loads?","How would the preferred removal method change if the as-installed suction anchor has tilted or developed significant internal soil plugging?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Hywind Scotland — operator project information","url":"https://www.equinor.com/energy/hywind-scotland","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Pilot Park decommissioning programme, May 2022","url":"https://cdn.equinor.com/files/h61q9gi9/global/1b585f93025b2cf77ece1bb597520ff325454abc.pdf?hywind-scotland-pilot-park-decommissioning-programme-submission-may-2022-equinor.pdf=","publisher":"Equinor","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Artificial hard-substrate colonisation — field inspection of structures, moorings and anchors","url":"https://wes.copernicus.org/articles/7/801/2022/","publisher":"Karlsson et al. / Wind Energy Science","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Hywind Wind Farm, off Peterhead - geograph.org.uk - 7226685.jpg","url":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","publisher":"Mike Pennington","year":2022,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hywind-scotland.svg","mimeType":"image/svg+xml","bytes":1207,"sha256":"6ad889aea5e670ab253f2620ef9208e359b31770bf96645ef006d1f14cee1371","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/schematic"},{"id":"project-image","title":"Hywind Scotland — floating turbines offshore Peterhead","kind":"project-image","fileName":"hywind-scotland.jpg","mimeType":"image/jpeg","bytes":184836,"sha256":"69d6f91c41a64fb6d8b73f64d25fc5e470c5c2dbaa26c9e97b497bcbef3d07e8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":854,"credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2022-06-22","evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/65/Hywind_Wind_Farm%2C_off_Peterhead_-_geograph.org.uk_-_7226685.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/hywind-scotland/download/project-image","originalSha1":"73679c0939c31070d5973600125fa5b98e70746c","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hywind-scotland-capstone.md","mimeType":"text/markdown","bytes":3976,"sha256":"85e5f997085ffbc3896b28ac27ae3e0c519a862847311a508ef90f2414b41c54","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hywind-scotland/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","caption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","credit":"Mike Pennington / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Hywind_Wind_Farm,_off_Peterhead_-_geograph.org.uk_-_7226685.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":854,"imageDate":"2022-06-22","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Hywind Scotland photographed from the sea on 22 June 2022. The turbine spars are visible above the water; the suction anchors and mooring arrangements are described in the linked project records.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":114,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hywind-scotland-r14-source.json","evidenceSha256":"b4eba94b304e0402dea046762d68b905162401c87534f310e3809635991a6849","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":190019,"sourceCount":4,"url":"/cases/hywind-scotland"},{"id":"yeager-airport","title":"Yeager Airport — reinforced-slope failure and degraded rock","summary":"The reinforced slope supporting a runway extension failed in 2015. Published investigations examine the fill–rock interface, material strength selection and global failure mechanisms, offering a strong forensic capstone.","topics":["reinforced-soil","slopes","rock","laboratory-testing","site-investigation","monitoring"],"country":"United States","region":"Charleston, West Virginia","owner":"Central West Virginia Regional Airport Authority","year":2015,"yearLabel":"Case reference year","projectType":"Failure investigation and lessons","methods":["Reinforced-slope stability","Fully softened and residual strength","Degraded sedimentary rock","Inverse analysis"],"documentationLevel":"forensic-study","design":{"availability":"partial","summary":"The author studies discuss construction, performance and post-failure testing. The reinforced-slope height is reported differently across papers; retain the geometry and datum of the particular section being analysed instead of merging those values.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The failure occurred on 12 March 2015 after several years of service. The published papers separately describe construction and the observed pre-failure movements.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"Post-failure investigation and analyses are documented; these sources are not a complete record of the later repair and acceptance programme.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Reconstruct a documented failure section and compare competing strength and groundwater assumptions against the observed failure geometry.","inputs":["Extract one internally consistent cross-section, foundation preparation detail and chronology from the selected author paper.","Separate coarse reinforced-fill test results from softened or residual strengths at the fill–rock interface, recording drainage and sample scale."],"deliverables":["Compare internal, compound and global mechanisms with sensitivity to interface strength and pore pressure.","Prepare an improved investigation, construction-observation and movement-trigger plan, clearly distinguished from the actual historical design.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can strong geogrid and competent reinforced fill fail to prevent a mechanism controlled by the underlying weathered-rock interface?","What would make a back-calculated strength plausible as a material property, rather than merely compensating for an incorrect geometry or groundwater model?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Case history: failure of the reinforced soil slope at Yeager Airport","url":"https://ascelibrary.org/doi/10.1061/%28ASCE%29GT.1943-5606.0002430","publisher":"VandenBerge, Valentine, Brandon and Wright / ASCE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Case history on failure of a 67 m tall reinforced soil slope","url":"https://www.sciencedirect.com/science/article/pii/S0266114420300686","publisher":"Collin and coauthors / Geotextiles and Geomembranes","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Stability and stress-deformation analyses — author-hosted paper","url":"https://www.thecollingroup.com/wp-content/uploads/2021/01/Collin-Yeager-Failure-JGGE-ASCE-GT.1943-5606.0002454.pdf","publisher":"Investigation authors / The Collin Group","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"KCRW airport aerial 20261020.jpg","url":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","publisher":"Designism","year":2026,"access":"public-link","license":"CC0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"yeager-airport.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/yeager-airport/download/schematic"},{"id":"reference-values","title":"Published reference values (CSV)","kind":"table","fileName":"yeager-airport-reference-values.csv","mimeType":"text/csv","bytes":794,"sha256":"743239327bd7a5bc43922859fa94090a2465f88f69d96df2d76f0f2ff4fc22f7","sourceId":null,"license":"Factual values transcribed with source attribution; original selection and descriptions by Foundation Design","downloadUrl":"/cases/yeager-airport/download/reference-values"},{"id":"project-image","title":"Yeager Airport — aerial site context in 2026","kind":"project-image","fileName":"yeager-airport.jpg","mimeType":"image/jpeg","bytes":192611,"sha256":"e81b78a1347994e6c2a868aa8ab7749e6e273bdd01e3b9cdf73809b3c388a605","sourceId":"s4","license":"CC0","width":1280,"height":867,"credit":"Designism / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2026-10-20 13:24:53","evidenceFile":"image-provenance/yeager-airport-r14-source.json","evidenceSha256":"11ad0740552021430cbcd470ca63fca0b86f43ac87d9d6aba8b379f3dc393172","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/c/cd/KCRW_airport_aerial_20261020.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/yeager-airport/download/project-image","originalSha1":"f179194a5d2d62c05b3a6400727fc85453c6caaf","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"yeager-airport-capstone.md","mimeType":"text/markdown","bytes":4809,"sha256":"f2ee34dc662632c6f866232936ea9c60202f43c4e59d54196c0d3d15c610fa5d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/yeager-airport/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","caption":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","credit":"Designism / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:KCRW_airport_aerial_20261020.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":867,"imageDate":"2026-10-20 13:24:53","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"Yeager Airport photographed on 20 October 2026. This later site view is context for the 2015 reinforced-slope failure; it is not an image of the failure itself or a reconstruction drawing.","qualityNotes":["The 2026 aerial photograph is a later view of the actual airport, not a photograph of the 2015 collapse.","Published heights differ by section/definition. The study must cite its selected source geometry."],"checked":"2026-11-22","addedIn":"r14","curatedOrder":117,"referenceValues":[{"label":"Slope height stated by Collin et al.","value":67,"unit":"m","scope":"Reinforced-soil slope height in the Geotextiles and Geomembranes case-history title; retain that paper’s definition.","sourceId":"s2","locator":"Article title and case description","basis":"As reported by the cited project source; not a universal design input."},{"label":"Slope height stated by VandenBerge et al.","value":73,"unit":"m","scope":"Height used in the ASCE case-history description; consult geometry and reference elevations before comparing with 67 m.","sourceId":"s1","locator":"Case-history description","basis":"Source-specific geometry definition. The two published heights are not averaged or silently treated as interchangeable."}],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/yeager-airport-r14-source.json","evidenceSha256":"11ad0740552021430cbcd470ca63fca0b86f43ac87d9d6aba8b379f3dc393172","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":199335,"sourceCount":4,"url":"/cases/yeager-airport"}]}