{"schemaVersion":1,"updated":"2026-11-22","total":17,"records":[{"id":"boston-central-artery","title":"Boston Central Artery/Tunnel — deep mixing and ground movement","summary":"Project research documents deep mixing in marine clay at Bird Island Flats and Fort Point Channel and the control of excavation-induced movements.","topics":["excavation","ground-improvement","tunnels","monitoring","delivery"],"country":"United States","region":"Boston, Massachusetts","owner":"Massachusetts highway agencies","year":2006,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Deep mixing","Excavation movement","Observational control"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The technical paper covers soil properties, mixing characteristics and measured response. FHWA separately documents project financial-management lessons.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"FHWA discusses major-project contingency management; it is not a priced geotechnical work breakdown.","sourceIds":["s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"Published research compares construction-induced ground movements and stabilization behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a ground-treatment and monitoring concept for a deep urban cut in soft clay, with construction risks included in the estimate.","inputs":["Extract the selected site section and treatment properties from the project paper.","Define movements tolerated by nearby structures and utilities as a study requirement."],"deliverables":["Compare untreated and treated basal stability and movement mechanisms.","Prepare a monitoring-trigger plan and a geotechnical contingency allowance.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lessons learned for ground movements and soil stabilization from the Boston Central Artery","url":"https://doi.org/10.1061/(ASCE)1090-0241(2006)132:8(966)","publisher":"O’Rourke and McGinn / ASCE","year":2006,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"Full technical article may require subscription.","checked":"2026-11-22"},{"id":"s2","title":"Contingency fund management — lessons learned","url":"https://www.fhwa.dot.gov/majorprojects/financial_plans/lessons_learned.cfm","publisher":"FHWA","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Big Dig construction 589.agr.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","publisher":"Wikimedia Commons / ArnoldReinhold","year":1989,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"boston-central-artery.svg","mimeType":"image/svg+xml","bytes":1131,"sha256":"2cef12431fd568911d4f480251e06d4f0a570421ccc1bd844159a0a660a48d4b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/schematic"},{"id":"project-image","title":"Big Dig construction 589.agr.jpg","kind":"project-image","fileName":"boston-central-artery.jpg","mimeType":"image/jpeg","bytes":339680,"sha256":"01902e3f96aad17c3cb58875d0a7591633c218d8dabbe0755b42916933825fe4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"1989-05","evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/46/Big_Dig_construction_589.agr.jpg","downloadUrl":"/cases/boston-central-artery/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"boston-central-artery-capstone.md","mimeType":"text/markdown","bytes":3134,"sha256":"f3d0712edf16c7e0d9920a6b8a1af90de9cdaed03a9c5eade371264e7933c719","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/boston-central-artery/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction for Boston’s Central Artery/Tunnel project in May 1989.","caption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","credit":"ArnoldReinhold","sourceUrl":"https://commons.wikimedia.org/wiki/File:Big_Dig_construction_589.agr.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"1989-05"},"figureCaption":"Construction for Boston’s Central Artery/Tunnel project in May 1989. This photograph shows actual Big Dig work; the ground-freezing case is described in the linked technical paper.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":17,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/boston-central-artery-commons.json","evidenceSha256":"f67f10e522c9cd6bd19cca67f39a6d5046be42df44eb008f81f878a0fdd0992c","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":343945,"sourceCount":3,"url":"/cases/boston-central-artery"},{"id":"seattle-sr99","title":"Seattle SR 99 tunnel — soft-ground tunnelling and settlement","summary":"The bored-tunnel replacement passed beneath downtown Seattle. Owner material includes geology/soils assessment, procurement information and completion history.","topics":["tunnels","excavation","dewatering","monitoring","delivery"],"country":"United States","region":"Seattle, Washington","owner":"Washington State Department of Transportation","year":2019,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Earth-pressure-balance tunnelling","Settlement","Groundwater control"],"documentationLevel":"technical-report","design":{"availability":"partial","summary":"The environmental geology/soils appendix and design-build procurement records establish ground risks and contract context, not a complete as-built tunnel design.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSDOT identifies February 2019 completion; procurement and construction milestones are available on the owner pages.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner’s completed-project page records the outcome and links supporting material.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a settlement-risk and monitoring plan for an urban bored tunnel, including shaft construction and dewatering interactions.","inputs":["Extract route geology, groundwater and protected assets from Appendix P.","Separate environmental alternatives from the subsequently selected design-build solution."],"deliverables":["Estimate surface settlement for documented or explicitly assumed loss scenarios.","Prepare shaft/uplift checks and a response plan for unexpected settlement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SR 99 tunnel — completed February 2019","url":"https://apps.wsdot.wa.gov/construction-planning/search-projects/sr-99-tunnel","publisher":"WSDOT","year":2019,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Alaskan Way Viaduct FEIS Appendix P — geology and soils","url":"https://data.wsdot.wa.gov/publications/Viaduct/AWVFEIS-AppendixP.pdf","publisher":"WSDOT","year":2011,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"SR 99 bored tunnel design-build procurement","url":"https://wsdot.wa.gov/business-wsdot/contracting-opportunities/sr-99-alaskan-way-viaduct-sr-99-bored-tunnel-design-build-project","publisher":"WSDOT","year":2010,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Bertha TBM retrieval site.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","publisher":"Wikimedia Commons / SounderBruce from Seattle, United States","year":2015,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"seattle-sr99.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/schematic"},{"id":"project-image","title":"Bertha TBM retrieval site.jpg","kind":"project-image","fileName":"seattle-sr99.jpg","mimeType":"image/jpeg","bytes":152931,"sha256":"4fa4ed3313fbe70109c8c909325c418043dd5c73592739c5fb1ad31a1a870385","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":406,"credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2015-07-15 12:27","evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/82/Bertha_TBM_retrieval_site.jpg","downloadUrl":"/cases/seattle-sr99/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"seattle-sr99-capstone.md","mimeType":"text/markdown","bytes":3334,"sha256":"c959a6fd7180face32361696df394f5ca309f8ad094b3f5b8ff41fe7dd4ed30e","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/seattle-sr99/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015.","caption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","credit":"SounderBruce from Seattle, United States","sourceUrl":"https://commons.wikimedia.org/wiki/File:Bertha_TBM_retrieval_site.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":406,"imageDate":"2015-07-15 12:27"},"figureCaption":"The SR 99 tunnel project’s Bertha retrieval and repair site in Seattle, July 2015. The photograph shows the actual construction setting after the machine’s front section had been lifted for repairs.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":18,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/seattle-sr99-commons.json","evidenceSha256":"6ef9f1e3baf0b484a5a9b6bb2a84fff9ba21ff6beab80316483ca283862594f3","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":157390,"sourceCount":4,"url":"/cases/seattle-sr99"},{"id":"crossrail-farringdon","title":"Crossrail Farringdon — compensation grouting near existing assets","summary":"Project-authored learning-legacy papers describe settlement mitigation and monitoring around Farringdon, including the response of Lindsey Street Bridge.","topics":["tunnels","ground-improvement","monitoring","excavation"],"country":"United Kingdom","region":"London, England","owner":"Crossrail","year":2016,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Compensation grouting","Asset protection","Observational tunnelling"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project papers document local asset constraints, grouting and a structural mitigation solution; they do not constitute the entire station design.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The learning-legacy papers report implementation and measured behaviour.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan mitigation for a sensitive structure above station tunnelling and decide when grouting alone is insufficient.","inputs":["Extract asset geometry, movement triggers and the documented construction sequence.","Distinguish monitoring observations from predicted ground movement."],"deliverables":["Prepare an asset damage assessment and mitigation alternatives.","Design monitoring review stages, trigger actions and verification of movement recovery.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lindsey Street Bridge — a structural solution to settlement mitigation","url":"https://learninglegacy.crossrail.co.uk/documents/lindsey-street-bridge-structural-solution-settlement-mitigation/","publisher":"Crossrail Learning Legacy / project authors","year":2016,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Data management, analysis and visualisation on Drive X","url":"https://learninglegacy.crossrail.co.uk/documents/data-management-analysis-and-visualisation-on-crossrail-drive-x-western-tunnels/index.html","publisher":"Crossrail Learning Legacy / project authors","year":2014,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Crossrail construction site, Farringdon - geograph.org.uk - 2259281.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","publisher":"Wikimedia Commons / Robin Webster","year":2011,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"crossrail-farringdon.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/crossrail-farringdon/download/schematic"},{"id":"project-image","title":"Crossrail construction site, Farringdon - geograph.org.uk - 2259281.jpg","kind":"project-image","fileName":"crossrail-farringdon.jpg","mimeType":"image/jpeg","bytes":135906,"sha256":"1e3b65e2566983c683fe4504c5ba077cc460e02e69371e8bbfc9b3bc55379987","sourceId":"s3","license":"CC BY-SA 2.0","width":640,"height":480,"credit":"Robin Webster","sourceUrl":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2011-02-05","evidenceFile":"image-provenance/crossrail-farringdon-commons.json","evidenceSha256":"c294f4b8021c7d8438edc8ab746650f06bb15707370570c92ff491e623289a26","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/9/96/Crossrail_construction_site%2C_Farringdon_-_geograph.org.uk_-_2259281.jpg","downloadUrl":"/cases/crossrail-farringdon/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"crossrail-farringdon-capstone.md","mimeType":"text/markdown","bytes":3376,"sha256":"3517728f9e88964f9f1290a79106101005b9cc1a4f5a51adc183182f4d16870c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/crossrail-farringdon/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site.","caption":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site. This is a site photograph; the Lindsey Street Bridge settlement-mitigation details are in the linked project account.","credit":"Robin Webster","sourceUrl":"https://commons.wikimedia.org/wiki/File:Crossrail_construction_site,_Farringdon_-_geograph.org.uk_-_2259281.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":640,"height":480,"imageDate":"2011-02-05"},"figureCaption":"Construction at Crossrail’s Farringdon station, including the western ticket-hall site. This is a site photograph; the Lindsey Street Bridge settlement-mitigation details are in the linked project account.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":19,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/crossrail-farringdon-commons.json","evidenceSha256":"c294f4b8021c7d8438edc8ab746650f06bb15707370570c92ff491e623289a26","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":140407,"sourceCount":3,"url":"/cases/crossrail-farringdon"},{"id":"gotthard-base-tunnel","title":"Gotthard Base Tunnel — squeezing rock and adaptive support","summary":"Deep tunnel sections encountered squeezing rock and strongly variable geological behavior. The Swiss geotechnical society’s project history explains both anticipated and unexpected support challenges at Sedrun and Faido.","topics":["tunnels","rock","site-investigation","monitoring","delivery"],"country":"Switzerland","region":"Swiss Alps","owner":"AlpTransit Gotthard","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Squeezing-ground support","Convergence monitoring","Geological prediction"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The heritage case includes geology and support-system discussions from project records. It supports assessment of alternatives and field observations rather than transfer of one support class to all rock.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The engineering overview records opening in June 2016 after a long multi-heading construction programme.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select and revise a tunnel support scheme when measured convergence exceeds the original forecast.","inputs":["Choose one published squeezing section and extract its geology and support sequence.","Distinguish forecast ground conditions from observations obtained during excavation."],"deliverables":["Compare yielding and stiff support with a convergence–confinement study.","Prepare an observational trigger plan and construction-time implications for revised support.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can stronger initial support fail to stop continuing squeezing?","Which measurements indicate that a support change is needed before the next excavation round?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Gotthard Base Tunnel engineering heritage case","url":"https://htc.issmge.org/virtual-time-capsule/member-societies/swiss-geotechnical-society-geotechnik-schweiz/gotthard-base-tunnel","publisher":"Swiss Geotechnical Society / ISSMGE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Project engineering overview","url":"https://www.satw.ch/en/gotthard-base-tunnel-1","publisher":"Swiss Academy of Engineering Sciences","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"20141120 gotthard-basistunnel05-wiki.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","publisher":"Wikimedia Commons / Hannes Ortlieb ( Diskussion )","year":2014,"access":"public-link","license":"CC BY-SA 3.0 de","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"gotthard-base-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/gotthard-base-tunnel/download/schematic"},{"id":"project-image","title":"20141120 gotthard-basistunnel05-wiki.jpg","kind":"project-image","fileName":"gotthard-base-tunnel.jpg","mimeType":"image/jpeg","bytes":270024,"sha256":"c34e7149142543a6d7467bab8777410c8eda3fd5bea95792762d9de0b49230d5","sourceId":"s3","license":"CC BY-SA 3.0 de","width":1280,"height":853,"credit":"Hannes Ortlieb ( Diskussion )","sourceUrl":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/de/deed.en","imageDate":"2014-11-20","evidenceFile":"image-provenance/gotthard-base-tunnel-commons.json","evidenceSha256":"b0b8e93d8f2238bc07cd984600507c4e88264e3ece95c7661871510ceae09f35","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/6/69/20141120_gotthard-basistunnel05-wiki.jpg","downloadUrl":"/cases/gotthard-base-tunnel/download/project-image","originalSha1":"e74de4bfce9b76c9c98d216f3edbb245cb2a7ec5","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"gotthard-base-tunnel-capstone.md","mimeType":"text/markdown","bytes":3256,"sha256":"76ba7c8ccd685844c7f7ec46648cb4988358b8db5be5d2a9269651d4d408168b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/gotthard-base-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014.","caption":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.","credit":"Hannes Ortlieb ( Diskussion )","sourceUrl":"https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg","license":"CC BY-SA 3.0 de","licenseUrl":"https://creativecommons.org/licenses/by-sa/3.0/de/deed.en","width":1280,"height":853,"imageDate":"2014-11-20","imageDownloadAllowed":true},"figureCaption":"Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":74,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/gotthard-base-tunnel-commons.json","evidenceSha256":"b0b8e93d8f2238bc07cd984600507c4e88264e3ece95c7661871510ceae09f35","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":274405,"sourceCount":3,"url":"/cases/gotthard-base-tunnel"},{"id":"channel-tunnel","title":"Channel Tunnel — geological alignment and water-pressure control","summary":"The alignment sought low-permeability marly chalk while accommodating more fractured ground on the French side. Project geologists describe how marine seismic surveys and boreholes informed route selection and machine requirements.","topics":["tunnels","rock","site-investigation","dewatering"],"country":"United Kingdom / France","region":"English Channel","owner":"Eurotunnel","year":1994,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine ground investigation","Geological alignment","Face-pressure control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The account is written by geologists involved in design and construction and includes the geological section. It does not provide all TBM operating logs.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select a sub-sea tunnel alignment that balances cover, geological continuity and water-inflow risk.","inputs":["Extract the main stratigraphic marker and the reported contrast between the two shores.","Identify where sparse boreholes require interpretation supported by seismic profiles."],"deliverables":["Prepare a route-risk section and specify investigation priorities.","Compare open and closed-face excavation assumptions with water-pressure and fault-zone scenarios.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is the shortest geometric route not necessarily the lowest ground-risk route?","What evidence should trigger closed-mode operation before a permeable zone is entered?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Channel Tunnel geology by project geologists","url":"https://www.geolsoc.org.uk/science-and-policy/100-great-geosites/industrial-and-economic-importance/channel-tunnel/","publisher":"Bill Rankin and Ron Williams / Geological Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Site of the Channel Tunnel Construction in May 1991.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","publisher":"Wikimedia Commons / The Basingstoker","year":null,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"channel-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/channel-tunnel/download/schematic"},{"id":"project-image","title":"Site of the Channel Tunnel Construction in May 1991.jpg","kind":"project-image","fileName":"channel-tunnel.jpg","mimeType":"image/jpeg","bytes":294751,"sha256":"f4aaa8dd8d642ab88dc0d9b42b5b4256db7db5a638caa32ec433aa1961dcde9e","sourceId":"s2","license":"CC BY-SA 2.0","width":1280,"height":821,"credit":"The Basingstoker","sourceUrl":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"Unknown date","evidenceFile":"image-provenance/channel-tunnel-commons.json","evidenceSha256":"9649b153db1a0137d64094b16abc794aca62ee229ecfa64ae4748d3f01da2f74","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a0/Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","downloadUrl":"/cases/channel-tunnel/download/project-image","originalSha1":"8ccf8054cb87766b63fdca45e2f2a8059e15029b","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"channel-tunnel-capstone.md","mimeType":"text/markdown","bytes":3106,"sha256":"12ad7d067a39fc330a07359b02e2fa40ea999e32678268d8ca45ee7002155e26","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/channel-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Channel Tunnel construction site in May 1991.","caption":"The Channel Tunnel construction site in May 1991. The historical project photograph provides context for the geological alignment and excavation study.","credit":"The Basingstoker","sourceUrl":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":821,"imageDate":"Unknown date","imageDownloadAllowed":true},"figureCaption":"The Channel Tunnel construction site in May 1991. The historical project photograph provides context for the geological alignment and excavation study.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":75,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/channel-tunnel-commons.json","evidenceSha256":"9649b153db1a0137d64094b16abc794aca62ee229ecfa64ae4748d3f01da2f74","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":298982,"sourceCount":2,"url":"/cases/channel-tunnel"},{"id":"marmaray-tunnel","title":"Marmaray crossing — immersed-tunnel foundations in seismic ground","summary":"The immersed crossing combined a gravel foundation, under-base grouting and treatment of liquefiable deposits. A project paper explains element connections and the transition to adjacent bored tunnels under severe seismic demands.","topics":["tunnels","seismic","ground-improvement","coastal-offshore"],"country":"Türkiye","region":"Bosphorus, Istanbul","owner":"Republic of Türkiye transport authorities","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Immersed tube","Compaction grouting","Under-base grouting","Seismic joints"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project authors describe the selected foundation and connection systems. Geotechnical parameters and element-specific loads must be extracted from the full paper before numerical design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a foundation and transition-zone concept for an immersed tunnel crossing soft deposits in an earthquake-prone strait.","inputs":["Separate seabed improvement, bedding preparation and under-base contact grouting.","Identify stiffness contrasts where immersed and bored tunnel sections meet."],"deliverables":["Check buoyancy, bearing contact and differential settlement under study load cases.","Prepare a ground-treatment verification and immersion monitoring sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why may a sand bedding option be unsuitable under the selected seismic demand?","How could a local bedding void change joint rotation and water-tightness demands?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Marmaray Bosphorus Crossing project paper","url":"https://www.sciencedirect.com/science/article/pii/S088677982100479X","publisher":"Project engineering authors / Tunnelling and Underground Space Technology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Marmaraytunnel3.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","publisher":"Wikimedia Commons / MEOGLOBAL Muhammed Enes Okullu","year":2012,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"marmaray-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marmaray-tunnel/download/schematic"},{"id":"project-image","title":"Marmaraytunnel3.JPG","kind":"project-image","fileName":"marmaray-tunnel.jpg","mimeType":"image/jpeg","bytes":276229,"sha256":"f3e756697f35224ea5239acf7a0a600b46fd3ea202d70966e50b0a832af8112e","sourceId":"s2","license":"Public domain","width":1280,"height":853,"credit":"MEOGLOBAL Muhammed Enes Okullu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing","imageDate":"2012-05-03","evidenceFile":"image-provenance/marmaray-tunnel-commons.json","evidenceSha256":"992a4c95cfe9d3bca4c2fd091ac9dbb0a06c833a5565a04236133b0da1ec4683","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/ab/Marmaraytunnel3.JPG","downloadUrl":"/cases/marmaray-tunnel/download/project-image","originalSha1":"bfd7bab91a5facb7c191df4e6e033099c5f5a320","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"marmaray-tunnel-capstone.md","mimeType":"text/markdown","bytes":3023,"sha256":"1220cb630342933c1c5a8fc2369b3e4f60800acbf176234665b3ea1f50a8780d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marmaray-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Interior of the Marmaray tunnel project in 2012.","caption":"Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.","credit":"MEOGLOBAL Muhammed Enes Okullu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing","width":1280,"height":853,"imageDate":"2012-05-03","imageDownloadAllowed":true},"figureCaption":"Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":76,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/marmaray-tunnel-commons.json","evidenceSha256":"992a4c95cfe9d3bca4c2fd091ac9dbb0a06c833a5565a04236133b0da1ec4683","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":280377,"sourceCount":2,"url":"/cases/marmaray-tunnel"},{"id":"eurasia-tunnel","title":"Eurasia Tunnel — high-pressure mixed-ground TBM crossing","summary":"The road tunnel passes through rock and marine sediments at high water pressure. The designers describe slurry-shield excavation, specialized lining details and seismic joints near changes in ground stiffness.","topics":["tunnels","seismic","dewatering","site-investigation"],"country":"Türkiye","region":"Bosphorus, Istanbul","owner":"Eurasia Tunnel concession / transport authority","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry shield","Mixed-face excavation","High-pressure lining","Seismic joints"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The design consultant and supervising engineer describe ground conditions, machine selection and the installed systems. They do not supply a complete downloadable design calculation set.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Italferr records TBM excavation during 2014–2015, opening to traffic in December 2016 and final acceptance in February 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Define a TBM operating envelope and segmental-lining checks for a deep water-bearing rock-to-soil transition.","inputs":["Map the reported stiffness transitions and separate water pressure from effective ground stress.","Identify the design-stage and construction-stage dates in the engineering accounts."],"deliverables":["Compare face-pressure limits for blowout, inflow and ground loss.","Prepare a lining/joint load summary and contingency measures for interventions under pressure.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why should seismic joints be linked to ground stiffness rather than regular spacing alone?","Which ground investigation would most reduce uncertainty at a mixed-face transition?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eurasia Tunnel design account","url":"https://www.wsp.com/en-us/projects/eurasia-tunnel-istanbul-strait-road-tube-crossing","publisher":"WSP","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Supervision and technical summary","url":"https://www.italferr.it/content/dam/italferr_nd/inglese/document/SCHEDA%20TECNICA%20EURASYA%20TUNNEL%20ENG1.pdf","publisher":"Italferr","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Eurasia tunnel Asia entrance 01.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","publisher":"Wikimedia Commons / Alessandro57","year":2026,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eurasia-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eurasia-tunnel/download/schematic"},{"id":"project-image","title":"Eurasia tunnel Asia entrance 01.jpg","kind":"project-image","fileName":"eurasia-tunnel.jpg","mimeType":"image/jpeg","bytes":311150,"sha256":"a70a83d8bcede2460dad6a00f50fbba6bc19afef5862ba33691ddfac8dee4ff9","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1705,"credit":"Alessandro57","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2026-07-24 15:29:41","evidenceFile":"image-provenance/eurasia-tunnel-commons.json","evidenceSha256":"4f618700c50021f9d429c13b5f18989c9579c0ad1b094084d10d5fbaeea320d5","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/8a/Eurasia_tunnel_Asia_entrance_01.jpg","downloadUrl":"/cases/eurasia-tunnel/download/project-image","originalSha1":"5a67caa8bf97490596743334a14bce0ff75c510c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eurasia-tunnel-capstone.md","mimeType":"text/markdown","bytes":3141,"sha256":"6a381930ec696f509d49754ffba8bc7339c8fe035c793a92086038fa0640bab3","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eurasia-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Asian entrance of the Eurasia Tunnel in Istanbul.","caption":"The Asian entrance of the Eurasia Tunnel in Istanbul. The photograph shows the completed road-tunnel project; the deep mixed-ground crossing is below the strait.","credit":"Alessandro57","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1705,"imageDate":"2026-07-24 15:29:41","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Asian entrance of the Eurasia Tunnel in Istanbul. The photograph shows the completed road-tunnel project; the deep mixed-ground crossing is below the strait.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":77,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eurasia-tunnel-commons.json","evidenceSha256":"4f618700c50021f9d429c13b5f18989c9579c0ad1b094084d10d5fbaeea320d5","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":315416,"sourceCount":3,"url":"/cases/eurasia-tunnel"},{"id":"tideway-tunnel","title":"Thames Tideway Tunnel — variable geology and deep shafts","summary":"The sewer tunnel crosses the London Basin sequence from clay into water-bearing chalk. Project engineers explain how geological observations and groundwater pressure influenced excavation methods and construction performance.","topics":["tunnels","dewatering","site-investigation","monitoring","delivery"],"country":"United Kingdom","region":"London","owner":"Tideway","year":2022,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry tunnelling","Deep shafts","Ground model refinement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project geologist’s technical lecture and designer account provide ground-model and machine-selection reasoning. Completion of tunnelling in a contract area is not the same as completion of the whole sewer system.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Compare tunnelling and shaft-construction risks across clay, sand and chalk reaches of an urban sewer alignment.","inputs":["Extract the geological units and identify where face pressure is governed by water rather than soil strength.","Choose one contract reach and preserve the distinction between main and connection tunnels."],"deliverables":["Prepare an excavation-method selection matrix and groundwater-control concepts.","Develop a monitoring and geological-reporting plan for updating production forecasts.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["What does an intact sample fail to reveal about in-situ chalk permeability?","How should a changed ground model alter contingency time and intervention planning?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Engineering geology and construction performance","url":"https://ice.org.uk/events/recorded-lectures/engineering-geology-of-the-thames-tideway-tunnel","publisher":"Tim Newman / Institution of Civil Engineers","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Engineering the Thames Tideway sewer","url":"https://www.mottmac.com/en-gb/projects/how-londons-thames-tideway-super-sewer-was-engineered/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Thames Tideway Tunnel construction, Nine Elms.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","publisher":"Wikimedia Commons / AndyScott","year":2022,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"tideway-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/schematic"},{"id":"project-image","title":"Thames Tideway Tunnel construction, Nine Elms.jpg","kind":"project-image","fileName":"tideway-tunnel.jpg","mimeType":"image/jpeg","bytes":574175,"sha256":"407b83af897291400982623e5865b9a4baefbb086e090062f79b6911b9d9e3f4","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1925,"credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2022-03-23 14:14:14","evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/4f/Thames_Tideway_Tunnel_construction%2C_Nine_Elms.jpg","downloadUrl":"/cases/tideway-tunnel/download/project-image","originalSha1":"a8e1f4ec3dc41e3101fff83dea35e08e296a2037","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"tideway-tunnel-capstone.md","mimeType":"text/markdown","bytes":3265,"sha256":"ba22b9318da7099b0a5527de83a4cf0224651f9706d87d28d94497b3cc7bfb99","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/tideway-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Thames Tideway Tunnel construction at Nine Elms, London.","caption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","credit":"AndyScott","sourceUrl":"https://commons.wikimedia.org/wiki/File:Thames_Tideway_Tunnel_construction,_Nine_Elms.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1925,"imageDate":"2022-03-23 14:14:14","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Thames Tideway Tunnel construction at Nine Elms, London. This is an actual project worksite; ground conditions differ along the full alignment.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":78,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/tideway-tunnel-commons.json","evidenceSha256":"0616950b502bc78a0661c75fda626f34e15506e1b58d4c7b2c1e13451c68b5b3","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":578565,"sourceCount":3,"url":"/cases/tideway-tunnel"},{"id":"lee-tunnel","title":"Lee Tunnel — diaphragm-wall shafts in water-bearing chalk","summary":"Deep circular shafts and a slurry-driven tunnel connected Abbey Mills and Beckton. The foundation contractor describes diaphragm-wall design, fractured chalk and flint bands encountered during shaft construction.","topics":["tunnels","excavation","dewatering","retaining-walls"],"country":"United Kingdom","region":"East London","owner":"Thames Water","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Diaphragm-wall shafts","Hoop action","Curtain grouting","Slurry TBM"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The contractor account describes geology and shaft systems; the contract case supplies delivery context. Its later Tideway forecasts are historical and are not treated as current milestones.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The contract case describes a £675 million overall project. It is not a shaft-only cost or an independently audited final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"The contract case reports operation beginning in 2016 and overall completion in 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a circular access shaft with large openings through mixed superficial deposits and chalk.","inputs":["Extract the reported shaft geometry range and rock description.","Identify openings and non-axisymmetric actions that violate a simple uniform hoop model."],"deliverables":["Check wall forces, basal water pressure and the staged excavation sequence.","Specify verticality, panel-joint and grouting acceptance checks before deep excavation.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How do large shaft openings alter the advantages of circular wall action?","Which checks become most sensitive when chalk fractures connect to overlying sands?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Lee Tunnel foundations and shafts","url":"https://www.bacsol.co.uk/project/lee-tunnel-london","publisher":"Bachy Soletanche","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s2","title":"Lee Tunnel delivery case","url":"https://www.neccontract.com/projects/lee-sewage-tunnel-uk","publisher":"NEC Contracts / project participants","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lee-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lee-tunnel/download/schematic"},{"id":"project-image","title":"Lee Tunnel — diaphragm-wall shaft","kind":"project-image","fileName":"lee-tunnel-r13.jpg","mimeType":"image/jpeg","bytes":228064,"sha256":"fc396c5f49b66dd83e44ab6a653056fe8d94c89b90f8994e87f69391358eef32","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":600,"height":400,"credit":"Bachy Soletanche","sourceUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","licenseUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","imageDate":null,"evidenceFile":"image-provenance/lee-tunnel-r13-source.json","evidenceSha256":"5cc7371182aedd09643f171ed244c2357082c4601da5804250e5e0010cf8673a","transformations":"Copied the publisher’s 600 × 400 JPEG derivative unchanged; no additional crop, resizing, added labels, or retouching.","originalUrl":"https://www.bacsol.co.uk/wp-content/uploads/2020/08/Retaining-Wall-Solution-Lee-Tunnel-Diaphragm-Wall-Shaft-7-600x400.jpg","originalSha256":"fc396c5f49b66dd83e44ab6a653056fe8d94c89b90f8994e87f69391358eef32","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/lee-tunnel/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lee-tunnel-capstone.md","mimeType":"text/markdown","bytes":2910,"sha256":"a2d8ea7378ad7a5316b4aff6b33df06977e908282baab4aa1e0a4f0859b388cc","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lee-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction photograph looking down into a circular Lee Tunnel diaphragm-wall shaft.","caption":"Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.","credit":"Bachy Soletanche","sourceUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.bacsol.co.uk/project/lee-tunnel-london","width":600,"height":400,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Looking into a deep Lee Tunnel diaphragm-wall shaft during construction, from the foundation contractor’s project gallery. The source does not identify this image as one particular named shaft.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":79,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lee-tunnel-r13-source.json","evidenceSha256":"5cc7371182aedd09643f171ed244c2357082c4601da5804250e5e0010cf8673a","visualReview":"Inspected the entire published 600 × 400 photograph. It shows the full visible circular shaft lining, suspended construction lines and equipment below. No generative or unrelated replacement was used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4035,"sourceCount":2,"url":"/cases/lee-tunnel"},{"id":"second-avenue-subway","title":"Second Avenue Subway Phase 1 — ground freezing at a TBM launch","summary":"Unexpected poor ground near the east running-tunnel launch required a revised sequence. The construction manager describes soil freezing while the TBM first advanced through the western alignment.","topics":["tunnels","ground-improvement","monitoring","delivery"],"country":"United States","region":"Manhattan, New York","owner":"Metropolitan Transportation Authority","year":2017,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","TBM launch support","Settlement control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The construction-manager account identifies the actual temporary treatment and sequencing response. It does not imply that the entire subway alignment was frozen.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"WSP records west and east running-tunnel completion in 2011 and Phase 1 opening in January 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Recover a tunnelling programme when a localized launch zone cannot support the planned hard-rock TBM excavation.","inputs":["Extract the reported launch problem and revised east/west drive sequence.","Define a study freezing geometry and groundwater flow scenario for the local weak zone."],"deliverables":["Estimate freeze formation time and identify verification boreholes and temperature targets.","Plan thawing and lining load transfer with utilities and adjacent building monitoring.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can closely spaced borings still miss a localized poor-ground pocket?","How does moving the TBM to a different drive reduce schedule risk without removing ground risk?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Opening and construction challenges","url":"https://www.wsp.com/en-us/insights/new-york-opens-its-second-avenue-subway","publisher":"WSP, construction manager","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Phase 1 project methods","url":"https://www.wsp.com/en-gb/projects/second-avenue-subway","publisher":"WSP","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Second Avenue Subway November 2013 (11344196583) (2).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","publisher":"Wikimedia Commons / Metropolitan Transportation Authority of the State of New York","year":2013,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"second-avenue-subway.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/second-avenue-subway/download/schematic"},{"id":"project-image","title":"Second Avenue Subway November 2013 (11344196583) (2).jpg","kind":"project-image","fileName":"second-avenue-subway.jpg","mimeType":"image/jpeg","bytes":544351,"sha256":"6683f5afad3af69a041d3b73709795ba2cb397ef47ff446be5e6577b1be71970","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":852,"credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2013-11-23 13:26","evidenceFile":"image-provenance/second-avenue-subway-commons.json","evidenceSha256":"ad23a21be5fd939864d642accfbf5f27829c9a31abdd0977487f66394614ac4b","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/fd/Second_Avenue_Subway_November_2013_%2811344196583%29_%282%29.jpg","downloadUrl":"/cases/second-avenue-subway/download/project-image","originalSha1":"0cae68c05f3f00662ab2261e99e53be5714184e8","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"second-avenue-subway-capstone.md","mimeType":"text/markdown","bytes":3216,"sha256":"b90c172254070205460219585cba13957e4c0b6c883c5b18b7e41dee3f25896a","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/second-avenue-subway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Construction of the future 86th Street station in November 2013.","caption":"Construction of the future 86th Street station in November 2013. MTA photograph from Second Avenue Subway Phase 1; the localized launch-freezing operation occurred elsewhere on the same phase.","credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:Second_Avenue_Subway_November_2013_(11344196583)_(2).jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":852,"imageDate":"2013-11-23 13:26","imageDownloadAllowed":true},"figureCaption":"Construction of the future 86th Street station in November 2013. MTA photograph from Second Avenue Subway Phase 1; the localized launch-freezing operation occurred elsewhere on the same phase.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":80,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/second-avenue-subway-commons.json","evidenceSha256":"ad23a21be5fd939864d642accfbf5f27829c9a31abdd0977487f66394614ac4b","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":548692,"sourceCount":3,"url":"/cases/second-avenue-subway"},{"id":"east-side-access","title":"East Side Access — frozen support beneath Northern Boulevard","summary":"A short mined connection beneath active transport infrastructure used a frozen soil arch for temporary support and groundwater cutoff. The project sources distinguish local freezing from the wider East Side Access tunnel programme.","topics":["tunnels","ground-improvement","dewatering","monitoring"],"country":"United States","region":"Queens, New York","owner":"Metropolitan Transportation Authority","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Sequential excavation","Heave and settlement control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The contractor case and design-team account describe the Northern Boulevard crossing and movement control. Photographs of the wider project are identified as context unless the crossing itself is shown.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a short mined crossing beneath an operating subway box where drawdown and ground movement are tightly constrained.","inputs":["Extract the access-shaft arrangement, groundwater setting and supported transport structures.","Distinguish freeze-induced heave from excavation-induced settlement in the monitoring plan."],"deliverables":["Develop staged thermal and stability checks for a frozen arch.","Coordinate compensation grouting, lining installation and controlled thaw with operating railway limits.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which monitoring trends would indicate that freezing is protecting the face but damaging the asset above?","Why must the temporary frozen ground remain effective until lining load transfer is complete?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Northern Boulevard crossing case","url":"https://www.geoinstitute.org/node/16177","publisher":"Project case author / ASCE Geo-Institute","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"East Side Access design and construction account","url":"https://www.mottmac.com/en-us/projects/transforming-rail-on-manhattans-east-side/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"ESA 0968 (8311751208).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","publisher":"Wikimedia Commons / Metropolitan Transportation Authority of the State of New York","year":2012,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"east-side-access.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-side-access/download/schematic"},{"id":"project-image","title":"ESA 0968 (8311751208).jpg","kind":"project-image","fileName":"east-side-access.jpg","mimeType":"image/jpeg","bytes":368730,"sha256":"b28bf3330220485b79647239eaf8a823d8cd8a8f655976d19808683423d66f38","sourceId":"s3","license":"CC BY 2.0","width":1280,"height":852,"credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2012-12-20 10:55","evidenceFile":"image-provenance/east-side-access-commons.json","evidenceSha256":"3b73a5b980a975dc875f8b13a25fae5c42e9eaeca85f68dbd88dfe46f47b2bb2","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e4/ESA_0968_%288311751208%29.jpg","downloadUrl":"/cases/east-side-access/download/project-image","originalSha1":"bed1ed4d21b8d615f8d47b1c8e599c6f7e8358a6","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"east-side-access-capstone.md","mimeType":"text/markdown","bytes":3336,"sha256":"dc67afd8eb763990e864f661eb9dbdfc1820f32ec6b4f975be6fad9154e02a62","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-side-access/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Excavation beneath Northern Boulevard in Queens in December 2012.","caption":"Excavation beneath Northern Boulevard in Queens in December 2012. The MTA photograph shows the actual East Side Access crossing where frozen ground and temporary supports protected the roadway and subway structures above.","credit":"Metropolitan Transportation Authority of the State of New York","sourceUrl":"https://commons.wikimedia.org/wiki/File:ESA_0968_(8311751208).jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":1280,"height":852,"imageDate":"2012-12-20 10:55","imageDownloadAllowed":true},"figureCaption":"Excavation beneath Northern Boulevard in Queens in December 2012. The MTA photograph shows the actual East Side Access crossing where frozen ground and temporary supports protected the roadway and subway structures above.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":81,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/east-side-access-commons.json","evidenceSha256":"3b73a5b980a975dc875f8b13a25fae5c42e9eaeca85f68dbd88dfe46f47b2bb2","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":373191,"sourceCount":3,"url":"/cases/east-side-access"},{"id":"hongkong-zhuhai-macao","title":"Hong Kong–Zhuhai–Macao crossing — immersed-tunnel settlement transitions","summary":"Artificial islands connect a long immersed crossing founded above variable soft deposits. Project papers describe composite foundation treatment, island formation and full-scale testing near transition zones.","topics":["tunnels","coastal-offshore","ground-improvement","settlement"],"country":"China","region":"Pearl River estuary","owner":"Hong Kong–Zhuhai–Macao Bridge Authority","year":2018,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Immersed-tunnel bedding","Jet grouting","Preloading","Transition settlement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project authors document implemented island/tunnel concepts; a separate test study evaluates preload and jet-grout treatment. A test section is not assumed to represent the full crossing.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The project paper describes island/tunnel work beginning in 2011 and handover in 2018; these milestones do not cover every contract in the full bridge system.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a settlement transition between an artificial island and an immersed-tunnel approach.","inputs":["Extract the transition geometry and distinguish soft seabed from later backfill.","Identify the test conditions and measured response used to judge treatment effectiveness."],"deliverables":["Compare composite-ground and untreated-ground settlement profiles.","Prepare treatment verification, dredging tolerance and immersion sequence requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is differential settlement at an island transition more consequential than uniform tunnel settlement?","How could sediment accumulation undermine a correctly designed bedding layer?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Novelties in the islands and tunnel project","url":"https://www.sciencedirect.com/science/article/pii/S0886779821004788","publisher":"Project authors / Tunnelling and Underground Space Technology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Full-scale jet-grouting loading test","url":"https://ascelibrary.org/doi/10.1061/%28ASCE%29GM.1943-5622.0002625","publisher":"Project researchers / ASCE International Journal of Geomechanics","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","publisher":"Wikimedia Commons / Tksteven","year":2013,"access":"public-link","license":"CC BY 3.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"hongkong-zhuhai-macao.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hongkong-zhuhai-macao/download/schematic"},{"id":"project-image","title":"Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG","kind":"project-image","fileName":"hongkong-zhuhai-macao.jpg","mimeType":"image/jpeg","bytes":252028,"sha256":"d7563419a811f7da36efb6afb13d22b3c9bdc67b63a65c0d79bd8ba53adcd21c","sourceId":"s3","license":"CC BY 3.0","width":1024,"height":768,"credit":"Tksteven","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","licenseUrl":"https://creativecommons.org/licenses/by/3.0","imageDate":"2013-02-11 15:19:38","evidenceFile":"image-provenance/hongkong-zhuhai-macao-commons.json","evidenceSha256":"e5d16295088c059e0cb1ffc80e0738fc71a6b60b7ce3f31ca3831aceec427f6a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/7/78/Eastern_artificial_island_for_the_tunnel_section%2C_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","downloadUrl":"/cases/hongkong-zhuhai-macao/download/project-image","originalSha1":"6ec561ebc1adfc53a5867ac30ff2729cd80c458d","originalSha256":"d7563419a811f7da36efb6afb13d22b3c9bdc67b63a65c0d79bd8ba53adcd21c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"hongkong-zhuhai-macao-capstone.md","mimeType":"text/markdown","bytes":3373,"sha256":"d3990d19ae12ff46c5c5c8650b34676fdad3037a61c38dba8bc5319e2623d603","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/hongkong-zhuhai-macao/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section.","caption":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.","credit":"Tksteven","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG","license":"CC BY 3.0","licenseUrl":"https://creativecommons.org/licenses/by/3.0","width":1024,"height":768,"imageDate":"2013-02-11 15:19:38","imageDownloadAllowed":true},"figureCaption":"The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":82,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/hongkong-zhuhai-macao-commons.json","evidenceSha256":"e5d16295088c059e0cb1ffc80e0738fc71a6b60b7ce3f31ca3831aceec427f6a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":256526,"sourceCount":3,"url":"/cases/hongkong-zhuhai-macao"},{"id":"smart-tunnel","title":"SMART Tunnel — tunnelling through urban karst","summary":"The combined stormwater and road tunnel passes through highly irregular limestone and overlying deposits. The builder and ground-treatment contractor describe slurry-shield excavation, grouting and sinkhole-management challenges.","topics":["tunnels","rock","dewatering","ground-improvement","site-investigation"],"country":"Malaysia","region":"Kuala Lumpur","owner":"Department of Irrigation and Drainage / Malaysian Highway Authority","year":2007,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Karst investigation","Slurry shield","Fissure and compaction grouting"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The primary construction accounts explain the selected methods and localized treatment purposes. They do not establish that karst uncertainty can be removed by one uniform grouting grid.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The builder identifies operation from 2007; the page is a project history rather than a detailed monthly programme.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan ground investigation and treatment for a tunnel encountering pinnacles, cavities and variable cover beneath a city.","inputs":["Extract the reported karst features and the purpose of each grouting method.","Specify investigation coverage at shafts, interventions and transitions rather than uniform spacing alone."],"deliverables":["Develop face-pressure and groundwater-control concepts for mixed ground.","Prepare a cavity/sinkhole response plan with survey triggers and treatment verification.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can groundwater drawdown cause a surface collapse away from the tunnel face?","Which evidence separates a treatable local void from a larger connected karst system?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"SMART construction and geology","url":"https://www.smarttunnel.com.my/construction/print_project_construction.htm","publisher":"SMART project","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Ground-treatment contractor case","url":"https://www.kellerasean.com/projects/storm-water-management-and-road-tunnel","publisher":"Keller","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Builder project record","url":"https://gamuda.com/our-expertise/engineering-construction/stormwater-management-and-road-tunnel-smart/","publisher":"Gamuda","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"KL-SMARTtunnelentrance.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","publisher":"Wikimedia Commons / Azreey","year":2007,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"smart-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/smart-tunnel/download/schematic"},{"id":"project-image","title":"KL-SMARTtunnelentrance.JPG","kind":"project-image","fileName":"smart-tunnel.jpg","mimeType":"image/jpeg","bytes":577763,"sha256":"96788f96ef8b17d718aeb536a6282dc215767c1c9217e99d6a7999c55a4d275d","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":960,"credit":"Azreey","sourceUrl":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2007-12-27","evidenceFile":"image-provenance/smart-tunnel-commons.json","evidenceSha256":"d6654eb1d691f51c5618edc29c7f59f575cfe4d5c70ce3a39979b2a84f69a950","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/2/26/KL-SMARTtunnelentrance.JPG","downloadUrl":"/cases/smart-tunnel/download/project-image","originalSha1":"a5a0765e43e062f683adc413aa657655bbd67c36","originalSha256":"96788f96ef8b17d718aeb536a6282dc215767c1c9217e99d6a7999c55a4d275d","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"smart-tunnel-capstone.md","mimeType":"text/markdown","bytes":3195,"sha256":"41d78160bf08853a679ec43e844ed00eefd919e2d2cb15461408fd68297d66db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/smart-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The northbound entrance to Kuala Lumpur’s SMART Tunnel.","caption":"The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.","credit":"Azreey","sourceUrl":"https://commons.wikimedia.org/wiki/File:KL-SMARTtunnelentrance.JPG","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":960,"imageDate":"2007-12-27","imageDownloadAllowed":true},"figureCaption":"The northbound entrance to Kuala Lumpur’s SMART Tunnel. This is the actual dual-purpose tunnel; its karst treatment works are underground.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":83,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/smart-tunnel-commons.json","evidenceSha256":"d6654eb1d691f51c5618edc29c7f59f575cfe4d5c70ce3a39979b2a84f69a950","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":582083,"sourceCount":4,"url":"/cases/smart-tunnel"},{"id":"auckland-city-rail","title":"Auckland City Rail Link — ground models and settlement baselines","summary":"The urban rail link traverses weak rock, younger sediments, volcanic material and reclamation. Project engineers describe how phased investigations and a shared three-dimensional ground model informed procurement and risk allocation.","topics":["tunnels","site-investigation","monitoring","delivery"],"country":"New Zealand","region":"Central Auckland","owner":"City Rail Link Limited","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Geotechnical baseline reports","EPB tunnelling","Settlement assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The geotechnical paper explains the baseline-report process, while owner pages link settlement assessments and TBM information. Those records support a procurement study without inventing a final asset-acceptance status.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a defensible ground baseline and investigation plan for an urban railway with several geological transitions.","inputs":["Extract the geological units and trace how investigation priorities changed through design.","Choose one alignment section and identify factual data separately from interpretation."],"deliverables":["Create a baseline table of expected conditions and measurable exceedance criteria.","Develop a building settlement screening and instrumentation strategy linked to tunnel operations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which uncertainties should remain explicit in a baseline rather than being hidden in an average profile?","How can a shared geological model improve procurement while still requiring independent interpretation?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Managing ground risk from concept to procurement","url":"https://www.nzgs.org/libraries/managing-ground-risk-for-aucklands-city-rail-link-project-concept-design-to-procurement/","publisher":"Project engineers / New Zealand Geotechnical Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"TBM technical facts","url":"https://www.cityraillink.co.nz/tunnel-boring-machine-key-facts","publisher":"City Rail Link Limited","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Consents and settlement assessments","url":"https://www.cityraillink.co.nz/consents-in-your-area","publisher":"City Rail Link Limited","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"CRL Albert Street 2452.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","publisher":"Wikimedia Commons / Schwede66","year":2018,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"auckland-city-rail.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/auckland-city-rail/download/schematic"},{"id":"project-image","title":"CRL Albert Street 2452.jpg","kind":"project-image","fileName":"auckland-city-rail.jpg","mimeType":"image/jpeg","bytes":335829,"sha256":"9f57ec9525f4422ccf4aab9a56c5d8b30f5836b5eb79c2fd3d9fa0bbe507bcd6","sourceId":"s4","license":"CC BY-SA 4.0","width":1280,"height":853,"credit":"Schwede66","sourceUrl":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2018-03-06 07:48:51","evidenceFile":"image-provenance/auckland-city-rail-commons.json","evidenceSha256":"798247ba9b24a81b1bbb676d213e54e192861dc5f1566b0513fc29a0de4de7e7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/0a/CRL_Albert_Street_2452.jpg","downloadUrl":"/cases/auckland-city-rail/download/project-image","originalSha1":"12611ec2058caffaa71507bb9e901326c9b29c39","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"auckland-city-rail-capstone.md","mimeType":"text/markdown","bytes":3369,"sha256":"aa8cd7d0034de7bd80af2853144a3ab04107a646cfef16d40bf7000246a3d3bb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/auckland-city-rail/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"City Rail Link construction on Albert Street in Auckland.","caption":"City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.","credit":"Schwede66","sourceUrl":"https://commons.wikimedia.org/wiki/File:CRL_Albert_Street_2452.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":853,"imageDate":"2018-03-06 07:48:51","imageDownloadAllowed":true},"figureCaption":"City Rail Link construction on Albert Street in Auckland. The photograph shows the real urban construction corridor.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":84,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/auckland-city-rail-commons.json","evidenceSha256":"798247ba9b24a81b1bbb676d213e54e192861dc5f1566b0513fc29a0de4de7e7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":340323,"sourceCount":4,"url":"/cases/auckland-city-rail"},{"id":"northern-line-extension","title":"Northern Line Extension — settlement assessment and station-box interfaces","summary":"The extension combines bored tunnels with deep station boxes and nearby developments. Owner settlement commitments and designer accounts link prediction, condition surveys and construction monitoring.","topics":["tunnels","excavation","monitoring","lateral-foundations"],"country":"United Kingdom","region":"Kennington to Battersea, London","owner":"Transport for London","year":2021,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Settlement troughs","Building damage assessment","Diaphragm walls"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The environmental assessment is a design-stage screening document, while the designer reports built features and opening. Predicted settlement values must not be presented as measured outcomes.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The designer records passenger opening in September 2021; the settlement-assessment documents predate construction.","sourceIds":["s1","s2","s3"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Prepare a staged settlement assessment for a tunnel approaching a station box beneath a dense urban neighborhood.","inputs":["Extract the screening assumptions and distinguish greenfield analysis from building interaction.","Identify the owner’s survey and monitoring commitments for affected properties."],"deliverables":["Calculate overlapping tunnel/box settlement envelopes with volume-loss sensitivity.","Propose building-specific follow-up analyses and monitoring/compensation arrangements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can a conservative greenfield prediction be unsuitable as a direct building-damage estimate?","How should deep foundations crossing the tunnel influence the screening process?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Ground movement assessment","url":"https://content.tfl.gov.uk/nle-twa-environmental-statement-volume-iic-appendix-i-part-4-a17-4d.pdf","publisher":"Buro Happold / Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Settlement commitments","url":"https://tfl.gov.uk/cdn/static/cms/documents/commitment-1-settlement.pdf","publisher":"Transport for London","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Designer project account","url":"https://www.mottmac.com/en/projects/northern-line-extension/","publisher":"Mott MacDonald","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Northern line extension construction site, SW8.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","publisher":"Wikimedia Commons / sludgegulper","year":2016,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"northern-line-extension.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/schematic"},{"id":"project-image","title":"Northern line extension construction site, SW8.jpg","kind":"project-image","fileName":"northern-line-extension.jpg","mimeType":"image/jpeg","bytes":422345,"sha256":"f4462889444ce02b4c781ef4bbf522a5573244ce74ff062bf476cfbd50c698fd","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":1707,"credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2016-03-11 12:38:22","evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/3/3c/Northern_line_extension_construction_site%2C_SW8.jpg","downloadUrl":"/cases/northern-line-extension/download/project-image","originalSha1":"3806f56827ba3cb38637a262dcd624ef348b915e","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"northern-line-extension-capstone.md","mimeType":"text/markdown","bytes":3319,"sha256":"cb2697c5975600fbf469eabdf4cd496ff91056b5d2ddf37e77b93a4e903f748f","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/northern-line-extension/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Battersea station construction site for the Northern Line Extension.","caption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","credit":"sludgegulper","sourceUrl":"https://commons.wikimedia.org/wiki/File:Northern_line_extension_construction_site,_SW8.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":1707,"imageDate":"2016-03-11 12:38:22","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"Battersea station construction site for the Northern Line Extension. The photograph shows actual station works within the project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":99,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/northern-line-extension-commons.json","evidenceSha256":"a30c027fd40c9b3a7e423cb9835a707dccce6ddb8989bbead14aa288ebb1eb42","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":426789,"sourceCount":4,"url":"/cases/northern-line-extension"},{"id":"london-bank-station","title":"Bank station upgrade — tunnelling through existing pile zones","summary":"The capacity upgrade required new tunnels beside operating infrastructure and existing building piles. The designer describes staged building-impact assessment and a load-transfer solution that retained foundation reuse options.","topics":["tunnels","deep-foundations","lateral-foundations","monitoring"],"country":"United Kingdom","region":"City of London","owner":"London Underground","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Tunnel–pile interaction","Load transfer","Three-dimensional assessment"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The impact-assessment engineer describes the pile interactions and modeling approach; the contractor records completion. Public summaries do not include every building-specific check.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The contractor records project completion in February 2023; the designer’s earlier timeframe refers to its own service scope.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Assess a new tunnel intersecting the influence zone of existing piled foundations without assuming the building can be demolished.","inputs":["Extract the reported pile types and identify which are directly intercepted.","Separate empirical screening from the later three-dimensional assessment."],"deliverables":["Compare pile load redistribution and building movement for alternative tunnel sequences.","Design a conceptual load-transfer structure with monitoring and verification hold points.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["When is a greenfield settlement trough insufficient for a piled building?","How can a retrofit preserve future foundation reuse while controlling present construction risk?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Building impact assessment for Bank station","url":"https://www.dr-sauer.com/projects/bank-station-capacity-upgrade-building-impact-assessment","publisher":"Dr. Sauer & Partners","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Completed station upgrade","url":"https://www.dragados.com/en/our-experience/our-projects/bank-station-capacity-upgrade","publisher":"Dragados","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"BSCU - Bank Station Cannon Street Entrance - Cannon Street, February 2023 44.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","publisher":"Wikimedia Commons / TheFrog001","year":2023,"access":"public-link","license":"CC0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"london-bank-station.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/london-bank-station/download/schematic"},{"id":"project-image","title":"BSCU - Bank Station Cannon Street Entrance - Cannon Street, February 2023 44.jpg","kind":"project-image","fileName":"london-bank-station.jpg","mimeType":"image/jpeg","bytes":288002,"sha256":"210ae3c5517a74552a2a317efa775f15a1f01c5798ac06246add01986e509bad","sourceId":"s3","license":"CC0","width":1280,"height":960,"credit":"TheFrog001","sourceUrl":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","imageDate":"2023-02-28 17:58:12","evidenceFile":"image-provenance/london-bank-station-commons.json","evidenceSha256":"e9420ca11e7ffb2e72446888c3e2ff14821e3f56f03075e35c0a3794e59297f7","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/f/f5/BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street%2C_February_2023_44.jpg","downloadUrl":"/cases/london-bank-station/download/project-image","originalSha1":"ee0124a274c02d78077408d5ddfe9242f19638bc","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"london-bank-station-capstone.md","mimeType":"text/markdown","bytes":3302,"sha256":"7481286fea1cc7b54d484a2ad7211302e6236d1c1ecf4f59f7f4b0c2a949b9fa","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/london-bank-station/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The new Cannon Street entrance to Bank station in February 2023.","caption":"The new Cannon Street entrance to Bank station in February 2023. The photograph shows the actual capacity-upgrade project after completion of the new entrance.","credit":"TheFrog001","sourceUrl":"https://commons.wikimedia.org/wiki/File:BSCU_-_Bank_Station_Cannon_Street_Entrance_-_Cannon_Street,_February_2023_44.jpg","license":"CC0","licenseUrl":"https://creativecommons.org/publicdomain/zero/1.0/deed.en","width":1280,"height":960,"imageDate":"2023-02-28 17:58:12","imageDownloadAllowed":true},"figureCaption":"The new Cannon Street entrance to Bank station in February 2023. The photograph shows the actual capacity-upgrade project after completion of the new entrance.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":102,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/london-bank-station-commons.json","evidenceSha256":"e9420ca11e7ffb2e72446888c3e2ff14821e3f56f03075e35c0a3794e59297f7","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":292429,"sourceCount":3,"url":"/cases/london-bank-station"},{"id":"svalbard-seed-vault","title":"Svalbard Seed Vault — tunnel waterproofing and frozen ground","summary":"The Seed Vault upgrade replaced its access tunnel with a watertight concrete structure and moved heat-producing services. The construction account includes artificial ground freezing to support the replacement works.","topics":["cold-regions","tunnels","ground-improvement","seepage","rock","delivery"],"country":"Norway","region":"Longyearbyen, Svalbard","owner":"Norwegian Ministry of Agriculture and Food / Statsbygg","year":2019,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Artificial ground freezing","Tunnel waterproofing","Thermal disturbance","Groundwater exclusion"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner sources describe the 2016–2019 upgrade and freezing used during tunnel construction. The seed-storage chambers and the entrance tunnel have different thermal and groundwater functions; do not treat the entire facility as one homogeneous frozen-ground boundary.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The owner identifies the main upgrade period as 2016–2019; the 2018 construction update describes the work while it was in progress.","sourceIds":["s1","s2","s3"]},"records":{"availability":"partial","summary":"The owner reports a waterproofed entrance tunnel and upgraded cooling. Published descriptions do not provide the full freeze-pipe commissioning records or as-built waterproofing details.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a watertight tunnel replacement in warming permafrost, combining temporary frozen-ground support with a permanent drainage, waterproofing and thermal strategy.","inputs":["Map the access tunnel, rock chambers, service heat sources and surface-water pathways from the owner descriptions.","Define study values for unfrozen permeability, ice content, thermal properties and freezing-system temperature, flagging them as assumptions."],"deliverables":["Estimate freeze-wall development and thaw sensitivity around the excavation, then assess leakage and uplift for the permanent tunnel.","Prepare freezing verification holes, temperature monitoring, excavation hold points and a seasonal surface-water diversion plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why does removing internal heat generation help even when the final tunnel lining is designed to be watertight?","What measurements would establish adequate frozen-ground continuity before excavation without confusing cold air with frozen soil?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Construction improvements and temporary ground freezing","url":"https://www.seedvault.no/2018/09/04/seed-vault-construction-improvements-proceed-as-planned/","publisher":"Svalbard Global Seed Vault / Norwegian Ministry of Agriculture and Food","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Purpose, operations and 2016–2019 upgrade","url":"https://www.seedvault.no/about/purpose-operations-and-organisation/","publisher":"Svalbard Global Seed Vault","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Facility operation and tunnel arrangement","url":"https://www.nordgen.org/our-work/svalbard-global-seed-vault/frequently-asked-questions/","publisher":"NordGen","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"Svalbard Global Seed Vault Exterior 2020.jpg","url":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","publisher":"Cierra Martin for Crop Trust","year":2020,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"svalbard-seed-vault.svg","mimeType":"image/svg+xml","bytes":968,"sha256":"90bd9d5f0e906d8c86b1dbf936087013600fc464568e53625a08db29592daa87","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/schematic"},{"id":"project-image","title":"Svalbard Global Seed Vault — exterior in 2020","kind":"project-image","fileName":"svalbard-seed-vault.jpg","mimeType":"image/jpeg","bytes":345849,"sha256":"3514d4606ff689bef0b68899a77237a3b3cf4225b33b29b32b01f7ab01657dc8","sourceId":"s4","license":"CC BY-SA 2.0","width":1280,"height":913,"credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"2020-02-25","evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","transformations":"Provider-generated width-limited JPEG preview; no local crop, retouching, added text or recolouring.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/e/e3/Svalbard_Global_Seed_Vault_Exterior_2020.jpg?utm_source=commons.wikimedia.org&utm_campaign=imageinfo&utm_content=original","downloadUrl":"/cases/svalbard-seed-vault/download/project-image","imageDownloadAllowed":true,"rightsStatus":"open-license","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"svalbard-seed-vault-capstone.md","mimeType":"text/markdown","bytes":3964,"sha256":"7be9dac2dda47c60c428fcb9c412c0a4663488f05b6fa991da6346122ad9c1cb","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/svalbard-seed-vault/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","caption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","credit":"Cierra Martin for Crop Trust / Wikimedia Commons","sourceUrl":"https://commons.wikimedia.org/wiki/File:Svalbard_Global_Seed_Vault_Exterior_2020.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":913,"imageDate":"2020-02-25","preserveWholeImage":true,"imageDownloadAllowed":true,"rightsStatus":"open-license"},"figureCaption":"The entrance to the Svalbard Global Seed Vault in February 2020, after the 2016–2019 upgrade period. The photograph shows the actual facility; buried tunnel details are documented by the linked owner sources.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r14","curatedOrder":106,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/svalbard-seed-vault-r14-source.json","evidenceSha256":"a74e8e13c3cc9218a920f57b5674c8c671e2a53fa45916765d7eb1b5f9620ccb","visualReview":"Reviewed the actual photograph at publication size against the file description and project identity. The caption states when the image is a site-context or historic-stage view; no diagram or substitute project image is used.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":350781,"sourceCount":4,"url":"/cases/svalbard-seed-vault"}]}