{"id":"center-hill","title":"Center Hill Dam — grouting, cutoff wall and stabilizing berm","summary":"A staged rehabilitation treated foundation seepage and auxiliary-dam risks using grouting, a deep cutoff wall and a roller-compacted-concrete berm.","topics":["dams-levees","seepage","rock","ground-improvement","delivery"],"country":"United States","region":"DeKalb County, Tennessee","owner":"US Army Corps of Engineers","year":2020,"yearLabel":"Case reference year","projectType":"Rehabilitation","methods":["Foundation grouting","Cutoff wall","Stabilizing berm"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"USACE describes three major repair phases and their completed components; detailed construction plans are not attached to the completion release.","sourceIds":["s1"]},"cost":{"availability":"partial","summary":"The completion release reports $353 million overall, with $107 million grouting, $122 million cutoff and $50 million berm contracts; scopes differ from the programme total.","sourceIds":["s1"]},"schedule":{"availability":"partial","summary":"Reported phases were grouting in 2008–2010, cutoff in 2012–2015 and final berm completion celebrated in July 2020.","sourceIds":["s1"]},"records":{"availability":"partial","summary":"The USACE release documents the final repair phase and constructed features.","sourceIds":["s1"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a risk-based sequence of dam repairs in which initial grouting also informs the later cutoff design.","inputs":["Extract phase scope, wall depth and published contract-period information.","Identify the piezometric and geological evidence needed to assess each repaired failure mode."],"deliverables":["Prepare a seepage/stability failure-mode map and an investigation-to-construction decision process.","Compare a single-stage programme with the documented phased strategy.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Berm construction completes last repair phase for dam rehabilitation","url":"https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2261687/berm-construction-completes-last-repair-phase-for-dam-rehabilitation/","publisher":"USACE","year":2020,"access":"public-link","license":"USACE public information; original credits retained","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Center Hill auxiliary-dam RCC berm — published image and source","url":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","publisher":"DVIDS / U.S. Army Corps of Engineers","year":2020,"access":"public-link","license":"Public domain — U.S. federal government work","notes":"Project image source. Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"center-hill.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/center-hill/download/schematic"},{"id":"project-image","title":"Center Hill auxiliary-dam RCC berm","kind":"project-image","fileName":"center-hill.jpg","mimeType":"image/jpeg","bytes":293503,"sha256":"a0d33fc9f80d78aecd1af015fbcb8573ffccfdd3639abf05c4993f77dfefa73c","sourceId":"s2","license":"Public domain — U.S. federal government work","width":1000,"height":667,"credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","licenseUrl":"https://www.dvidshub.net/about/copyright","imageDate":"2020","evidenceFile":"image-provenance/center-hill-source.json","evidenceSha256":"7491f54c4d276ee87d196bb5ab594f571734776ba54d95bb86336014027cecf1","transformations":"Unmodified bytes from the publisher’s 1000-pixel image; responsive display only.","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","downloadUrl":"/cases/center-hill/download/project-image"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"center-hill-capstone.md","mimeType":"text/markdown","bytes":3178,"sha256":"fd3962a5077f1d6636c34b684c2ab4f19da43c9623771422cb63d524eb0013d6","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/center-hill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020..","caption":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020.","credit":"Leon Roberts / U.S. Army Corps of Engineers","sourceUrl":"https://www.dvidshub.net/image/6260111/berm-construction-completes-last-repair-phase-dam-rehabilitation","license":"Public domain — U.S. federal government work","licenseUrl":"https://www.dvidshub.net/about/copyright","width":1000,"height":667,"imageDate":"2020"},"figureCaption":"The roller-compacted-concrete berm at the Center Hill auxiliary dam, shown in the USACE project-completion image collection published in July 2020.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":21,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/center-hill-source.json","evidenceSha256":"7491f54c4d276ee87d196bb5ab594f571734776ba54d95bb86336014027cecf1","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":297666,"sourceCount":2,"url":"/cases/center-hill"}