{"id":"changi-east","title":"Changi East reclamation — instrumented vertical-drain design","summary":"The reclamation programme used prefabricated vertical drains to accelerate consolidation of marine clay. Its investigators publish pilot trials, specialized testing and interpretation of settlement and pore-pressure records.","topics":["settlement","ground-improvement","laboratory-testing","site-investigation","coastal-offshore"],"country":"Singapore","region":"Eastern Singapore","owner":"Singapore reclamation authorities","year":2005,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Vertical drains","Radial consolidation","Pore-pressure monitoring"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The papers provide field and laboratory characterization and consolidation-monitoring methods for the historic reclamation phases. They should not be mistaken for current Terminal 5 construction records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"The research account covers the historic reclamation phases completed by 2005, not the schedule of present airport expansion.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select drain spacing and surcharge duration for a reclamation cell using both settlement and pore-pressure acceptance measures.","inputs":["Extract a single pilot-cell stratigraphy, drain spacing and loading history from the papers.","Identify horizontal consolidation coefficients and laboratory versus field scale differences."],"deliverables":["Calculate consolidation time with drain smear and well resistance sensitivities.","Create a surcharge-removal decision that reconciles settlement and piezometer observations.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can settlement-based and pore-pressure-based degrees of consolidation disagree?","What evidence would justify changing drain spacing after a pilot trial?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Soil improvement works for an offshore land reclamation","url":"https://doi.org/10.1680/geng.2009.162.1.21","publisher":"Project investigators / ICE Geotechnical Engineering","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Research-oriented ground investigation at Changi","url":"https://www.sciencedirect.com/org/science/article/pii/S205261561700014X","publisher":"Project investigators / ICE Geotechnical Research","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Reclamation of a slurry pond in Singapore","url":"https://doi.org/10.1680/geng.2009.162.1.13","publisher":"Institution of Civil Engineers","year":null,"access":"public-link","license":"No open reuse license verified; original copyright retained","notes":"Project image source. Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"changi-east.svg","mimeType":"image/svg+xml","bytes":1178,"sha256":"24343c950faef54c58254cb9ddd4a6ab08882609f915b834abe764d4b384f92c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/schematic"},{"id":"project-image","title":"Changi East reclamation — historical slurry pond","kind":"project-image","fileName":"changi-east-r13.png","mimeType":"image/png","bytes":62386,"sha256":"4f62cd73fd4d72c53798f8a5ac698776331144b757d2814d6ad4c0cbf4599d37","sourceId":"s3","license":"No open reuse license verified; original copyright retained","width":400,"height":248,"credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","imageDate":null,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","transformations":"Extracted the complete embedded Figure 2 photograph (PDF image object 40) without cropping, added labels, or retouching; saved losslessly as PNG at its native 400 × 248 resolution.","originalUrl":"https://pdfs.semanticscholar.org/b85d/a748e31f6ee68e6b2d2076def3513f3cb316.pdf","originalSha256":"7a40c8913a894c9fef0283fae1eb9bcd280f828c5054512d20515287d3286e26","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/changi-east/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"changi-east-capstone.md","mimeType":"text/markdown","bytes":3304,"sha256":"8e246b3753d44e7c2626bb72152377dffbf29f9f2be0c1f274cc61f2ec018be8","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/changi-east/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Historical aerial photograph of the enclosed Changi East slurry pond before reclamation.","caption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","credit":"J. Chu, M. W. Bo and A. Arulrajah / ICE Geotechnical Engineering (2009), Figure 2","sourceUrl":"https://doi.org/10.1680/geng.2009.162.1.13","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://doi.org/10.1680/geng.2009.162.1.13","width":400,"height":248,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The Changi East slurry pond before reclamation, reproduced from Figure 2 of the original 2009 engineering paper. This is the historic reclamation programme, not current airport expansion work.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":55,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/changi-east-r13-source.json","evidenceSha256":"17554a80b12ce069abb06daab5d140757cf6c0ee84d2fafa125af3778a6b92e5","visualReview":"Inspected the complete first paper page, its Figure 2 caption, and the extracted 400 by 248 pixel photograph. The image shows the enclosed slurry pond and surrounding reclamation land; it is not the adjacent site-plan diagram or an author portrait.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4482,"sourceCount":3,"url":"/cases/changi-east"}