{"id":"channel-tunnel","title":"Channel Tunnel — geological alignment and water-pressure control","summary":"The alignment sought low-permeability marly chalk while accommodating more fractured ground on the French side. Project geologists describe how marine seismic surveys and boreholes informed route selection and machine requirements.","topics":["tunnels","rock","site-investigation","dewatering"],"country":"United Kingdom / France","region":"English Channel","owner":"Eurotunnel","year":1994,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Marine ground investigation","Geological alignment","Face-pressure control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The account is written by geologists involved in design and construction and includes the geological section. It does not provide all TBM operating logs.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Select a sub-sea tunnel alignment that balances cover, geological continuity and water-inflow risk.","inputs":["Extract the main stratigraphic marker and the reported contrast between the two shores.","Identify where sparse boreholes require interpretation supported by seismic profiles."],"deliverables":["Prepare a route-risk section and specify investigation priorities.","Compare open and closed-face excavation assumptions with water-pressure and fault-zone scenarios.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why is the shortest geometric route not necessarily the lowest ground-risk route?","What evidence should trigger closed-mode operation before a permeable zone is entered?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Channel Tunnel geology by project geologists","url":"https://www.geolsoc.org.uk/science-and-policy/100-great-geosites/industrial-and-economic-importance/channel-tunnel/","publisher":"Bill Rankin and Ron Williams / Geological Society","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Site of the Channel Tunnel Construction in May 1991.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","publisher":"Wikimedia Commons / The Basingstoker","year":null,"access":"public-link","license":"CC BY-SA 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"channel-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/channel-tunnel/download/schematic"},{"id":"project-image","title":"Site of the Channel Tunnel Construction in May 1991.jpg","kind":"project-image","fileName":"channel-tunnel.jpg","mimeType":"image/jpeg","bytes":294751,"sha256":"f4aaa8dd8d642ab88dc0d9b42b5b4256db7db5a638caa32ec433aa1961dcde9e","sourceId":"s2","license":"CC BY-SA 2.0","width":1280,"height":821,"credit":"The Basingstoker","sourceUrl":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","imageDate":"Unknown date","evidenceFile":"image-provenance/channel-tunnel-commons.json","evidenceSha256":"9649b153db1a0137d64094b16abc794aca62ee229ecfa64ae4748d3f01da2f74","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a0/Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","downloadUrl":"/cases/channel-tunnel/download/project-image","originalSha1":"8ccf8054cb87766b63fdca45e2f2a8059e15029b","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"channel-tunnel-capstone.md","mimeType":"text/markdown","bytes":3106,"sha256":"12ad7d067a39fc330a07359b02e2fa40ea999e32678268d8ca45ee7002155e26","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/channel-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Channel Tunnel construction site in May 1991.","caption":"The Channel Tunnel construction site in May 1991. The historical project photograph provides context for the geological alignment and excavation study.","credit":"The Basingstoker","sourceUrl":"https://commons.wikimedia.org/wiki/File:Site_of_the_Channel_Tunnel_Construction_in_May_1991.jpg","license":"CC BY-SA 2.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/2.0","width":1280,"height":821,"imageDate":"Unknown date","imageDownloadAllowed":true},"figureCaption":"The Channel Tunnel construction site in May 1991. The historical project photograph provides context for the geological alignment and excavation study.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":75,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/channel-tunnel-commons.json","evidenceSha256":"9649b153db1a0137d64094b16abc794aca62ee229ecfa64ae4748d3f01da2f74","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":298982,"sourceCount":2,"url":"/cases/channel-tunnel"}