# Hugh K. Leatherman Terminal — vertical-drain installation control

Case reference year: 2018 | Location: Charleston, South Carolina, United States

Terminal ground treatment used vertical drains through variable soft deposits. Installation equipment recorded drain location and depth for quality control.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Plan drain installation and acceptance for a reclaimed port platform with spatially variable compressible deposits.

### Inputs to assemble

- Extract drain-depth ranges and the documented installation-control workflow.
- Map the missing ground profile and design settlement inputs before sizing drain spacing.

### Deliverables

- Develop zone-specific consolidation calculations and installation tolerances.
- Prepare a spatial acceptance register and a response to short or misplaced drains.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — partial

The submitted case describes variable drain depths and as-installed data acquisition during surcharge-ground improvement.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The source reports delivery of the drain programme on schedule but does not supply the complete programme.

### Completion and records — partial

As-installed depth/location data are described; the underlying installation register is not locally supplied.

## Project image

Vertical-drain installation at the Hugh K. Leatherman Terminal project in Charleston, South Carolina.

Credit: Project photograph published by ASCE Geo-Institute in Melissa S. Beauregard’s case history
Image source: https://www.geoinstitute.org/node/15986
Image rights: No open reuse license verified; original copyright retained — https://www.geoinstitute.org/node/15986

## Sources

- Port of Charleston HLT wall remediation — PVD case (ASCE Geo-Institute / named case-history author; 2020): https://www.geoinstitute.org/node/15986

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.