{"id":"clearwater-dam","title":"Clearwater Dam — karst pretreatment and a hanging cutoff","summary":"A sinkhole prompted foundation exploration and grouting before construction of a deep seepage cutoff. The owner explains why treating solution-enlarged fractures was necessary for slurry-supported excavation.","topics":["dams-levees","seepage","rock","ground-improvement"],"country":"United States","region":"Wayne and Reynolds counties, Missouri","owner":"US Army Corps of Engineers","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Karst grouting","Hydromill cutoff","Slurry loss control"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE’s rehabilitation account describes the grouting sequence, epikarst treatment and cutoff construction. Its forecast of later completion is retained as a forecast rather than a final-account statement.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The owner page forecast approximately $240 million for the overall rehabilitation. It is not presented here as a verified final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE records placement of the final cutoff panel on 6 December 2011; the page’s remaining-work milestones were forecasts.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a pretreatment and cutoff-wall sequence for a dam with connected karst features.","inputs":["Extract the reported seepage problem and the relationship between pretreatment and panel excavation.","Define a study range for rock permeability and connected-void sizes."],"deliverables":["Compare seepage paths around a hanging cutoff and through a locally defective panel.","Specify staged grouting, slurry-loss response and test-panel acceptance requirements.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why can grouting be necessary even when a cutoff wall is the main permanent barrier?","How should treatment change when drilling loses circulation in a solution feature?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Clearwater major rehabilitation","url":"https://www.swl.usace.army.mil/Missions/Civil-Works/Program-and-Project-Management/Clearwater-Major-Rehab/","publisher":"USACE Little Rock District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Cutoff-wall construction account","url":"https://www.keller-na.com/projects/clearwater-lake-dam","publisher":"Keller","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"clearwater-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/clearwater-dam/download/schematic"},{"id":"project-image","title":"Clearwater Lake Dam — rehabilitation works in Missouri","kind":"project-image","fileName":"clearwater-dam-r13.jpg","mimeType":"image/jpeg","bytes":157363,"sha256":"6ba4f3f9f46427acca852befd6cbcf86ed02208a0029c7b3d592a2bc62707bea","sourceId":"s2","license":"No open reuse license verified; original copyright retained","width":900,"height":561,"credit":"Keller / Keller Management Services, LLC","sourceUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","licenseUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","imageDate":null,"evidenceFile":"image-provenance/clearwater-dam-r13-source.json","evidenceSha256":"c4e83124dafe5ca3ef277b3db6f7ac973e45d1e9d7dd7b6067175829993234e6","transformations":"Resized the full 2500 × 1559 source photograph proportionally to 900 × 561 pixels, JPEG quality 90; no cropping, added labels, or retouching.","originalUrl":"https://www.keller-na.com/sites/keller-na/files/2019-11/Clearwater-Lake-Dam-aerial.jpg","originalSha256":"a42680ec532691b4140cd8daf9878188de455cc941f6b4b7c9dd8eb695ee1575","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/clearwater-dam/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"clearwater-dam-capstone.md","mimeType":"text/markdown","bytes":3059,"sha256":"784e54f18432f07f72ef06f300e14058dcca60705b6602c74041dc9056c09cb9","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/clearwater-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction equipment along the crest of Clearwater Lake Dam in Missouri.","caption":"Aerial view of Clearwater Lake Dam in Missouri during the rehabilitation works, from Keller’s project account. The photograph shows construction along the dam crest.","credit":"Keller / Keller Management Services, LLC","sourceUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://www.keller-na.com/projects/clearwater-lake-dam","width":900,"height":561,"imageDate":null,"preserveWholeImage":true,"imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"Aerial view of Clearwater Lake Dam in Missouri during the rehabilitation works, from Keller’s project account. The photograph shows construction along the dam crest.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":66,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/clearwater-dam-r13-source.json","evidenceSha256":"c4e83124dafe5ca3ef277b3db6f7ac973e45d1e9d7dd7b6067175829993234e6","visualReview":"Inspected the full uncropped photograph and its 900 pixel derivative. It shows a reservoir, the Missouri dam embankment, and construction equipment on the crest. No embedded credit or other edge content was removed.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":4044,"sourceCount":2,"url":"/cases/clearwater-dam"}