# East Branch Dam — cutoff-wall construction and verification

Case reference year: 2020 | Location: Elk County, Pennsylvania, United States

A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Plan a cutoff-wall quality-assurance programme that can demonstrate continuity without damaging the finished barrier.

### Inputs to assemble

- Extract the owner’s treatment objective and the technical abstract’s verification problem.
- Specify study foundation permeability zones and their uncertainty before comparing barrier options.

### Deliverables

- Estimate seepage reduction for intact and defective wall scenarios.
- Develop test-panel, drilling, permeability-testing and reservoir-response acceptance criteria.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Can a low-permeability test core establish continuity between adjacent panels?
- What monitoring evidence is needed before relaxing an operating restriction?

## Published project information

### Design — partial

Owner releases establish the rehabilitation scope and outcome. The cited verification reference is an abstract, so complete verification datasets are not claimed locally.

### Cost information — partial

The owner reports a $132.5 million cutoff-wall rehabilitation contract awarded in 2014, not a certified final expenditure.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — partial

The owner’s 2020 releases describe repair completion and reservoir-operating changes.

## Project image

East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.

Credit: Margaret Luzier, U.S. Army Corps of Engineers
Image source: https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg
Image rights: Public domain — https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing

## Sources

- Repair-project conclusion (USACE Pittsburgh District; date not stated): https://www.usace.army.mil/Media/News/Article/2453263/thats-a-wrap-corps-concludes-east-branch-dam-repair-project/
- Return to normal operations announcement (USACE; date not stated): https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2386554/east-branch-dam-safety-modification-project-returning-to-normal-operations-weat/
- Lessons during cutoff-wall verification drilling (USACE authors / ASDSO; date not stated): https://damsafety.org/reference/east-branch-dam-lessons-learned-during-cutoff-wall-verification-drilling
- USACE East Branch Clarion River Lake and Dam.jpg — image and reuse license (Wikimedia Commons / Margaret Luzier, U.S. Army Corps of Engineers; 1985): https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.