{"id":"east-branch-dam","title":"East Branch Dam — cutoff-wall construction and verification","summary":"A dam-repair programme installed a cutoff wall to reduce foundation seepage. USACE reports the contract and return toward normal operations; the technical literature discusses wall verification drilling.","topics":["dams-levees","seepage","ground-improvement","monitoring"],"country":"United States","region":"Elk County, Pennsylvania","owner":"US Army Corps of Engineers","year":2020,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Seepage cutoff","Wall continuity","Verification drilling"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner releases establish the rehabilitation scope and outcome. The cited verification reference is an abstract, so complete verification datasets are not claimed locally.","sourceIds":["s1","s2","s3"]},"cost":{"availability":"partial","summary":"The owner reports a $132.5 million cutoff-wall rehabilitation contract awarded in 2014, not a certified final expenditure.","sourceIds":["s1","s2","s3"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The owner’s 2020 releases describe repair completion and reservoir-operating changes.","sourceIds":["s1","s2","s3"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a cutoff-wall quality-assurance programme that can demonstrate continuity without damaging the finished barrier.","inputs":["Extract the owner’s treatment objective and the technical abstract’s verification problem.","Specify study foundation permeability zones and their uncertainty before comparing barrier options."],"deliverables":["Estimate seepage reduction for intact and defective wall scenarios.","Develop test-panel, drilling, permeability-testing and reservoir-response acceptance criteria.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Can a low-permeability test core establish continuity between adjacent panels?","What monitoring evidence is needed before relaxing an operating restriction?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Repair-project conclusion","url":"https://www.usace.army.mil/Media/News/Article/2453263/thats-a-wrap-corps-concludes-east-branch-dam-repair-project/","publisher":"USACE Pittsburgh District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Return to normal operations announcement","url":"https://www.usace.army.mil/Media/News-Releases/News-Release-Article-View/Article/2386554/east-branch-dam-safety-modification-project-returning-to-normal-operations-weat/","publisher":"USACE","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Lessons during cutoff-wall verification drilling","url":"https://damsafety.org/reference/east-branch-dam-lessons-learned-during-cutoff-wall-verification-drilling","publisher":"USACE authors / ASDSO","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s4","title":"USACE East Branch Clarion River Lake and Dam.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","publisher":"Wikimedia Commons / Margaret Luzier, U.S. Army Corps of Engineers","year":1985,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"east-branch-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-branch-dam/download/schematic"},{"id":"project-image","title":"USACE East Branch Clarion River Lake and Dam.jpg","kind":"project-image","fileName":"east-branch-dam.jpg","mimeType":"image/jpeg","bytes":295707,"sha256":"3a7264103efa49f7a3c6af162e3c91518990dbc92b306642e9d07fe5b08de9d8","sourceId":"s4","license":"Public domain","width":1280,"height":854,"credit":"Margaret Luzier, U.S. Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing","imageDate":"1985-09-01","evidenceFile":"image-provenance/east-branch-dam-commons.json","evidenceSha256":"c1163c137e1710737ad46d4a734fa7fc01a733a7ca0c14b7a83b70471c24912a","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/b5/USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","downloadUrl":"/cases/east-branch-dam/download/project-image","originalSha1":"b4e50869d539b41ada751c645b44bb0bc14f6900","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"east-branch-dam-capstone.md","mimeType":"text/markdown","bytes":3598,"sha256":"0424302e3006289b5f388519b956d139f36356bd9b7283fd3dc7b8a8a3076f4c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/east-branch-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania.","caption":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.","credit":"Margaret Luzier, U.S. Army Corps of Engineers","sourceUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:USACE_East_Branch_Clarion_River_Lake_and_Dam.jpg#Licensing","width":1280,"height":854,"imageDate":"1985-09-01","imageDownloadAllowed":true},"figureCaption":"East Branch Clarion River Lake and Dam near Wilcox, Pennsylvania. USACE photograph of the dam treated by the later seepage-cutoff rehabilitation.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":65,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/east-branch-dam-commons.json","evidenceSha256":"c1163c137e1710737ad46d4a734fa7fc01a733a7ca0c14b7a83b70471c24912a","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":300290,"sourceCount":4,"url":"/cases/east-branch-dam"}