{"id":"eurasia-tunnel","title":"Eurasia Tunnel — high-pressure mixed-ground TBM crossing","summary":"The road tunnel passes through rock and marine sediments at high water pressure. The designers describe slurry-shield excavation, specialized lining details and seismic joints near changes in ground stiffness.","topics":["tunnels","seismic","dewatering","site-investigation"],"country":"Türkiye","region":"Bosphorus, Istanbul","owner":"Eurasia Tunnel concession / transport authority","year":2016,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Slurry shield","Mixed-face excavation","High-pressure lining","Seismic joints"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The design consultant and supervising engineer describe ground conditions, machine selection and the installed systems. They do not supply a complete downloadable design calculation set.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"Italferr records TBM excavation during 2014–2015, opening to traffic in December 2016 and final acceptance in February 2017.","sourceIds":["s1","s2"]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Define a TBM operating envelope and segmental-lining checks for a deep water-bearing rock-to-soil transition.","inputs":["Map the reported stiffness transitions and separate water pressure from effective ground stress.","Identify the design-stage and construction-stage dates in the engineering accounts."],"deliverables":["Compare face-pressure limits for blowout, inflow and ground loss.","Prepare a lining/joint load summary and contingency measures for interventions under pressure.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why should seismic joints be linked to ground stiffness rather than regular spacing alone?","Which ground investigation would most reduce uncertainty at a mixed-face transition?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Eurasia Tunnel design account","url":"https://www.wsp.com/en-us/projects/eurasia-tunnel-istanbul-strait-road-tube-crossing","publisher":"WSP","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Supervision and technical summary","url":"https://www.italferr.it/content/dam/italferr_nd/inglese/document/SCHEDA%20TECNICA%20EURASYA%20TUNNEL%20ENG1.pdf","publisher":"Italferr","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Eurasia tunnel Asia entrance 01.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","publisher":"Wikimedia Commons / Alessandro57","year":2026,"access":"public-link","license":"CC BY-SA 4.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"eurasia-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eurasia-tunnel/download/schematic"},{"id":"project-image","title":"Eurasia tunnel Asia entrance 01.jpg","kind":"project-image","fileName":"eurasia-tunnel.jpg","mimeType":"image/jpeg","bytes":311150,"sha256":"a70a83d8bcede2460dad6a00f50fbba6bc19afef5862ba33691ddfac8dee4ff9","sourceId":"s3","license":"CC BY-SA 4.0","width":1280,"height":1705,"credit":"Alessandro57","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","imageDate":"2026-07-24 15:29:41","evidenceFile":"image-provenance/eurasia-tunnel-commons.json","evidenceSha256":"4f618700c50021f9d429c13b5f18989c9579c0ad1b094084d10d5fbaeea320d5","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/8/8a/Eurasia_tunnel_Asia_entrance_01.jpg","downloadUrl":"/cases/eurasia-tunnel/download/project-image","originalSha1":"5a67caa8bf97490596743334a14bce0ff75c510c","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"eurasia-tunnel-capstone.md","mimeType":"text/markdown","bytes":3141,"sha256":"6a381930ec696f509d49754ffba8bc7339c8fe035c793a92086038fa0640bab3","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/eurasia-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The Asian entrance of the Eurasia Tunnel in Istanbul.","caption":"The Asian entrance of the Eurasia Tunnel in Istanbul. The photograph shows the completed road-tunnel project; the deep mixed-ground crossing is below the strait.","credit":"Alessandro57","sourceUrl":"https://commons.wikimedia.org/wiki/File:Eurasia_tunnel_Asia_entrance_01.jpg","license":"CC BY-SA 4.0","licenseUrl":"https://creativecommons.org/licenses/by-sa/4.0","width":1280,"height":1705,"imageDate":"2026-07-24 15:29:41","preserveWholeImage":true,"imageDownloadAllowed":true},"figureCaption":"The Asian entrance of the Eurasia Tunnel in Istanbul. The photograph shows the completed road-tunnel project; the deep mixed-ground crossing is below the strait.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":77,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/eurasia-tunnel-commons.json","evidenceSha256":"4f618700c50021f9d429c13b5f18989c9579c0ad1b094084d10d5fbaeea320d5","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":315416,"sourceCount":3,"url":"/cases/eurasia-tunnel"}