{"id":"folsom-spillway","title":"Folsom auxiliary spillway — rock excavation and foundation preparation","summary":"The auxiliary spillway required major rock excavation and preparation of the control-structure foundation before concrete placement.","topics":["rock","dams-levees","excavation","delivery"],"country":"United States","region":"Folsom, California","owner":"USACE / Bureau of Reclamation","year":2017,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Rock excavation","Foundation preparation","Controlled blasting"],"documentationLevel":"project-summary","design":{"availability":"partial","summary":"USACE construction accounts describe blasting completion, foundation cleaning and the subsequent control structure and chute.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"USACE describes a $900 million cooperative effort, a programme total rather than a rock-excavation unit-rate schedule.","sourceIds":["s2"]},"schedule":{"availability":"partial","summary":"The source records initial excavation in 2008, final concrete stages in 2016 and the October 2017 completion ceremony.","sourceIds":["s2"]},"records":{"availability":"partial","summary":"The owner’s completion release identifies the constructed auxiliary spillway.","sourceIds":["s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Plan a rock-foundation excavation and acceptance programme beside an operating dam and public transport route.","inputs":["Extract published construction stages and final structure dimensions.","Establish study discontinuity, groundwater and blast-vibration parameters explicitly."],"deliverables":["Prepare a temporary rock-slope/bench concept and foundation mapping checklist.","Design sequencing between blasting, cleaning, drainage, acceptance and concrete placement.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Corps completes blasting for Folsom Dam spillway","url":"https://www.spk.usace.army.mil/Media/News-Stories/Article/479150/corps-completes-blasting-for-folsom-dam-spillway/","publisher":"USACE","year":2012,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Folsom auxiliary spillway completion ceremony","url":"https://www.spk.usace.army.mil/Media/News-Releases/Article/1347967/folsom-auxiliary-spillway-completion-ceremony-marks-conclusion-of-historic-proj/","publisher":"USACE","year":2017,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Corps completes final rock blasting for Folsom Dam spillway (7074960195).jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers Sacramento District","year":2012,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"folsom-spillway.svg","mimeType":"image/svg+xml","bytes":1017,"sha256":"ab086e9b878d71ca75443d4083022bf013c864b1ad5c4bbfbedf783b1ffc7360","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/folsom-spillway/download/schematic"},{"id":"project-image","title":"Corps completes final rock blasting for Folsom Dam spillway (7074960195).jpg","kind":"project-image","fileName":"folsom-spillway.jpg","mimeType":"image/jpeg","bytes":464701,"sha256":"7a19a74d7b3b5a33de9a62801a125a79786fab6e5e3741f2489f8163752e394c","sourceId":"s3","license":"Public domain","width":1280,"height":853,"credit":"U.S. Army Corps of Engineers Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg#Licensing","imageDate":"2012-04-09 13:07","evidenceFile":"image-provenance/folsom-spillway-commons.json","evidenceSha256":"f8c58b1165831e3d43c019c6198f439b3999d2ca0dd921846e86483602a54411","transformations":"Unmodified image bytes from the publisher’s selected-size file; only responsive display sizing is applied by the website.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/a9/Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_%287074960195%29.jpg","downloadUrl":"/cases/folsom-spillway/download/project-image","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"folsom-spillway-capstone.md","mimeType":"text/markdown","bytes":3360,"sha256":"9db574128d7dfcb79de13e692011843039bad04940c148f1a0128a63dc749079","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/folsom-spillway/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012.","caption":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012. U.S. Army Corps of Engineers construction photograph.","credit":"U.S. Army Corps of Engineers Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Corps_completes_final_rock_blasting_for_Folsom_Dam_spillway_(7074960195).jpg#Licensing","width":1280,"height":853,"imageDate":"2012-04-09 13:07"},"figureCaption":"Rock excavation for the Folsom Dam auxiliary spillway, April 2012. U.S. Army Corps of Engineers construction photograph.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":23,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/folsom-spillway-commons.json","evidenceSha256":"f8c58b1165831e3d43c019c6198f439b3999d2ca0dd921846e86483602a54411","visualReview":"Original image inspected at card scale and against its caption/source; no AI-created replacement.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":469078,"sourceCount":3,"url":"/cases/folsom-spillway"}