# Founders/Meadows Bridge — footings on reinforced soil

Case reference year: 1999 | Location: Castle Rock, Colorado, United States

The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Evaluate the load path from bridge footing through reinforced soil and compare calculated wall movements with the reported observations.

### Inputs to assemble

- Extract the front-wall geometry, footing loads and reinforcement properties.
- Tabulate measured displacement/stress locations and distinguish construction stages.

### Deliverables

- Develop bearing, sliding, internal stability and deformation checks for the reference section.
- Prepare an instrumentation layout and explain which measurements can test each design assumption.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Which site data control the decision, and what additional investigation would reduce uncertainty?
- How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?

## Published project information

### Design — available

CDOT Report 1 covers design, materials, construction and instruments; Report 2 evaluates wall performance.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

CDOT reports completion in July 1999.

### Completion and records — partial

The two reports contain construction observations and instrumented performance results.

## Project image

The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.

Credit: CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)
Image source: https://rosap.ntl.bts.gov/view/dot/93454
Image rights: No open reuse license verified; original copyright retained — https://rosap.ntl.bts.gov/view/dot/93454

## Sources

- Founders/Meadows Bridge — Report 1 (CDOT / FHWA; 2000): https://rosap.ntl.bts.gov/view/dot/93454
- Founders/Meadows Bridge — Report 2 (CDOT / FHWA; 2001): https://rosap.ntl.bts.gov/view/dot/93418

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.