{"id":"founders-meadows","title":"Founders/Meadows Bridge — footings on reinforced soil","summary":"The bridge and approach roadway were supported on geosynthetic-reinforced segmental walls. A material-testing and instrumentation programme followed the experimental arrangement.","topics":["reinforced-soil","shallow-foundations","laboratory-testing","monitoring"],"country":"United States","region":"Castle Rock, Colorado","owner":"Colorado Department of Transportation","year":1999,"yearLabel":"Case reference year","projectType":"Design and construction","methods":["Footings on MSE","Geosynthetic reinforcement","Measured deformation"],"documentationLevel":"technical-report","design":{"availability":"available","summary":"CDOT Report 1 covers design, materials, construction and instruments; Report 2 evaluates wall performance.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"partial","summary":"CDOT reports completion in July 1999.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"The two reports contain construction observations and instrumented performance results.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Evaluate the load path from bridge footing through reinforced soil and compare calculated wall movements with the reported observations.","inputs":["Extract the front-wall geometry, footing loads and reinforcement properties.","Tabulate measured displacement/stress locations and distinguish construction stages."],"deliverables":["Develop bearing, sliding, internal stability and deformation checks for the reference section.","Prepare an instrumentation layout and explain which measurements can test each design assumption.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which site data control the decision, and what additional investigation would reduce uncertainty?","How would the proposed solution change under the stated sensitivity cases, construction constraints and performance limits?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Founders/Meadows Bridge — Report 1","url":"https://rosap.ntl.bts.gov/view/dot/93454","publisher":"CDOT / FHWA","year":2000,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22","localAssetIds":["project-image"]},{"id":"s2","title":"Founders/Meadows Bridge — Report 2","url":"https://rosap.ntl.bts.gov/view/dot/93418","publisher":"CDOT / FHWA","year":2001,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"founders-meadows.svg","mimeType":"image/svg+xml","bytes":1121,"sha256":"0e13d7f91be9a4043d6221c6dd16082f3a79a21a846b2c1d4395e0bb04939f37","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/founders-meadows/download/schematic"},{"id":"project-image","title":"Founders/Meadows Bridge — completed reinforced-soil approaches","kind":"project-image","fileName":"founders-meadows-r13.jpeg","mimeType":"image/jpeg","bytes":153856,"sha256":"eab161baabb50bab8ad8fbabd87e30265ce580748743fa6841d132e6b722019e","sourceId":"s1","license":"No open reuse license verified; original copyright retained","width":1024,"height":768,"credit":"CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/93454","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/93454","imageDate":"2000","evidenceFile":"image-provenance/founders-meadows-r13-source.json","evidenceSha256":"448c5095d4b3dae7640c6b858a7052727d7113bce0d2b321ab909ffbfe33e328","transformations":"Original embedded photograph extracted unchanged from the source PDF; no crop, added labels, or retouching.","originalUrl":"https://rosap.ntl.bts.gov/view/dot/93454/dot_93454_DS1.pdf","originalSha256":"8dc6a24810c88a96b1eaa7f05c3eef4d4ef221ad38cb2b4cd3a9223ae3ee98de","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph","rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis.","previewUrl":"/cases/founders-meadows/figure"},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"founders-meadows-capstone.md","mimeType":"text/markdown","bytes":2817,"sha256":"39abf337de186a2f27bd8426784e781403fda0be815e01e9e8cd82cb69a4200c","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/founders-meadows/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","caption":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","credit":"CDOT research team: Naser Abu-Hejleh, William (Skip) Outcalt, Trever Wang and Jorge G. Zornberg (2000)","sourceUrl":"https://rosap.ntl.bts.gov/view/dot/93454","license":"No open reuse license verified; original copyright retained","licenseUrl":"https://rosap.ntl.bts.gov/view/dot/93454","width":1024,"height":768,"imageDate":"2000","imageDownloadAllowed":false,"rightsStatus":"editorial-reference","permissionStatus":"No open reuse permission verified","rightsNote":"Source-linked editorial reference; copyright remains with the original owner. The site does not offer this image as a reusable download.","imageUsage":"project-photograph"},"figureCaption":"The completed Founders/Meadows Bridge and its reinforced-soil approaches, viewed from the southwest. Original project photograph in Report 1, Figure B-3.","qualityNotes":[],"checked":"2026-11-22","curatedOrder":2,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/founders-meadows-r13-source.json","evidenceSha256":"448c5095d4b3dae7640c6b858a7052727d7113bce0d2b321ab909ffbfe33e328","visualReview":"Viewed the complete original photograph and compared it with the identified project/source caption. No generated or unrelated replacement image.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":3938,"sourceCount":2,"url":"/cases/founders-meadows"}