# Freshkills Park — landfill cap, drainage and long-term integrity

Case reference year: 2011 | Location: Staten Island, New York, United States

Former waste mounds are being converted to parkland above engineered cover and gas/leachate systems. The project explains how cover layers limit infiltration, protect barriers and drain slopes.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Design a park-compatible cover section that remains functional as underlying waste settles.

### Inputs to assemble

- Extract the barrier, drainage, protection and vegetation functions from the project account.
- Define study waste-settlement and rainfall conditions without treating landscaping as structural cover.

### Deliverables

- Check interface sliding and drainage capacity for the selected slope.
- Detail utility penetrations, gas collection interfaces and a settlement/erosion maintenance plan.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- How can differential settlement damage a low-permeability cover without visible surface cracking?
- Why must planting and visitor access be coordinated with gas and leachate infrastructure?

## Published project information

### Design — partial

The project’s landfill-engineering descriptions identify layer functions and monitoring needs. Published expectations for later park phases are not treated as final completion records.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.

Credit: Master Sgt. Mark Olsen
Image source: https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg
Image rights: Public domain — https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing

## Sources

- Landfill engineering systems (Freshkills Park / New York City project; date not stated): https://freshkillspark.org/the-park/landfill-engineering
- Covering, stabilizing and maintaining (Freshkills Park; date not stated): https://freshkillspark.org/landfill-engineering/covering-stabilizing-maintaining
- Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg — image and reuse license (Wikimedia Commons / Master Sgt. Mark Olsen; date not stated): https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.