{"id":"freshkills-landfill","title":"Freshkills Park — landfill cap, drainage and long-term integrity","summary":"Former waste mounds are being converted to parkland above engineered cover and gas/leachate systems. The project explains how cover layers limit infiltration, protect barriers and drain slopes.","topics":["geoenvironmental","reinforced-soil","settlement","slopes"],"country":"United States","region":"Staten Island, New York","owner":"New York City","year":2011,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Composite cover","Interface stability","Leachate control","Waste settlement"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"The project’s landfill-engineering descriptions identify layer functions and monitoring needs. Published expectations for later park phases are not treated as final completion records.","sourceIds":["s1","s2"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Design a park-compatible cover section that remains functional as underlying waste settles.","inputs":["Extract the barrier, drainage, protection and vegetation functions from the project account.","Define study waste-settlement and rainfall conditions without treating landscaping as structural cover."],"deliverables":["Check interface sliding and drainage capacity for the selected slope.","Detail utility penetrations, gas collection interfaces and a settlement/erosion maintenance plan.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can differential settlement damage a low-permeability cover without visible surface cracking?","Why must planting and visitor access be coordinated with gas and leachate infrastructure?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Landfill engineering systems","url":"https://freshkillspark.org/the-park/landfill-engineering","publisher":"Freshkills Park / New York City project","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Covering, stabilizing and maintaining","url":"https://freshkillspark.org/landfill-engineering/covering-stabilizing-maintaining","publisher":"Freshkills Park","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","publisher":"Wikimedia Commons / Master Sgt. Mark Olsen","year":null,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"freshkills-landfill.svg","mimeType":"image/svg+xml","bytes":991,"sha256":"26222485f74844ee89b3f605791d3913e3b1100909062100b32642ad290c3b48","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/freshkills-landfill/download/schematic"},{"id":"project-image","title":"Aerial views of Ground Zero and Fresh Kills Landfill 011003-Z-AL508-007.jpg","kind":"project-image","fileName":"freshkills-landfill.jpg","mimeType":"image/jpeg","bytes":450785,"sha256":"5251a14d60d70cdf43e8b1f9d40fa2414fcc37c14d14cb6a0da53fca4fcd1bc0","sourceId":"s3","license":"Public domain","width":1280,"height":816,"credit":"Master Sgt. Mark Olsen","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing","imageDate":"Taken on 3 October 2001","evidenceFile":"image-provenance/freshkills-landfill-commons.json","evidenceSha256":"d4019d87a4f791f31f0117545d4c2fe381f92a396a324526924c135ac6f47c3e","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/0/08/Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","downloadUrl":"/cases/freshkills-landfill/download/project-image","originalSha1":"b72773f0a41399c197eae4d74b920815b06bcb86","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"freshkills-landfill-capstone.md","mimeType":"text/markdown","bytes":3372,"sha256":"c49404fa89808b5b9fe490e5b9952afbe7e4bf7418806ef6a1726affa36a8094","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/freshkills-landfill/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of Fresh Kills Landfill in October 2001.","caption":"Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.","credit":"Master Sgt. Mark Olsen","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_views_of_Ground_Zero_and_Fresh_Kills_Landfill_011003-Z-AL508-007.jpg#Licensing","width":1280,"height":816,"imageDate":"Taken on 3 October 2001","imageDownloadAllowed":true},"figureCaption":"Aerial view of Fresh Kills Landfill in October 2001. The historical site photograph predates later park development and illustrates the actual waste-mound setting.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":94,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/freshkills-landfill-commons.json","evidenceSha256":"d4019d87a4f791f31f0117545d4c2fe381f92a396a324526924c135ac6f47c3e","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":455148,"sourceCount":3,"url":"/cases/freshkills-landfill"}