# Gotthard Base Tunnel — squeezing rock and adaptive support

Case reference year: 2016 | Location: Swiss Alps, Switzerland

Deep tunnel sections encountered squeezing rock and strongly variable geological behavior. The Swiss geotechnical society’s project history explains both anticipated and unexpected support challenges at Sedrun and Faido.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Select and revise a tunnel support scheme when measured convergence exceeds the original forecast.

### Inputs to assemble

- Choose one published squeezing section and extract its geology and support sequence.
- Distinguish forecast ground conditions from observations obtained during excavation.

### Deliverables

- Compare yielding and stiff support with a convergence–confinement study.
- Prepare an observational trigger plan and construction-time implications for revised support.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Why can stronger initial support fail to stop continuing squeezing?
- Which measurements indicate that a support change is needed before the next excavation round?

## Published project information

### Design — partial

The heritage case includes geology and support-system discussions from project records. It supports assessment of alternatives and field observations rather than transfer of one support class to all rock.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The engineering overview records opening in June 2016 after a long multi-heading construction programme.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

Faido crossover area in the Gotthard Base Tunnel during construction in 2014. The actual underground works are shown; squeezing-ground support stages are described in the technical case.

Credit: Hannes Ortlieb ( Diskussion )
Image source: https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg
Image rights: CC BY-SA 3.0 de — https://creativecommons.org/licenses/by-sa/3.0/de/deed.en

## Sources

- Gotthard Base Tunnel engineering heritage case (Swiss Geotechnical Society / ISSMGE; date not stated): https://htc.issmge.org/virtual-time-capsule/member-societies/swiss-geotechnical-society-geotechnik-schweiz/gotthard-base-tunnel
- Project engineering overview (Swiss Academy of Engineering Sciences; date not stated): https://www.satw.ch/en/gotthard-base-tunnel-1
- 20141120 gotthard-basistunnel05-wiki.jpg — image and reuse license (Wikimedia Commons / Hannes Ortlieb ( Diskussion ); 2014): https://commons.wikimedia.org/wiki/File:20141120_gotthard-basistunnel05-wiki.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.