# Hong Kong–Zhuhai–Macao crossing — immersed-tunnel settlement transitions

Case reference year: 2018 | Location: Pearl River estuary, China

Artificial islands connect a long immersed crossing founded above variable soft deposits. Project papers describe composite foundation treatment, island formation and full-scale testing near transition zones.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Design a settlement transition between an artificial island and an immersed-tunnel approach.

### Inputs to assemble

- Extract the transition geometry and distinguish soft seabed from later backfill.
- Identify the test conditions and measured response used to judge treatment effectiveness.

### Deliverables

- Compare composite-ground and untreated-ground settlement profiles.
- Prepare treatment verification, dredging tolerance and immersion sequence requirements.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Why is differential settlement at an island transition more consequential than uniform tunnel settlement?
- How could sediment accumulation undermine a correctly designed bedding layer?

## Published project information

### Design — partial

The project authors document implemented island/tunnel concepts; a separate test study evaluates preload and jet-grout treatment. A test section is not assumed to represent the full crossing.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — partial

The project paper describes island/tunnel work beginning in 2011 and handover in 2018; these milestones do not cover every contract in the full bridge system.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

The eastern artificial island of the Hong Kong–Zhuhai–Macao immersed-tunnel section. The photograph shows the actual island-to-tunnel connection area.

Credit: Tksteven
Image source: https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG
Image rights: CC BY 3.0 — https://creativecommons.org/licenses/by/3.0

## Sources

- Novelties in the islands and tunnel project (Project authors / Tunnelling and Underground Space Technology; date not stated): https://www.sciencedirect.com/science/article/pii/S0886779821004788
- Full-scale jet-grouting loading test (Project researchers / ASCE International Journal of Geomechanics; date not stated): https://ascelibrary.org/doi/10.1061/%28ASCE%29GM.1943-5622.0002625
- Eastern artificial island for the tunnel section, Hong Kong - Zhuhai - Macao Bridge.JPG — image and reuse license (Wikimedia Commons / Tksteven; 2013): https://commons.wikimedia.org/wiki/File:Eastern_artificial_island_for_the_tunnel_section,_Hong_Kong_-_Zhuhai_-_Macao_Bridge.JPG

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.