{"id":"isabella-dam","title":"Isabella Dam modifications — seismic, seepage and spillway risk","summary":"The main and auxiliary dams were modified to address combined seismic, seepage and flood-passage concerns. Owner records describe dam raises, downstream buttress work, filters, drainage and major spillway excavation.","topics":["dams-levees","seepage","seismic","rock","earthworks"],"country":"United States","region":"Kern County, California","owner":"US Army Corps of Engineers","year":2023,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Embankment buttress","Filter compatibility","Rock excavation","Dam raise"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"USACE publishes the programme scope and completion milestones. A study should keep the different failure modes separate before combining their risk-reduction measures.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The owner identifies a $204 million Phase II construction contract awarded in 2017. This amount is contract scope, not the whole programme’s final cost.","sourceIds":["s1","s2"]},"schedule":{"availability":"partial","summary":"USACE reports substantial completion of the Phase II dam and spillway work in 2022; related facilities are separate phases.","sourceIds":["s1","s2"]},"records":{"availability":"partial","summary":"USACE documents a reduced dam-risk classification and lifting of operating restrictions in 2023.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a coordinated rehabilitation concept for an embankment dam with both seepage and seismic deficiencies.","inputs":["Extract the owner’s modification components and their targeted failure modes.","Build study sections for the embankment, filter/drain system and spillway excavation."],"deliverables":["Compare stability and seepage checks before and after buttressing and drainage improvements.","Sequence the work to preserve flood passage and define filter-placement quality controls.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Which risk remains if a dam raise is designed without checking seepage gradients?","How should rock excavation and embankment placement share temporary drainage and access?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Isabella Dam safety modification project","url":"https://www.spk.usace.army.mil/Missions/Civil-Works/Isabella-Dam-Safety-Modification-Project/show/all/","publisher":"USACE Sacramento District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Operating restrictions lifted after improvements","url":"https://www.spk.usace.army.mil/Media/News-Releases/Article/3465598/usace-lowers-isabella-dam-risk-rating-lifts-operating-restrictions/","publisher":"USACE Sacramento District","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"Aerial view of the Isabella Dam Safety Modification Project.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","publisher":"Wikimedia Commons / U.S. Army Corps of Engineers, Sacramento District","year":2022,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"isabella-dam.svg","mimeType":"image/svg+xml","bytes":985,"sha256":"ee95ff57b022b53ff13f55beb263a60b849d824c45c609ed976e0810f3961f8b","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/isabella-dam/download/schematic"},{"id":"project-image","title":"Aerial view of the Isabella Dam Safety Modification Project.jpg","kind":"project-image","fileName":"isabella-dam.jpg","mimeType":"image/jpeg","bytes":575748,"sha256":"f66ddb737d1275d09742d361d46183bcf320b45382a1625ec3e4af5f0f9d5750","sourceId":"s3","license":"Public domain","width":1280,"height":960,"credit":"U.S. Army Corps of Engineers, Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg#Licensing","imageDate":"2022-09-13 20:00:00","evidenceFile":"image-provenance/isabella-dam-commons.json","evidenceSha256":"585cadac20100e6a89c699ae881d201bb11fd0a8f347cfe93812aaa5a2d07c09","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/b/bd/Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","downloadUrl":"/cases/isabella-dam/download/project-image","originalSha1":"bb9ba911a669570736c2b7ca7f7f5b5e1079e431","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"isabella-dam-capstone.md","mimeType":"text/markdown","bytes":3526,"sha256":"4abb6ee3c8ffc12bed66ea962c61321ddb882f4d54ec0ee44678422325316d28","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/isabella-dam/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022.","caption":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022. USACE construction photograph of the actual dams and spillway works.","credit":"U.S. Army Corps of Engineers, Sacramento District","sourceUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Aerial_view_of_the_Isabella_Dam_Safety_Modification_Project.jpg#Licensing","width":1280,"height":960,"imageDate":"2022-09-13 20:00:00","imageDownloadAllowed":true},"figureCaption":"Aerial view of the Isabella Dam Safety Modification Project on 14 September 2022. USACE construction photograph of the actual dams and spillway works.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":64,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/isabella-dam-commons.json","evidenceSha256":"585cadac20100e6a89c699ae881d201bb11fd0a8f347cfe93812aaa5a2d07c09","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":580259,"sourceCount":3,"url":"/cases/isabella-dam"}