# Lake Borgne surge barrier — pile-supported flood protection

Case reference year: 2013 | Location: New Orleans, Louisiana, United States

The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a representative barrier-wall foundation and its transition into an earthen levee.

### Inputs to assemble

- Extract the wall, gate and levee interface functions from the owner material.
- Define study water levels, wave actions and soft-soil strength profiles with explicit source limits.

### Deliverables

- Check axial/lateral pile response, group behavior and global stability.
- Design transition details and instrumentation to compare storm response with predictions.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- How can a locally adequate pile group still sit within an unstable soil mass?
- Why do differential movement and seepage deserve special attention at levee transitions?

## Published project information

### Design — partial

Owner and consultant sources explain the built system and geotechnical scope. Published summaries use differing pile counts and stages; no single count is inferred across them.

### Cost information — partial

The operator describes an approximately $1.3 billion whole-barrier project, not a geotechnical-package final account.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — partial

The operator records transfer of operating and maintenance responsibilities following construction in 2013.

## Project image

Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.

Credit: Ray Devlin
Image source: https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg
Image rights: CC BY 2.0 — https://creativecommons.org/licenses/by/2.0

## Sources

- Barrier operations and system description (Flood Protection Authority East; date not stated): https://www.floodauthority.org/the-system/lake-borgne-surge-barrier/
- Geotechnical engineering account (Ardaman & Associates; date not stated): https://ardaman.com/ihnc-lake-borgne-barrier-giww-to-mrgo-st-bernard-parish-louisiana-usace-new-orleans-district/
- IHNC Surge Barrier Construction from Air.jpg — image and reuse license (Wikimedia Commons / Ray Devlin; 2010): https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.