{"id":"lake-borgne-barrier","title":"Lake Borgne surge barrier — pile-supported flood protection","summary":"The barrier combines a long pile-supported wall with navigation gates and levee connections. The geotechnical consultant describes capacity, settlement, global stability and temporary-works analyses in soft coastal deposits.","topics":["deep-foundations","lateral-foundations","coastal-offshore","seepage","monitoring"],"country":"United States","region":"New Orleans, Louisiana","owner":"Flood Protection Authority East / USACE","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Driven piles","Lateral pile response","Global stability","Floodwall transitions"],"documentationLevel":"technical-case","design":{"availability":"partial","summary":"Owner and consultant sources explain the built system and geotechnical scope. Published summaries use differing pile counts and stages; no single count is inferred across them.","sourceIds":["s1","s2"]},"cost":{"availability":"partial","summary":"The operator describes an approximately $1.3 billion whole-barrier project, not a geotechnical-package final account.","sourceIds":["s1","s2"]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"partial","summary":"The operator records transfer of operating and maintenance responsibilities following construction in 2013.","sourceIds":["s1","s2"]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a representative barrier-wall foundation and its transition into an earthen levee.","inputs":["Extract the wall, gate and levee interface functions from the owner material.","Define study water levels, wave actions and soft-soil strength profiles with explicit source limits."],"deliverables":["Check axial/lateral pile response, group behavior and global stability.","Design transition details and instrumentation to compare storm response with predictions.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["How can a locally adequate pile group still sit within an unstable soil mass?","Why do differential movement and seepage deserve special attention at levee transitions?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Barrier operations and system description","url":"https://www.floodauthority.org/the-system/lake-borgne-surge-barrier/","publisher":"Flood Protection Authority East","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Geotechnical engineering account","url":"https://ardaman.com/ihnc-lake-borgne-barrier-giww-to-mrgo-st-bernard-parish-louisiana-usace-new-orleans-district/","publisher":"Ardaman & Associates","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s3","title":"IHNC Surge Barrier Construction from Air.jpg — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","publisher":"Wikimedia Commons / Ray Devlin","year":2010,"access":"public-link","license":"CC BY 2.0","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"lake-borgne-barrier.svg","mimeType":"image/svg+xml","bytes":1199,"sha256":"2e6aeebf9456a19bc9da1a7d3b9c13bec3912b8bc79cc219008f227e2613f027","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/schematic"},{"id":"project-image","title":"IHNC Surge Barrier Construction from Air.jpg","kind":"project-image","fileName":"lake-borgne-barrier.jpg","mimeType":"image/jpeg","bytes":101254,"sha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","sourceId":"s3","license":"CC BY 2.0","width":800,"height":533,"credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","licenseUrl":"https://creativecommons.org/licenses/by/2.0","imageDate":"2010-01-11 16:26:30","evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/4/42/IHNC_Surge_Barrier_Construction_from_Air.jpg","downloadUrl":"/cases/lake-borgne-barrier/download/project-image","originalSha1":"ec096cf2cb2f46b2508af820b50bbfcb78c8a3d3","originalSha256":"ff7799b304b27541e0c09c127bd2718d5607905b5ff14344b2932419ae791efb","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"lake-borgne-barrier-capstone.md","mimeType":"text/markdown","bytes":3192,"sha256":"3d36487e28f0ac12f46bdcec3ecfa9d5a263ed5a4ad8e7455a843d1d326bbdf0","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/lake-borgne-barrier/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans.","caption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","credit":"Ray Devlin","sourceUrl":"https://commons.wikimedia.org/wiki/File:IHNC_Surge_Barrier_Construction_from_Air.jpg","license":"CC BY 2.0","licenseUrl":"https://creativecommons.org/licenses/by/2.0","width":800,"height":533,"imageDate":"2010-01-11 16:26:30","imageDownloadAllowed":true},"figureCaption":"Aerial view of construction at the IHNC–Lake Borgne Surge Barrier in eastern New Orleans. The image shows the actual flood-protection project.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":72,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/lake-borgne-barrier-commons.json","evidenceSha256":"183dc1677df71ad78ff5537da46666412547cd3fbfbfb8f16e710b9608086ea8","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":105645,"sourceCount":3,"url":"/cases/lake-borgne-barrier"}