# Malpasset Dam — abutment wedge failure and uplift

Case reference year: 1959 | Location: Fréjus, France

The arch dam failed after instability developed in its rock foundation. The French dam committee and government accident record describe the role of discontinuity geometry, uplift and stress-dependent drainage.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Evaluate an arch-dam abutment where intersecting discontinuities create a potentially unstable rock wedge.

### Inputs to assemble

- Extract the reported fault, foliation and abutment-force relationships.
- Separate known observations from later interpretations of permeability changes.

### Deliverables

- Calculate wedge stability for several groundwater-pressure distributions.
- Specify investigation and drainage verification that could discriminate between the competing assumptions.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- How can increased compressive stress reduce drainage yet raise destabilizing uplift?
- Why may strong intact rock still provide an inadequate dam abutment?

## Published project information

### Design — partial

The English technical material supports a forensic rock-wedge study. It is not an as-built remediation proposal for the ruined dam.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

Ruins of Malpasset Dam photographed in 2007. The remaining concrete and rock setting belong to the actual 1959 failure site.

Credit: Bonho1962
Image source: https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg
Image rights: Public domain — https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg#Licensing

## Sources

- Government accident review (French Ministry environmental accident database; date not stated): https://www.aria.developpement-durable.gouv.fr/fiche_detaillee/29490_en/?lang=en
- Arch-dam guidance and Malpasset foundation case (French Committee on Dams and Reservoirs; date not stated): https://www.barrages-cfbr.eu/IMG/pdf/gtvoute_vienne2018.pdf
- Barrage Malpasset 2007.jpg — image and reuse license (Wikimedia Commons / Bonho1962; 2007): https://commons.wikimedia.org/wiki/File:Barrage_Malpasset_2007.jpg

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.