# Marmaray crossing — immersed-tunnel foundations in seismic ground

Case reference year: 2013 | Location: Bosphorus, Istanbul, Türkiye

The immersed crossing combined a gravel foundation, under-base grouting and treatment of liquefiable deposits. A project paper explains element connections and the transition to adjacent bored tunnels under severe seismic demands.

## Suggested capstone study

An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.

Develop a foundation and transition-zone concept for an immersed tunnel crossing soft deposits in an earthquake-prone strait.

### Inputs to assemble

- Separate seabed improvement, bedding preparation and under-base contact grouting.
- Identify stiffness contrasts where immersed and bored tunnel sections meet.

### Deliverables

- Check buoyancy, bearing contact and differential settlement under study load cases.
- Prepare a ground-treatment verification and immersion monitoring sequence.
- A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.
- A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points.

### Review questions

- Why may a sand bedding option be unsuitable under the selected seismic demand?
- How could a local bedding void change joint rotation and water-tightness demands?

## Published project information

### Design — partial

The project authors describe the selected foundation and connection systems. Geotechnical parameters and element-specific loads must be extracted from the full paper before numerical design.

### Cost information — not-found

A project-specific estimate, bid schedule or final account was not found in the reviewed sources.

### Schedule information — not-found

A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.

### Completion and records — not-found

Complete as-built drawings and acceptance records were not found in the reviewed sources.

## Project image

Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.

Credit: MEOGLOBAL Muhammed Enes Okullu
Image source: https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG
Image rights: Public domain — https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing

## Sources

- Marmaray Bosphorus Crossing project paper (Project engineering authors / Tunnelling and Underground Space Technology; date not stated): https://www.sciencedirect.com/science/article/pii/S088677982100479X
- Marmaraytunnel3.JPG — image and reuse license (Wikimedia Commons / MEOGLOBAL Muhammed Enes Okullu; 2012): https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG

Sources checked: 2026-11-22. This brief is an original teaching aid. Source rights remain with their respective holders.