{"id":"marmaray-tunnel","title":"Marmaray crossing — immersed-tunnel foundations in seismic ground","summary":"The immersed crossing combined a gravel foundation, under-base grouting and treatment of liquefiable deposits. A project paper explains element connections and the transition to adjacent bored tunnels under severe seismic demands.","topics":["tunnels","seismic","ground-improvement","coastal-offshore"],"country":"Türkiye","region":"Bosphorus, Istanbul","owner":"Republic of Türkiye transport authorities","year":2013,"yearLabel":"Case reference year","projectType":"Design, construction and performance","methods":["Immersed tube","Compaction grouting","Under-base grouting","Seismic joints"],"documentationLevel":"technical-paper","design":{"availability":"partial","summary":"The project authors describe the selected foundation and connection systems. Geotechnical parameters and element-specific loads must be extracted from the full paper before numerical design.","sourceIds":["s1"]},"cost":{"availability":"not-found","summary":"A project-specific estimate, bid schedule or final account was not found in the reviewed sources.","sourceIds":[]},"schedule":{"availability":"not-found","summary":"A dated project programme was not found in the reviewed sources; develop a study schedule from the documented method.","sourceIds":[]},"records":{"availability":"not-found","summary":"Complete as-built drawings and acceptance records were not found in the reviewed sources.","sourceIds":[]},"capstone":{"label":"Suggested capstone study","scope":"An original teaching brief based on the documented project. Study assumptions and student designs are separate from the built project.","brief":"Develop a foundation and transition-zone concept for an immersed tunnel crossing soft deposits in an earthquake-prone strait.","inputs":["Separate seabed improvement, bedding preparation and under-base contact grouting.","Identify stiffness contrasts where immersed and bored tunnel sections meet."],"deliverables":["Check buoyancy, bearing contact and differential settlement under study load cases.","Prepare a ground-treatment verification and immersion monitoring sequence.","A quantity takeoff and priced estimate with dated rate sources; separate historical project costs from the study estimate.","A construction sequence, programme and risk register tied to investigation, access, monitoring and hold points."],"questions":["Why may a sand bedding option be unsuitable under the selected seismic demand?","How could a local bedding void change joint rotation and water-tightness demands?"],"output":"Design report, calculation workbook, concept drawings, quantity schedule and construction programme."},"sources":[{"id":"s1","title":"Marmaray Bosphorus Crossing project paper","url":"https://www.sciencedirect.com/science/article/pii/S088677982100479X","publisher":"Project engineering authors / Tunnelling and Underground Space Technology","year":null,"access":"public-link","license":"Publisher-hosted; redistribution permission not established","notes":"","checked":"2026-11-22"},{"id":"s2","title":"Marmaraytunnel3.JPG — image and reuse license","url":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","publisher":"Wikimedia Commons / MEOGLOBAL Muhammed Enes Okullu","year":2012,"access":"public-link","license":"Public domain","notes":"Project image source. Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","checked":"2026-11-22","localAssetIds":["project-image"]}],"assets":[{"id":"schematic","title":"Conceptual study schematic","kind":"figure","fileName":"marmaray-tunnel.svg","mimeType":"image/svg+xml","bytes":1125,"sha256":"6e6bc7d568720504ae2ac68b2111e026e4bb56fc1979d2a2854bd49ec8c3b1db","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marmaray-tunnel/download/schematic"},{"id":"project-image","title":"Marmaraytunnel3.JPG","kind":"project-image","fileName":"marmaray-tunnel.jpg","mimeType":"image/jpeg","bytes":276229,"sha256":"f3e756697f35224ea5239acf7a0a600b46fd3ea202d70966e50b0a832af8112e","sourceId":"s2","license":"Public domain","width":1280,"height":853,"credit":"MEOGLOBAL Muhammed Enes Okullu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","licenseUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing","imageDate":"2012-05-03","evidenceFile":"image-provenance/marmaray-tunnel-commons.json","evidenceSha256":"992a4c95cfe9d3bca4c2fd091ac9dbb0a06c833a5565a04236133b0da1ec4683","transformations":"Unmodified publisher-generated display-size file; the original source URL and publisher metadata are retained. No AI-generated replacement or content alteration.","originalUrl":"https://upload.wikimedia.org/wikipedia/commons/a/ab/Marmaraytunnel3.JPG","downloadUrl":"/cases/marmaray-tunnel/download/project-image","originalSha1":"bfd7bab91a5facb7c191df4e6e033099c5f5a320","imageDownloadAllowed":true,"rightsBasis":"See the per-image provenance record and linked license; source hosting alone is not the rights basis."},{"id":"capstone-brief","title":"Capstone brief (Markdown)","kind":"brief","fileName":"marmaray-tunnel-capstone.md","mimeType":"text/markdown","bytes":3023,"sha256":"1220cb630342933c1c5a8fc2369b3e4f60800acbf176234665b3ea1f50a8780d","sourceId":null,"license":"Original Foundation Design teaching material","downloadUrl":"/cases/marmaray-tunnel/download/capstone-brief"}],"figure":{"assetId":"project-image","kind":"photograph","alt":"Interior of the Marmaray tunnel project in 2012.","caption":"Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.","credit":"MEOGLOBAL Muhammed Enes Okullu","sourceUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG","license":"Public domain","licenseUrl":"https://commons.wikimedia.org/wiki/File:Marmaraytunnel3.JPG#Licensing","width":1280,"height":853,"imageDate":"2012-05-03","imageDownloadAllowed":true},"figureCaption":"Interior of the Marmaray tunnel project in 2012. The actual tunnel works are shown; bedding and seabed treatment remain below the structure.","qualityNotes":[],"checked":"2026-11-22","addedIn":"r13","curatedOrder":76,"referenceValues":[],"teachingFigureCaption":"Conceptual study schematic; not an as-built project drawing.","imageEvidence":{"status":"acquired","identityVerified":true,"evidenceFile":"image-provenance/marmaray-tunnel-commons.json","evidenceSha256":"992a4c95cfe9d3bca4c2fd091ac9dbb0a06c833a5565a04236133b0da1ec4683","visualReview":"Viewed the complete publisher photograph in the final contact sheets or individually and compared it with the source identity, date, and caption. The caption distinguishes project context from the particular underground treatment or construction stage.","checked":"2026-11-22"},"localReportCount":0,"downloadBytes":280377,"sourceCount":2,"url":"/cases/marmaray-tunnel"}